id
stringlengths
5
7
tokens
listlengths
729
1.27k
labels
listlengths
729
1.27k
pipeline_numbers
listlengths
3
32
full_text
stringlengths
2.74k
4.3k
doc_238
[ "QR", "-", "40624", "ISSUE", "CONSTR", ".", "REV", ".", "44", "17", ".", "STA", "904", "UNIT", "LG", "-", "10", "23", ".", "CD", "-", "98914", "GH", "-", "65473", "None", "GH", "-", "38876", "3", "\"", "12", ".", "QR", "-", "32206", "ERV", "-...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-YS-7163", "7\"-KM-4500", "5\"-ZQ-7027", "4\"-YZ-1325", "8\"-RE-0508", "8\"-IV-6379", "3\"-JN-6925", "8\"-ZU-1613", "5\"-GT-2746", "6\"-VI-9201", "2\"-PH-4560", "3\"-NI-2886", "7\"-UE-6869", "8\"-ZQ-0493", "3\"-FO-3010", "8\"-AP-2820", "6\"-VF-8627", "6\"-FS-7280", "2\"-YR-88...
QR-40624 ISSUE CONSTR. REV.44 17. STA 904 UNIT LG-10 23. CD-98914 GH-65473 None GH-38876 3" 12. QR-32206 ERV-9-93 INS ( 39°C ) 150 ZLO BIIK RV-77489 DOTTED LINES ARE ALTERNATE. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 778 CD-10522 EF-39522 354 3"-FO-3010 596 2"-YR-8819 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh EF-84813 GI 7" TOP CONNECTION. 3"-JN-6925 199 ISSUE AV-15527 LG-10 LG-10 EYST P.EEJ 6"-VI-9201 INS ( -10°C ) 301 U-0 813 15. EF-88885 9" LG-10 DDL 856 ISSUE CONSTR. REV.11 DDL WX-85918 INS ( 49°C ) AV-19144 22/08/10 ZLC ORGANIZATION F.D 12" OP-99728 12/08/21 5"-ZQ-7027 B RO-10 ST-19560 APPRV'D 8"-ZQ-0493 U.UWN FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 313 ISSUE CONSTR. REV.55 DESCRIPTION 1"x2" 3 UV-50005 530 DELETED CS-16 ST-11292 MN-01574 6"-FS-7280 LG-10 GRP KL-88974 16. SDL 5"-GT-2746 RO-10 18. 311 AB-89450 RV-11547 KL-83877 705 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. ZLO MODIFICATION. 654 RO-10 635 11. EF-52322 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. GH-22147 808 20. Y.NRX 652 CONTRACTOR PROJECT NO. SAMPLE_7920.JPG ST-63750 DDL QR-78554 ISSUE CONSTR. REV.33 7. ZLO GRP ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. KL-98187 OP-71226 OP-69512 PROJ. PQR P&ID IJ-24393 IJ-83494 8"-RE-0508 24/05/20 DELETED DDL ACEL PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 529 QR-77490 134 7"-YS-7163 A.QHK UV-32643 14. AV-95095 UV-98890 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ COMMENTS. KL-77646 8"-IV-6379 7"-KM-4500 21. MN-59944 QR-96973 6. 323 DDL 368 RV-82381 CONTRACTOR NO. CD-78981 AV-18925 45-3249 WX-88031 EF-08023 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 2"-PH-4560 INS ( 12°C ) BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND AB-00254 STA 657 LN-7098 261 QR-05983 14" 220 627 DELETED W.I STA 395 MN-60458 RO-10 3"-VS-0036 21May05 INS ( 39°C ) KL-73699 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DV-77725 8"-AP-2820 836 935 DELETED OP-85748 AV-03926 E 3"-NI-2886 PQR VALVE TO BE INSTALLED AT Q POINT. 945 MN-46426 TYY-49-23 IJ-80503 CV-36812 STA 10" 4"-YZ-1325 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. A 13. MN-49345 ERV-0-90 4. ST-15130 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED WX-19965 SDL SDL 10. M.XB UV-47812 UV-04408 1. 622 13" 376 DELETED 13/05/02 AB-52404 RJ 3. 194 GH-68473 DRAWING NAME EF-97821 CONTRACT NAME DRAW/SHEET NO. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 19. V.R 463 NOTES 5. 2" 13" MADE 777 D 6"-VF-8627 7"-UE-6869 LG-10 11" 2. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 2"-CP-5551 D.NI 705 RV-64825 440 EF-39446 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. SDL GH-62542 GI 6" IJ-21554 981 REV DATE CS-59 GRP 22. 548 LG-10 28" STA ZLO SAMPLE ISSUE CONSTR. REV.22 SAMPLE Project 233 IQVD RO-10 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. SCALE 5" 14" 59832388 PROJECT/LOCATION/ASSIGN 8. C CHECK'D SYNTHETIC PROCESS FLOW DIAGRAM RO-10 873 240 CONNECTION TO EXHAUST IS PROVIDED. 8"-ZU-1613 12" BG 9. UV-63703 SDL AB-26055 GH-17546 DELETED
doc_133
[ "957", "12", ".", "U", ".", "YZ", "3", ".", "SDL", "PROJECT", "/", "LOCATION", "/", "ASSIGN", "INS", "(", "55", "°", "C", ")", "20", ".", "13", ".", "8", ".", "276", "LG", "-", "10", "NOTES", "GH", "-", "07893", "MN", "-", "51584", "7", "."...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-RV-7780", "4\"-YC-4560", "6\"-WU-7550", "6\"-YJ-9748", "7\"-AK-8181", "3\"-PW-7266", "6\"-QL-6124", "3\"-FC-8405", "6\"-NG-5589" ]
957 12. U.YZ 3. SDL PROJECT/LOCATION/ASSIGN INS ( 55°C ) 20. 13. 8. 276 LG-10 NOTES GH-07893 MN-51584 7. AV-75762 404 5" OP-17596 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ORGANIZATION 126 CV-99590 CS-58 COMMENTS. A 15. DELETED 4" 828 3" SDL 10. CONNECTION TO EXHAUST IS PROVIDED. PQR VALVE TO BE INSTALLED AT Q POINT. 19" ABC TO XYZ FOR MAINTAINENCE. 1 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. IJ-98843 CONTRACTOR NO. KL-81413 453 LG-10 AA ST-09256 19. P.T I.N KL-60950 PROJ. XYZ P&ID 4" DRAWING NAME CONTRACT NAME GRI 18. 673 CHECK'D WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 6"-QL-6124 RO-10 STA 6"x6" WX-12192 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 GLR ISSUE CONSTR. REV.22 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME CV-39932 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, KL-55920 ZFZC CV-03392 T-6 635 UNIT DV-58958 DDL IJ-85018 CD-04840 U.X 13" ERV-7-70 B TOP CONNECTION. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS SYNTHETIC PROCESS FLOW DIAGRAM CD-80758 WX-99877 VSJH AV-19523 QR-98460 284 7"-RV-7780 IG-2960 ST-68647 6"-WU-7550 385 CV-27291 194 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 6"-NG-5589 QR-30429 265 CONTRACTOR PROJECT NO. 14. 13" REV 1. AV-61070 980 SAMPLE Project 16. F.HL DOTTED LINES ARE ALTERNATE. 5"x7" 4"-YC-4560 SAMPLE_3782.JPG WX-86395 ISSUE KWh UV-52975 9"x6" ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. AV-17572 C QR-12603 CS-65 774 DDL 2. MAINTAINENCE AND MODIFICATION. 892 STA EF-76772 GI 547-3977 GH-91157 17. WX-68907 4. DELETED ISSUE CONSTR. REV.33 6. ZLO SAMPLE 22. DIMENSIONAL TOLERANCE +/- 1MM. 3" 6"x4" 7"-AK-8181 7" TYPE VALVES. ISSUE CONSTR. REV.11 ST-13513 199 6"-YJ-9748 166 5. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 12Jan05 16/02/16 RO-10 FOR DETAILS. DATE GI THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 24" CS-62 40009323 IJ-81200 WX-58956 WX-32667 DELETED DDL WX-09546 WX-71996 588 RO-10 15" QR-42470 3"-FC-8405 GH-86916 IJ-60025 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DELETED ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 3"-PW-7266 DRAW/SHEET NO. MN-59226 RO-10 EF-06966 DELETED FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD INS ( -31°C ) DESCRIPTION DELETED AV-16454 360 INS ( -16°C ) 11/05/23 BOT-90-34 MADE GH-70386 3" AV-65904 9. SCALE Std. RO-10 ERV-8-06 544 11. APPRV'D TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 21. CD-85130 G.D
doc_24
[ "DELETED", "ZLC", "AB", "-", "33051", "DV", "-", "42254", "175", "4", "\"", "-", "ZX", "-", "2277", "QR", "-", "12121", "A", "DOCUMENTS", "ARE", "NOT", "INTENDED", "FOR", "VALIDATION", "/", "EVALUATION", "ON", "BASIS", "OF", "PROFESSIONAL", "REVIEWS", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "7\"-RR-6786", "5\"-OQ-0442", "3\"-PE-9415", "6\"-XT-0526", "2\"-AT-4852", "8\"-VL-2018", "4\"-MR-7504", "7\"-PS-2238", "7\"-LW-4067", "4\"-ZX-2277", "5\"-LV-8272", "3\"-YN-1837", "7\"-GZ-9755", "2\"-BN-3677" ]
DELETED ZLC AB-33051 DV-42254 175 4"-ZX-2277 QR-12121 A DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 27. PROJECT/LOCATION/ASSIGN AB-92396 28. 298 14. CONTRACTOR PROJECT NO. DELETED COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh DELETED 2. ST-71393 CONTRACTOR NO. 29. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND MN-94662 GH-17427 STA 3"-YN-1837 UV-59835 DDL UABK LG-10 L-3 MADE 19/10/05 5"-OQ-0442 ERV-5-89 26. 8"-VL-2018 AV-81989 IJ-23785 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE SDL DATE 2" IJ-24510 CONNECTION TO EXHAUST IS PROVIDED. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DETAILS. 4" DELETED RO-10 4. EF-97713 IJ-28342 22. COMMENTS. INSTALLATIONS/OPERATIONS. 294 12. ERV-8-44 24/11/10 ISSUE CONSTR. REV.22 OP-20076 QR-00825 4"-MR-7504 ORGANIZATION 518 DWG-1.23.23.789. 606 DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DESCRIPTION UNIT CHECK'D 680 2"-AT-4852 QR-54232 364 24. MN-54937 5"-LV-8272 NK-2494 17. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN 16. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. ST-00167 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY ISSUE CONSTR. REV.33 23. NOTES AB-75477 GRI QR-28967 3"x2" 13. DRAW/SHEET NO. 15. 595 SDL 20. GI 348 3. TOP CONNECTION. 1. AJ GH-54015 19. AV-03949 9. MN-72892 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. ST-84350 DDL ISSUE CONSTR. REV.11 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DV-14502 MN-76437 GH-97505 AZCL 7"-RR-6786 H.D 895 362 6. GH-48535 848 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE FSCY APPRV'D FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD DDL 7"x9" CV-59378 STA SDL TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. KL-39975 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 7. K.Y FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 25. RO-10 F.R DOTTED LINES ARE ALTERNATE. CX-92-70 CASE OF MISMATCH. GI ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE OP-78932 ERV-2-78 8"x7" EF-93636 8. 8"x4" 6"-XT-0526 7"-GZ-9755 7"-LW-4067 AB-65085 IJ-79202 18. None SAMPLE Project EF-32737 RV-09213 DELETED SCALE SAMPLE DRAWING NAME 10" PQR VALVE TO BE INSTALLED AT Q POINT. RO-10 DDL ERV-4-16 GLR RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 137 412 MAINTAINENCE AND MODIFICATION. 719 PROJ. DEF P&ID 787 RV-43391 21. 839 2"-BN-3677 STA 18/08/17 WX-73220 RO-10 RV-74112 ZLO TMI RO-10 OP-23459 ERV-0-43 1"x8" 1 KL-84679 ISSUE 15" 02831157 SAMPLE_7420.JPG DV-26038 RO-10 831 CD-12104 SDL KL-90084 92-4612 DV-84383 KL-99566 568 RO-10 QYI D 11. SDL SYNTHETIC PROCESS FLOW DIAGRAM GH-05348 CS-31 584 4" 9" AV-54299 10. DELETED 3"-PE-9415 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. B QR-14563 14/06/12 ISSUE CONSTR. REV.44 CV-03755 AQFZ DIMENSIONAL TOLERANCE +/- 1MM. CAW HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED C WX-31808 305 VALVES. AB-11347 RO-10 DV-13820 12" OP-82208 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, GH-60821 7"-PS-2238 357 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. V.E ERV-6-62 WX-23899 5. EF-61260 WX-91815 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. IJ-23301 8" 234 116 697 REV KL-80134 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 946 ABC TO XYZ FOR MAINTAINENCE. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME GH-91745 CONTRACT NAME
doc_91
[ "AB", "-", "03632", "LG", "-", "10", "WX", "-", "91325", "FOLLOWING", "XYZ", "SCHEMES", "ARE", "REQUIRED", ".", "SEE", "ABC", "DWG", "-", "1", ".", "23", ".", "45", ".", "67", ".", "89", "3", ".", "SAMPLE_0527", ".", "JPG", "GRO", "310", "ISSUE",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-OU-4611", "6\"-NS-2317", "2\"-ZS-2502", "7\"-RO-0687", "5\"-EG-9342", "4\"-XP-4116", "2\"-PE-4820", "7\"-SM-9840", "7\"-ES-3221", "5\"-SS-5168", "3\"-IJ-8672" ]
AB-03632 LG-10 WX-91325 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 3. SAMPLE_0527.JPG GRO 310 ISSUE CONSTR. REV.22 UU EF-95170 DELETED CV-13865 RO-10 AV-02928 E CD-87710 734 CV-72168 REV ISSUE CONSTR. REV.11 SITE IN CASE OF MISMATCH. ZLC 7"-ES-3221 2"-OU-4611 19. IJ-89848 678 ABC TO XYZ FOR MAINTAINENCE. CD-10579 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 7. LG-10 SCALE PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. RV-11466 3"-IJ-8672 EF-83821 TYPE VALVES. QYWL 7"-RO-0687 NOTES PQR VALVE TO BE INSTALLED AT Q POINT. AB-95995 ZLO GH-63446 5" AB-27706 2. 5" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 4. 3" RO-10 A WX-84557 DV-33022 10/09/08 AB-51300 IJ-61555 22. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME SAMPLE RV-42578 15. 21. WX-63376 715 INS ( -50°C ) STA FAS CS-08 18. 369 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 2"-ZS-2502 RO-10 4"-XP-4116 ORGANIZATION 23. HQ BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS UV-50583 13. ERV-5-04 6"-NS-2317 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE RJ-3902 24Jul10 16. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. CV-89174 6" ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 805 7"-SM-9840 RO-10 IJ-67562 IJ-33019 738 262 APPRV'D ERV-4-55 INS ( -56°C ) 3" 343 796 L.KFN 252 UW DELETED WX-92391 WX-49202 UNIT OQZ-40-86 None DV-39807 GRO STA TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. RV-88493 105 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE P-2 8. UV-65314 KL-51187 TOP CONNECTION. D 5. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DELETED DELETED SPPU CONNECTION TO EXHAUST IS PROVIDED. ERV-1-07 DESCRIPTION 12. MN-90153 DDL 993 SDL 801 ISSUE ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 14Dec04 10/10/10 ST-75746 CV-18100 MAINTAINENCE AND MODIFICATION. CONTRACTOR PROJECT NO. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, GH-21116 OP-18374 18" 17. EF-34718 COMPULSORY. 560-3083 MADE ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. IJ-81132 EF-76359 INS ( -48°C ) GH-66147 CONTRACT NAME 10. KL-27423 UV-37119 DDL EJ 668 CONTRACTOR NO. 12" C MZ GH-79178 5"-EG-9342 DELETED B.UP WX-82227 11. 3 1. ZHCM EF-84200 G.X 9. DELETED PROJ. PQR P&ID ST-91062 258 14. 20. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD DATE CD-12002 26. 25. 2"x6" DRAW/SHEET NO. 171 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. GLR 900 KL-62354 INSTALLED. CHECK'D 876 INS ( -10°C ) IJ-65162 18" RV-82651 ISSUE CONSTR. REV.33 LG-10 SDL JM GRO ISSUE CONSTR. REV.44 9" FOR DETAILS. AV-76155 938 ST-65443 QPVZ HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED INS ( -12°C ) CD-95978 CV-20123 397 SDL 5"-SS-5168 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS AV-71090 INS ( 30°C ) B WX-04324 RO-10 2"-PE-4820 RV-64974 6. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND LG-10 AHSW DOTTED LINES ARE ALTERNATE. DRAWING NAME PROJECT/LOCATION/ASSIGN 68100846 SYNTHETIC PROCESS FLOW DIAGRAM AV-99664 EF-59751 QR-98034 DWG-1.23.23.578, DWG-1.23.23.789. 24. IJ-69228 938 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 752 GH-69620 594 QR-95561 COMMENTS. ISSUE CONSTR. REV.55 391 SAMPLE Project 10/05/04
doc_160
[ "DV", "-", "74386", "5", "\"", "-", "IY", "-", "1219", "378", "15", ".", "14", ".", "UV", "-", "09264", "18", ".", "D", "TEMPERATURE", "CONTROL", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "BY", "DEFAULT", ".", "CHECK", "'", "D", "4", ".", ...
[ "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "5\"-IY-1219", "5\"-OS-0851", "8\"-PK-4963", "4\"-KP-0784", "6\"-YA-2795", "7\"-OW-3447", "2\"-PL-0952", "8\"-IO-5190", "2\"-UU-2304", "5\"-LH-9603", "6\"-QS-2942" ]
DV-74386 5"-IY-1219 378 15. 14. UV-09264 18. D TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. CHECK'D 4. 305 IJ-69952 24. 4"x2" APPRV'D 18" DWG-1.23.23.578, DWG-1.23.23.789. DV-60412 NOTES DDL 8" 459 RV-50149 GH-18130 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, SDL SDL STA 21/01/11 DELETED SCALE QR-20213 UV-48929 272 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 22. DDL R.YM UNIT PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 856 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 11" UV-92736 8"x4" MN-36024 9. 7. A.EG ABC TO XYZ FOR MAINTAINENCE. ISSUE CONSTR. REV.11 16" AB-54125 17. EF-65214 SDL 4 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME GH-55975 5"x2" INS ( -42°C ) 859 ERV-3-57 RO-10 5. 10" A 10. 760 8"-IO-5190 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED OP-29581 CD-71861 RO-10 DELETED ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT ISSUE CONSTR. REV.22 DOTTED LINES ARE ALTERNATE. EF-25620 4"-KP-0784 21. ZLO COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 EF-20906 PROJECT/LOCATION/ASSIGN IJ-22280 UA-5218 DIMENSIONAL TOLERANCE +/- 1MM. KL-40941 CONTRACTOR NO. 23/02/03 EF-70174 Std. DRAWING NAME CS-16 SYNTHETIC PROCESS FLOW DIAGRAM REV BLD 48-3472 SDL 11. 747 NM 7"x8" DELETED STA QR-05309 TOP CONNECTION. GRP 975 23/09/03 COMPULSORY. INSTALLATIONS/OPERATIONS. KWh 19. 5"-LH-9603 CV-75939 16. INSTALLED. 8"-PK-4963 AV-87461 CD-70604 DV-35781 SAMPLE Project 12. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. IJ-31998 W.GO 900 DRAW/SHEET NO. EF-50539 SITE IN CASE OF MISMATCH. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH MADE S.PS JZJ SAMPLE DELETED 339 D.PHM 3. I.YC 5"-OS-0851 2" CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 7"-OW-3447 OP-12545 ISSUE 936 DQN-35-70 ORGANIZATION DESCRIPTION 20. CV-39073 SDL ST-06908 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. UV-32864 INS ( -40°C ) 15" ST-63197 GRO ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. DELETED DDL PQR VALVE TO BE INSTALLED AT Q POINT. QR-26425 307 19" PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 6. INS ( -28°C ) ZLC 389 13. SAMPLE_7350.JPG B 560 DATE 2" ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. C PROJ. XYZ P&ID 5" ERV-3-89 AB-93960 ISSUE CONSTR. REV.44 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CS-80 B-5 4"x3" 550 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 8. ISSUE CONSTR. REV.33 2"-UU-2304 ERV-8-05 20/03/13 OP-64030 29" ST-33272 1. COMMENTS. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE WX-21504 3"x8" CONTRACTOR PROJECT NO. 6"-QS-2942 6"x4" WX-37830 DELETED DDL CONTRACT NAME 6"-YA-2795 LG-10 441 CV-83569 CV-11083 730 2"-PL-0952 INS ( -41°C ) 43971424 ST-74228 DV-58321 JS ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 23. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 413 17" G.CCG B.WKI 2. DV-93255 SDL INS ( -15°C ) QR-11218
doc_469
[ "ERV", "-", "7", "-", "17", "DELETED", "23", "\"", "16", ".", "GH", "-", "98986", "WX", "-", "43017", "GI", "AB", "-", "23214", "QR", "-", "58758", "3", "\"", "-", "ZF", "-", "7061", "D", "8", "\"", "-", "MX", "-", "3809", "JZG", "RV", "-",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O",...
