GlobalID
stringlengths 36
36
| InfraYear
int64 2.02k
2.03k
| Region
stringclasses 16
values | Province
stringclasses 98
values | Municipality
stringlengths 11
52
⌀ | ImplementingOffice
stringclasses 203
values | ProjectID
stringlengths 11
11
| ProjectDescription
stringlengths 37
314
| ProjectComponentID
stringlengths 15
15
| ProjectComponentDescription
stringlengths 74
359
| Program
float64 | TypeofWork
stringclasses 18
values | infra_type
stringclasses 1
value | Longitude
float64 117
127
| Latitude
float64 5.77
20.5
| ContractID
stringlengths 8
8
| ABC
float64 1.16M
311M
| ContractCost
float64 1.15M
290M
| CompletionDateOriginal
float64 1,539B
1,770B
⌀ | CompletionYear
int64 2.02k
2.03k
| Contractor
stringlengths 10
199
| ObjectId
int64 1
9.86k
| CreationDate
int64 1,754B
1,754B
| Creator
stringclasses 1
value | EditDate
int64 1,754B
1,754B
| Editor
stringclasses 1
value | FundingYear
int64 2.02k
2.03k
| LegislativeDistrict
stringclasses 252
values | DistrictEngineeringOffice
stringclasses 199
values | ABC_String
stringlengths 7
72
| ContractCost_String
stringlengths 7
72
| CompletionDateActual
stringdate 2022-07-01 00:00:00
2025-05-30 00:00:00
| StartDate
stringclasses 739
values | type
stringclasses 1
value | slug
stringlengths 44
273
| _geo
stringclasses 1
value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6dc483b1-5b8d-4577-b78c-c39b391f8ca5
| 2,023
|
Region X
|
BUKIDNON
|
CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00732049MN
|
Construction of Flood Mitigation Structure, Barangay 9, Malaybalay City, Bukidnon
|
P00732049MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, Barangay 9, Malaybalay City, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.135442
| 8.152251
|
23KA0100
| 96,500,000
| 96,499,999.25
| 1,708,646,400,000
| 2,024
|
HGG BUILDERS & SUPPLY
| 9,602
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
96500000
|
96499999.25
|
2024-02-24
|
02/28/2023
|
flood_control
|
construction-of-flood-mitigation-structure-barangay-9-malaybalay-city-bukidnon-23ka0100
|
[object Object]
|
faff6c67-ac5f-4837-a408-9eae43515657
| 2,022
|
Region XIII
|
SURIGAO DEL SUR
|
LANUZA (SURIGAO DEL SUR)
|
Surigao del Sur 1st District Engineering Office
|
P00630655MN
|
Construction of River Wall along Bypass Road to Purok 3 of Barangay Zone III, Lanuza, Surigao del Sur
|
P00630655MN-CW1
|
Construction of Flood Mitigation Structure - Construction of River Wall along Bypass Road to Purok 3 of Barangay Zone III, Lanuza, Surigao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.062644
| 9.230783
|
22NH0021
| 29,400,000
| 29,399,774.88
| 1,676,937,600,000
| 2,023
|
O. G. SANTOS CONSTRUCTION
| 9,603
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SURIGAO DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Surigao del Sur 1st District Engineering Office
|
29400000
|
29399774.88
|
2023-02-22
|
08/01/2022
|
flood_control
|
construction-of-river-wall-along-bypass-road-to-purok-3-of-barangay-zone-iii-lanuza-surigao-del-sur-22nh0021
|
[object Object]
|
fc0e3d41-e270-4607-8cb5-5840e883d838
| 2,024
|
Region X
|
BUKIDNON
|
CABANGLASAN (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00820046MN
|
Construction of Flood Mitigation Structure, barangay Paradise (Phase 2), Cabanglasan, Bukidnon
|
P00820046MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, barangay Paradise (Phase 2), Cabanglasan, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.301692
| 7.997293
|
24KA0104
| 96,500,000
| 96,500,000
| 1,746,662,400,000
| 2,025
|
ROSBILL CONSTRUCTION AND SUPPLY
| 9,604
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
96500000
|
96500000
|
2025-05-09
|
01/31/2024
|
flood_control
|
construction-of-flood-mitigation-structure-barangay-paradise-phase-2-cabanglasan-bukidnon-24ka0104
|
[object Object]
|
e681eb11-b50c-4f20-b6e4-9f1d6cb51383
| 2,022
|
Region XIII
|
AGUSAN DEL SUR
|
CITY OF BAYUGAN (AGUSAN DEL SUR)
|
Agusan del Sur 1st District Engineering Office
|
P00620352MN
|
Construction of Flood Mitigation Structures along Andanan River Bank (Upstream), Bayugan City, Agusan del Sur
|
P00620352MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structures along Andanan River Bank (Upstream), Bayugan City, Agusan del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.730801
| 8.731407
|
22NB0043
| 49,000,000
| 48,999,901.68
| 1,679,097,600,000
| 2,023
|
CM TAN CONSTRUCTION
| 9,605
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
AGUSAN DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Agusan del Sur 1st District Engineering Office
|
49000000
|
48999901.68
|
2023-03-19
|
05/24/2022
|
flood_control
|
construction-of-flood-mitigation-structures-along-andanan-river-bank-upstream-bayugan-city-agusan-del-sur-22nb0043
|
[object Object]
|
43af7871-af77-4ebf-a46c-5a8714012b4c
| 2,022
|
Region XIII
|
SURIGAO DEL SUR
|
CITY OF BISLIG (SURIGAO DEL SUR)
|
Surigao del Sur 2nd District Engineering Office
|
P00620303MN
|
Improvement of Drainage Canal along NRJ Cumawas- Tinuy-an Falls Road, Cumawas, Sta. 0+000.00 - Sta. 2+000.00, Bislig City, Surigao del Sur
|
P00620303MN-CW1
|
Construction of Drainage Structure - Improvement of Drainage Canal along NRJ Cumawas- Tinuy-an Falls Road, Cumawas, Sta. 0+000.00 - Sta. 2+000.00, Bislig City, Surigao del Sur
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 126.33751
| 8.18276
|
22NI0048
| 49,000,000
| 48,999,970.58
| 1,694,908,800,000
| 2,023
|
A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D / MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC.
| 9,606
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SURIGAO DEL SUR (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Sur 2nd District Engineering Office
|
49000000
|
48999970.58
|
2023-09-16
|
03/04/2022
|
flood_control
|
improvement-of-drainage-canal-along-nrj-cumawas--tinuy-an-falls-road-cumawas-sta-000000---sta-200000-bislig-city-surigao-del-sur-22ni0048
|
[object Object]
|
c46c71e2-8850-478c-820c-7ca529904a4d
| 2,024
|
Region X
|
BUKIDNON
|
IMPASUG-ONG (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00820047MN
|
Construction of Flood Mitigation Structure, barangay Poblacion (Phase 2), Impasug-ong, Bukidnon
|
P00820047MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, barangay Poblacion (Phase 2), Impasug-ong, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.135744
| 8.150217
|
24KA0105
| 96,500,000
| 96,500,000
| 1,744,156,800,000
| 2,025
|
ROSBILL CONSTRUCTION AND SUPPLY
| 9,607
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
96500000
|
96500000
|
2025-04-10
|
01/31/2024
|
flood_control
|
construction-of-flood-mitigation-structure-barangay-poblacion-phase-2-impasug-ong-bukidnon-24ka0105
|
[object Object]
|
f68f852f-6338-4a25-b497-2d6ef1a47575
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
DAVAO CITY (DAVAO DEL SUR)
|
Davao City District Engineering Office
|
P00620163MN
|
Construction of Esplanade at Davao River, Right Bank Outfall Section, Davao City
|
P00620163MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Esplanade at Davao River, Right Bank Outfall Section, Davao City
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.605978
| 7.048473
|
22LB0025
| 29,400,000
| 29,400,000
| 1,698,192,000,000
| 2,023
|
GENESIS88 CONSTRUCTION INC.
| 9,608
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
29400000
|
29400000
|
2023-10-26
|
03/31/2022
|
flood_control
|
construction-of-esplanade-at-davao-river-right-bank-outfall-section-davao-city-22lb0025
|
[object Object]
|
c31dac97-3bb4-4bd6-a4c5-f5dc4d954964
| 2,022
|
Region XII
|
SARANGANI
|
ALABEL (CAPITAL) (SARANGANI)
|
Sarangani District Engineering Office
|
P00620183MN
|
Construction of Bagacay Bridge Flood Control, Alabel, Sarangani
|
P00620183MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Bagacay Bridge Flood Control, Alabel, Sarangani
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.301856
| 6.109917
|
22ME0032
| 29,400,000
| 29,399,996.68
| 1,665,705,600,000
| 2,022
|
SILVER HAMMER CONSTRUCTION AND SUPPLIES
| 9,609
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SARANGANI (LEGISLATIVE DISTRICT)
|
Sarangani District Engineering Office
|
29400000
|
29399996.68
|
2022-10-03
|
03/20/2022
|
flood_control
|
construction-of-bagacay-bridge-flood-control-alabel-sarangani-22me0032
|
[object Object]
|
ab7b392e-b382-40a6-aa64-389fdb869c47
| 2,023
|
Region XI
|
DAVAO DE ORO
|
MONKAYO (DAVAO DE ORO)
|
Davao de Oro 2nd District Engineering Office
|
P00721563MN
|
Construction of revetment along Aunan Creek (Bridge section Downstream) leading to agusan River at Barangay Babag, Monkayo, Davao de Oro
|
P00721563MN-CW1
|
Construction of Revetment - Construction of revetment along Aunan Creek (Bridge section Downstream) leading to agusan River at Barangay Babag, Monkayo, Davao de Oro
| null |
Construction of Revetment
|
Flood Control Structures
| 126.066408
| 7.74682
|
23LI0062
| 96,500,000
| 96,499,596.51
| 1,707,177,600,000
| 2,023
|
ROSBILL CONSTRUCTION AND SUPPLY
| 9,610
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO DE ORO (FIRST LEGISLATIVE DISTRICT)
|
Davao de Oro 2nd District Engineering Office
|
96500000
|
96499596.51
|
2023-12-06
|
03/28/2023
|
flood_control
|
construction-of-revetment-along-aunan-creek-bridge-section-downstream-leading-to-agusan-river-at-barangay-babag-monkayo-davao-de-oro-23li0062
|
[object Object]
|
a5ae20eb-8d9e-4d9b-acce-e54900d33a35
| 2,023
|
Region XII
|
SARANGANI
|
ALABEL (CAPITAL) (SARANGANI)
|
Sarangani District Engineering Office
|
P00734000MN
|
Construction of Flood Mitigation Structure at Bagacay Creek, Brgy. Bagacay, Alabel, Sarangani Province
|
P00734000MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure at Bagacay Creek, Brgy. Bagacay, Alabel, Sarangani Province
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.30371
| 6.11233
|
23ME0054
| 77,200,000
| 77,188,853.74
| 1,706,140,800,000
| 2,023
|
J.G. ORANZA CONSTRUCTION
| 9,611
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SARANGANI (LEGISLATIVE DISTRICT)
|
Sarangani District Engineering Office
|
77200000
|
77188853.74
|
2023-12-15
|
05/02/2023
|
flood_control
|
construction-of-flood-mitigation-structure-at-bagacay-creek-brgy-bagacay-alabel-sarangani-province-23me0054
|
[object Object]
|
a4f4aa06-1247-4b35-883e-9e4689c7f60b
| 2,023
|
Region XIII
|
SURIGAO DEL NORTE
|
GIGAQUIT (SURIGAO DEL NORTE)
|
Surigao del Norte 2nd District Engineering Office
|
P00721629MN
|
Construction of Flood Mitigation Structure along Magallanes River, Brgy. Lahi, Gigaquit, Surigao del Norte
|
P00721629MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Magallanes River, Brgy. Lahi, Gigaquit, Surigao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.7319
| 9.4985
|
23NG0046
| 49,000,000
| 47,523,238.44
| 1,696,377,600,000
| 2,023
|
ABOA CONSTRUCTION AND SUPPLY / CHARLZ CONSTRUCTION, INC.
