Dataset Viewer
Auto-converted to Parquet Duplicate
image
image
filename
string
subtype_label
string
modifier
bool
transcription
string
metadata_json
string
series_title
string
episode_no
string
program_title
string
episode_title
string
director
string
producer
string
cpb-aacip-345d475a397_01922687_00085519_00085552.jpg
D
false
STATELINE Number: 716 Air Dates: 01/14/87 19:30 Repeat: 01/18/87 12:30 Producer: Hatch Director: Sheehan TH 2390 Time: 28:45
{"series-title": "Stateline", "episode-no": "716", "air-date": ["1987-01-14", "1987-01-18"], "director": "Sheehan", "producer": "Hatch"}
Stateline
716
Sheehan
Hatch
cpb-aacip-30edf375fbf_01890755_00116517_00116549.jpg
D
false
STATELINE PROGRAM NO. 1023 TAPE DATE: 04/12/90 AIR DATE: 04/12/90 19:30 AIR DATE: 04/15/90 17:00 LENGTH: 28:45 TAPE NO.: TH 6512 DIRECTOR: EARNHARDT PRODUCER: HARRISON/MADDEN
{"series-title": "Stateline", "episode-no": "1023", "create-date": "1990-04-12", "air-date": ["1990-04-12", "1990-04-15"], "director": "Earnhardt", "producer": ["Harrison", "Madden"]}
Stateline
1023
Earnhardt
cpb-aacip-225-04rjdgb8_03856052_00033033_00033033.jpg
D
false
PR: 92 CUT: 3 Show & No. DIALOG #98-005 Title: The IRRADIATION Issue For: Friday @ 8:00 p.m. Airs: Friday, 9/19/97 Length :30
{"episode-title": "The Irradiation Issue", "series-title": "Dialog", "episode-no": "98-005", "air-date": "1997-09-19"}
Dialog
98-005
The Irradiation Issue
cpb-aacip-225-15bcc3vt_01843641_00031532_00031564.jpg
H
false
Pau Hana # 731 D: Hyne P/ Bob Barker Sept. 10
{"title": "Pau Hana", "episode-no": "731"}
731
cpb-aacip-42-71ngfc92_01695427_00043010_00043043.jpg
D
false
Wild Florida Show # 204 "CRUSTACEANS" 02/28/07 TRT 26:42 STEREO
{"series-title": "Wild Florida", "episode-title": "Crustaceans", "episode-no": "204", "date": "2007-02-28"}
Wild Florida
204
Crustaceans
cpb-aacip-42-41zcrqz2_03585415_00048515_00048515.jpg
D
false
Tradicion A Holiday Celebration English Version TRT 58:18 2 Channel Stereo WPBT/CH 2 Miami
{"title": "Tradicion A Holiday Celebration"}
cpb-aacip-1c5c6f8385a_01860758_00007007_00007040.jpg
D
false
Series: Stateline Program: 112 Length: 28:45 Air: 10/39/81 Studio: Raleigh A Director: Dobbs
{"series-title": "Stateline", "episode-no": "112", "director": "Dobbs"}
Stateline
112
Dobbs
cpb-aacip-0a30eac6277_01935533_00025526_00025558.jpg
D
false
NORTH CAROLINA PUBLIC TV STATELINE #1116 TIME: 28:45 TAPE DATE: 3/20/91 AIR DATES: 3/20/91 LIVE 3/21/91 7:00 AM TAPE: TH 4804 DIR: EARNHARDT PROD: HARRISON
{"series-title": "Stateline", "episode-no": "1116", "create-date": "1991-03-20", "air-date": ["1991-03-20", "1991-03-21"], "director": "Earnhardt", "producer": "Harrison"}
Stateline
1116
Earnhardt
Harrison
cpb-aacip-13ab8023bb5_07617543_00222022_00222055.jpg
D
false
CLINTON LIBRARY Opening Ceremony 10AM Date: 11/18/04 Producer: Brocchus Director: Worden
{"title": "Clinton Library Opening Ceremony", "date": "2004-11-18", "director": "Worden", "producer": "Brocchus"}
Worden
Brocchus
cpb-aacip-42-58bg7jb0_03849979_00040007_00040040.jpg
D
false
WPBT/MIAMI " MIAMI BEACH WALKING TOUR " PLEDGE VERSION SEGMENT 1 T.R.T. 21:22 SEGMENT 2 T.R.T. 15:34 SEGMENT 3 T.R.T. 19:36
{"title": "Miami Beach Walking Tour"}
cpb-aacip-2d3cb385585_01861993_00066033_00066066.jpg
D
false
STATELINE NUMBER: 907 TAPE DATE: 12/15/88 AIR DATE 1: 12/15/88 at 19:30 AIR DATE 2: 12/18/88 at 17:00 LENGTH: 28:45 TAPE NP.: TH 5920 DIRECTOR: EARNHARDT PRODUCER: BAILEY
{"series-title": "Stateline", "episode-no": "907", "create-date": "1988-12-15", "air-date": ["1988-12-15", "1988-12-18"], "director": "Earnhardt", "producer": "Bailey"}
Stateline
907
Earnhardt
Bailey
cpb-aacip-5e569422766_01856387_00026026_00026059.jpg
D
false
Program: STATELINE Legislative Report Director: Sheehan Record Date: 3/13/85 Air Date: 3/13/85, 3/14/85 Air Time: 1930, 0730 Length: 28:45 Program No: 017 Tape No: TH.2936
{"series-title": "Stateline Legislative Report", "episode-no": "017", "create-date": "1985-03-13", "air-date": ["1985-03-13", "1985-03-14"], "director": "Sheehan"}
Stateline Legislative Report
017
Sheehan
cpb-aacip-597047bd6b8_03316813_00060527_00060527.jpg
H
false
PRODUCTION NC 400 SCENE 4 TAKE 1 DIRECTOR COLMAN CAMERA AUDIO SIMONI ENGINEER SHOTS 1+ 2 02:07:14:07
{"director": "Colman"}
Colman
cpb-aacip-111-18dfn6br_01803168_00053020_00053053.jpg
D
false
unconventional wisdom December 15,2006 Hosts: Sanders, Sabin Guests: Laverty, Bryles, Bisbee Director: Andrews