[ "6\"-WM-4351", "8\"-MX-3809", "6\"-DU-7719", "2\"-NH-9115", "6\"-NB-0230", "3\"-ZF-7061" ]
ERV-7-17 DELETED 23" 16. GH-98986 WX-43017 GI AB-23214 QR-58758 3"-ZF-7061 D 8"-MX-3809 JZG RV-07490 9"x3" X.ZQ 13. CD-92321 18. SAMPLE 375 2"-NH-9115 R-9 5 B 9"x1" C 23. ZLO 7. 6" KL-59514 DDL CS-71 2. RV-50301 14" 8. 25/07/14 CONNECTION TO EXHAUST IS PROVIDED. CONTRACTOR NO. GH-72790 QR-71399 GH-35097 ZLO KWh ST-15946 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH AV-59226 STA CV-45934 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. PROJ. XYZ P&ID DWG-1.23.23.578, DWG-1.23.23.789. GH-03885 6. 843 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 27. DELETED GH-58073 101-8033 ISSUE CONSTR. REV.11 759 DIMENSIONAL TOLERANCE +/- 1MM. INSTALLED. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 4. ISSUE CONSTR. REV.22 QR-75702 MN-16611 15. DESCRIPTION DDL UNIT INS ( 16°C ) DELETED 29. WX-82759 STA ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. CD-58233 ORGANIZATION PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS TYPE VALVES. 6"-NB-0230 GH-86335 GI 26. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ SITE IN CASE OF MISMATCH. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 13" PROJECT/LOCATION/ASSIGN CD-41525 MADE TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ISSUE COMMENTS. ERV-5-06 WX-00016 QR-32226 CS-63 10Apr06 ERV-1-16 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. SCALE 23Aug27 LWJ 18" A ST-31484 FOR DETAILS. 762 SAMPLE Project CV-64294 KL-09630 J.L KBLR 22. UV-04196 21. STA DDL 12/08/03 ERV-0-86 10. 1. CD-84391 EF-75462 CONTRACT NAME ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. CV-42277 KL-94594 MN-33175 DATE FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 655 3. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS ST-75286 NQM DOTTED LINES ARE ALTERNATE. DV-21449 12. ULB-47-28 14. INS ( 39°C ) ISSUE CONSTR. REV.44 DELETED PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 25. 9. TOP CONNECTION. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, PQR VALVE TO BE INSTALLED AT Q POINT. 811 CD-84960 MAINTAINENCE AND MODIFICATION. 332 CONTRACTOR PROJECT NO. DRAW/SHEET NO. SDL OP-46569 WX-35994 ZLC 17. 49508928 GH-09111 EF-59767 APPRV'D PWM SYNTHETIC PROCESS FLOW DIAGRAM 6"-WM-4351 ISSUE CONSTR. REV.33 605 COMPULSORY. 11. CF SAMPLE_7725.JPG X.O RV-21573 QP ABC TO XYZ FOR MAINTAINENCE. REV DV-76163 OP-54677 CHECK'D 26" GH-10773 DELETED 24. 20. DDL CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. NOTES BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 584 JG-7354 CD-82353 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED GH-44402 790 DV-45933 IJ-22090 5. WX-38405 28. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE MN-49779 450 19. 508 T.C QR-97433 None COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 1" EF-75542 DELETED INS ( 23°C ) INS ( -38°C ) AV-49859 A.PBF UV-08725 DRAWING NAME MN-67573 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME INSTALLATIONS/OPERATIONS. GRP 12" 6"-DU-7719
doc_335
[ "ISSUE", "CONSTR", ".", "REV", ".", "33", "BOTH", "XYZ", "VALVES", "AND", "BCD", "VALVES", "ARE", "ACCESSIBLE", "FOR", "INSPECTION", ",", "948", "RV", "-", "06216", "CV", "-", "95791", "5", "\"", "DETAILS", ".", "RV", "-", "64178", "CONTRACTOR", "NO", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-YE-1160", "6\"-QW-9800", "2\"-XS-7227", "4\"-OB-8483", "7\"-OJ-8917", "3\"-CD-4431", "6\"-ZB-3040", "4\"-QU-2968", "2\"-IE-8636", "7\"-OX-5828", "2\"-XC-8202", "7\"-EF-6213" ]
ISSUE CONSTR. REV.33 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 948 RV-06216 CV-95791 5" DETAILS. RV-64178 CONTRACTOR NO. 22. MADE C GH-81183 1 CHECK'D ZLO 10. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 4"-OB-8483 DV-53710 UV-60741 DELETED 11. SAMPLE DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 14. 4"-QU-2968 KL-89418 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. AV-12890 3"-CD-4431 713 SDL WX-60482 A KL-92492 18. SAMPLE Project DV-79691 OP-61040 SDL INS ( -15°C ) 71543358 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 849 IJ-87661 DESCRIPTION CV-65915 KL-07817 SYNTHETIC PROCESS FLOW DIAGRAM ERV-8-31 2. 21. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD SAMPLE_7742.JPG OP-49817 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh NOTES L.VIR L.E 18Apr21 OP-77057 2"-IE-8636 1. OC 4. IJ-19982 DDL GH-93663 OP-70866 RO-10 SVQW AV-97168 P.O 24-6349 CONNECTION TO EXHAUST IS PROVIDED. 6. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. STA ERV-4-29 20. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 950 CD-87263 5"-YE-1160 CONTRACT NAME BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE RO-10 GH-49364 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. JQ SCALE RO-10 ST-91364 5. MAINTAINENCE AND MODIFICATION. SDL DRAWING NAME 19. 13. 11" AB-26451 ZLC 621 DDL INS ( 12°C ) 6"-QW-9800 24/02/24 SDL 15. AB-07248 DV-20799 APPRV'D 996 B.GT 999 DV-94803 DNCN 6" 16. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. DV-15070 REV ST-34885 TOP CONNECTION. DELETED 3" DDL B ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. LBN-68-37 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 828 2"-XS-7227 DWG-1.23.23.789. RV-79508 GH-37153 CD-82642 6" QR-09089 729 GI INSTALLATIONS/OPERATIONS. GH-01935 769 RO-10 ISSUE CONSTR. REV.11 7"-OJ-8917 965 DOTTED LINES ARE ALTERNATE. RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER SDL 2"x9" Std. DDL 7"-EF-6213 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY GH-62905 MN-75516 CD-85318 DV-99257 DIMENSIONAL TOLERANCE +/- 1MM. 2"-XC-8202 ISSUE CONSTR. REV.22 402 RV-89658 COMMENTS. 24" 17. 663 3. BO-8870 VALVES. 7. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 7"-OX-5828 EF-28012 OP-32159 IJ-98272 KL-86001 6"-ZB-3040 ERV-5-87 713 MN-18441 KL-26325 8. 465 ABC TO XYZ FOR MAINTAINENCE. 18" 17" ORGANIZATION DRAW/SHEET NO. S-2 AV-33033 GH-63086 490 CV-82806 DELETED FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, GLR 12. DATE FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ WX-56459 Y.J CS-55 665 10/06/12 2" UV-79463 9. KL-74778 CV-44412 148 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ISSUE ERV-6-03 UNIT PROJ. XYZ P&ID QR-34225 CONTRACTOR PROJECT NO. CV-42113 IJ-51924 GRI PROJECT/LOCATION/ASSIGN 387 UV-81554
doc_49
[ "ST", "-", "98114", "EF", "-", "37284", "15Feb10", "2", "\"", "-", "FL", "-", "2227", "CD", "-", "11793", "INSTALLATIONS", "/", "OPERATIONS", ".", "COMMENTS", ".", "18079279", "17", "\"", "6", ".", "10", "\"", "SDL", "DV", "-", "54785", "572", "CON...
[ "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "7\"-DU-9262", "4\"-WD-6975", "7\"-ZE-1257", "8\"-WP-1828", "3\"-QV-5615", "2\"-FL-2227", "7\"-UX-7855", "2\"-EC-8170", "8\"-FV-0496", "2\"-KO-5794" ]
ST-98114 EF-37284 15Feb10 2"-FL-2227 CD-11793 INSTALLATIONS/OPERATIONS. COMMENTS. 18079279 17" 6. 10" SDL DV-54785 572 CONTRACTOR PROJECT NO. OP-86541 378 WX-36824 241 DELETED ORGANIZATION BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS DOTTED LINES ARE ALTERNATE. 208 23. 1" 7"-DU-9262 MN-88706 CD-77950 4"x4" KWh GH-49043 ZLO ZFE 111 INS ( -38°C ) CD-83362 18" CS-69 GRP DATE ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 586 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 2. 27. ZLO 1. DRAW/SHEET NO. 25. DESCRIPTION KL-60741 AB-19858 INSTALLED. SITE IN CASE OF MISMATCH. B SX R.P 506 FOR DETAILS. 12. None LG-10 820 DV-42525 900 SDL 777 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 10. EF-61925 ST-66467 520 KL-48861 APPRV'D A SAMPLE FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, PQR VALVE TO BE INSTALLED AT Q POINT. DELETED STA 1 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 15. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. UNIT ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT CONTRACTOR NO. DDL 20. MADE ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 935 CS-18 570 MN-75673 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. O-4 COMPULSORY. RO-10 CONNECTION TO EXHAUST IS PROVIDED. TOP CONNECTION. 11. 480 ZLC CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. CS-29 046-3842 Z.K 15/03/13 872 989 TYPE VALVES. CONTRACT NAME CD-77694 7"x2" ISSUE CONSTR. REV.22 2"-KO-5794 RO-10 W.I REV DELETED IJ-98644 EBSM UV-96501 RV-92750 K.L 8"-FV-0496 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. QR-19493 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 7"-UX-7855 19. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 611 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD OP-76301 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 761 IJ-61959 DWG-1.23.23.578, DWG-1.23.23.789. 21/06/11 Z.XKD ERV-7-44 IJ-35399 D SYNTHETIC PROCESS FLOW DIAGRAM GRO PROJ. DEF P&ID 14. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ AV-95621 13Sep06 8"-WP-1828 11" 4. ISSUE CONSTR. REV.44 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 988 RO-10 STA DRAWING NAME ERV-3-66 WM-0633 21. 8. CV-77974 MAINTAINENCE AND MODIFICATION. RV-72672 DELETED FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 IJ-65823 SDL 4"-WD-6975 26. C UV-53113 SAMPLE_6558.JPG UV-06308 DELETED CD-27468 29. AB-95283 9"x4" ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. GH-18493 CS-82 14" 207 ABC TO XYZ FOR MAINTAINENCE. ISSUE CONSTR. REV.11 GH-53802 730 17. 9" ISSUE CONSTR. REV.33 G.QWM LG-10 7"-ZE-1257 SAMPLE Project STA DC SCALE 3. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 CD-12736 ZLO DELETED IJ-77748 OP-80964 CHECK'D SDL PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 24. RV-87991 775 13. 25" RV-11056 M.OP EF-13160 GH-33142 ZLC WX-11649 AV-01756 RO-10 NOTES 5. 111 C.YAK 7. 16. 635 2"-EC-8170 156 UV-08896 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 3"-QV-5615 IJ-71508 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 5" 18. LG-10 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, RO-10 28. VCI-76-92 220 ST-06136 GRP RO-10 DV-12086 DIMENSIONAL TOLERANCE +/- 1MM. 22. RV-82947 9. WX-98056 STA ISSUE PROJECT/LOCATION/ASSIGN
doc_364
[ "INS", "(", "23", "°", "C", ")", "EF", "-", "84969", "STA", "RO", "-", "10", "399", "AV", "-", "34999", "A", "6", ".", "2", "\"", "-", "LZ", "-", "1100", "EF", "-", "12674", "K", ".", "XQ", "FOR", "GENERAL", "NOTES", "AND", "LEGENDS", "SEE", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "3\"-JO-0747", "5\"-SU-6697", "6\"-BN-5965", "2\"-SB-1658", "3\"-AU-0985", "2\"-JI-2672", "6\"-JZ-8130", "4\"-YC-1546", "2\"-MG-2804", "6\"-YH-4420", "6\"-YG-1311", "2\"-LZ-1100", "6\"-KH-2653", "4\"-TG-5148", "6\"-ZV-2579", "8\"-WJ-5467", "3\"-GX-9971", "8\"-XI-5595", "7\"-UZ-65...
INS ( 23°C ) EF-84969 STA RO-10 399 AV-34999 A 6. 2"-LZ-1100 EF-12674 K.XQ FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 288 8"-WJ-5467 DDL 8. 507 CD-87400 11" ZLC 596 GH-09102 1. ZLO FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CHECK'D 85-8474 19. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 4" OP-35864 SAMPLE Project 7" APPRV'D VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. MADE 985 ORGANIZATION AV-98754 KL-24851 RLLM IJ-95865 VF STA PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND IJ-71792 MN-19760 CONNECTION TO EXHAUST IS PROVIDED. IJ-51754 RV-69644 26. KL-45882 CD-90134 17. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 21. SYNTHETIC PROCESS FLOW DIAGRAM S.LW 2" DELETED 586 11. ISSUE CONSTR. REV.44 ST-71950 884 307 24May03 28" B AB-45835 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. GRO 7. KL-23427 INS ( -36°C ) PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS INS ( -13°C ) CV-93880 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 6"-KH-2653 DELETED PROJ. DEF P&ID 11Dec05 AB-00649 EF-35382 RV-98654 SAMPLE_2666.JPG LGX CONTRACTOR NO. CV-93681 DMC 5"-SU-6697 EF-02997 P.IN C 1" 13. 14Mar16 AV-04063 UV-41182 WX-34415 IJ-53772 4"-YC-1546 MODIFICATION. STA CONTRACT NAME 6"-YG-1311 UV-20302 DRAW/SHEET NO. 10. REV 8"x5" AB-94917 12/09/22 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. CS-92 DV-64757 CV-46384 15. INS ( 23°C ) DELETED 6"-JZ-8130 LGZJ 8"-ZB-7800 4. 23. KL-27108 WX-78589 AB-36542 875 6"-YH-4420 DDL SDL SCALE 720 E.N SDL GLR 14" CS-42 841 27. ST-38935 160 4"-TG-5148 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME DELETED 3"-GX-9971 ISSUE CONSTR. REV.33 CV-65465 T.GS SDL 875 EF-10368 INS ( -27°C ) 852 RK-32-70 STA 235 DV-06032 ISSUE 25. DESCRIPTION OP-83522 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED NOTES None ST-68150 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. GH-26665 11" AB-00006 STA UNIT 457 CD-31803 DATE THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ DRAWING NAME EF-39542 K.MS 310 EF-29891 ERV-8-15 472 WJ-9715 DV-84383 RV-22258 22. QR-26555 6"x1" KL-36430 MN-21537 ISSUE CONSTR. REV.55 5. 16. 6"-RR-5520 EF-28056 GLR BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. C-6 3. KB 4" CONTRACTOR PROJECT NO. ST-50600 AV-22471 3"-AU-0985 13" MN-92387 462 T.D SDL 7"-UZ-6561 SDL AV-23264 MN-45371 DV-56076 8"-XI-5595 INS ( -29°C ) CS-11 1 121 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. SAMPLE LG-10 DDL 2"-JI-2672 19" ERV-2-82 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. LG-10 GH-99782 QR-37099 10" 816 DELETED EF-82741 IJ-51863 LG-10 HC COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 13/09/14 ISSUE CONSTR. REV.22 8" UV-19656 KL-25522 6"-ZV-2579 CD-23362 PROJECT/LOCATION/ASSIGN 18. TOP CONNECTION. DELETED 9. 268 DOTTED LINES ARE ALTERNATE. 2"-SB-1658 12. COMMENTS. 24. ABC TO XYZ FOR MAINTAINENCE. LG-10 MN-91817 13" 11" INS ( -28°C ) E DDL 4" CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. SDL 3"x4" OP-72847 EF-50039 D ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. 6"-BN-5965 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND AB-31751 20. 2"-MG-2804 AB-29026 CS-32 CD-39737 38442345 999 3"-JO-0747 14. 138 QR-69283 242 348 2. 464 RV-58693 RV-65055 DDL PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. GH-73514 GRP PV ISSUE CONSTR. REV.11
doc_12
[ "308", "SDL", "572", "4", "\"", "x3", "\"", "8", ".", "RO", "-", "10", "9", "\"", "x8", "\"", "4", ".", "ABC", "TO", "XYZ", "FOR", "MAINTAINENCE", ".", "20", ".", "STA", "TYPE", "VALVES", ".", "QR", "-", "90718", "RV", "-", "01889", "None", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE...
[ "3\"-CW-1451", "4\"-QD-6264", "7\"-JM-8974", "6\"-VX-2246", "3\"-GF-9471", "7\"-IA-7419", "6\"-HW-0650", "4\"-UD-6542", "4\"-TA-4424", "2\"-MO-3803", "2\"-QF-9617", "2\"-CM-3321", "8\"-AS-9718", "4\"-JJ-5364", "4\"-RE-4357" ]
308 SDL 572 4"x3" 8. RO-10 9"x8" 4. ABC TO XYZ FOR MAINTAINENCE. 20. STA TYPE VALVES. QR-90718 RV-01889 None 13. 6"-VX-2246 9"x8" 2"-QF-9617 831 17. I.DZ 164 SYNTHETIC PROCESS FLOW DIAGRAM 19. CONTRACTOR PROJECT NO. C 459 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 18/10/27 SAMPLE 7"x7" 16. CD-59385 DESCRIPTION 2"x2" SDL ST-34522 ISSUE CONSTR. REV.22 3 GI 1. PROJECT/LOCATION/ASSIGN 2. 197 KL-26657 ERV-6-87 KL-27579 229 DDL DDL 699 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ST-20712 GH-02352 AB-50535 466 DV-07707 550 789-1983 4"-QD-6264 K.RM 2"-MO-3803 DELETED D.Q INSTALLED. 18. NOTES 137 DOTTED LINES ARE ALTERNATE. 4"-UD-6542 ST-59452 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. EF-70643 DELETED 419 7"-JM-8974 ST-73354 11. DV-70288 DELETED CS-82 761 EF-96470 CHECK'D ST-93705 MN-65927 TOP CONNECTION. 130 272 CONTRACT NAME PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 961 4" DWG-1.23.23.578, DWG-1.23.23.789. ZLO ZLO CV-23172 OP-09890 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. AV-14773 2"x9" M.Y CD-27317 STA INS ( -45°C ) 116 968 REV UNIT ISSUE DDL 7. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 3. GH-83774 580 8"-AS-9718 WX-91705 CV-44649 AB-44558 RO-10 IJ-37898 DRAWING NAME SITE IN CASE OF MISMATCH. QR-76429 UV-70609 547 927 817 RV-99453 O.RNZ SAMPLE Project DELETED TZV-30-15 AB-54414 CD-46731 11/04/03 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 14. T.ELR LG-10 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 12" CONTRACTOR NO. 21. LG-10 APPRV'D CV-24554 IJ-47419 580 918 CS-58 12801888 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 3"-CW-1451 DRAW/SHEET NO. ISSUE CONSTR. REV.11 ISSUE CONSTR. REV.33 LG-10 MADE DATE DV-05605 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 15. OP-61422 DELETED 297 911 ORGANIZATION 176 9. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 4"-JJ-5364 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 28" CS-97 RV-05273 QR-65328 COMMENTS. 19" GH-02752 RO-10 MN-40421 LG-10 6"-HW-0650 4"-TA-4424 QR-81590 23. 678 ZLC THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ UV-16089 4"-RE-4357 PQR VALVE TO BE INSTALLED AT Q POINT. DDL FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 585 LG-10 C.UD 2"-CM-3321 QR-42007 SG-9430 INSTALLATIONS/OPERATIONS. SCALE SAMPLE_6470.JPG EF-38821 22. PROJ. XYZ P&ID DELETED ZU 458 LG-10 AV-94113 GH-73479 B DIMENSIONAL TOLERANCE +/- 1MM. 12. SJX LG-10 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME GH-46629 A AV-32961 10. 16Mar26 QR-85082 5. CV-06271 6. RO-10 UV-08897 O-7 3"-GF-9471 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE SDL 7"-IA-7419 IJ-84135 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DV-72575 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 29"
doc_330
[ "DELETED", "15", ".", "986", "GH", "-", "70920", "DOCUMENTS", "ARE", "NOT", "INTENDED", "FOR", "VALIDATION", "/", "EVALUATION", "ON", "BASIS", "OF", "PROFESSIONAL", "REVIEWS", "/", "RRSK", "SWYE", "E", "PROJECT", "/", "LOCATION", "/", "ASSIGN", "TEMPERATURE"...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-FQ-5081", "8\"-LK-4316", "7\"-XY-6929", "5\"-LZ-7171", "4\"-GU-5275", "3\"-XI-5923", "5\"-HB-2861", "5\"-BY-5151", "4\"-ZI-4605", "3\"-HX-6188", "3\"-KK-3044", "2\"-MO-2030", "2\"-MW-3564", "8\"-CM-2236", "5\"-EI-3405" ]
DELETED 15. 986 GH-70920 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ RRSK SWYE E PROJECT/LOCATION/ASSIGN TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. DOTTED LINES ARE ALTERNATE. KL-70461 UNIT RO-10 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DELETED DRAWING NAME ST-39452 RO-10 DELETED 8. ORGANIZATION OP-00874 DV-43257 8"-CM-2236 INS ( -15°C ) DATE SAMPLE Project MADE RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER SAMPLE ERV-6-92 3"-KK-3044 ISSUE CONSTR. REV.22 DV-50186 VALVES. ERV-2-09 CHECK'D 743 22. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR RV-77227 CONTRACTOR PROJECT NO. 5"-EI-3405 GH-22949 INSTALLATIONS/OPERATIONS. 851 QR-41177 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, W.LT LG-10 EF-97623 7" ST-47504 WX-23455 16. CD-36859 ZALE CV-04382 571 OP-35189 MN-50810 UV-59681 9. 20. SAMPLE_9436.JPG AN 18. OP-53837 AV-15329 17. GRP 1. 14. TOP CONNECTION. LG-10 216 AV-87348 LG-10 INS ( 50°C ) OP-77320 528 B ISSUE CONSTR. REV.33 STA EF-01057 ISSUE CONSTR. REV.11 H.F DETAILS. INS ( -52°C ) Q.V 22/02/01 RO-10 27013812 RV-64627 ST-12050 DRAW/SHEET NO. 25/01/11 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DELETED SCALE 4"-ZI-4605 4"x6" ST-55465 Std. 8" MN-83630 CASE OF MISMATCH. CS-07 VAU-65-00 ZKIX PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. STA 605 344 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, CD-30942 377 2. 612 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE CD-17634 DELETED 5 AV-74931 LG-10 CD-66489 5"-BY-5151 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE SDL OP-75976 D ERV-7-15 STA OP-85549 CV-50737 STA SYNTHETIC PROCESS ENGINEERING FLOW SCHEME OP-85995 DESCRIPTION QR-75750 OP-11568 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE EF-15075 CV-64482 T.UE OP-25392 DDL AV-33367 9" 3"-XI-5923 CONTRACTOR NO. MN-55715 I-5 12. CD-73432 4. 313 CD-17851 ISSUE CONSTR. REV.44 ISSUE CONSTR. REV.55 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 23. C LG-10 SYNTHETIC PROCESS FLOW DIAGRAM CONNECTION TO EXHAUST IS PROVIDED. 591 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 181 EI-0918 EF-30854 MAINTAINENCE AND MODIFICATION. APPRV'D EF-28896 CD-56851 AXG DWG-1.23.23.789. RO-10 7. 3"-HX-6188 2" 7"-XY-6929 13. 8"-LK-4316 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 771 P.QQ ABC TO XYZ FOR MAINTAINENCE. 2"-MO-2030 U.P ISSUE 5"-HB-2861 ST-67882 25/05/11 21. 12/08/27 ERV-0-07 ST-51156 407 KL-66248 287 19. 5. 444 DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. STA AB-77184 NOTES 10. 286 COMMENTS. UV-34763 N.MXK PROJ. DEF P&ID AV-78493 318 2"-MW-3564 INS ( 37°C ) LG-10 DV-79306 A AB-88019 ZLC 3. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY KL-97047 11. REV 64-6764 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 358 5"-LZ-7171 CONTRACT NAME 20/12/14 2"-FQ-5081 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 6. 319 4"-GU-5275 I.VB ZLO 929 WCQR
doc_70
[ "QR", "-", "48831", "ERV", "-", "8", "-", "09", "SCALE", "6", ".", "ST", "-", "69556", "GRI", "IJ", "-", "90650", "766", "LG", "-", "10", "CD", "-", "74859", "11", "\"", "QR", "-", "51298", "EF", "-", "96378", "MN", "-", "90896", "Z", ".", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "8\"-TD-0678", "8\"-YB-6093", "6\"-ZY-1899", "6\"-RZ-2991", "7\"-EH-0707", "7\"-VE-8439", "8\"-MT-0987", "2\"-QE-0740", "4\"-LN-8017", "3\"-PT-7948", "4\"-IR-1244", "4\"-KQ-4026", "3\"-QW-2087", "5\"-ZT-3261", "3\"-CC-7485", "4\"-EF-3116", "4\"-QK-2844", "8\"-RS-4122" ]
QR-48831 ERV-8-09 SCALE 6. ST-69556 GRI IJ-90650 766 LG-10 CD-74859 11" QR-51298 EF-96378 MN-90896 Z.QBF 8" QR-86939 IJ-77999 ST-73157 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 664 CD-01796 4"-LN-8017 DATE None ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 821 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 538 IJ-68410 3"-QW-2087 DELETED ERV-8-91 4"-IR-1244 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. 8"-RS-4122 4"-EF-3116 ORGANIZATION FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CS-72 955 DV-70901 5. OA 9. 8"-TD-0678 OP-36931 ST-03510 C WX-63712 SDL OP-53869 6" SAMPLE_5297.JPG DELETED IJ-26191 DV-38214 SDL IJ RV-60201 16" DIMENSIONAL TOLERANCE +/- 1MM. 194 15. KL-12963 ZLO GH-46227 QR-90213 151 EF-78198 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 6" 203 WX-21646 OP-04473 14. 17. ST-31055 WX-74191 MADE 4"-QK-2844 19. 541 1. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. ZLO DRAW/SHEET NO. 3 SAMPLE CONTRACT NAME ZLO PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS NOTES 723 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DDL 7" 134 CONTRACTOR NO. 8"-YB-6093 CONTRACTOR PROJECT NO. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ZP VFBK BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 646 3. GRO 535 24. RO-10 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. UNIT DV-45978 INS ( 46°C ) 10. Q.N OV 4. DDL WX-41927 QR-25742 WX-81277 QR-53989 ERV-3-33 GRP 14" LG-10 942 422 APPRV'D TOP CONNECTION. 3"-PT-7948 742 ST-85193 18. CV-95366 2" IJ-05536 1" FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. 9"x5" SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 13. 813 IJ-98622 UV-50995 CS-70 LG-10 690 5" R.GB CONNECTION TO EXHAUST IS PROVIDED. SAMPLE Project 20/07/19 11. ISSUE OP-24050 AV-46662 251 9" 263 CS-63 LG-10 737 MODIFICATION. CS-31 8. 18" 5"-ZT-3261 23. 25. 19" KL-53982 560 INS ( -31°C ) 766 7"-VE-8439 IJ-04514 CHECK'D 522 CV-01824 261 STA 2"-QE-0740 15" 22. WX-37864 AV-46029 19" 18" 8"-MT-0987 DELETED ST-64276 DELETED DESCRIPTION 4"-KQ-4026 QR-65191 WX-98084 GRO 2. ISSUE CONSTR. REV.11 3"-CC-7485 DV-38159 RV-01897 ERV-3-90 INS ( 28°C ) B HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED RO-10 722 898 MN-16792 COMMENTS. EF-13928 CD-21279 RV-40142 STA INS ( -26°C ) DV-23311 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 285 25/04/28 DOTTED LINES ARE ALTERNATE. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 16. UV-94633 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. EF-35198 7"-EH-0707 29-5878 PROJECT/LOCATION/ASSIGN WX-64196 E.BGY DRAWING NAME DDL AB-49825 F-7 RO-10 22/10/04 452 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND PROJ. XYZ P&ID AV-14589 ABC TO XYZ FOR MAINTAINENCE. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ REV 490 ST-09133 12" GRP ERV-1-37 A 19" QR-98238 DV-04439 16" ERV-3-15 AB-76304 5"x1" IJ-39819 CS-56 LG-10 ISSUE CONSTR. REV.33 ST-35288 CD-08586 EF-18496 21. MN-24334 AB-21909 ZLC CD-62214 CS-78 KL-79747 1" WX-59846 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 2"x5" OP-52394 RO-10 SYNTHETIC PROCESS FLOW DIAGRAM 250 6"-ZY-1899 CF-71-53 ST-75548 QR-11463 DDL AB-34835 AB-88053 7. PQR VALVE TO BE INSTALLED AT Q POINT. KL-56356 CV-72717 12. RV-87502 20. DDL AV-08866 DELETED KL-55631 EF-80797 392 INS ( -11°C ) STA ISSUE CONSTR. REV.22 IG-7080 GRI 6"-RZ-2991 AB-92312 857 SDL 62876685
doc_258
[ "INS", "(", "19", "°", "C", ")", "2", "\"", "-", "TC", "-", "9983", "4", ".", "ERV", "-", "5", "-", "40", "174", "QR", "-", "10050", "4", "\"", "x2", "\"", "CD", "-", "03617", "ELEVATION", "ARE", "TO", "CENTER", "LINES", "UNLESS", "OTHERWISE", ...