| 9,612
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SURIGAO DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Norte 2nd District Engineering Office
|
49000000
|
47523238.44
|
2023-07-31
|
03/24/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-magallanes-river-brgy-lahi-gigaquit-surigao-del-norte-23ng0046
|
[object Object]
|
01f67fca-7355-40dd-bd7c-a2f53cd606bb
| 2,024
|
Region XIII
|
SURIGAO DEL SUR
|
HINATUAN (SURIGAO DEL SUR)
|
Surigao del Sur 2nd District Engineering Office
|
P00820928MN
|
Construction of Bank Revetment along Hinatuan River (Sto. Niño Section), Hinatuan, Surigao del Sur
|
P00820928MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Bank Revetment along Hinatuan River (Sto. Niño Section), Hinatuan, Surigao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.33771
| 8.3705
|
24NI0057
| 115,800,000
| 115,796,983.1
| 1,743,638,400,000
| 2,024
|
LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)
| 9,613
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
SURIGAO DEL SUR (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Sur 2nd District Engineering Office
|
115800000
|
115796983.1
|
2024-11-27
|
04/15/2024
|
flood_control
|
construction-of-bank-revetment-along-hinatuan-river-sto-nio-section-hinatuan-surigao-del-sur-24ni0057
|
[object Object]
|
8471e0b5-32fa-4fd3-82df-2939fc340116
| 2,022
|
Region XII
|
SOUTH COTABATO
|
GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)
|
South Cotabato 1st District Engineering Office
|
P00620283MN
|
Construction of Concrete Revetment, Sinawal River, Barangay Labangal, General Santos City
|
P00620283MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment, Sinawal River, Barangay Labangal, General Santos City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.138251
| 6.120865
|
22MB0016
| 49,000,000
| 48,849,784.13
| 1,661,904,000,000
| 2,022
|
MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS) / REYDAN BUILDERS
| 9,614
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
49000000
|
48849784.13
|
2022-10-01
|
02/24/2022
|
flood_control
|
construction-of-concrete-revetment-sinawal-river-barangay-labangal-general-santos-city-22mb0016
|
[object Object]
|
626c6ee8-8a4f-45ea-8a19-d57efeb14a8c
| 2,021
|
Region XI
|
DAVAO DEL SUR
| null |
Davao City District Engineering Office
|
P00522319MN
|
Construction of Esplanade at Davao River, Right Bank, Bolton Bridge Downstream Section, Davao City
|
P00522319MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Esplanade at Davao River, Right Bank, Bolton Bridge Downstream Section, Davao City
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.606042
| 7.049336
|
21LB0254
| 71,796,000
| 71,796,000
| 1,674,864,000,000
| 2,022
|
PRIMECON BUILDERS, INC. / ARCINUE COMM'L CORPORATION
| 9,615
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
71796000
|
71796000
|
2022-10-20
|
12/05/2021
|
flood_control
|
construction-of-esplanade-at-davao-river-right-bank-bolton-bridge-downstream-section-davao-city-21lb0254
|
[object Object]
|
cc803451-0294-4c79-87a8-f3e2f4a5519d
| 2,023
|
Region XIII
|
SURIGAO DEL NORTE
|
BURGOS (SURIGAO DEL NORTE)
|
Surigao del Norte 1st District Engineering Office
|
P00734421MN
|
Construction of Seashore Protection (Seawall) along the Shore of Brgy. Poblacion 1, Poblacion 2, and Bitaug in Municipality of Burgos, Surigao del Norte
|
P00734421MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Seashore Protection (Seawall) along the Shore of Brgy. Poblacion 1, Poblacion 2, and Bitaug in Municipality of Burgos, Surigao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.06998
| 10.02392
|
23NF0028
| 4,950,000
| 4,948,878.13
| 1,693,180,800,000
| 2,023
|
BAMBOE CONSTRUCTION
| 9,616
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SURIGAO DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Surigao del Norte 1st District Engineering Office
|
4950000
|
4948878.13
|
2023-08-27
|
05/03/2023
|
flood_control
|
construction-of-seashore-protection-seawall-along-the-shore-of-brgy-poblacion-1-poblacion-2-and-bitaug-in-municipality-of-burgos-surigao-del-norte-23nf0028
|
[object Object]
|
7f998d1c-e9bd-4e95-9d94-b8f73637d969
| 2,022
|
Region VIII
|
NORTHERN SAMAR
|
LAPINIG (NORTHERN SAMAR)
|
Northern Samar 2nd District Engineering Office
|
P00633244VS
|
Rehabilitation of Seawall, Brgy. Del Norte, Lapinig, Northern Samar
|
P00633244VS-CW1
|
Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Seawall, Brgy. Del Norte, Lapinig, Northern Samar
| null |
Rehabilitation / Major Repair of Flood Control Structure
|
Flood Control Structures
| 125.304722
| 12.315
|
22II0054
| 49,499,783.9
| 49,004,700
| 1,671,235,200,000
| 2,022
|
CDU CONSTRUCTION
| 9,617
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
NORTHERN SAMAR (SECOND LEGISLATIVE DISTRICT)
|
Northern Samar 2nd District Engineering Office
|
49499783.9
|
49004700
|
2022-12-05
|
05/20/2022
|
flood_control
|
rehabilitation-of-seawall-brgy-del-norte-lapinig-northern-samar-22ii0054
|
[object Object]
|
3d108a2d-3f4b-4b7e-bbb9-108deabe0990
| 2,022
|
Region XIII
|
SURIGAO DEL SUR
|
HINATUAN (SURIGAO DEL SUR)
|
Region XIII
|
P00632319MN
|
Construction of Rockfall Protection Along Cambatong - Portlamon -Baculin Road (Cambatong Section) Hinatuan, Surigao Del Sur
|
P00632319MN-CW1
|
Construction of Slope Protection Structure - Construction of Rockfall Protection Along Cambatong - Portlamon -Baculin Road (Cambatong Section) Hinatuan, Surigao Del Sur
| null |
Construction of Slope Protection Structure
|
Flood Control Structures
| 126.343611
| 8.432222
|
22N00180
| 106,150,000
| 106,149,679.1
| 1,694,649,600,000
| 2,023
|
NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC
| 9,618
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SURIGAO DEL SUR (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Sur 2nd District Engineering Office
|
106150000
|
106149679.14
|
2023-09-12
|
09/19/2022
|
flood_control
|
construction-of-rockfall-protection-along-cambatong---portlamon--baculin-road-cambatong-section-hinatuan-surigao-del-sur-22n00180
|
[object Object]
|
83f95ae9-1961-49e8-a7b7-a72e2095aed7
| 2,022
|
Region XIII
|
SURIGAO DEL NORTE
|
GIGAQUIT (SURIGAO DEL NORTE)
|
Surigao del Norte 2nd District Engineering Office
|
P00630642MN
|
Construction of Flood Mitigation Structure along Magallanes River, Barangay Lahi, Gigaquit, Surigao del Norte
|
P00630642MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Magallanes River, Barangay Lahi, Gigaquit, Surigao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.73806
| 9.49861
|
22NG0020
| 49,000,000
| 48,990,622.84
| 1,661,299,200,000
| 2,022
|
JMT CONSTRUCTION
| 9,619
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SURIGAO DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Norte 2nd District Engineering Office
|
49000000
|
48990622.84
|
2022-08-25
|
02/11/2022
|
flood_control
|
construction-of-flood-mitigation-structure-along-magallanes-river-barangay-lahi-gigaquit-surigao-del-norte-22ng0020
|
[object Object]
|
ea648dfd-8c47-4748-84ee-d5cd7933334d
| 2,020
|
Region XI
|
DAVAO DEL SUR
| null |
Davao City District Engineering Office
|
P00420007MN
|
Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City
|
P00420007MN-CW1
|
Construction of Revetment - Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.606269
| 7.053756
|
20LB0036
| 77,523,275
| 77,523,275
| 1,671,321,600,000
| 2,022
|
APEIRON CONSTRUCTION SOLUTIONS / ABU CONSTRUCTION
| 9,620
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,020
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
77523275
|
77523275
|
2022-12-19
|
12/10/2020
|
flood_control
|
construction-of-revetment-along-davao-river-sta-1095-to-sta-1543-davao-city-20lb0036
|
[object Object]
|
c2932c10-3546-4e48-b008-e621e22a5668
| 2,023
|
Region XII
|
SOUTH COTABATO
|
GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)
|
South Cotabato 1st District Engineering Office
|
P00734409MN
|
Construction of Drainage, Barangay Apopong, General Santos City, South Cotabato
|
P00734409MN-CW1
|
Construction of Drainage Structure - Construction of Drainage, Barangay Apopong, General Santos City, South Cotabato
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 125.138384
| 6.137223
|
23MB0087
| 9,900,000
| 9,899,952.37
| 1,695,427,200,000
| 2,023
|
MJ TIONGSON CONSTRUCTION (FORMERLY: MJT BUILDERS)
| 9,621
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
9900000
|
9899952.37
|
2023-09-14
|
04/11/2023
|
flood_control
|
construction-of-drainage-barangay-apopong-general-santos-city-south-cotabato-23mb0087
|
[object Object]
|
136f202a-84c3-4078-8b1d-557c58b4111a
| 2,023
|
Region XI
|
DAVAO DE ORO
|
MONKAYO (DAVAO DE ORO)
|
Davao de Oro 2nd District Engineering Office
|
P00721562MN
|
Construction of revetment along Aunan Creek (Bridge section Upstream) leading to agusan River at Barangay Babag, Monkayo, Davao de Oro
|
P00721562MN-CW1
|
Construction of Revetment - Construction of revetment along Aunan Creek (Bridge section Upstream) leading to agusan River at Barangay Babag, Monkayo, Davao de Oro
| null |
Construction of Revetment
|
Flood Control Structures
| 126.07076
| 7.744367
|
23LI0061
| 96,500,000
| 96,499,253.36
| 1,707,177,600,000
| 2,023
|
ROSBILL CONSTRUCTION AND SUPPLY
| 9,622
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO DE ORO (FIRST LEGISLATIVE DISTRICT)
|
Davao de Oro 2nd District Engineering Office
|
96500000
|
96499253.36
|
2023-12-27
|
03/28/2023
|
flood_control
|
construction-of-revetment-along-aunan-creek-bridge-section-upstream-leading-to-agusan-river-at-barangay-babag-monkayo-davao-de-oro-23li0061
|
[object Object]
|
1d38fec1-a635-44e8-b1e4-38192af1b45f
| 2,024
|
Region XII
|
SARANGANI
|
ALABEL (CAPITAL) (SARANGANI)
|
Region XII
|
P00833571MN
|
Construction of Flood Mitigation Structure, Bagacay Creek, Barangay Bagacay, Alabel, Sarangani Province
|
P00833571MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, Bagacay Creek, Barangay Bagacay, Alabel, Sarangani Province
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.304963
| 6.113606
|
24M00112
| 89,100,000
| 89,000,301.34
| 1,739,664,000,000
| 2,025
|
J.G. ORANZA CONSTRUCTION
| 9,623
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
SARANGANI (LEGISLATIVE DISTRICT)
|
Sarangani District Engineering Office
|
89100000
|
89000301.34
|
2025-02-17
|
05/27/2024
|
flood_control
|
construction-of-flood-mitigation-structure-bagacay-creek-barangay-bagacay-alabel-sarangani-province-24m00112
|
[object Object]
|
0b592da4-66a1-4662-9938-372224aa20ad
| 2,024
|
Region XIII
|
SURIGAO DEL SUR
|
CITY OF BISLIG (SURIGAO DEL SUR)
|
Region XIII
|
P00833294MN
|
Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Rd, Surigao del Sur
|
P00833294MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Rd, Surigao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.345678
| 8.184419
|
24N00100
| 173,700,000
| 173,699,971.7
| 1,735,430,400,000
| 2,024
|
J.M. LUCIANO CONSTRUCTION, INC. / SURIGAO LA SUERTE CORPORATION
| 9,624
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
SURIGAO DEL SUR (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Sur 2nd District Engineering Office
|
173700000
|
173699971.67
|
2024-09-15
|
03/06/2024
|
flood_control
|
construction-of-bislig-city-coastal-protection-along-surigao-davao-coastal-rd-surigao-del-sur-24n00100
|
[object Object]
|
13086a2a-c364-4cd8-b685-f89a704bef6d
| 2,022
|
Region XIII
|
SURIGAO DEL NORTE
|
CLAVER (SURIGAO DEL NORTE)
|
Surigao del Norte 2nd District Engineering Office
|
P00634153MN
|
Rehabilitation of Seawall, Sitio Sabang, Brgy. Tayaga, Claver, Surigao del Norte
|
P00634153MN-CW1
|
