Unnamed: 0
int64
path
string
paragraph
string
adaptation
int64
action
int64
solution
int64
risk_assessment
int64
physical_protection
int64
adaptive_operations
int64
risk_transfer
int64
financial_reserves
int64
600
./filings/2013/GPJA/2013-02-27_10-K_so_10-kx12312012.htm
Based on an order from the Alabama PSC, the Company maintains a reserve for operations and maintenance expenses to cover the cost of damages from major storms to its transmission and distribution facilities. The order approves a separate monthly Rate Natural Disaster Reserve (Rate NDR) charge to customers consisting of...
1
1
0
0
0
0
1
0
601
./filings/2010/DEP/2010-08-09_10-Q_depform10q_063010.htm
currently provides $141.3 million of coverage per occurrence for named windstorm events compared to $150.0 million per occurrence in the prior year. With respect to offshore assets, the deductible for windstorm damage remained at $75.0 million per storm. EPCO’s insurance program for offshore Gulf of Mexico assets curre...
1
1
0
0
0
0
1
0
602
./filings/2010/MIGP/2010-08-09_10-Q_mercer10q.htm
Included in commercial lines in the first six months of 2010 were losses of approximately $1.0 million from catastrophe numbers 94 and 96 (as numbered and described by the Insurance Services Office). Development of these winter storms continued after March 31, 2010 and resulted in losses of $0.5 million in the quarter ...
1
1
0
1
0
0
0
0
603
./filings/2015/AAL/2015-10-23_10-Q_d14219d10q.htm
Total operating revenues in the first nine months of 2015 decreased $707 million, or 3.4%, from the 2014 period principally due to winter storm flight cancellations and competitive growth, as well as weaker international yields due to foreign currency devaluation. Significant changes in the components of operating reve...
0
0
0
0
0
0
0
0
604
./filings/2015/ETR/2015-02-26_10-K_etr-12312014x10k.htm
In July 2014, Entergy Gulf States Louisiana issued $110 million of 3.78% Series first mortgage bonds due April 2025. Entergy Gulf States Louisiana used the proceeds to re-establish and replenish its storm damage escrow reserves and for general corporate purposes.
1
1
0
0
0
0
0
1
605
./filings/2018/RKDA/2018-08-08_10-Q_rkda-10q_20180630.htm
An important aspect of our business is also improving farmer productivity through the development of more robust crop varieties, by developing specific crop traits designed to counteract the detrimental impact of environmental stresses on harvest yields. Traditional genetic modification (GM) trait development has conce...
1
0
1
0
0
0
0
0
606
./filings/2015/POR/2015-10-26_10-Q_por2015093010-q.htm
Customers and Demand—The0.7%increase in retail energy deliveries for thenine months ended September 30,2015compared with thenine months ended September 30,2014was driven by a7.6%increase in industrial energy deliveries combined with a0.5%increase in commercial deliveries, somewhat offset by a3.0%decrease in residential...
0
0
0
0
0
0
0
0
607
./filings/2016/EAI/2016-02-25_10-K_etr-12312015x10k.htm
In October 2006, the City Council approved a rate filing settlement agreement that, among other things, authorized a$75 millionstorm reserve for damage from future storms, which will be created over a ten-year period through a storm reserve rider that began in March 2007. These storm reserve funds are held in a restric...
1
1
0
0
0
0
0
1
608
./filings/2021/HA/2021-02-12_10-K_ha-20201231.htm
We could incur significant costs to improve the climate resiliency of our infrastructure and otherwise prepare for, respond to, and mitigate such physical effects of climate change. We are not able to accurately predict the materiality of any potential losses or costs associated with the physical effects of climate cha...
0
0
0
0
0
0
0
0
609
./filings/2017/AEE/2017-02-28_10-K_aee201610-k.htm
•The absence of warmer-than-normal 2015 winter temperatures and the application of the VBA in 2016, whichincreasedmargins by$3 million. The VBA, which was approved by the ICC in December 2015, eliminated the impact of weather on natural gas margins for residential and small nonresidential customers in 2016. The change ...
0
0
0
0
0
0
0
0
610
./filings/2013/CERE/2013-11-26_10-K_v359672_10k.htm
Sweet sorghum is a type of sorghum that accumulates free sugars in its stalk much like sugarcane. It is sown by seed, grows faster than sugarcane, and typically requires substantially less water and nitrogen fertilizer than sugarcane to grow to harvestable maturity. In Brazil, sweet sorghum can be planted from October ...