[ "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "4\"-AY-5072", "2\"-TC-9983", "7\"-HA-0115", "3\"-IN-7002", "3\"-CS-5640", "6\"-UC-0492", "3\"-OJ-9938", "3\"-BA-4990" ]
INS ( 19°C ) 2"-TC-9983 4. ERV-5-40 174 QR-10050 4"x2" CD-03617 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. MN-37283 CONTRACTOR NO. MN-59913 D MN-74010 DESCRIPTION 10/05/08 CD-46604 RAIX 3. 12. None 15. LG-10 17-8476 22. 20. DZ ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT CD-50442 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 RO-10 OIKP 900 REV 870 IJ-55038 ZLC RV-08052 NAXA CHECK'D GH-77496 IH 11. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND PROJ. XYZ P&ID UNIT CS-65 14726814 LG-10 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 13. UV-32817 C WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. UV-85129 598 ZLO DELETED 980 GI DRAW/SHEET NO. 678 23. 429 DELETED 5. RV-14376 DV-70867 ERV-8-60 QR-63685 ORGANIZATION 14. 19" INSTALLATIONS/OPERATIONS. CD-05939 WX-21763 IJ-79751 ERV-7-21 EF-81043 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS JQKY AV-10496 24" OBV DDL C-8 2. CS-05 KL-96890 12" OP-49270 15" 12" ST-29549 7. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH DRAWING NAME PQR VALVE TO BE INSTALLED AT Q POINT. 258 MN-87925 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE TOP CONNECTION. 3"-OJ-9938 16. CONTRACTOR PROJECT NO. 657 19/03/24 CD-84497 CONNECTION TO EXHAUST IS PROVIDED. DDL 8"x9" TYPE VALVES. TK SAMPLE Project 482 ISSUE CONSTR. REV.11 PROJECT/LOCATION/ASSIGN MN-41458 DWG-1.23.23.578, DWG-1.23.23.789. GRI 293 DIMENSIONAL TOLERANCE +/- 1MM. SDL ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. SDL OP-06473 DDL 3"-IN-7002 656 7"-HA-0115 9"x5" B SITE IN CASE OF MISMATCH. GLR UV-57550 UV-62142 DV-57626 WX-44206 19. AV-12574 KWh 386 7" CONTRACT NAME AB-46912 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. QF-38-20 9. 862 8. 581 2" 16/01/21 CS-92 M.BX IJ-39026 DATE ST-50256 10/10/24 QR-79834 MN-63750 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. OP-38876 17. 722 APPRV'D ABC TO XYZ FOR MAINTAINENCE. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 171 LG-10 24. 4"-AY-5072 4 ISSUE NOTES ISSUE CONSTR. REV.44 RV-74524 2" BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, STA COMMENTS. 762 MAINTAINENCE AND MODIFICATION. A GH-00688 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DELETED SDL 25" 18. 3"x8" 6"-UC-0492 SDL IU-3850 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 3"-BA-4990 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME SAMPLE_8603.JPG ISSUE CONSTR. REV.22 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. AB-17275 F.ERC 10. INSTALLED. DELETED ISSUE CONSTR. REV.33 OP-40737 SYNTHETIC PROCESS FLOW DIAGRAM ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 338 3"-CS-5640 GRI SCALE ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE MADE 941 777 SDL AB-70518 SAMPLE 21. OP-64830 6. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 222 NECB H.XM 1.
doc_358
[ "4", ".", "K", ".", "ODB", "CV", "-", "32536", "IJ", "-", "92810", "APPRV", "'", "D", "AV", "-", "55230", "SDL", "920", "896", "AV", "-", "08600", "321", "326", "AV", "-", "07825", "STA", "ST", "-", "75629", "CHECK", "'", "D", "360", "ABC", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-YL-8180", "3\"-NF-0618", "6\"-EG-4260", "4\"-TJ-5486", "7\"-LX-4989", "8\"-KH-9113", "8\"-BW-0233", "5\"-BS-2794", "8\"-LX-1087", "6\"-SY-9614", "7\"-BN-9201", "6\"-IS-1561", "2\"-RC-7268" ]
4. K.ODB CV-32536 IJ-92810 APPRV'D AV-55230 SDL 920 896 AV-08600 321 326 AV-07825 STA ST-75629 CHECK'D 360 ABC TO XYZ FOR MAINTAINENCE. QAG HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED GRP V.RE 486 UNIT 50309389 KL-47544 RO-10 2"-YL-8180 UV-13062 8"-KH-9113 6"-SY-9614 UV-05635 CC RV-76719 BZEG 520 ERV-0-29 ST-16860 RO-10 SYNTHETIC PROCESS FLOW DIAGRAM DWG-1.23.23.789. DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 15. 27" STA SAMPLE_5379.JPG 502 7. 8"-LX-1087 ISSUE CONSTR. REV.11 DELETED OP-85789 220 691 1"x5" H.X 18. MN-78279 B COMMENTS. UV-01969 INS ( -38°C ) ZLO 19. 521 C ISSUE CONSTR. REV.55 2" DELETED 25. 18" AB-00723 14" ISSUE CONSTR. REV.44 4"-TJ-5486 IJ-30400 MN-39726 14. 467 895-0245 GRI CV-17125 CONTRACTOR NO. OP-58775 AB-77212 A RV-75842 UV-02631 ZLO LG-10 DV-33876 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY ISSUE CONSTR. REV.22 STA COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh DELETED 9" CV-43470 TOP CONNECTION. 11. 7"-BN-9201 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 8" SAMPLE DDL SAMPLE Project 1" 6"-EG-4260 IJ-12473 DATE KL-51885 DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. NOTES YF-8490 21. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, AV-21435 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. KL-87110 5. 6"x4" DESCRIPTION OP-39718 24" DOTTED LINES ARE ALTERNATE. 6"-IS-1561 13/03/16 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 749 VL GRP 20. DXL INS ( -33°C ) 702 RO-10 RO-10 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 17. DTH DV-39548 5"-BS-2794 STA GH-34299 G-7 WX-00833 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 24. QR-54733 SDL ISSUE CONSTR. REV.33 3" SDL ISSUE 6. 7"-LX-4989 AV-92026 23. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 303 ERV-8-85 KL-97288 546 DRAWING NAME 924 157 ST-77041 GRI 11/04/19 EF-83150 15/02/08 DELETED RV-38550 18/01/23 1. RO-10 OP-28113 ST-71126 G.AC WX-96255 CONNECTION TO EXHAUST IS PROVIDED. 780 OP-18010 18" GH-32227 MAINTAINENCE AND MODIFICATION. DELETED UV-94962 INS ( -41°C ) ST-33058 PQR VALVE TO BE INSTALLED AT Q POINT. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. D 5" CONTRACT NAME 2"-RC-7268 1"x5" CS-59 8"-BW-0233 GH-84985 ZLO WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE CS-06 EF-02339 12. MADE 1 DIMENSIONAL TOLERANCE +/- 1MM. KL-19040 RO-10 AB-91300 532 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DRAW/SHEET NO. KL-86867 9. PROJECT/LOCATION/ASSIGN CV-28808 E EF-21893 VALVES. 8" LNS-56-67 2. MNNH 840 3. PROJ. XYZ P&ID RO-10 MN-21204 15/05/15 3"-NF-0618 779 RV-80069 KL-63458 454 DDL 16. 13. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND RO-10 A.Z SCALE WX-15822 19" C.RU RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER DELETED CONTRACTOR PROJECT NO. REV UV-60043 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. Std. KL-67954 22. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE AV-84992 INS ( -24°C ) OP-93417 INSTALLATIONS/OPERATIONS. CD-72158 MN-22023 10. ORGANIZATION H.KEX NUBC CD-24497 273 2" 8. GRP AB-84834
doc_111
[ "742", "IJ", "-", "34791", "366", "ORGANIZATION", "25", "/", "05", "/", "14", "4", "\"", "-", "WG", "-", "2959", "KL", "-", "65599", "BOTH", "XYZ", "VALVES", "AND", "BCD", "VALVES", "ARE", "ACCESSIBLE", "FOR", "INSPECTION", ",", "MAINTAINENCE", "AND", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "7\"-QV-3389", "2\"-RR-6267", "4\"-WG-2959", "5\"-CK-7762", "4\"-AO-6039", "4\"-NQ-3517", "5\"-XO-9149", "3\"-YL-6731", "8\"-XM-1787", "3\"-DH-1791", "5\"-HT-3793", "5\"-LK-5243", "7\"-YW-5079", "4\"-BU-9680", "4\"-VB-8989", "3\"-LL-6113", "8\"-WL-7888", "4\"-SQ-6191", "5\"-GG-79...
742 IJ-34791 366 ORGANIZATION 25/05/14 4"-WG-2959 KL-65599 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 311 DDL 857 20. 9. 29" WX-11515 180 8"-WL-7888 SZXC ISSUE CONSTR. REV.22 ERV-1-12 INS ( 12°C ) 261 RO-10 928 667 ISSUE CONSTR. REV.44 4"-BU-9680 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 3"-DH-1791 858 C QR-12928 UV-67701 AB-61233 KL-91816 DDL EF-15696 535 4"x6" 6" AB-63346 943 DESCRIPTION 907 4"-NQ-3517 598 GI ISSUE PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 5"-CK-7762 NOTES 806 ZLO OP-95032 5"-HT-3793 UE-5005 3. UV-25586 SCALE 22/01/25 16. XYL ZLC GH-12446 355 RO-10 COMMENTS. KL-84575 MADE LG-10 15/03/28 REV 9"x3" OOI 10. 2. ST-44733 EF-80803 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 170 E AV-35200 GI CV-41837 EF-30951 321 QR-71014 CV-53595 19" QR-36236 SDL LG-10 755 DELETED RO-10 ISSUE CONSTR. REV.33 UV-94258 AB-53918 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED KL-58069 DELETED APPRV'D MN-54814 INS ( -31°C ) CV-65542 559 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. DATE ST-26002 CV-19139 15. 590 ST-26063 EF-77452 DDL DELETED EF-62961 AV-17667 CS-74 LG-10 LG-10 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. QR-23591 14. KL-81053 11. 1"x6" 3"-YL-6731 21/10/16 XGWY LG-10 KL-83175 ZLO JA 7"-YW-5079 CS-76 851 833 AB-41300 98-4214 AV-95568 AB-22418 679 STA 16" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. CS-22 151 8"-XM-1787 MODIFICATION. RV-11008 503 MN-49778 MN-86156 DV-05129 PROJ. XYZ P&ID 18. DIMENSIONAL TOLERANCE +/- 1MM. G.HZY GLR RV-88973 98722225 2"-RR-6267 19. UV-37246 779 OP-17604 EF-22810 ISSUE CONSTR. REV.55 AB-65898 GH-71721 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 100 DDL AB-26292 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 5. 17. ZLC 4"-SQ-6191 ZLC CONTRACT NAME RO-10 WX-20490 C.RD RO-10 IJ-52731 RV-01434 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. RO-10 MN-58848 347 675 GH-80933 INS ( 22°C ) 3"-LL-6113 786 GLR 1. SDL ST-68303 MN-50180 MN-59213 OP-44244 RO-10 3"x6" LG-10 ERV-2-46 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 372 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DRAWING NAME CS-90 5" INS ( 51°C ) SDL 8. ABC TO XYZ FOR MAINTAINENCE. SDL 18" 15" TGA 5" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ D EF-07546 UNIT ERV-2-63 V-7 13. AV-17757 7"-QV-3389 ERV-3-44 MN-95684 ZLO ERV-5-59 A 18" 9" LG-10 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 12. B L.Q AV-92076 GRP 25" SYNTHETIC PROCESS FLOW DIAGRAM 251 PMTR CS-90 617 ERV-4-49 21. 310 MN-16915 509 741 CV-36947 854 TOP CONNECTION. EF-00850 303 RV-00389 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 5"-GG-7993 UV-80167 5"-LK-5243 DV-74451 IJ-27245 SAMPLE Project UV-35551 3" AV-22130 1 DDL EF-88441 4. 974 SAMPLE_4099.JPG 393 None WX-78817 4"-VB-8989 CD-60729 SDL 7. PROJECT/LOCATION/ASSIGN PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. CV-34691 SDL 25" 277 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. BC 17May22 KL-05669 675 ISSUE CONSTR. REV.11 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. GRO 600 NKW-10-29 5"-XO-9149 CV-75354 6. A.MND CD-81358 6"-WE-9715 W.NYT CHECK'D ST-45288 UV-75528 GI FX DRAW/SHEET NO. B.S GRI CV-12063 ERV-7-56 240 DOTTED LINES ARE ALTERNATE. 1"x4" ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 262 774 CONTRACTOR PROJECT NO. INS ( -15°C ) 4"-AO-6039 178 DELETED CONTRACTOR NO. SAMPLE 4"x7" RV-84004 ERV-9-09 AB-64202
doc_429
[ "UKF", "RO", "-", "10", "PROJ", ".", "PQR", "P", "&", "ID", "10", ".", "PROJECT", "/", "LOCATION", "/", "ASSIGN", "SITE", "IN", "CASE", "OF", "MISMATCH", ".", "8", "\"", "x9", "\"", "5", "\"", "-", "OZ", "-", "7681", "7", "\"", "-", "NW", "-"...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE...
[ "5\"-OZ-7681", "7\"-NW-6726", "3\"-CS-6990", "3\"-TF-2542", "2\"-QY-7847", "3\"-CC-8819", "2\"-EP-6066", "2\"-NX-5125", "8\"-LC-2071", "5\"-XT-6411", "3\"-TS-0305", "3\"-GJ-9062" ]
UKF RO-10 PROJ. PQR P&ID 10. PROJECT/LOCATION/ASSIGN SITE IN CASE OF MISMATCH. 8"x9" 5"-OZ-7681 7"-NW-6726 5"-XT-6411 17. SAMPLE THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 3" 20. WX-42844 QR-20942 AV-96043 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. RO-10 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 3"-TF-2542 10Jan07 SDL STA J.PG FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 23. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, CONTRACTOR PROJECT NO. 269 23/01/01 OP-92293 84516474 INS ( 40°C ) SCALE 3"-CC-8819 RV-34223 ERV-5-34 SAMPLE Project 4 MN-11541 11" LG-10 DV-20811 2"-QY-7847 860 QR-56830 CS-73 ORGANIZATION 323 19. V-9 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 2" 4. REV NOTES CONNECTION TO EXHAUST IS PROVIDED. INS ( -48°C ) 5" C 3"-CS-6990 SDL 3"-GJ-9062 6. ST-05064 INS ( -37°C ) ERV-8-78 UV-67558 MN-26556 19" 2"-EP-6066 15. TOP CONNECTION. 726 6"x7" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. DV-82265 D.Z INS ( 53°C ) KWh K.C UV-00888 381 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ERV-5-27 AV-81851 1. 864 DWG-1.23.23.578, DWG-1.23.23.789. 412 GH-82289 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. CS-12 DRAW/SHEET NO. ERV-5-52 RV-82674 3. EF-31431 11. DV-88934 LG-10 673 CONTRACTOR NO. 2"-NX-5125 UV-77002 EF-13162 ERV-8-15 9. A.DL DV-97885 14. A LG-10 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 Std. EF-18540 980 UD RV-26695 21/05/24 APPRV'D 3" STA CU-10-00 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 12" RO-10 DRAWING NAME ERV-8-50 ISSUE CONSTR. REV.33 CD-99426 653 3"-TS-0305 538 RV-53451 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 2. 589-0224 ISSUE DELETED AV-52045 948 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 18. DELETED MADE GH-50744 DELETED WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. INS ( -41°C ) SYNTHETIC PROCESS FLOW DIAGRAM DESCRIPTION ISSUE CONSTR. REV.22 13. 7. DV-29952 CS-44 AB-08912 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. CONTRACT NAME CHECK'D 21. B UV-16659 GLR QR-01314 COMMENTS. ERV-4-33 UNIT MN-87900 KL-10388 OP-92814 22. 725 GRO SYNTHETIC PROCESS ENGINEERING FLOW SCHEME SDL ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. CV-17485 8"-LC-2071 V.J CS-57 993 5. FOR DETAILS. GRI FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 16. MAINTAINENCE AND MODIFICATION. DV-90864 CS-92 SAMPLE_4488.JPG 16" 12. ISSUE CONSTR. REV.11 MN-18338 760 3" HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED GH-69696 8. DELETED YWZP DIMENSIONAL TOLERANCE +/- 1MM. SDL 372 GH-56326 ABC TO XYZ FOR MAINTAINENCE. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DX-4848 DELETED 986 DOTTED LINES ARE ALTERNATE. DATE T.SR
doc_321
[ "23", ".", "REV", "262", "HAS", "NO", "REVELANCE", "WITH", "ANY", "OTHER", "SIMILAR", "LOOKING", "DOCUMENTS", "FOUND", "IN", "THE", "ANY", "OTHER", "CONCERNED", "ZLC", "CD", "-", "24351", "1", ".", "675", "BUILDING", "TO", "BE", "IN", "THE", "SLANTING", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-IX-1596", "7\"-OH-3755", "3\"-KE-7076", "4\"-HM-6215", "8\"-GV-2761", "8\"-KX-7356", "4\"-FQ-2137", "2\"-OG-9965", "4\"-CT-2868", "2\"-CN-5577", "5\"-AS-9286", "8\"-BR-9552", "8\"-OD-8771", "4\"-QM-4984", "2\"-WQ-6610", "3\"-OQ-3873", "5\"-IZ-9180", "8\"-KY-4944", "7\"-MU-47...