Construction of Flood Mitigation Structure - Rehabilitation of Seawall, Sitio Sabang, Brgy. Tayaga, Claver, Surigao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.73806
| 9.58639
|
22NG0059
| 4,950,000
| 4,875,748.77
| 1,657,670,400,000
| 2,022
|
ZI 9 BUILDERS AND SUPPLIES
| 9,625
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SURIGAO DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Norte 2nd District Engineering Office
|
4950000
|
4875748.77
|
2022-07-14
|
04/13/2022
|
flood_control
|
rehabilitation-of-seawall-sitio-sabang-brgy-tayaga-claver-surigao-del-norte-22ng0059
|
[object Object]
|
ad3a0cdc-a420-45f5-bae1-a1ffba79db2d
| 2,023
|
Region XII
|
SOUTH COTABATO
|
GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)
|
South Cotabato 1st District Engineering Office
|
P00721315MN
|
Construction of Concrete Revetment, Mabuhay Bridge, General Santos City
|
P00721315MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Concrete Revetment, Mabuhay Bridge, General Santos City
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.138472
| 6.191208
|
23MB0074
| 51,145,000
| 51,089,346.18
| 1,703,376,000,000
| 2,024
|
TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS)
| 9,626
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
51145000
|
51089346.18
|
2024-02-02
|
07/10/2023
|
flood_control
|
construction-of-concrete-revetment-mabuhay-bridge-general-santos-city-23mb0074
|
[object Object]
|
3c020ba8-7840-4113-8d47-f6bc429ebb94
| 2,022
|
Region XI
|
DAVAO DE ORO
|
COMPOSTELA (DAVAO DE ORO)
|
Davao de Oro 1st District Engineering Office
|
P00630761MN
|
Construction of Revetment along Batutu River, Compostela, Davao de Oro
|
P00630761MN-CW1
|
Construction of Revetment - Construction of Revetment along Batutu River, Compostela, Davao de Oro
| null |
Construction of Revetment
|
Flood Control Structures
| 126.071617
| 7.641065
|
22LA0130
| 72,374,937.84
| 72,370,604.7
| 1,681,603,200,000
| 2,023
|
VICENTE T. LAO CONSTRUCTION
| 9,627
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DE ORO (FIRST LEGISLATIVE DISTRICT)
|
Davao de Oro 1st District Engineering Office
|
72374937.84
|
72370604.7
|
2023-04-17
|
03/18/2022
|
flood_control
|
construction-of-revetment-along-batutu-river-compostela-davao-de-oro-22la0130
|
[object Object]
|
b38d1ced-bf72-49ec-a656-eb86e7035ac6
| 2,022
|
Region XIII
|
AGUSAN DEL SUR
|
CITY OF BAYUGAN (AGUSAN DEL SUR)
|
Agusan del Sur 1st District Engineering Office
|
P00620294MN
|
Construction of Bank Protection along Bayugan River, Sta. 0+100 - Sta. 0+349.00 (L/S), Sta. 0+110.00 - Sta. 348.00 (R/S), Bayugan City, Agusan del Sur
|
P00620294MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Bank Protection along Bayugan River, Sta. 0+100 - Sta. 0+349.00 (L/S), Sta. 0+110.00 - Sta. 348.00 (R/S), Bayugan City, Agusan del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.741787
| 8.707164
|
22NB0006
| 45,080,000
| 45,079,990.82
| 1,689,120,000,000
| 2,023
|
A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D
| 9,628
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
AGUSAN DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Agusan del Sur 1st District Engineering Office
|
45080000
|
45079990.82
|
2023-07-13
|
06/13/2022
|
flood_control
|
construction-of-bank-protection-along-bayugan-river-sta-0100---sta-034900-ls-sta-011000---sta-34800-rs-bayugan-city-agusan-del-sur-22nb0006
|
[object Object]
|
00e72f86-c679-46e8-867f-6c85dca3eb0e
| 2,023
|
Region XIII
|
SURIGAO DEL SUR
|
CITY OF BISLIG (SURIGAO DEL SUR)
|
Surigao del Sur 2nd District Engineering Office
|
P00732106MN
|
Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Road, Surigao del Sur
|
P00732106MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Road, Surigao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.34767
| 8.18582
|
23NI0052
| 77,200,000
| 77,199,029.74
| 1,711,929,600,000
| 2,023
|
J.M. LUCIANO CONSTRUCTION, INC.
| 9,629
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SURIGAO DEL SUR (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Sur 2nd District Engineering Office
|
77200000
|
77199029.74
|
2023-07-21
|
03/17/2023
|
flood_control
|
construction-of-bislig-city-coastal-protection-along-surigao-davao-coastal-road-surigao-del-sur-23ni0052
|
[object Object]
|
4c800d3d-1a6e-46b2-a14d-799dadea006d
| 2,022
|
Region XII
|
SOUTH COTABATO
|
GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)
|
South Cotabato 1st District Engineering Office
|
P00630528MN
|
Construction of Revetment along Makar River, General Santos City
|
P00630528MN-CW1
|
Construction of Revetment - Construction of Revetment along Makar River, General Santos City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.140432
| 6.094836
|
22MB0022
| 62,725,000
| 62,723,813.21
| 1,662,681,600,000
| 2,022
|
J.G. ORANZA CONSTRUCTION
| 9,630
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
62725000
|
62723813.21
|
2022-09-10
|
02/24/2022
|
flood_control
|
construction-of-revetment-along-makar-river-general-santos-city-22mb0022
|
[object Object]
|
6f4b7d43-acfe-4c10-a227-32d75f23b5c3
| 2,021
|
Region XI
|
DAVAO DEL SUR
| null |
Davao City District Engineering Office
|
P00420007MN
|
Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City
|
P00420007MN-CW1
|
Construction of Revetment - Construction of Revetment along Davao River, Sta. 1+095 to Sta. 1+543, Davao City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.606269
| 7.053756
|
20LB0036
| 77,523,275
| 77,523,275
| 1,671,321,600,000
| 2,022
|
APEIRON CONSTRUCTION SOLUTIONS / ABU CONSTRUCTION
| 9,631
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
MYCA with Project ID P00420007MN
|
MYCA with Project ID P00420007MN
|
2022-12-19
|
12/10/2020
|
flood_control
|
construction-of-revetment-along-davao-river-sta-1095-to-sta-1543-davao-city-20lb0036
|
[object Object]
|
891ef9fc-277e-4b55-aa13-ea060cb33acb
| 2,022
|
Region VIII
|
NORTHERN SAMAR
|
LAPINIG (NORTHERN SAMAR)
|
Northern Samar 2nd District Engineering Office
|
P00633243VS
|
Rehabilitation of Flood Control at Municipal Port, Brgy. Del Sur, Lapinig, Northern Samar
|
P00633243VS-CW1
|
Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Flood Control at Municipal Port, Brgy. Del Sur, Lapinig, Northern Samar
| null |
Rehabilitation / Major Repair of Flood Control Structure
|
Flood Control Structures
| 125.306745
| 12.315599
|
22II0053
| 49,499,297.58
| 49,491,713.8
| 1,676,160,000,000
| 2,023
|
CDU CONSTRUCTION
| 9,632
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
NORTHERN SAMAR (SECOND LEGISLATIVE DISTRICT)
|
Northern Samar 2nd District Engineering Office
|
49499297.58
|
49491713.8
|
2023-02-09
|
05/20/2022
|
flood_control
|
rehabilitation-of-flood-control-at-municipal-port-brgy-del-sur-lapinig-northern-samar-22ii0053
|
[object Object]
|
b9d0432d-2e17-4c2c-8e83-99917cb85d7a
| 2,024
|
Region XIII
|
SURIGAO DEL NORTE
|
BURGOS (SURIGAO DEL NORTE)
|
Region XIII
|
P00836163MN
|
Construction of Shore Protection Structure along Poblacion 2, Burgos, Surigao del Norte
|
P00836163MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Shore Protection Structure along Poblacion 2, Burgos, Surigao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.072978
| 10.020692
|
24N00126
| 99,000,000
| 98,999,966.68
| 1,735,257,600,000
| 2,024
|
RCDG CONSTRUCTION CORPORATION / LPO1 GROUP OF COMPANIES INC.
| 9,633
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
SURIGAO DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Surigao del Norte 1st District Engineering Office
|
99000000
|
98999966.68
|
2024-12-22
|
05/13/2024
|
flood_control
|
construction-of-shore-protection-structure-along-poblacion-2-burgos-surigao-del-norte-24n00126
|
[object Object]
|
4e668408-08fc-4f99-bb1d-1049a056f469
| 2,023
|
Region XI
|
DAVAO ORIENTAL
|
BOSTON (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00721502MN
|
Construction of Flood Mitigation Structure along Boston River (Carmen Section), Sta. 0 + 000 - Sta. 0 + 300, Boston, Davao Oriental
|
P00721502MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Boston River (Carmen Section), Sta. 0 + 000 - Sta. 0 + 300, Boston, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.352004
| 7.86986
|
23LF0027
| 29,400,000
| 29,399,619.39
| 1,700,870,400,000
| 2,023
|
RANGAY CONSTRUCTION AND SUPPLY
| 9,634
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
29400000
|
29399619.39
|
2023-08-29
|
04/05/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-boston-river-carmen-section-sta-0-000---sta-0-300-boston-davao-oriental-23lf0027
|
[object Object]
|
fdab8d25-6589-490d-a967-500398cbec8b
| 2,023
|
Region X
|
BUKIDNON
|
CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00721533MN
|
Construction of Flood Mitigation Structure, Barangay Simaya, Malaybalay City, Bukidnon
|
P00721533MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, Barangay Simaya, Malaybalay City, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.141732
| 8.016127
|
23KA0162
| 72,375,000
| 72,374,999.37
| 1,709,510,400,000
| 2,024
|
RITCHE-NATHALIE BUILDERS & GENERAL MERCHANDISE
| 9,635
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
72375000
|
72374999.37
|
2024-03-05
|
03/13/2023
|
flood_control
|
construction-of-flood-mitigation-structure-barangay-simaya-malaybalay-city-bukidnon-23ka0162
|
[object Object]
|
3ca92cc2-1aca-4cd8-ba2c-57200582ec06
| 2,024
|
Region XIII
|
AGUSAN DEL NORTE
|
LAS NIEVES (AGUSAN DEL NORTE)
|
Region XIII
|
P00820378MN
|
Construction of Flood Mitigation Structure along Agusan River Basin protecting Barangay Poblacion of Las Nieves, Package 2, Agusan del Norte
|
P00820378MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Agusan River Basin protecting Barangay Poblacion of Las Nieves, Package 2, Agusan del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.60727
| 8.73219
|
24N00085
| 168,635,680
| 168,635,678.1
| 1,742,428,800,000
| 2,025
|
ADFIL CORPORATION
| 9,636
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
AGUSAN DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Agusan del Norte District Engineering Office
|
168635680
|
168635678.05
|
2025-02-28
|
02/22/2024
|
flood_control
|
construction-of-flood-mitigation-structure-along-agusan-river-basin-protecting-barangay-poblacion-of-las-nieves-package-2-agusan-del-norte-24n00085
|
[object Object]
|
82ce9552-c768-479f-a8af-13fe4dfaa310
| 2,023
|
Region XII
|
SARANGANI
|
MALAPATAN (SARANGANI)
|
Sarangani District Engineering Office
|
P00734405MN
|
Construction of Drainage System at Brgy. Patag, Malapatan, Sarangani
|
P00734405MN-CW1
|
Construction of Drainage Structure - Construction of Drainage System at Brgy. Patag, Malapatan, Sarangani
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 125.30917
| 6.0343
|
23ME0049
| 4,950,000
| 4,949,593.99
| 1,692,662,400,000
| 2,023
|
SILVER HAMMER CONSTRUCTION AND SUPPLIES
| 9,637
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SARANGANI (LEGISLATIVE DISTRICT)
|
Sarangani District Engineering Office
|
4950000
|
4949593.99
|
2023-08-22
|
04/26/2023
|
flood_control
|
construction-of-drainage-system-at-brgy-patag-malapatan-sarangani-23me0049
|
[object Object]
|
f0551e7b-5b91-40f9-a2aa-556608f27f0a
| 2,024
|
Region XIII
|
SURIGAO DEL NORTE
|
BURGOS (SURIGAO DEL NORTE)
|
Region XIII
|
P00833300MN
|
Construction of Shore Protection Structure, Brgy. Poblacion 2, Burgos, Surigao del Norte
|
P00833300MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Shore Protection Structure, Brgy. Poblacion 2, Burgos, Surigao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.073472
| 10.020317
|
24N00121
| 48,250,000
| 48,249,809.12
| 1,727,654,400,000
| 2,024
|
RCDG CONSTRUCTION CORPORATION / KENT MARKETING GROUP OF COMPANIES INC.