0
0
0
0
0
0
0
0
611
./filings/2013/MARK/2013-04-15_10-K_mark-20121231x10k.htm
In addition, as operators of content websites reliant on user traffic to sell advertising, our users must have adequate and functioning Internet access. Technical problems with Internet access providers such as cable, DSL satellite or mobile companies may inhibit user access to our websites and slow traffic. Such event...
0
0
0
0
0
0
0
0
612
./filings/2021/NODK/2021-08-04_10-Q_nodk10q0621.htm
In the crop segment, we continue to monitor the impact of this year’s extreme drought conditions across North and South Dakota on our multi-peril crop business. We expect that crop yields will be significantly reduced and will have an adverse impact on our anticipated multi-peril crop losses. In anticipation of the dry...
1
1
0
1
0
0
1
0
613
./filings/2024/ZVIA/2024-03-06_10-K_zvia-20231231.htm
Our profitability is dependent on, among other things, our ability to anticipate and react to raw material costs. Currently, a key ingredient in our products is stevia extract. Our stevia leaf extract is procured by our contract manufacturers and sourced from a large multi-national ingredient company with whom we have ...
1
1
0
1
0
1
0
0
614
./filings/2022/EIX/2022-11-01_10-Q_eix-20220930x10q.htm
of amounts authorized and the risk management balancing account to track the authorized costs of wildfire insurance. The amount recorded to these balancing accounts represents the difference between costs tracked in the balancing accounts and authorized revenue for those costs recorded to the base revenue requirement b...
1
1
0
0
0
0
1
0
615
./filings/2005/SUG/2005-03-16_10-K_southernunion10k.htm
On May 24, 2002, the RIPUC approved a settlement agreement between the New England Gas Company and the Rhode Island Division of Public Utilities and Carriers. The settlement agreement resulted in a $3,900,000 decrease in base revenues for New England Gas Company’s Rhode Island operations, a unified rate structure ("One...
1
1
0
0
0
1
1
0
616
./filings/2024/ETI.P/2024-11-01_10-Q_etr-20240930.htm
•an increase of $3.2 million in storm damage provisions.
1
1
0
0
0
0
0
1
617
./filings/2022/AES/2022-02-28_10-K_aes-20211231.htm
•Higher earnings in Colombia due to the life extension project at the Chivor hydroelectric plant completed in the prior year and better hydrology.
0
0
0
0
0
0
0
0
618
./filings/2015/PGN/2015-02-27_10-K_duk-20141231x10k.htm
In March 2011, the NRC formed a task force to conduct a comprehensive review of processes and regulations to determine whether the agency should make additional improvements to the nuclear regulatory system. On July 13, 2011, the task force proposed a set of improvements designed to ensure protection, enhance accident ...
1
1
0
1
1
1
0
0
619
./filings/2008/EMDY/2008-05-20_10-Q_v115174_10q.htm
Intangible assets consist of land use rights we acquired and are amortized on a straight line basis over the lives of the rights agreements, which is fifty years and patents which are amortized on a straight line basis over the remaining life of the patents which is five years. We evaluate...
0
0
0
0
0
0
0
0
620
./filings/2013/ENJ/2013-02-27_10-K_a10-k.htm
Receipts from storm resrve escrow account
0
0
0
0
0
0
0
0
621
./filings/2013/ELS/2013-02-28_10-K_els1231201210-k.htm
Insurance. The Properties are insured against all risks causing property damage and business interruption caused by fire, flood, earthquake, or windstorm, and the relevant insurance policies contain various deductible requirements, such as coverage limits and particular exclusions. The Company’s current property and ca...
1
1
0
0
0
0
1
0
622
./filings/2012/ABHD/2012-03-30_10-K_v307123_10k.htm
Hydrodynamic Separators.HDS products use gravitational flow to spin the water in such a way that density differences cause sediment and other pollutants to be separated and skimmed-off the water. HDS units are large compared to catch basin inserts (smallest systems are about the size of an automobile) and are comprised...
0
0
0
0
0
0
0
0
623
./filings/2009/SO/2009-08-06_10-Q_form10q-q209.htm
“Property Damage Reserve” and Note 3 to the financial statements of Gulf Power under “Retail Regulatory Matters – Storm Damage Cost Recovery” and “Fuel Cost Recovery” in Item 8 of the -K for additional information.
1
1
0
0
0
0
0
1
624
./filings/2007/ELC/2007-03-01_10-K_a10-k.htm
the receipt of CDBG funds or insurance proceeds that it may receive. With the second rider, Entergy New Orleans sought to establish a storm reserve to provide for the risk of another storm.
