GlobalID stringlengths 36 36 | InfraYear int64 2.02k 2.03k | Region stringclasses 16 values | Province stringclasses 98 values | Municipality stringlengths 11 52 ⌀ | ImplementingOffice stringclasses 203 values | ProjectID stringlengths 11 11 | ProjectDescription stringlengths 37 314 | ProjectComponentID stringlengths 15 15 | ProjectComponentDescription stringlengths 74 359 | Program float64 | TypeofWork stringclasses 18 values | infra_type stringclasses 1 value | Longitude float64 117 127 | Latitude float64 5.77 20.5 | ContractID stringlengths 8 8 | ABC float64 1.16M 311M | ContractCost float64 1.15M 290M | CompletionDateOriginal float64 1,539B 1,770B ⌀ | CompletionYear int64 2.02k 2.03k | Contractor stringlengths 10 199 | ObjectId int64 1 9.86k | CreationDate int64 1,754B 1,754B | Creator stringclasses 1 value | EditDate int64 1,754B 1,754B | Editor stringclasses 1 value | FundingYear int64 2.02k 2.03k | LegislativeDistrict stringclasses 252 values | DistrictEngineeringOffice stringclasses 199 values | ABC_String stringlengths 7 72 | ContractCost_String stringlengths 7 72 | CompletionDateActual stringdate 2022-07-01 00:00:00 2025-05-30 00:00:00 | StartDate stringclasses 739 values | type stringclasses 1 value | slug stringlengths 44 273 | _geo stringclasses 1 value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
b554b825-dfdc-4081-b803-f6b8c1364fb4 | 2,022 | Region I | PANGASINAN | DAGUPAN CITY (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00631089LZ | Construction of Riverbank Protection along Barangay Calmay, Dagupan City, Pangasinan | P00631089LZ-CW1 | Construction of Slope Protection Structure - Construction of Riverbank Protection along Barangay Calmay, Dagupan City, Pangasinan | null | Construction of Slope Protection Structure | Flood Control Structures | 120.328789 | 16.045842 | 22AH0068 | 49,000,000 | 48,996,222.71 | 1,686,528,000,000 | 2,023 | BET CONSTRUCTION & SUPPLY | 801 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 49000000 | 48996222.71 | 2023-05-29 | 02/18/2022 | flood_control | construction-of-riverbank-protection-along-barangay-calmay-dagupan-city-pangasinan-22ah0068 | [object Object] |
517f82da-9223-43ae-8279-a087c11f32d5 | 2,023 | Region I | LA UNION | BAUANG (LA UNION) | Region I | P00726340LZ | Construction of Flood Control Structure along Bauang River, Downstream of Bauang Bridge 1, Brgys. Parian Este - Nagrebcan, Bauang, La Union | P00726340LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bauang River, Downstream of Bauang Bridge 1, Brgys. Parian Este - Nagrebcan, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.329084 | 16.519011 | 23A00244 | 78,400,000 | 77,199,690.44 | 1,711,843,200,000 | 2,024 | C.T. LEONCIO CONSTRUCTION & TRADING | 802 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 78400000 | 77199690.44 | 2024-04-01 | 03/03/2023 | flood_control | construction-of-flood-control-structure-along-bauang-river-downstream-of-bauang-bridge-1-brgys-parian-este---nagrebcan-bauang-la-union-23a00244 | [object Object] |
77d0066b-4c85-4e42-92ed-85e0f68ea6bb | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726076LZ | Construction of Slope Protection Works along San Juan River, San Juan Section, San Carlos City, Pangasinan | P00726076LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along San Juan River, San Juan Section, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33046 | 15.91548 | 23AJ0023 | 19,600,000 | 19,599,856.12 | 1,692,057,600,000 | 2,023 | MIGHTYWAY CONSTRUCTION AND SUPPLY | 803 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19599856.12 | 2023-08-11 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-san-juan-river-san-juan-section-san-carlos-city-pangasinan-23aj0023 | [object Object] |
055f317e-360f-40a6-8478-6241d880505f | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00820712LZ | Construction of Damaged Shore Protection Works (Groins), Barangay Bagbag, Bauang, La Union | P00820712LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Damaged Shore Protection Works (Groins), Barangay Bagbag, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.330837 | 16.467769 | 24AF0093 | 28,949,995.25 | 28,938,082.84 | 1,728,000,000,000 | 2,024 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 804 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 28949995.25 | 28938082.84 | 2024-09-23 | 04/16/2024 | flood_control | construction-of-damaged-shore-protection-works-groins-barangay-bagbag-bauang-la-union-24af0093 | [object Object] |
4a036907-15f3-43a7-9979-9c7410ff2e17 | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00824810LZ | Construction of Flood Control structure along Bauang River Basin (Package 1), Bauang, La Union | P00824810LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 1), Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33135 | 16.519094 | 24AF0108 | 89,744,999.16 | 89,737,118.14 | 1,735,862,400,000 | 2,025 | SILVERWOLVES CONSTRUCTION CORPORATION | 805 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 89744999.16 | 89737118.14 | 2025-01-06 | 04/16/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-1-bauang-la-union-24af0108 | [object Object] |
7f3476f8-4d16-4fa0-86db-f35eb583a205 | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00838336LZ | Construction of Shore Protection Works, Barangay Urayong, Bauang, La Union | P00838336LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Shore Protection Works, Barangay Urayong, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.331704 | 16.459076 | 24AF0094 | 96,499,998.37 | 96,493,843.08 | 1,735,948,800,000 | 2,025 | ANORE CONSTRUCTION | 806 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 96499998.37 | 96493843.08 | 2025-03-16 | 04/16/2024 | flood_control | construction-of-shore-protection-works-barangay-urayong-bauang-la-union-24af0094 | [object Object] |
eb35d37b-7443-42dc-8c66-44874f6ae55f | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726087LZ | Construction of Slope Protection Works along Baldakit Creek, barangay Manzon-Cacaritan-Pagal, San Carlos City, Pangasinan | P00726087LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Baldakit Creek, barangay Manzon-Cacaritan-Pagal, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33218 | 15.949959 | 23AJ0039 | 19,600,000 | 19,136,072.38 | 1,690,934,400,000 | 2,023 | LEZA CONSTRUCTION & SUPPLY | 807 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19136072.38 | 2023-06-20 | 02/22/2023 | flood_control | construction-of-slope-protection-works-along-baldakit-creek-barangay-manzon-cacaritan-pagal-san-carlos-city-pangasinan-23aj0039 | [object Object] |
e3af6d39-2f63-44ad-9b13-39fe0e6e7824 | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726077LZ | Construction of Slope Protection Works along San Juan River, Tebag, San Carlos City, Pangasinan | P00726077LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along San Juan River, Tebag, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.332955 | 15.899147 | 23AJ0024 | 19,600,000 | 19,370,189.68 | 1,690,156,800,000 | 2,023 | BALLESTEROS CONSTRUCTION AND SUPPLY | 808 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19370189.68 | 2023-04-17 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-san-juan-river-tebag-san-carlos-city-pangasinan-23aj0024 | [object Object] |
8f56ede5-b0f5-4ad6-a05a-ee6338098081 | 2,022 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00620950LZ | Construction of Flood Control Structure along Bauang River Basin, Sta. 0+000 - Sta. 0+540, Brgys, Calumbaya and Boy-utan, Bauang, La Union | P00620950LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bauang River Basin, Sta. 0+000 - Sta. 0+540, Brgys, Calumbaya and Boy-utan, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33355 | 16.51662 | 22AF0005 | 45,569,965.75 | 44,202,866.82 | 1,658,793,600,000 | 2,022 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 809 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 45569965.75 | 44202866.82 | 2022-08-15 | 02/17/2022 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-sta-0000---sta-0540-brgys-calumbaya-and-boy-utan-bauang-la-union-22af0005 | [object Object] |
4944d233-7eb4-4eb3-9a2e-d979f97bdd48 | 2,024 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00824802LZ | Construction of Flood Control Structure along Aringay River Basin, Barangay Sto. Rosario West, Aringay, La Union | P00824802LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River Basin, Barangay Sto. Rosario West, Aringay, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.333738 | 16.388885 | 24AF0054 | 96,499,995.82 | 96,479,841.9 | 1,733,443,200,000 | 2,025 | ANORE CONSTRUCTION | 810 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 96499995.82 | 96479841.9 | 2025-01-20 | 03/08/2024 | flood_control | construction-of-flood-control-structure-along-aringay-river-basin-barangay-sto-rosario-west-aringay-la-union-24af0054 | [object Object] |
1d568efb-4ead-4c54-b333-92d6d882f3f2 | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00824821LZ | Construction of Flood Control structure along Bauang River Basin (Package 6), Bauang, La Union | P00824821LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 6), Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.335475 | 16.516406 | 24AF0113 | 89,744,994.56 | 89,737,362.73 | 1,735,862,400,000 | 2,025 | SILVERWOLVES CONSTRUCTION CORPORATION | 811 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 89744994.56 | 89737362.73 | 2025-03-16 | 04/16/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-6-bauang-la-union-24af0113 | [object Object] |