{"series-title": "Unconventional Wisdom", "date": "2006-12-15", "director": "Andrews"}
Unconventional Wisdom
Andrews
cpb-aacip-111-57np5s6c_01732464_00068502_00068535.jpg
D
false
ARKANSAS WEEK Dec. 31, 1993 MODERATOR: Barnes Guest: Bumpers DIRECTOR: Andrews
{"series-title": "Arkansas Week", "date": "1993-12-31", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-36ec2db98b3_02464929_00075509_00075542.jpg
D
false
Show: Stateline Director: Talbot Recording Date: 04/13/84 Play Date: 04/13/84, 04/15/84 Play Time: 19:30, 12:30 Length: 28:45 Program Number: T1.32 Tape Number: TH 1457
{"series-title": "Stateline", "create-date": "1984-04-13", "air-date": ["1984-04-13", "1984-04-15"], "director": "Talbot"}
Stateline
Talbot
cpb-aacip-1fd7065246e_02010808_00085018_00085018.jpg
G
false
Oregon Art Beat # 813 1/4/06 CH. 1,2 STEREO 29:25 Oregon Public Broadcasting Portland (503) 244-9900
{"title": "Oregon Art Beat", "date": "2006-01-04", "episode-no": "813"}
813
cpb-aacip-36b4bf68d43_01943441_00095529_00095562.jpg
D
false
STATELINE PROGRAM NO. 1721 TAPE DATE: 7/12/90 AIR DATE: 7/12/90 19:30 7/13/90 07:00 TAPE NO. TH 6520 LENGTH: 28:45 DIRECTOR: EARNHARDT PRODUCER: HARRISON
{"series-title": "Stateline", "episode-no": "1721", "create-date": "1990-07-12", "air-date": ["1990-07-12", "1990-07-13"], "director": "Earnhardt", "producer": "Harrison"}
Stateline
1721
Earnhardt
Harrison
cpb-aacip-111-902z3j1t_03594290_00026527_00026559.jpg
D
false
ARKANSAS WEEK DEC. 29, 1989 MODERATOR: Barnes Guests: Brummett, Blakley,Atwood Director: Andrews
{"series-title": "Arkansas Week", "date": "1989-12-29", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-35f95ff4b4b_01684215_00054521_00054521.jpg
D
false
Arkansas Week April 10, 2009 Host: Barnes Panelists: DeMillo, Williams Thompson Director: Worden
{"series-title": "Arkansas Week", "date": "2009-04-10", "director": "Worden"}
Arkansas Week
Worden
cpb-aacip-161e30489fb_01672570_00043510_00043510.jpg
D
false
EL LATINO July 15, 2010 Moderador- Michel Leidermann Panelistas- Castro, Hoey Orellana-Frisby Director- Worden
{"series-title": "El Latino", "date": "2010-07-15", "director": "Worden"}
El Latino
Worden
cpb-aacip-2b2478a0afe_01926190_00054521_00054521.jpg
B
false
LEGISLATIVE REPORT PROGRAM NO. 1427 AIR DATE 04/02/87 19:30 AIR DATE 04/03/87 7:00 TAPE NO. TH 2938 DIRECTOR: DOBBS TIME: 28:45
{"series-title": "Legislative Report", "episode-no": "1427", "air-date": ["1987-04-02", "1987-04-03"], "director": "Dobbs"}
Legislative Report
1427
Dobbs
cpb-aacip-1ba30fb15b6_01865029_00051018_00051051.jpg
D
false
STATELINE PROGRAM NO. 803 AIR DATE: 11/19/87 at 19:30 REPEAT: 11/22/87 at 18:30 TAPE DATE: 11/19/87 TAPE NO.: TH 4645 DIRECTOR: SHEEHAN RUN TIME: 28:45
{"series-title": "Stateline", "episode-no": "803", "create-date": "1987-11-19", "air-date": ["1987-11-19", "1987-11-22"], "director": "Sheehan"}
Stateline
803
Sheehan
cpb-aacip-5af2f21a2a0_01958056_00035502_00035502.jpg
D
false
LEGISLATIVE REPORT PROGRAM NO.: 1607 TAPE DATE: 02/09/89 AIR DATE: 02/09/89 19:30 live REPEAT: 02/09/89 23:00 TAPE NO.: TH 5043 LENGTH: 24:18 DIRECTOR: EARNHARDT
{"series-title": "Legislative Report", "episode-no": "1607", "create-date": "1989-02-09", "air-date": "1989-02-09", "director": "Earnhardt"}
Legislative Report
1607
Earnhardt
cpb-aacip-48075b55dfa_01725123_00028529_00028561.jpg
D
false
ARKANSAS WEEK DATE: Aug. 17,2001 HOST: Steve Barnes PANELISTS: Purvis, Fahr, Moritz, Breeding DIRECTOR: Andrews
{"series-title": "Arkansas Week", "date": "2001-08-17", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-4d52440f8cb_01791022_00009009_00009009.jpg
B
false
LEGISLATIVE REPORT PROGRAM NO: 1601 TAPE DATE: 01/31/89 AIR DATE: 01/31/89 19:30 LIVE REPEAT: 01/31/89 23:00 TAPE NO. TH 5037 LENGTH 28:45 DIRECTOR: SHEEHAN
{"series-title": "Legislative Report", "episode-no": "1601", "create-date": "1989-01-31", "air-date": "1989-01-31", "director": "Sheehan"}
Legislative Report
1601
Sheehan
cpb-aacip-508c536bd43_01826057_00023524_00023556.jpg
D
false
STATELINE Number: 709 Air Dates: 11/26/86 19:30 Repeat: 11/30/86 12:30 Producer: Hatch Director: Dobbs TH 2387 Time: 29:15
{"series-title": "Stateline", "episode-no": "709", "air-date": ["1986-11-26", "1986-11-30"], "producer": "Hatch", "director": "Dobbs"}
Stateline
709
Dobbs
Hatch
cpb-aacip-53986c2494d_01961659_00081014_00081014.jpg
D
false
Program: STATELINE Director: Sheehan Record Date: 4/26/85 Air Dates: 4/26/85 19:30 4/29/85 07:30 Program No. 043 Tape No: TH.2938 Length: 28:47