1
1
0
0
0
0
1
0
625
./filings/2008/ZENX.OB/2008-11-14_10-Q_aii10q-093008.htm
Aduddell Industries, Inc. (the “Company”) is engaged in the commercial and industrial roofing and re-roofing, specialty-roofing metals, waterproofing and concrete restoration and consulting businesses through our subsidiaries, Aduddell Roofing, Inc., Aduddell Restoration and Waterproofing, Inc., and Global Specialty Gr...
1
0
1
0
0
0
0
0
626
./filings/2020/CHSCL/2020-11-05_10-K_chscp-20200831.htm
Poor weather conditions during fiscal 2019 negatively impacted our Ag segment's operations during the first half of fiscal 2020, including lower crop yields and poor grain quality following a late harvest, as well as lower crop nutrient sales that traditionally occur during the fall.
0
0
0
0
0
0
0
0
627
./filings/2023/AMPS/2023-05-15_10-Q_amps-20230331.htm
The amount of electricity our solar energy systems produce is dependent in part on the amount of sunlight, or irradiation, where the assets are located. Because shorter daylight hours in winter months and poor weather conditions due to rain or snow results in less irradiation, the output of solar energy systems will va...
1
1
0
0
0
1
0
0
628
./filings/2014/GUA/2014-02-27_10-K_so_10-kx12312013.htm
The Company's financial condition remained stable at December 31, 2013. The Company's cash requirements primarily consist of funding ongoing operations, common stock dividends, capital expenditures, and debt maturities. Capital expenditures and other investing activities include investments to meet projected long-term ...
0
0
0
0
0
0
0
0
629
./filings/2007/CLH/2007-05-10_10-Q_a07-11162_110q.htm
Site Services revenues for the three months ended March 31, 2007 increased $0.1 million to $62.2 million from $62.1 million for the comparable period in 2006. In the first quarter of 2007, Site Services continued to perform emergency response work in the Gulf region related to hurricanes Katrina and Rita. This work acc...
0
0
0
0
0
0
0
0
630
./filings/2014/EE/2014-02-26_10-K_a201310-k.htm
Other Laws and Regulations and Risks.As stated above, the Company intends to cease its participation in Four Corners at the expiration of the50-year participation agreement in 2016. The Company believes that it has better economic and cleaner alternatives for serving the energy needs of its customers than coal-fired ge...
0
0
0
0
0
0
0
0
631
./filings/2013/POR/2013-02-21_10-K_por201210k.htm
As part of its normal business operations, PGE purchases power and natural gas in the open market under short and long term contracts, which may specify variable-prices or volumes. Market prices for power and natural gas are influenced primarily by factors related to supply and demand. These factors generally include t...
0
0
0
0
0
0
0
0
632
./filings/2010/LAYN/2010-04-02_10-K_l39272e10vk.htm
Our domestic drilling and construction activities and related revenues and earnings tend to decrease in the winter months when adverse weather conditions interfere with access to project sites. Additionally, our international mineral exploration customers tend to slow drilling activities surrounding the Christmas and N...
0
0
0
0
0
0
0
0
633
./filings/2019/PCG/2019-08-09_10-Q_pge-063019x10q.htm
prior to June 21, 2019, “re-inspect all of its electrical grid and remove or trim all trees that could fall onto its power lines, poles or equipment in high-wind conditions, .
1
1
0
1
1
0
0
0
634
./filings/2011/BRSW/2011-05-20_10-K_d10k.htm
weather conditions, including the impact of hurricanes and other weather-related phenomena;
0
0
0
0
0
0
0
0
635
./filings/2010/CPRT/2010-09-23_10-K_a2200235z10-k.htm
Capacity at our storage facilities varies from period to period and from region to region. For example, following adverse weather conditions in a particular area, our yards in that area may fill and limit our ability to accept additional salvage vehicles while we process existing inventories. As discussed below, Hurric...
1
1
0
1
0
1
0
0
636
./filings/2014/NEE/2014-02-24_10-K_nee-12312013x10k.htm
Storm hardening and reliability: FPL plans to continue to invest in storm hardening and reliability efforts.
1
1
0
0
1
0
0
0
637
./filings/2019/VMC/2019-02-26_10-K_vmc-20181231x10k.htm
FEDERAL WATER INFRASTRUCTURE:In October 2018, President Trump signed America’s Water Infrastructure Act of 2018 (AWIA 2018) into law. The new law includes the Water Resources Development Act of 2018 (WRDA 2018), which reauthorizes needed investment in America’s ports, channels, locks, dams, and other infrastructure tha...