| 9,638
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
SURIGAO DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Surigao del Norte 1st District Engineering Office
|
48250000
|
48249809.12
|
2024-10-01
|
03/06/2024
|
flood_control
|
construction-of-shore-protection-structure-brgy-poblacion-2-burgos-surigao-del-norte-24n00121
|
[object Object]
|
2d93b984-c0ea-49e1-b7c8-99efed3805a1
| 2,021
|
Region XI
|
DAVAO DEL SUR
| null |
Davao City District Engineering Office
|
P00522102MN
|
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+614 - Sta. 2+173)
|
P00522102MN-CW1
|
Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+614 - Sta. 2+173)
| null |
Rehabilitation / Major Repair of Flood Control Structure
|
Flood Control Structures
| 125.608037
| 7.049036
|
21LB0016
| 77,200,000
| 77,200,000
| 1,671,667,200,000
| 2,022
|
JARGON CONSTRUCTION & SUPPLY
| 9,639
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
77200000
|
77200000
|
2022-12-23
|
09/22/2021
|
flood_control
|
rehabilitation-major-repair-of-flood-control-structure-along-davao-river-bolton-bridge-upstream-left-bank-davao-city-sta-1614---sta-2173-21lb0016
|
[object Object]
|
7965ce83-63b7-4eee-9cf5-3f5178b077c4
| 2,022
|
Region XI
|
DAVAO ORIENTAL
|
CATEEL (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00620170MN
|
Construction of Flood Mitigation Structure along Hulid River, Sta. 0+000 - Sta. 0+100, Cateel, Davao Oriental
|
P00620170MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Hulid River, Sta. 0+000 - Sta. 0+100, Cateel, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.366376
| 7.766763
|
22LF0045
| 9,800,000
| 9,799,417.14
| 1,660,089,600,000
| 2,022
|
RITZ BUILDERS CONSTRUCTION INC. (FORMERLY:RITZTOK CONSTRUCTION AND SUPPLY)
| 9,640
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
9800000
|
9799417.14
|
2022-08-26
|
02/21/2022
|
flood_control
|
construction-of-flood-mitigation-structure-along-hulid-river-sta-0000---sta-0100-cateel-davao-oriental-22lf0045
|
[object Object]
|
e1e896d5-fa46-4940-b276-a8a2f1bf93ed
| 2,022
|
Region VIII
|
EASTERN SAMAR
|
ORAS (EASTERN SAMAR)
|
Eastern Samar District Engineering Office
|
P00620325VS
|
Construction of Flood Control Structure along Oras River, Brgy. Cagpili, Oras, Eastern Samar
|
P00620325VS-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Oras River, Brgy. Cagpili, Oras, Eastern Samar
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.317638
| 12.239769
|
22IB0007
| 48,984,766.27
| 48,999,969.4
| 1,668,038,400,000
| 2,022
|
888 ACY ENTERPRISES
| 9,641
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
EASTERN SAMAR (LEGISLATIVE DISTRICT)
|
Eastern Samar District Engineering Office
|
48984766.27
|
48999969.4
|
2022-11-11
|
02/13/2022
|
flood_control
|
construction-of-flood-control-structure-along-oras-river-brgy-cagpili-oras-eastern-samar-22ib0007
|
[object Object]
|
4479a304-5031-4481-be2e-49f86a739862
| 2,021
|
Region XIII
|
AGUSAN DEL SUR
| null |
Agusan del Sur 1st District Engineering Office
|
P00522127MN
|
Construction of Flood Relief along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Road - K1326+822 - K1328+985, Agusan del Sur
|
P00522127MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Relief along Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Road - K1326+822 - K1328+985, Agusan del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.74505
| 8.439266
|
21NB0041
| 96,500,000
| 96,497,913.33
| 1,680,566,400,000
| 2,023
|
MADYAW CONSTRUCTION & DEV. CORPORATION
| 9,642
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
AGUSAN DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Agusan del Sur 1st District Engineering Office
|
96500000
|
96497913.33
|
2023-03-25
|
03/29/2021
|
flood_control
|
construction-of-flood-relief-along-butuan-city-talacogon-loreto-veruela-sta-josefa-road---k1326822---k1328985-agusan-del-sur-21nb0041
|
[object Object]
|
7f169dbf-1514-46a0-9c18-c3e7c0509d12
| 2,023
|
Region XIII
|
SURIGAO DEL SUR
|
TAGO (SURIGAO DEL SUR)
|
Surigao del Sur 1st District Engineering Office
|
P00721520MN
|
Construction of Flood Control Structure along Tago River, Brgy. Libas Gua, San Miguel, Surigao del Sur
|
P00721520MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Tago River, Brgy. Libas Gua, San Miguel, Surigao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.076111
| 8.923055
|
23NH0003
| 49,000,000
| 48,999,999.94
| 1,702,512,000,000
| 2,025
|
LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)
| 9,643
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SURIGAO DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Surigao del Sur 1st District Engineering Office
|
49000000
|
48999999.94
|
2025-03-09
|
04/04/2023
|
flood_control
|
construction-of-flood-control-structure-along-tago-river-brgy-libas-gua-san-miguel-surigao-del-sur-23nh0003
|
[object Object]
|
8f7d0be4-ba11-4201-af0f-1293048850f9
| 2,024
|
Region XIII
|
DINAGAT ISLANDS
|
DINAGAT (DINAGAT ISLANDS)
|
Dinagat Islands District Engineering Office
|
P00820116MN
|
Construction of Flood Control Structure Protecting Balinaonao Br., Dinagat, Dinagat Islands
|
P00820116MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure Protecting Balinaonao Br., Dinagat, Dinagat Islands
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.609469
| 9.989464
|
24NE0024
| 67,550,000
| 67,548,671.39
| 1,727,222,400,000
| 2,024
|
CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS)
| 9,644
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
DINAGAT ISLANDS (LEGISLATIVE DISTRICT)
|
Dinagat Islands District Engineering Office
|
67550000
|
67548671.39
|
2024-09-25
|
03/05/2024
|
flood_control
|
construction-of-flood-control-structure-protecting-balinaonao-br-dinagat-dinagat-islands-24ne0024
|
[object Object]
|
99a34063-f781-4128-be1f-d6d90a0322d7
| 2,023
|
Region XII
|
SOUTH COTABATO
|
GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)
|
South Cotabato 1st District Engineering Office
|
P00721461MN
|
Construction of Concrete Revetment, Upper Silway Bridge, Silway River, General Santos City
|
P00721461MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Concrete Revetment, Upper Silway Bridge, Silway River, General Santos City
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.142108
| 6.153104
|
23MB0079
| 51,145,000
| 51,143,096.92
| 1,698,451,200,000
| 2,023
|
J.G. ORANZA CONSTRUCTION
| 9,645
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
51145000
|
51143096.92
|
2023-10-27
|
02/21/2023
|
flood_control
|
construction-of-concrete-revetment-upper-silway-bridge-silway-river-general-santos-city-23mb0079
|
[object Object]
|
8954bad9-bf2d-4ca9-aef1-9731c2f4f333
| 2,022
|
Region XIII
|
SURIGAO DEL SUR
|
HINATUAN (SURIGAO DEL SUR)
|
Region XIII
|
P00632320MN
|
Construction of Rockfall Protection Along Cambatong - Portlamon - Baculin Road (Portlamon Section) Hinatuan, Surigao del Sur
|
P00632320MN-CW1
|
Construction of Slope Protection Structure - Construction of Rockfall Protection Along Cambatong - Portlamon - Baculin Road (Portlamon Section) Hinatuan, Surigao del Sur
| null |
Construction of Slope Protection Structure
|
Flood Control Structures
| 126.37078
| 8.477373
|
22N00181
| 106,150,000
| 106,149,809.5
| 1,694,649,600,000
| 2,023
|
NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC
| 9,646
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
SURIGAO DEL SUR (SECOND LEGISLATIVE DISTRICT)
|
Surigao del Sur 2nd District Engineering Office
|
106150000
|
106149809.49
|
2023-09-12
|
09/19/2022
|
flood_control
|
construction-of-rockfall-protection-along-cambatong---portlamon---baculin-road-portlamon-section-hinatuan-surigao-del-sur-22n00181
|
[object Object]
|
5325de49-3636-4f44-9cf0-cf93af895786
| 2,024
|
Region X
|
BUKIDNON
|
SAN FERNANDO (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00835756MN
|
Construction of Flood Control, Brgy. Tugop, San Fernando, Bukidnon
|
P00835756MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control, Brgy. Tugop, San Fernando, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.322206
| 7.968081
|
24KA0093
| 96,500,000
| 96,500,000
| 1,729,814,400,000
| 2,024
|
ROSBILL CONSTRUCTION AND SUPPLY
| 9,647
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
96500000
|
96500000
|
2024-10-26
|
01/31/2024
|
flood_control
|
construction-of-flood-control-brgy-tugop-san-fernando-bukidnon-24ka0093
|
[object Object]
|
64057075-e610-4963-b7da-e6f8bc4d8cfa
| 2,023
|
Region XI
|
DAVAO ORIENTAL
|
BOSTON (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00721386MN
|
Construction of Boston Coastal Protection (Cabasagan Section), Boston, Davao Oriental
|
P00721386MN-CW1
|
Construction of Slope Protection Structure - Construction of Boston Coastal Protection (Cabasagan Section), Boston, Davao Oriental
| null |
Construction of Slope Protection Structure
|
Flood Control Structures
| 126.372584
| 7.847605
|
23LF0040
| 43,120,000
| 43,105,338.71
| 1,694,476,800,000
| 2,023
|
JHARKHA CONSTRUCTION AND SUPPLY
| 9,648
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
43120000
|
43105338.71
|
2023-08-15
|
03/28/2023
|
flood_control
|
construction-of-boston-coastal-protection-cabasagan-section-boston-davao-oriental-23lf0040
|
[object Object]
|
35e29a12-953a-4f63-a8b0-ae94631b50fd
| 2,022
|
Region XI
|
DAVAO DEL NORTE
|
CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)
|
Davao del Norte District Engineering Office
|
P00620219MN
|
Construction of Dike along Tagum Libuganon River, Brgy. Bincungan - Brgy. Busaon, Tagum City, Davao del Norte
|
P00620219MN-CW1
|
Construction of Dike - Construction of Dike along Tagum Libuganon River, Brgy. Bincungan - Brgy. Busaon, Tagum City, Davao del Norte
| null |
Construction of Dike
|
Flood Control Structures
| 125.745506
| 7.372481
|
22LC0035
| 47,211,408
| 47,211,408
| 1,691,280,000,000
| 2,023
|
O. G. SANTOS CONSTRUCTION
| 9,649
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Davao del Norte District Engineering Office
|
47211408
|
47211408
|
2023-08-07
|
03/01/2022
|
flood_control
|
construction-of-dike-along-tagum-libuganon-river-brgy-bincungan---brgy-busaon-tagum-city-davao-del-norte-22lc0035
|
[object Object]
|
94731342-43b1-4862-8588-b3b2da2e017a
| 2,023
|
Region XI
|
DAVAO ORIENTAL
|
LUPON (DAVAO ORIENTAL)
|
Davao Oriental 2nd District Engineering Office
|
P00734031MN
|
Construction of Flood Mitigation Structure, Brgy. Macangao, Lupon, Davao Oriental
|
P00734031MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, Brgy. Macangao, Lupon, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.076206
| 6.892125
|
23LG0052
| 34,300,000
| 34,300,000
| 1,700,352,000,000
| 2,023
|
AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.
| 9,650
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO ORIENTAL (SECOND LEGISLATIVE DISTRICT)
|
Davao Oriental 2nd District Engineering Office
|
34300000
|
34300000
|
2023-11-20
|
03/30/2023
|
flood_control
|
construction-of-flood-mitigation-structure-brgy-macangao-lupon-davao-oriental-23lg0052
|
[object Object]
|
218ae81c-9f87-4b84-84a0-48a8a8ea2151
| 2,021
|
Region XII
|
SOUTH COTABATO
| null |
South Cotabato 1st District Engineering Office
|
P00522370MN
|
Construction of Flood Control/Concrete Revetment along Makar River (Phase 2), Barangay Labangal, General Santos City
|
P00522370MN-CW1
|
Construction of Revetment - Construction of Flood Control/Concrete Revetment along Makar River (Phase 2), Barangay Labangal, General Santos City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.142422
| 6.094344
|
21MB0021
| 49,000,000
| 48,998,990.7
| 1,666,051,200,000
| 2,022
|
JDRC CONSTRUCTION & SUPPLIES, CORP.
