GlobalID stringlengths 36 36 | InfraYear int64 2.02k 2.03k | Region stringclasses 16
values | Province stringclasses 98
values | Municipality stringlengths 11 52 ⌀ | ImplementingOffice stringclasses 203
values | ProjectID stringlengths 11 11 | ProjectDescription stringlengths 37 314 | ProjectComponentID stringlengths 15 15 | ProjectComponentDescription stringlengths 74 359 | Program float64 | TypeofWork stringclasses 18
values | infra_type stringclasses 1
value | Longitude float64 117 127 | Latitude float64 5.77 20.5 | ContractID stringlengths 8 8 | ABC float64 1.16M 311M | ContractCost float64 1.15M 290M | CompletionDateOriginal float64 1,539B 1,770B ⌀ | CompletionYear int64 2.02k 2.03k | Contractor stringlengths 10 199 | ObjectId int64 1 9.86k | CreationDate int64 1,754B 1,754B | Creator stringclasses 1
value | EditDate int64 1,754B 1,754B | Editor stringclasses 1
value | FundingYear int64 2.02k 2.03k | LegislativeDistrict stringclasses 252
values | DistrictEngineeringOffice stringclasses 199
values | ABC_String stringlengths 7 72 | ContractCost_String stringlengths 7 72 | CompletionDateActual stringdate 2022-07-01 00:00:00 2025-05-30 00:00:00 | StartDate stringclasses 739
values | type stringclasses 1
value | slug stringlengths 44 273 | _geo stringclasses 1
value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2e6599a8-6438-48d6-87ce-1fe1e99bcd4f | 2,023 | Region I | ILOCOS NORTE | BACARRA (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00727043LZ | Construction of Flood Control Structure along Bislak River, Barangay Cabaruan, Bacarra, Ilocos Norte | P00727043LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bislak River, Barangay Cabaruan, Bacarra, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.593277 | 18.252722 | 23AA0148 | 29,399,735.53 | 29,399,734 | 1,695,859,200,000 | 2,023 | BJMJB CONSTRUCTION & SUPPLY | 1,101 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 29399735.53 | 29399734 | 2023-08-15 | 03/29/2023 | flood_control | construction-of-flood-control-structure-along-bislak-river-barangay-cabaruan-bacarra-ilocos-norte-23aa0148 | [object Object] |
80010302-23a9-4b2e-91ad-1a1d188bd889 | 2,024 | Region III | TARLAC | CITY OF TARLAC (CAPITAL) (TARLAC) | Tarlac District Engineering Office | P00825059LZ | Construction of Flood Control along Tarlac River Control Right Dike, Salapungan - Sta. Cruz Section (Segment B), Tarlac City, Tarlac | P00825059LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along Tarlac River Control Right Dike, Salapungan - Sta. Cruz Section (Segment B), Tarlac City, Tarlac | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.593417 | 15.530111 | 24CJ0278 | 96,500,000 | 99,000,000 | 1,729,900,800,000 | 2,024 | L.R. TIQUI BUILDERS, INC. | 1,102 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 96500000 | 99000000 | 2024-09-19 | 02/27/2024 | flood_control | construction-of-flood-control-along-tarlac-river-control-right-dike-salapungan---sta-cruz-section-segment-b-tarlac-city-tarlac-24cj0278 | [object Object] |
dc264d77-f060-441b-b4bd-723c5c2b0ac8 | 2,023 | Region I | ILOCOS NORTE | LAOAG CITY (CAPITAL) (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00742252LZ | Construction / Rehabilitation of Drainage Structure within the vicinity ofIlocos Norte College of Arts and Trades (INCAT), Brgy. 3 Nstra. Sra. Del Rosario, Laoag City, Ilocos Norte | P00742252LZ-CW1 | Construction of Drainage Structure - Construction / Rehabilitation of Drainage Structure within the vicinity ofIlocos Norte College of Arts and Trades (INCAT), Brgy. 3 Nstra. Sra. Del Rosario, Laoag City, Ilocos Norte | null | Construction of Drainage Structure | Flood Control Structures | 120.593518 | 18.203994 | 23AA0392 | 4,949,760.83 | 4,949,233.07 | 1,691,798,400,000 | 2,023 | ZEDIK BUILDERS | 1,103 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 4949760.83 | 4949233.07 | 2023-08-13 | 04/20/2023 | flood_control | construction-rehabilitation-of-drainage-structure-within-the-vicinity-ofilocos-norte-college-of-arts-and-trades-incat-brgy-3-nstra-sra-del-rosario-laoag-city-ilocos-norte-23aa0392 | [object Object] |
722871f4-4b79-4696-9c7e-53e0a6f8703f | 2,021 | Region III | PAMPANGA | null | Pampanga 2nd District Engineering Office | P00526038LZ | Construction of Slope Protection, Sta. 00+000 - Sta. 0+460 along GPDC, San Jose Gumi, Lubao, Pampanga | P00526038LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection, Sta. 00+000 - Sta. 0+460 along GPDC, San Jose Gumi, Lubao, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.593531 | 14.873542 | 21CH0040 | 48,999,870.69 | 48,244,588.77 | 1,662,163,200,000 | 2,022 | OMICRON CONSTRUCTION | 1,104 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 48999870.69 | 48244588.77 | 2022-08-24 | 03/09/2022 | flood_control | construction-of-slope-protection-sta-00000---sta-0460-along-gpdc-san-jose-gumi-lubao-pampanga-21ch0040 | [object Object] |
2c2eb7b7-077d-4f6b-a8e7-03a3825601e2 | 2,024 | Region III | TARLAC | CITY OF TARLAC (CAPITAL) (TARLAC) | Tarlac District Engineering Office | P00825058LZ | Construction of Flood Control along Tarlac River Control Right Dike, Salapungan - Sta. Cruz Section (Segment A), Tarlac City, Tarlac | P00825058LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along Tarlac River Control Right Dike, Salapungan - Sta. Cruz Section (Segment A), Tarlac City, Tarlac | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.59395 | 15.527233 | 24CJ0276 | 96,500,000 | 99,000,000 | 1,729,900,800,000 | 2,024 | L.R. TIQUI BUILDERS, INC. | 1,105 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 96500000 | 99000000 | 2024-09-19 | 02/27/2024 | flood_control | construction-of-flood-control-along-tarlac-river-control-right-dike-salapungan---sta-cruz-section-segment-a-tarlac-city-tarlac-24cj0276 | [object Object] |
b312590f-8ae3-44b2-ab91-dce404ef9d1e | 2,024 | Region I | PANGASINAN | BINALONAN (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00821507LZ | Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 7) | P00821507LZ-CW1 | Construction of Revetment - Construction of Flood Control Structure along Tagamusing and Allied River, Binalonan, Pangasinan (Package 7) | null | Construction of Revetment | Flood Control Structures | 120.594108 | 16.067247 | 24AI0020 | 49,000,000 | 48,883,150.79 | 1,725,667,200,000 | 2,024 | W.J.P. CONSTRUCTION AND SUPPLY | 1,106 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FIFTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 49000000 | 48883150.79 | 2024-05-31 | 02/21/2024 | flood_control | construction-of-flood-control-structure-along-tagamusing-and-allied-river-binalonan-pangasinan-package-7-24ai0020 | [object Object] |
a41e69f3-bc53-4b3e-8e46-69b29dc3c1ad | 2,023 | Region III | PAMPANGA | ANGELES CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00740635LZ | Construction of Drainage in Brgy. Sto. Cristo, Angeles City, Pampanga | P00740635LZ-CW1 | Construction of Drainage Structure - Construction of Drainage in Brgy. Sto. Cristo, Angeles City, Pampanga | null | Construction of Drainage Structure | Flood Control Structures | 120.594279 | 15.140447 | 23CI0067 | 4,897,413.29 | 4,881,475.05 | 1,689,811,200,000 | 2,023 | NES-SAN BUILDERS | 1,107 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 4897413.29 | 4881475.05 | 2023-07-21 | 03/24/2023 | flood_control | construction-of-drainage-in-brgy-sto-cristo-angeles-city-pampanga-23ci0067 | [object Object] |
54d7d863-2ffa-4a67-b0cc-04c4b50272bb | 2,023 | Region III | PAMPANGA | ANGELES CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00740621LZ | Construction of Drainage with Outfall at Brgy. Lourdes Sur East, Angeles City, Pampanga | P00740621LZ-CW1 | Construction of Drainage Structure - Construction of Drainage with Outfall at Brgy. Lourdes Sur East, Angeles City, Pampanga | null | Construction of Drainage Structure | Flood Control Structures | 120.594279 | 15.140447 | 23CI0143 | 4,892,793.3 | 4,889,105.41 | 1,689,724,800,000 | 2,023 | QUANTUMWAYS BUILDERS ROAD CONSTRUCTION | 1,108 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 4892793.3 | 4889105.41 | 2023-07-20 | 05/22/2023 | flood_control | construction-of-drainage-with-outfall-at-brgy-lourdes-sur-east-angeles-city-pampanga-23ci0143 | [object Object] |
1d1969d0-a5ab-4b32-90d8-e71ddfddab4b | 2,022 | Region III | PAMPANGA | ANGELES CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00631253LZ | Construction of Slope Protection with steel Sheet Pile Foundation along Abacan River, Brgy. Balibago, Angeles City, Pampanga | P00631253LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection with steel Sheet Pile Foundation along Abacan River, Brgy. Balibago, Angeles City, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.594492 | 15.157027 | 22CI0125 | 24,497,833.03 | 24,472,169.33 | 1,667,088,000,000 | 2,022 | THREE-IN-ONE CONSTRUCTION & TRADING | 1,109 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 24497833.03 | 24472169.33 | 2022-10-31 | 03/24/2022 | flood_control | construction-of-slope-protection-with-steel-sheet-pile-foundation-along-abacan-river-brgy-balibago-angeles-city-pampanga-22ci0125 | [object Object] |
f42f34ea-265b-4f70-b9cb-4f98b63d5e7e | 2,022 | Region III | TARLAC | CITY OF TARLAC (CAPITAL) (TARLAC) | Tarlac District Engineering Office | P00630939LZ | Construction of Tarlac City Urban Drainage System (Phase 3), Tarlac City, Tarlac | P00630939LZ-CW1 | Construction of Drainage Structure - Construction of Tarlac City Urban Drainage System (Phase 3), Tarlac City, Tarlac | null | Construction of Drainage Structure | Flood Control Structures | 120.595042 | 15.479256 | 22CJ0051 | 96,500,000 | 95,052,418.57 | 1,668,124,800,000 | 2,022 | NORTHERN BUILDERS | 1,110 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 96500000 | 95052418.57 | 2022-11-12 | 03/10/2022 | flood_control | construction-of-tarlac-city-urban-drainage-system-phase-3-tarlac-city-tarlac-22cj0051 | [object Object] |
6adfb248-61c9-4117-bf91-5062e7c6c943 | 2,022 | Region III | TARLAC | CITY OF TARLAC (CAPITAL) (TARLAC) | Tarlac District Engineering Office | P00640529LZ | Construction of Tarlac City Urban Drainage System, Package 11, Tarlac City, Tarlac | P00640529LZ-CW1 | Construction of Drainage Structure - Construction of Tarlac City Urban Drainage System, Package 11, Tarlac City, Tarlac | null | Construction of Drainage Structure | Flood Control Structures | 120.595283 | 15.480872 | 22CJ0222 | 49,500,000 | 48,515,833 | 1,666,828,800,000 | 2,022 | NORTHERN BUILDERS | 1,111 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 49500000 | 48515833 | 2022-10-28 | 03/30/2022 | flood_control | construction-of-tarlac-city-urban-drainage-system-package-11-tarlac-city-tarlac-22cj0222 | [object Object] |