02c9e744-f596-4577-9f10-c23e2241e41e | 2,024 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00824801LZ | Construction of Flood Control Structure along Aringay River Basin, Barangay Samara, Aringay, La Union | P00824801LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River Basin, Barangay Samara, Aringay, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.336763 | 16.388063 | 24AF0057 | 96,499,999.35 | 96,492,336.54 | 1,733,443,200,000 | 2,024 | ANORE CONSTRUCTION | 812 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 96499999.35 | 96492336.54 | 2024-09-23 | 03/08/2024 | flood_control | construction-of-flood-control-structure-along-aringay-river-basin-barangay-samara-aringay-la-union-24af0057 | [object Object] |
8feda4b5-978d-4c52-bbe5-371f9814246e | 2,022 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00631074LZ | Construction of Flood Control Mitigation Structures Along Bauang River Basin, Brgy. Acao, Bauang, La Union | P00631074LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Mitigation Structures Along Bauang River Basin, Brgy. Acao, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33682 | 16.51937 | 22AF0003 | 34,299,997.97 | 33,522,947.4 | 1,657,756,800,000 | 2,022 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 813 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 34299997.97 | 33522947.4 | 2022-08-15 | 02/16/2022 | flood_control | construction-of-flood-control-mitigation-structures-along-bauang-river-basin-brgy-acao-bauang-la-union-22af0003 | [object Object] |
2ed7c552-fe47-4c83-bf63-e0d9b5c8af88 | 2,022 | Region I | PANGASINAN | DAGUPAN CITY (PANGASINAN) | Region I | P00637752LZ | Construction Of Riverbank Protection along Barangay Pogo Grande-Barangay Lasip Grande, Dagupan City, Pangasinan | P00637752LZ-CW1 | Construction of Flood Mitigation Structure - Construction Of Riverbank Protection along Barangay Pogo Grande-Barangay Lasip Grande, Dagupan City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33787 | 16.0346 | 22A00305 | 69,300,000 | 69,299,993.18 | 1,677,369,600,000 | 2,023 | BET CONSTRUCTION & SUPPLY | 814 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 69300000 | 69299993.18 | 2023-02-27 | 04/07/2022 | flood_control | construction-of-riverbank-protection-along-barangay-pogo-grande-barangay-lasip-grande-dagupan-city-pangasinan-22a00305 | [object Object] |
ed2361a9-c039-467b-be95-d853ffdef0cd | 2,023 | Region I | LA UNION | ARINGAY (LA UNION) | Region I | P00726339LZ | Construction of Flood Control Structure along Aringay River, Barangay Sta Lucia, Aringay, La Union | P00726339LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River, Barangay Sta Lucia, Aringay, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.337939 | 16.39493 | 23A00245 | 78,400,000 | 77,199,423.32 | 1,717,632,000,000 | 2,024 | GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. | 815 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 78400000 | 77199423.32 | 2024-06-07 | 02/14/2023 | flood_control | construction-of-flood-control-structure-along-aringay-river-barangay-sta-lucia-aringay-la-union-23a00245 | [object Object] |
0d48bfba-8d8e-4fc7-aa6e-e69fcf0e4f39 | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00821476LZ | Construction of Flood Control Structure along Bauang River Basin, Barangay Acao, Bauang, La Union | P00821476LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bauang River Basin, Barangay Acao, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33804 | 16.518327 | 24AF0101 | 28,949,999.89 | 28,946,444.57 | 1,733,529,600,000 | 2,025 | PANGASINAN NEW WILSON LUMBER & CONSTRUCTION SUPPLY | 816 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 28949999.89 | 28946444.57 | 2025-03-16 | 06/19/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-barangay-acao-bauang-la-union-24af0101 | [object Object] |
2e29108a-997f-499d-8b93-26d32ace98c6 | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726073LZ | Construction of Slope Protection Works along San Juan River, Mestizo Norte Section, San Carlos City, Pangasinan | P00726073LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along San Juan River, Mestizo Norte Section, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.3382 | 15.9092 | 23AJ0017 | 19,600,000 | 19,599,753.41 | 1,690,156,800,000 | 2,023 | 2-R CONSTRUCTION SUPPLY | 817 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19599753.41 | 2023-05-15 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-san-juan-river-mestizo-norte-section-san-carlos-city-pangasinan-23aj0017 | [object Object] |
c4b4662d-2762-4d17-b326-078251a47c3b | 2,022 | Region I | LA UNION | SAN JUAN (LA UNION) | La Union 1st District Engineering Office | P00621444LZ | Construction of Taboc Seawall, Barangay Taboc, San Juan, La Union | P00621444LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Taboc Seawall, Barangay Taboc, San Juan, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.338241 | 16.690477 | 22AE0060 | 29,399,785.9 | 29,399,459.28 | 1,665,705,600,000 | 2,022 | J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND S | 818 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 29399785.9 | 29399459.28 | 2022-10-15 | 03/28/2022 | flood_control | construction-of-taboc-seawall-barangay-taboc-san-juan-la-union-22ae0060 | [object Object] |
9cfc41c1-a3ca-453a-b81c-a82b3a0398b6 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726097LZ | Construction of Slope Protection Works along Ingalera River, Macabito Section, Calasiao, Pangasinan | P00726097LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, Macabito Section, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.33877 | 15.95469 | 23AJ0054 | 19,600,000 | 19,599,732.5 | 1,697,760,000,000 | 2,023 | HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED | 819 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19599732.5 | 2023-06-26 | 05/12/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-macabito-section-calasiao-pangasinan-23aj0054 | [object Object] |
9cfa1820-0c35-4a53-a12f-d23adb47a063 | 2,024 | Region I | PANGASINAN | DAGUPAN CITY (PANGASINAN) | Region I | P00824832LZ | Construction of Riverbank Protection along Sinucalan River, Brgy. Lasip Chico, Dagupan City, Pangasinan | P00824832LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection along Sinucalan River, Brgy. Lasip Chico, Dagupan City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.338778 | 16.023962 | 24A00293 | 96,500,000 | 96,500,000 | 1,734,825,600,000 | 2,024 | BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) | 820 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 96500000 | 96500000 | 2024-07-31 | 03/11/2024 | flood_control | construction-of-riverbank-protection-along-sinucalan-river-brgy-lasip-chico-dagupan-city-pangasinan-24a00293 | [object Object] |
bf3d0eb1-90d0-45cd-a606-572c0b113757 | 2,022 | Region I | LA UNION | AGOO (LA UNION) | La Union 2nd District Engineering Office | P00631078LZ | Rehabilitation of Damaged Shore Protection Works (Groins & Bulkhead) at Barangays Balawarte, San Julian West And San Julian Norte, Agoo, La Union | P00631078LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Damaged Shore Protection Works (Groins & Bulkhead) at Barangays Balawarte, San Julian West And San Julian Norte, Agoo, La Union | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.33984 | 16.30897 | 22AF0006 | 44,099,995.78 | 44,100,000 | 1,660,780,800,000 | 2,022 | BERSON'S CONSTRUCTION & TRADING | 821 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 44099995.78 | 44100000 | 2022-08-01 | 02/22/2022 | flood_control | rehabilitation-of-damaged-shore-protection-works-groins-bulkhead-at-barangays-balawarte-san-julian-west-and-san-julian-norte-agoo-la-union-22af0006 | [object Object] |
2eceb686-5fb3-450e-a41e-dc0034e03752 | 2,022 | Region I | LA UNION | SAN JUAN (LA UNION) | La Union 1st District Engineering Office | P00620941LZ | Construction of San Juan Waterways, Barangay Ili Norte-Talogtog, San Juan, La Union | P00620941LZ-CW1 | Construction of Flood Mitigation Structure - Construction of San Juan Waterways, Barangay Ili Norte-Talogtog, San Juan, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.340548 | 16.679605 | 22AE0059 | 19,086,476.65 | 19,085,370.2 | 1,658,361,600,000 | 2,022 | J.A. OLIVAR ENGINEERING DESIGN, CONSTRUCTION AND S | 822 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 19086476.65 | 19085370.2 | 2022-07-22 | 02/14/2022 | flood_control | construction-of-san-juan-waterways-barangay-ili-norte-talogtog-san-juan-la-union-22ae0059 | [object Object] |
9313ecee-78ca-432e-9ff1-2a0cc71e7e28 | 2,022 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00640500LZ | Construction of Slope Protection, Barangay Sta. Lucia, Aringay, La Union | P00640500LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection, Barangay Sta. Lucia, Aringay, La Union | null | Construction of Slope Protection Structure | Flood Control Structures | 120.340897 | 16.396245 | 22AF0056 | 4,949,997.63 | 4,898,251.25 | 1,662,854,400,000 | 2,022 | KRYPTONITE 6S BUILDERS INC. | 823 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 4949997.63 | 4898251.25 | 2022-08-15 | 07/08/2022 | flood_control | construction-of-slope-protection-barangay-sta-lucia-aringay-la-union-22af0056 | [object Object] |
73132602-e76c-4399-aa58-aadd71a2b6a7 | 2,022 | Region I | LA UNION | AGOO (LA UNION) | La Union 2nd District Engineering Office | P00631079LZ | Rehabilitation of Damaged Shore Protection Works (Groins & Bulkhead) at Barangays San Nicolas West and San Isidro, Agoo, La Union | P00631079LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Damaged Shore Protection Works (Groins & Bulkhead) at Barangays San Nicolas West and San Isidro, Agoo, La Union | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.34111 | 16.30446 | 22AF0011 | 44,099,999.53 | 42,721,838.4 | 1,661,558,400,000 | 2,022 | BONIMAR CONSTRUCTION ENTERPRISES | 824 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 44099999.53 | 42721838.4 | 2022-08-15 | 02/24/2022 | flood_control | rehabilitation-of-damaged-shore-protection-works-groins-bulkhead-at-barangays-san-nicolas-west-and-san-isidro-agoo-la-union-22af0011 | [object Object] |