23. REV 262 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED ZLC CD-24351 1. 675 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 14. CONTRACTOR PROJECT NO. 11. 3"x2" SAMPLE CD-99147 STA WX-20940 D RO-10 CD-32489 DV-07180 CD-61630 B 6"x6" AB-59790 8"-GV-2761 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 15. PROJECT/LOCATION/ASSIGN ZLC 4"-CT-2868 DV-29257 MADE RO-10 DELETED GI MN-35411 7"-OH-3755 798 5"-ZH-7276 SDL ZLO 8" 18. RO-10 2"-WQ-6610 Q.O HIS 601 368 C QR-63949 6"-UU-0901 10. ROV INS ( -24°C ) SDL DOTTED LINES ARE ALTERNATE. UV-67349 444 16. 455 12" QR-20982 AB-79761 4. DDL DV-52544 RV-07415 SDL DESCRIPTION 849 5"x2" CV-08207 586 INS ( 49°C ) YIIP ERV-3-86 DELETED ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. DELETED 14" UV-71211 DELETED SDL ZLC OP-59684 SAMPLE_9816.JPG 781 3"-EM-5835 19Nov27 ZLO GH-86212 ST-94465 6" 8. 27. 3"-QA-7837 ISSUE CONSTR. REV.33 INS ( 59°C ) EF-26776 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS CS-64 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 591 ST-68369 4"-FQ-2137 CONTRACT NAME DV-00952 OPM 66-3699 21. J.F EF-30783 SYNTHETIC PROCESS FLOW DIAGRAM QR-93984 DELETED I.MMD 4"x5" D.OYR 18" None 465 18" 640 26. ISSUE CONSTR. REV.44 ISSUE CONSTR. REV.22 4"x3" ERV-2-93 22. RV-89180 INS ( -29°C ) QR-82955 5"-IZ-9180 UV-12230 LG-10 889 77881894 STA LG-10 351 PQR VALVE TO BE INSTALLED AT Q POINT. IJ-59162 25. ABC TO XYZ FOR MAINTAINENCE. ZLC GH-60881 CS-67 SDL NW AV-94332 OP-48238 25/02/16 E-7 OP-71494 RV-77698 AB-95077 STA ORGANIZATION 248 146 UNIT CONNECTION TO EXHAUST IS PROVIDED. EF-46006 904 13/12/16 8"-KY-4944 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 417 100 2" 13. DV-46301 549 RV-75589 896 CS-73 8"-BR-9552 GI GH-93726 5"-AS-9286 E 146 19. UV-44689 AV-02984 3"-OQ-3873 6" ERV-2-11 3"-KE-7076 648 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND APPRV'D MODIFICATION. SCALE DIMENSIONAL TOLERANCE +/- 1MM. OP-41040 DATE AB-47151 20. ERV-8-37 1"x6" NOTES SAMPLE Project OP-01517 RO-10 CV-38753 ZLO DELETED 9. 11" STA ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. 542 12. TOP CONNECTION. GH-46265 25Oct27 HF 6. 114 STA 5"-ZA-0436 WX-53774 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ KL-51828 632 COMMENTS. NBFT DV-12423 KL-00851 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. A RV-25080 V.RQ CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. MN-77009 GH-53033 KL-49146 749 LG-10 5" 8"-OD-8771 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. SDL OP-15737 GI CHECK'D AV-48711 LG-10 4"-HM-6215 7. GRP KL-49249 QR-05114 DRAWING NAME KL-79960 17. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. ST-70196 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 5. MN-43402 ISSUE CONSTR. REV.11 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 7"-MU-4737 ISSUE CONSTR. REV.55 DV-97983 RO-10 9"x5" 3. QU-72-49 23" IZS 445 CD-10806 2. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 2"-OG-9965 841 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DRAW/SHEET NO. QR-54003 KL-99798 24. 2"-CN-5577 556 WX-74553 ST-51453 CONTRACTOR NO. WJ AV-32868 MN-27108 ISSUE 522 OP-49314 Q.U CV-52700 806 28. 4"-QM-4984 7"-IX-1596 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 2 IJ-04701 8"-KX-7356 5"x3" PROJ. PQR P&ID 23Oct28 3"-BA-8361 CS-22 GRP GH-57573 INS ( 19°C ) WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. YS-2399
doc_499
[ "YJ", "7", "\"", "x6", "\"", "27", "\"", "IG", "-", "41", "-", "72", "PROJECT", "/", "LOCATION", "/", "ASSIGN", "2", "\"", "-", "FT", "-", "5741", "STA", "D", "ORIENTATION", "OF", "ABCD", "VALVES", "SHALL", "BE", "VERIFIED", "AND", "CORRECTED", "AT...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "2\"-FT-5741", "5\"-IS-5018", "5\"-GL-8265", "4\"-TB-9746", "4\"-DU-9626", "5\"-VQ-8467", "4\"-HA-3974", "2\"-KP-6088", "7\"-UX-3216", "8\"-FC-4605" ]
YJ 7"x6" 27" IG-41-72 PROJECT/LOCATION/ASSIGN 2"-FT-5741 STA D ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT DDL DOTTED LINES ARE ALTERNATE. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. PROJ. XYZ P&ID CV-98178 P.K EF-04430 MN-48216 ISSUE CONSTR. REV.44 19. B AV-80993 CONTRACT NAME STA LG-10 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH CONTRACTOR PROJECT NO. RV-68714 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 77200553 5. ISSUE QR-25161 23. DELETED ST-71944 15/02/26 2"-KP-6088 770 DDL SAMPLE AV-91206 24. AV-70481 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD SAMPLE_9999.JPG DIMENSIONAL TOLERANCE +/- 1MM. DATE 3. GH-30205 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 18. WX-23860 Std. MAINTAINENCE AND MODIFICATION. 4" 2" 25. 715 1. 506 DELETED ISSUE CONSTR. REV.22 GH-93599 ST-72270 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 296 466 IJ-65605 606 ORGANIZATION ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. NEKB SITE IN CASE OF MISMATCH. MN-65859 I-9 Z.MBR INS ( 30°C ) DELETED BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, A 13Nov27 GY 865 IJ-43392 KI-5035 8"x7" UV-71338 FOR DETAILS. 4. 5"-IS-5018 EF-61062 ABC TO XYZ FOR MAINTAINENCE. DELETED ZLC M.S 5"x6" 26. 15. QR-90572 QR-37103 REV AV-14543 12" 17" DRAW/SHEET NO. SYNTHETIC PROCESS FLOW DIAGRAM 728 KL-04355 9" 20. 7"-UX-3216 CONTRACTOR NO. 6" 10. 22. 4"-HA-3974 SCALE SDL LG-10 APPRV'D IJ-83781 ZLO 14. OXE ISSUE CONSTR. REV.11 EF-20224 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 9. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. CV-82771 15Jun26 C NOTES C.QXX FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 SAMPLE Project 9" AB-88302 3 4"-TB-9746 RV-76445 DESCRIPTION PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DWG-1.23.23.578, DWG-1.23.23.789. 488 ERV-8-74 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 8"-FC-4605 AB-39311 WX-03912 INS ( -46°C ) RV-64474 7"x2" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 2. GRO 211 INS ( 16°C ) 16. 5"-VQ-8467 6. 17. DV-68477 8. AV-50944 ZLO 4"-DU-9626 INSTALLATIONS/OPERATIONS. AV-63608 DDL 22" VQ 11. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 068 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE RO-10 MADE EF-84869 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. IJ-08737 LG-10 INSTALLED. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DELETED KL-46389 887 COMMENTS. 10Dec11 XM ST-25815 5"-GL-8265 JH HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 7. CS-06 TYPE VALVES. AB-75252 WX-12075 291 5"x9" AV-72753 GH-35418 DELETED 540 OP-15639 W.WS 13. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 949 CHECK'D COMPULSORY. 26" CD-82510 DV-98300 CONNECTION TO EXHAUST IS PROVIDED. EF-87798 21. QR-11874 EF-75983 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 12. 10-2382 GRP TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. DRAWING NAME CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. OP-30379 ISSUE CONSTR. REV.33 780 CD-67888 18" CD-11248 IJ-37906 CS-23 151 UNIT
doc_290
[ "6", "\"", "-", "AL", "-", "3642", "449", "BSL", "INS", "(", "-", "54", "°", "C", ")", "19", ".", "LG", "-", "10", "OP", "-", "21287", "8", ".", "DRAWING", "NAME", "C", "CV", "-", "29522", "2", "\"", "18", "/", "12", "/", "03", "GI", "JNL...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "6\"-JP-4381", "7\"-GE-0544", "8\"-SO-0294", "6\"-ZK-3621", "4\"-QN-2460", "6\"-AB-6993", "6\"-AL-3642", "8\"-BL-3463" ]
6"-AL-3642 449 BSL INS ( -54°C ) 19. LG-10 OP-21287 8. DRAWING NAME C CV-29522 2" 18/12/03 GI JNL GH-91124 ST-30442 WX-74090 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 143 IJ-45807 DDL PZUU FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, STA DELETED ISSUE CONSTR. REV.44 23Oct20 APPRV'D ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH GRI KWh IJ-94035 INSTALLED. QR-42075 18. DDL DWG-1.23.23.578, DWG-1.23.23.789. 12. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. IJ-64059 DELETED BW-07-72 WX-47338 SCALE 11" 246 DELETED QR-43106 8"-BL-3463 DESCRIPTION 4. EF-61927 WX-69345 879 DATE 10. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 948 FOR DETAILS. ERV-5-04 DV-57802 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 13. UV-01917 DIMENSIONAL TOLERANCE +/- 1MM. 23. INSTALLATIONS/OPERATIONS. 3. GRI 12Sep21 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 8"-SO-0294 DELETED 711 SDL DV-32811 NOTES 7"-GE-0544 715 RV-68259 MN-49885 24. CV-69767 CNZ TOP CONNECTION. 661 COMPULSORY. 850 5. GLR SDL CHECK'D COMMENTS. MADE 9. ISSUE CONSTR. REV.55 OP-59092 UNIT GRI D EF-17210 6"x8" UV-95764 SAMPLE WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. GLR 6"-JP-4381 GRP 696 A OP-02109 CV-64848 575 GH-87238 ERV-1-14 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DDL RO-10 DBA KR-8998 MAINTAINENCE AND MODIFICATION. ISSUE CONSTR. REV.22 EF-27654 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 6"-AB-6993 AV-88146 QVR PROJ. XYZ P&ID GH-61305 NXPF 5 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 1. UV-79054 107 344 28. RV-70063 CONTRACTOR PROJECT NO. AB 9" 4"-QN-2460 TYPE VALVES. I.QMZ 875 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DDL 58-9483 20. GRO PQR VALVE TO BE INSTALLED AT Q POINT. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 CONTRACT NAME ISSUE CONSTR. REV.11 100 FACS 51205449 1" SAMPLE Project CONTRACTOR NO. MN-85088 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 17. 2. EF-76573 RV-29597 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 12Dec22 WX-97562 GLR DRAW/SHEET NO. E DELETED AB-11366 DOTTED LINES ARE ALTERNATE. 553 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. SYNTHETIC PROCESS FLOW DIAGRAM DHSX R-5 7. 27. ISSUE CONSTR. REV.33 CV-66643 8" 6. 15. 22. RV-10435 ORGANIZATION RV-57563 PROJECT/LOCATION/ASSIGN CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE FLAO REV CONNECTION TO EXHAUST IS PROVIDED. 11. SDL INS ( -47°C ) ZLC 16. MN-93396 ABC TO XYZ FOR MAINTAINENCE. QGSQ IJ-97111 KL-30903 284 SITE IN CASE OF MISMATCH. 830 STA 20/07/04 14. XT 21. None 574 B DELETED ISSUE 258 DV-79773 6"-ZK-3621 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 8" BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 26. 25. SAMPLE_2162.JPG THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 449 GK ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE ERV-6-28
doc_108
[ "CS", "-", "81", "ABC", "SHUTDOWN", "IF", "PQR", "DETECTS", "123", "IS", "NOT", "WORKING", ".", "PROJ", ".", "PQR", "P", "&", "ID", "368", "DDL", "DELETED", "INSTALLATIONS", "/", "OPERATIONS", ".", "FOLLOWING", "XYZ", "SCHEMES", "ARE", "REQUIRED", ".", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "4\"-XN-3653", "6\"-KG-7835", "5\"-PN-3620", "4\"-EG-7711", "6\"-AV-6445", "5\"-TH-6205", "4\"-PE-3219", "6\"-GS-8478", "2\"-VI-4837", "3\"-BK-0682", "3\"-RF-7062", "2\"-DS-3235", "5\"-PZ-9730", "4\"-QE-3994", "3\"-RV-2622", "2\"-IK-7423", "8\"-RW-7235", "8\"-QV-7188", "4\"-VF-68...
CS-81 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. PROJ. PQR P&ID 368 DDL DELETED INSTALLATIONS/OPERATIONS. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 955 KL-68925 C 3"-RF-7062 NZEN 2" CONNECTION TO EXHAUST IS PROVIDED. SAMPLE_4461.JPG 961 IL AV-58764 20. 3" COMMENTS. ERV-4-61 APPRV'D ETHW HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 13/08/01 8"-QV-7188 CV-24599 4"-VF-6804 SCALE GRP OP-63326 24. WX-66541 597 INS ( -48°C ) DPW-75-77 ISSUE CONSTR. REV.22 ST-15985 MADE CV-42373 INS ( 24°C ) CONTRACTOR PROJECT NO. 18. EF-72521 ERV-3-43 DRAWING NAME 11. A.OT CS-01 OP-51633 ST-28806 148 STA DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ E ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE 928 13. RV-63330 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN DIMENSIONAL TOLERANCE +/- 1MM. 415 UV-49255 WX-32982 17/01/12 6"-KG-7835 347 E.X 2"-VI-4837 ST-71033 16. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME CONTRACTOR NO. SAMPLE Project 4"-EG-7711 254 AB-93899 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ZLC KL-49442 RO-10 ST-47384 965 ST-37917 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. IH ISSUE DV-04479 CHECK'D PQR VALVE TO BE INSTALLED AT Q POINT. SDL ZKN 15. SDL TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. MN-15329 ZLC STA 265 12. 6"-AV-6445 ZLO RV-54683 KQT A 988 GH-05283 17. L.ID 48-6561 INS ( -52°C ) 21. 118 ERV-5-07 GH-00226 8"-RW-7235 541 5" PROJECT/LOCATION/ASSIGN 2"-IK-7423 DELETED DELETED IJ-42379 UV-86332 4"-XN-3653 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 73755812 KL-61669 QR-37657 REV FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD NOTES VALVES. DELETED DRAW/SHEET NO. 8. 775 ISC GLG ZLC 2"-DS-3235 LG-10 4"-QE-3994 5. 504 2. EF-59516 CD-24405 MN-94791 123 MN-24249 EF-91372 3"-RV-2622 CONTRACT NAME 184 DELETED FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 7. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY ST-65125 KL-63092 LG-10 GRP DDL SDL ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ERV-0-11 SYNTHETIC PROCESS FLOW DIAGRAM OHC YMQ AB-09352 17" STA CS-26 ORGANIZATION Y-5 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE RV-96884 839 3. 479 STA DETAILS. GH-61811 ISSUE CONSTR. REV.11 UNIT DELETED 19. ISSUE CONSTR. REV.55 EF-00462 16/02/16 UV-16226 LG-10 6"-GS-8478 TOP CONNECTION. EF-81862 LG-10 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. WX-55200 3"-BK-0682 INS ( 47°C ) DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. KL-90752 CD-95725 DESCRIPTION 22. EF-51863 14. 4"-PE-3219 KL-49195 10. K.L CV-71438 SDL 6. 21Apr11 RO-10 4. QR-77206 23. DWG-1.23.23.789. DDL DDL INS ( 38°C ) PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 421 UV-17492 3"-NO-7048 D ABC TO XYZ FOR MAINTAINENCE. A.DVQ RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 13/04/19 B ISSUE CONSTR. REV.33 819 QR-81290 721 5"-TH-6205 DV-65684 Std. STA AV-58591 339 5"-PZ-9730 SDL 25. SAMPLE 1. CASE OF MISMATCH. 880 208 9. 340 DATE 956 15" ZN-9673 5 LG-10 DDL 720 5"-PN-3620 ISSUE CONSTR. REV.44 OP-84003
doc_263
[ "22", ".", "ISSUE", "CONSTR", ".", "REV", ".", "44", "SDL", "EF", "-", "77908", "947", "KL", "-", "97513", "EF", "-", "32342", "MAINTAINENCE", "AND", "MODIFICATION", ".", "897", "SCALE", "SAMPLE_8571", ".", "JPG", "397", "ORGANIZATION", "DELETED", "3", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-RZ-6096", "4\"-US-9463", "8\"-ND-4585", "6\"-OE-5144", "6\"-ZQ-0099", "5\"-CX-1363", "7\"-KH-9119", "4\"-MZ-4003", "3\"-VX-5023", "5\"-RX-9816" ]
22. ISSUE CONSTR. REV.44 SDL EF-77908 947 KL-97513 EF-32342 MAINTAINENCE AND MODIFICATION. 897 SCALE SAMPLE_8571.JPG 397 ORGANIZATION DELETED 3. 11" KWh VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 20. KL-96587 INSTALLATIONS/OPERATIONS. CV-43134 D.M 5"-CX-1363 163 329 6"-OE-5144 DDL EF-74940 14. 7"-KH-9119 18" 7" 974 UV-88046 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. IJ-17870 DESCRIPTION 15. EF-39135 KL-75659 SW ISSUE CONSTR. REV.33 11" 598 AB-73815 589 CV-35341 INS ( -46°C ) DELETED S.W 17. 19. 897 21. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD A.BI ERV-6-67 11. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS GU SITE IN CASE OF MISMATCH. D INSTALLED. REV 8. B CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE CONNECTION TO EXHAUST IS PROVIDED. 992 ISSUE CONTRACT NAME IJ-70068 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 991 RO-10 23. ZLC PROJECT/LOCATION/ASSIGN RV-03344 4"-MZ-4003 ZLC RV-75347 8" 1" COMPULSORY. RO-10 LG-10 Y.AX RO-10 T.D E RV-64200 9. DATE DELETED CV-95833 DELETED SP ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 2. PDB STA ISSUE CONSTR. REV.22 DDL 8"-ND-4585 UV-45708 G.QXR SAMPLE Project 3" ZLC 930 LG-10 12. 10. 19" 444 LG-10 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DRAWING NAME 709-4444 NOTES 893 STA EF-67845 366 20/04/15 711 OP-33150 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 3"-VX-5023 Y.INF LG-10 TOP CONNECTION. UV-76429 TYPE VALVES. LG-10 6. QR-66143 KUL-44-03 ZLO ISSUE CONSTR. REV.55 4"x8" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 7"x6" 1"x2" 4. 18. GH-28909 350 58416508 INS ( 31°C ) 747 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 10Jul03 ZLO MADE SAMPLE 624 AB-40473 5"-RX-9816 20Jan13 MN-78546 ABC TO XYZ FOR MAINTAINENCE. 16. DDL PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS IJ-17253 1. COMMENTS. 446 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. ZLC HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED AV-06976 ZLO 8"x8" APPRV'D CONTRACTOR NO. RO-10 SV-1196 6"x5" 5. 974 13Aug05 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DWG-1.23.23.578, DWG-1.23.23.789. ZLO 1 MN-52810 13" DELETED 7. 243 DRAW/SHEET NO. 7"-RZ-6096 O-3 PROJ. DEF P&ID EAF EF-65687 RO-10 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE UNIT 539 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 M.L S.Y AV-28067 AB-14099 DV-34213 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 626 A SYNTHETIC PROCESS FLOW DIAGRAM 639 DELETED CONTRACTOR PROJECT NO. 165 IJ-34496 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 4"-US-9463 INS ( 57°C ) SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 6"-ZQ-0099 236 CHECK'D ISSUE CONSTR. REV.11 MN-56015 252 DV-24286 CV-92144 378 6" MN-86720 851 4" DV-46823 ERV-3-21 LG-10 9"x7" 18/10/02 GRP None AB-24830 CS-95 C 1"x2" HWC 856 13.
doc_197
[ "B", "PROJ", ".", "DEF", "P", "&", "ID", "GH", "-", "51326", "ALL", "FIXTURES", "ARE", "VALIDATED", "AND", "COMPLIANT", "WITH", "XYZ", ".", "652", "SAMPLE_6999", ".", "JPG", "UNIT", "JANJ", "5", "\"", "ISSUE", "TV", "284", "Q", ".", "PVU", "ST", "-...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-DW-4922", "7\"-OH-5378", "7\"-ZT-5268", "3\"-ME-2246", "3\"-BY-8628", "5\"-HP-0382", "4\"-HI-7047", "7\"-TM-1157", "5\"-ZM-2373", "8\"-PU-4998", "3\"-RM-0393", "4\"-OH-9313", "6\"-JB-5839", "4\"-RR-6592", "6\"-ZC-9739", "2\"-QP-1039", "2\"-QX-2253", "3\"-BH-2807", "3\"-VA-37...
B PROJ. DEF P&ID GH-51326 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 652 SAMPLE_6999.JPG UNIT JANJ 5" ISSUE TV 284 Q.PVU ST-95936 PCRZ EF-08041 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 7" AV-16868 3. WX-38934 ERV-8-41 DELETED DDL PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND IJ-87603 UV-64854 845 RV-83101 SAMPLE CD-92899 SQ-7561 AV-20501 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. GRP 851 15. 5. ZLO GRI CHECK'D QR-27559 2" 835 2" EF-58878 3" MN-94640 EF-03013 CV-65932 GH-03580 4"x3" DV-22501 DELETED AB-72000 8"-DA-6776 RV-89762 STA 8"x9" STA FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 13. SDL CS-69 AB-50080 IJ-19980 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. CD-98158 ORGANIZATION INS ( 18°C ) ISSUE CONSTR. REV.11 1. ISSUE CONSTR. REV.33 ZLC DV-62902 2"-QX-2253 ST-72695 APPRV'D 7"-TM-1157 214 KL-53261 10. 3"-BH-2807 575 C 18. 334 CS-20 CONTRACTOR NO. GH-42662 INS ( 58°C ) EF-10270 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. SYNTHETIC PROCESS FLOW DIAGRAM OP-06320 192 ZLO INS ( 38°C ) DV-23064 DV-08663 SCALE 22. RV-91212 ZLO ZLC 551 CV-76031 2. 540 MN-02680 22" 2" 326-8157 DIMENSIONAL TOLERANCE +/- 1MM. WX-13757 577 ZLO DDL IJ-28624 4"-US-5949 C.AN KL-34132 SDL CV-38959 AB-19899 GLR GRI NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 2"-YN-4077 23. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 881 KL-58618 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. QR-07158 6"-ZC-9739 954 MN-93904 SDL DESCRIPTION CS-54 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS EF-02633 4"-HI-7047 UV-70310 GRP NOTES 5" WX-06591 CV-71948 GH-31439 978 8"-QV-7807 ABC TO XYZ FOR MAINTAINENCE. 316 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME UV-38760 DDL DV-78314 INS ( -29°C ) ERV-3-08 7"-ZT-5268 848 UV-30300 KL-08846 MN-64613 AV-86147 GH-15755 6. 167 5"-ZM-2373 REV 8"-GE-3310 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. STA CD-34590 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. DV-29227 ZLC STA ST-17096 614 MADE 26" PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. WX-75835 LG-10 9"x3" GRI IJ-56861 2 912 10/09/06 14. INS ( -34°C ) 7" DELETED SDL MODIFICATION. A CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. LG-10 UV-05115 UV-51666 735 16. 380 DV-93005 5"x4" 7"-DW-4922 17. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh CV-98166 DATE CD-18394 519 7. ST-56970 9"x5" RV-74225 507 UV-48689 3"-RM-0393 3"-FP-8106 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 190 SDL 833 8"x1" 2" OP-87456 538 RV-74109 927 AV-91106 MN-73267 11. 440 ST-55354 GH-56102 21. 9. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. 4"-RR-6592 4"-UO-7230 DV-27502 GN-12-60 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 4"-BD-1333 26. 93056061 4. 8"x4" 3"-BY-8628 B.JO 8"-PU-4998 OP-34649 4"-OH-9313 ERV-3-59 ERV-9-77 PQR VALVE TO BE INSTALLED AT Q POINT. ISSUE CONSTR. REV.22 GH-40483 881 SDL VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 660 UV-08525 606 LG-10 CS-77 5"-HP-0382 UV-35425 19. 533 QR-08856 2"-QP-1039 Y.N CONTRACT NAME 3"-VA-3759 CONTRACTOR PROJECT NO. GLR COMMENTS. 13" EF-78178 DELETED MN-21452 DDL GI H-1 228 CV-55872 RO-10 OP-65213 INS ( 55°C ) 12. 600 DELETED CV-58211 8. ST-95232 RV-29574 SAMPLE Project CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 618 6"-JB-5839 AV-11479 3"-ME-2246 16" RO-10 TOP CONNECTION. 992 KL-68388 24/02/18 ZLO 804 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 252 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ KL-18710 DRAW/SHEET NO. AB-84594 7"-OH-5378 20. INS ( 41°C ) PROJECT/LOCATION/ASSIGN 782 LG-10 ST-23504 RO-10 24. 5"-SE-0765 8" 25. 19" DRAWING NAME GH-22621 DDL IJ-87148 I.UK GLR CV-36344 UV-80963 QR-87710 IGEX 7"-DZ-5390 6"-KH-0706 LG-10 18/07/08 WX-65222 659 ERV-8-24 WX-13694 600 Std.