0
0
0
0
0
0
0
0
638
./filings/2015/AFCO/2015-11-25_10-Q_afco-10q_20150930.htm
The global supply of arable land and the productivity of such land is adversely affected by the scarcity of water in many irrigated growing regions, both globally and within the U.S. For example, a significant portion of the U.S. has experienced severe drought conditions over the past few years, most recently in the Pa...
1
1
0
0
0
1
0
0
639
./filings/2010/PCG/2010-02-19_10-K_form10k.htm
The Utility believes its strategies to reduce GHG emissions—such as energy efficiency and demand response programs, infrastructure improvements, and the support of renewable energy development —are also effective strategies for adapting to the expected increased demand for electricity in extreme hot weather events like...
1
1
0
1
0
1
0
0
640
./filings/2017/GRWG/2017-11-08_10-Q_f10q0917_growgeneration.htm
GrowGeneration serves a new, yet sophisticated community of commercial and urban cultivators growing specialty crops including organics, greens and plant-based medicines. Unlike the traditional agricultural industry, these cultivators use innovative indoor and outdoor growing techniques to produce specialty crops in hi...
1
0
1
0
0
0
0
0
641
./filings/2021/LDOS/2021-02-23_10-K_ldos-20210101.htm
Our business is subject to disruption caused by natural disasters that could adversely affect our profitability and our overall financial position.
0
0
0
0
0
0
0
0
642
./filings/2014/ELC/2014-11-06_10-Q_etr-09x30x2014x10q.htm
As discussed in the -K, Entergy Louisiana sought to recover restoration costs for the repair and replacement of electric facilities damaged by Hurricane Isaac, as well as replenishment of storm escrow accounts for prior storms, in the amount of $247.7 million. In January 2013, Entergy Louisiana drew $187 million from...
1
1
0
0
0
0
1
1
643
./filings/2015/BRO/2015-02-27_10-K_d847767d10k.htm
•Colonial Claimsprovides insurance claims adjusting and related services, including education and training services, throughout the United States. Colonial Claims handles property and casualty insurers’ multi-line and catastrophic claims needs, including auto, earthquake, flood, hail, homeowners and wind claims. Coloni...
1
0
1
0
0
0
0
0
644
./filings/2022/CPWR/2022-05-13_10-Q_cpwr_10q.htm
OTEC and SWAC/LSC—designing ocean thermal energy conversion (“OTEC”) power plants and seawater air conditioning and lake water air conditioning (“SWAC/LSC”) plants for large commercial properties, utilities, and municipalities. These technologies provide practical solutions to mankind’s three oldest and most fundamenta...
1
0
1
0
0
0
0
0
645
./filings/2006/RDC/2006-03-16_10-K_h32163e10vk.htm
ITEM 6.SELECTED FINANCIAL DATAThe following information summarizes Rowan’s results of operations and financial position for each of the last five years.20052004200320022001(In thousands except per share amounts and ratios)OperationsRevenues:Drilling services$775,356$472,103$392,211$323,847$438,275Manufa...
0
0
0
0
0
0
0
0
646
./filings/2022/AWR/2022-11-07_10-Q_awr-20220930.htm
GSWC currently tests its water supplies and water systems according to, among other things, requirements listed in the Federal Safe Drinking Water Act (“SDWA”). GSWC works proactively with third parties and governmental agencies to address issues relating to known contamination threatening GSWC water sources. GSWC also...
1
1
0
1
0
1
0
0
647
./filings/2013/MBVT/2013-03-05_10-K_mbvt-20121231x10k.htm
Other noninterest expenses were $5.75 million for 2011 compared to $6.01 million for 2010. The primary reason for the decrease was the final disposition of our flood damaged branch in Wilmington, Vermont. We sold the branch for $90 thousand during 2011 and received insurance proceeds of $298 thousand. In total, we book...
0
0
0
0
0
0
0
0
648
./filings/2018/VRSK/2018-10-30_10-Q_vrsk-201893010q.htm
solutions revenue, which was partially offset by a decline in our aerial imagery solutions revenue. The severe storm-related repair costs estimating and aerial imagery-based solutions contributed approximately $8.0 millionfor the three months ended September 30, 2017, which did not reoccur in 2018.