8f309b45-2c3f-470a-9c0c-1b632894f996 | 2,024 | Region I | LA UNION | ARINGAY (LA UNION) | Region I | P00824803LZ | Construction of Flood Control Structure along Aringay River, Barangay Samara-Sta.Lucia, Aringay, La Union | P00824803LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Aringay River, Barangay Samara-Sta.Lucia, Aringay, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34174 | 16.394478 | 24A00438 | 144,750,000 | 144,739,151.6 | 1,737,072,000,000 | 2,024 | SILVERWOLVES CONSTRUCTION CORPORATION | 825 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 144750000 | 144739151.62 | 2024-09-02 | 05/03/2024 | flood_control | construction-of-flood-control-structure-along-aringay-river-barangay-samara-stalucia-aringay-la-union-24a00438 | [object Object] |
4d8a50c5-4a47-479e-9ae0-860b0790eec9 | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00824813LZ | Construction of Flood Control structure along Bauang River Basin (Package 2), Bauang, La Union | P00824813LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 2), Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.342058 | 16.518783 | 24AF0109 | 89,744,995.99 | 89,737,280.52 | 1,735,862,400,000 | 2,025 | SILVERWOLVES CONSTRUCTION CORPORATION | 826 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 89744995.99 | 89737280.52 | 2025-01-06 | 04/16/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-2-bauang-la-union-24af0109 | [object Object] |
e3f5ccac-2b1f-4252-84d8-252c9b46fd22 | 2,024 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00824840LZ | Construction of Flood Control Structures along Aringay River Basin, Brgy. Sta. Lucia, Aringay, La Union | P00824840LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Aringay River Basin, Brgy. Sta. Lucia, Aringay, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.3422 | 16.3981 | 24AF0139 | 19,299,998.47 | 19,224,221.54 | 1,728,604,800,000 | 2,025 | KRYPTONITE 6S BUILDERS INC. | 827 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 19299998.47 | 19224221.54 | 2025-03-16 | 05/08/2024 | flood_control | construction-of-flood-control-structures-along-aringay-river-basin-brgy-sta-lucia-aringay-la-union-24af0139 | [object Object] |
3bb2d88d-192d-48b1-a78f-dd09e53252d1 | 2,024 | Region I | LA UNION | CITY OF SAN FERNANDO (CAPITAL) (LA UNION) | Region I | P00820710LZ | Construction of Flood Control Structure, Barangay Langcuas, San Fernando City, La Union | P00820710LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Langcuas, San Fernando City, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.342305 | 16.614697 | 24A00167 | 38,600,000 | 38,599,971.35 | 1,731,542,400,000 | 2,024 | E.E. MADAYAG CONSTRUCTION | 828 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 38600000 | 38599971.35 | 2024-11-15 | 03/11/2024 | flood_control | construction-of-flood-control-structure-barangay-langcuas-san-fernando-city-la-union-24a00167 | [object Object] |
2e3f70ce-ab4e-42d1-83c5-56b3e70c72e2 | 2,022 | Region I | PANGASINAN | DAGUPAN CITY (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00639431LZ | Construction of Drainage Structure at Brgy. Bonuan Gueset, Dagupan City, Pangasinan | P00639431LZ-CW1 | Construction of Drainage Structure - Construction of Drainage Structure at Brgy. Bonuan Gueset, Dagupan City, Pangasinan | null | Construction of Drainage Structure | Flood Control Structures | 120.342597 | 16.076458 | 22AH0133 | 4,900,000 | 4,898,112.71 | 1,655,769,600,000 | 2,022 | ZOTA TRADING & CONSTRUCTION | 829 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 4900000 | 4898112.71 | 2022-08-19 | 04/05/2022 | flood_control | construction-of-drainage-structure-at-brgy-bonuan-gueset-dagupan-city-pangasinan-22ah0133 | [object Object] |
810152e2-6ba0-4bae-bc2a-67ee60ce092b | 2,022 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00632747LZ | Construction of Box Culvert, Barangay Bacnar, San Carlos City, Pangasinan | P00632747LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Box Culvert, Barangay Bacnar, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34268 | 15.873849 | 22AJ0038 | 4,950,000 | 4,949,968.24 | 1,667,952,000,000 | 2,022 | MIGHTYWAY CONSTRUCTION AND SUPPLY | 830 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 4950000 | 4949968.24 | 2022-09-30 | 02/21/2022 | flood_control | construction-of-box-culvert-barangay-bacnar-san-carlos-city-pangasinan-22aj0038 | [object Object] |
08d2f589-07ce-4e29-abb8-3778b4b4476f | 2,021 | Region I | LA UNION | null | La Union 2nd District Engineering Office | P00525547LZ | Construction of Flood Control Structures along Principe River, Brgy.San Vicente Sur, San Vicente Norte and Sta. Rita Sur, Agoo, La Union | P00525547LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Principe River, Brgy.San Vicente Sur, San Vicente Norte and Sta. Rita Sur, Agoo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.344123 | 16.343036 | 21AF0030 | 67,549,999.97 | 66,702,855.9 | 1,656,201,600,000 | 2,022 | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | 831 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 67549999.97 | 66702855.9 | 2022-10-24 | 11/15/2021 | flood_control | construction-of-flood-control-structures-along-principe-river-brgysan-vicente-sur-san-vicente-norte-and-sta-rita-sur-agoo-la-union-21af0030 | [object Object] |
21885d4e-821f-4992-a7f8-934303315484 | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726078LZ | Construction of Slope Protection Works along San Juan River, Bacnar, San Carlos City, Pangasinan | P00726078LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along San Juan River, Bacnar, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.344124 | 15.877561 | 23AJ0028 | 19,600,000 | 19,599,122.42 | 1,690,156,800,000 | 2,023 | JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 832 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19599122.42 | 2023-06-08 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-san-juan-river-bacnar-san-carlos-city-pangasinan-23aj0028 | [object Object] |
1bc8a3c4-daf3-4069-847a-4ca7962370e8 | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726074LZ | Construction of Slope Protection Works along San Juan River, Bolosan Section, San Carlos City, Pangasinan | P00726074LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along San Juan River, Bolosan Section, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34418 | 15.90459 | 23AJ0018 | 19,600,000 | 19,599,638.68 | 1,690,156,800,000 | 2,023 | 5J AND G CONSTRUCTION AND SUPPLY | 833 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19599638.68 | 2023-05-29 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-san-juan-river-bolosan-section-san-carlos-city-pangasinan-23aj0018 | [object Object] |
45351742-bbf4-4ae9-a5f0-98f770f6df9d | 2,022 | Region I | LA UNION | AGOO (LA UNION) | La Union 2nd District Engineering Office | P00631080LZ | Rehabilitation of Damaged Shore Protection Works, Brgys. San Manuel Norte and San Manuel Sur, Agoo, La Union | P00631080LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Damaged Shore Protection Works, Brgys. San Manuel Norte and San Manuel Sur, Agoo, La Union | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.344451 | 16.363641 | 22AF0017 | 9,799,986.57 | 9,554,879.78 | 1,655,596,800,000 | 2,022 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 834 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 9799986.57 | 9554879.78 | 2022-08-15 | 02/22/2022 | flood_control | rehabilitation-of-damaged-shore-protection-works-brgys-san-manuel-norte-and-san-manuel-sur-agoo-la-union-22af0017 | [object Object] |
fcbb123f-5830-4ade-9b8e-e42bf61d9f3f | 2,023 | Region IV-B | OCCIDENTAL MINDORO | LOOC (OCCIDENTAL MINDORO) | Mindoro Occidental District Engineering Office | P00737550LZ | Construction of Flood Control Structure, Barangay Bulacan, Looc, Occidental Mindoro | P00737550LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Bulacan, Looc, Occidental Mindoro | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34498 | 13.67057 | 23EB0044 | 9,800,000 | 9,798,295.61 | 1,684,281,600,000 | 2,023 | ANORE CONSTRUCTION | 835 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | OCCIDENTAL MINDORO (LEGISLATIVE DISTRICT) | Mindoro Occidental District Engineering Office | 9800000 | 9798295.61 | 2023-06-26 | 02/10/2023 | flood_control | construction-of-flood-control-structure-barangay-bulacan-looc-occidental-mindoro-23eb0044 | [object Object] |
59fb9605-65bf-468a-b7e0-74ebbf652305 | 2,022 | Region I | PANGASINAN | DAGUPAN CITY (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00620458LZ | Construction of Riverbank Protection Structure along Sinocalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan | P00620458LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection Structure along Sinocalan River, Barangay Bacayao Norte, Dagupan City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.344981 | 16.029461 | 22AH0057 | 49,000,000 | 47,539,279.87 | 1,662,422,400,000 | 2,023 | BET CONSTRUCTION & SUPPLY | 836 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 49000000 | 47539279.87 | 2023-02-16 | 02/18/2022 | flood_control | construction-of-riverbank-protection-structure-along-sinocalan-river-barangay-bacayao-norte-dagupan-city-pangasinan-22ah0057 | [object Object] |