| 9,651
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
49000000
|
48998990.7
|
2022-09-30
|
03/08/2022
|
flood_control
|
construction-of-flood-controlconcrete-revetment-along-makar-river-phase-2-barangay-labangal-general-santos-city-21mb0021
|
[object Object]
|
0dc10b00-d939-4653-968a-365735e0ca2d
| 2,024
|
Region X
|
BUKIDNON
|
SAN FERNANDO (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00835758MN
|
Construction of Flood Control Structure (Package 2) barangay Tugop, San Fernando, Bukidnon
|
P00835758MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure (Package 2) barangay Tugop, San Fernando, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.324706
| 7.969531
|
24KA0123
| 96,500,000
| 96,500,000
| 1,731,715,200,000
| 2,024
|
ROSBILL CONSTRUCTION AND SUPPLY
| 9,652
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
96500000
|
96500000
|
2024-11-17
|
02/22/2024
|
flood_control
|
construction-of-flood-control-structure-package-2-barangay-tugop-san-fernando-bukidnon-24ka0123
|
[object Object]
|
f79a820a-7519-4c19-9029-4f9d76fa4d98
| 2,023
|
Region XIII
|
DINAGAT ISLANDS
|
DINAGAT (DINAGAT ISLANDS)
|
Dinagat Islands District Engineering Office
|
P00721398MN
|
Construction of Flood Control Structure at Balinaonao Br., Barangay Cayetano, Dinagat, Dinagat Islands
|
P00721398MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure at Balinaonao Br., Barangay Cayetano, Dinagat, Dinagat Islands
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.610018
| 9.990199
|
23NE0010
| 9,800,000
| 9,779,976.14
| 1,691,020,800,000
| 2,023
|
CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS)
| 9,653
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DINAGAT ISLANDS (LEGISLATIVE DISTRICT)
|
Dinagat Islands District Engineering Office
|
9800000
|
9779976.14
|
2023-08-03
|
02/23/2023
|
flood_control
|
construction-of-flood-control-structure-at-balinaonao-br-barangay-cayetano-dinagat-dinagat-islands-23ne0010
|
[object Object]
|
e681c2a0-e85a-49d9-b7b5-6f8814a34100
| 2,024
|
Region XI
|
DAVAO ORIENTAL
|
CATEEL (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00820174MN
|
Construction of Cateel I IS River Bank Protection Dike along the Left Main Canal Service Road, Cateel, Davao Oriental
|
P00820174MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Cateel I IS River Bank Protection Dike along the Left Main Canal Service Road, Cateel, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.379105
| 7.743753
|
24LF0013
| 14,700,000
| 14,699,816.87
| 1,730,332,800,000
| 2,024
|
LICSAL CONSTRUCTION CORPORATION
| 9,654
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
14700000
|
14699816.87
|
2024-10-15
|
02/12/2024
|
flood_control
|
construction-of-cateel-i-is-river-bank-protection-dike-along-the-left-main-canal-service-road-cateel-davao-oriental-24lf0013
|
[object Object]
|
a4bb6769-0ccf-43f5-9602-ab864159d2dd
| 2,022
|
Region XI
|
DAVAO ORIENTAL
|
LUPON (DAVAO ORIENTAL)
|
Davao Oriental 2nd District Engineering Office
|
P00630610MN
|
Construction of Flood Mitigation Structure along Sumlog River (Barangay Tagugpo to Barangay Ilangay Section) Lupon, Davao Oriental
|
P00630610MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Sumlog River (Barangay Tagugpo to Barangay Ilangay Section) Lupon, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.076221
| 6.973977
|
22LG0015
| 29,400,000
| 29,398,234.15
| 1,665,360,000,000
| 2,022
|
MAVERICK BUILDERS INCORPORATED (FORMERLY MAVERICK
| 9,655
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO ORIENTAL (SECOND LEGISLATIVE DISTRICT)
|
Davao Oriental 2nd District Engineering Office
|
29400000
|
29398234.15
|
2022-10-11
|
02/21/2022
|
flood_control
|
construction-of-flood-mitigation-structure-along-sumlog-river-barangay-tagugpo-to-barangay-ilangay-section-lupon-davao-oriental-22lg0015
|
[object Object]
|
8af122c4-577b-46a3-89e4-da16db7d79a3
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
DAVAO CITY (DAVAO DEL SUR)
|
Davao City District Engineering Office
|
P00633923MN
|
Construction of Drainage System at Purok 7 & 9, Barangay 39-D, Davao City
|
P00633923MN-CW1
|
Construction of Drainage Structure - Construction of Drainage System at Purok 7 & 9, Barangay 39-D, Davao City
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 125.612633
| 7.061388
|
22LB0371
| 6,860,000
| 6,860,000
| 1,673,222,400,000
| 2,023
|
C'ZARLES CONSTRUCTION & SUPPLY
| 9,656
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
6860000
|
6860000
|
2023-01-10
|
04/13/2022
|
flood_control
|
construction-of-drainage-system-at-purok-7-9-barangay-39-d-davao-city-22lb0371
|
[object Object]
|
f44512cc-bf70-4777-8f38-8bdeb7a49462
| 2,024
|
Region XII
|
SOUTH COTABATO
|
GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)
|
South Cotabato 1st District Engineering Office
|
P00820328MN
|
Construction of Concrete Revetment, Upper Silway Bridge, Silway River, Barangay Apopong, General Santos City
|
P00820328MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment, Upper Silway Bridge, Silway River, Barangay Apopong, General Santos City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.142434
| 6.150469
|
24MB0002
| 69,962,500
| 69,961,399.76
| 1,729,123,200,000
| 2,024
|
JDRC CONSTRUCTION & SUPPLIES, CORP.
| 9,657
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
69962500
|
69961399.76
|
2024-10-18
|
03/12/2024
|
flood_control
|
construction-of-concrete-revetment-upper-silway-bridge-silway-river-barangay-apopong-general-santos-city-24mb0002
|
[object Object]
|
774ec171-b892-42da-9642-4631460b2d40
| 2,023
|
Region X
|
BUKIDNON
|
SAN FERNANDO (BUKIDNON)
|
Region X
|
P00721243MN
|
Construction of Flood Control Structure along Tigwa River, San Fernando, Bukidnon
|
P00721243MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Tigwa River, San Fernando, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.330541
| 7.923425
|
23K00108
| 101,325,000
| 99,002,702.01
| 1,698,364,800,000
| 2,024
|
M. MONTESCLAROS ENTERPRISES, INC.
| 9,658
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
101325000
|
99002702.01
|
2024-02-01
|
02/13/2023
|
flood_control
|
construction-of-flood-control-structure-along-tigwa-river-san-fernando-bukidnon-23k00108
|
[object Object]
|
d094ffc3-95b9-4ebf-b0d5-b33f5089d81a
| 2,024
|
Region XI
|
DAVAO ORIENTAL
|
TARRAGONA (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00820074MN
|
Construction of Flood Mitigation Structure along Baguan River, Tarragona, Davao Oriental
|
P00820074MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Baguan River, Tarragona, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.408643
| 7.056676
|
24LF0024
| 48,250,000
| 48,248,389.36
| 1,736,640,000,000
| 2,025
|
P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION)
| 9,659
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
48250000
|
48248389.36
|
2025-01-13
|
03/19/2024
|
flood_control
|
construction-of-flood-mitigation-structure-along-baguan-river-tarragona-davao-oriental-24lf0024
|
[object Object]
|
71157267-6c74-45de-9010-1a02c9c03ff0
| 2,024
|
Region XIII
|
AGUSAN DEL SUR
|
CITY OF BAYUGAN (AGUSAN DEL SUR)
|
Agusan del Sur 1st District Engineering Office
|
P00820210MN
|
Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur
|
P00820210MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.747067
| 8.739616
|
24NB0050
| 29,400,000
| 29,399,610.23
| 1,743,984,000,000
| 2,024
|
J.M. LACORTE CONSTRUCTION
| 9,660
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
AGUSAN DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Agusan del Sur 1st District Engineering Office
|
29400000
|
29399610.23
|
2024-12-10
|
08/12/2024
|
flood_control
|
construction-of-andanan-ris-flood-control-structure-bayugan-city-agusan-del-sur-24nb0050
|
[object Object]
|
bf7a7499-4f55-4d93-82e0-dcb44e1334fd
| 2,023
|
Region XIII
|
SURIGAO DEL NORTE
|
BURGOS (SURIGAO DEL NORTE)
|
Surigao del Norte 1st District Engineering Office
|
P00721589MN
|
Rehabilitation of Shore Protection Structure, Barangay Poblacion 1, Burgos, Surigao del Norte
|
P00721589MN-CW1
|
Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Shore Protection Structure, Barangay Poblacion 1, Burgos, Surigao del Norte
| null |
Rehabilitation / Major Repair of Flood Control Structure
|
Flood Control Structures
| 126.07662
| 10.01651
|
23NF0032
| 48,443,000
| 47,951,985.95
| 1,713,830,400,000
| 2,024
|
LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION)
| 9,661
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SURIGAO DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Surigao del Norte 1st District Engineering Office
|
48443000
|
47951985.95
|
2024-04-24
|
03/28/2023
|
flood_control
|
rehabilitation-of-shore-protection-structure-barangay-poblacion-1-burgos-surigao-del-norte-23nf0032
|
[object Object]
|
bd0df349-ad4a-49d3-b2f4-93bd890d86f6
| 2,023
|
Region XIII
|
AGUSAN DEL NORTE
|
LAS NIEVES (AGUSAN DEL NORTE)
|
Region XIII
|
P00721477MN
|
Construction of Flood Mitigation Structure along Agusan River (Ambacon Section) Downstream, Las Nieves, Agusan del Norte
|
P00721477MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Agusan River (Ambacon Section) Downstream, Las Nieves, Agusan del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.613281
| 8.722582
|
23N00096
| 115,800,000
| 115,799,197.3
| 1,716,940,800,000
| 2,024
|
ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)
| 9,662
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
AGUSAN DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Butuan City District Engineering Office
|
115800000
|
115799197.33
|
2024-05-30
|
04/20/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-agusan-river-ambacon-section-downstream-las-nieves-agusan-del-norte-23n00096
|
[object Object]
|
274f9482-c5b6-4bd3-b97a-173e9ec01a4c
| 2,023
|
Region XIII
|
AGUSAN DEL NORTE
|
LAS NIEVES (AGUSAN DEL NORTE)
|
Region XIII
|
P00721478MN
|
Construction of Flood Mitigation Structure along Agusan River (Ambacon Section) Upstream, Las Nieves, Agusan del Norte
|
P00721478MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Agusan River (Ambacon Section) Upstream, Las Nieves, Agusan del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.613281
| 8.722582
|
23N00097
| 115,800,000
| 115,799,566.4
| 1,716,940,800,000
| 2,024
|
ME 3 CONSTRUCTION / EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)
| 9,663
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
AGUSAN DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Butuan City District Engineering Office
|
115800000
|
115799566.41
|
2024-05-30
|
04/20/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-agusan-river-ambacon-section-upstream-las-nieves-agusan-del-norte-23n00097
|
[object Object]
|
68535691-ad67-4a83-a56d-8a173a1d98e5
| 2,024
|
Region XIII
|
AGUSAN DEL SUR
|
SAN LUIS (AGUSAN DEL SUR)
|
Agusan del Sur 1st District Engineering Office
|
P00820363MN
|
Construction of Bank Protection along Agusan River (Magtuyon Section) San Luis, Agusan del Sur
|
P00820363MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Bank Protection along Agusan River (Magtuyon Section) San Luis, Agusan del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.748515
| 8.475431
|
24NB0012
| 77,200,000
| 77,199,705.93
| 1,745,452,800,000
| 2,024
|
J.M. LACORTE CONSTRUCTION / LEXICON DEVELOPMENT CORPORATION
| 9,664
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
AGUSAN DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Agusan del Sur 1st District Engineering Office
|
77200000
|
77199705.93
|
2024-12-11
|
04/17/2024
|
flood_control
|
construction-of-bank-protection-along-agusan-river-magtuyon-section-san-luis-agusan-del-sur-24nb0012
|
[object Object]
|
0613d9fa-b9b0-4d1b-bb35-dd69b1c6cf30
| 2,022
|
Region XI
|
DAVAO ORIENTAL
|
TARRAGONA (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00620175MN
|
Rehabilitation of Flood Control Structure along Baguan River, Sta. 0+000 - Sta. 0+400, Tarragona, Davao Oriental
|
P00620175MN-CW1
|
Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of Flood Control Structure along Baguan River, Sta. 0+000 - Sta. 0+400, Tarragona, Davao Oriental
| null |
Rehabilitation / Major Repair of Flood Control Structure
|
Flood Control Structures
| 126.410566
| 7.037276
|
22LF0009
| 29,400,000
| 29,399,769.79
| 1,670,544,000,000
| 2,022
|
RITZ BUILDERS CONSTRUCTION INC. (FORMERLY:RITZTOK CONSTRUCTION AND SUPPLY)
| 9,665
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
29400000
|
29399769.79
|
2022-12-02
|
02/21/2022
|
flood_control
|
rehabilitation-of-flood-control-structure-along-baguan-river-sta-0000---sta-0400-tarragona-davao-oriental-22lf0009
|
[object Object]
|
01bda81e-c4a1-4174-a23b-61dbdcb7f2b0
| 2,023
|
Region XI
|
DAVAO ORIENTAL
|
GOVERNOR GENEROSO (DAVAO ORIENTAL)
|
Davao Oriental 2nd District Engineering Office
|
P00721620MN
|
Construction of Flood Mitigation Structure along Tibanban River, Governor Generoso, Davao Oriental
|
P00721620MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Tibanban River, Governor Generoso, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.076663
| 6.630418
|
23LG0066
| 24,500,000
| 24,132,496.94
| 1,701,993,600,000
| 2,023
|
MAER SUMMIT KONSTRUKT CO.