ceac8e35-d3bc-4409-97cf-80344e48f0c8 | 2,023 | Region I | ILOCOS NORTE | PAOAY (ILOCOS NORTE) | Region I | P00726843LZ | Construction of Quiaoit River Diversion Canal (Cut-Off Channel), Paoay, Ilocos Norte | P00726843LZ-CW1 | Construction of Drainage Structure - Construction of Quiaoit River Diversion Canal (Cut-Off Channel), Paoay, Ilocos Norte | null | Construction of Drainage Structure | Flood Control Structures | 120.5309 | 18.0567 | 23A00249 | 53,075,000 | 53,074,990.83 | 1,709,683,200,000 | 2,024 | JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT | 1,112 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 53075000 | 53074990.83 | 2024-03-07 | 03/22/2023 | flood_control | construction-of-quiaoit-river-diversion-canal-cut-off-channel-paoay-ilocos-norte-23a00249 | [object Object] |
aa0bc0e2-5520-4033-9651-540ee3317f96 | 2,024 | Region I | ILOCOS NORTE | SARRAT (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00824638LZ | Construction of Flood Mitigating Structure along Padsan River connecting Barangay 6 Tonoton, Piddig, Ilocos Norte and Barangay San Marcos, Sitio Cabuloan, Sarrat, Ilocos Norte | P00824638LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigating Structure along Padsan River connecting Barangay 6 Tonoton, Piddig, Ilocos Norte and Barangay San Marcos, Sitio Cabuloan, Sarrat, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.672181 | 18.148731 | 24AA0105 | 48,999,745.89 | 48,999,653.83 | 1,727,308,800,000 | 2,024 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION | 1,113 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 48999745.89 | 48999653.83 | 2024-09-27 | 03/01/2024 | flood_control | construction-of-flood-mitigating-structure-along-padsan-river-connecting-barangay-6-tonoton-piddig-ilocos-norte-and-barangay-san-marcos-sitio-cabuloan-sarrat-ilocos-norte-24aa0105 | [object Object] |
2e6f80b0-8bf5-440b-bcdd-e98ff47eba33 | 2,022 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00620513LZ | Construction of Flood Control Structure at Talisay River, Brgy. Nagwaling (Station 9+412 - Station 9+741) Pilar, Bataan | P00620513LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Talisay River, Brgy. Nagwaling (Station 9+412 - Station 9+741) Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.531059 | 14.639486 | 22CB0056 | 49,000,000 | 49,000,000 | 1,670,976,000,000 | 2,022 | E.R. VENZON CONSTRUCTION / JVN CONSTRUCTION AND TRADING | 1,114 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 49000000 | 49000000 | 2022-12-22 | 04/04/2022 | flood_control | construction-of-flood-control-structure-at-talisay-river-brgy-nagwaling-station-9412---station-9741-pilar-bataan-22cb0056 | [object Object] |
293a6811-ceb1-4e2b-a05c-9b62aa6a62ec | 2,024 | Region I | ILOCOS SUR | QUIRINO (ANGKAKI) (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00843216LZ | Construction of River Wall at Dagman along Tikeng River, Poblacion, Quirino, Ilocos Sur | P00843216LZ-CW1 | Construction of Flood Mitigation Structure - Construction of River Wall at Dagman along Tikeng River, Poblacion, Quirino, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.67303 | 17.11248 | 24AD0077 | 5,880,000 | 5,688,635.44 | 1,720,051,200,000 | 2,024 | NABANEW CONSTRUCTION AND SUPPLY | 1,115 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 5880000 | 5688635.44 | 2024-10-07 | 04/30/2024 | flood_control | construction-of-river-wall-at-dagman-along-tikeng-river-poblacion-quirino-ilocos-sur-24ad0077 | [object Object] |
690fea90-e119-4705-9dfd-6e3255a37999 | 2,021 | Region I | ILOCOS SUR | null | Ilocos Sur 2nd District Engineering Office | P00525873LZ | Construction of Sugpon Flood Control, Sugpon, Ilocos Sur | P00525873LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Sugpon Flood Control, Sugpon, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.53108 | 16.825868 | 21AD0066 | 9,800,000 | 9,799,998.61 | 1,645,833,600,000 | 2,022 | A.I.P. CONSTRUCTION | 1,116 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 9800000 | 9799998.61 | 2022-08-31 | 10/11/2021 | flood_control | construction-of-sugpon-flood-control-sugpon-ilocos-sur-21ad0066 | [object Object] |
26c3b309-d20f-453f-a11e-5389fd03bad4 | 2,023 | Region I | ILOCOS NORTE | BANNA (ESPIRITU) (ILOCOS NORTE) | Region I | P00725581LZ | Construction of Flood Control/River Control Structure Along Bongo River, Brgy. Catagtaguen, Banna, Ilocos Norte | P00725581LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control/River Control Structure Along Bongo River, Brgy. Catagtaguen, Banna, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.67305 | 17.95888 | 23A00064 | 48,250,000 | 48,249,410.43 | 1,702,598,400,000 | 2,023 | JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT | 1,117 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48250000 | 48249410.43 | 2023-12-16 | 02/23/2023 | flood_control | construction-of-flood-controlriver-control-structure-along-bongo-river-brgy-catagtaguen-banna-ilocos-norte-23a00064 | [object Object] |
cbb3625b-fae7-47e4-b27f-259b4047d85e | 2,024 | Region IV-A | BATANGAS | LIAN (BATANGAS) | Batangas 1st District Engineering Office | P00820867LZ | Construction of Palico RIS Water Management Flood Control Project of Palico River, Lian, Batangas | P00820867LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Palico RIS Water Management Flood Control Project of Palico River, Lian, Batangas | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.673108 | 14.049497 | 24DB0067 | 19,600,000 | 19,600,000 | 1,722,729,600,000 | 2,024 | AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. | 1,118 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATANGAS (FIRST LEGISLATIVE DISTRICT) | Batangas 1st District Engineering Office | 19600000 | 19600000 | 2024-08-05 | 02/08/2024 | flood_control | construction-of-palico-ris-water-management-flood-control-project-of-palico-river-lian-batangas-24db0067 | [object Object] |
f35f6d9a-c514-48ae-a64c-66019e2cf167 | 2,024 | Region I | ILOCOS NORTE | BANNA (ESPIRITU) (ILOCOS NORTE) | Region I | P00820134LZ | Construction of Flood Mitigation Structure and Drainage System along Cadaanan River, Upstream and Downstream of Cadaanan Bridge, Barangay Balioeg, Banna, Ilocos Norte | P00820134LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure and Drainage System along Cadaanan River, Upstream and Downstream of Cadaanan Bridge, Barangay Balioeg, Banna, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.674077 | 17.952852 | 24A00233 | 72,375,000 | 72,374,725.65 | 1,725,580,800,000 | 2,024 | JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT | 1,119 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 72375000 | 72374725.65 | 2024-09-07 | 02/26/2024 | flood_control | construction-of-flood-mitigation-structure-and-drainage-system-along-cadaanan-river-upstream-and-downstream-of-cadaanan-bridge-barangay-balioeg-banna-ilocos-norte-24a00233 | [object Object] |
02c000fd-0421-461a-a2ba-000cbabee5cd | 2,024 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00821291LZ | Rehabilitation of Dike along O'Donnell River, (Downstream of Palublub Bridge, Left Bank), Phase 3, Sta. 0 + 991.76 to Sta. 1 + 489.18, Capas, Tarlac | P00821291LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along O'Donnell River, (Downstream of Palublub Bridge, Left Bank), Phase 3, Sta. 0 + 991.76 to Sta. 1 + 489.18, Capas, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.531186 | 15.409806 | 24CK0035 | 96,498,191.94 | 96,492,882.96 | 1,729,728,000,000 | 2,024 | ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. | 1,120 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 96498191.94 | 96492882.96 | 2024-10-25 | 02/20/2024 | flood_control | rehabilitation-of-dike-along-odonnell-river-downstream-of-palublub-bridge-left-bank-phase-3-sta-0-99176-to-sta-1-48918-capas-tarlac-24ck0035 | [object Object] |
1f0abeb4-b858-435d-811d-88a783509eda | 2,022 | Region III | PAMPANGA | ARAYAT (PAMPANGA) | Pampanga 1st District Engineering Office | P00632838LZ | Construction of Slope Protection, Barangay Telapayong, Arayat, Pampanga | P00632838LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection, Barangay Telapayong, Arayat, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.674229 | 15.188842 | 22CG0094 | 4,950,000 | 4,687,517 | 1,662,422,400,000 | 2,022 | N.T. TULABUT CONSTRUCTION AND SUPPLY | 1,121 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (THIRD LEGISLATIVE DISTRICT) | Pampanga 1st District Engineering Office | 4950000 | 4687517 | 2022-09-07 | 06/10/2022 | flood_control | construction-of-slope-protection-barangay-telapayong-arayat-pampanga-22cg0094 | [object Object] |
ab940af1-1cc1-4ae2-af8c-3c27dd0a8d96 | 2,024 | Region I | ILOCOS NORTE | SARRAT (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00820688LZ | Construction of Flood Control Structure along Padsan River, Barangay 21 San Marcos, Sarrat, Ilocos Norte (Phase 2) | P00820688LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Padsan River, Barangay 21 San Marcos, Sarrat, Ilocos Norte (Phase 2) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.674277 | 18.148655 | 24AA0090 | 48,999,903.35 | 48,999,571.26 | 1,727,049,600,000 | 2,024 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION | 1,122 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 48999903.35 | 48999571.26 | 2024-09-24 | 02/27/2024 | flood_control | construction-of-flood-control-structure-along-padsan-river-barangay-21-san-marcos-sarrat-ilocos-norte-phase-2-24aa0090 | [object Object] |
852adab9-4a07-47ee-b05a-aa764d2cc3ba | 2,023 | Region I | PANGASINAN | BALUNGAO (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00742282LZ | Construction of Flood Control Structure located at Barangay Capulaan, Balungao, Pangasinan | P00742282LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure located at Barangay Capulaan, Balungao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.675044 | 15.908449 | 23AI0096 | 9,800,000 | 9,671,787.53 | 1,687,824,000,000 | 2,023 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 1,123 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (SIXTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 9800000 | 9671787.53 | 2023-04-27 | 03/31/2023 | flood_control | construction-of-flood-control-structure-located-at-barangay-capulaan-balungao-pangasinan-23ai0096 | [object Object] |