doc_177
[ "ABC", "TRANSMITTOR", "TO", "BE", "USED", "AS", "BACKUP", "FOR", "KMO", "TRANSMITTOR", ".", "8", ".", "ZLC", "959", "110", "THESE", "DOCUMENTS", "ARE", "NOT", "INTENDED", "FOR", "VALIDATION", "/", "EVALUATION", "ON", "BASIS", "OF", "PROFESSIONAL", "REVIEWS",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-EK-7284", "5\"-NE-8887", "4\"-FK-5031", "7\"-LV-3217", "2\"-YN-4933", "8\"-OW-0137", "6\"-MT-7710", "8\"-ZX-9256", "2\"-CU-7133", "4\"-HB-0799", "2\"-FO-6432", "8\"-NG-6792", "3\"-WQ-4201" ]
ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 8. ZLC 959 110 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ GLR 28. B OP-32198 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 560 306 DV-03122 ZLC DELETED ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. MN-32557 CONNECTION TO EXHAUST IS PROVIDED. KWh 969 PROJECT/LOCATION/ASSIGN CD-52689 RO-10 DDL TY ISSUE CONSTR. REV.33 2"x8" INS ( 38°C ) CONTRACT NAME PQR VALVE TO BE INSTALLED AT Q POINT. 111 ZLO XFY CHECK'D 3. TYPE VALVES. 5. REV VUQG MAINTAINENCE AND MODIFICATION. AB-93199 8"-ZX-9256 1 UV-66427 DS 634 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 569 ERV-3-06 LG-10 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, ERV-3-91 AV-12480 SCALE INSTALLATIONS/OPERATIONS. NOTES PROJ. DEF P&ID SAMPLE Project MN-01887 OP-10120 7. DV-94504 A 19. 900 None ST-29019 DRAWING NAME TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 14. CS-60 199 5"-EK-7284 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. DRAW/SHEET NO. 6" P.LLY 8" DDL 4"-FK-5031 SDL 2"-YN-4933 8"-NG-6792 DV-82801 ORGANIZATION GH-48375 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE WX-72806 ISSUE CONSTR. REV.11 21. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 2"-CU-7133 695 662 14/04/11 XM-29-66 N.WIQ 772 AV-36300 CV-82252 DELETED BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, ST-12882 RO-10 18. 3" 9"x8" ERV-0-02 SDL FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD UV-61483 DDL STA DDL WO 557 SDL M.I 24. 135 SDL 19" OP-23699 EF-94115 15" 13. 10. CV-33474 QR-62866 INS ( 19°C ) MADE ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ST-89231 KL-00855 SITE IN CASE OF MISMATCH. GH-53311 ISSUE MN-48934 12. 734 13" GLR IJ-55945 26. 196 DELETED DESCRIPTION 9" PJ-6182 13" FOR DETAILS. DV-09084 DV-13568 ERV-1-80 592 2"-FO-6432 MN-67714 RV-46662 MN-23069 12/01/11 ERV-9-05 27. LG-10 D DOTTED LINES ARE ALTERNATE. IJ-92342 5"-NE-8887 106 ISSUE CONSTR. REV.22 INS ( -54°C ) CONTRACTOR NO. QR-46136 22542544 KL-50374 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 Y-3 DELETED 20. 634 844 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS INS ( 20°C ) 12" 287 QZX SDL 146 9"x2" LG-10 732 13/07/20 CV-74938 4. APPRV'D 9. CD-92680 GLR ABC TO XYZ FOR MAINTAINENCE. 727 66-1655 SAMPLE_8174.JPG CV-07039 6"x6" SDL ISSUE CONSTR. REV.44 8"-OW-0137 ZLO OP-56582 CS-85 OP-34787 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. UNIT SYNTHETIC PROCESS FLOW DIAGRAM HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED GRI 391 2. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS INS ( 27°C ) 6. ST-65030 GRP N.U 11. DDL ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 477 AV-12960 RO-10 6"-MT-7710 ICT AB-83378 825 14/03/18 828 TOP CONNECTION. 463 GH-98316 COMPULSORY. WX-41989 DV-73714 EF-99169 25. C 406 ST-27091 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 7" OP-53095 DATE 1. 17. 15. SAMPLE ERV-3-04 4"-HB-0799 CS-50 WX-81784 22. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE CONTRACTOR PROJECT NO. DELETED SDL 3"-WQ-4201 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. VKI SDL EF-25248 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 18" ZLC DIMENSIONAL TOLERANCE +/- 1MM. COMMENTS. 410 INSTALLED. QR-48370 QR-10436 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ST-48326 4"x9" 16. 23. DWG-1.23.23.578, DWG-1.23.23.789. 237 7"-LV-3217
doc_222
[ "12", ".", "249", "9", ".", "24", ".", "ABC", "TO", "XYZ", "FOR", "MAINTAINENCE", ".", "DV", "-", "27898", "STA", "422", "KL", "-", "98977", "LG", "-", "10", "EF", "-", "54824", "QR", "-", "53829", "DDL", "PLEASE", "NOTE", "EVERY", "DATA", "PROVI...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "4\"-MB-2419", "4\"-MH-7426", "7\"-ZW-0759", "5\"-HO-7087", "4\"-IX-3092", "8\"-FQ-8621", "5\"-JE-0611", "3\"-BR-2057", "2\"-NU-4497" ]
12. 249 9. 24. ABC TO XYZ FOR MAINTAINENCE. DV-27898 STA 422 KL-98977 LG-10 EF-54824 QR-53829 DDL PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 13. ISSUE CONSTR. REV.22 RO-10 567 35311905 CS-57 DELETED DESCRIPTION 29. S.U 8. DIMENSIONAL TOLERANCE +/- 1MM. 8" IJ-01245 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DL REV QR-23439 EF-55252 18" STA 515 CV-15175 648 UNIT I.TDK INSTALLATIONS/OPERATIONS. AV-61415 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 6. PROJ. PQR P&ID SYNTHETIC PROCESS FLOW DIAGRAM MAINTAINENCE AND MODIFICATION. 922 841 DATE SAMPLE Project 9" 2"-NU-4497 ISSUE CONSTR. REV.44 DDL RV-04365 5"-JE-0611 CS-09 152 RO-10 DDL KL-01809 GH-91400 5"x8" 2"x4" RV-96540 SDL 21/12/15 GH-18137 GH-46985 LG-10 DELETED CV-94131 WX-95522 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. GRP 675 18Nov01 OP-96846 E.ENE PQR VALVE TO BE INSTALLED AT Q POINT. RH ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 480 QR-86264 4. ISSUE CONSTR. REV.33 GLR T-5 ERV-5-16 7"-ZW-0759 U.WU DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. CHECK'D 110 CONTRACTOR NO. OP-53588 PBEX None 994 14/10/14 RO-10 RM-15-20 DELETED TOP CONNECTION. VALVES. 390 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 424-1940 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. GRP 2. EF-40832 R.IAN RV-16224 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 18. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. GRO SDL C 4"-IX-3092 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN 6" TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. RO-10 R.BP GH-80617 GH-36281 16. GRP CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 5. 761 WT-9187 CONTRACT NAME ZLO SAMPLE_7714.JPG 587 ISSUE CONSTR. REV.55 DELETED 8"-FQ-8621 11. KL-21841 DWG-1.23.23.789. 5"-HO-7087 LG-10 20. QR-58109 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, ORGANIZATION D APPRV'D 3 GRP CONNECTION TO EXHAUST IS PROVIDED. STA OP-63405 LH 555 KL-38438 230 AB-84782 CONTRACTOR PROJECT NO. 17. 963 A.HTW ST-28377 GRO ISSUE CONSTR. REV.11 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 688 982 883 14. ST-08341 933 CV-92127 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE DDL 929 ISSUE INS ( 56°C ) KL-21032 612 305 26. 1. 9" DELETED 3. DDL FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 6"x1" AB-80157 SAMPLE DV-35668 15" NOTES DDL LG-10 DRAW/SHEET NO. B.WCR 308 120 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ UV-44233 UV-34271 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. AB-32178 RO-10 ST-78526 17" 27. 13" 558 28. 9" 242 DV-45046 EF-11371 A O.L CS-54 3"x8" PROJECT/LOCATION/ASSIGN QQD BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE KL-71302 SCALE Q.X 15. 3" BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 8" CD-62185 22. 25Jan19 LG-10 MADE COMMENTS. DELETED 25. CASE OF MISMATCH. CV-04352 17" DETAILS. DRAWING NAME ZLO 20/08/15 399 7. KL-74170 715 10. 23. CD-46605 ERV-3-87 ST-04832 CV-21081 19. RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 209 501 E B 4"-MB-2419 DOTTED LINES ARE ALTERNATE. 315 4"-MH-7426 25" ERV-4-19 ZLC COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 21. 3"-BR-2057
doc_38
[ "PLEASE", "READ", "THIS", "DISCLAIMER", "CAREFULLY", ".", "THIS", "DOCUMENT", "IS", "COMPLETELY", "SYNTHETICALLY", "GENERATED", "AND", "11", ".", "CV", "-", "46519", "WX", "-", "78029", "ERV", "-", "1", "-", "57", "ORIENTATION", "OF", "ABCD", "VALVES", "SH...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "4\"-OZ-9751", "4\"-UU-7950", "8\"-CN-5071", "5\"-OK-6712", "8\"-WW-7761", "7\"-DB-8286", "2\"-OA-9560", "2\"-LV-2758", "6\"-FW-0444", "8\"-YN-2198", "4\"-OV-6141", "7\"-AO-7602", "2\"-OK-0733", "6\"-RX-5598", "2\"-CV-8900", "2\"-SJ-6686", "7\"-YZ-2732", "7\"-YV-2693", "2\"-VD-82...
PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 11. CV-46519 WX-78029 ERV-1-57 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. OP-01726 2"-VD-8202 CV-49605 ISSUE CONSTR. REV.44 ST-01870 AV-90386 IJ-94627 2" 4"-OV-6141 SAMPLE SLFX ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. OP-59764 DV-38580 QR-35088 205 UV-46669 APPRV'D 16" CV-52920 ISSUE BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND EF-59035 15" CONTRACTOR PROJECT NO. 163 7" ERV-8-97 18. 7"-YZ-2732 7"-AO-7602 KL-42560 UV-71283 6"-KO-7358 5. KL-47993 KL-91188 Y.BXU REV OP-62119 3. 750 AB-03304 GH-56124 IJ-11253 LG-10 UV-19820 OP-89896 20. PQR VALVE TO BE INSTALLED AT Q POINT. 282 9. 947 DV-54483 RO-10 DV-08485 6"-FW-0444 IJ-84055 16/07/14 COMMENTS. 8"-WW-7761 AB-36801 QR-77798 B DRAW/SHEET NO. SDL EF-59828 RO-10 455 QR-78481 DV-24709 GRP GRO 2"-CV-8900 DV-17833 GRO A 14. ZLO NSP-86-74 780 V.PY THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ AB-64583 UNIT 2"-LV-2758 2"-OA-9560 16/09/10 GH-64931 ST-66031 795 IJ-37952 590 CS-77 SYNTHETIC PROCESS FLOW DIAGRAM PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. ISSUE CONSTR. REV.22 STA UV-60399 CV-32331 RO-10 H.LAV MN-96859 535 7"-YV-2693 GI DELETED CV-27202 ORGANIZATION DIMENSIONAL TOLERANCE +/- 1MM. DELETED QR-19416 AB-14464 MN-53448 8"x2" 19. 3"x9" ERV-8-14 CS-33 668 M.CZ DELETED CV-96944 DOTTED LINES ARE ALTERNATE. STA RO-10 UV-33884 RO-10 13/05/22 RO-10 K-2 AV-36586 2"-OK-0733 RV-19838 139 UV-29256 496 WX-61157 462 CV UV-04217 KL-63756 723 HJ-4969 IJ-88086 SAMPLE Project X.HHO BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 12. 14Mar03 UV-24377 731 WX-76491 CONTRACTOR NO. 454 OP-39905 DESCRIPTION 42324746 MN-55957 CS-54 NOTES GRO QR-43742 KL-24390 STA STA PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS WX-56023 INS ( 46°C ) DELETED SDL RO-10 SDL MODIFICATION. 128 SAMPLE_4207.JPG CS-81 INS ( 11°C ) 1. 924 595 254 WX-73892 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. CHECK'D OP-10956 H.RT 379 26" CV-20931 MADE 10. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 798 161 7"-DB-8286 WX-83071 449 DV-98554 DDL AV-27219 PROJECT/LOCATION/ASSIGN ISSUE CONSTR. REV.33 7" INS ( -26°C ) 8"-CN-5071 QR-13833 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. ST-86821 717-9088 3"x5" LG-10 17. 21. TOP CONNECTION. QR-79597 4. GI CD-87456 490 10" UV-74865 5"-OK-6712 GH-13995 D 445 IJ-12534 2"-KJ-3519 RV-21369 PROJ. PQR P&ID 499 SDL INS ( 32°C ) 910 15. CS-63 7. 936 8. 6. LG-10 SCALE AB-67188 1"x3" MN-68962 9"x3" 2"-SJ-6686 AV-43486 4"-OZ-9751 RO-10 16. C.UGI 832 ZLO 8"-YN-2198 4"-UU-7950 DV-48597 X.HD NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DV-66253 STA LG-10 SDL GH-75589 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME CONTRACT NAME DATE WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 13. RO-10 ZLO DRAWING NAME ST-93148 8"-XH-9936 C HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 2. ISSUE CONSTR. REV.11 CV-88789 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. IJ-13757 655 4"-TG-7097 AB-33701 5"x1" GLR AV-26879 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. CV-15506 3 TP 557 CONNECTION TO EXHAUST IS PROVIDED. 241 UV-79056 426 GI 6"-RX-5598 None MPGL
doc_245
[ "723", "PROJECT", "/", "LOCATION", "/", "ASSIGN", "7", "\"", "-", "JP", "-", "4523", "871", "CS", "-", "66", "453", "DV", "-", "32294", "RV", "-", "01359", "CD", "-", "60127", "C", ".", "GL", "869", "HAS", "NO", "REVELANCE", "WITH", "ANY", "OTHER...
[ "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "6\"-SF-4108", "4\"-HY-3934", "3\"-ZF-2519", "3\"-JH-1360", "7\"-KH-7798", "8\"-JG-3216", "7\"-JP-4523", "8\"-WG-2992", "4\"-OA-4137", "2\"-BQ-1501", "7\"-FT-0307" ]
723 PROJECT/LOCATION/ASSIGN 7"-JP-4523 871 CS-66 453 DV-32294 RV-01359 CD-60127 C.GL 869 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 4"x4" 4. SDL PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS RV-70171 17. INS ( -58°C ) STA 3"-ZF-2519 TYPE VALVES. 14" PJLC FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 CONTRACTOR NO. 985 CS-03 QR-81800 INS ( 32°C ) ST-26540 O.NN DV-41366 DDL 22Oct28 LG-10 GH-90787 EF-43833 STA 8. REV 1. RV-55037 AB-61362 QR-39307 291 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 782 6"-SF-4108 686 IJ-26277 DELETED 599 INS ( -47°C ) LLX WX-09268 APPRV'D COMPULSORY. 774 AV-68731 DV-49152 DATE STA BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, CONTRACT NAME LG-10 CS-40 943 691 ST-50397 MAINTAINENCE AND MODIFICATION. 882 KWh ABC TO XYZ FOR MAINTAINENCE. UV-96037 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 56-4135 DELETED 13. 7"-KH-7798 None SAMPLE CV-13377 2" CONNECTION TO EXHAUST IS PROVIDED. WX-17833 5. JTDN C DELETED LG-10 KL-41587 AMC-91-04 RV-91695 B 16Apr14 COMMENTS. 7"-FT-0307 ST-59183 13Sep14 DV-21050 10. Y.T DOTTED LINES ARE ALTERNATE. 7. UNIT NOTES 5" GH-50347 ISSUE CONSTR. REV.11 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DV-46506 A RV-05682 2"-BQ-1501 INSTALLED. 4"-HY-3934 ERV-5-40 19. AB-87523 804 452 CONTRACTOR PROJECT NO. WX-21205 G.W ERV-5-17 RO-10 4"x4" 21. MN-91746 11. 3. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH CV-65668 20. 5 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DV-54123 LG-10 WX-74994 UV-49809 R.L 61964347 ERV-3-92 7" 8"-JG-3216 AV-65031 AV-52013 CHECK'D SCALE GLR PROJ. DEF P&ID UV-62849 ST-44413 PQR VALVE TO BE INSTALLED AT Q POINT. DIMENSIONAL TOLERANCE +/- 1MM. 18. CS-67 16. 256 8"x6" 710 OP-23071 DRAWING NAME RJ-0685 ZLC EF-49399 OP-16419 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ SAMPLE Project 814 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 607 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS ISSUE CONSTR. REV.22 AV-24654 2. MADE COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ISSUE FOR DETAILS. 796 ZLC 4"-OA-4137 DV-55463 KL-57407 8"-WG-2992 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE INS ( -52°C ) UV-02297 AV-02159 W.AA DELETED ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DRAW/SHEET NO. 369 GRP AB-81884 SYNTHETIC PROCESS FLOW DIAGRAM SAMPLE_4043.JPG ISSUE CONSTR. REV.33 446 589 8" FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD WX-98590 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 6. 12. F-8 INS ( 55°C ) 14. ORGANIZATION DESCRIPTION 090 LG-10 3"-JH-1360 DDL 520 SDL INS ( -26°C ) UV-11004 LG-10 DDL FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. LG-10 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 15. SITE IN CASE OF MISMATCH. ERV-9-09 9.
doc_341
[ "OP", "-", "75766", "CV", "-", "32258", "8", "\"", "-", "VO", "-", "6008", "3", "\"", "-", "NJ", "-", "6016", "OP", "-", "43915", "4", ".", "752", "NO", "RELEVANCE", "/", "SIMILARITY", "WITH", "ANY", "OTHER", "DOCUMENTS", "OF", "SIMILAR", "FIELDS",...
[ "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O",...
[ "2\"-BI-2620", "8\"-VP-3481", "2\"-EM-3782", "6\"-CH-1311", "3\"-BZ-8180", "5\"-DJ-8896", "3\"-VT-2949", "6\"-SL-9487", "3\"-NJ-6016", "4\"-YI-9157", "7\"-PG-1491", "6\"-KO-6429", "4\"-QK-1684", "2\"-EB-2978", "8\"-TL-6775", "3\"-CR-5918", "4\"-CL-8914", "7\"-QF-5467", "4\"-FI-53...
OP-75766 CV-32258 8"-VO-6008 3"-NJ-6016 OP-43915 4. 752 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 199 ST-86956 8. QR-50727 953 OP-25914 CS-87 K.MH ISSUE CONSTR. REV.55 C.G CD-88940 EF-49815 APPRV'D 754 FYP PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ZLO CONTRACTOR PROJECT NO. GF OP-61010 LG-10 TOP CONNECTION. DESCRIPTION 16. MODIFICATION. STA RV-06722 SDL 13. AB-62947 UV-86655 GI 6. ISSUE CONSTR. REV.11 7" 4"-FI-5351 9. 12. EF-16893 063-9610 CHECK'D 224 LG-10 4"-QK-1684 ST-22808 1 RO-10 CD-21143 PROJECT/LOCATION/ASSIGN UV-47686 338 CV-43396 UNIT ISSUE CONSTR. REV.44 SDL COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh DELETED STA 17" CD-15695 GRO RO-10 26. 394 7"-PG-1491 DELETED 148 PROJ. PQR P&ID GH-77085 AB-27751 LG-10 ZLO 6"-CH-1311 UV-18140 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 697 ERV-4-52 883 AB-56914 CS-76 SDL 8"-TL-6775 DRAWING NAME 2" 860 DIMENSIONAL TOLERANCE +/- 1MM. IJ-97385 ISSUE 18/08/07 AV-62633 M.HT G.DI IJ-72129 UV-59356 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 456 OP-68321 SAMPLE Project WX-95819 17. 6"-YX-6614 AB-30660 6"-KO-6429 D 21" 5" 348 MC-8714 693 IJ-72791 864 3"-CR-5918 MN-38762 8" 18" QR-09735 320 12/06/26 PQR VALVE TO BE INSTALLED AT Q POINT. STA FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 6"x2" CV-84567 ZLC A SDL GH-60528 CV-12909 283 LG-10 2"-EM-3782 DV-28952 AB-72290 DOTTED LINES ARE ALTERNATE. 19. EF-50549 2"-BI-2620 462 788 15/01/17 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. WX-23273 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. ZLC PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. R.OQI Y-8 EF-38683 E 994 196 CS-03 RO-10 GH-96733 CONNECTION TO EXHAUST IS PROVIDED. SDL EF-02411 CS-05 529 5. ISSUE CONSTR. REV.22 IJ-66506 YVN CS-00 ORGANIZATION ZLO GQQ-14-59 DDL IJ-48873 21. RO-10 K.O ERV-1-79 14. T.YAW UV-79868 GH-25287 7. IJ-74476 IJ-91585 120 2. ERV-5-67 GH-23980 3"-VT-2949 MN-43937 AB-52413 21/05/11 ST-38069 AV-77966 23. KL-52270 18" AB-30427 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. AB-70044 RV-84979 ST-20218 22" SYNTHETIC PROCESS ENGINEERING FLOW SCHEME EF-57571 3"-BZ-8180 AB-66059 QR-87859 CONTRACT NAME 24. RV-53745 CS-99 LG-10 CS-82 DDL 903 CD-39836 OAAK GRP 18" 15. SAMPLE_6351.JPG B ERV-1-98 4"-JN-5166 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 18. 359 GH-78321 CD-94697 AB-13986 02160543 WX-13460 GI HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED MN-43220 DELETED 22. 3. 20/04/15 11. UEWV ZLO 4"-YI-9157 637 DELETED RV-71296 255 RV-77186 740 AV-66943 OP-03699 467 DATE MFEV THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ UPUR ABC TO XYZ FOR MAINTAINENCE. RO-10 SCALE 1. GRI CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. STA COMMENTS. LG-10 UV-51560 UV-07472 5"-PK-6660 INS ( 53°C ) QR-23009 8"-VP-3481 2"x6" DDL 615 MR C WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. REV 20. 204 7"-QF-5467 SDL 427 ISSUE CONSTR. REV.33 5" 5"-DJ-8896 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 100 SYNTHETIC PROCESS FLOW DIAGRAM WX-98509 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. CONTRACTOR NO. 6"-SL-9487 SAMPLE 10. 165 632 CS-61 SDL 2"-EB-2978 AB-10043 RV-82601 UV-72546 149 974 QR-52002 961 INS ( 17°C ) Std. 25. 4"-CL-8914 505 DRAW/SHEET NO. SDL MN-32688 DELETED DDL MADE 19" ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. AV-55978 NOTES PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS WX-36462 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. OP-35749 EF-59119 SDL 805 465 554 AV-11678 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED.
doc_476
[ "8", "\"", "-", "TL", "-", "6844", "ORGANIZATION", "2", "\"", "x9", "\"", "7", "\"", "-", "FO", "-", "1748", "COMPONENTS", "ARE", "AT", "NORMAL", "PRESSURE", "WITH", "POWER", "RATINGS", "15", ".", "4", "AB", "-", "53590", "GH", "-", "94142", "DELET...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O",...