| 9,666
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO ORIENTAL (SECOND LEGISLATIVE DISTRICT)
|
Davao Oriental 2nd District Engineering Office
|
24500000
|
24132496.94
|
2023-11-15
|
03/27/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-tibanban-river-governor-generoso-davao-oriental-23lg0066
|
[object Object]
|
70a8fbae-35a3-469b-a854-2ffd8b9aafae
| 2,024
|
Region X
|
BUKIDNON
|
CITY OF MALAYBALAY (CAPITAL) (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00835776MN
|
Construction of Flood Mitigation Structure, Barangay Simaya, Malaybalay City, Bukidnon
|
P00835776MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, Barangay Simaya, Malaybalay City, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.144019
| 8.010822
|
24KA0143
| 135,100,000
| 135,100,000
| 1,739,750,400,000
| 2,025
|
RITCHE-NATHALIE DEVELOPMENT CORPORATION (FORMERLY: RITCHE-NATHALIE BUILDERS AND GEN. MERCHANDISE)
| 9,667
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
135100000
|
135100000
|
2025-02-18
|
02/27/2024
|
flood_control
|
construction-of-flood-mitigation-structure-barangay-simaya-malaybalay-city-bukidnon-24ka0143
|
[object Object]
|
5d169504-1652-45e6-9b6a-8f2c92ceeedf
| 2,023
|
Region X
|
BUKIDNON
|
SAN FERNANDO (BUKIDNON)
|
Region X
|
P00721244MN
|
Construction of Flood Control Structure along Kapalong-Talaingod-Valencia Road (Mawi-i Creek - Mawi-i Bridge, Tributary to Pulangui River), Package 2, Barangay Halapitan (Poblacion), San Fernando, Bukidnon
|
P00721244MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Kapalong-Talaingod-Valencia Road (Mawi-i Creek - Mawi-i Bridge, Tributary to Pulangui River), Package 2, Barangay Halapitan (Poblacion), San Fernando, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.330736
| 7.921056
|
23K00161
| 66,550,000
| 65,122,870.63
| 1,700,611,200,000
| 2,024
|
M. MONTESCLAROS ENTERPRISES, INC.
| 9,668
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
66550000
|
65122870.63
|
2024-03-17
|
03/29/2023
|
flood_control
|
construction-of-flood-control-structure-along-kapalong-talaingod-valencia-road-mawi-i-creek---mawi-i-bridge-tributary-to-pulangui-river-package-2-barangay-halapitan-poblacion-san-fernando-bukidnon-23k00161
|
[object Object]
|
b329b458-c2e4-4657-8a69-520b9a662cb3
| 2,022
|
Region XI
|
DAVAO ORIENTAL
|
BOSTON (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00620171MN
|
Construction of Flood Mitigation Structure, Sibajay Coastal Protection, Sta. 0+000 - Sta. 0+250, Boston, Davao Oriental
|
P00620171MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure, Sibajay Coastal Protection, Sta. 0+000 - Sta. 0+250, Boston, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.41416
| 7.827187
|
22LF0046
| 29,400,000
| 29,398,519.57
| 1,662,336,000,000
| 2,022
|
RDJM CONSTRUCTION AND SUPPLY
| 9,669
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
29400000
|
29398519.57
|
2022-09-06
|
02/08/2022
|
flood_control
|
construction-of-flood-mitigation-structure-sibajay-coastal-protection-sta-0000---sta-0250-boston-davao-oriental-22lf0046
|
[object Object]
|
2c6d551b-3112-4301-8bd4-5f311121ba43
| 2,022
|
Region XI
|
DAVAO DEL NORTE
|
CARMEN (DAVAO DEL NORTE)
|
Davao del Norte District Engineering Office
|
P00630524MN
|
Construction of Revetment along Tagum Libuganon River Basin, Carmen Section, Brgy. Guadalupe, Carmen, Davao del Norte
|
P00630524MN-CW1
|
Construction of Revetment - Construction of Revetment along Tagum Libuganon River Basin, Carmen Section, Brgy. Guadalupe, Carmen, Davao del Norte
| null |
Construction of Revetment
|
Flood Control Structures
| 125.749194
| 7.39155
|
22LC0095
| 67,550,000
| 67,549,987.12
| 1,703,635,200,000
| 2,023
|
RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY)
| 9,670
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Davao del Norte District Engineering Office
|
67550000
|
67549987.12
|
2023-12-28
|
03/01/2022
|
flood_control
|
construction-of-revetment-along-tagum-libuganon-river-basin-carmen-section-brgy-guadalupe-carmen-davao-del-norte-22lc0095
|
[object Object]
|
747a693c-20ea-473f-b48f-b312f8e4be82
| 2,023
|
Region XIII
|
SURIGAO DEL SUR
|
LIANGA (SURIGAO DEL SUR)
|
Surigao del Sur 1st District Engineering Office
|
P00746137MN
|
Reconstruction of Flood Control Project in Barangay Ban-as, Municipality of Lianga, Surigao del Sur - Barangay Roads
|
P00746137MN-CW1
|
Construction of Flood Mitigation Structure - Reconstruction of Flood Control Project in Barangay Ban-as, Municipality of Lianga, Surigao del Sur - Barangay Roads
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.08567
| 8.6428
|
23NH0112
| 134,798,785.9
| 134,798,744.4
| 1,732,579,200,000
| 2,024
|
CM TAN CONSTRUCTION
| 9,671
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
SURIGAO DEL SUR (FIRST LEGISLATIVE DISTRICT)
|
Surigao del Sur 1st District Engineering Office
|
134798785.86
|
134798744.38
|
2024-11-27
|
01/10/2024
|
flood_control
|
reconstruction-of-flood-control-project-in-barangay-ban-as-municipality-of-lianga-surigao-del-sur---barangay-roads-23nh0112
|
[object Object]
|
5fc803fb-003b-473d-a07e-9f752fe0756b
| 2,024
|
Region VIII
|
NORTHERN SAMAR
|
PALAPAG (NORTHERN SAMAR)
|
Northern Samar 2nd District Engineering Office
|
P00820251VS
|
Construction of Palapag CIS River Bank Protection at Damsite, Palapag, Northern Samar
|
P00820251VS-CW1
|
Construction of Flood Mitigation Structure - Construction of Palapag CIS River Bank Protection at Damsite, Palapag, Northern Samar
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.146488
| 12.49998
|
24II0037
| 9,799,917.39
| 9,791,028.32
| 1,731,110,400,000
| 2,024
|
DEACONS TEMPLE CONSTRUCTION & SUPPLY
| 9,672
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
NORTHERN SAMAR (SECOND LEGISLATIVE DISTRICT)
|
Northern Samar 2nd District Engineering Office
|
9799917.39
|
9791028.32
|
2024-11-10
|
05/15/2024
|
flood_control
|
construction-of-palapag-cis-river-bank-protection-at-damsite-palapag-northern-samar-24ii0037
|
[object Object]
|
c6e4a708-4e0d-446a-8ba5-02393174faae
| 2,021
|
Region XI
|
DAVAO DEL SUR
| null |
Davao City District Engineering Office
|
P00550458MN
|
Construction of Drainage System leading to Roxas Maindrain, Davao City
|
P00550458MN-CW1
|
Construction of Drainage Structure - Construction of Drainage System leading to Roxas Maindrain, Davao City
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 125.613384
| 7.07058
|
21LB0287
| 96,500,000
| 96,500,000
| 1,674,518,400,000
| 2,023
|
MITZ CONSTRUCTION AND SUPPLY / O. G. SANTOS CONSTRUCTION
| 9,673
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
96500000
|
96500000
|
2023-01-25
|
01/16/2022
|
flood_control
|
construction-of-drainage-system-leading-to-roxas-maindrain-davao-city-21lb0287
|
[object Object]
|
533d3030-d558-4504-998a-7ed342881740
| 2,023
|
Region X
|
BUKIDNON
|
SAN FERNANDO (BUKIDNON)
|
Bukidnon 1st District Engineering Office
|
P00721365MN
|
Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Tigwa River), Barangay Halapitan, San Fernando, Bukidnon
|
P00721365MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Kapalong-Talaingod-Valencia Road (Tigwa River), Barangay Halapitan, San Fernando, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.330924
| 7.924754
|
23KA0047
| 49,000,000
| 49,000,000
| 1,699,574,400,000
| 2,023
|
M. MONTESCLAROS ENTERPRISES, INC.
| 9,674
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
49000000
|
49000000
|
2023-11-11
|
01/31/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-kapalong-talaingod-valencia-road-tigwa-river-barangay-halapitan-san-fernando-bukidnon-23ka0047
|
[object Object]
|
3664fc36-1d2f-4d40-851b-f6915fc9155f
| 2,023
|
Region XI
|
DAVAO ORIENTAL
|
CATEEL (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00721388MN
|
Construction of Flood Mitigation Structure along Surigao Del Sur - Davao Oriental Coastal Road (Sta Filomena - Central Section), Sta. 1541 + 000.00 - Sta. 1544 + 000.00, Cateel, Davao Oriental
|
P00721388MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Surigao Del Sur - Davao Oriental Coastal Road (Sta Filomena - Central Section), Sta. 1541 + 000.00 - Sta. 1544 + 000.00, Cateel, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.438048
| 7.809187
|
23LF0094
| 19,600,000
| 19,599,646.11
| 1,718,323,200,000
| 2,024
|
JHARKHA CONSTRUCTION AND SUPPLY
| 9,675
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
19600000
|
19599646.11
|
2024-06-03
|
05/23/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-surigao-del-sur---davao-oriental-coastal-road-sta-filomena---central-section-sta-1541-00000---sta-1544-00000-cateel-davao-oriental-23lf0094
|
[object Object]
|
352fb23b-c2fa-46ea-9ce3-af1f1f827d2f
| 2,021
|
Region XI
|
DAVAO DEL SUR
| null |
Davao City District Engineering Office
|
P00522101MN
|
Drainage System Leading to Dacudao Maindrain, Davao City
|
P00522101MN-CW1
|
Construction of Drainage Structure - Drainage System Leading to Dacudao Maindrain, Davao City
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 125.613691
| 7.094162
|
21LB0118
| 56,610,760
| 56,610,760
| 1,682,726,400,000
| 2,023
|
ABU CONSTRUCTION
| 9,676
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
DAVAO CITY (SECOND LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
56610760
|
56610760
|
2023-04-30
|
08/16/2021
|
flood_control
|
drainage-system-leading-to-dacudao-maindrain-davao-city-21lb0118
|
[object Object]
|
18e44de9-cb10-4994-8dee-43f02b8e4b53
| 2,021
|
Region XI
|
DAVAO DEL NORTE
| null |
Davao del Norte District Engineering Office
|
P00550542MN
|
Construction of Concrete Revetment along Tagum Libuganon River Basin, Carmen Section, Davao del Norte
|
P00550542MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment along Tagum Libuganon River Basin, Carmen Section, Davao del Norte
| null |
Construction of Revetment
|
Flood Control Structures
| 125.749544
| 7.387953
|
21LC0200
| 49,000,000
| 48,125,352
| 1,664,755,200,000
| 2,022
|
LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)
| 9,677
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
DAVAO DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Davao del Norte District Engineering Office
|
49000000
|
48125352
|
2022-10-04
|
01/27/2022
|
flood_control
|
construction-of-concrete-revetment-along-tagum-libuganon-river-basin-carmen-section-davao-del-norte-21lc0200
|
[object Object]
|
ccd21f67-2023-4f75-afff-c3df95a0daf1
| 2,023
|
Region XI
|
DAVAO DE ORO
|
COMPOSTELA (DAVAO DE ORO)
|
Davao de Oro 2nd District Engineering Office
|
P00721647MN
|
Construction of Flood Mitigation Structure along Agusan River (Agusan Valma Bridge Downstream), Brgy. Poblacion, Compostela, Davao De Oro
|
P00721647MN-CW1
|
Construction of Revetment - Construction of Flood Mitigation Structure along Agusan River (Agusan Valma Bridge Downstream), Brgy. Poblacion, Compostela, Davao De Oro
| null |
Construction of Revetment
|
Flood Control Structures
| 126.088451
| 7.676195
|
23LI0030
| 93,315,500
| 93,315,500
| 1,705,536,000,000
| 2,023
|
LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)
| 9,678
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO DE ORO (FIRST LEGISLATIVE DISTRICT)
|
Davao de Oro 2nd District Engineering Office
|
93315500
|
93315500
|
2023-11-15
|
03/21/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-agusan-river-agusan-valma-bridge-downstream-brgy-poblacion-compostela-davao-de-oro-23li0030
|
[object Object]
|
4a33eab8-2be9-49c4-912e-d5004cfa72ae
| 2,021
|
Region X
|
BUKIDNON
| null |
Region X
|
P00522062MN
|
Construction of Flood Control Structure along Kapalong-Talaingod-Valencia Road (Mawi-i Creek - Mawi-i Bridge, Tributary to Pulangui River), Brgy. Halapitan (Poblacion), San Fernando, Bukidnon
|
P00522062MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure along Kapalong-Talaingod-Valencia Road (Mawi-i Creek - Mawi-i Bridge, Tributary to Pulangui River), Brgy. Halapitan (Poblacion), San Fernando, Bukidnon
