text stringlengths 9 94.9k |
|---|
Do the regulations allow dilution of an ignitable or characteristic waste to remove the characteristic? |
Do the spent solvent listings in §261.31 apply to solvent constituents used as ingredients in the formulation of a commercial chemical product (CCP)? |
Does the F006 listing apply to copper electroplating? |
Does the U223 hazardous waste code apply to virgin toluene diisocyanate (TDI) that has been neutralized to remove the reactivity characteristic? |
Does a decharacterized waste have to meet the land disposal restrictions? |
Does a waste derived from a hazardous waste listed solely for exhibiting a characteristic of ignitability, corrosivity, and/or reactivity remain a hazardous waste when it no longer exhibits a hazardous waste characteristic? |
How are spent filters that have been used in reclaiming spent chlorofluorocarbon filters regulated? |
How can waste generators demonstrate that their dyes and pigment wastes are not hazardous? |
Does the waste code for a waste listed solely for the characteristic of ignitability, corrosivity, and/or reactivity apply if the waste does not exhibit any hazardous waste characteristics at the point of generation? |
For the purposes of determining whether a waste meets the characteristic of ignitability, how does EPA define an ignitable compressed gas or an oxidizer? |
How did EPA determine that the proposed listing amendment change for F019 wastewater treatment sludges is fully protective of human health and the environment? |
How is a corrosive solid defined in the hazardous waste regulations? |
How does the final rule compare to the 1999 HWIR proposal? |
How is contaminated environmental media regulated under the contained-in policy? |
How is the dyes and pigments listing implemented? |
How may I get health effects information on a particular chemical or hazardous waste? |
How should paint be disposed? Is it a hazardous waste? |
How were the constituents of concern selected in the dyes and pigments listing? |
If a facility generates F001-F005 solvent wastes containing carbon disulfide, cyclohexanone, and methanol, along with other constituents of concern, must it only treat these three constituents when they are in wastewaters? |
Are CRTs considered hazardous waste? How should they be managed? Do they have to be recycled or can they be disposed? |
Are commercial chemical products (CCPs) solid waste when burned as a fuel for energy recovery? |
Do hazardous waste recycling units need to comply with the air emission requirements in Parts 264/265, Subpart AA, BB, and CC? |
Does dumping old TVs pose as much toxic waste as dumping old computers? What about other electronic devices, such as cell phones? |
Does EPA think e-waste is an environmental crisis? |
How do individual homeowners in a homeowners association comply with the Mercury Containing Equipment Final Rule? |
How do I choose a reputable company for demanufacturing/recycling? |
How do you choose a reuse or recycle option for electronics? |
How does the cathode ray tube (CRT) rule encourage electronics recycling? |
How is a product that is produced from recycled hazardous waste regulated? |
How is a secondary material regulated if it is recycled by direct use or reuse without prior reclamation? |
How is spent photographic fixer solution regulated when it is being recycled to recover silver? |
How is the final CRT rule different from the proposal? |
What are the regulatory requirements for owners and operators of recycling facilities that immediately recycle hazardous waste without prior storage? |
What is EPA?s opinion about landfilling of electronics such as CRTs? |
Where can I find information on the 2011 proposed Definition of Solid Waste for hazardous secondary materials recycling rule? |
What's the basic principle behind e-Cycling? |
Why does export of electronics occur and what is being done internationally to address it? |
Why were the mercury-containing equipment rule and the cathode ray tube rule finalized separately when they were proposed in one action? |
Are any RCRA forms, such as the 8700-23 (Part A), available to be filled out electronically? |
Can my permitting authority issue a combined RCRA and CAA permit for my facility? |
Can RCRA program staff issue CAA Title 5 permits for sources subject to the Phase 1 HWC NESHAP? |
Can the implementing agency establish conditions in a facility's permit that are not specified in 40 CFR Parts 264 or 266 through 268 in order to protect human health and the environment? |
Does the Standardized Permit Rule apply to storage of mixed (hazardous and radioactive) waste? |
Do facilities still have to complete the SSRA before a RCRA permit decision will be made? |
Do I send my request for a RCRA streamlined permit modification to my state regulatory agency or to EPA? |
Does the Standardized Permit Rule apply to large quantity generators storing hazardous waste in tanks? |
How and when do I make the transition to the permitting scheme outlined in the Phase 1 HWC NESHAP? |
How can the public become involved in the hazardous waste permitting process? |
How do I apply for a Standardized Permit? |
How does the public benefit from NESHAP permits? |
How long will it take to issue a standardized permit? |
I am looking for information about a RCRA permit for a specific company. Can I find this company?s permit on the EPA Web site? |