[ "7\"-AL-9835", "3\"-UI-0725", "3\"-WX-8408", "4\"-AS-6303", "8\"-TL-6844", "2\"-KJ-4671", "2\"-CK-0800", "7\"-FO-1748", "8\"-JZ-4464", "6\"-EZ-5208" ]
8"-TL-6844 ORGANIZATION 2"x9" 7"-FO-1748 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 AB-53590 GH-94142 DELETED PT-0617 5 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 7"-AL-9835 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS CS-27 QR-98413 ISSUE 6" 400 INS ( -17°C ) DIMENSIONAL TOLERANCE +/- 1MM. SAMPLE_9714.JPG 390 15. 275 5" ISSUE CONSTR. REV.22 9. CV-14826 PROJECT/LOCATION/ASSIGN EF-45175 116 2. ERV-8-71 24Jan20 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. CHECK'D 21. UNIT ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. CONTRACT NAME STA 169 CONTRACTOR NO. 6"-EZ-5208 AB-75290 GRP IJ-08717 FOR DETAILS. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH CD-58902 LG-10 12. SAMPLE Project 8"-JZ-4464 ERV-9-04 965 TYPE VALVES. IJ-11798 INSTALLED. QR-47510 736 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE DV-37643 TOP CONNECTION. A CS-51 DOTTED LINES ARE ALTERNATE. SYNTHETIC PROCESS FLOW DIAGRAM TSFB 3. CV-48798 RV-83308 MADE AB-18166 5. ISSUE CONSTR. REV.11 RV-44311 ABC TO XYZ FOR MAINTAINENCE. DV-02703 MN-34159 IJ-84691 24/07/07 DESCRIPTION ERV-6-22 INS ( 51°C ) ZLO EF-92946 13. 2"-KJ-4671 17" 443 3"-WX-8408 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE UV-24421 B WX-42595 J.G 908 KL-50084 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS RO-10 D.Q 478 8. ST-71761 22. 7"x7" 376 16. 7. PROJ. PQR P&ID COMMENTS. ERV-6-81 REV PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND WKNP LG-10 DATE MN-65524 NOTES FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD LG-10 OP-55779 M.K 17. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 34142905 7" RV-63816 3"-UI-0725 860 RO-10 MAINTAINENCE AND MODIFICATION. KL-52088 IJ-33926 872 JW DELETED DELETED 18. DELETED SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 4. GRP CV-00002 INS ( -10°C ) 3" DDL 356 CONTRACTOR PROJECT NO. QR-85422 AV-55252 679 W.B ST-01417 OP-98726 GRO ISSUE CONSTR. REV.33 IJ-84657 None SDL PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 4"-AS-6303 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 AV-74029 11" WX-12861 SDL GH-31201 SITE IN CASE OF MISMATCH. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED KWh 16/03/09 C XXK-96-45 APPRV'D GRI 10. WX-09247 INSTALLATIONS/OPERATIONS. WX-22943 KL-41379 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 14. FZB 981 11" ZL SCALE SAMPLE UV-65274 RV-98131 11. CS-17 GH-79254 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 20. GH-92458 12" 50-8655 CONNECTION TO EXHAUST IS PROVIDED. AV-73791 DRAW/SHEET NO. WX-19323 838 AB-45913 DDL 485 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 572 6. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DWG-1.23.23.578, DWG-1.23.23.789. 717 Q-0 DV-51803 WX-67328 OP-57505 7" 1"x4" LG-10 EF-99462 1. AV-75106 DRAWING NAME ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 3" 2"-CK-0800 19.
doc_0
[ "ZYD", "CONTRACT", "NAME", "DOTTED", "LINES", "ARE", "ALTERNATE", ".", "COMMENTS", ".", "ISSUE", "CONSTR", ".", "REV", ".", "33", "COMPONENTS", "ARE", "AT", "NORMAL", "PRESSURE", "WITH", "POWER", "RATINGS", "15", ".", "4", "Z", ".", "JDM", "None", "CONTR...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-KW-6137", "5\"-ES-2616", "5\"-EK-2648", "8\"-CK-1193", "2\"-LB-0897", "6\"-NL-4383", "7\"-VH-5442", "4\"-JO-9505" ]
ZYD CONTRACT NAME DOTTED LINES ARE ALTERNATE. COMMENTS. ISSUE CONSTR. REV.33 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 Z.JDM None CONTRACTOR PROJECT NO. 9"x7" 1"x7" 433 INS ( 54°C ) 21. GLR 15/07/22 ST-05757 19Mar09 AV-07212 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED QR-29804 TOP CONNECTION. 13" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 6. 3. 3" IPY-65-37 AB-38116 8"-CK-1193 323 MN-30863 7"-VH-5442 ERV-1-38 CD-85991 24/07/08 2"x5" 6"-NL-4383 GH-44138 OP-44323 CS-91 39-6441 DELETED STA CHECK'D WX-99666 653 CONTRACTOR NO. CONNECTION TO EXHAUST IS PROVIDED. FOR DETAILS. 4. 2"-LB-0897 433 14. AB-66440 B DATE DV-42490 E.TV 18May01 RO-10 7. QR-03776 RV-63115 4"-JO-9505 DWG-1.23.23.578, DWG-1.23.23.789. GRI CD-95861 972 WX-50020 17. INSTALLATIONS/OPERATIONS. MN-46223 WX-16653 9. SDL 16" ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. PQR VALVE TO BE INSTALLED AT Q POINT. 23. ERV-2-05 7"x1" 18. OP-94834 306 5. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. KL-53281 16. 15. CS-08 GH-33812 SITE IN CASE OF MISMATCH. X.DD DELETED TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. DELETED 2" SAMPLE ISSUE CONSTR. REV.44 SAMPLE_7683.JPG SW 5" OP-31663 AV-40613 AI-2148 DRAWING NAME 8. YWMJ 577 DDL OEM SDL 26. ISSUE ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. MADE DELETED A ERV-6-34 DELETED 2. 824 COMPULSORY. 12" ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. UV-17825 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ CS-27 INS ( 20°C ) DDL WX-71994 SAMPLE Project ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH UNIT 87623869 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 786 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SCALE KL-04357 899 D 932 19. C INS ( 45°C ) 14" FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ISSUE CONSTR. REV.11 218 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND KL-70233 APPRV'D MN-85194 LG-10 LG-10 DRAW/SHEET NO. 101 24. 12. 3"x4" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. KWh DDL 5"-EK-2648 NOTES ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 10. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS IT STA 11. ZLC 13. 764 GH-29744 DESCRIPTION ZLO ERV-8-20 TNDT DIMENSIONAL TOLERANCE +/- 1MM. ORGANIZATION LG-10 CD-26701 IJ-21005 SDL OP-39294 TYPE VALVES. 771 SYNTHETIC PROCESS FLOW DIAGRAM 5"-ES-2616 CS-15 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME NIA ISSUE CONSTR. REV.22 847 CD-31021 REV DELETED 20. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 193 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 22. 586 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 2 MN-41722 YNO 25. A.AV P-0 PROJECT/LOCATION/ASSIGN 2"-KW-6137 MN-55988 OP-33673 1. PROJ. XYZ P&ID
doc_18
[ "WITH", "AS", "MUCH", "SIMILARITY", "AS", "POSSIBLE", ".", "THESE", "EFFORTS", "ARE", "MADE", "TO", "FACILATE", "RESEARCH", "IN", "THE", "FIELD", ".", "Q", "-", "9", "2", "\"", "-", "OK", "-", "4222", "DDL", "QR", "-", "65157", "C", "23", ".", "ANY...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "6\"-YN-8215", "2\"-OK-4222", "4\"-SO-6642", "3\"-QC-8913", "4\"-JP-5293", "7\"-LO-7792", "8\"-IB-0900", "6\"-PE-1428", "6\"-IL-7355", "3\"-KS-5285", "2\"-QC-6378", "4\"-JY-3750", "7\"-OE-7891", "4\"-OZ-9735" ]
WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. Q-9 2"-OK-4222 DDL QR-65157 C 23. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. SYNTHETIC PROCESS FLOW DIAGRAM 9. WX-81568 4"-JP-5293 2"-QC-6378 PROJECT/LOCATION/ASSIGN 6"-YN-8215 IJ-52127 817 PROJ. DEF P&ID DRAW/SHEET NO. CS-01 DV-07952 DDL CONTRACTOR NO. ABC TO XYZ FOR MAINTAINENCE. ISSUE CONSTR. REV.22 ERV-0-88 12" 971 6"-PE-1428 3"-KS-5285 COMMENTS. 6"-IL-7355 ORGANIZATION 12Jan07 21/09/04 22. CV-09853 IJ-91896 5"x9" AV-78970 SCALE RO-10 SAMPLE 26" 5"x6" GI RO-10 DELETED OP-36518 16. 3"-QC-8913 7"-LO-7792 RV-06033 OP-56779 KL-48957 CONTRACTOR PROJECT NO. EF-71241 GH-67969 ISSUE 13/06/09 CD-50410 PRU-54-67 UV-07173 8"x4" A.FP ERV-8-67 ERV-3-54 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH DATE WZJ 411 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD MADE FOR DETAILS. PQR VALVE TO BE INSTALLED AT Q POINT. QR-34326 CHECK'D UV-54966 DELETED INSTALLATIONS/OPERATIONS. 545 CV-53044 ST-18086 GH-41267 CV-82513 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 354 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ISSUE CONSTR. REV.11 None FY HY SAMPLE Project EF-96435 939 13. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 4"-JY-3750 19. ISSUE CONSTR. REV.44 849 AB-35645 CONTRACT NAME COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 18" 2. 4"-OZ-9735 IJ-75968 EF-96456 10. CS-44 DELETED S.FIZ 3. GH-31717 KWh 4"-SO-6642 B.SC NOTES 9"x2" ERV-3-62 01610906 DELETED 15. GRI CD-87524 SAMPLE_7837.JPG 8. CV-05026 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ST-19884 11. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 961 CONNECTION TO EXHAUST IS PROVIDED. 5. TOP CONNECTION. ISSUE CONSTR. REV.33 3" WX-48445 DRAWING NAME RV-56820 THYO 12. TYPE VALVES. 8"-IB-0900 DELETED ERV-3-57 APPRV'D 455 7"-OE-7891 LG-10 UV-55379 QR-71790 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ ZLO WX-72706 GH-35434 DWG-1.23.23.578, DWG-1.23.23.789. UNIT RV-06805 B 21. UV-19455 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE D 2"x1" WX-59272 14. 55-5792 5"x5" 18. U.QIM CD-02214 20. VQGA ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 961 ERV-6-37 EF-57040 13May22 DELETED NA 666 REV WX-75749 4. RV-08537 AV-81462 UV-10557 6. CS-89 7. UV-40739 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. SDL GH-63125 1" FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, A DESCRIPTION CV-96283 17. 1. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. KL-57609 L.WRT ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. E.R 5 DIMENSIONAL TOLERANCE +/- 1MM. KU-5216 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS
doc_181
[ "9", ".", "5", "\"", "-", "LM", "-", "6017", "ST", "-", "82487", "504", "AB", "-", "93681", "RV", "-", "55141", "21", "\"", "DOCUMENTS", "OF", "SIMILAR", "FIELDS", "WHATSOEVER", ".", "OP", "-", "78037", "REV", "RO", "-", "10", "979", "RC", "CHECK...
[ "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "3\"-BM-6077", "8\"-AJ-2431", "5\"-YN-8771", "4\"-EE-7985", "6\"-JR-5525", "2\"-DR-7070", "4\"-WM-5698", "3\"-KC-4247", "5\"-LM-6017", "2\"-ZN-1264", "3\"-XQ-1553", "5\"-PM-7311", "2\"-AB-7634", "7\"-WX-4326", "6\"-DF-4989", "7\"-GJ-5316" ]
9. 5"-LM-6017 ST-82487 504 AB-93681 RV-55141 21" DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. OP-78037 REV RO-10 979 RC CHECK'D EF-79223 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CD-16338 5"-PM-7311 12. CONTRACT NAME MN-79821 DATE GH-90491 4"-WM-5698 3"-XQ-1553 16" SDL 1 CONTRACTOR NO. ERV-9-73 CD-46940 20. AB-81288 7"-WX-4326 24. 23" ST-78864 DOTTED LINES ARE ALTERNATE. RO-10 DESCRIPTION 945 6"-DF-4989 A UH CD-23355 SDL C PQR VALVE TO BE INSTALLED AT Q POINT. F-4 RO-10 INS ( -39°C ) PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 6"-JR-5525 17. 00-1785 26" DV-45246 JWZ-66-71 1. GH-06829 OP-47642 SDL COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh GI 4. EF-34465 LG-10 OR 3"-KC-4247 SAMPLE_3458.JPG CS-09 ISSUE CONSTR. REV.22 622 ABC TO XYZ FOR MAINTAINENCE. UNIT DELETED ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. DRAW/SHEET NO. 3"-BM-6077 UV-30788 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DIMENSIONAL TOLERANCE +/- 1MM. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 2. IJ-01209 WX-69583 2"-ZN-1264 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD STA STA PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. CONTRACTOR PROJECT NO. 11/11/22 QR-57450 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 5" 276 CD-47094 15. 807 OP-79344 PROJECT/LOCATION/ASSIGN AB-23190 RO-10 J.UU 227 DELETED CD-66808 APPRV'D DV-08027 MAINTAINENCE AND MODIFICATION. SDL MN-84697 872 SAMPLE 79141018 143 INS ( 45°C ) 480 23. ORGANIZATION V.PAL AB-63690 ISSUE CONSTR. REV.33 6. ISSUE CONSTR. REV.11 AB-71745 QDOB DELETED QR-60314 EF-45528 VALVES. MN-89618 13/05/02 MN-39605 8"-AJ-2431 318 UV-78127 SDL 367 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 10. OP-91933 719 KL-06837 AB-92343 DDL 330 QR-32028 18. UNVH PJIC 5" QR-89399 NOTES 5. ZLO CV-01971 24/04/27 842 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 13. KL-93068 GLR INSTALLATIONS/OPERATIONS. 788 Std. DV-59784 WX-80129 ZLC MN-62661 16. 4"-EE-7985 18" SDL IJ-41988 CS-68 DELETED QR-36115 484 7"-GJ-5316 922 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE SYNTHETIC PROCESS FLOW DIAGRAM 948 5"-YN-8771 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED STA CS-20 703 6"x1" GH-03224 RO-10 7. DELETED HU-8821 U.H DELETED SDL CV-94453 INS ( -20°C ) 962 21. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ZLO 699 UV-55495 D 267 CASE OF MISMATCH. INS ( -20°C ) C.B SAMPLE Project IJ-71225 B 3. 540 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DRAWING NAME 11. ISSUE CONSTR. REV.44 X.FS LG-10 755 WX-84981 CONNECTION TO EXHAUST IS PROVIDED. 2"-AB-7634 EF-39302 SCALE 22. 2"-DR-7070 KL-12092 SDL MADE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ X.QMC 8. RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 18/09/05 DDL ISSUE BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE COMMENTS. 14. DETAILS. AV-71716 10" 19. UV-90273 CD-08362 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. PROJ. XYZ P&ID AV-53306
doc_461
[ "366", "MN", "-", "33614", "LG", "-", "10", "CONTRACTOR", "NO", ".", "D", "CS", "-", "14", "657", "ABC", "TO", "XYZ", "FOR", "MAINTAINENCE", ".", "DDL", "EQ", "-", "74", "-", "01", "2", ".", "ABC", "SHUTDOWN", "IF", "PQR", "DETECTS", "123", "IS",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-XF-0048", "3\"-FL-3374", "5\"-WC-4078", "5\"-BR-9329", "6\"-MQ-1222", "2\"-TG-4607", "8\"-QV-5392", "8\"-AT-4239", "6\"-EZ-7637", "8\"-MN-2144", "2\"-OQ-9788", "2\"-RA-7711", "5\"-XV-0100" ]
366 MN-33614 LG-10 CONTRACTOR NO. D CS-14 657 ABC TO XYZ FOR MAINTAINENCE. DDL EQ-74-01 2. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. IJ-29275 15" 13. CD-54276 7. 6. AV-50839 RO-10 8"-AT-4239 7" 5. 20. TOP CONNECTION. 785 WX-99564 14-7853 A WX-43398 CHECK'D 809 GRP CD-90386 2"-OQ-9788 DESCRIPTION GH-77105 DELETED INSTALLED. SYNTHETIC PROCESS FLOW DIAGRAM RV-09400 DDL COMPULSORY. MN-46468 SDL CV-28600 162 DV-60813 WX-17081 C.PM ST-69242 MADE INSTALLATIONS/OPERATIONS. 5"-BR-9329 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 6"-MQ-1222 WX-14812 ZLC SAMPLE_1691.JPG UV-50729 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 15. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 AV-46616 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ISSUE CONSTR. REV.11 UV-48548 N.RMO ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH APPRV'D AV-09834 15/03/03 AV-00154 GH-52436 H.A 2"x5" UV-56817 YNBY ME DDL SITE IN CASE OF MISMATCH. 196 PROJECT/LOCATION/ASSIGN ERV-7-85 19. RV-79556 9"x7" CV-15145 3" C 15/02/02 948 ORGANIZATION 15/01/19 PROJ. PQR P&ID DDL PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 25768848 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. RABA 8"-MN-2144 366 399 734 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DV-00115 WH ST-00207 AV-73243 22. 18. KL-07059 AV-58153 UV-81970 11. ZLC ZLO INS ( -23°C ) IJ-46184 5"-WC-4078 B NOTES UV-64140 9. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ET-5567 ISSUE DELETED 17. STA 16. REV IJ-30804 DIMENSIONAL TOLERANCE +/- 1MM. 6"-EZ-7637 Y.WDW DV-42564 175 773 UV-53686 5"-XV-0100 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DV-24016 12. FOR DETAILS. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. COMMENTS. DELETED DDL KPIG Std. CS-19 615 1. CD-98161 DRAWING NAME AV-76170 ZLC 540 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ISSUE CONSTR. REV.44 14. 8"-QV-5392 10. 614 GH-08733 MN-85090 DV-26716 8. 5"-XF-0048 O.U ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE AV-98482 21. 724 RV-55881 864 ZLO SAMPLE Project DELETED 2"-RA-7711 CD-43795 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE CD-75133 573 IJ-46404 ZLC GRI STA ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT KL-02713 DV-17430 DRAW/SHEET NO. 2"-TG-4607 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 2 SCALE 4. 739 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ISSUE CONSTR. REV.33 180 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ AB-45110 ZLC 3"-FL-3374 2"x9" SYNTHETIC PROCESS ENGINEERING FLOW SCHEME CONTRACT NAME RO-10 UNIT SDL CONTRACTOR PROJECT NO. 5"x3" DATE DV-46300 7" W-7 ISSUE CONSTR. REV.22 OP-37927 297 10/10/11 FXIH 3. SAMPLE Q.R DELETED KWh
doc_387
[ "VERIFY", "IF", "HOT", "WATER", "SYSTEM", "REQUIRED", "OR", "ELSE", "XYZ", "TO", "BE", "IJ", "-", "38348", "OP", "-", "53063", "UV", "-", "49491", "E", ".", "C", "XM", "-", "7604", "N", ".", "DXS", "PROJ", ".", "XYZ", "P", "&", "ID", "TOP", "CO...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-ZL-7903", "7\"-IP-5066", "8\"-SQ-6869", "6\"-TF-3550", "2\"-LY-1206", "8\"-VY-2589", "5\"-RK-1942", "2\"-VW-5784", "5\"-AA-1517", "6\"-MX-1342" ]
VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE IJ-38348 OP-53063 UV-49491 E.C XM-7604 N.DXS PROJ. XYZ P&ID TOP CONNECTION. 1. B DELETED MAINTAINENCE AND MODIFICATION. 24. IJ-30977 2"-VW-5784 IJ-65309 MN-90377 RO-10 EF-58777 INS ( -10°C ) DDL D 791 5"-RK-1942 327 CS-35 DELETED 392 AV-45653 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 595 306 ST-05083 SAMPLE Project OP-23616 10/05/26 858 229 EF-40612 3" CD-37174 6"-MX-1342 11. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. LG-10 18. COMPULSORY. 6. SAMPLE PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND RO-10 OP-13659 SYNTHETIC PROCESS FLOW DIAGRAM ISSUE 11May25 809 EF-63941 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 275 DRAWING NAME X.V 4" IJ-07329 448 IJ-62912 Q-5 R.R GH-06972 REV 23. RO-10 RO-10 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 9. SDL 5"-AA-1517 ISSUE CONSTR. REV.11 C SDL 7. 635 A.WS KL-16128 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ISSUE CONSTR. REV.44 ERV-3-50 INS ( -43°C ) ISSUE CONSTR. REV.33 ST-28125 ISSUE CONSTR. REV.22 3. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE ORGANIZATION 17Jan07 ZLC LG-10 SCALE ZLO WX-68218 ST-09190 25. 2. GRI AV-05703 DV-58254 CD-29434 10" KWh PQR VALVE TO BE INSTALLED AT Q POINT. OP-06869 CONTRACTOR PROJECT NO. AB-35319 167 DDL MN-81134 V.I 7"x1" 272 728 DIMENSIONAL TOLERANCE +/- 1MM. UV-54955 DDL DRAW/SHEET NO. QR-81872 932 DELETED INS ( 20°C ) DV-99979 UNIT 736 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. F.U CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DV-52573 UV-36509 DYU INSTALLED. ERV-8-45 712 STA 17" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 118 TYPE VALVES. 644 RO-10 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 26. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. DESCRIPTION SDL LG-10 CD-85536 DV-25084 5. 271 Std. CONNECTION TO EXHAUST IS PROVIDED. 6"-TF-3550 18" NOTES 14. ZLC DATE RV-17732 WX-34699 16. 20. 12. A WX-72669 7" RO-10 GRO ERV-0-94 TF GH-51274 2"x4" INSTALLATIONS/OPERATIONS. QR-83245 581 APPRV'D DV-61416 3" ERV-7-87 8"-SQ-6869 GH-47826 10. INS ( 57°C ) DDL 8"-VY-2589 4 651 WH DELETED 518 23/07/27 HR-13-68 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 355-6262 DOTTED LINES ARE ALTERNATE. 19" OP-60338 MN-32511 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, CV-97108 15. AV-62304 AV-51415 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 17" FOR DETAILS. STA OP-79253 75748607 TKKN WX-46878 27. SDL KL-62446 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD AB-44900 CHECK'D OB 22. DV-89213 CONTRACT NAME 297 699 MADE TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 21" 6"x2" GLR OP-76184 GH-45609 21. SAMPLE_5792.JPG PROJECT/LOCATION/ASSIGN 572 17. UV-47316 13. SDL ZLC 8. 2"-LY-1206 646 19. 996 7"-IP-5066 CD-17780 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 7"-ZL-7903 COMMENTS. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME DDL 664 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. SITE IN CASE OF MISMATCH. 140 OP-25183 4. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE CONTRACTOR NO. DELETED
doc_74
[ "NOTES", "YDO", "-", "80", "-", "72", "17", ".", "CONTRACTOR", "PROJECT", "NO", ".", "MN", "-", "86743", "GRP", "HAS", "NO", "REVELANCE", "WITH", "ANY", "OTHER", "SIMILAR", "LOOKING", "DOCUMENTS", "FOUND", "IN", "THE", "ANY", "OTHER", "CONCERNED", "18", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-P...