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.330932
| 7.920557
|
21K00262
| 61,064,235
| 57,865,469.51
| 1,649,894,400,000
| 2,022
|
M. MONTESCLAROS ENTERPRISES, INC.
| 9,679
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
BUKIDNON (SECOND LEGISLATIVE DISTRICT)
|
Bukidnon 1st District Engineering Office
|
61064235
|
57865469.51
|
2022-07-28
|
08/16/2021
|
flood_control
|
construction-of-flood-control-structure-along-kapalong-talaingod-valencia-road-mawi-i-creek---mawi-i-bridge-tributary-to-pulangui-river-brgy-halapitan-poblacion-san-fernando-bukidnon-21k00262
|
[object Object]
|
49c38521-51db-4b97-9456-39cf29a5ddb4
| 2,021
|
Region XI
|
DAVAO DEL SUR
| null |
Davao City District Engineering Office
|
P00550459MN
|
Construction of Drainage System leading to Dacudao Maindrain, Davao City
|
P00550459MN-CW1
|
Construction of Drainage Structure - Construction of Drainage System leading to Dacudao Maindrain, Davao City
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 125.613827
| 7.090898
|
21LB0306
| 96,500,000
| 96,500,000
| 1,666,742,400,000
| 2,022
|
MAER SUMMIT KONSTRUKT CO.
| 9,680
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
96500000
|
96500000
|
2022-10-27
|
01/16/2022
|
flood_control
|
construction-of-drainage-system-leading-to-dacudao-maindrain-davao-city-21lb0306
|
[object Object]
|
5049347d-8ab8-4284-aa28-a4328c5f4080
| 2,022
|
Region XI
|
DAVAO DEL NORTE
|
CITY OF TAGUM (CAPITAL) (DAVAO DEL NORTE)
|
Davao del Norte District Engineering Office
|
P00620233MN
|
Construction of Saug River Flood Control, Pagsabangan Section, Tagum City, Davao del Norte
|
P00620233MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Saug River Flood Control, Pagsabangan Section, Tagum City, Davao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.751206
| 7.478767
|
22LC0040
| 57,900,000
| 57,900,000
| 1,669,939,200,000
| 2,022
|
GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)
| 9,681
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL NORTE (FIRST LEGISLATIVE DISTRICT)
|
Davao del Norte District Engineering Office
|
57900000
|
57900000
|
2022-11-28
|
02/22/2022
|
flood_control
|
construction-of-saug-river-flood-control-pagsabangan-section-tagum-city-davao-del-norte-22lc0040
|
[object Object]
|
c6e90173-3e8f-426a-93c0-7bf7c0940527
| 2,024
|
Region XI
|
DAVAO ORIENTAL
|
TARRAGONA (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00833298MN
|
Construction of Flood Mitigation Structure Protecting Surigao Del Sur Bdry. - Davao Oriental Coastal Road (Moyapoy Section), Tarragona, Davao Oriental
|
P00833298MN-CW1
|
Construction of Revetment - Construction of Flood Mitigation Structure Protecting Surigao Del Sur Bdry. - Davao Oriental Coastal Road (Moyapoy Section), Tarragona, Davao Oriental
| null |
Construction of Revetment
|
Flood Control Structures
| 126.443063
| 7.020912
|
24LF0074
| 48,250,000
| 48,249,684.37
| 1,736,121,600,000
| 2,024
|
ECBJ EASTCOAST CONSTRUCTION
| 9,682
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
48250000
|
48249684.37
|
2024-07-15
|
04/22/2024
|
flood_control
|
construction-of-flood-mitigation-structure-protecting-surigao-del-sur-bdry---davao-oriental-coastal-road-moyapoy-section-tarragona-davao-oriental-24lf0074
|
[object Object]
|
d1f42748-5ffd-4845-a274-7ec7c979222f
| 2,024
|
Region XI
|
DAVAO DEL SUR
|
MAGSAYSAY (DAVAO DEL SUR)
|
Davao del Sur District Engineering Office
|
P00820065MN
|
Construction of Concrete Revetment along Bulatukan River, Barangay Poblacion, Magsaysay, Davao del Sur
|
P00820065MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment along Bulatukan River, Barangay Poblacion, Magsaysay, Davao del Sur
| null |
Construction of Revetment
|
Flood Control Structures
| 125.14812
| 6.74608
|
24LD0011
| 115,800,000
| 115,800,000
| 1,729,814,400,000
| 2,024
|
ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP.
| 9,683
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
DAVAO DEL SUR (LEGISLATIVE DISTRICT)
|
Davao del Sur District Engineering Office
|
115800000
|
115800000
|
2024-10-26
|
03/07/2024
|
flood_control
|
construction-of-concrete-revetment-along-bulatukan-river-barangay-poblacion-magsaysay-davao-del-sur-24ld0011
|
[object Object]
|
322ff144-88af-47d2-8b64-0c7f3b8a935d
| 2,023
|
Region XI
|
DAVAO DE ORO
|
COMPOSTELA (DAVAO DE ORO)
|
Davao de Oro 2nd District Engineering Office
|
P00721644MN
|
Construction of Flood Mitigation Structure along Old Batutu River (Downstream) leading to Agusan River, Brgy. Poblacion, Compostela, Davao de Oro
|
P00721644MN-CW1
|
Construction of Revetment - Construction of Flood Mitigation Structure along Old Batutu River (Downstream) leading to Agusan River, Brgy. Poblacion, Compostela, Davao de Oro
| null |
Construction of Revetment
|
Flood Control Structures
| 126.088621
| 7.675722
|
23LI0060
| 96,500,000
| 96,499,992.3
| 1,733,443,200,000
| 2,024
|
AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC.
| 9,684
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO DE ORO (FIRST LEGISLATIVE DISTRICT)
|
Davao de Oro 2nd District Engineering Office
|
96500000
|
96499992.3
|
2024-12-06
|
03/28/2023
|
flood_control
|
construction-of-flood-mitigation-structure-along-old-batutu-river-downstream-leading-to-agusan-river-brgy-poblacion-compostela-davao-de-oro-23li0060
|
[object Object]
|
34c26c1a-8723-46d9-b3a5-280ef46ff6b7
| 2,022
|
Region XIII
|
AGUSAN DEL NORTE
|
NASIPIT (AGUSAN DEL NORTE)
|
Region XIII
|
P00620104MN
|
Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+259.50, Nasipit, Agusan del Norte
|
P00620104MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+259.50, Nasipit, Agusan del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.333489
| 8.970381
|
22N00108
| 120,625,000
| 120,624,963.4
| 1,688,256,000,000
| 2,023
|
ADFIL CORPORATION
| 9,685
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
AGUSAN DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Agusan del Norte District Engineering Office
|
120625000
|
120624963.35
|
2023-04-30
|
10/07/2022
|
flood_control
|
construction-of-flood-mitigation-structure-at-brgy-camagong-sta-000000---sta-025950-nasipit-agusan-del-norte-22n00108
|
[object Object]
|
96064ffb-9375-48cf-856c-c17a50bc0a43
| 2,024
|
Region XI
|
DAVAO ORIENTAL
|
MANAY (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00833292MN
|
Construction of Flood Mitigation Structure along Lingayao River (Sitio Sumading), Manay, Davao Oriental
|
P00833292MN-CW1
|
Construction of Revetment - Construction of Flood Mitigation Structure along Lingayao River (Sitio Sumading), Manay, Davao Oriental
| null |
Construction of Revetment
|
Flood Control Structures
| 126.469888
| 7.13978
|
24LF0046
| 96,500,000
| 96,495,097.92
| 1,742,947,200,000
| 2,024
|
O. G. SANTOS CONSTRUCTION
| 9,686
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
96500000
|
96495097.92
|
2024-10-28
|
04/22/2024
|
flood_control
|
construction-of-flood-mitigation-structure-along-lingayao-river-sitio-sumading-manay-davao-oriental-24lf0046
|
[object Object]
|
d7d004dc-63c2-49cc-a9c7-985f434ff1dc
| 2,023
|
Region XI
|
DAVAO DEL NORTE
|
CARMEN (DAVAO DEL NORTE)
|
Region XI
|
P00734402MN
|
Construction of Slope Protection at Mabaus Relief Drainage in Carmen, Davao del Norte
|
P00734402MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Slope Protection at Mabaus Relief Drainage in Carmen, Davao del Norte
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.753
| 7.4083
|
23L00171
| 9,900,000
| 9,876,434.36
| 1,717,200,000,000
| 2,024
|
FORDEX CONSTRUCTION CORPORATION
| 9,687
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Davao del Norte 2nd District Engineering Office
|
9900000
|
9876434.36
|
2024-06-02
|
11/17/2023
|
flood_control
|
construction-of-slope-protection-at-mabaus-relief-drainage-in-carmen-davao-del-norte-23l00171
|
[object Object]
|
9634af01-22e2-436e-908e-0c08011b4b77
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
MAGSAYSAY (DAVAO DEL SUR)
|
Davao del Sur District Engineering Office
|
P00630526MN
|
Construction of Revetment, Magsaysay, Davao del Sur
|
P00630526MN-CW1
|
Construction of Revetment - Construction of Revetment, Magsaysay, Davao del Sur
| null |
Construction of Revetment
|
Flood Control Structures
| 125.148623
| 6.750834
|
22LD0033
| 67,550,000
| 67,550,000
| 1,667,520,000,000
| 2,022
|
TKS BUILDERS & SUPPLIES
| 9,688
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL SUR (LEGISLATIVE DISTRICT)
|
Davao del Sur District Engineering Office
|
67550000
|
67550000
|
2022-11-05
|
02/18/2022
|
flood_control
|
construction-of-revetment-magsaysay-davao-del-sur-22ld0033
|
[object Object]
|
7d4a4795-3b82-4724-9ceb-c69e21830711
| 2,022
|
Region XI
|
DAVAO ORIENTAL
|
LUPON (DAVAO ORIENTAL)
|
Davao Oriental 2nd District Engineering Office
|
P00620178MN
|
Construction of Flood Mitigation Structure along Cuabo Creek, Sta.0+000 - Sta. 0+400, Lupon Davao Oriental
|
P00620178MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure along Cuabo Creek, Sta.0+000 - Sta. 0+400, Lupon Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.08886
| 6.90475
|
22LG0011
| 19,600,000
| 19,600,000
| 1,665,100,800,000
| 2,022
|
FAJR CONSTRUCTION PARTS AND SUPPLY
| 9,689
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO ORIENTAL (SECOND LEGISLATIVE DISTRICT)
|
Davao Oriental 2nd District Engineering Office
|
19600000
|
19600000
|
2022-10-08
|
02/21/2022
|
flood_control
|
construction-of-flood-mitigation-structure-along-cuabo-creek-sta0000---sta-0400-lupon-davao-oriental-22lg0011
|
[object Object]
|
1071accc-d54f-432b-9364-9713ab856359
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
DAVAO CITY (DAVAO DEL SUR)
|
Davao City District Engineering Office
|
P00631101MN
|
Rehabilitation of existing Flood Mitigation Structure at Barangay 17-B Poblacion, Davao City
|
P00631101MN-CW1
|
Rehabilitation / Major Repair of Flood Control Structure - Rehabilitation of existing Flood Mitigation Structure at Barangay 17-B Poblacion, Davao City
| null |
Rehabilitation / Major Repair of Flood Control Structure
|
Flood Control Structures
| 125.615757
| 7.083661
|
22LB0245
| 4,950,000
| 4,950,000
| 1,661,644,800,000
| 2,022
|
CJEP BUILDERS AND ENGINEERING SERVICES
| 9,690
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO CITY (FIRST LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
4950000
|
4950000
|
2022-08-29
|
04/13/2022
|
flood_control
|
rehabilitation-of-existing-flood-mitigation-structure-at-barangay-17-b-poblacion-davao-city-22lb0245
|
[object Object]
|
cc03d7dc-879e-48ba-9725-4e56647df3f9
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)
|
Region XI
|
P00630509MN
|
Construction of Digos River Flood Control Project, Barangay Ruparan (Section 6), City of Digos, Davao del Sur
|
P00630509MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Digos River Flood Control Project, Barangay Ruparan (Section 6), City of Digos, Davao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.333575
| 6.780079
|
22L00084
| 173,700,000
| 173,600,437.6
| 1,708,732,800,000
| 2,024
|
P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION)
| 9,691
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL SUR (LEGISLATIVE DISTRICT)
|
Davao del Sur District Engineering Office
|
173700000
|
173600437.58
|
2024-02-25
|
03/25/2022
|
flood_control
|
construction-of-digos-river-flood-control-project-barangay-ruparan-section-6-city-of-digos-davao-del-sur-22l00084
|
[object Object]
|
18c1cdee-3d2a-4e0a-bff3-5a2c597b35e3
| 2,024
|
Region XI
|
DAVAO ORIENTAL
|
MANAY (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00833296MN
|
Construction of Concrete Revetment along Lingayao River, Brgy. San Ignacio, Manay, Davao Oriental
|
P00833296MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment along Lingayao River, Brgy. San Ignacio, Manay, Davao Oriental
| null |
Construction of Revetment
|
Flood Control Structures
| 126.4797
| 7.1227
|
24LF0038
| 48,250,000
| 48,249,609.7
| 1,734,652,800,000
| 2,024
|
ECBJ EASTCOAST CONSTRUCTION
| 9,692
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
48250000
|
48249609.7
|
2024-07-22
|
04/22/2024
|
flood_control
|
construction-of-concrete-revetment-along-lingayao-river-brgy-san-ignacio-manay-davao-oriental-24lf0038
|
[object Object]
|
128c0b9a-67e3-4bfb-a72c-c6d8005bcead
| 2,023
|
Region VIII
|
EASTERN SAMAR
|
HERNANI (EASTERN SAMAR)
|
Region VIII
|
P00733310VS
|
Construction of Flood Control Structure, Barangay Poblacion, Hernani, Eastern Samar
|
P00733310VS-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Barangay Poblacion, Hernani, Eastern Samar
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.61678
| 11.321771
|
23I00084
| 24,124,924.27
| 24,123,628.52
| 1,701,734,400,000
| 2,023
|
QUEEN MARIECRIS CONSTRUCTION CORP.