{"series-title": "Stateline", "director": "Sheehan", "create-date": "1985-04-26", "air-date": ["1985-04-26", "1985-04-29"], "episode-no": "043"}
Stateline
043
Sheehan
cpb-aacip-2089b4024e9_01622153_00021522_00021554.jpg
D
false
ARKANSAS WEEK FEB. 12, 2010 HOST: BARNES PANELIST: HANKINS, DEMILLO, MORITZ DIRECTOR: ANDREWS
{"series-title": "Arkansas Week", "date": "2010-02-12", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-17138c95fff_00789121_00015015_00015015.jpg
D
false
THE BOOKSTORE REMOTE INTERVIEW DATE: August 24, 2001 HOST: Roby Brock AUTHOR: Terry Kay PRODUCER: Sanders DIRECTOR: Worden
{"title": "That Bookstore Remote Interview", "date": "2001-08-24", "director": "Worden", "producer": "Sanders"}
Worden
Sanders
cpb-aacip-5c1645cc4f0_01876241_00090524_00090557.jpg
D
false
Show: Stateline Director: Sheehan Recording Date: 04/20/84 Play Date: 04/20/84, 04/22/84 Play Time: 19:30, 12:30 Length: 28:45 Program Number: T1.34 Tape Number: TH 1457
{"series-title": "Stateline", "create-date": "1984-04-20", "air-date": ["1984-04-20", "1984-04-22"], "director": "Sheehan"}
Stateline
Sheehan
cpb-aacip-42-15p8d3zh_01737068_00070003_00070003.jpg
D
false
Florida Roadtrip Show # 106 trt 00:26:42:00 channels 1 & 2 STEREO
{"series-title": "Florida Roadtrip", "episode-no": "106"}
Florida Roadtrip
106
cpb-aacip-4f0c70de1e9_01695760_00052019_00052052.jpg
D
false
EL LATINO March 25, 2010 Moderador- Michel Leidermann Panelistas- Birkhead, Morrissey Solorzano Director- Worden
{"series-title": "El Latino", "date": "2010-03-25", "director": "Worden"}
El Latino
Worden
cpb-aacip-3c2fc7b270f_03632328_00009510_00009542.jpg
D
true
"SLEEP BABY SLEEP" CUT 1
{"title": "Sleep Baby Sleep"}
cpb-aacip-1df6a1c829c_01884215_00064031_00064063.jpg
D
false
STATELINE PROGRAM NO. 1002 TAPE DATE: 11/16/89 AIR DATE: 11/16/89 19:30 AIR DATE: 11/18/89 17:00 LENGTH: 29:45 TAPE NO.: TH 6511 DIRECTOR: EARNHARDT PRODUCER: HARRISON
{"series-title": "Stateline", "episode-no": "1002", "create-date": "1989-11-16", "air-date": ["1989-11-16", "1989-11-18"], "director": "Earnhardt", "producer": "Harrison"}
Stateline
1002
Earnhardt
Harrison
cpb-aacip-25362be7677_01819250_00062529_00062529.jpg
D
false
STATELINE PROGRAM NO.: 1715 TAPE DATE: 06/28/90 AIR DATE: 06/28/90 19:30 AIR DATE: 06/29/90 07:00 LENGTH: 28:45 TAPE NO.: TH 6514 DIRECTOR: EARNHARDT PRODUCER: HARRISON/MADDEN
{"series-title": "Stateline", "episode-no": "1715", "create-date": "1990-06-28", "air-date": ["1990-06-28", "1990-06-29"], "director": "Earnhardt", "producer": ["Harrison", "Madden"]}
Stateline
1715
Earnhardt
cpb-aacip-225-22v41r4g_03766796_00019019_00019019.jpg
D
false
PR: 92 CUT: 5 Show & No. DIALOG #98-006 Title: Women's Issues For: Friday @ 8:00 p.m. Airs: Friday, 9/26/97 Length :30
{"episode-title": "Women's Issues", "series-title": "Dialog", "episode-no": "98-006", "air-date": "1997-09-26"}
Dialog
98-006
Women's Issues
cpb-aacip-42-91sf7zqb_01706705_00067501_00067534.jpg
D
false
Florida Roadtrip Show # 102 trt 00:26:42:00 channels 1 & 2 STEREO
{"series-title": "Florida Roadtrip", "episode-no": "102"}
Florida Roadtrip
102
cpb-aacip-1dd89bf9715_01757856_00055022_00055055.jpg
D
false
ARKANSAS WEEK DATE: JANUARY 10, 2003 HOST: BARNES PANELISTS: SANDERS, FAHR SIMMONS, BRANTLEY DIRECTOR: ANDREWS
{"series-title": "Arkansas Week", "date": "2003-01-10", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-1afa5c0b32b_01092624_00070003_00070003.jpg
D
false
On The Same Page That Bookstore (Blytheville) 9/10/02 Tayari Jones Interview
{"title": "On the Same Page Yhat Bookstore (Blytheville)", "date": "2002-09-10"}
cpb-aacip-1fb687ee880_01868967_00085018_00085018.jpg
D
false
Program: Stateline Director: Sheehan Air Date: 11/16/84. 11/18/84 Air Time: 1930. 12:30 Length: 28:45 Program No: T2.10 Tape No: TH.2714
{"episode-no": "T2.10", "series-title": "Stateline", "air-date": ["1984-11-16", "1984-11-18"], "director": "Sheehan"}
Stateline
T2.10
Sheehan
cpb-aacip-42-56zw3zfc_03498661_00068502_00068535.jpg
D
false
Musica de Mi Tierra TRT: 56:28 segment 1 --- TRT: 16:43 segment 2 ---- TRT: 19:42 segment 3 ---- TRT: 18:55 segment 4 ------ TRT: 1:05 4x3 letterboxed Stereo channels 1 Left - 2 Right "CC"
{"title": "Musica de Mi Tierra"}
cpb-aacip-2658bd55d35_01689587_00023524_00023556.jpg
D
false
ARKANSAS WEEK JAN. 16, 2009 HOST: BARNES PANELIST: SANDERS, THOMPSN. DEMILLO DIRECTOR: ANDREWS