How long is the term of my Standardized Permit? |
If an owner or operator must make a change to a RCRA permit that is not specified in Appendix I of 40 CFR Section 270.42, what class modification procedures should the permittee follow? |
If I am in the process of obtaining my RCRA permit, do I have to continue now that the Phase 1 HWC MACT standards are effective? |
If my source is a major source, what do I need to do to include the February 13, 2002 interim standards and February 14, 2002 final amendments in my permit; and what about the permanent replacement standards to be issued in 2005? |
May a generator conduct thermal treatment without obtaining a permit? |
Must owners and operators renew post-closure permits during the post- closure care period? |
Under RCRA, EPA can issue an emergency permit to a facility when imminent and substantial endangerment to human health and the environment exists. What is the term of an emergency permit? |
What if I cannot use the streamlined permit modification procedure? |
What are the public participation requirements for a facility seeking a research, development, and demonstration (RD&D) permit? |
What is a Remedial Action Plan (RAP)? |
What is the RCRA streamlined permit modification procedure? |
What is the duration of a RCRA permit? |
What type of modification is required if there are changes at a permitted facility? |
What should I do if my state does not seek authorization for the RCRA streamlined permit modification procedure? |
When can an owner or operator seeking a permit for a hazardous waste management facility begin construction on the site? |
Are ocean carriers transporting hazardous waste required to obtain EPA identification (ID) numbers? Are uniform hazardous waste manifests required for international shipments of hazardous wastes? |
Are transporters of universal waste required to have an EPA identification number? |
Can a hazardous waste transporter consolidate different hazardous wastes into a single container? |
Can I submit multiple form samples to the EPA Registry for approval? |
Can I typeset the manifest registry form after I am approved to print the manifest? |
Can my organization request two or more suffixes in our initial manifest registry application? |
Does a hazard waste manifest need to accompany an off-site shipment of waste samples to a laboratory for waste characterization? |
Does EPA currently collect manifests? |
How can a company become registered to distribute the Hazardous Waste Manifest? |
How does EPA plan to oversee this manifest form distribution and numbering process? |
How does the rule specifically address problems associated with manifest variability? |
How much information must be provided in the initial manifest registry application and how must it be organized? |
How will the Modification of the Hazardous Waste Manifest System Final Rule affect waste handlers' ability to obtain blank manifest forms? |
If Company A leases space within its facility to Company B, can Company A fill out the manifest for hazardous waste sent off site for disposal? |
In addition to the manifest, what changes can be expected with the new Hazardous Waste Manifest System regulations? |
Must I submit a continuation sheet sample to the Registry under section 262.21(d)? |
Some states have developed abbreviated manifest forms for some of its state-only hazardous waste. How will state-only waste manifests be affected by the new rule? |
What is a digital signature and what is authentication? |
What is a transfer facility? How are transportation facilities regulated under RCRA? |
What is the Uniform Hazardous Waste Manifest? |
What situations might exempt me from having to submit manifest registry form samples under 40 CFR 262.21(d) or (h)(3)? |
When will waste handlers and states need to begin using the revised manifest form? |
Where are the changes promulgated in the Modification of the Hazardous Waste Manifest System Final Rule going to be codified? |
Who is responsible for the Hazardous Waste Manifest? |
Who must sign the generator certification on the hazardous waste manifest? Does this person have any personal liability for the hazardous waste? |
Why is EPA allowing an 18-month delayed compliance date for the Modification of the Hazardous Waste Manifest System Final Rule? |
After a source submits a Notification of Compliance documenting compliance with the MACT emission standards, will it ever have to conduct a RCRA trial burn? |
A facility treats groundwater contaminated with a listed hazardous waste by filtering the water through a carbon filter. When the carbon filter is removed from the treatment unit does the derived-from rule or contained-in policy apply to the filter? |
After I demonstrate compliance with the Phase 1 HWC NESHAP, what should my permitting authority incorporate into my CAA Title 5 operating permit? |
Are cement kilns as tightly regulated as incinerators under the Hazardous Waste Combustion Emission Standards Rule? |
Are Environmental Indicator (EI) determinations a point-in-time determination, or do they have to be maintained to ensure they remain true through time? |
Are facilities that manage hazardous waste required to prepare a closure plan? |
Are risk assessments required for hazardous waste incinerators? |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.