| 9,693
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
EASTERN SAMAR (LEGISLATIVE DISTRICT)
|
Eastern Samar District Engineering Office
|
24124924.27
|
24123628.52
|
2023-12-06
|
07/12/2023
|
flood_control
|
construction-of-flood-control-structure-barangay-poblacion-hernani-eastern-samar-23i00084
|
[object Object]
|
5331c802-8303-4410-9cc3-03f3e9b39dcf
| 2,023
|
Region XI
|
DAVAO DE ORO
|
COMPOSTELA (DAVAO DE ORO)
|
Davao de Oro 2nd District Engineering Office
|
P00721571MN
|
Construction of Protection Dike at Cambaong Creek, Poblacion, Compostela, Davao de Oro
|
P00721571MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Protection Dike at Cambaong Creek, Poblacion, Compostela, Davao de Oro
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.089266
| 7.675793
|
23LI0067
| 96,500,000
| 51,859,623.25
| 1,730,937,600,000
| 2,024
|
METRO GEAR CONSTRUCTION CORP. / REPLICON CONSTRUCTION CORPORATION
| 9,694
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,023
|
DAVAO DE ORO (FIRST LEGISLATIVE DISTRICT)
|
Davao de Oro 2nd District Engineering Office
|
96500000
|
51859623.25
|
2024-11-08
|
08/09/2023
|
flood_control
|
construction-of-protection-dike-at-cambaong-creek-poblacion-compostela-davao-de-oro-23li0067
|
[object Object]
|
1c3ad301-a55e-4e6b-b4c7-622b6f40b0f8
| 2,024
|
Region XII
|
SOUTH COTABATO
|
GENERAL SANTOS CITY (DADIANGAS) (SOUTH COTABATO)
|
Region XII
|
P00820325MN
|
Construction of Concrete Revetment, Downstream of Sinawal Bridge, Sinawal River, Barangay Labangal, General Santos City
|
P00820325MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment, Downstream of Sinawal Bridge, Sinawal River, Barangay Labangal, General Santos City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.149238
| 6.111089
|
24M00162
| 120,625,000
| 120,624,229.7
| 1,748,736,000,000
| 2,025
|
J.G. ORANZA CONSTRUCTION
| 9,695
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,024
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
120625000
|
120624229.69
|
2025-03-21
|
08/12/2024
|
flood_control
|
construction-of-concrete-revetment-downstream-of-sinawal-bridge-sinawal-river-barangay-labangal-general-santos-city-24m00162
|
[object Object]
|
efe9fb6d-88ed-455f-a64f-9b5090629ea5
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)
|
Region XI
|
P00630506MN
|
Construction of Digos River Flood Control Project, Barangay Ruparan (Section 3), City of Digos, Davao del Sur
|
P00630506MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Digos River Flood Control Project, Barangay Ruparan (Section 3), City of Digos, Davao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.333874
| 6.786175
|
22L00081
| 173,700,000
| 173,625,230.3
| 1,679,788,800,000
| 2,023
|
MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)
| 9,696
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL SUR (LEGISLATIVE DISTRICT)
|
Davao del Sur District Engineering Office
|
173700000
|
173625230.25
|
2023-03-27
|
03/11/2022
|
flood_control
|
construction-of-digos-river-flood-control-project-barangay-ruparan-section-3-city-of-digos-davao-del-sur-22l00081
|
[object Object]
|
88851b1a-cc43-40d8-9553-28ea935b529a
| 2,022
|
Region XI
|
DAVAO ORIENTAL
|
MANAY (DAVAO ORIENTAL)
|
Davao Oriental 1st District Engineering Office
|
P00620380MN
|
Construction of Flood Mitigation Structure protecting Surigao del Sur Bdry - Davao Oriental Coastal Rd (San Ignacio Section), Manay, Davao Oriental
|
P00620380MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Flood Mitigation Structure protecting Surigao del Sur Bdry - Davao Oriental Coastal Rd (San Ignacio Section), Manay, Davao Oriental
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 126.484216
| 7.116111
|
22LF0099
| 96,500,000
| 96,499,661.76
| 1,677,628,800,000
| 2,022
|
MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)
| 9,697
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO ORIENTAL (FIRST LEGISLATIVE DISTRICT)
|
Davao Oriental 1st District Engineering Office
|
96500000
|
96499661.76
|
2022-12-12
|
03/28/2022
|
flood_control
|
construction-of-flood-mitigation-structure-protecting-surigao-del-sur-bdry---davao-oriental-coastal-rd-san-ignacio-section-manay-davao-oriental-22lf0099
|
[object Object]
|
30f1bbad-5f69-4943-a025-7dfc9f029900
| 2,022
|
Region XI
|
DAVAO DEL NORTE
|
CARMEN (DAVAO DEL NORTE)
|
Davao del Norte District Engineering Office
|
P00630603MN
|
Construction of Concrete Revetment along Tagum-Libuganon River Basin, Carmen Section, Davao del Norte
|
P00630603MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment along Tagum-Libuganon River Basin, Carmen Section, Davao del Norte
| null |
Construction of Revetment
|
Flood Control Structures
| 125.755122
| 7.402742
|
22LC0096
| 49,000,000
| 49,000,000
| 1,668,556,800,000
| 2,022
|
GP & H CONSTRUCTION INCORPORATED (FORMERLY: GP & H CONSTRUCTION & SUPPLY)
| 9,698
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL NORTE (SECOND LEGISLATIVE DISTRICT)
|
Davao del Norte District Engineering Office
|
49000000
|
49000000
|
2022-11-17
|
02/11/2022
|
flood_control
|
construction-of-concrete-revetment-along-tagum-libuganon-river-basin-carmen-section-davao-del-norte-22lc0096
|
[object Object]
|
5ebffc82-e012-4c39-89b7-6cbe9670ab55
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
DAVAO CITY (DAVAO DEL SUR)
|
Davao City District Engineering Office
|
P00634137MN
|
Construction (Riprapping) of Canal from Deca Homes going to Country Homes up to the boundary of Barangay Communal, Barangay Cabantian, Buhangin District, Davao City (near Greenland Phase 1)
|
P00634137MN-CW1
|
Construction of Drainage Structure - Construction (Riprapping) of Canal from Deca Homes going to Country Homes up to the boundary of Barangay Communal, Barangay Cabantian, Buhangin District, Davao City (near Greenland Phase 1)
| null |
Construction of Drainage Structure
|
Flood Control Structures
| 125.619181
| 7.131305
|
22LB0414
| 29,700,000
| 29,700,000
| 1,683,331,200,000
| 2,023
|
MARK ANTHONY CONSTRUCTION & SUPPLY
| 9,699
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO CITY (SECOND LEGISLATIVE DISTRICT)
|
Davao City District Engineering Office
|
29700000
|
29700000
|
2023-05-07
|
06/09/2022
|
flood_control
|
construction-riprapping-of-canal-from-deca-homes-going-to-country-homes-up-to-the-boundary-of-barangay-communal-barangay-cabantian-buhangin-district-davao-city-near-greenland-phase-1-22lb0414
|
[object Object]
|
272942d4-1f00-4ebc-b625-2962b611ed14
| 2,021
|
Region XII
|
SOUTH COTABATO
| null |
South Cotabato 1st District Engineering Office
|
P00522369MN
|
Construction of Concrete Revetment, P.I. Silway River, Barangay Apopong, General Santos City
|
P00522369MN-CW1
|
Construction of Revetment - Construction of Concrete Revetment, P.I. Silway River, Barangay Apopong, General Santos City
| null |
Construction of Revetment
|
Flood Control Structures
| 125.15105
| 6.130386
|
21MB0023
| 29,400,000
| 22,631,367.51
| 1,665,446,400,000
| 2,022
|
J.G. ORANZA CONSTRUCTION
| 9,700
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,021
|
SOUTH COTABATO (THIRD LEGISLATIVE DISTRICT)
|
South Cotabato 1st District Engineering Office
|
29400000
|
22631367.51
|
2022-09-20
|
03/08/2022
|
flood_control
|
construction-of-concrete-revetment-pi-silway-river-barangay-apopong-general-santos-city-21mb0023
|
[object Object]
|
04d83702-1ed5-4ccb-99d9-6ae148e1a651
| 2,022
|
Region XI
|
DAVAO DEL SUR
|
CITY OF DIGOS (CAPITAL) (DAVAO DEL SUR)
|
Region XI
|
P00630508MN
|
Construction of Digos River Flood Control Project, Barangay Ruparan (Section 5), City of Digos, Davao del Sur
|
P00630508MN-CW1
|
Construction of Flood Mitigation Structure - Construction of Digos River Flood Control Project, Barangay Ruparan (Section 5), City of Digos, Davao del Sur
| null |
Construction of Flood Mitigation Structure
|
Flood Control Structures
| 125.334886
| 6.796318
|
22L00083
| 173,700,000
| 173,700,000
| 1,700,611,200,000
| 2,023
|
MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION)
| 9,701
| 1,754,268,322,388
|
dpwh_view
| 1,754,303,523,936
|
dpwh_view
| 2,022
|
DAVAO DEL SUR (LEGISLATIVE DISTRICT)
|
Davao del Sur District Engineering Office
|
173700000
|
173700000
|
2023-11-23
|
03/24/2022
|
flood_control
|
construction-of-digos-river-flood-control-project-barangay-ruparan-section-5-city-of-digos-davao-del-sur-22l00083
|
[object Object]
|
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.