{"series-title": "Arkansas Week", "date": "2009-01-16", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-0e6970679a4_01937769_00035502_00035502.jpg
G
false
NORTH CAROLINA PUBLIC TELEVISION SHOW STATELINE LEG. REPORT TAPE NO. TH 4810 CUT 01 AIR DATE 4/24/91 1930 4/25/91 0700 LENGTH 28:45 AIR TIME 1930 AUDIO STEREO Ted Harrison PRODUCER 10 TW ALEXANDER DR PO BOX 14900 RTP, NC 27709-4900 DIR. David Earnhardt
{"title": "Stateline Leg. Report", "air-date": ["1991-04-24", "1991-04-25"], "producer": "Harrison, Ted", "director": "Earnhardt, David"}
Earnhardt, David
Harrison, Ted
cpb-aacip-111-69z08vxd_01874005_00026026_00026026.jpg
D
false
unconventional wisdom August 22, 2006 Hosts: Sanders, Sabin Guests: Lynch, Vickery Director: Andrews
{"series-title": "Unconventional Wisdom", "date": "2006-08-22", "director": "Andrews"}
Unconventional Wisdom
Andrews
cpb-aacip-475270adb26_01814479_00011011_00011011.jpg
D
false
Program: GLOBE WATCH Guest: LAPPE Director: THE GREAT C Tape No.:TH 2327 Rec. Date: 3/27/84 Play Date(s) 4/26/84 Run Time: 28:45
{"title": "Globe Watch", "director": "The Great C", "create-date": "1984-03-27", "air-date": "1984-04-26"}
The Great C
cpb-aacip-517ab27e0f4_01082481_00124525_00124557.jpg
D
false
On The Same Page CRESCENT DRAGONWAGON WILDOATS/ LR INTERVIEW DT: 5/19/03 PRODUCER: SANDERS DIRECTOR: WORDEN
{"series-title": "On the Same Page", "date": "2003-05-19", "director": "Worden", "producer": "Sanders"}
On the Same Page
Worden
Sanders
cpb-aacip-111-53jwt2wk_00929094_00072005_00072005.jpg
D
false
AETN Productions: CUT 1 barnes and dickey 06/21/99 dur 00:22
{"title": "Barnes and Dickey", "date": "1999-06-21"}
cpb-aacip-111-54kkwr9x_01696194_00021522_00021554.jpg
D
false
Unconventional Wisdom Host: David Sanders Warwick Sabin Guest: Nick Coulter Rex Nelson RT - 26:47
{"series-title": "Unconventional Wisdom"}
Unconventional Wisdom
cpb-aacip-59743fe534a_01830295_00046013_00046046.jpg
G
false
Client: TeleVision for Arkansas Title: Water Steals the Land Date: 4/18/02 Length: 28:56 Agency: n/a Producer: Jack Hill Editor: A. May 6 Light Productions 15 Shackleford Dr., Suite D Little Rock, AR 72211 (501) 223-8736
{"title": "Water Steals the Land", "date": "2002-04-18", "producer": "Hill, Jack"}
Hill, Jack
cpb-aacip-36d9505f88c_01948012_00076009_00076009.jpg
G
false
STATELINE TOBACCO ROAD SPECIAL TH-4805 CUT 1 REC.: 1/18/91 15:00 PLAY: 1/24/91 19:30 PROD.: McSWEENEY DIR.: EARNHARDT
{"series-title": "Stateline: Tobacco Road Special", "create-date": "1991-01-18", "air-date": "1991-01-24", "director": "Earnhardt", "producer": "McSweeney"}
Stateline: Tobacco Road Special
Earnhardt
McSweeney
cpb-aacip-5b5d835bd7c_01827926_00058525_00058525.jpg
G
false
NORTH CAROLINA PUBLIC TV STATELINE # 1115 TIME: 28:45 TAPE DATE: 3/19/91 AIR DATES: 3/19/91 LIVE 3/20/91 7:00 am TAPE: TH 4803 DIR: EARNHARDT PROD: HARRISON
{"series-title": "Stateline", "episode-no": "1115", "director": "Earnhardt", "producer": "Harrison", "create-date": "1991-03-19", "air-date": ["1991-03-19", "1991-03-20"]}
Stateline
1115
Earnhardt
Harrison
cpb-aacip-27def972f9c_01708740_00067000_00067000.jpg
D
false
Wild Florida Show # 209 "DRY TORTUGAS" TRT: 26:42 STEREO
{"episode-title": "Dry Tortugas", "series-title": "Wild Florida", "episode-no": "209"}
Wild Florida
209
Dry Tortugas
cpb-aacip-225-10wpzhpt_03850146_00102503_00102535.jpg
G
false
CUT 13 DIALOG BUMPER #4
{"series-title": "Dialog"}
Dialog
cpb-aacip-0859fde0a04_07506932_00009009_00009009.jpg
D
false
NORTH CAROLINA THIS WEEK PROGRAM NO.: 343 TAPE DATE: 04/22/88 AIR DATE: 04/22/88 19:30 REPEAT: 04/24/88 12:30 TAPE NO.: TH 2983 LENGTH: 28:45 DIRECTOR: SHEEHAN
{"series-title": "North Carolina This Week", "episode-no": "343", "create-date": "1988-04-22", "air-date": ["1988-04-22", "1988-04-24"], "director": "Sheehan"}
North Carolina This Week
343
Sheehan
cpb-aacip-225-30prr7rk_03853449_00090023_00090023.jpg
D
false
DIALOG Encore "Power '94: Your Voice, Your Vote" Time: 59:14 contains PBS Positioning Spot "Kids (PR 51-4/1:00) 6
{"episode-title": "Power '94: Your Voice, Your Vote", "series-title": "Dialog Encore"}
Dialog Encore
Power '94: Your Voice, Your Vote
cpb-aacip-010691103f6_01787418_00023524_00023556.jpg
D
false
LEGISLATIVE REPORT PROGRAM NO.: 1602 TAPE DATE: 02/01/89 AIR DATE: 02/01/89 19:30 LIVE REPEAT: 02/01/89 23:00 TAPE NO.: TH 5038 LENGTH: 28:45 DIRECTOR: SHEEHAN