531404c7-02ce-4718-8d72-8ba73b42cadc | 2,023 | Region I | ILOCOS NORTE | BANNA (ESPIRITU) (ILOCOS NORTE) | Region I | P00725582LZ | Construction of Flood Control/River Control Structure Along Bongo River, Brgy. Balioeg, Banna, Ilocos Norte | P00725582LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control/River Control Structure Along Bongo River, Brgy. Balioeg, Banna, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.675218 | 17.958116 | 23A00065 | 48,250,000 | 48,249,997.02 | 1,701,302,400,000 | 2,023 | JLP CONSTRUCTION & SUPPLY (FORMERLY: JLP CONSTRUCT | 1,124 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48250000 | 48249997.02 | 2023-12-01 | 02/23/2023 | flood_control | construction-of-flood-controlriver-control-structure-along-bongo-river-brgy-balioeg-banna-ilocos-norte-23a00065 | [object Object] |
d314d641-e018-4389-a0a8-0bdfe13e1fb0 | 2,024 | Region III | PAMPANGA | CITY OF SAN FERNANDO (CAPITAL) (PAMPANGA) | Pampanga 1st District Engineering Office | P00844759LZ | Construction of Slope Protection at Sapang Balen (Del Carmen-Bulaon Portion), City of San Fernando, Pampanga | P00844759LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Sapang Balen (Del Carmen-Bulaon Portion), City of San Fernando, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.675466 | 15.069523 | 24CG0091 | 49,000,000 | 46,549,904.52 | 1,727,395,200,000 | 2,024 | EDDMARI CONSTRUCTION & TRADING | 1,125 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PAMPANGA (THIRD LEGISLATIVE DISTRICT) | Pampanga 1st District Engineering Office | 49000000 | 46549904.52 | 2024-08-06 | 03/15/2024 | flood_control | construction-of-slope-protection-at-sapang-balen-del-carmen-bulaon-portion-city-of-san-fernando-pampanga-24cg0091 | [object Object] |
21a864fe-864e-4977-9aa2-93a244a502db | 2,024 | Region III | PAMPANGA | ARAYAT (PAMPANGA) | Pampanga 1st District Engineering Office | P00839589LZ | Construction of Slope Protection Structure, Telapayong, Arayat, Pampanga | P00839589LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Structure, Telapayong, Arayat, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.675546 | 15.187046 | 24CG0008 | 4,950,000 | 4,677,654.23 | 1,714,262,400,000 | 2,024 | DAUNGAN CONSTRUCTION DEV'T. & GEN. SUPPLIES CO., INC. | 1,126 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PAMPANGA (THIRD LEGISLATIVE DISTRICT) | Pampanga 1st District Engineering Office | 4950000 | 4677654.23 | 2024-04-29 | 02/07/2024 | flood_control | construction-of-slope-protection-structure-telapayong-arayat-pampanga-24cg0008 | [object Object] |
00c978d4-9082-4d27-a0d9-0650b5e24e80 | 2,022 | Region I | ILOCOS NORTE | BANNA (ESPIRITU) (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00620122LZ | Construction of Dike Extension along Bongo River (Right Bank), Brgy. Tabtabagan, Banna, Ilocos Norte | P00620122LZ-CW1 | Construction of Dike - Construction of Dike Extension along Bongo River (Right Bank), Brgy. Tabtabagan, Banna, Ilocos Norte | null | Construction of Dike | Flood Control Structures | 120.675991 | 17.998178 | 22A00181 | 55,928,505 | 55,928,505 | 1,671,494,400,000 | 2,022 | VIKING CONSTRUCTION & SUPPLIES / BJMJB CONSTRUCTION & SUPPLY | 1,127 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 55928505 | 55928505 | 2022-11-30 | 03/25/2022 | flood_control | construction-of-dike-extension-along-bongo-river-right-bank-brgy-tabtabagan-banna-ilocos-norte-22a00181 | [object Object] |
4a2451da-1cf4-42fe-8555-9660be449f9f | 2,022 | Region III | PAMPANGA | BACOLOR (PAMPANGA) | Pampanga 1st District Engineering Office | P00631242LZ | Rehabilitation of Damaged Slope Protection of Sapang Cabalantian Creek, Cabalantian, Bacolor, Pampanga | P00631242LZ-CW1 | Rehabilitation / Major Repair of Slope Protection Structure - Rehabilitation of Damaged Slope Protection of Sapang Cabalantian Creek, Cabalantian, Bacolor, Pampanga | null | Rehabilitation / Major Repair of Slope Protection Structure | Flood Control Structures | 120.676045 | 15.013574 | 22CG0050 | 19,600,000 | 18,561,193.12 | 1,658,361,600,000 | 2,022 | R.S.C. CONSTRUCTION SERVICES | 1,128 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (THIRD LEGISLATIVE DISTRICT) | Pampanga 1st District Engineering Office | 19600000 | 18561193.12 | 2022-07-31 | 02/23/2022 | flood_control | rehabilitation-of-damaged-slope-protection-of-sapang-cabalantian-creek-cabalantian-bacolor-pampanga-22cg0050 | [object Object] |
f7a8d68c-fa95-420d-b090-2231c3721042 | 2,022 | Region III | PAMPANGA | PORAC (PAMPANGA) | Pampanga 2nd District Engineering Office | P00637783LZ | Construction of Slope Protection along Porac River, Pio Section, Porac, Pampanga | P00637783LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Porac River, Pio Section, Porac, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.531352 | 15.057364 | 22CH0069 | 19,798,253.91 | 19,769,166.53 | 1,668,384,000,000 | 2,022 | R.D. SADSAD CONSTRUCTION & TRADING | 1,129 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 19798253.91 | 19769166.53 | 2022-11-15 | 04/13/2022 | flood_control | construction-of-slope-protection-along-porac-river-pio-section-porac-pampanga-22ch0069 | [object Object] |
7d1f270b-e898-4ed3-a680-fd30cd8c4e6a | 2,022 | Region III | PAMPANGA | PORAC (PAMPANGA) | Region III | P00630938LZ | Construction of Slope Protection Structure along Porac River, Brgy. Pio, Porac, Pampanga | P00630938LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection Structure along Porac River, Brgy. Pio, Porac, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.531356 | 15.057236 | 22C00028 | 241,249,381.9 | 241,250,000 | 1,677,542,400,000 | 2,023 | NORTHERN BUILDERS | 1,130 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 241249381.9 | 241250000 | 2023-03-01 | 03/07/2022 | flood_control | construction-of-slope-protection-structure-along-porac-river-brgy-pio-porac-pampanga-22c00028 | [object Object] |
67976acc-0917-4994-ae0a-5d1b95d1f5eb | 2,024 | Region III | BATAAN | ORANI (BATAAN) | Bataan 1st District Engineering Office | P00824693LZ | Construction of Flood Mitigation Structure along Orani River, Orani, Bataan | P00824693LZ-CW1 | Construction of Revetment - Construction of Flood Mitigation Structure along Orani River, Orani, Bataan | null | Construction of Revetment | Flood Control Structures | 120.53146 | 14.79185 | 24CA0065 | 48,999,999.89 | 48,999,998.54 | 1,732,320,000,000 | 2,025 | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | 1,131 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999999.89 | 48999998.54 | 2025-05-28 | 05/20/2024 | flood_control | construction-of-flood-mitigation-structure-along-orani-river-orani-bataan-24ca0065 | [object Object] |
069cd248-097b-45be-9370-93725ca8d48a | 2,022 | Region III | BATAAN | ORANI (BATAAN) | Bataan 1st District Engineering Office | P00632803LZ | Construction of Drainage Canal along Gov. Pascual to River, Orani, Bataan | P00632803LZ-CW1 | Construction of Drainage Structure - Construction of Drainage Canal along Gov. Pascual to River, Orani, Bataan | null | Construction of Drainage Structure | Flood Control Structures | 120.53194 | 14.80333 | 22CA0057 | 14,849,997.48 | 14,849,989.69 | 1,674,950,400,000 | 2,023 | AS MACHA CONSTRUCTION AND TRADING | 1,132 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 14849997.48 | 14849989.69 | 2023-01-28 | 04/04/2022 | flood_control | construction-of-drainage-canal-along-gov-pascual-to-river-orani-bataan-22ca0057 | [object Object] |
ce52acb6-fcc9-4abc-99dd-2ab1aaeb2648 | 2,022 | Region I | PANGASINAN | BALUNGAO (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00620970LZ | Construction of Flood Control Structure along Banila River, Brgy. Capulaan, Balungao, Pangasinan | P00620970LZ-CW1 | Construction of Dike - Construction of Flood Control Structure along Banila River, Brgy. Capulaan, Balungao, Pangasinan | null | Construction of Dike | Flood Control Structures | 120.6761 | 15.9092 | 22AI0050 | 29,400,000 | 29,345,730.44 | 1,662,422,400,000 | 2,023 | RS RODRIGUEZ CONSTRUCTION & SUPPLIES | 1,133 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (SIXTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 29400000 | 29345730.44 | 2023-02-25 | 03/14/2022 | flood_control | construction-of-flood-control-structure-along-banila-river-brgy-capulaan-balungao-pangasinan-22ai0050 | [object Object] |
df7b3755-65a5-4c1e-b78e-3286ce2aa6be | 2,024 | Region III | BATAAN | CITY OF BALANGA (CAPITAL) (BATAAN) | Bataan 2nd District Engineering Office | P00820812LZ | Construction of Flood Control Structure along Talisay River (9+087- 9+385), Balanga City, Bataan | P00820812LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Talisay River (9+087- 9+385), Balanga City, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.532094 | 14.643328 | 24CB0036 | 49,000,000 | 49,000,000 | 1,727,913,600,000 | 2,024 | BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION | 1,134 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 49000000 | 49000000 | 2024-10-10 | 02/27/2024 | flood_control | construction-of-flood-control-structure-along-talisay-river-9087--9385-balanga-city-bataan-24cb0036 | [object Object] |
faf7f2f7-d99d-4608-b398-1ea5f125d8b9 | 2,022 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00620510LZ | Construction of Flood Control Structure at Talisay River, Brgy. Ala-uli (Station 9+083 - Station 9+412) Pilar, Bataan | P00620510LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Talisay River, Brgy. Ala-uli (Station 9+083 - Station 9+412) Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.53227 | 14.642069 | 22CB0055 | 49,000,000 | 49,000,000 | 1,668,902,400,000 | 2,022 | POLYMER-VIC CONSTRUCTION | 1,135 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 49000000 | 49000000 | 2022-11-21 | 04/04/2022 | flood_control | construction-of-flood-control-structure-at-talisay-river-brgy-ala-uli-station-9083---station-9412-pilar-bataan-22cb0055 | [object Object] |
2e19a4f3-d096-40c1-b1be-c780ff3cafcb | 2,023 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00726713LZ | Construction of Flood Control Structure along Talisay River, (8+773-9+083), Pilar, Bataan | P00726713LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Talisay River, (8+773-9+083), Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.53227 | 14.642069 | 23CB0010 | 49,000,000 | 49,000,000 | 1,696,204,800,000 | 2,023 | BPQ CONSTRUCTION AND TRADING / POLYMER-VIC CONSTRUCTION | 1,136 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 49000000 | 49000000 | 2023-06-26 | 02/14/2023 | flood_control | construction-of-flood-control-structure-along-talisay-river-8773-9083-pilar-bataan-23cb0010 | [object Object] |
0b8a80a0-2e60-481b-ac8a-08f856e48eac | 2,022 | Region III | BATAAN | ABUCAY (BATAAN) | Bataan 1st District Engineering Office | P00621237LZ | Construction of Flood Control Project in Capitangan River, Abucay, Bataan | P00621237LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Project in Capitangan River, Abucay, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.53247 | 14.70634 | 22CA0077 | 96,499,999.81 | 96,500,000 | 1,685,491,200,000 | 2,023 | ROCKSTEEL CONSTRUCTION AND DEV'T CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 1,137 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 96499999.81 | 96500000 | 2023-05-02 | 07/06/2022 | flood_control | construction-of-flood-control-project-in-capitangan-river-abucay-bataan-22ca0077 | [object Object] |