1
0
1
0
0
0
0
0
649
./filings/2021/GEL/2021-05-05_10-Q_gel-20210331.htm
Offshore pipeline transportation Segment Margin for the 2021 Quarter decreased $1.0 million, or 1%, from the 2020 Quarter, primarily due to lower overall volumes on our crude oil and natural gas pipeline systems. These lower volumes are primarily the result of our CHOPS pipeline being out of service through February 3,...
1
1
0
0
0
1
0
0
650
./filings/2011/EMKR/2011-12-29_10-K_fiscal2011form10k.htm
SeeItem 8-Financial Statements and Supplementary Datafor disclosures related to the impact to our consolidated financial statements associated with this natural disaster.
0
0
0
0
0
0
0
0
651
./filings/2009/URS/2009-03-03_10-K_form10-k.htm
·Levees, watershed and stormwater management, flood control systems and coastal restoration;
1
1
0
0
1
0
0
0
652
./filings/2023/CWT/2023-07-27_10-Q_cwt-20230630.htm
the impact of weather, climate change, natural disasters, and actual or threatened public health emergencies, including disease outbreaks, on our operations, water quality, water availability, water sales and operating results and the adequacy of our emergency preparedness;
0
0
0
0
0
0
0
0
653
./filings/2021/GLRE/2021-03-10_10-K_glre-20201231.htm
Our property business, and to a lesser extent our casualty and other business, incorporate contracts that contain natural peril loss exposure. We estimate catastrophe loss exposure in terms of the PML. We anticipate that the PML will vary from period to period depending upon the modeled simulated losses and the composi...
1
1
0
1
0
0
0
0
654
./filings/2023/CAR/2023-02-16_10-K_car-20221231.htm
•Supporting Community Resilience: Over the past 70 years, we have developed strong competencies in responding to business disruptions. Whether the disruption is man-made, an extreme weather event or a global health crisis, our business continuity programs are central to how we respond in times of crisis. Our program’s ...
1
1
1
0
1
1
0
0
655
./filings/2009/ETI.P/2009-03-02_10-K_a10k.htm
The settlement also authorized a $75 million storm reserve for damage from future storms, which will be created over a ten-year period through a storm reserve rider beginning in March 2007. These storm reserve funds will be held in a restricted escrow account.In January 2008, Entergy New Orleans voluntarily implemented...
1
1
0
0
0
0
0
1
656
./filings/2016/LFUS/2016-03-01_10-K_lfus20151226_10k.htm
Littelfuse custom-engineered electrical equipment is designed and built for use in harsh or demanding environments where standard industrial electrical gear will not meet customer needs for reliability and durability. Portable power substations are used throughout mines to transform voltage from distribution to utiliza...
0
0
0
0
0
0
0
0
657
./filings/2015/BYIN/2015-11-12_10-K_byin_10k.htm
Shipments to and from our warehouses could be delayed for a variety of reasons, including weather conditions, strikes, and shipping delays. Any significant delay in the shipments of product would have a material adverse effect on our business, results of operations and financial condition, and could cause our sales and...
0
0
0
0
0
0
0
0
658
./filings/2023/EMP/2023-02-24_10-K_etr-20221231.htm
Storm damage costs, including hurricane costs- recovered through securitization and retail rates (Note 2 -Storm Cost Recovery Filings with Retail RegulatorsandNote 5 -Entergy Texas Securitization Bonds - Hurricane Ike and GustavandEntergy Texas Securitization Bonds - Hurricane Laura, Hurricane Delta, and Winter Storm U...
0
0
0
0
0
0
0
0
659
./filings/2014/TXNM/2014-05-02_10-Q_pnm331201410-q.htm
Because of New Mexico’s arid climate and periodic drought conditions, there is concern in New Mexico about the use of water, including that used for power generation. PNM has secured groundwater rights in connection with the existing plants at Reeves Station, Delta, Afton, Luna, and Lordsburg. Water availability is not...
0
0
0
0
0
0
0
0
660
./filings/2013/CNL/2013-02-19_10-K_cnl-12312012x10k.htm
(THOUSANDS)BALANCE ATBEGINNING OFPERIODADDITIONSDEDUCTIONSBALANCE ATEND OFPERIODUnrestricted Storm ReserveYear Ended Dec. 31, 2012$1,403$10,968$10,579$1,792Year Ended Dec. 31, 2011$1,454$2,000$2,051$1,403Year Ended Dec. 31, 2010$1,146$543$235$1,454Restricted Storm ReserveYear Ended Dec. 31, 2012$24,880$1,485$10,080$16,...