f36d3333-a2ee-4dce-a0b3-24660997cf29 | 2,023 | Region I | PANGASINAN | MANGATAREM (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00726842LZ | Construction of Riverbank Protection, Barangay Takipan, Mangatarem, Pangasinan | P00726842LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection, Barangay Takipan, Mangatarem, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.3454 | 15.73249 | 23AH0028 | 96,500,000 | 96,446,398.75 | 1,714,608,000,000 | 2,024 | CHIARA2300 INCORPORATED / BERSON'S CONSTRUCTION & TRADING | 837 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (SECOND LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 96500000 | 96446398.75 | 2024-05-03 | 04/24/2023 | flood_control | construction-of-riverbank-protection-barangay-takipan-mangatarem-pangasinan-23ah0028 | [object Object] |
9a926ef9-248e-449b-a940-43546d511025 | 2,023 | Region I | ILOCOS SUR | SANTA CATALINA (ILOCOS SUR) | Region I | P00725617LZ | Construction of Seawall Cabittaogan, Sta. Catalina, Ilocos Sur | P00725617LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall Cabittaogan, Sta. Catalina, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34545 | 17.5693 | 23A00090 | 53,075,000 | 53,074,634.39 | 1,727,740,800,000 | 2,024 | APP CONSTRUCTION AND SUPPLIES / A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE | 838 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 53075000 | 53074634.39 | 2024-10-02 | 10/02/2023 | flood_control | construction-of-seawall-cabittaogan-sta-catalina-ilocos-sur-23a00090 | [object Object] |
fd75b177-5665-41a7-8314-be162eebf4d9 | 2,022 | Region I | ILOCOS SUR | SANTA CATALINA (ILOCOS SUR) | Region I | P00620797LZ | Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur | P00620797LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Shoreline Protection (Groins) along Santa Catalina, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34583 | 17.585938 | 22A00031 | 241,250,000 | 241,249,984.4 | 1,672,876,800,000 | 2,023 | A.P.B. CONSTRUCTION / EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 839 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 241250000 | 241249984.37 | 2023-01-06 | 03/04/2022 | flood_control | construction-of-shoreline-protection-groins-along-santa-catalina-ilocos-sur-22a00031 | [object Object] |
f0eb4a0b-a101-452a-8bea-a10e2faa59c5 | 2,023 | Region I | PANGASINAN | DAGUPAN CITY (PANGASINAN) | Pangasinan 2nd District Engineering Office | P00727090LZ | Construction of Riverbank Protection Sinucalan River, Brgy. Lasip Grande, Dagupan City, Pangasinan | P00727090LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Riverbank Protection Sinucalan River, Brgy. Lasip Grande, Dagupan City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.3465 | 16.02714 | 23AH0072 | 49,000,000 | 48,995,165.49 | 1,702,166,400,000 | 2,023 | BET CONSTRUCTION & SUPPLY | 840 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (FOURTH LEGISLATIVE DISTRICT) | Pangasinan 2nd District Engineering Office | 49000000 | 48995165.49 | 2023-11-24 | 05/24/2023 | flood_control | construction-of-riverbank-protection-sinucalan-river-brgy-lasip-grande-dagupan-city-pangasinan-23ah0072 | [object Object] |
196bdc8d-27c8-4b3f-b0be-6fd5573e568d | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00824823LZ | Construction of Flood Control structure along Bauang River Basin (Package 7), Bauang, La Union | P00824823LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 7), Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.347036 | 16.518456 | 24AF0114 | 89,744,998.48 | 89,737,260.38 | 1,735,862,400,000 | 2,025 | SILVERWOLVES CONSTRUCTION CORPORATION | 841 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 89744998.48 | 89737260.38 | 2025-03-16 | 04/16/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-7-bauang-la-union-24af0114 | [object Object] |
f8a6e34f-68ae-4465-b14d-9a4353f9f123 | 2,023 | Region I | ILOCOS SUR | SANTA CATALINA (ILOCOS SUR) | Region I | P00726840LZ | Construction of Flood Control Structure along Paratong-Subec, Cabittaogan Creek, Sta. Catalina, Ilocos Sur | P00726840LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Paratong-Subec, Cabittaogan Creek, Sta. Catalina, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34705 | 17.58591 | 23A00109 | 77,200,000 | 77,199,817.11 | 1,732,838,400,000 | 2,024 | BET CONSTRUCTION & SUPPLY / LEZA CONSTRUCTION & SUPPLY | 842 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 77200000 | 77199817.11 | 2024-11-30 | 10/02/2023 | flood_control | construction-of-flood-control-structure-along-paratong-subec-cabittaogan-creek-sta-catalina-ilocos-sur-23a00109 | [object Object] |
cc08123b-ec9c-402d-8f1d-8caa1a5f2437 | 2,021 | Region I | ILOCOS SUR | null | Ilocos Sur 1st District Engineering Office | P00525864LZ | Construction of Flood Control, Paratong-Subec Creek, Brgy. Paratong-Subec, Sta. Catalina, Ilocos Sur | P00525864LZ-CW1 | Construction of Revetment - Construction of Flood Control, Paratong-Subec Creek, Brgy. Paratong-Subec, Sta. Catalina, Ilocos Sur | null | Construction of Revetment | Flood Control Structures | 120.347067 | 17.58591 | 21AC0011 | 24,500,000 | 24,500,000 | 1,674,777,600,000 | 2,022 | LEZA CONSTRUCTION & SUPPLY | 843 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 24500000 | 24500000 | 2022-12-28 | 02/24/2022 | flood_control | construction-of-flood-control-paratong-subec-creek-brgy-paratong-subec-sta-catalina-ilocos-sur-21ac0011 | [object Object] |
0c61a192-9f4d-402f-957e-f0a135b8f5f8 | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00824815LZ | Construction of Flood Control structure along Bauang River Basin (Package 3), Bauang, La Union | P00824815LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 3), Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.348475 | 16.520656 | 24AF0110 | 89,744,999.91 | 89,736,907.75 | 1,735,862,400,000 | 2,025 | SILVERWOLVES CONSTRUCTION CORPORATION | 844 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 89744999.91 | 89736907.75 | 2025-03-16 | 04/16/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-3-bauang-la-union-24af0110 | [object Object] |
97ffffa9-f6de-4ab6-9483-9ef73de3de82 | 2,024 | Region I | LA UNION | CABA (LA UNION) | La Union 2nd District Engineering Office | P00843188LZ | Construction of Flood Control Structure Barangay Poblacion Sur, Caba, La Union | P00843188LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure Barangay Poblacion Sur, Caba, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.348839 | 16.428131 | 24AF0103 | 48,249,999.19 | 48,244,241.98 | 1,728,950,400,000 | 2,024 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 845 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 48249999.19 | 48244241.98 | 2024-10-21 | 04/03/2024 | flood_control | construction-of-flood-control-structure-barangay-poblacion-sur-caba-la-union-24af0103 | [object Object] |
29404550-93a8-4ed7-918c-ad8cc2c21aa7 | 2,023 | Region I | ILOCOS SUR | SANTA CATALINA (ILOCOS SUR) | Region I | P00725618LZ | Construction of Seawall Tamorong, Sta. Catalina, Ilocos Sur | P00725618LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall Tamorong, Sta. Catalina, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.348889 | 17.600833 | 23A00091 | 53,075,000 | 51,458,957.34 | 1,700,956,800,000 | 2,023 | APP CONSTRUCTION AND SUPPLIES / A.C. SOLIVEN CONSTRUCTION & GENERAL MERCHANDISE | 846 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 53075000 | 51458957.34 | 2023-11-27 | 02/23/2023 | flood_control | construction-of-seawall-tamorong-sta-catalina-ilocos-sur-23a00091 | [object Object] |
7514d1d8-e14c-4630-8bae-cd45ad8202a5 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726095LZ | Construction of Slope Protection Works along Ingalera River, barangay Dinalaoan, Calasiao, Pangasinan | P00726095LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, barangay Dinalaoan, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.34901 | 16.002062 | 23AJ0059 | 19,600,000 | 19,019,455.46 | 1,697,760,000,000 | 2,023 | MANIMELDS CONSTRUCTION & IRON WORKS | 847 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19019455.46 | 2023-09-18 | 05/12/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-barangay-dinalaoan-calasiao-pangasinan-23aj0059 | [object Object] |
a0725de1-36f8-4609-bea9-834810128932 | 2,024 | Region I | LA UNION | BACNOTAN (LA UNION) | Region I | P00824806LZ | Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion | P00824806LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Baroro River, Barangay Bacsil, Bacnotan, LaUnion | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.349032 | 16.705345 | 24A00276 | 154,400,000 | 154,399,996.7 | 1,741,478,400,000 | 2,024 | RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE | 848 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 154400000 | 154399996.67 | 2024-11-05 | 06/14/2024 | flood_control | construction-of-flood-control-structure-along-baroro-river-barangay-bacsil-bacnotan-launion-24a00276 | [object Object] |
7b1a471f-408a-430a-bc46-055372e87cf9 | 2,023 | Region I | LA UNION | CABA (LA UNION) | Region I | P00735958LZ | Construction of Flood Control Structure along Caba River, Barangay Las-Ud - Poblacion Sur - Gana, Caba, La Union | P00735958LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Caba River, Barangay Las-Ud - Poblacion Sur - Gana, Caba, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.349072 | 16.428321 | 23A00123 | 115,800,000 | 115,799,320.9 | 1,717,027,200,000 | 2,024 | C.T. LEONCIO CONSTRUCTION & TRADING | 849 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 115800000 | 115799320.88 | 2024-05-31 | 02/14/2023 | flood_control | construction-of-flood-control-structure-along-caba-river-barangay-las-ud---poblacion-sur---gana-caba-la-union-23a00123 | [object Object] |
97a972aa-97e3-492c-8d52-7e6cb8753db2 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726059LZ | Construction of Slope Protection Works along Ingalera River, Brgy. Dinalaoan, Calasiao, Pangasinan | P00726059LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, Brgy. Dinalaoan, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.349173 | 16.005956 | 23AJ0002 | 49,000,000 | 47,992,273.56 | 1,693,353,600,000 | 2,023 | ALCEL CONSTRUCTION | 850 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 47992273.56 | 2023-07-17 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-brgy-dinalaoan-calasiao-pangasinan-23aj0002 | [object Object] |