a792cd55-c72c-40d0-893a-527f51e55ca6 | 2,022 | Region I | PANGASINAN | BALUNGAO (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00620971LZ | Construction of Flood Control Structure along Banila River, Brgy. Pugaro, Balungao, Pangasinan | P00620971LZ-CW1 | Construction of Dike - Construction of Flood Control Structure along Banila River, Brgy. Pugaro, Balungao, Pangasinan | null | Construction of Dike | Flood Control Structures | 120.6764 | 15.9086 | 22AI0067 | 49,000,000 | 48,950,632.01 | 1,664,409,600,000 | 2,022 | JHI CONSTRUCTION & SUPPLY | 1,138 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (SIXTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 49000000 | 48950632.01 | 2022-10-10 | 03/14/2022 | flood_control | construction-of-flood-control-structure-along-banila-river-brgy-pugaro-balungao-pangasinan-22ai0067 | [object Object] |
6e8ae5fe-a40b-4896-a6fb-4afad4ef77b3 | 2,024 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00821292LZ | Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 1, Sta. 1+080.00 to Sta. 1+451.91, Capas, Tarlac. | P00821292LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 1, Sta. 1+080.00 to Sta. 1+451.91, Capas, Tarlac. | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.532625 | 15.407797 | 24CK0036 | 96,499,373.58 | 96,500,000 | 1,724,112,000,000 | 2,024 | ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. | 1,139 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 96499373.58 | 96500000 | 2024-11-25 | 02/20/2024 | flood_control | rehabilitation-of-dike-along-odonnell-river-downstream-of-palublub-bridge-right-bank-lawy-section-phase-1-sta-108000-to-sta-145191-capas-tarlac-24ck0036 | [object Object] |
35a06676-8b70-4005-86de-b145465d94b1 | 2,022 | Cordillera Administrative Region | ABRA | LA PAZ (ABRA) | Abra District Engineering Office | P00632779LZ | Construction of Salip Flood Control, Barangay Poblacion, La Paz, Abra | P00632779LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Salip Flood Control, Barangay Poblacion, La Paz, Abra | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.676793 | 17.661836 | 22PA0079 | 48,999,965.06 | 49,497,900 | 1,664,150,400,000 | 2,022 | ST. TIMOTHY CONSTRUCTION CORPORATION | 1,140 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ABRA (LEGISLATIVE DISTRICT) | Abra District Engineering Office | 48999965.06 | 49497900 | 2022-09-27 | 03/16/2022 | flood_control | construction-of-salip-flood-control-barangay-poblacion-la-paz-abra-22pa0079 | [object Object] |
8d6913d0-336f-4f95-a601-d5181d7d81ca | 2,022 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00621453LZ | Construction of Slope Protection along Porac River, Valdez Section, Floridablanca, Pampanga | P00621453LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Porac River, Valdez Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.532709 | 14.980226 | 22CH0054 | 48,852,575.92 | 48,844,689.26 | 1,663,027,200,000 | 2,022 | STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) | 1,141 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 48852575.92 | 48844689.26 | 2022-09-14 | 04/18/2022 | flood_control | construction-of-slope-protection-along-porac-river-valdez-section-floridablanca-pampanga-22ch0054 | [object Object] |
68924afb-2c78-4560-8e50-6079fe937800 | 2,022 | Cordillera Administrative Region | ABRA | LA PAZ (ABRA) | Abra District Engineering Office | P00632765LZ | Construction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra | P00632765LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Gucab Flood Control, Barangay Poblacion, La Paz, Abra | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.677562 | 17.663141 | 22PA0093 | 48,999,909.19 | 46,352,378.91 | 1,670,371,200,000 | 2,022 | ST. TIMOTHY CONSTRUCTION CORPORATION | 1,142 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ABRA (LEGISLATIVE DISTRICT) | Abra District Engineering Office | 48999909.19 | 46352378.91 | 2022-12-08 | 03/28/2022 | flood_control | construction-of-gucab-flood-control-barangay-poblacion-la-paz-abra-22pa0093 | [object Object] |
588c6917-6d9c-470d-8e1c-27666bf18a80 | 2,023 | Region I | PANGASINAN | MANAOAG (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00727088LZ | Construction of Riverbank Protection, Brgy. Lelemaan, Manaoag, Pangasinan | P00727088LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection, Brgy. Lelemaan, Manaoag, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.532908 | 16.008706 | 23AH0070 | 49,000,000 | 48,996,410.44 | 1,705,536,000,000 | 2,024 | BET CONSTRUCTION & SUPPLY | 1,143 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 49000000 | 48996410.44 | 2024-01-19 | 05/12/2023 | flood_control | construction-of-riverbank-protection-brgy-lelemaan-manaoag-pangasinan-23ah0070 | [object Object] |
37f3d279-bc60-4a42-8165-8a6814c780c8 | 2,023 | Region I | ILOCOS NORTE | VINTAR (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00740512LZ | Construction of Flood Control Structure along Bislak River, Barangay Salsalamagui, Vintar, I Locos Norte | P00740512LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bislak River, Barangay Salsalamagui, Vintar, I Locos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.677651 | 18.241592 | 23AA0257 | 29,399,927.25 | 29,399,903.6 | 1,698,451,200,000 | 2,023 | HEKLER BUILDERS CORP. | 1,144 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 29399927.25 | 29399903.6 | 2023-12-15 | 03/29/2023 | flood_control | construction-of-flood-control-structure-along-bislak-river-barangay-salsalamagui-vintar-i-locos-norte-23aa0257 | [object Object] |
e3fb96ec-72d1-48b0-9827-5da133207e16 | 2,022 | Region I | PANGASINAN | MANAOAG (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00631087LZ | Construction of Riverbank Protection at Sitio Manggaan, Brgy. Lelemaan, Manaoag, Pangasinan | P00631087LZ-CW1 | Construction of Slope Protection Structure - Construction of Riverbank Protection at Sitio Manggaan, Brgy. Lelemaan, Manaoag, Pangasinan | null | Construction of Slope Protection Structure | Flood Control Structures | 120.532977 | 16.008572 | 22AH0072 | 14,700,000 | 14,550,366.98 | 1,655,856,000,000 | 2,022 | BET CONSTRUCTION & SUPPLY | 1,145 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 14700000 | 14550366.98 | 2022-07-23 | 02/18/2022 | flood_control | construction-of-riverbank-protection-at-sitio-manggaan-brgy-lelemaan-manaoag-pangasinan-22ah0072 | [object Object] |
aee9954b-0324-4001-8060-4d3d25786e7a | 2,024 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00820811LZ | Construction of Flood Control Structure along Talisay River (8+475 - 8+773), Pilar, Bataan | P00820811LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Talisay River (8+475 - 8+773), Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.533167 | 14.643592 | 24CB0037 | 49,000,000 | 49,000,000 | 1,732,060,800,000 | 2,024 | E.R. VENZON CONSTRUCTION / L.R. DE GUZMAN CONSTRUCTION | 1,146 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 49000000 | 49000000 | 2024-11-15 | 02/21/2024 | flood_control | construction-of-flood-control-structure-along-talisay-river-8475---8773-pilar-bataan-24cb0037 | [object Object] |
b2772f0a-aa54-461a-a6f7-e1e79ef9309b | 2,022 | Region III | TARLAC | CONCEPCION (TARLAC) | Tarlac 2nd District Engineering Office | P00621539LZ | Rehabilitation of Dike along Lucung river, (Malupa section, Left Bank), Concepcion, Tarlac (Sta. 1+637 to Sta. 1+909) | P00621539LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along Lucung river, (Malupa section, Left Bank), Concepcion, Tarlac (Sta. 1+637 to Sta. 1+909) | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.6777 | 15.3221 | 22CK0082 | 37,239,610.69 | 37,228,052.04 | 1,665,792,000,000 | 2,022 | HIGH STRENGTH DEV. CORPORATION / T2B3 BUILDERS AND SUPPLIES CORP. | 1,147 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 37239610.69 | 37228052.04 | 2022-10-16 | 03/24/2022 | flood_control | rehabilitation-of-dike-along-lucung-river-malupa-section-left-bank-concepcion-tarlac-sta-1637-to-sta-1909-22ck0082 | [object Object] |
24199eec-144f-40e1-b1ae-d4e8c2a8e21b | 2,022 | Region III | PAMPANGA | PORAC (PAMPANGA) | Pampanga 2nd District Engineering Office | P00621457LZ | Construction of Slope Protection along Porac River, Jalung Section, Porac, Pampanga | P00621457LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Porac River, Jalung Section, Porac, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.533182 | 15.067352 | 22CH0053 | 48,852,088.12 | 48,840,873.66 | 1,667,779,200,000 | 2,022 | ARROW CONSTRUCTION | 1,148 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 48852088.12 | 48840873.66 | 2022-10-28 | 04/13/2022 | flood_control | construction-of-slope-protection-along-porac-river-jalung-section-porac-pampanga-22ch0053 | [object Object] |
b094821c-2628-4f46-abdf-519df1db8aa1 | 2,024 | Region III | TARLAC | CONCEPCION (TARLAC) | Tarlac 2nd District Engineering Office | P00824708LZ | Rehabilitation of Existing Dike along Lucung River (Malupa Section, Left Bank), Sta. 1+637 to Sta. 1+674 and Sta. 2+196 to Sta. 2+376, Concepcion, Tarlac | P00824708LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Existing Dike along Lucung River (Malupa Section, Left Bank), Sta. 1+637 to Sta. 1+674 and Sta. 2+196 to Sta. 2+376, Concepcion, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.677839 | 15.322063 | 24CK0027 | 46,751,014.15 | 46,749,922.54 | 1,719,619,200,000 | 2,024 | RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) | 1,149 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 46751014.15 | 46749922.54 | 2024-06-30 | 02/05/2024 | flood_control | rehabilitation-of-existing-dike-along-lucung-river-malupa-section-left-bank-sta-1637-to-sta-1674-and-sta-2196-to-sta-2376-concepcion-tarlac-24ck0027 | [object Object] |
5a3f6c3b-1bc2-41d0-b195-09abda8b3d53 | 2,022 | Region III | PAMPANGA | MABALACAT CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00621461LZ | Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village Sapangbalen Riverwall Sta. (-0+620) to Sta. (-0+870), Mabalacat, Pampanga | P00621461LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village Sapangbalen Riverwall Sta. (-0+620) to Sta. (-0+870), Mabalacat, Pampanga | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.533186 | 15.214361 | 22CI0059 | 24,496,149.16 | 24,311,437.71 | 1,662,768,000,000 | 2,022 | ARROWHEAD CONSTRUCTION | 1,150 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 24496149.16 | 24311437.71 | 2022-09-11 | 03/24/2022 | flood_control | construction-of-riverwall-along-sacobia-river-in-barangay-macapagal-village-and-marcos-village-sapangbalen-riverwall-sta--0620-to-sta--0870-mabalacat-pampanga-22ci0059 | [object Object] |