1
1
0
0
0
0
1
0
661
./filings/2007/CNLHN/2007-02-28_10-K_f2006nuform10k.htm
Severe weather, such as ice and snow storms, hurricanes and other natural disasters, may cause outages and property damage which may require us to incur additional costs that are generally not insured and that may not be recoverable from customers. The cost of repairing damage to our operating subsidiaries' facilities ...
0
0
0
0
0
0
0
0
662
./filings/2018/NRG/2018-03-01_10-K_nrg201710-k.htm
Climate change could also affect the availability of a secure and economical supply of water in some locations, which is essential for the continued operation of NRG's generation plants. Water risk is monitored by the risk owners (individual plant operators) and reported to Company management upon changes with a signif...
1
1
0
1
0
1
0
0
663
./filings/2008/AMPL/2008-03-17_10-K_zk84902.htm
Gadot has received third party notices in a number of lawsuits regarding pollution of the Kishon River in Israel. These lawsuits have been filed by various claimants who claim harm by the polluted water of the river, including soldiers from various units in the Israeli Defense Forces who trained in the river, fishermen...
0
0
0
0
0
0
0
0
664
./filings/2005/CULS/2005-03-23_10-K_d16590_10-k.htm
Each of our stores is outfitted with adjustable metal shelving that allows us to vary the display of our products based on each location’s specific consumer needs. Each island store has backup generators designed to protect perishables and the store’s security system during disruption of electric service caused by seve...
1
1
0
0
1
1
0
0
665
./filings/2006/PGN/2006-03-10_10-K_form10-k2005.htm
Under a regulatory order, PEF maintains a storm damage reserve account for major storms. Due to the significant costs incurred to recover from the 2004 hurricanes, PEF’s storm damage reserve accounts were largely depleted at December 31, 2005. PEF is currently considering alternative...
1
1
0
0
0
0
0
1
666
./filings/2020/FNHCQ/2020-03-06_10-K_fnhc-20191231.htm
The insurance carriers’ cost and amounts of reinsurance are based on current analysis of exposure to catastrophic risk. The data is subjected to exposure level analysis at various dates through December 31, 2019. This analysis of the carriers’ exposure level in relation to the total exposures to the FHCF and excess of ...
1
1
0
1
0
0
1
0
667
./filings/2020/PCG/2020-07-30_10-Q_pcg-20200630.htm
The Utility’s wildfire risk mitigation initiatives involve substantial and ongoing expenditures and could involve other costs. The extent to which the Utility will be able to recover these expenditures and potential other costs through rates is uncertain. The PSPS program, one of the Utility’s wildfire risk mitigation ...
1
1
0
0
0
1
0
0
668
./filings/2023/TMQ/2023-02-14_10-K_tmq-20221130x10k.htm
The Arctic Project will utilize proven technology and equipment that can be built, operated and maintained under adverse weather conditions.
0
0
0
0
0
0
0
0
669
./filings/2019/SOCGM/2019-02-26_10-K_sre20181231form10k.htm
our ability to shut down power for safety reasons, including potentially dangerous wildfire conditions;
1
1
0
0
0
1
0
0
670
./filings/2017/QUOT/2017-08-04_10-Q_quot-10q_20170630.htm
•interruptions to our operations in the countries where our research and development activities and operations are located as a result of floods and other natural catastrophic events as well as manmade problems such as power disruptions or terrorism.
0
0
0
0
0
0
0
0
671
./filings/2009/EAI/2009-03-02_10-K_a10k.htm
a credit passed on to customers as a result of the Act 55 storm cost financings.
0
0
0
0
0
0
0
0
672
./filings/2024/CB/2024-07-26_10-Q_cb-20240630.htm
•2023: Storms in New Zealand, flooding in Italy, and international weather-related events.
0
0
0
0
0
0
0
0
673
./filings/2007/CPKI/2007-03-14_10-K_d10k.htm
Many of the food products purchased by us are affected by changes in weather, production, availability, seasonality and other factors outside our control. In an effort to control some of this risk, we have entered into some fixed price purchase commitments with terms of no more than one year. In addition, we believe th...
0
0
0
0
0
0
0
0
674
./filings/2023/SWIM/2023-03-07_10-K_swim-20221231x10k.htm
We use an eight-layer building process to provide an industry-leading thickness and durability formula for our fiberglass pools. We also use finite element analysis, which is a computerized method for predicting how a product reacts to real-world forces, vibration, heat, fluid flow, and other physical effects. This all...