{"series-title": "Legislative Report", "episode-no": "1602", "create-date": "1989-02-01", "air-date": ["1989-02-01", "1989-02-01"], "director": "Sheehan"}
Legislative Report
1602
Sheehan
cpb-aacip-1ae404ceb68_01660992_00048515_00048515.jpg
D
false
AETN Productions: CENTRAL HIGH #103 Producer: Tanisha Joe 9/16/97 trt 26:29 tc 01:01:24
{"title": "Central High", "episode-no": "103", "date": "1997-09-16", "producer": "Joe, Tanisha"}
103
Joe, Tanisha
cpb-aacip-273aeeb4fad_07146072_00040007_00040040.jpg
D
false
DIRECTOR: Snavely PROGRAM: 145 RECORD DATE: 09/12/86 AIR DATE: 9/12/86 at 19:30 9/14/86 at 18:30 LENGTH: 28:45 TAPE NO: TH 2983
{"episode-no": "145", "create-date": "1986-09-12", "air-date": ["1986-09-12", "1986-09-14"], "director": "Snavely"}
145
Snavely
cpb-aacip-251725eed3f_01773605_00018018_00018018.jpg
D
false
Program: STATELINE Director: Sheehan Air Date: 2/06/85. 2/07/85 Air Time: 1930. 0730 Length: 28:30 Program No: 001 Tape No: LIVE
{"series-title": "Stateline", "episode-no": "001", "air-date": ["1985-02-06", "1985-02-07"], "director": "Sheehan"}
Stateline
001
Sheehan
cpb-aacip-1f05d928ed0_01281947_00017017_00017017.jpg
D
false
1st show broll
cpb-aacip-111-11kh1czr_03426156_00007007_00007007.jpg
D
false
84th General Assembly Date- Jan. 9, 2004 Host- Steve Barnes Guests- Argue, Green, Jones, Wooldridge Director Andrews
{"title": "84th General Assembly", "date": "2004-01-09", "director": "Andrews"}
Andrews
cpb-aacip-111-375tb7tw_03481578_00055022_00055055.jpg
D
false
ARKANSAS ASK: GOVERNOR MIKE HUCKABEE March 28, 2006 Host- Barnes Panelists- Governor, Nugent Kellams, Fugate,Simmons Director- Andrews
{"series-title": "Arkansans Ask", "episode-title": "Governor Mike Huckabee", "date": "2006-03-28", "director": "Andrews"}
Arkansans Ask
Governor Mike Huckabee
Andrews
cpb-aacip-21d9fae5426_01821419_00050517_00050517.jpg
D
false
LEGISLATIVE REPORT PROGRAM NO. 1440 AIR DATE 04/24/87 23:00 AIR DATE 04/26/87 18:00 TAPE NO. TH 2943 DIRECTOR: SHEEHAN TIME: 28:45
{"series-title": "Legislative Report", "episode-no": "1440", "air-date": ["1987-04-24", "1987-04-26"], "director": "Sheehan"}
Legislative Report
1440
Sheehan
cpb-aacip-42-68kd5bj4_01697128_00061028_00061061.jpg
D
false
Wild Florida Show # 110 "PANTHERS" date of air: 07/26/2006 TRT: 26:42 Closed Captioned STEREO
{"series-title": "Wild Florida", "episode-no": "110", "episode-title": "Panthers", "air-date": "2006-07-26"}
Wild Florida
110
Panthers
cpb-aacip-4c2178f9b7f_04224044_00012513_00012545.jpg
D
false
2013 ASHSAA BOYS VOLLEYBALL MONDAY SEPTEMBER 09, 2013 JV & VARSITY KANANA-FOU vs LEONE 1HR 10minutes
{"program-title": "2013 ASHSAA Boys Volleyball", "episode-title": "JV & Varsity Kanana-fou vs Leone", "date": "2013-09-09"}
2013 ASHSAA Boys Volleyball
JV & Varsity Kanana-fou vs Leone
cpb-aacip-4ed66b0ef0c_02538335_02200501_02200531.jpg
H
false
PRODUCTION NC400 SCENE 16 TAKE 1 DIRECTOR COLMAN CAMERA CCO Inc. AUDIO SIMONI ENGINEER DON DON SHOTS 79+78 06:36:50:23
{"director": "Colman"}
Colman
cpb-aacip-5f619847c57_01692791_00048015_00048048.jpg
G
false
ARKANSAS WEEK June 24, 2011 Host: Barnes Panelists: Dooley McNeil, Dumas Director: Andrews
{"series-title": "Arkansas Week", "date": "2011-06-24", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-346f8ffe2c3_01698463_00036003_00036036.jpg
G
false
ARKANSAS WEEK June 4, 2010 Host: Barnes Panelists: Purvis, Blome, Harris Director: Andrews
{"series-title": "Arkansas Week", "date": "2010-06-04", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-4b948ca1752_01864762_00044011_00044044.jpg
D
false
LEGISLATIVE REPORT PROGRAM NO. 1673 TAPE DATE: 06/06/89 AIR DATE: 06/06/89 19:30 live AIR DATE: 06/09/89 23:00 LENGTH: 28:45 TAPE NO.: TH 5049 DIRECTOR: EARNHARDT PRODUCER: BAILEY
{"series-title": "Legislative Report", "episode-no": "1673", "create-date": "1989-06-06", "air-date": ["1989-06-06", "1989-06-09"], "director": "Earnhardt", "producer": "Bailey"}
Legislative Report
1673
Earnhardt
Bailey
cpb-aacip-42-182jmbsp_01716648_00057524_00057524.jpg
G
false
Wild Florida Show #202 "BIRDS OF PREY" NOLA CODE: WLFL#202 TRT: 26:42 Closed Captioned Audio: CH1&CH2 STEREO CH2&CH3 MONO
{"series-title": "Wild Florida", "episode-no": "202", "episode-title": "Birds of Prey"}
Wild Florida
202
Birds of Prey
cpb-aacip-225-54xgxjwb_03639936_00099032_00099032.jpg
D
false
Dialog Encore "pets and people- Dogs" trt: 58:48 (including break) 26 june 1996 5
{"episode-title": "pets and people- Dogs", "series-title": "Dialog Encore", "date": "1996-06-26"}