e15545aa-858b-437d-a63b-9863c4c393c6 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00737428LZ | Construction of Slope Protection (Phase I) at Barangay Dinalaoan, Calasiao, Pangasinan | P00737428LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection (Phase I) at Barangay Dinalaoan, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.349492 | 16.000945 | 23AJ0063 | 9,900,000 | 9,608,748.04 | 1,695,513,600,000 | 2,023 | BALLESTEROS CONSTRUCTION AND SUPPLY | 851 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 9900000 | 9608748.04 | 2023-09-25 | 05/12/2023 | flood_control | construction-of-slope-protection-phase-i-at-barangay-dinalaoan-calasiao-pangasinan-23aj0063 | [object Object] |
282ee98b-9e2f-484a-bdb4-a0afcd4e28eb | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726093LZ | Construction of Slope Protection Works along Marusay River, Lasip Section, Calasiao, Pangasinan | P00726093LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Marusay River, Lasip Section, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.349627 | 16.005358 | 23AJ0057 | 19,600,000 | 19,369,726.57 | 1,697,760,000,000 | 2,023 | JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 852 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19369726.57 | 2023-09-13 | 05/12/2023 | flood_control | construction-of-slope-protection-works-along-marusay-river-lasip-section-calasiao-pangasinan-23aj0057 | [object Object] |
afe8af7d-79b0-451e-a80a-7d0a6e76fdb1 | 2,024 | Region I | LA UNION | CABA (LA UNION) | La Union 2nd District Engineering Office | P00844720LZ | Construction of Flood Control Structure, Barangay Gana, Caba, La Union | P00844720LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Gana, Caba, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.350509 | 16.429326 | 24AF0040 | 48,999,993.44 | 48,995,000 | 1,724,889,600,000 | 2,025 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 853 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 48999993.44 | 48995000 | 2025-02-16 | 02/16/2024 | flood_control | construction-of-flood-control-structure-barangay-gana-caba-la-union-24af0040 | [object Object] |
80ed0f86-18dd-43d0-b8dc-3c34682d8f28 | 2,023 | Region I | LA UNION | CITY OF SAN FERNANDO (CAPITAL) (LA UNION) | La Union 1st District Engineering Office | P00740568LZ | Construction of Flood Mitigating Structure, Purok 5, Namtutan, City of San Fernando, La Union | P00740568LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Mitigating Structure, Purok 5, Namtutan, City of San Fernando, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.350775 | 16.625641 | 23AE0039 | 4,899,998.98 | 4,899,991.63 | 1,692,057,600,000 | 2,023 | RAPHAEIL CONSTRUCTION | 854 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 4899998.98 | 4899991.63 | 2023-05-24 | 03/27/2023 | flood_control | construction-of-flood-mitigating-structure-purok-5-namtutan-city-of-san-fernando-la-union-23ae0039 | [object Object] |
4b58a824-5222-4646-868c-ccac5abbee80 | 2,023 | Region I | LA UNION | CITY OF SAN FERNANDO (CAPITAL) (LA UNION) | Region I | P00742115LZ | Construction of Bato Creek Slope Protection, City of San Fernando, La Union | P00742115LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Bato Creek Slope Protection, City of San Fernando, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.350903 | 16.64016 | 23A00382 | 99,000,000 | 98,996,959.56 | 1,710,547,200,000 | 2,024 | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) | 855 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 99000000 | 98996959.56 | 2024-04-30 | 05/08/2023 | flood_control | construction-of-bato-creek-slope-protection-city-of-san-fernando-la-union-23a00382 | [object Object] |
487830bd-c540-4b54-a921-7b33927b56b2 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726096LZ | Construction of Slope Protection Works along Ingalera River, Lumbang Section, Calasiao, Pangasinan | P00726096LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, Lumbang Section, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.351865 | 15.985903 | 23AJ0051 | 49,000,000 | 47,554,595.06 | 1,700,956,800,000 | 2,023 | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | 856 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 47554595.06 | 2023-08-11 | 05/12/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-lumbang-section-calasiao-pangasinan-23aj0051 | [object Object] |
55135440-e177-4ae0-8e83-ddf8dedfb8fa | 2,023 | Region I | LA UNION | SANTO TOMAS (LA UNION) | La Union 2nd District Engineering Office | P00727086LZ | Construction of Shore Protection Works, barangay Cabaruan, Sto. Tomas, La Union | P00727086LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Shore Protection Works, barangay Cabaruan, Sto. Tomas, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.353652 | 16.276119 | 23AF0043 | 48,999,971.73 | 48,754,908.74 | 1,693,958,400,000 | 2,024 | A.I.P. CONSTRUCTION / BMK CONSTRUCTION CORPORATION (FORMERLY B.M.K. CONSTRUCTION) | 857 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 48999971.73 | 48754908.74 | 2024-02-11 | 02/23/2023 | flood_control | construction-of-shore-protection-works-barangay-cabaruan-sto-tomas-la-union-23af0043 | [object Object] |
f98978d7-745c-4a7a-bcb4-af40d9f355f4 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726094LZ | Construction of Slope Protection Works along Ingalera River, Mancup Section, Calasiao, Pangasinan | P00726094LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, Mancup Section, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.35373 | 15.99477 | 23AJ0058 | 19,600,000 | 19,589,753.85 | 1,697,760,000,000 | 2,023 | JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 858 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19589753.85 | 2023-07-17 | 05/12/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-mancup-section-calasiao-pangasinan-23aj0058 | [object Object] |
78a2d5e4-8595-4b04-8d0b-474990be135f | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00821101LZ | Construction of Flood Control Structures along Bauang River Basin, Bauang, La Union | P00821101LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Bauang River Basin, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.353761 | 16.518222 | 24AF0095 | 96,499,994.18 | 96,492,001.36 | 1,736,812,800,000 | 2,025 | ANORE CONSTRUCTION | 859 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 96499994.18 | 96492001.36 | 2025-02-16 | 04/16/2024 | flood_control | construction-of-flood-control-structures-along-bauang-river-basin-bauang-la-union-24af0095 | [object Object] |
90541d86-fd6d-429d-9342-f13db47e5401 | 2,021 | Region III | TARLAC | null | Tarlac District Engineering Office | P00561142LZ | Construction of Road Slope Protection along Tarlac-Palauig Road, San Jose, Tarlac (Phase 4) | P00561142LZ-CW1 | Construction of Slope Protection Structure - Construction of Road Slope Protection along Tarlac-Palauig Road, San Jose, Tarlac (Phase 4) | null | Construction of Slope Protection Structure | Flood Control Structures | 120.35458 | 15.508167 | 21CJ0074 | 67,550,000 | 56,776,877.63 | 1,663,977,600,000 | 2,022 | R-II BUILDERS, INC. | 860 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 67550000 | 56776877.63 | 2022-11-27 | 03/30/2022 | flood_control | construction-of-road-slope-protection-along-tarlac-palauig-road-san-jose-tarlac-phase-4-21cj0074 | [object Object] |
5668f7ba-67ce-441c-a482-9556044169ac | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00824817LZ | Construction of Flood Control structure along Bauang River Basin (Package 4), Bauang, La Union | P00824817LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 4), Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.354714 | 16.519056 | 24AF0111 | 89,744,997.81 | 89,736,445.72 | 1,735,862,400,000 | 2,025 | SILVERWOLVES CONSTRUCTION CORPORATION | 861 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 89744997.81 | 89736445.72 | 2025-03-16 | 04/16/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-4-bauang-la-union-24af0111 | [object Object] |
1bc49dd0-729e-46b1-bfff-c46bd3704264 | 2,021 | Region III | TARLAC | null | Tarlac District Engineering Office | P00561141LZ | Construction of Road Slope Protection along Tarlac-Palauig Road, San Jose, Tarlac (Phase 3) | P00561141LZ-CW1 | Construction of Slope Protection Structure - Construction of Road Slope Protection along Tarlac-Palauig Road, San Jose, Tarlac (Phase 3) | null | Construction of Slope Protection Structure | Flood Control Structures | 120.355153 | 15.508142 | 21CJ0073 | 67,550,000 | 64,172,013.74 | 1,663,977,600,000 | 2,022 | R-II BUILDERS, INC. | 862 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,021 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 67550000 | 64172013.74 | 2022-09-25 | 03/30/2022 | flood_control | construction-of-road-slope-protection-along-tarlac-palauig-road-san-jose-tarlac-phase-3-21cj0073 | [object Object] |
ee1a1316-7c10-4345-9a7d-d2bf9873c9e5 | 2,024 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00845917LZ | Rehabilitation Flood Control Structures along Caba Creek, Brgy. Ilang, San Carlos City, Pangasinan | P00845917LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation Flood Control Structures along Caba Creek, Brgy. Ilang, San Carlos City, Pangasinan | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.356 | 15.917 | 24AJ0096 | 54,450,000 | 9,899,873.79 | 1,731,888,000,000 | 2,024 | MIGHTYWAY CONSTRUCTION AND SUPPLY | 863 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | Clustered with Contract ID 24AJ0096 | 9899873.79 | 2024-09-11 | 06/03/2024 | flood_control | rehabilitation-flood-control-structures-along-caba-creek-brgy-ilang-san-carlos-city-pangasinan-24aj0096 | [object Object] |