0
0
0
0
0
0
0
0
675
./filings/2018/IDXG/2018-03-23_10-K_form10-k.htm
The laboratories and equipment we use to perform our tests would be costly to replace and could require substantial lead time to replace and qualify for use if they became inoperable. Either of our facilities may be harmed or rendered inoperable by natural or man-made disasters, including earthquakes, flooding and powe...
1
1
0
0
0
0
1
0
676
./filings/2013/CINF/2013-02-27_10-K_v329482_10k.htm
Initiatives enhancing our ability to more profitably underwrite property coverages for various lines of business are an area of emphasis for 2013. A multi-department, multi-disciplinary taskforce has been reviewing our property book of business and continues to seek ways to improve profitability, similar to the approac...
1
1
0
1
0
0
1
0
677
./filings/2021/DBP/2021-02-25_10-K_dbp-10k_20201231.htm
There may be circumstances outside the control of the Managing Owner and/or the Fund that make it, for all practical purposes, impossible to re-positionthe Fund and/or to process a purchase or redemption order. Examples of such circumstances include: natural disasters; public service disruptions or utility problems suc...
0
0
0
0
0
0
0
0
678
./filings/2020/WARM/2020-05-29_10-K_cool_10k.htm
The letters were a request for collaborative support between the two countries to accelerate CoolTech’s product deployment into Mexico to help solve urgent rural power and water purification problems that are hurting rural communities. Those problems include irregular and faulty power in rural areas which hinders crop ...
0
0
0
0
0
0
0
0
679
./filings/2005/BRCM/2005-05-04_10-Q_a08486e10vq.htm
In September 1999 two of our foundries’ principal facilities were affected by a significant earthquake in Taiwan. As a consequence of this earthquake, they suffered power outages and equipment damage that impaired their wafer deliveries, which, together with strong demand, resulted in wafer shortages and higher wafer p...
0
0
0
0
0
0
0
0
680
./filings/2017/ABG/2017-02-23_10-K_abg201610-k.htm
SG&A expense as a percentage of gross profit was69.2%for2016compared to68.8%for2015. Same store SG&A expense as a percentage of gross profit increased by 70 basis points, from68.3%in2015to69.0%in2016. The increase, was due primarily to increased personnel costs, which was a result of higher employee benefit costs, and ...
0
0
0
0
0
0
0
0
681
./filings/2015/CYRX/2015-05-19_10-K_v410289_10k.htm
Some of the other disadvantages to using dry ice for shipping or transporting temperature sensitive products are as follows:
0
0
0
0
0
0
0
0
682
./filings/2016/NEE/2016-02-19_10-K_nee-12312015x10k.htm
Securitized Storm-Recovery Costs, Storm Fund and Storm Reserve- In connection with the 2007 storm-recovery bond financing (see Note 9 - FPL), the net proceeds to FPL from the sale of the storm-recovery property were used primarily to reimburse FPL for its estimated net of tax deficiency in its storm and property insura...
1
1
0
0
0
0
1
0
683
./filings/2023/ETI.P/2023-02-24_10-K_etr-20221231.htm
Due in part to the recent increase in frequency and intensity of major storm activity along the Gulf Coast, Entergy is developing plans to accelerate investments that would enhance the resilience of the electric systems of the Utility operating companies to enable them to better withstand major storms or other adverse ...
1
1
0
0
1
1
0
0
684
./filings/2010/MRH/2010-02-26_10-K_a09-36088_110k.htm
We manage certain key risks using a combination of CATM, various third-party vendor models and underwriting judgment. Our three-tiered approach focuses on tracking exposed contract limits, estimating the potential impact of a single natural catastrophe event, and simulating our yearly net operating result to reflect ag...
0
0
0
0
0
0
0
0
685
./filings/2005/GUA/2005-11-03_10-Q_final10q9-05.htm
See MANAGEMENT’S DISCUSSION AND ANALYSIS — FUTURE EARNINGS POTENTIAL — “FERC and Florida PSC Matters — Storm Damage Cost Recovery” of Gulf Power in Item 7 and Note 3 to the financial statements of Gulf Power under “Retail Regulatory Matters” in Item 8 of the -K and Note (K) to the Condensed Financial Statements herein ...
1
1
0
0
0
0
0
1
686
./filings/2020/XYL/2020-02-28_10-K_xyl1231201910kv1.htm
Measurement & Control Solutions develops advanced technology solutions that enable intelligent use and conservation of critical water and energy resources. The segment delivers communications, smart metering, measurement and control technologies and critical infrastructure technologies that allow customers to more effe...