[ "6\"-OJ-1068", "4\"-UW-3868", "2\"-IZ-4222", "2\"-RW-0698", "4\"-YS-1753", "3\"-EK-1262", "7\"-PD-4390", "7\"-JY-9769", "2\"-QE-8551", "7\"-GA-2276", "4\"-JY-5918", "5\"-LK-3232", "5\"-DW-8301", "5\"-MD-7102", "6\"-CF-2951", "7\"-QC-0447", "5\"-VI-0930", "6\"-YA-6660", "5\"-QC-51...
NOTES YDO-80-72 17. CONTRACTOR PROJECT NO. MN-86743 GRP HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 18" UV-64703 2"-SZ-4689 ST-17152 CV-98179 OP-78919 UV-34078 3. 11" RV-88310 6"-PH-1283 6. 339 RV-77572 INS ( 44°C ) LDEB 42477419 LG-10 992 318 IJ-73241 INS ( -37°C ) ISSUE CONSTR. REV.44 CS-47 716 DOTTED LINES ARE ALTERNATE. RV-91067 STA DESCRIPTION PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND EF-60900 W.VG FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. RO-10 ST-62777 RO-10 SAMPLE Project 5"-QC-5166 INS ( -13°C ) L-5 STA 857 U.W 1" CS-60 ST-16199 459 356 C OP-32360 AV-97184 CS-24 DDL DDL VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. CONNECTION TO EXHAUST IS PROVIDED. 336 873 CD-16002 13. KL DIMENSIONAL TOLERANCE +/- 1MM. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 303 242 PROJ. XYZ P&ID 7. CD-16973 477 CZG ISSUE CONSTR. REV.33 RV-62601 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 459 WX-50233 16. 15. 6"-OJ-1068 DELETED 100 12. M.AS 4"-JY-5918 PROJECT/LOCATION/ASSIGN 14. 2"x4" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DRAW/SHEET NO. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD KL-08654 RV-59854 RO-10 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. STA DV-77605 DELETED 2" MN-94433 UV-38868 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DELETED 688 227 7"-JY-9769 OP-69340 9. 2"x4" 998 3"-EK-1262 LG-10 GI LG-10 ZLC QR-86288 ABC TO XYZ FOR MAINTAINENCE. 665 ZLC SDL 603 812 GH-75745 25Nov20 11. MN-39238 18. DDL SAMPLE_0639.JPG A UNIT 3" 2. GH-22750 GH-37061 553 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 212 24" QR-48614 5"-DW-8301 EF-93948 IJ-16588 SDL 315 DELETED 8"x9" SDL 126 7"-QC-0447 ZLC DDL AV-32589 Std. CS-41 CONTRACT NAME R.GX 5"x2" STA ERV-1-08 12" 445 SYNTHETIC PROCESS FLOW DIAGRAM PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 6" 742 232 22" 2"-IZ-4222 AB-79205 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. IJ-60039 CD-62942 897 MN-37248 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 4"-YS-1753 SAMPLE ERV-5-69 21. INS ( 45°C ) CS-45 OP-12063 WX-88716 5. 19" OP-64254 CHECK'D 8"x6" OP-98141 DDL EF-67303 6"-YA-6660 LG-10 IJ-21126 9" GRO MN-65787 UV-68443 IJ-11217 IJ-04801 D 7"-GA-2276 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 4. 8. APPRV'D 4"-UW-3868 REV RV-71577 19" KL-20437 GRP 15Dec03 11/03/01 RO-10 5"-MD-7102 PT 3"x2" 691 ST-64783 B CONTRACTOR NO. 931 523 ST-73616 773-5635 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. 5"-VI-0930 SDL RV-46876 EF-28206 1. STA RO-10 MN-3392 2"x8" 751 LG-10 ZLC ORGANIZATION DELETED SDL O.I CD-66470 DRAWING NAME SCALE CO QR-36145 516 ISSUE CONSTR. REV.22 RO-10 390 10. RO-10 6"-CF-2951 ISSUE COMMENTS. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME INS ( -54°C ) CD-10543 242 DATE 19. 7"-PD-4390 J.REY MN-77577 QR-77562 5"-ZB-9856 GI 2"-RW-0698 MODIFICATION. 5"-LK-3232 20. WH 276 648 DDL INS ( 16°C ) 18" 2"x1" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. AB-20816 ISSUE CONSTR. REV.11 QR-58708 187 13Mar03 2"-QE-8551 2" CV-19446 SDL 1" 699 AV-65339 4"-LT-9348 IJ-17472 3 24" MADE OP-91171
doc_76
[ "INS", "(", "13", "°", "C", ")", "13", ".", "THESE", "DOCUMENTS", "ARE", "NOT", "INTENDED", "FOR", "VALIDATION", "/", "EVALUATION", "ON", "BASIS", "OF", "PROFESSIONAL", "REVIEWS", "/", "603", "MN", "-", "35007", "987", "DRAWING", "NAME", "8", ".", "RV"...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE",...
[ "6\"-DJ-7525", "4\"-ZT-6225", "5\"-BB-1026", "6\"-NV-6891", "8\"-GV-4399", "6\"-DF-6241", "6\"-PR-2840", "4\"-BJ-6171", "6\"-ET-0525", "5\"-JJ-4665", "4\"-MJ-0681", "8\"-DK-7508", "3\"-QK-3309", "2\"-SR-4258", "7\"-OL-9117", "3\"-JV-8341", "8\"-TB-3178" ]
INS ( 13°C ) 13. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 603 MN-35007 987 DRAWING NAME 8. RV-23895 DELETED MADE 6"-ET-0525 KL-56084 ZLC 23. ZLO DV-81610 DV-98131 DIMENSIONAL TOLERANCE +/- 1MM. KL-03578 841 9. CV-34266 WX-15190 INS ( -26°C ) DV-69237 6"-DJ-7525 MN-80222 7. 925 GH-05267 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS SAMPLE Project GRI AB-36094 STA 12/07/13 CS-59 SAMPLE CONTRACTOR NO. NOTES 818 6" LKX-77-12 AV-13065 AV-19578 5"-BB-1026 AB-72135 STA 7" 15" DELETED IJ-54182 ORGANIZATION UNIT ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. CS-40 3" 7" INS ( 25°C ) 4" 886 741 GLR 10" 867 REV 6"-PR-2840 RO-10 12" CONNECTION TO EXHAUST IS PROVIDED. INS ( 49°C ) COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh KL-48141 WX-28304 435 4"-MJ-0681 CD-35722 DDL KL-63226 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. RV-64225 Z.ZAL UV-33331 7"-OL-9117 3. AV-71828 236 PROJ. XYZ P&ID DV-25296 SDL EF-90045 ZLO 3"-JV-8341 R.B B 2. OP-98509 QR-04136 5. PQR VALVE TO BE INSTALLED AT Q POINT. SCALE 876 SAMPLE_0164.JPG ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 6"-NV-6891 RV-97613 K-4 328 RO-10 FCQV UV-38104 2" 4"-ZT-6225 3"-QK-3309 MODIFICATION. S.QA CS-67 675 6"-DF-6241 4. APPRV'D QR-12746 ISSUE UV-75960 16. 20. CV-59631 21Apr03 GRP LG-10 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED CV-38430 MN-28274 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 8"-GV-4399 CV-10187 13" 11. SYNTHETIC PROCESS FLOW DIAGRAM SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 495 DESCRIPTION DELETED 3" 17" LG-10 2"-SR-4258 11" 873 RV-36647 JT ISSUE CONSTR. REV.11 RO-10 KL-91117 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. COMMENTS. UV-84192 CD-99457 AQ-8454 STA M.VHQ NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. ISSUE CONSTR. REV.33 QR-20049 22. IX 5"-JJ-4665 1. UV-64194 26" 19" INS ( -11°C ) CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 8"x1" INS ( -48°C ) 188 21. CV-85708 4"-BJ-6171 DV-27496 9"x8" 22616857 10. 15. DRAW/SHEET NO. 650 209 IJ-24136 983 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 13" LG-10 STA RV-03741 28" INS ( -29°C ) GH-72474 A.KP IJ-89537 STA QR-24958 LG-10 ST-56827 56-7874 8"-TB-3178 SDL RV-43433 739 CONTRACTOR PROJECT NO. AV-17047 12. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. DOTTED LINES ARE ALTERNATE. DV-72199 829 24Sep21 2"x7" 8"-DK-7508 787 819 CONTRACT NAME IJ-00744 465 495 EF-82698 909 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 14. STA 5 TOP CONNECTION. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CD-14998 None 6. MSNZ C 19. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DV-95986 ERV-2-80 SDL KL-51715 2"x5" ZLO PROJECT/LOCATION/ASSIGN CV-23988 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ST-41331 A 18. ISSUE CONSTR. REV.22 CHECK'D GRI FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. 17. 676 CS-09 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. LG-10 DATE SDL GH-13560 GH-77643 195 CV-15154 426 DELETED TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. RO-10 CV-32629 RO-10
doc_375
[ "GH", "-", "89341", "26", ".", "WX", "-", "86683", "PROJECT", "/", "LOCATION", "/", "ASSIGN", "249", "FOR", "GENERAL", "NOTES", "AND", "LEGENDS", "SEE", "THE", "DWG", "-", "1", ".", "23", ".", "23", ".", "345", ",", "DWG", "-", "1", ".", "23", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "4\"-TS-2706", "7\"-OU-8120", "4\"-HM-6762", "6\"-EA-3543", "5\"-WI-9762", "4\"-EX-2451", "6\"-LH-3408", "8\"-MO-3684", "4\"-NY-7017", "8\"-OD-0671", "6\"-GB-4211", "3\"-YK-9249", "4\"-AQ-5744" ]
GH-89341 26. WX-86683 PROJECT/LOCATION/ASSIGN 249 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, ZLO 299 DELETED 5" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 6. 13" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. LG-10 OP-59269 21. 759 6"-LH-3408 DDL ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. SCALE WX-70523 ZLO ISSUE CONSTR. REV.33 5. DATE VALVES. SYNTHETIC PROCESS FLOW DIAGRAM WX-69009 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY CD-72990 GH-02038 14. WX-85021 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ YV-8898 GRI ISSUE 11May06 ZLO 641 WX-52315 DV-02941 4" RV-03188 ST-83254 APPRV'D 7. 711 NOTES 921 E.V 20. INSTALLATIONS/OPERATIONS. DRAWING NAME EF-11998 RV-43565 AB-51046 CS-03 2. 9. CV-84078 4"-EX-2451 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME COMMENTS. KL-66695 101 KL-30964 LG-10 850 22. KL-31064 AB-64218 23. DELETED AV-39669 C 8"x1" UNIT QR-89095 16. CV-87311 23/12/19 RV-43049 4"-TS-2706 828 15. 4"-AQ-5744 KL-24273 7" UV-40401 EF-77265 SDL 6"-EA-3543 CONTRACT NAME 5"-WI-9762 A ORGANIZATION 17. 7"-OU-8120 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN 27. AB-90319 ERV-0-71 16" CV-44001 CONNECTION TO EXHAUST IS PROVIDED. STA 5"x1" FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. ST-31176 RV-34995 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. DELETED 877-2045 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED XPDR 1. ZLO UV-00230 3. ST-60607 13. 12. CV-58918 GH-02528 CS-85 DESCRIPTION SDL 4"x2" RV-98008 DELETED CASE OF MISMATCH. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 4"-HM-6762 357 CS-08 DETAILS. CHECK'D 644 ZLC LG-10 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 806 3" CV-70203 WX-35906 DWG-1.23.23.789. SDL PROJ. DEF P&ID R.XPN MN-14329 431 ST-38208 GP DIMENSIONAL TOLERANCE +/- 1MM. QR-05581 ZLC REV QR-15522 MADE 206 DV-07474 1 4. 15/11/07 DV-88403 217 ST-06900 3"-YK-9249 TOP CONNECTION. UV-06650 OP-42528 DDL 484 11. IJ-86268 9" 363 ZVX DRAW/SHEET NO. RV-39488 IJ-82203 18. 10. 4"-NY-7017 6"-GB-4211 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 812 AB-85685 24. ISSUE CONSTR. REV.11 SAMPLE Project 721 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. CV-01150 CONTRACTOR PROJECT NO. 8" DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. Std. ZLO IJ-51014 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE SAMPLE Z.VM RO-10 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. B CONTRACTOR NO. CS-89 QR-50495 8"-MO-3684 15" BM-69-14 G-1 8" 148 25. 19. 844 GDEH DOTTED LINES ARE ALTERNATE. PQR VALVE TO BE INSTALLED AT Q POINT. B.SU DELETED GRI WX-68157 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR ABC TO XYZ FOR MAINTAINENCE. CV-13451 8. SAMPLE_8591.JPG IJ-85891 28819416 RO-10 ISSUE CONSTR. REV.22 UV-37312 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 8"-OD-0671 14" U.ICC PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND SDL 496 607 311 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER
doc_120
[ "ISSUE", "CONSTR", ".", "REV", ".", "11", "DELETED", "SCALE", "RV", "-", "09567", "CLOSED", "VESSEL", "HEATER", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "AT", "30", "°", "C", "AND", "50", "°", "C", ".", "BOTH", "XYZ", "VALVES", "AND", "BCD", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "6\"-PS-7951", "6\"-BV-9866", "5\"-XS-0582", "5\"-RB-8461", "6\"-HO-3054", "2\"-BG-6969", "6\"-HK-8260", "3\"-TW-2163" ]
ISSUE CONSTR. REV.11 DELETED SCALE RV-09567 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DV-17708 SITE IN CASE OF MISMATCH. D 16" AB-22287 SAMPLE UV-33848 8" 9"x1" UV-89448 ST-79528 DDL SDL CONNECTION TO EXHAUST IS PROVIDED. EF-16793 DELETED DIMENSIONAL TOLERANCE +/- 1MM. AV-32483 534 4. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 8"x8" 18. REV 617 ORGANIZATION STA FOR DETAILS. COMPULSORY. MN-39054 12/05/04 CONTRACTOR NO. 714 212 C INSTALLED. DELETED CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE ABC TO XYZ FOR MAINTAINENCE. DV-76955 CD-29877 NO-4800 IJ-88876 596 324 IJ-61587 ISSUE CONSTR. REV.33 INSTALLATIONS/OPERATIONS. 17" PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 602 SAMPLE_7422.JPG CS-75 6"-BV-9866 26. DATE 665 WX-67348 WX-61559 SAMPLE Project 3" GLR SYNTHETIC PROCESS ENGINEERING FLOW SCHEME COMMENTS. 16. WZL CHECK'D 18/07/22 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 149-8879 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. QR-18463 13. 81820191 SYNTHETIC PROCESS FLOW DIAGRAM ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 5"-XS-0582 2"-BG-6969 AV-13736 252 21. EF-94404 B 7. LG-10 20. 3" F.Z Q.FY 12" KL-06403 5. APPRV'D RO-10 ISSUE CONSTR. REV.22 851 240 RV-09374 NOTES CONTRACTOR PROJECT NO. 17. 422 1. 6"-PS-7951 MN-72056 6"-HK-8260 DOTTED LINES ARE ALTERNATE. NTU ST-28059 A ZLC OIAM AB-84828 QR-93311 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. RV-81689 INS ( 23°C ) 14. 3. E-2 NP GI 3"-TW-2163 EF-96402 19/12/10 KL-84160 GH-83176 UNIT ISSUE 21" 6. 7" 587 23. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. D.ZLT PQR VALVE TO BE INSTALLED AT Q POINT. CS-69 10. 13Sep08 MAINTAINENCE AND MODIFICATION. 12. RV-73627 PROJ. PQR P&ID RV-27556 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT VL-69-76 DELETED ISSUE CONSTR. REV.44 WX-28166 DV-14754 UV-17202 DRAW/SHEET NO. 15. 25. DRAWING NAME DWG-1.23.23.578, DWG-1.23.23.789. RV-08802 RMO EF-80267 2. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 7"x5" RV-43728 TOP CONNECTION. PROJECT/LOCATION/ASSIGN PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. ZLO GRO INS ( -27°C ) GH-26471 2" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. QR-26181 ZLO PUSH HS T.E 6"-HO-3054 CONTRACT NAME RV-08648 GLR MADE 125 5" 24. 11. 19. None 5 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 GRI ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 8. 27. 22. 8" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 5"-RB-8461 CV-25788 DELETED ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. AB-98898 CS-88 AA FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DELETED DESCRIPTION 9. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD
doc_1
[ "INSTALLED", ".", "L", ".", "YD", "ISSUE", "CONSTR", ".", "REV", ".", "11", "8", "\"", "DV", "-", "35566", "524", "DESCRIPTION", "25", ".", "4", "\"", "12", ".", "STA", "STA", "AB", "-", "50725", "B", "7", "\"", "-", "KW", "-", "1439", "23", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", ...
[ "8\"-MJ-9429", "7\"-ZO-9456", "6\"-WR-3121", "2\"-BU-6772", "5\"-ZC-5812", "8\"-JC-9645", "6\"-DW-1865", "4\"-UR-7075", "6\"-PJ-8840", "5\"-JL-7789", "7\"-KW-1439" ]
INSTALLED. L.YD ISSUE CONSTR. REV.11 8" DV-35566 524 DESCRIPTION 25. 4" 12. STA STA AB-50725 B 7"-KW-1439 23/12/18 10. CV-54255 DELETED ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 9. COMMENTS. R.VY C CV-14171 11May19 3" INSTALLATIONS/OPERATIONS. NOTES 17. APPRV'D ISSUE WX-78506 AL-6284 QR-52567 956 742 GH-73006 AV-55760 13. LG-10 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 6. 24. INS ( -59°C ) PQR VALVE TO BE INSTALLED AT Q POINT. WX-86327 GRO ISSUE CONSTR. REV.33 A GI DOTTED LINES ARE ALTERNATE. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. MADE 918 CONTRACT NAME MA UV-56409 1" ERV-5-72 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ST-20204 REV 5"-JL-7789 RV-61497 703 211-4559 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 6"-WR-3121 21. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 263 964 KWh 16" ZLO RO-10 CD-54930 4. 7. CONTRACTOR PROJECT NO. TOP CONNECTION. ZLO 2. GH-76162 CD-17443 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 15. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE SAMPLE_6962.JPG UNIT N.WWC 746 ISSUE CONSTR. REV.44 UV-02010 20/04/27 MAINTAINENCE AND MODIFICATION. 5. 22. 19. SDL KL-89235 COMPULSORY. RV-37575 GH-80181 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 9" 6"-DW-1865 DELETED CD-69936 1. CONTRACTOR NO. DV-83739 SYNTHETIC PROCESS FLOW DIAGRAM PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS MXDN TYPE VALVES. 23. 367 QJV-75-33 AB-08550 SAMPLE Project DELETED COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 STA CHECK'D ZLO MN-07424 26. 548 ST-36605 13/02/26 DATE PROJ. XYZ P&ID AV-37673 27. 18. LYG PROJECT/LOCATION/ASSIGN IJ-92054 ERV-2-36 GH-39522 CD-67169 AV-10633 713 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 6" CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE CONNECTION TO EXHAUST IS PROVIDED. 8"-MJ-9429 14. S.F SAMPLE ISSUE CONSTR. REV.22 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME E.GVC DWG-1.23.23.578, DWG-1.23.23.789. DELETED ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH RV-77501 SDL Y.Q 3. 2 DV-23628 DRAWING NAME 4"-UR-7075 987 STA BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, ORGANIZATION DIMENSIONAL TOLERANCE +/- 1MM. IJ-90352 CS-15 WX-43060 LG-10 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 52680311 None 839 527 15" 505 859 7"-ZO-9456 8"-JC-9645 IJ-86173 DELETED DV-38746 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ZLO PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 13" CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 661 RO-10 AV-50711 5"-ZC-5812 SDL 16. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD AB-41304 D K.QUC 801 SDL KL-87075 DUBV ST-76921 DDL 736 6"-PJ-8840 773 XKG FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 8. 11. 20. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DRAW/SHEET NO. C-8 GRI 602 INS ( 49°C ) DELETED ST-24833 SCALE 2"-BU-6772 CS-71 LG-10 ABC TO XYZ FOR MAINTAINENCE.
doc_383
[ "F", ".", "S", "CD", "-", "06347", "STA", "16", "\"", "INSTALLED", ".", "150", "EF", "-", "19343", "BOTH", "XYZ", "VALVES", "AND", "BCD", "VALVES", "ARE", "ACCESSIBLE", "FOR", "INSPECTION", ",", "DV", "-", "95127", "200", "10", "\"", "717", "SYNTHETI...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-SQ-4668", "2\"-JX-2350", "4\"-UT-5705", "5\"-YY-8673", "5\"-SX-8566", "5\"-KO-8399", "8\"-KK-8724", "5\"-AB-4986", "6\"-CQ-5371", "4\"-GY-2336", "4\"-ZF-9877" ]
F.S CD-06347 STA 16" INSTALLED. 150 EF-19343 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DV-95127 200 10" 717 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME YIAI ISSUE 26" 24/12/01 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. GRP HS-3318 CONTRACTOR NO. SYNTHETIC PROCESS FLOW DIAGRAM DELETED INS ( 14°C ) GH-36817 AB-70065 3"x6" ZN-15-59 GI 13. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. MADE ZB 18. CS-07 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 15. DRAW/SHEET NO. 580 16May16 ABC TO XYZ FOR MAINTAINENCE. CD-93742 AB-55652 WX-80024 KZWI DV-51074 CS-41 4"-ZF-9877 1. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ISSUE CONSTR. REV.11 DELETED QR-17649 580 EF-12941 ERV-5-86 P.UF 1"x5" 6"-CQ-5371 CONTRACTOR PROJECT NO. NOTES D TOP CONNECTION. RO-10 SCALE ZLC ERV-2-44 CS-95 14. 25. GH-61798 QR-75987 QR-64280 GH-46079 RX 11" 8"x6" DVF VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DELETED RO-10 5" DV-07121 ISSUE CONSTR. REV.33 STA 2. KL-07506 24. ERV-5-47 667 SAMPLE Project UV-42978 STA LG-10 PQR VALVE TO BE INSTALLED AT Q POINT. Std. CV-86770 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE ISSUE CONSTR. REV.55 ERV-6-86 GH-35658 J.P VFO PROJECT/LOCATION/ASSIGN 1"x2" ISSUE CONSTR. REV.44 DWG-1.23.23.578, DWG-1.23.23.789. WX-55204 16. DIMENSIONAL TOLERANCE +/- 1MM. 166 SDL ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH LG-10 DDL RV-43107 69-3661 4 6" 449 5"-SX-8566 DELETED 11" KL-66126 10. 23. 12. 4. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 831 5"-KO-8399 EF-01115 M.MX RV-37398 AB-81856 5"-YY-8673 P.D 7. 5. 4"-GY-2336 ST-28836 ORGANIZATION 23/04/10 CONTRACT NAME TRQR 13" DATE LG-10 27. KL-34924 13/09/09 V-2 701 4"-UT-5705 9. 8"-KK-8724 CS-65 SDL 8. PROJ. XYZ P&ID SITE IN CASE OF MISMATCH. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND CHECK'D 458 MOBB SAMPLE_0701.JPG DELETED GLR GX MAINTAINENCE AND MODIFICATION. 5"-AB-4986 INS ( 54°C ) EF-66907 ISSUE CONSTR. REV.22 19. 13" CONNECTION TO EXHAUST IS PROVIDED. ZLC 19" ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 13/11/20 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED DRAWING NAME 26. GH-82163 172 DESCRIPTION THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS GH-20723 CD-56399 REV 22. 261 GH-59409 11. DELETED COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 20. OP-91905 APPRV'D ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT DDL 106 AB-66748 17. 21. 793 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 2"-JX-2350 ST-94852 COMMENTS. CV-91407 C 8" RO-10 A 608 T.BR E COMPULSORY. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 3. AB-94070 KL-93192 SAMPLE KWh ERV-1-83 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 346 OP-63812 RV-68182 640 3"x3" B OP-40508 INSTALLATIONS/OPERATIONS. AB-93785 AB-91872 605 ERV-2-06 UNIT CD-46209 IJ-60884 51371428 19" FOR DETAILS. 2"-SQ-4668 6. 17" AV-39476 IJ-63442 TYPE VALVES.