77cee2fa-44ca-4dea-926e-c8169c9252df | 2,023 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00727233LZ | Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 1) | P00727233LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 1) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.356302 | 16.391459 | 23AF0100 | 72,374,998.02 | 72,334,509.64 | 1,702,080,000,000 | 2,024 | SILVERWOLVES CONSTRUCTION CORPORATION | 864 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 72374998.02 | 72334509.64 | 2024-02-11 | 04/19/2023 | flood_control | construction-of-flood-control-structure-along-the-aringay-river-basin-aringay-la-union-package-1-23af0100 | [object Object] |
25ef029f-60f8-4e2d-9767-cdf6ca1673fd | 2,023 | Region I | LA UNION | SAN JUAN (LA UNION) | La Union 1st District Engineering Office | P00726638LZ | Rehabilitation of Baroro River Control, barangay Sta. Rosa, San Juan, La Union | P00726638LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Baroro River Control, barangay Sta. Rosa, San Juan, La Union | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.356774 | 16.68483 | 23AE0013 | 48,999,975.9 | 48,998,880.4 | 1,696,032,000,000 | 2,023 | MY BUILDERS AND CONSTRUCTION | 865 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 48999975.9 | 48998880.4 | 2023-08-30 | 02/14/2023 | flood_control | rehabilitation-of-baroro-river-control-barangay-sta-rosa-san-juan-la-union-23ae0013 | [object Object] |
1bdb6456-9612-4529-b61a-75b1a5751d68 | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726084LZ | Construction of Slope Protection Works along Caba Creek, barangay Ilang, San Carlos City, Pangasinan | P00726084LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Caba Creek, barangay Ilang, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.357613 | 15.918838 | 23AJ0040 | 19,600,000 | 19,031,663.71 | 1,702,944,000,000 | 2,023 | LEZA CONSTRUCTION & SUPPLY | 866 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19031663.71 | 2023-12-15 | 05/12/2023 | flood_control | construction-of-slope-protection-works-along-caba-creek-barangay-ilang-san-carlos-city-pangasinan-23aj0040 | [object Object] |
0557608a-d996-49e9-b92a-f58b9cc301da | 2,024 | Region I | ILOCOS SUR | SANTO DOMINGO (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00839546LZ | Construction of Seawall, Sto. Domingo, Ilocos Sur | P00839546LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Seawall, Sto. Domingo, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.358749 | 17.645135 | 24AC0009 | 4,950,000 | 4,920,631.39 | 1,714,953,600,000 | 2,024 | FIT CONSTRUCTION | 867 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 4950000 | 4920631.39 | 2024-05-03 | 02/26/2024 | flood_control | construction-of-seawall-sto-domingo-ilocos-sur-24ac0009 | [object Object] |
f906fd5f-e6b0-4e73-b34e-0d306930b35a | 2,023 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00727234LZ | Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 2) | P00727234LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 2) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.359763 | 16.39133 | 23AF0101 | 72,374,992.09 | 72,334,339.31 | 1,702,080,000,000 | 2,024 | SILVERWOLVES CONSTRUCTION CORPORATION | 868 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 72374992.09 | 72334339.31 | 2024-02-11 | 04/19/2023 | flood_control | construction-of-flood-control-structure-along-the-aringay-river-basin-aringay-la-union-package-2-23af0101 | [object Object] |
4e9870f7-9b82-44b1-af5a-d74eed950a5d | 2,022 | Region III | TARLAC | SAN JOSE (TARLAC) | Tarlac District Engineering Office | P00637030LZ | Construction of Road Slope Protection Structures along San Jose, Tarlac-Palauig, Zambales Road (Package 6), San Jose, Tarlac | P00637030LZ-CW1 | Construction of Slope Protection Structure - Construction of Road Slope Protection Structures along San Jose, Tarlac-Palauig, Zambales Road (Package 6), San Jose, Tarlac | null | Construction of Slope Protection Structure | Flood Control Structures | 120.360219 | 15.504031 | 22CJ0157 | 96,500,000 | 93,815,457.98 | 1,669,248,000,000 | 2,022 | STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) | 869 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 96500000 | 93815457.98 | 2022-11-25 | 03/31/2022 | flood_control | construction-of-road-slope-protection-structures-along-san-jose-tarlac-palauig-zambales-road-package-6-san-jose-tarlac-22cj0157 | [object Object] |
93e40f82-d6ce-41a3-9ef3-17fc185f1dcb | 2,022 | Region III | TARLAC | SAN JOSE (TARLAC) | Tarlac District Engineering Office | P00637031LZ | Construction of Road Slope Protection Structures along San Jose, Tarlac-Palauig, Zambales Road (Package 7), San Jose, Tarlac | P00637031LZ-CW1 | Construction of Slope Protection Structure - Construction of Road Slope Protection Structures along San Jose, Tarlac-Palauig, Zambales Road (Package 7), San Jose, Tarlac | null | Construction of Slope Protection Structure | Flood Control Structures | 120.360661 | 15.503603 | 22CJ0180 | 96,500,000 | 94,473,488.06 | 1,669,248,000,000 | 2,022 | STO. CRISTO CONSTRUCTION & TRADING INC. (FOR: STO. CRISTO CONSTRUCTION & TRADING) | 870 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 96500000 | 94473488.06 | 2022-11-25 | 03/31/2022 | flood_control | construction-of-road-slope-protection-structures-along-san-jose-tarlac-palauig-zambales-road-package-7-san-jose-tarlac-22cj0180 | [object Object] |
74e27e90-50ab-42a8-8494-c503cce88772 | 2,022 | Region III | TARLAC | SAN JOSE (TARLAC) | Tarlac District Engineering Office | P00639353LZ | Construction of Road Slope Protection along San Jose, Tarlac - Palauig, Zambales Road (Package F), San Jose, Tarlac | P00639353LZ-CW1 | Construction of Slope Protection Structure - Construction of Road Slope Protection along San Jose, Tarlac - Palauig, Zambales Road (Package F), San Jose, Tarlac | null | Construction of Slope Protection Structure | Flood Control Structures | 120.360679 | 15.503604 | 22CJ0199 | 96,500,000 | 94,270,850 | 1,663,977,600,000 | 2,022 | THREE W BUILDERS, INC. | 871 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | TARLAC (SECOND LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 96500000 | 94270850 | 2022-09-25 | 03/30/2022 | flood_control | construction-of-road-slope-protection-along-san-jose-tarlac---palauig-zambales-road-package-f-san-jose-tarlac-22cj0199 | [object Object] |
704f28f5-3a00-4ab7-8539-9bb6d05aca9b | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00824819LZ | Construction of Flood Control structure along Bauang River Basin (Package 5), Bauang, La Union | P00824819LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control structure along Bauang River Basin (Package 5), Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.360733 | 16.516203 | 24AF0112 | 89,744,999.98 | 89,736,347.57 | 1,735,862,400,000 | 2,025 | SILVERWOLVES CONSTRUCTION CORPORATION | 872 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 89744999.98 | 89736347.57 | 2025-03-16 | 04/16/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-package-5-bauang-la-union-24af0112 | [object Object] |
c46288b7-1cb8-4131-b15c-528beb7453dd | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726062LZ | Construction of Slope Protection Works along Marusay River, Poblacion East, Calasiao, Pangasinan | P00726062LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Marusay River, Poblacion East, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.361376 | 16.008119 | 23AJ0003 | 19,600,000 | 19,599,931.81 | 1,701,216,000,000 | 2,023 | HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED | 873 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19599931.81 | 2023-07-17 | 06/21/2023 | flood_control | construction-of-slope-protection-works-along-marusay-river-poblacion-east-calasiao-pangasinan-23aj0003 | [object Object] |
b45bd609-5e06-428f-af4e-6381c79daa56 | 2,023 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00727235LZ | Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 3) | P00727235LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 3) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.36233 | 16.390257 | 23AF0102 | 72,374,999.04 | 72,334,295.99 | 1,702,080,000,000 | 2,024 | SILVERWOLVES CONSTRUCTION CORPORATION | 874 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 72374999.04 | 72334295.99 | 2024-02-11 | 04/19/2023 | flood_control | construction-of-flood-control-structure-along-the-aringay-river-basin-aringay-la-union-package-3-23af0102 | [object Object] |
22bb91fb-5d93-4cd9-afda-02f8855dbcf7 | 2,022 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Region I | P00620782LZ | Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase I) | P00620782LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase I) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.363127 | 16.023588 | 22A00078 | 129,562,830 | 129,562,772 | 1,679,616,000,000 | 2,022 | ARCINUE COMM'L CORPORATION | 875 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 129562830 | 129562772.03 | 2022-12-04 | 04/12/2022 | flood_control | construction-of-flood-control-structure-along-parongking-river-brgy-ambonao-and-brgy-san-miguel-calasiao-pangasinan-phase-i-22a00078 | [object Object] |