1
0
1
0
0
0
0
0
687
./filings/2016/EME/2016-02-25_10-K_eme-20151231x10k.htm
Our business may also be affected by weather conditions.Adverse weather conditions, particularly during the winter season, could impact our construction services operations as those conditions affect our ability to perform efficient work outdoors in certain regions of the United States, adversely affecting the revenues...
0
0
0
0
0
0
0
0
688
./filings/2024/ETR/2024-05-02_10-Q_etr-20240331.htm
As discussed in the -K, Entergy Mississippi has approval from the MPSC to collect a storm damage provision of $1.75million per month. If Entergy Mississippi’s accumulated storm damage provision balance exceeds $15million, the collection of the storm damage provision ceases until such time that the accumulated storm dam...
1
1
0
0
0
0
0
1
689
./filings/2023/GMS/2023-06-22_10-K_gms-20230430.htm
operating hazards that may cause personal injury or property damage;
0
0
0
0
0
0
0
0
690
./filings/2013/CDZI/2013-03-15_10-K_form10k_2012.htm
Following Metropolitan’s decision, we began to pursue new partnerships and redesigned the Project to meet the changing needs of Southern California’s water providers. We invested in significant scientific and technical analysis of the groundwater resources at the Project area as part of this effort, and focused on the ...
1
1
1
1
0
1
0
0
691
./filings/2005/ANDE/2005-03-14_10-K_l12556ae10vk.htm
When a futures contract is entered into, an initial margin deposit must be sent to the CBOT. The amount of the margin deposit is set by the CBOT and varies by commodity. If the market price of a futures contract moves in a direction that is adverse to the Company’s position, an additional margin deposit, called a maint...
0
0
0
0
0
0
0
0
692
./filings/2014/ETI.P/2014-02-27_10-K_etr-12312013x10k.htm
The LPSC Staff filed direct testimony in September 2013 concluding that Hurricane Isaac system restoration costs incurred by Entergy Gulf States Louisiana and Entergy Louisiana were reasonable and prudent, subject to proposed minor adjustments which totaled approximately 1% of each company’s costs. The LPSC Staff also ...
1
1
0
0
0
0
0
1
693
./filings/2009/ELC/2009-03-02_10-K_a10k.htm
See Note 8 to the financial statements for a discussion of Entergy's conventional property insurance program. Entergy has received a total of $277 million as of December 31, 2008 on its Hurricane Katrina and Hurricane Rita insurance claims, including the settlements of its Hurricane Katrina claims with each of its two ...
1
1
0
0
0
0
1
0
694
./filings/2016/EAI/2016-02-25_10-K_etr-12312015x10k.htm
•changes in the quality and availability of water supplies and the related regulation of water use and diversion;
0
0
0
0
0
0
0
0
695
./filings/2013/KAYS/2013-04-23_10-K_v337592_10k.htm
5.Geographic diversity- AFAI will plant in different regions in each target country to minimize the risks from adverse weather patterns, acts of God, and other risks to the well-being of the crops or the enterprise.
1
1
0
0
0
1
0
0
696
./filings/2018/EXPO/2018-02-23_10-K_tv485565_10k.htm
Our Civil Engineering Practice provides broad expertise that includes geotechnical engineering, geological engineering, engineering geology, and geology to address a host of geo-failures, including landslides, foundation and retaining wall failures, pipeline failures, dam and levee failures, and construction claims. We...
0
0
0
0
0
0
0
0
697
./filings/2012/THG/2012-02-28_10-K_d305934d10k.htm
We maintain a reinsurance program designed to protect against large or unusual loss and LAE activity. We utilize a variety of reinsurance agreements, which are intended to control our exposure to large property and casualty losses, stabilize earnings and protect capital resources, including facultative reinsurance, exc...
1
1
0
1
0
0
1
0
698
./filings/2015/WTI/2015-05-07_10-Q_wti-10q_20150331.htm
All of our Gulf of Mexico properties with estimated future net revenues are covered under our current insurance policies for named windstorm damage. The risk exposure varies per property and we have exposure for applicable retentions, co-insurance amounts and coverage limits.
1
1
0
0
0
0
1
0
699
./filings/2023/VRME/2023-03-28_10-K_vm32123010k.htm
Weather/Traffic Service: PeriShip Global has full-time meteorologists on staff to monitor weather. A package may experience a variety of weather conditions between the origin and destination, and our team actively monitors these conditions to minimize the changes of timely and safe transit of shipments. Similarly, traf...
0
0
0
0
0
0
0
0