729fcb54-a973-4365-b642-7fcad2c6d6c3 | 2,022 | Region I | ILOCOS NORTE | VINTAR (ILOCOS NORTE) | Region I | P00621135LZ | Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos Norte | P00621135LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bislak River, Upstream and Downstream, Leftside of Vintar Bridge, Brgy. Abkir-Alviar, Vintar, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.678776 | 18.244652 | 22A00176 | 211,335,000 | 211,334,996.3 | 1,674,518,400,000 | 2,022 | JOZEN BUILDERS AND CONSTRUCTION SUPPLY CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 1,151 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 211335000 | 211334996.32 | 2022-10-10 | 04/01/2022 | flood_control | construction-of-flood-control-structure-along-bislak-river-upstream-and-downstream-leftside-of-vintar-bridge-brgy-abkir-alviar-vintar-ilocos-norte-22a00176 | [object Object] |
86525639-f048-421f-8f8b-f7c8ea07ac7d | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00621593LZ | Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 1, Nueva Era, Ilocos Norte | P00621593LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 1, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.67893 | 17.94322 | 22AB0086 | 48,999,996.73 | 48,999,996.76 | 1,670,716,800,000 | 2,022 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 1,152 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48999996.73 | 48999996.76 | 2022-12-06 | 03/25/2022 | flood_control | construction-of-flood-control-structure-along-sinigpit-creek-right-bank-barangay-caray-sitio-sinigpit-1-nueva-era-ilocos-norte-22ab0086 | [object Object] |
10cd840e-9b06-4011-ac64-c1ff28dead08 | 2,024 | Region III | BATAAN | ORANI (BATAAN) | Bataan 1st District Engineering Office | P00845962LZ | Construction of Flood Control Project along Puksuan River, Brgy. Puksuan, Orani, Bataan | P00845962LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Project along Puksuan River, Brgy. Puksuan, Orani, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.5333 | 14.807899 | 24CA0064 | 9,899,999.72 | 9,899,999.72 | 1,728,432,000,000 | 2,024 | SAN SEBASTIAN CONSTRUCTION | 1,153 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 9899999.72 | 9899999.72 | 2024-10-08 | 07/11/2024 | flood_control | construction-of-flood-control-project-along-puksuan-river-brgy-puksuan-orani-bataan-24ca0064 | [object Object] |
145a7fea-5604-444f-bfbc-19478cfdf7d3 | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Region I | P00621558LZ | Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Caray, Sitio Bangbangcag, Nueva Era, Ilocos Norte | P00621558LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bongo River, Right Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Caray, Sitio Bangbangcag, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.678949 | 17.943479 | 22A00263 | 80,360,000 | 79,130,000 | 1,666,828,800,000 | 2,022 | ST. TIMOTHY CONSTRUCTION CORPORATION | 1,154 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 80360000 | 79130000 | 2022-10-28 | 04/07/2022 | flood_control | construction-of-flood-control-structure-along-bongo-river-right-bank-laoag-river-basin-flood-control-and-sabo-project-brgy-caray-sitio-bangbangcag-nueva-era-ilocos-norte-22a00263 | [object Object] |
f66ca2e8-9913-4136-9b4c-7e8b8a73646a | 2,022 | Region III | PAMPANGA | MABALACAT CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00639485LZ | Construction of River Wall along Sacobia River (Downstream of Sacobia Bridge), Brgy. Marcos Village, Mabalacat City, Pampanga | P00639485LZ-CW1 | Construction of Flood Mitigation Structure - Construction of River Wall along Sacobia River (Downstream of Sacobia Bridge), Brgy. Marcos Village, Mabalacat City, Pampanga | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.533403 | 15.21598 | 22CI0055 | 48,998,211.85 | 48,534,502.89 | 1,663,891,200,000 | 2,022 | ARROWHEAD CONSTRUCTION | 1,155 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 48998211.85 | 48534502.89 | 2022-09-24 | 03/24/2022 | flood_control | construction-of-river-wall-along-sacobia-river-downstream-of-sacobia-bridge-brgy-marcos-village-mabalacat-city-pampanga-22ci0055 | [object Object] |
18978bde-0f29-463f-ac0d-c159113ea58a | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Region I | P00621552LZ | Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Caray, Sitio Bangbangcag, Nueva Era, Ilocos Norte | P00621552LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bongo River, Left Bank, Laoag River Basin Flood Control and Sabo Project, Brgy. Caray, Sitio Bangbangcag, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.67903 | 17.943407 | 22A00262 | 80,360,000 | 79,130,000 | 1,666,828,800,000 | 2,022 | ST. TIMOTHY CONSTRUCTION CORPORATION | 1,156 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 80360000 | 79130000 | 2022-10-28 | 04/07/2022 | flood_control | construction-of-flood-control-structure-along-bongo-river-left-bank-laoag-river-basin-flood-control-and-sabo-project-brgy-caray-sitio-bangbangcag-nueva-era-ilocos-norte-22a00262 | [object Object] |
71c0bbfa-d8c5-4571-a6cb-89d90e9e2798 | 2,022 | Region I | ILOCOS SUR | SALCEDO (BAUGEN) (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00621508LZ | Construction of Atabay Flood Control, Salcedo, Ilocos Sur | P00621508LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Atabay Flood Control, Salcedo, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.5335 | 17.1385 | 22AD0079 | 14,700,000 | 14,699,999.73 | 1,661,644,800,000 | 2,022 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 1,157 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 14700000 | 14699999.73 | 2022-08-28 | 04/04/2022 | flood_control | construction-of-atabay-flood-control-salcedo-ilocos-sur-22ad0079 | [object Object] |
2d41dc13-407f-4aeb-9008-b7e710828716 | 2,023 | Region I | ILOCOS SUR | BURGOS (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00742269LZ | Construction of Brgy. Bessang Flood Control, Burgos, Ilocos Sur | P00742269LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Brgy. Bessang Flood Control, Burgos, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.533611 | 17.291944 | 23AD0032 | 9,900,000 | 9,879,986.49 | 1,688,947,200,000 | 2,024 | A.I.P. CONSTRUCTION | 1,158 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 9900000 | 9879986.49 | 2024-07-02 | 04/20/2023 | flood_control | construction-of-brgy-bessang-flood-control-burgos-ilocos-sur-23ad0032 | [object Object] |
b5dd877c-cf9d-433f-b3f6-f7621cec7cc5 | 2,023 | Region I | ILOCOS NORTE | SARRAT (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00726043LZ | Construction of Flood Control Structure along Padsan River US Sarrat Br., Left Bank, San Marcos, Sarrat, Ilocos Norte | P00726043LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Padsan River US Sarrat Br., Left Bank, San Marcos, Sarrat, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.679043 | 18.14737 | 23AA0027 | 39,199,899.27 | 39,199,115.51 | 1,693,526,400,000 | 2,023 | IGWT-JAV CONSTRUCTION & DEVELOPMENT CORPORATION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 1,159 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 39199899.27 | 39199115.51 | 2023-06-23 | 02/13/2023 | flood_control | construction-of-flood-control-structure-along-padsan-river-us-sarrat-br-left-bank-san-marcos-sarrat-ilocos-norte-23aa0027 | [object Object] |
79a4d026-275d-4147-9078-da6c9a3bbdcd | 2,022 | Cordillera Administrative Region | BENGUET | SABLAN (BENGUET) | Benguet 1st District Engineering Office | P00639451LZ | Construction of Slope Protection at Yabyabuan Multi-Grade School, Barangay Bagong, Sablan, Benguet | P00639451LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection at Yabyabuan Multi-Grade School, Barangay Bagong, Sablan, Benguet | null | Construction of Slope Protection Structure | Flood Control Structures | 120.533664 | 16.544339 | 22PE0093 | 14,700,000 | 14,688,347 | 1,689,206,400,000 | 2,023 | UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES | 1,160 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BENGUET (LEGISLATIVE DISTRICT) | Benguet 1st District Engineering Office | 14700000 | 14688347 | 2023-12-01 | 09/07/2022 | flood_control | construction-of-slope-protection-at-yabyabuan-multi-grade-school-barangay-bagong-sablan-benguet-22pe0093 | [object Object] |
21a1d2fc-da22-48e8-b4aa-6eb2a6a5a65a | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Region I | P00621603LZ | Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Dongdong River (Left Bank), Barangay Acnam, Sitio Saranay, Nueva Era, Ilocos Norte | P00621603LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Dongdong River (Left Bank), Barangay Acnam, Sitio Saranay, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.679073 | 17.942804 | 22A00281 | 49,000,000 | 48,249,999.1 | 1,682,812,800,000 | 2,023 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 1,161 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 49000000 | 48249999.1 | 2023-03-15 | 11/03/2022 | flood_control | construction-of-flood-control-structure-laoag-river-basin-and-sabo-flood-control-structure-along-dongdong-river-left-bank-barangay-acnam-sitio-saranay-nueva-era-ilocos-norte-22a00281 | [object Object] |
b0139f30-9713-48dc-8a4b-15090fad2947 | 2,023 | Region I | ILOCOS NORTE | PAOAY (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00726854LZ | Construction of Flood Control Structure traversing Ilocos Norte-Apayao Road, Upstream & Downstream of Suyo Bridge, Dingras, Ilocos Norte | P00726854LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure traversing Ilocos Norte-Apayao Road, Upstream & Downstream of Suyo Bridge, Dingras, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.67986 | 18.13531 | 23AB0148 | 8,299,000 | 8,288,961.56 | 1,690,588,800,000 | 2,023 | SOLSONA-GANAL CONSTRUCTION & SUPPLY | 1,162 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 8299000 | 8288961.56 | 2023-07-11 | 05/08/2023 | flood_control | construction-of-flood-control-structure-traversing-ilocos-norte-apayao-road-upstream-downstream-of-suyo-bridge-dingras-ilocos-norte-23ab0148 | [object Object] |