39622ab4-aa98-4ede-92d6-ab7e9367857c | 2,022 | Region I | LA UNION | SAN JUAN (LA UNION) | La Union 1st District Engineering Office | P00620948LZ | Rehabilitation of Baroro River Control, Brgy. Dangdangla, San Juan, La Union | P00620948LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Baroro River Control, Brgy. Dangdangla, San Juan, La Union | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.363499 | 16.683286 | 22AE0023 | 48,019,927.13 | 48,020,000 | 1,660,521,600,000 | 2,022 | MY BUILDERS AND CONSTRUCTION | 876 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 48019927.13 | 48020000 | 2022-07-28 | 02/11/2022 | flood_control | rehabilitation-of-baroro-river-control-brgy-dangdangla-san-juan-la-union-22ae0023 | [object Object] |
7bcdeba4-117d-4c31-bba1-5f6d05ea66ff | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726064LZ | Construction of Slope Protection Works along Ingalera River, Malabago, Calasiao, Pangasinan | P00726064LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, Malabago, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.363593 | 15.981701 | 23AJ0004 | 9,800,000 | 9,799,989.13 | 1,691,971,200,000 | 2,023 | HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED | 877 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 9800000 | 9799989.13 | 2023-05-31 | 05/12/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-malabago-calasiao-pangasinan-23aj0004 | [object Object] |
b9e31f5d-38e0-4e39-a815-9d1cb7eaebd9 | 2,023 | Region I | LA UNION | CITY OF SAN FERNANDO (CAPITAL) (LA UNION) | La Union 1st District Engineering Office | P00742274LZ | Construction of Slope Protection, Barangay Bacsil, City of San Fernando, La Union | P00742274LZ-CW1 | Construction of Slope Protection Structure - Construction of Slope Protection, Barangay Bacsil, City of San Fernando, La Union | null | Construction of Slope Protection Structure | Flood Control Structures | 120.364145 | 16.618659 | 23AE0034 | 4,949,992.07 | 4,949,512.1 | 1,695,600,000,000 | 2,023 | FABRO CONSTRUCTION | 878 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 4949992.07 | 4949512.1 | 2023-09-22 | 03/30/2023 | flood_control | construction-of-slope-protection-barangay-bacsil-city-of-san-fernando-la-union-23ae0034 | [object Object] |
43c9484c-4ce4-4925-9740-0f03f4d12458 | 2,022 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Region I | P00620783LZ | Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase II) | P00620783LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Parongking River, Brgy. Ambonao and Brgy. San Miguel, Calasiao, Pangasinan (Phase II) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.364366 | 16.01869 | 22A00079 | 128,345,000 | 128,344,991.7 | 1,678,060,800,000 | 2,023 | ARCINUE COMM'L CORPORATION | 879 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 128345000 | 128344991.7 | 2023-01-07 | 04/12/2022 | flood_control | construction-of-flood-control-structure-along-parongking-river-brgy-ambonao-and-brgy-san-miguel-calasiao-pangasinan-phase-ii-22a00079 | [object Object] |
44b3d9f2-e0f4-4225-8b81-cdb2d2ed3c61 | 2,024 | Region I | LA UNION | SANTO TOMAS (LA UNION) | La Union 2nd District Engineering Office | P00821103LZ | Construction of Flood Control Structures along Bauang River Basin, Sto Tomas, La Union | P00821103LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Bauang River Basin, Sto Tomas, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.365269 | 16.512147 | 24AF0195 | 96,499,998.98 | 96,494,448.46 | 1,758,585,600,000 | 2,025 | HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY | 880 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 96499998.98 | 96494448.46 | 2025-03-16 | 12/24/2024 | flood_control | construction-of-flood-control-structures-along-bauang-river-basin-sto-tomas-la-union-24af0195 | [object Object] |
d5674476-cf7f-42c8-9ce4-f3a1ef508b12 | 2,024 | Region I | LA UNION | SAN JUAN (LA UNION) | Region I | P00824805LZ | Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnion | P00824805LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Baroro River, Barangay Bambanay, San Juan, LaUnion | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.365815 | 16.67425 | 24A00277 | 154,400,000 | 154,399,997.4 | 1,732,924,800,000 | 2,024 | BALINTUGAN CONSTRUCTION | 881 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 154400000 | 154399997.44 | 2024-11-11 | 03/07/2024 | flood_control | construction-of-flood-control-structure-along-baroro-river-barangay-bambanay-san-juan-launion-24a00277 | [object Object] |
a58b6018-9c26-4339-80db-e6f8109c0914 | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726072LZ | Construction of Slope Protection Works along Ingalera River, barangay Inerangan, San Carlos City, Pangasinan | P00726072LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, barangay Inerangan, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.366355 | 15.960363 | 23AJ0016 | 19,600,000 | 19,593,200.89 | 1,690,156,800,000 | 2,023 | JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 882 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19593200.89 | 2023-05-10 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-barangay-inerangan-san-carlos-city-pangasinan-23aj0016 | [object Object] |
25d6cfa4-2418-4135-a8ab-758fe9000a09 | 2,022 | Region I | LA UNION | AGOO (LA UNION) | La Union 2nd District Engineering Office | P00631077LZ | Construction of Shore Protection Works at Brgys. Sta. Rita Sur And Sta. Rita Central, Agoo, La Union | P00631077LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Shore Protection Works at Brgys. Sta. Rita Sur And Sta. Rita Central, Agoo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.366522 | 16.323087 | 22AF0004 | 44,099,991.15 | 42,775,317.09 | 1,661,040,000,000 | 2,022 | BONIMAR CONSTRUCTION ENTERPRISES | 883 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 44099991.15 | 42775317.09 | 2022-08-15 | 02/18/2022 | flood_control | construction-of-shore-protection-works-at-brgys-sta-rita-sur-and-sta-rita-central-agoo-la-union-22af0004 | [object Object] |
d99cb784-e679-480a-b883-d7e8d90f7aba | 2,022 | Region I | LA UNION | AGOO (LA UNION) | La Union 2nd District Engineering Office | P00630927LZ | Construction of Flood Control Structures along Principe River, Brgys. Sta. Monica And Sta. Rita Sur, Agoo, La Union | P00630927LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structures along Principe River, Brgys. Sta. Monica And Sta. Rita Sur, Agoo, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.366522 | 16.323087 | 22AF0028 | 67,549,999.23 | 66,191,241.77 | 1,664,582,400,000 | 2,023 | VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 884 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 67549999.23 | 66191241.77 | 2023-05-15 | 04/04/2022 | flood_control | construction-of-flood-control-structures-along-principe-river-brgys-sta-monica-and-sta-rita-sur-agoo-la-union-22af0028 | [object Object] |
1ba9d62f-d2a6-48df-9e37-f7508db2f624 | 2,023 | Region I | LA UNION | SAN JUAN (LA UNION) | La Union 1st District Engineering Office | P00726637LZ | Rehabilitation of Baroro River Control, barangay Dangdangla, San Juan, La Union | P00726637LZ-CW1 | Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Baroro River Control, barangay Dangdangla, San Juan, La Union | null | Rehabilitation / Major Repair of Flood Control Structure | Flood Control Structures | 120.366951 | 16.681514 | 23AE0012 | 49,000,000 | 48,998,252.87 | 1,696,204,800,000 | 2,023 | MY BUILDERS AND CONSTRUCTION | 885 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 49000000 | 48998252.87 | 2023-08-24 | 02/10/2023 | flood_control | rehabilitation-of-baroro-river-control-barangay-dangdangla-san-juan-la-union-23ae0012 | [object Object] |
fb0e57b5-aeda-4757-be08-7ca4a8048c7c | 2,024 | Region I | PANGASINAN | BAYAMBANG (PANGASINAN) | Pangasinan 4th District Engineering Office | P00825216LZ | Construction of Flood Control Structure along Agno River, Caturay Section, Bayambang, Pangasinan | P00825216LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Agno River, Caturay Section, Bayambang, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.367 | 15.786 | 24AJ0097 | 39,200,000 | 9,533,434.84 | 1,728,864,000,000 | 2,024 | HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED / JHI CONSTRUCTION & SUPPLY | 886 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | Clustered with Contract ID 24AJ0097 | 9533434.84 | 2024-08-05 | 05/06/2024 | flood_control | construction-of-flood-control-structure-along-agno-river-caturay-section-bayambang-pangasinan-24aj0097 | [object Object] |
0dcd35d9-bc90-42db-8d38-e6a901532e50 | 2,023 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00727236LZ | Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 4) | P00727236LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 4) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.367623 | 16.389579 | 23AF0103 | 72,374,999.67 | 72,334,428.4 | 1,702,080,000,000 | 2,024 | SILVERWOLVES CONSTRUCTION CORPORATION | 887 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 72374999.67 | 72334428.4 | 2024-02-11 | 04/19/2023 | flood_control | construction-of-flood-control-structure-along-the-aringay-river-basin-aringay-la-union-package-4-23af0103 | [object Object] |
3f82f417-298a-432d-93b7-167b26703e84 | 2,024 | Region I | LA UNION | BAUANG (LA UNION) | La Union 2nd District Engineering Office | P00825211LZ | Construction of Flood Control Structure along Bauang River Basin, Barangay Cabalayangan, Bauang, La Union | P00825211LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Bauang River Basin, Barangay Cabalayangan, Bauang, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.367721 | 16.512074 | 24AF0102 | 48,249,993.13 | 48,238,274.49 | 1,727,654,400,000 | 2,024 | UNIVERSAL DE LEON CONSTRUCTION AND AGGREGATES | 888 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 48249993.13 | 48238274.49 | 2024-12-23 | 03/19/2024 | flood_control | construction-of-flood-control-structure-along-bauang-river-basin-barangay-cabalayangan-bauang-la-union-24af0102 | [object Object] |