Dialog Encore
pets and people- Dogs
cpb-aacip-42-47rn8wm7_03600196_00055022_00055055.jpg
D
false
WРВТ MIAMI - FT. LAUDERDALE VANISHING FLORIDA LENGTH 53:42
{"title": "Vanishing Florida"}
cpb-aacip-225-246q5998_03856719_00099032_00099032.jpg
G
false
DIALOG Encore Title: Big Island, Big Questions Time: 58:59 Note: contains PBS positioning spot in mid-break 4
{"episode-title": "Big Island, Big Questions", "series-title": "Dialog Encore"}
Dialog Encore
Big Island, Big Questions
cpb-aacip-6016333941a_01650048_00027528_00027560.jpg
D
false
EL LATINO May 18, 2011 Moderador- Michel Leidermann Panelistas- Cervantes, Cruz Ocasio, Ortiz Director- Worden
{"series-title": "El Latino", "date": "2011-05-18", "director": "Worden"}
El Latino
Worden
cpb-aacip-41ca75f2853_01868833_00105005_00105037.jpg
D
false
STATELINE PROGRAM NO. 1008 TAPE DATE: 01/04/90 AIR DATE: 01/04/90 19:30 AIR DATE: 01/07/90 15:00 LENGTH: 28:15 TAPE NO.: TH 6518 DIRECTOR: EARNHARDT PRODUCER: HARRISON
{"series-title": "Stateline", "episode-no": "1008", "create-date": "1990-01-04", "air-date": ["1990-01-04", "1990-01-07"], "director": "Earnhardt", "producer": "Harrison"}
Stateline
1008
Earnhardt
Harrison
cpb-aacip-0f646bc24a0_03442705_00013013_00013046.jpg
D
false
ARKANSAS WEEK DATE: May 10, 2002 HOST: Steve Barnes PANELISTS: Hy, Byrd, Dumas DIRECTOR: Worden
{"series-title": "Arkansas Week", "date": "2002-05-10", "director": "Worden"}
Arkansas Week
Worden
cpb-aacip-58629e18c6b_01663061_00039506_00039506.jpg
D
false
MINORITY MATTERS Feb 21, 2013 Host: Sylvester Smith Panelists: Haygood, Carter, Foster, Mehdizadegan, Thompson Director: Worden
{"series-title": "Minority Matters", "date": "2013-02-21", "director": "Worden"}
Minority Matters
Worden
cpb-aacip-4b66f4b7d5c_01818483_00062529_00062562.jpg
D
false
LEGISLATIVE REPORT PROGRAM NO. 1485 AIR DATE 07/14/87 19:30 AIR DATE 07/15/87 7:00 TAPE NO. TH 2940 LENGTH 28:45 DIRECTOR: SHEEHAN
{"series-title": "Legislative Report", "episode-no": "1485", "air-date": ["1987-07-14", "1987-07-15"], "director": "Sheehan"}
Legislative Report
1485
Sheehan
cpb-aacip-5fd870d3a15_01799364_00042009_00042042.jpg
D
false
Program: STATELINE Director: Sheehan Record Date: 5/29/85 Air Dates: 5/29/85 19:30 5/30/85 07:30 Program No. 061 Tape No: TH.2940 Length: 28:45
{"series-title": "Stateline", "episode-no": "061", "create-date": "1985-05-29", "air-date": ["1985-05-29", "1985-05-30"], "director": "Sheehan"}
Stateline
061
Sheehan
cpb-aacip-34a8c624382_01931095_00104505_00104537.jpg
G
false
NORTH CAROLINA PUBLIC TV STATELINE # 1112 TIME: 29:30 TAPE DATE: 2/28/91 AIR DATES: 2/28/91 LIVE 3/03/91 5:00 PM TAPE: TH 4810 DIR: EARNHARDT PROD: McSWEENEY
{"series-title": "Stateline", "episode-no": "1112", "create-date": "1991-02-28", "air-date": ["1991-02-28", "1991-03-03"], "director": "Earnhardt", "producer": "McSweeney"}
Stateline
1112
Earnhardt
McSweeney
cpb-aacip-37dceb778b0_01341039_00048515_00048515.jpg
D
false
STATELINE/LEGISLATIVE REP. PROGRAM NO.: 2272 TAPE DATE: 03/08/89 AIR DATE 1: 03/08/89 19:30 AIR DATE 2: 03/08/89 23:00 LENGTH: 21:00 DIRECTOR: BULLOCK PRODUCER: BAILEY
{"series-title": "Stateline Legislative Rep.", "episode-no": "2272", "create-date": "1989-03-08", "air-date": "1989-03-08", "director": "Bullock", "producer": "Bailey"}
Stateline Legislative Rep.
2272
Bullock
Bailey
cpb-aacip-1c252f0f857_01913878_00054521_00054521.jpg
D
false
STATELINE #631 AIR: 06/04/86 19:30 06/08/86 12:30 LENGTH: 28:45 TAPE#: TH-2393 NORTH CAROLINA PUBLIC TELEVISION
{"series-title": "Stateline", "episode-no": "631", "air-date": ["1986-06-04", "1986-06-08"]}
Stateline
631
cpb-aacip-42-53jwt1q2_03839936_00042009_00042042.jpg
G
false
Date 1/04/99 Running Time 60:46 Tracks Ch. 1 & 2 Mixed Mono Client WPBT CORRECTED MASTER Client WPBT Title Final Fla. Home Video (v. d) Israel's Forgotten Heroes - All Segments Higher Authority Productions 12000 Biscayne Boulevard Suite 200 Miami, Florida 33181 (305) 899-3002/3 Fax
{"date": "1999-01-04", "title": "Israel's Forgotten Heroes - All Segments"}
cpb-aacip-35b470d7acc_01949881_00096530_00096563.jpg
D
false
Program: STATELINE Legislative Report Director: Talbot Record Date: 3/01/85 Air Date: 3/01/85, 3/04/85 Air Time: 1930, 0730 Length: 28:45 Program No: 011 Tape No: TH.2938
{"series-title": "Stateline Legislative Report", "episode-no": "011", "create-date": "1985-03-01", "air-date": ["1985-03-01", "1985-03-04"], "director": "Talbot"}