2a81357c-70d7-4fc1-8ecc-295200cf79b8 | 2,022 | Region I | ILOCOS NORTE | BADOC (ILOCOS NORTE) | Region I | P00621273LZ | Construction of Flood Control Structure along Badoc River, Brgy. Balbaldez, Badoc, Ilocos Norte | P00621273LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Badoc River, Brgy. Balbaldez, Badoc, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.53374 | 17.915698 | 22A00232 | 96,500,000 | 96,499,997.09 | 1,672,444,800,000 | 2,022 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 1,163 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 96500000 | 96499997.09 | 2022-10-18 | 04/07/2022 | flood_control | construction-of-flood-control-structure-along-badoc-river-brgy-balbaldez-badoc-ilocos-norte-22a00232 | [object Object] |
d0ce5eb8-8f7e-4ecb-8d39-167a1022ac86 | 2,022 | Region I | ILOCOS SUR | SALCEDO (BAUGEN) (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00620134LZ | Construction of Sorioan River Control Structure, Salcedo, Ilocos Sur | P00620134LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Sorioan River Control Structure, Salcedo, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.53389 | 17.12948 | 22AD0064 | 49,000,000 | 48,999,995.79 | 1,672,272,000,000 | 2,023 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 1,164 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 49000000 | 48999995.79 | 2023-02-15 | 04/04/2022 | flood_control | construction-of-sorioan-river-control-structure-salcedo-ilocos-sur-22ad0064 | [object Object] |
ac0a73af-78fc-4bff-9589-37ce9d10b1c3 | 2,021 | Cordillera Administrative Region | ABRA | null | Abra District Engineering Office | P00561497LZ | Construction of Gucab - Demet Flood Control, La Paz, Abra | P00561497LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Gucab - Demet Flood Control, La Paz, Abra | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.680061 | 17.66798 | 21PA0220 | 48,999,808.84 | 48,997,500 | 1,658,275,200,000 | 2,022 | ST. TIMOTHY CONSTRUCTION CORPORATION | 1,165 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | ABRA (LEGISLATIVE DISTRICT) | Abra District Engineering Office | 48999808.84 | 48997500 | 2022-07-12 | 01/07/2022 | flood_control | construction-of-gucab---demet-flood-control-la-paz-abra-21pa0220 | [object Object] |
edc3b7b3-c1b8-4b41-8b75-668d396846b6 | 2,023 | Region III | BATAAN | ORANI (BATAAN) | Bataan 1st District Engineering Office | P00727125LZ | Construction of Flood Control Structure along Orani River (Phase II-AA), Orani, Bataan | P00727125LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Orani River (Phase II-AA), Orani, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.534103 | 14.793509 | 23CA0030 | 48,999,999.04 | 49,000,000 | 1,697,760,000,000 | 2,023 | AVE-MIRA CONSTRUCTION AND TRADING | 1,166 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 48999999.04 | 49000000 | 2023-10-16 | 03/13/2023 | flood_control | construction-of-flood-control-structure-along-orani-river-phase-ii-aa-orani-bataan-23ca0030 | [object Object] |
9fa87b71-ed17-40f3-9482-815f20f3cd1a | 2,023 | Region I | ILOCOS SUR | BURGOS (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00737413LZ | Construction of Flood Control Structure, Barangay Bessang, Burgos, Ilocos Sur | P00737413LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Bessang, Burgos, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.534444 | 17.291389 | 23AD0075 | 9,900,000 | 9,598,259.55 | 1,686,960,000,000 | 2,024 | JMCQ CONSTRUCTION AND SUPPLY | 1,167 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 9900000 | 9598259.55 | 2024-06-04 | 03/28/2023 | flood_control | construction-of-flood-control-structure-barangay-bessang-burgos-ilocos-sur-23ad0075 | [object Object] |
ff3894a7-d01e-4e94-9be4-29ee06750957 | 2,024 | Region III | TARLAC | CONCEPCION (TARLAC) | Tarlac 2nd District Engineering Office | P00824707LZ | Rehabilitation of Existing Dike along Parua River (Barangay Santa Rita Section, Right Bank), Package A, Sta. 12+210.40 - Sta. 12+406.75, Concepcion, Tarlac | P00824707LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Existing Dike along Parua River (Barangay Santa Rita Section, Right Bank), Package A, Sta. 12+210.40 - Sta. 12+406.75, Concepcion, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.680061 | 15.302619 | 24CK0024 | 46,748,976.2 | 46,728,726.02 | 1,719,619,200,000 | 2,024 | HIGH STRENGTH DEV. CORPORATION | 1,168 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 46748976.2 | 46728726.02 | 2024-05-13 | 02/05/2024 | flood_control | rehabilitation-of-existing-dike-along-parua-river-barangay-santa-rita-section-right-bank-package-a-sta-1221040---sta-1240675-concepcion-tarlac-24ck0024 | [object Object] |
a30dae38-b299-4fc8-8d14-bb13bfea1ad0 | 2,022 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00637782LZ | Construction of Slope Protection along Porac River, Solib Section, Floridablanca, Pampanga | P00637782LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Porac River, Solib Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.5347 | 14.9681 | 22CH0059 | 19,799,967.46 | 19,779,866.52 | 1,662,595,200,000 | 2,022 | R.M. VITUG CONSTRUCTION | 1,169 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 19799967.46 | 19779866.52 | 2022-09-09 | 04/13/2022 | flood_control | construction-of-slope-protection-along-porac-river-solib-section-floridablanca-pampanga-22ch0059 | [object Object] |
a98c373c-d6c1-4c02-bf6d-da2afa33ebe2 | 2,023 | Cordillera Administrative Region | ABRA | DOLORES (ABRA) | Abra District Engineering Office | P00726375LZ | Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, Abra | P00726375LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Abra Major River Basin, Barangay Nagtupacan, Dolores, Abra | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.680981 | 17.642188 | 23PA0104 | 144,749,907.4 | 144,744,528.6 | 1,710,892,800,000 | 2,024 | MG SAMIDAN CONSTRUCTION | 1,170 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ABRA (LEGISLATIVE DISTRICT) | Abra District Engineering Office | 144749907.38 | 144744528.57 | 2024-04-10 | 04/14/2023 | flood_control | construction-of-flood-control-structure-along-abra-major-river-basin-barangay-nagtupacan-dolores-abra-23pa0104 | [object Object] |
a74b3f9c-7cf1-4e4a-b20d-54d6ce4e1f93 | 2,024 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00846005LZ | Constuction of Slope Protection along Porac River, Valdez Section, Floridablanca, Pampanga | P00846005LZ-CW1 | Construction of Slope Protection Structure - Constuction of Slope Protection along Porac River, Valdez Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.5348 | 14.9806 | 24CH0065 | 14,849,616.15 | 14,842,087.89 | 1,722,211,200,000 | 2,024 | J. LINGAT CONSTRUCTION | 1,171 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 14849616.15 | 14842087.89 | 2024-07-30 | 03/18/2024 | flood_control | constuction-of-slope-protection-along-porac-river-valdez-section-floridablanca-pampanga-24ch0065 | [object Object] |
611cf775-6e84-4264-a880-a1ee162f3342 | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Region I | P00621605LZ | Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Left Bank), Barangay Barikir, Nueva Era, Ilocos Norte | P00621605LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Left Bank), Barangay Barikir, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.6811 | 17.921504 | 22A00279 | 49,000,000 | 48,249,999.67 | 1,682,812,800,000 | 2,023 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 1,172 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 49000000 | 48249999.67 | 2023-03-15 | 11/03/2022 | flood_control | construction-of-flood-control-structure-laoag-river-basin-and-sabo-flood-control-structure-along-gadgadawan-river-left-bank-barangay-barikir-nueva-era-ilocos-norte-22a00279 | [object Object] |
43148de8-7767-40db-a650-4cfdd2b8a51a | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00740610LZ | Construction of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga | P00740610LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Porac River, Mabical Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.5349 | 14.973005 | 23CH0057 | 29,399,126.19 | 29,393,302.38 | 1,712,534,400,000 | 2,024 | RVR3 CONSTRUCTION SUPPLY AND SERVICES | 1,173 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 29399126.19 | 29393302.38 | 2024-04-09 | 04/20/2023 | flood_control | construction-of-slope-protection-along-porac-river-mabical-section-floridablanca-pampanga-23ch0057 | [object Object] |
251a12a5-0b46-487c-abd0-95335fb2a087 | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Region I | P00621606LZ | Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Right Bank), Barangay Barikir, Nueva Era, Ilocos Norte | P00621606LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Laoag River Basin and Sabo Flood Control Structure along Gadgadawan River (Right Bank), Barangay Barikir, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.681142 | 17.921381 | 22A00280 | 49,000,000 | 48,249,996.9 | 1,682,812,800,000 | 2,023 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 1,174 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 49000000 | 48249996.9 | 2023-03-15 | 11/03/2022 | flood_control | construction-of-flood-control-structure-laoag-river-basin-and-sabo-flood-control-structure-along-gadgadawan-river-right-bank-barangay-barikir-nueva-era-ilocos-norte-22a00280 | [object Object] |
9cbfef18-c7e5-4072-930c-0a482decc71e | 2,024 | Region I | PANGASINAN | BALUNGAO (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00843203LZ | Construction of Flood Mitigation Structure along Lagasit River, Package A, Balungao - Santa Maria, Pangasinan | P00843203LZ-CW1 | Construction of Dike - Construction of Flood Mitigation Structure along Lagasit River, Package A, Balungao - Santa Maria, Pangasinan | null | Construction of Dike | Flood Control Structures | 120.681458 | 15.939035 | 24AI0147 | 96,500,000 | 96,393,183.69 | 1,737,590,400,000 | 2,024 | RS RODRIGUEZ CONSTRUCTION & SUPPLIES / JHI CONSTRUCTION & SUPPLY | 1,175 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (SIXTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 96500000 | 96393183.69 | 2024-06-30 | 04/16/2024 | flood_control | construction-of-flood-mitigation-structure-along-lagasit-river-package-a-balungao---santa-maria-pangasinan-24ai0147 | [object Object] |
2214fc1b-d10f-4cea-80cf-a52314d4424c | 2,022 | Region III | TARLAC | CONCEPCION (TARLAC) | Tarlac 2nd District Engineering Office | P00621291LZ | Rehabilitation of Dike along Lucung River, (Malupa Section, Right Bank), Concepcion, Tarlac (Sta. 2+206 to Sta. 2+688) | P00621291LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along Lucung River, (Malupa Section, Right Bank), Concepcion, Tarlac (Sta. 2+206 to Sta. 2+688) | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.68223 | 15.32478 | 22CK0081 | 60,215,392.55 | 60,202,410.54 | 1,672,790,400,000 | 2,023 | HIGH STRENGTH DEV. CORPORATION / T2B3 BUILDERS AND SUPPLIES CORP. | 1,176 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 60215392.55 | 60202410.54 | 2023-01-05 | 03/26/2022 | flood_control | rehabilitation-of-dike-along-lucung-river-malupa-section-right-bank-concepcion-tarlac-sta-2206-to-sta-2688-22ck0081 | [object Object] |