c3b52598-3a75-4efc-a9e4-469859ad8796 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726060LZ | Construction of Slope Protection Works along Ingalera River, Doyong Section, Calasiao, Pangasinan | P00726060LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, Doyong Section, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.368336 | 15.96668 | 23AJ0064 | 49,000,000 | 48,999,947.92 | 1,701,129,600,000 | 2,023 | BERSON'S CONSTRUCTION & TRADING | 889 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 48999947.92 | 2023-11-29 | 02/22/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-doyong-section-calasiao-pangasinan-23aj0064 | [object Object] |
eac73e96-a3f8-4ebe-9999-ec0bc55a66ed | 2,023 | Region I | LA UNION | SAN JUAN (LA UNION) | La Union 1st District Engineering Office | P00742273LZ | Construction of Flood Control Project, Brgy. Dangdangla, San Juan, La Union | P00742273LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Project, Brgy. Dangdangla, San Juan, La Union | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.36854 | 16.680194 | 23AE0061 | 9,900,000 | 9,898,955.58 | 1,695,945,600,000 | 2,023 | FABRO CONSTRUCTION | 890 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (FIRST LEGISLATIVE DISTRICT) | La Union 1st District Engineering Office | 9900000 | 9898955.58 | 2023-12-15 | 04/04/2023 | flood_control | construction-of-flood-control-project-brgy-dangdangla-san-juan-la-union-23ae0061 | [object Object] |
4019f6f7-0a4c-4c51-ab28-ac001a4d3138 | 2,023 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726061LZ | Construction of Slope Protection Works along Ingalera River, Songkoy Section, Calasiao, Pangasinan | P00726061LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along Ingalera River, Songkoy Section, Calasiao, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.369113 | 15.957514 | 23AJ0014 | 49,000,000 | 48,999,998.83 | 1,700,352,000,000 | 2,023 | ORIENTAL SALES CENTER AND CONTRACTOR / ALCEL CONSTRUCTION | 891 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 49000000 | 48999998.83 | 2023-11-20 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-ingalera-river-songkoy-section-calasiao-pangasinan-23aj0014 | [object Object] |
69f2c480-7065-4837-855a-5a9791b1c9d2 | 2,024 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00844729LZ | Construction of Slope Protection Structure along San Juan River Barangay Turac, San Carlos City, Pangasinan | P00844729LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Structure along San Juan River Barangay Turac, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.37 | 15.895 | 24AJ0049 | 19,600,000 | 19,197,354.75 | 1,725,235,200,000 | 2,024 | EXTENSIVE STEEL WORKS AND CONSTRUCTION | 892 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19197354.75 | 2024-07-17 | 03/25/2024 | flood_control | construction-of-slope-protection-structure-along-san-juan-river-barangay-turac-san-carlos-city-pangasinan-24aj0049 | [object Object] |
d2a4b83e-b94e-4f0c-b03a-e2e3a209e42e | 2,023 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00726071LZ | Construction of Slope Protection Works along San Juan River, Barangay Turac, San Carlos City, Pangasinan (Phase II) | P00726071LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along San Juan River, Barangay Turac, San Carlos City, Pangasinan (Phase II) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.370431 | 15.895265 | 23AJ0012 | 19,600,000 | 19,212,536.57 | 1,690,156,800,000 | 2,023 | BALLESTEROS CONSTRUCTION AND SUPPLY | 893 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19212536.57 | 2023-03-24 | 02/13/2023 | flood_control | construction-of-slope-protection-works-along-san-juan-river-barangay-turac-san-carlos-city-pangasinan-phase-ii-23aj0012 | [object Object] |
4e0b3e10-c01b-4997-8c87-f58aa63fefe6 | 2,022 | Region I | PANGASINAN | SAN CARLOS CITY (PANGASINAN) | Pangasinan 4th District Engineering Office | P00621447LZ | Construction of Slope Protection Works along San Juan River, Brgy. Turac, San Carlos City, Pangasinan | P00621447LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection Works along San Juan River, Brgy. Turac, San Carlos City, Pangasinan | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.37045 | 15.895245 | 22AJ0062 | 19,600,000 | 19,594,702.35 | 1,661,990,400,000 | 2,022 | BALLESTEROS CONSTRUCTION AND SUPPLY | 894 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 19600000 | 19594702.35 | 2022-08-08 | 03/24/2022 | flood_control | construction-of-slope-protection-works-along-san-juan-river-brgy-turac-san-carlos-city-pangasinan-22aj0062 | [object Object] |
102da070-227f-49b3-8af8-6a046bdcadd6 | 2,023 | Region I | LA UNION | AGOO (LA UNION) | Region I | P00726827LZ | Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 1) | P00726827LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along the Principe River, Agoo, La Union (Package 1) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.37064 | 16.327532 | 23A00268 | 72,375,000 | 72,364,531.35 | 1,712,188,800,000 | 2,024 | SILVERWOLVES CONSTRUCTION CORPORATION | 895 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 72375000 | 72364531.35 | 2024-04-05 | 05/12/2023 | flood_control | construction-of-flood-control-structure-along-the-principe-river-agoo-la-union-package-1-23a00268 | [object Object] |
c89b9ee5-74b2-44c8-a412-31d8814aeaf4 | 2,023 | Region I | LA UNION | ARINGAY (LA UNION) | La Union 2nd District Engineering Office | P00727237LZ | Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 5) | P00727237LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control Structure along the Aringay River Basin, Aringay, La Union (Package 5) | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.370719 | 16.390117 | 23AF0104 | 72,374,998.57 | 72,334,998.57 | 1,702,080,000,000 | 2,024 | MG SAMIDAN CONSTRUCTION | 896 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | LA UNION (SECOND LEGISLATIVE DISTRICT) | La Union 2nd District Engineering Office | 72374998.57 | 72334998.57 | 2024-02-11 | 04/19/2023 | flood_control | construction-of-flood-control-structure-along-the-aringay-river-basin-aringay-la-union-package-5-23af0104 | [object Object] |
9d37efc2-8d05-4ec6-adf9-5f18bae4cc81 | 2,023 | Region I | ILOCOS SUR | SAN VICENTE (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00727066LZ | Construction of Flood Control along Bantaoay River, Barangay San Sebastian, San Vicente, Ilocos Sur | P00727066LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along Bantaoay River, Barangay San Sebastian, San Vicente, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.37084 | 17.612065 | 23AC0053 | 29,400,000 | 29,400,000 | 1,689,465,600,000 | 2,023 | FIT CONSTRUCTION | 897 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 29400000 | 29400000 | 2023-07-17 | 03/10/2023 | flood_control | construction-of-flood-control-along-bantaoay-river-barangay-san-sebastian-san-vicente-ilocos-sur-23ac0053 | [object Object] |
1d0cb867-c5a9-4c4f-a130-16ce5daaa0e4 | 2,022 | Region I | ILOCOS SUR | SAN VICENTE (ILOCOS SUR) | Ilocos Sur 1st District Engineering Office | P00620777LZ | Construction of Flood Control along Bantaoay River, San Vicente, Ilocos Sur | P00620777LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Flood Control along Bantaoay River, San Vicente, Ilocos Sur | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.371172 | 17.618784 | 22AC0014 | 93,100,000 | 91,675,000 | 1,671,494,400,000 | 2,022 | A.P.B. CONSTRUCTION / FIT CONSTRUCTION | 898 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,022 | ILOCOS SUR (FIRST LEGISLATIVE DISTRICT) | Ilocos Sur 1st District Engineering Office | 93100000 | 91675000 | 2022-12-15 | 02/24/2022 | flood_control | construction-of-flood-control-along-bantaoay-river-san-vicente-ilocos-sur-22ac0014 | [object Object] |
51be994a-15c5-4aca-8187-869062412962 | 2,023 | Region III | TARLAC | SAN CLEMENTE (TARLAC) | Tarlac District Engineering Office | P00735973LZ | Construction of Slope Protection with Steel Sheet Pile Foundation Along Batacan River, Pit-ao Section (Package C), Barangay Pit-ao, San Clemente, Tarlac | P00735973LZ-CW1 | Construction of Flood Mitigation Structure - Construction of Slope Protection with Steel Sheet Pile Foundation Along Batacan River, Pit-ao Section (Package C), Barangay Pit-ao, San Clemente, Tarlac | null | Construction of Flood Mitigation Structure | Flood Control Structures | 120.371742 | 15.736619 | 23CJ0048 | 72,375,000 | 70,203,757.24 | 1,699,315,200,000 | 2,023 | R.R. RICAFORT CONSTRUCTION AND SUPPLIES | 899 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,023 | TARLAC (FIRST LEGISLATIVE DISTRICT) | Tarlac District Engineering Office | 72375000 | 70203757.24 | 2023-11-08 | 02/10/2023 | flood_control | construction-of-slope-protection-with-steel-sheet-pile-foundation-along-batacan-river-pit-ao-section-package-c-barangay-pit-ao-san-clemente-tarlac-23cj0048 | [object Object] |
54b6f175-7ee1-4a2e-a1ac-d2c4d765c785 | 2,024 | Region I | PANGASINAN | CALASIAO (PANGASINAN) | Pangasinan 4th District Engineering Office | P00845920LZ | Construction of Drainage, Brgy. Cabilocaan, Calasiao, Pangasinan | P00845920LZ-CW1 | Construction of Drainage Structure - Construction of Drainage, Brgy. Cabilocaan, Calasiao, Pangasinan | null | Construction of Drainage Structure | Flood Control Structures | 120.372 | 16.025 | 24AJ0056 | 4,950,000 | 4,815,318.1 | 1,726,012,800,000 | 2,024 | JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 900 | 1,754,268,322,388 | dpwh_view | 1,754,303,523,936 | dpwh_view | 2,024 | PANGASINAN (THIRD LEGISLATIVE DISTRICT) | Pangasinan 4th District Engineering Office | 4950000 | 4815318.1 | 2024-09-03 | 03/25/2024 | flood_control | construction-of-drainage-brgy-cabilocaan-calasiao-pangasinan-24aj0056 | [object Object] |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.