Stateline Legislative Report
011
Talbot
cpb-aacip-4182658a526_01818750_00055022_00055055.jpg
D
false
Program: STATELINE Legislative Report Director: Sheehan Record Date: 4/02/85 Air Date: 4/02/85, 4/03/85 Air Time: 1930, 0730 Length: 28:45 Program No: 028 Tape No: TH.2939
{"series-title": "Stateline Legislative Report", "episode-no": "028", "create-date": "1985-04-02", "air-date": ["1985-04-02", "1985-04-03"], "director": "Sheehan"}
Stateline Legislative Report
028
Sheehan
cpb-aacip-42-15bcc5gs_04446508_00055022_00055055.jpg
D
false
Eternal Cuba Anamorphic Version Channels 1 & 2 full stereo mix
{"series-title": "Eternal Cuba"}
Eternal Cuba
cpb-aacip-59e4f0e93ea_06695655_00016517_00016549.jpg
B
false
VJ Day Observance USS North Carolina UNC PTW MU 9/02/95 1330 SBS6-3 11774 Mhz 95 West
{"title": "VJ Day Observance USS North Carolina", "date": "1995-09-02"}
cpb-aacip-600c322d0e9_01790221_00038505_00038505.jpg
D
false
STATELINE Number: 713 Air Dates: 12/24/86 1930 Repeat: 12/28/86 1230 Producer: Hatch Director: Morton TH 2387 Time: 28:45
{"series-title": "Stateline", "episode-no": "713", "air-date": ["1986-12-24", "1986-12-28"], "producer": "Hatch", "director": "Morton"}
Stateline
713
Morton
Hatch
cpb-aacip-12283941229_01666131_00036503_00036503.jpg
D
false
EL LATINO Sept. 23, 2010 Moderador- Michel Leidermann Panelistas- Paniagua, Blasini Fernandez, Arana Director- Worden
{"series-title": "El Latino", "date": "2010-09-23", "director": "Worden"}
El Latino
Worden
cpb-aacip-3a2acd33fbf_03995858_00047514_00047514.jpg
D
false
ON THE SAME PAGE #102 LENGTH - 27:36 4/24/02
{"series-title": "On the Same Page", "episode-no": "102", "date": "2002-04-24"}
On the Same Page
102
cpb-aacip-225-26m0cjgr_03816879_00124024_00124057.jpg
G
false
Dialog Encore Title: "Eating Disorders" Time: 57:08 NO MID BREAK 9
{"episode-title": "Eating Disorders", "series-title": "Dialog Encore"}
Dialog Encore
Eating Disorders
cpb-aacip-5ef31ce27fe_01820251_00061528_00061528.jpg
B
false
STATELINE NUMBER: 911A TAPE DATE: 01/11/89 AIR DATE 1: 01/11/89 at 19:30 AIR DATE 2: 01/11/89 at 23:00 LENGTH: 28:45 TAPE NO.: TH 5915 DIRECTOR: DOBBS PRODUCER: BAILEY
{"series-title": "Stateline", "episode-no": "911", "create-date": "1989-01-11", "air-date": "1989-01-11", "director": "Dobbs", "producer": "Bailey"}
Stateline
911
Dobbs
Bailey
cpb-aacip-225-82x3fpj9_03717313_00091525_00091558.jpg
G
false
Dialog Encore Title: "Information Highway" Time: 58:50 NO MID BREAK 9
{"episode-title": "Information Highway", "series-title": "Dialog Encore"}
Dialog Encore
Information Highway
cpb-aacip-61281d08f88_01849581_00092526_00092559.jpg
D
false
STATELINE Number: 712 Air Dates: 12/17/86 19:30 Repeat: 12/21/86 12:30 Producer: Hatch Director: Dobbs TH 2390 Time: 28:45
{"series-title": "Stateline", "episode-no": "712", "air-date": ["1986-12-17", "1986-12-21"], "producer": "Hatch", "director": "Dobbs"}
Stateline
712
Dobbs
Hatch
cpb-aacip-111-26xwdj2j_02061959_00065532_00065532.jpg
D
false
Talking to your Children About War March 17, 2003 Host: Goddard Guests: Caldwell, Long Director: Worden
{"title": "Talking to your Children About War", "date": "2003-03-17", "director": "Worden"}
Worden
cpb-aacip-36a0535215c_01862594_00065032_00065065.jpg
D
false
STATELINE Program: 207 Length: 28:45 Air: 9/17/82 and 9/19/82 Director: The Marvelous C Studio: Raleigh A
{"series-title": "Stateline", "episode-no": "207", "air-date": ["1982-09-17", "1982-09-19"], "director": "The Marvelous C"}
Stateline
207
The Marvelous C
cpb-aacip-412aa1ce66b_01605503_00066533_00066566.jpg
D
false
Program: STATELINE Legislative Report Director: Sheehan Record Date: 3/22/85 Air Date: 3/22/85, 3/25/85 Air Time: 1930, 0730 Length: 24:45 Program No: 023 Tape No: TH.2942
{"series-title": "Stateline Legislative Report", "episode-no": "023", "create-date": "1985-03-22", "air-date": ["1985-03-22", "1985-03-25"], "director": "Sheehan"}
Stateline Legislative Report
023
Sheehan
cpb-aacip-41f09b30d65_01788753_00086019_00086019.jpg
G
false
ARKANSAS WEEK Special Edition August 26, 2011 Host: Barnes Guest: Ross Director: Andrews
{"series-title": "Arkansas Week", "date": "2011-08-26", "director": "Andrews"}
Arkansas Week
Andrews
cpb-aacip-225-13mw6nzn_03164861_00083517_00083550.jpg
D
false
1996 GOVERNOR CAYETANO'S STATE OF STATE Airs: 1/22/96 (38:00) 6
{"title": "1996 Governor Cayetano's State of State", "air-date": "1996-01-22"}
End of preview. Expand in Data Studio