606334e5-5782-4ad8-824d-87b0eebea9e8 | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00621592LZ | Construction of Flood Control Structure along Sinigpit Creek, Barangay Caray, Nueva Era, Ilocos Norte | P00621592LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sinigpit Creek, Barangay Caray, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.6823 | 17.94131 | 22AB0085 | 48,999,997.76 | 48,999,997.76 | 1,671,062,400,000 | 2,022 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 1,177 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48999997.76 | 48999997.76 | 2022-12-08 | 03/29/2022 | flood_control | construction-of-flood-control-structure-along-sinigpit-creek-barangay-caray-nueva-era-ilocos-norte-22ab0085 | [object Object] |
2ec933f4-a4f4-453e-8a54-67b6d0afd8d1 | 2,022 | Region I | ILOCOS NORTE | NUEVA ERA (ILOCOS NORTE) | Ilocos Norte 2nd District Engineering Office | P00621594LZ | Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 2, Nueva Era, Ilocos Norte | P00621594LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Sinigpit Creek (Right Bank), Barangay Caray, Sitio Sinigpit 2, Nueva Era, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.68232 | 17.94181 | 22AB0087 | 48,999,997.76 | 48,999,997.76 | 1,670,716,800,000 | 2,022 | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. | 1,178 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48999997.76 | 48999997.76 | 2022-12-05 | 03/25/2022 | flood_control | construction-of-flood-control-structure-along-sinigpit-creek-right-bank-barangay-caray-sitio-sinigpit-2-nueva-era-ilocos-norte-22ab0087 | [object Object] |
840dc168-ee50-4b57-afe7-8f63d984e89b | 2,024 | Region III | TARLAC | CAPAS (TARLAC) | Tarlac 2nd District Engineering Office | P00821293LZ | Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 2, Sta. 1+451.91 to Sta. 1+823.05, Capas, Tarlac | P00821293LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Dike along O'Donnell River, Downstream of Palublub Bridge, Right Bank, Lawy Section, Phase 2, Sta. 1+451.91 to Sta. 1+823.05, Capas, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.534978 | 15.405428 | 24CK0037 | 96,499,828.21 | 96,497,531.14 | 1,729,728,000,000 | 2,024 | ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. | 1,179 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 96499828.21 | 96497531.14 | 2024-10-25 | 02/20/2024 | flood_control | rehabilitation-of-dike-along-odonnell-river-downstream-of-palublub-bridge-right-bank-lawy-section-phase-2-sta-145191-to-sta-182305-capas-tarlac-24ck0037 | [object Object] |
13bf6f0a-d16e-4148-a583-b25325e35a25 | 2,022 | Region III | PAMPANGA | BACOLOR (PAMPANGA) | Pampanga 1st District Engineering Office | P00620542LZ | Rehabilitation of Flood Control Structure/Slope Protection of Mesalipit Creek, Bacolor, Pampanga | P00620542LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Flood Control Structure/Slope Protection of Mesalipit Creek, Bacolor, Pampanga | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.682564 | 14.991692 | 22CG0008 | 29,400,000 | 27,782,198.84 | 1,658,188,800,000 | 2,022 | DAUNGAN CONSTRUCTION DEV'T. & GEN. SUPPLIES CO., INC. | 1,180 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (THIRD LEGISLATIVE DISTRICT) | Pampanga 1st District Engineering Office | 29400000 | 27782198.84 | 2022-07-20 | 02/21/2022 | flood_control | rehabilitation-of-flood-control-structureslope-protection-of-mesalipit-creek-bacolor-pampanga-22cg0008 | [object Object] |
67db8e5e-895b-4d82-b939-26877aa2d591 | 2,022 | Region III | PAMPANGA | MABALACAT CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00631254LZ | Construction of Riverwall along Sacobia River Brgy. Macapagal Village, Mabalacat City, Pampanga | P00631254LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverwall along Sacobia River Brgy. Macapagal Village, Mabalacat City, Pampanga | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.534987 | 15.215746 | 22CI0057 | 24,497,798.6 | 23,752,035.93 | 1,660,435,200,000 | 2,022 | ARROWHEAD CONSTRUCTION | 1,181 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 24497798.6 | 23752035.93 | 2022-07-07 | 02/25/2022 | flood_control | construction-of-riverwall-along-sacobia-river-brgy-macapagal-village-mabalacat-city-pampanga-22ci0057 | [object Object] |
0bd49f65-d9ac-40e2-ab29-297bd04a48ca | 2,023 | Region I | ILOCOS SUR | QUIRINO (ANGKAKI) (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00727081LZ | Construction of Quirino Flood Control, Quirino, Ilocos Sur | P00727081LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Quirino Flood Control, Quirino, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.68343 | 17.13962 | 23AD0048 | 19,600,000 | 19,599,957.43 | 1,689,724,800,000 | 2,023 | NABANEW CONSTRUCTION AND SUPPLY | 1,182 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 19600000 | 19599957.43 | 2023-12-26 | 03/22/2023 | flood_control | construction-of-quirino-flood-control-quirino-ilocos-sur-23ad0048 | [object Object] |
582aef24-e44f-4e50-81aa-0198a3b7baf0 | 2,022 | Region III | PAMPANGA | MABALACAT CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00621460LZ | Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village Sapangbalen Riverwall Sta. (-0+370) to Sta. (-0+620), Mabalacat, Pampanga | P00621460LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village Sapangbalen Riverwall Sta. (-0+370) to Sta. (-0+620), Mabalacat, Pampanga | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.534987 | 15.215746 | 22CI0058 | 24,493,652.12 | 24,304,593.61 | 1,662,768,000,000 | 2,022 | ARROWHEAD CONSTRUCTION | 1,183 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 24493652.12 | 24304593.61 | 2022-09-11 | 03/24/2022 | flood_control | construction-of-riverwall-along-sacobia-river-in-barangay-macapagal-village-and-marcos-village-sapangbalen-riverwall-sta--0370-to-sta--0620-mabalacat-pampanga-22ci0058 | [object Object] |
ad81f05f-f39c-44d8-889b-6decc3b2e175 | 2,022 | Cordillera Administrative Region | BENGUET | ITOGON (BENGUET) | Benguet 1st District Engineering Office | P00639446LZ | Construction of Flood Control Structure along Ambalanga River (Below Vital Fianza Jr Residence), Supang, Poblacion, Itogon, Benguet | P00639446LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Ambalanga River (Below Vital Fianza Jr Residence), Supang, Poblacion, Itogon, Benguet | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.683674 | 16.365829 | 22PE0072 | 5,390,000 | 5,289,578.4 | 1,667,433,600,000 | 2,022 | NINETY ONE BUILDERS | 1,184 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BENGUET (LEGISLATIVE DISTRICT) | Benguet 1st District Engineering Office | 5390000 | 5289578.4 | 2022-11-04 | 07/18/2022 | flood_control | construction-of-flood-control-structure-along-ambalanga-river-below-vital-fianza-jr-residence-supang-poblacion-itogon-benguet-22pe0072 | [object Object] |
fc5a1549-32d8-4974-a8d3-dbcdfa956b72 | 2,024 | Region III | TARLAC | CONCEPCION (TARLAC) | Tarlac 2nd District Engineering Office | P00824709LZ | Rehabilitation of Existing Dike along Parua River (Balutu Section, Right Bank), Sta. 14+253 to Sta. 14+443, Concepcion, Tarlac | P00824709LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Existing Dike along Parua River (Balutu Section, Right Bank), Sta. 14+253 to Sta. 14+443, Concepcion, Tarlac | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.684077 | 15.301922 | 24CK0028 | 46,749,159.12 | 46,736,249.12 | 1,719,619,200,000 | 2,024 | RAIK CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: RAIK CONSTRUCTION AND SUPPLY) | 1,185 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | TARLAC (THIRD LEGISLATIVE DISTRICT) | Tarlac 2nd District Engineering Office | 46749159.12 | 46736249.12 | 2024-05-20 | 02/05/2024 | flood_control | rehabilitation-of-existing-dike-along-parua-river-balutu-section-right-bank-sta-14253-to-sta-14443-concepcion-tarlac-24ck0028 | [object Object] |
c65e5925-5c31-4f5f-ba80-627359786a8e | 2,022 | Region III | PAMPANGA | MABALACAT CITY (PAMPANGA) | Pampanga 3rd District Engineering Office | P00637077LZ | Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village, Sapang Balen Riverwall Sta. (-0+120) to Sta. (-0+370), Mabalacat City, Pampanga | P00637077LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverwall along Sacobia River in Barangay Macapagal Village and Marcos Village, Sapang Balen Riverwall Sta. (-0+120) to Sta. (-0+370), Mabalacat City, Pampanga | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.534987 | 15.215746 | 22CI0119 | 24,494,456.68 | 24,278,801.96 | 1,668,038,400,000 | 2,022 | ARROWHEAD CONSTRUCTION | 1,186 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (FIRST LEGISLATIVE DISTRICT) | Pampanga 3rd District Engineering Office | 24494456.68 | 24278801.96 | 2022-11-11 | 05/24/2022 | flood_control | construction-of-riverwall-along-sacobia-river-in-barangay-macapagal-village-and-marcos-village-sapang-balen-riverwall-sta--0120-to-sta--0370-mabalacat-city-pampanga-22ci0119 | [object Object] |
cc6764cd-1bb4-4a7e-a062-76f95803dbaf | 2,024 | Region I | PANGASINAN | BALUNGAO (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00843204LZ | Construction of Flood Mitigation Structure along Lagasit River, Package B, Balungao - Santa Maria, Pangasinan | P00843204LZ-CW1 | Construction of Dike - Construction of Flood Mitigation Structure along Lagasit River, Package B, Balungao - Santa Maria, Pangasinan | null | Construction of Dike | Flood Control Structures | 120.684611 | 15.938483 | 24AI0148 | 96,500,000 | 96,390,646.52 | 1,737,590,400,000 | 2,024 | RS RODRIGUEZ CONSTRUCTION & SUPPLIES / JHI CONSTRUCTION & SUPPLY | 1,187 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (SIXTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 96500000 | 96390646.52 | 2024-06-30 | 04/16/2024 | flood_control | construction-of-flood-mitigation-structure-along-lagasit-river-package-b-balungao---santa-maria-pangasinan-24ai0148 | [object Object] |
f29f0884-8666-4f78-bedc-3b10729ff3b5 | 2,024 | Region I | ILOCOS SUR | QUIRINO (ANGKAKI) (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00838504LZ | Construction of River Wall at Tilek, Suagayan, Quirino, Ilocos Sur | P00838504LZ-CW1 | Construction of Flood Mitigation Structure - Construction of River Wall at Tilek, Suagayan, Quirino, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.68479 | 17.09436 | 24AD0089 | 5,880,000 | 5,688,855.8 | 1,720,310,400,000 | 2,024 | EJIEV CONSTRUCTION SERVICES | 1,188 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 5880000 | 5688855.8 | 2024-10-10 | 05/03/2024 | flood_control | construction-of-river-wall-at-tilek-suagayan-quirino-ilocos-sur-24ad0089 | [object Object] |