Transcribed Slates

General Information

This dataset was created for the training and testing of machine learning systems for extracting information from slates/on-screen or filmed text in video productions. The data associated with each instance was acquired by observing text on the slates in the file. There are two levels of data collected, a direct transcription and contextual information. For the direct transcription if there was illegible text an approximation was derived. The information is reported by the original creator of the slates and can be assumed to be accurate.

The data was collected using a software made specifically to categorize and transcribe metadata from these instances (see file directory description). The transcription was written in a natural reading order (for a western audience), so right to left and top to bottom. If the instance was labeled “Graphical” then the reading order was also right to left and top to bottom within individual sections as well as work as a whole.

This dataset was created by Madison Courtney, in collaboration with GBH Archives staff, and in consultation with researchers in the Brandeis University Department of Computer Science.

Uniqueness and overlapping data

Some of the slates come from different episodes of the same series; therefore, some slates have data overlap. For example, the “series-title” may be common across many slates. However, each slate instance in this dataset was labeled independently of the others. No information was removed, but not every slate contains the same information.

Different “sub-types” of slates have different graphical features, and present unique challenges for interpretation. In general, sub-types H (Handwritten), G (Graphical), C (Clapperboard) are more complex than D (Simple digital text) and B (Slate over bars). Most instances in the dataset are D. Users may wish to restrict the set to only those with subtype D.

Labels and annotations were created by an expert human judge. In Version 2, labels and annotations were created only once without any measure of inter-annotator agreement. In Version 3, all data were confirmed and/or edited by a second expert human judge. The dataset is self-contained. But more information about the assets from which these slates were taken can be found at the main website of the AAPB https://www.americanarchive.org/

Data size and structure

The data is tabular. There are 7 columns and 503 rows. Each row represents a different labeled image. The image files themselves are included in the dataset directory. The columns are as follows:

  • 0: filename : The name of the image file for this slate
  • 1: seen : A boolean book-keeping field used during the annotation process
  • 2: type-label : The type of scene pictured in the image. All images in this set have type "S" signifying "Slate"
  • 3: subtype-label : The sub-type of scene pictured in the image. Possible subtypes are "H" (Handwritten), "C" (Clapperboard), "D" (Simple digital text), "B" (Slate over bars), "G" (Graphical).
  • 4: modifier : A boolean value indicating whether the slate was "transitional" in the sense that the still image was captured as the slate was fading in or out of view.
  • 5: note-3 : Verbatim transcription of the text appearing on the slate
  • 6: note-4 : Data in key-value structure indicating important data values presented on the slate. Possible keys are "program-title", "episode-title", "series-title", "title", "episode-no", "create-date", "air-date", "date", "director", "producer", "camera". Dates were normalized as YYYY-MM-DD. Names were normalized as Last, First Middle.

Data format

The directory contains the tabular data, the image files, and a small utility for viewing and/or editing labels. The Keystroke Labeler utility is a simple, serverless HTML-based viewer/editor. You can use the Keystroke Labeler by simply opening labeler.html in your web browser. The data are also provided serialized as JSON and CSV. The exact same label data appears redundantly in these 3 files:

  • img_arr_prog.js - the label data loaded by the Keystroke Labeler
  • img_labels.csv - the label data serialized as CSV
  • img_labels.json - the label data serialized as JSON

This dataset includes metadata about programs in the American Archive of Public Broadcasting. Any use of programs referenced by this dataset are subject to the terms of use set by the American Archive of Public Broadcasting.

Downloads last month
9