1741909a-35b9-413b-839b-c21ecb14bd33 | 2,022 | Region I | ILOCOS NORTE | SARRAT (ILOCOS NORTE) | Ilocos Norte 1st District Engineering Office | P00621585LZ | Construction of Flood Control Structure Along Laoag River Basin, Brgy. San Marcos, Sarrat, Ilocos Norte | P00621585LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure Along Laoag River Basin, Brgy. San Marcos, Sarrat, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.684841 | 18.144172 | 22AA0132 | 11,759,923.14 | 11,759,084.34 | 1,660,176,000,000 | 2,022 | ALTEC CONSTRUCTION | 1,189 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS NORTE (FIRST LEGISLATIVE DISTRICT) | Ilocos Norte 1st District Engineering Office | 11759923.14 | 11759084.34 | 2022-08-03 | 04/04/2022 | flood_control | construction-of-flood-control-structure-along-laoag-river-basin-brgy-san-marcos-sarrat-ilocos-norte-22aa0132 | [object Object] |
2907253c-2537-44b6-b5a9-27d56a066332 | 2,022 | Cordillera Administrative Region | BENGUET | ATOK (BENGUET) | Benguet 2nd District Engineering Office | P00620809LZ | Construction of Naguey Flood Control Structure, Sta. 5+875 - Sta. 6+475 (L.S), Sta. 4+725 - 5+725 (B.S) along Amburayan River, Atok, Benguet | P00620809LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Naguey Flood Control Structure, Sta. 5+875 - Sta. 6+475 (L.S), Sta. 4+725 - 5+725 (B.S) along Amburayan River, Atok, Benguet | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.685143 | 16.600089 | 22PF0025 | 51,920,860 | 51,857,438.1 | 1,667,433,600,000 | 2,022 | ALMOND ENGINEERING & CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 1,190 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | BENGUET (LEGISLATIVE DISTRICT) | Benguet 2nd District Engineering Office | 51920860 | 51857438.1 | 2022-10-17 | 03/08/2022 | flood_control | construction-of-naguey-flood-control-structure-sta-5875---sta-6475-ls-sta-4725---5725-bs-along-amburayan-river-atok-benguet-22pf0025 | [object Object] |
9243401a-edb1-42f8-9318-5c6d4af8411c | 2,022 | Region I | PANGASINAN | SANTA MARIA (PANGASINAN) | Pangasinan 3rd District Engineering Office | P00620975LZ | Construction of Flood Control Structure along Lagasit River, Brgy. Namagbagan, Sta. Maria, Pangasinan | P00620975LZ-CW1 | Construction of Revetment - Construction of Flood Control Structure along Lagasit River, Brgy. Namagbagan, Sta. Maria, Pangasinan | null | Construction of Revetment | Flood Control Structures | 120.68556 | 15.9392 | 22AI0107 | 29,400,000 | 28,517,854.91 | 1,660,176,000,000 | 2,022 | R.A. MATIAS CONSTRUCTION AND DEVELOPERS INC. (FORMERLY : R.A. MATIAS CONSTRUCTION AND DEVELOPERS) | 1,191 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (SIXTH LEGISLATIVE DISTRICT) | Pangasinan 3rd District Engineering Office | 29400000 | 28517854.91 | 2022-11-17 | 02/24/2022 | flood_control | construction-of-flood-control-structure-along-lagasit-river-brgy-namagbagan-sta-maria-pangasinan-22ai0107 | [object Object] |
fe8de9de-1cf0-4ea6-8789-5eb31f557715 | 2,023 | Region I | ILOCOS NORTE | MARCOS (ILOCOS NORTE) | Region I | P00725596LZ | Construction of Flood Control Structures at BarangayEscoda (Bongo River Tributaries) Marcos, Ilocos Norte | P00725596LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures at BarangayEscoda (Bongo River Tributaries) Marcos, Ilocos Norte | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.6859 | 18.025905 | 23A00066 | 48,250,000 | 48,249,058.58 | 1,706,659,200,000 | 2,024 | MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY | 1,192 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS NORTE (SECOND LEGISLATIVE DISTRICT) | Ilocos Norte 2nd District Engineering Office | 48250000 | 48249058.58 | 2024-01-31 | 03/03/2023 | flood_control | construction-of-flood-control-structures-at-barangayescoda-bongo-river-tributaries-marcos-ilocos-norte-23a00066 | [object Object] |
6ffb9bef-cb04-4078-a3c2-0ec4dbf7048b | 2,022 | Region I | ILOCOS SUR | QUIRINO (ANGKAKI) (ILOCOS SUR) | Ilocos Sur 2nd District Engineering Office | P00621510LZ | Construction of Quirino Flood Control, Quirino, Ilocos Sur | P00621510LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Quirino Flood Control, Quirino, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.686055 | 17.135031 | 22AD0094 | 19,600,000 | 19,599,997.6 | 1,659,312,000,000 | 2,023 | NABANEW CONSTRUCTION AND SUPPLY | 1,193 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (SECOND LEGISLATIVE DISTRICT) | Ilocos Sur 2nd District Engineering Office | 19600000 | 19599997.6 | 2023-08-30 | 04/04/2022 | flood_control | construction-of-quirino-flood-control-quirino-ilocos-sur-22ad0094 | [object Object] |
872f4519-5a74-4ac7-a607-3e91bd1e07cd | 2,021 | Cordillera Administrative Region | BENGUET | null | Cordillera Administrative Region | P00561462LZ | Construction of Naguey Flood Control, Atok, Benguet | P00561462LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Naguey Flood Control, Atok, Benguet | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.68643 | 16.60064 | 21P00050 | 96,493,651 | 96,500,000 | 1,662,076,800,000 | 2,022 | 4RMCONSTRUCTION & SUPPLIES / R.S. SEPIAN CONSTRUCTION & TRUCKING | 1,194 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | BENGUET (LEGISLATIVE DISTRICT) | Benguet 2nd District Engineering Office | 96493651 | 96500000 | 2022-09-03 | 01/07/2022 | flood_control | construction-of-naguey-flood-control-atok-benguet-21p00050 | [object Object] |
d18312d0-e7bd-495c-9ca9-ef36ed61ba3c | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00742344LZ | Construction of Slope Protection along Porac River, Brgy. Poblacion Section, Floridablanca | P00742344LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Porac River, Brgy. Poblacion Section, Floridablanca | null | Construction of Slope Protection Structure | Flood Control Structures | 120.53502 | 14.97963 | 23CH0035 | 29,699,731.69 | 29,692,996.3 | 1,694,736,000,000 | 2,023 | R.M. VITUG CONSTRUCTION | 1,195 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 29699731.69 | 29692996.3 | 2023-09-16 | 04/05/2023 | flood_control | construction-of-slope-protection-along-porac-river-brgy-poblacion-section-floridablanca-23ch0035 | [object Object] |
2bc8367c-50d7-4e5c-a170-75c7b438cc9a | 2,024 | Region III | BATAAN | ABUCAY (BATAAN) | Bataan 1st District Engineering Office | P00845964LZ | Construction of Concrete Canal with Concrete Cover and Sidewalk, Brgy. Cailayan, Abucay, Bataan (Phase I) | P00845964LZ-CW1 | Construction of Drainage Structure - Construction of Concrete Canal with Concrete Cover and Sidewalk, Brgy. Cailayan, Abucay, Bataan (Phase I) | null | Construction of Drainage Structure | Flood Control Structures | 120.535022 | 14.729544 | 24CA0055 | 9,899,999.1 | 9,899,999.1 | 1,726,876,800,000 | 2,024 | DE JESUS CONSTRUCTION | 1,196 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (FIRST LEGISLATIVE DISTRICT) | Bataan 1st District Engineering Office | 9899999.1 | 9899999.1 | 2024-09-19 | 04/22/2024 | flood_control | construction-of-concrete-canal-with-concrete-cover-and-sidewalk-brgy-cailayan-abucay-bataan-phase-i-24ca0055 | [object Object] |
79caee39-cbbf-4599-9d94-21614d0ec05d | 2,023 | Region III | PAMPANGA | FLORIDABLANCA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00742357LZ | Contruction of Slope Protection along Porac River Paguiruan Section, Floridablanca, Pampanga | P00742357LZ-CW1 | Construction of Slope Protection Structure - Contruction of Slope Protection along Porac River Paguiruan Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.5352 | 14.9911 | 23CH0067 | 49,499,311.6 | 49,489,954.9 | 1,700,092,800,000 | 2,023 | DMDANAN CONSTRUCTION AND TRADING | 1,197 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 49499311.6 | 49489954.9 | 2023-11-17 | 05/22/2023 | flood_control | contruction-of-slope-protection-along-porac-river-paguiruan-section-floridablanca-pampanga-23ch0067 | [object Object] |
32849dd9-fb2f-40fa-870d-e69a3c0cabfd | 2,022 | Region III | PAMPANGA | GUAGUA (PAMPANGA) | Pampanga 2nd District Engineering Office | P00639365LZ | Rehabilitation of Canal System of Porac-Gumain RIS (Porac RIS), Guagua, Pampanga | P00639365LZ-CW1 | Rehabilitation / Major Repair of Drainage Structure - Rehabilitation of Canal System of Porac-Gumain RIS (Porac RIS), Guagua, Pampanga | null | Rehabilitation / Major Repair of Drainage Structure | Flood Control Structures | 120.535251 | 15.002689 | 22CH0081 | 96,499,899.11 | 96,492,456.51 | 1,675,900,800,000 | 2,022 | SOLFIO P. JACINTO CONSTRUCTION INC. | 1,198 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 96499899.11 | 96492456.51 | 2022-12-05 | 06/01/2022 | flood_control | rehabilitation-of-canal-system-of-porac-gumain-ris-porac-ris-guagua-pampanga-22ch0081 | [object Object] |
f6512321-aa62-475b-bd5b-2bcf6d0eb1f4 | 2,024 | Region III | BATAAN | PILAR (BATAAN) | Bataan 2nd District Engineering Office | P00820810LZ | Construction of Flood Control Structure along Talisay River (8+177 - 8+475), Pilar, Bataan | P00820810LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Talisay River (8+177 - 8+475), Pilar, Bataan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.535258 | 14.642744 | 24CB0038 | 49,000,000 | 49,000,000 | 1,728,432,000,000 | 2,024 | 4B CONSTRUCTION CORPORATION | 1,199 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | BATAAN (SECOND LEGISLATIVE DISTRICT) | Bataan 2nd District Engineering Office | 49000000 | 49000000 | 2024-10-10 | 02/27/2024 | flood_control | construction-of-flood-control-structure-along-talisay-river-8177---8475-pilar-bataan-24cb0038 | [object Object] |
9c41866e-7840-4e90-a158-6e1e9849ce5b | 2,021 | Region III | PAMPANGA | null | Pampanga 2nd District Engineering Office | P00526024LZ | Construction of Slope Protection along Porac River, Paguiruan Section, Floridablanca, Pampanga | P00526024LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection along Porac River, Paguiruan Section, Floridablanca, Pampanga | null | Construction of Slope Protection Structure | Flood Control Structures | 120.53526 | 14.99121 | 21CH0090 | 19,599,915.01 | 19,594,564.38 | 1,660,608,000,000 | 2,022 | ARROW CONSTRUCTION | 1,200 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | PAMPANGA (SECOND LEGISLATIVE DISTRICT) | Pampanga 2nd District Engineering Office | 19599915.01 | 19594564.38 | 2022-08-17 | 03/21/2022 | flood_control | construction-of-slope-protection-along-porac-river-paguiruan-section-floridablanca-pampanga-21ch0090 | [object Object] |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.