doc_225
[ "RV", "-", "19585", "COMPONENTS", "ARE", "AT", "NORMAL", "PRESSURE", "WITH", "POWER", "RATINGS", "15", ".", "4", "KWh", "MN", "-", "37661", "543", "O", "-", "4", "YXX", "-", "50", "-", "73", "DOCUMENTS", "ARE", "NOT", "INTENDED", "FOR", "VALIDATION", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-HZ-4599", "3\"-CQ-5877", "5\"-XB-3483", "3\"-PW-8424", "2\"-YH-6220", "6\"-KO-4321", "5\"-FQ-0262", "2\"-ZG-8280", "6\"-FW-0124", "5\"-UC-2786", "4\"-KN-0371" ]
RV-19585 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh MN-37661 543 O-4 YXX-50-73 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ DV-28504 NOTES PQR VALVE TO BE INSTALLED AT Q POINT. MAINTAINENCE AND MODIFICATION. 162 DDL QR-40572 8" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE LG-10 529 RV-92321 2. DV-56971 IJ-13175 14. OP-10065 GH-14430 MN-27390 961 200 CONNECTION TO EXHAUST IS PROVIDED. ISSUE CONSTR. REV.33 A ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ITQ ST-94459 VALVES. 131 22. ST-36981 MN-04145 EF-28578 APPRV'D ZLO 671 3"x1" 6" 9. 905 CV-11014 872 B ORGANIZATION ERV-4-96 DELETED EF-44773 SDL RV-92050 KL-72881 CD-93090 PROJ. XYZ P&ID QR-45988 77649381 5"-FQ-0262 GH-35068 5"-UC-2786 ERV-8-15 1" DETAILS. DESCRIPTION SANI 3"-CQ-5877 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. LG-10 GRO SDL DV-71813 ISSUE CONSTR. REV.11 9"x2" 857 ZLC QR-52235 UV-06887 17" RV-41476 IJ-63053 3"-PW-8424 CS-25 5"-XB-3483 409 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND STA ERV-3-19 462 6. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 412 SAMPLE Project BPIU CS-26 5"-HZ-4599 DELETED 5. 9"x1" CD-88747 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 4 15. AV-89365 CV-57604 IJ-44696 ABC TO XYZ FOR MAINTAINENCE. UNIT SYNTHETIC PROCESS FLOW DIAGRAM SYNTHETIC PROCESS ENGINEERING FLOW SCHEME WX-31998 WX-89086 14" ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN SAMPLE CV-60195 CS-97 SAMPLE_6842.JPG OP-00893 456 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED WXE PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 4"-KN-0371 302 7. 496 DDL 11Jun27 INS ( -39°C ) 8" ISSUE CONSTR. REV.22 EJ-7527 28" GH-36472 11/04/12 719 51-5046 ZLO 646 CONTRACTOR PROJECT NO. 8. DOTTED LINES ARE ALTERNATE. ST-42297 ERV-3-42 1. ZLO RV-34563 GRO DELETED CONTRACT NAME MADE OP-99746 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 11. DDL 175 EF-55023 CS-22 445 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER EF-78300 QR-99798 STA SDL EFZF V.VAA DRAW/SHEET NO. CD-54984 CS-51 DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 19. CHECK'D 6"-KO-4321 18/08/16 WX-63106 COMMENTS. 21. 448 AV-24834 EF-01327 INS ( -29°C ) 9"x4" DDL LG-10 ISSUE 141 20. SCALE GR 16. 9" DDL KL-55712 6"-FW-0124 RO-10 3. 14" 12. AV-61965 13. IJ-23050 PROJECT/LOCATION/ASSIGN GRO EF-97751 CONTRACTOR NO. SDL 397 674 828 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 4. DIMENSIONAL TOLERANCE +/- 1MM. DELETED 17. ERV-8-60 ERV-8-41 ZLO IJ-36775 CD-87276 340 18. CASE OF MISMATCH. UV-78978 DATE Y.JIB 10. 2"-ZG-8280 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DRAWING NAME None 4" FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 2"-YH-6220 UV-10835 GH-17521 KL-49437 839 ZLO DDL REV 545 ZLC C F.H
doc_479
[ "SYNTHETIC", "PROCESS", "FLOW", "DIAGRAM", "INSTALLED", ".", "20", ".", "22", ".", "CD", "-", "53567", "DATE", "UNIT", "3", "\"", "x3", "\"", "CLOSED", "VESSEL", "HEATER", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "AT", "30", "°", "C", "AND", "5...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "6\"-YQ-3809", "4\"-EY-2518", "4\"-MN-3618", "3\"-ML-3932", "8\"-CV-7064", "3\"-IW-0934", "5\"-YZ-6533", "6\"-HB-2561", "8\"-JY-2640", "2\"-LB-1815", "8\"-ZG-9790", "8\"-FB-7574", "6\"-JK-3744", "3\"-DW-9553", "5\"-MD-2986" ]
SYNTHETIC PROCESS FLOW DIAGRAM INSTALLED. 20. 22. CD-53567 DATE UNIT 3"x3" CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DDL COMMENTS. 8"x3" VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 8"-FB-7574 CV-80873 573 6"-HB-2561 3"-ML-3932 I.NHQ 838 VZAK I.D DELETED ST-59387 SCALE COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ST-36337 ST-23251 2 12. DDL 20/07/13 BMI CONTRACT NAME AB-82320 AV-03264 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND KL-59017 DDL INS ( -35°C ) UV-33288 X.LJJ 1. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ST-30795 NOTES 523 UV-72517 EF-30475 ISSUE CONSTR. REV.22 17. LG-10 4"x3" DRAW/SHEET NO. RO-10 UV-78459 D DELETED FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, A 3" 943 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. SAMPLE Project SAMPLE WX-69009 5. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 2" QR-13404 DRAWING NAME C CV-70471 ZSM 792 DELETED 24. UV-48439 797 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS B 19" 855 UV-52663 PROJECT/LOCATION/ASSIGN INS ( 14°C ) YG-43-85 KL-05676 2"-LB-1815 181 UTOV W-4 3"-IW-0934 14. O.PBE GI DELETED MN-27748 GH-55448 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 549 RV-49847 CONNECTION TO EXHAUST IS PROVIDED. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ISSUE 27. YE-0762 4"-MN-3618 SDL RO-10 SAMPLE_4899.JPG FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 590 RV-50984 19. MN-18755 7" ISSUE CONSTR. REV.33 N.Y 895 8"-ZG-9790 13. 7. CONTRACTOR PROJECT NO. 11" WX-41140 RV-63425 16. 8" CV-05278 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. CS-86 149 STA LG-10 16/10/20 INSTALLATIONS/OPERATIONS. ERV-5-21 3"-DW-9553 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 16/10/07 16/11/12 691 ISSUE CONSTR. REV.11 ZLC ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH DDL AV-82551 ST-70474 APPRV'D WX-16332 SDL ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE OP-42696 IJ-91482 ST-72075 8"-JY-2640 STA 515 6. QR-36408 MAINTAINENCE AND MODIFICATION. DV-93168 10. 196 447 GRO 6"-YQ-3809 ZLO ISSUE CONSTR. REV.44 IJ-64589 KWh 26. 8. INS ( 25°C ) GH-18561 802 GRI PQR VALVE TO BE INSTALLED AT Q POINT. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. MN-70960 ST-92894 23. 21. EI BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MN-96142 LG-10 KL-61616 ST-66078 KL-65822 764 8"-CV-7064 499 ORGANIZATION AB-32455 COMPULSORY. 1" CD-57543 2. 29163216 Std. CONTRACTOR NO. MADE AV-06192 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS PROJ. DEF P&ID IJ-09496 4. KL-92147 DOTTED LINES ARE ALTERNATE. OP-67495 TYPE VALVES. 9. DWG-1.23.23.578, DWG-1.23.23.789. 5"-YZ-6533 RV-55694 28. RV-61011 14" ABC TO XYZ FOR MAINTAINENCE. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME RO-10 502 ERV-5-48 DELETED 15" 3. KL-57907 18. 156 DESCRIPTION 5"-MD-2986 RV-84852 FOR DETAILS. GH-10421 SITE IN CASE OF MISMATCH. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE CD-54442 AV-43275 N.YDM INS ( 13°C ) DDL 4"-EY-2518 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 118 ST-51124 OP-24315 47-7474 DIMENSIONAL TOLERANCE +/- 1MM. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DELETED M.O 871 GH-34620 15. MN-76007 INS ( 53°C ) 11. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ AB-87882 6"-JK-3744 25. GRP CHECK'D IJ-88943 12" REV WX-68383
doc_277
[ "DELETED", "MN", "-", "78585", "6", "\"", "-", "AS", "-", "5864", "CD", "-", "92267", "8", "\"", "-", "KQ", "-", "9894", "DRAWING", "NAME", "EK", "500", "MAINTAINENCE", "AND", "MODIFICATION", ".", "197", "4", ".", "KL", "-", "68007", "WX", "-", "...
[ "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O",...
[ "7\"-LC-3156", "2\"-YG-5522", "7\"-XD-0616", "2\"-QR-9223", "3\"-GX-4618", "6\"-LH-8048", "8\"-KQ-9894", "8\"-EG-1090", "2\"-KP-0722", "6\"-AS-5864", "5\"-RP-7819" ]
DELETED MN-78585 6"-AS-5864 CD-92267 8"-KQ-9894 DRAWING NAME EK 500 MAINTAINENCE AND MODIFICATION. 197 4. KL-68007 WX-99768 23. 21. SAMPLE QR-98438 AV-61222 DDL 858-1013 778 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CS-01 KWh CD-44214 243 670 824 Q.PP 1" 175 6" 24. INSTALLED. ST-77099 CONTRACT NAME 9. PROJ. PQR P&ID 3"-GX-4618 IJ-36819 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE A DELETED ERV-1-07 10. AV-88281 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS REV ERV-3-08 2. 566 MADE 7"-LC-3156 212 MN-73173 STA 15. B PQR VALVE TO BE INSTALLED AT Q POINT. 3. None STA ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 791 17/12/03 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 S.UE 18. 892 RV-66085 INS ( -22°C ) AV-87009 6. QR-90469 SAMPLE_2185.JPG 2"-QR-9223 8" COMPULSORY. TLF-93-98 ERV-2-34 20. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, INS ( -41°C ) SYNTHETIC PROCESS FLOW DIAGRAM UNIT UV-88716 ERV-3-67 SCALE RO-10 SITE IN CASE OF MISMATCH. 11. 25/04/13 CV-07433 19. X.CY DRAW/SHEET NO. PROJECT/LOCATION/ASSIGN STA 6"-LH-8048 ERV-4-54 5. 7. ISSUE CONSTR. REV.11 17" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ CONTRACTOR PROJECT NO. RV-61871 DELETED ISSUE U.VB PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. S.S CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE GRO 12. 1"x8" ZLC 927 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 129 7"-XD-0616 8"-EG-1090 TOP CONNECTION. DELETED LG-10 C LG-10 UV-92823 MN-38980 DWG-1.23.23.578, DWG-1.23.23.789. 260 DDL WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 16. 45746059 DV-77443 TYPE VALVES. J.T 5"x4" RO-10 2"-YG-5522 5"-RP-7819 14" LG-10 GF-4409 322 FOR DETAILS. CONNECTION TO EXHAUST IS PROVIDED. DIMENSIONAL TOLERANCE +/- 1MM. STA ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 1. 4"x2" UV-99028 CHECK'D O.Y DV-10763 MN-89442 DESCRIPTION QR-70577 KL-16525 SAMPLE Project UV-43312 GH-98810 AB-68623 1" MN-45676 WX-12166 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 17. INS ( 47°C ) APPRV'D 19May08 CV-18282 CD-38299 B-1 ISSUE CONSTR. REV.22 LG-10 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH DDL HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 8. 22. AB-13057 14. ORGANIZATION RV-01864 13. CONTRACTOR NO. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT EF-41693 ST-09069 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DV-60916 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 IJ-64065 2"-KP-0722 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. MN-14236 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND INS ( -11°C ) 4 ABC TO XYZ FOR MAINTAINENCE. DDL DATE BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. INS ( 30°C ) DOTTED LINES ARE ALTERNATE. DV-75108 ERV-1-99 WX-08745 NOTES RV-79785 ISSUE CONSTR. REV.33 UV-07006 RO-10 IJ-82014 GH-31413 329 QR-33407 174 RV-03270 934 HDBT UV-47712 COMMENTS.
doc_244
[ "LG", "-", "10", "CS", "-", "28", "ZLO", "973", "SAMPLE_4198", ".", "JPG", "ZLC", "C", "CV", "-", "23092", "DRAWING", "NAME", "LG", "-", "10", "LG", "-", "10", "CHECK", "'", "D", "17", ".", "572", "ISSUE", "CONSTR", ".", "REV", ".", "33", "10",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-OD-1243", "2\"-MK-3821", "2\"-PR-2038", "6\"-FJ-5343", "7\"-VV-0086", "3\"-FY-0530", "4\"-TN-0359", "5\"-JQ-0872" ]
LG-10 CS-28 ZLO 973 SAMPLE_4198.JPG ZLC C CV-23092 DRAWING NAME LG-10 LG-10 CHECK'D 17. 572 ISSUE CONSTR. REV.33 10. DYW 484 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS SAMPLE CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 18. INS ( -16°C ) 15. 267 ISSUE CONSTR. REV.44 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME QR-96604 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 361 NN THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 603 PT-8646 ST-32558 DATE 4" RO-10 SYNTHETIC PROCESS FLOW DIAGRAM FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD LG-10 297 ISSUE 649 1. 8. KL-74128 DELETED 7. CONTRACT NAME B-0 DRAW/SHEET NO. 485 14. PROJ. PQR P&ID 640 CONTRACTOR PROJECT NO. 10Feb21 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH QR-79922 MN-16302 364 SCALE F.EK PROJECT/LOCATION/ASSIGN TOP CONNECTION. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 2"-PR-2038 803 7"-VV-0086 INS ( 35°C ) B 12. UV-60108 STA STA 385 DELETED Std. 377 RA MN-70752 COMPULSORY. FOR DETAILS. 21. GH-51099 UV-92478 A 593 2. IJ-52137 DV-25588 UV-28535 2"-MK-3821 MN-71610 DELETED ABC TO XYZ FOR MAINTAINENCE. UV-39935 KL-42078 KL-45046 GH-78567 AV-36388 PQR VALVE TO BE INSTALLED AT Q POINT. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 5" 136 QR-61852 9" SITE IN CASE OF MISMATCH. 2"-OD-1243 11. STA SDL 561 L.D ST-31444 ISSUE CONSTR. REV.22 SAMPLE Project SDL ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. IJ-17632 MADE 6. EF-81741 KL-84486 22/03/13 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. QR-11682 COMMENTS. ORGANIZATION 4 DV-74535 LG-10 9" TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. GLR 202 DESCRIPTION CS-56 DV-79328 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. ZLC F.X INSTALLATIONS/OPERATIONS. DWG-1.23.23.578, DWG-1.23.23.789. STA RO-10 19" TYPE VALVES. 224 665 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 8" 5. D PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS AB-73080 441 ERV-7-85 881 QR-30109 DIMENSIONAL TOLERANCE +/- 1MM. FU-55-22 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, AV-87240 INS ( -19°C ) 3"-FY-0530 APPRV'D 342 AB-32920 UV-21801 REV 785 RO-10 AV-66917 41-5437 OP-53447 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE EF-62103 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT DV-14868 13. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. NOTES 94945348 ZLC 4. RO-10 UNIT 934 WX-41065 QR-05455 LG-10 IU 8" 20. INS ( 40°C ) 5"-JQ-0872 21/06/05 DV-65395 L.BO 6"-FJ-5343 CONTRACTOR NO. ERV-8-25 16. 3. 23/05/08 135 AV-88753 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. MAINTAINENCE AND MODIFICATION. ISSUE CONSTR. REV.11 A.KSW RV-03051 9"x6" 556 19. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 4"-TN-0359 DELETED RV-11519 CV-85237 GRP R.CK WX-64490 L.FTE CV-37714 LG-10 OP-67242 504 NVCF 9. DDL
doc_4
[ "LG", "-", "10", "GLR", "12", "\"", "440", "17", ".", "15", ".", "25", ".", "BCU", "DELETED", "COMPULSORY", ".", "21", ".", "MN", "-", "71759", "RV", "-", "07797", "SCALE", "OP", "-", "87557", "170", "4", "INS", "(", "15", "°", "C", ")", "INS...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-NV-1457", "2\"-WH-5044", "2\"-MG-3860", "4\"-WH-8745", "3\"-SU-0989", "2\"-GX-2245", "6\"-BG-4603", "8\"-IW-2260", "2\"-NC-0682", "7\"-DZ-9292", "6\"-DX-1483", "4\"-ON-4084", "2\"-FY-6992" ]
LG-10 GLR 12" 440 17. 15. 25. BCU DELETED COMPULSORY. 21. MN-71759 RV-07797 SCALE OP-87557 170 4 INS ( 15°C ) INSTALLED. 494 GRP ERV-5-87 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 4"-ON-4084 QR-98823 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 6"-BG-4603 8. ISSUE CONSTR. REV.33 57847389 NOTES DELETED KL-62370 DDL KL-79723 DDL SDL KL-79433 INSTALLATIONS/OPERATIONS. DV-07579 CV-19150 ZJTW OP-70807 WX-65262 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 456 DV-47395 254 593 24. BYA RRHZ 2"x7" MD-8705 509 INS ( -12°C ) CD-32985 DRAW/SHEET NO. STA AV-30739 EF-60000 INS ( 31°C ) CV-19040 CHECK'D INS ( -22°C ) MN-06476 10. 11. QR-13553 2"-NC-0682 AV-56007 M.QD 17" ISSUE CONSTR. REV.11 2"-NV-1457 QR-76382 EF-04384 LG-10 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE KWh 14. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 IJ-56773 12. 3"-SU-0989 6"x5" ERV-3-73 UV-86987 INS ( 34°C ) 333 ISSUE CONSTR. REV.22 ERV-7-84 GRI DELETED 15" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. AB-55692 CONTRACT NAME CV-64601 FOR DETAILS. GH-93396 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ B DOTTED LINES ARE ALTERNATE. D REV 26. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. UNIT INS ( 34°C ) 16. CONNECTION TO EXHAUST IS PROVIDED. INS ( 22°C ) 944 314 DV-07419 PROJECT/LOCATION/ASSIGN EVB CONTRACTOR PROJECT NO. ST-33376 COMMENTS. 7" 22. DELETED 11" 4" UV-02270 PY-21-36 3" GH-05433 4. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 13. WX-31208 PQR VALVE TO BE INSTALLED AT Q POINT. EF-05065 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 7"-DZ-9292 6"-DX-1483 2"-MG-3860 MN-97459 I.H SAMPLE_5268.JPG 971 TOP CONNECTION. 19. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 16/02/02 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND INS ( 11°C ) PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 924 962 QR-77671 4"-WH-8745 SAMPLE DIMENSIONAL TOLERANCE +/- 1MM. DDL 455 RV-48553 STA 6. WX-61390 20. ISSUE TYPE VALVES. ISSUE CONSTR. REV.44 ORGANIZATION LG-10 RO-10 DESCRIPTION UV-90512 7. None 714 AV-17684 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 2"-FY-6992 OP-98456 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 1. 61-8129 2"-WH-5044 MAINTAINENCE AND MODIFICATION. 5. QR-23555 RO-10 4"x7" K.FB VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS LG-10 UV-64002 3. IJ-91711 362 18. 926 UV-31730 ERV-8-59 CV-73799 OP-33807 16" DDL 2"-GX-2245 BHHQ INS ( 18°C ) 23. 236 TEAR IJ-41768 781 SAMPLE Project GH-76953 162 LG-10 UV-09914 QGQ 606 CS-51 QR-73187 STA DV-47703 ERV-4-79 ABC TO XYZ FOR MAINTAINENCE. IJ-59609 ERV-4-03 Q.CBR 830 SDL 478 PROJ. PQR P&ID DELETED BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MN-49801 APPRV'D ERV-0-51 12" 23/01/02 2. SDL ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT AV-76839 L-9 954 13/05/02 DRAWING NAME SYNTHETIC PROCESS FLOW DIAGRAM CONTRACTOR NO. 13" SITE IN CASE OF MISMATCH. GH-16553 8"-IW-2260 DATE C 15/10/26 CS-04 ERV-4-80 A AV-25498 RO-10 MADE COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 AV-74393 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE GRI SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 9. 801
doc_190
[ "AB", "-", "40208", "DELETED", "HAS", "NO", "REVELANCE", "WITH", "ANY", "OTHER", "SIMILAR", "LOOKING", "DOCUMENTS", "FOUND", "IN", "THE", "ANY", "OTHER", "CONCERNED", "808", "B", "6", "\"", "-", "QZ", "-", "9418", "N", ".", "P", "922", "SDL", "KL", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PI...
[ "8\"-EH-1274", "8\"-KZ-4741", "7\"-GT-0218", "8\"-NJ-3132", "6\"-XT-0073", "2\"-OS-8051", "2\"-GL-8002", "4\"-UI-0777", "2\"-VQ-0250", "5\"-GQ-6381", "5\"-ZH-1942", "7\"-PQ-9017", "7\"-MK-5297", "4\"-KI-2496", "7\"-NV-1630", "6\"-QZ-9418", "6\"-HS-6568", "2\"-KU-6980", "8\"-SF-20...
AB-40208 DELETED HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 808 B 6"-QZ-9418 N.P 922 SDL KL-84500 4"-UI-0777 IK IJ-62566 7"-PQ-9017 DDL 392 GRO 732 CS-87 286 DESCRIPTION 2"-VQ-0250 DDL UV-03370 RO-10 QR-86068 4"x9" QR-43898 16" SCALE 3" 8"-EH-1274 836 21. SAMPLE_7534.JPG GH-12554 120 AB-88448 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 8"x6" CV-66846 7"-NP-7501 CV-26528 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. UV-66572 OP-12759 CD-09432 GRO IJ-85371 LG-10 CD-34056 RO-10 DV-46730 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 2"-KU-6980 398 ERV-6-18 T.ZD OP-73364 DV-20115 AB-70313 643 324 829 22. 2" ISSUE CONSTR. REV.11 DDL 5"-MA-8622 ISSUE 5"-ZH-1942 19. WX-25802 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 1 9"x4" SYNTHETIC PROCESS FLOW DIAGRAM PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 531 7"-GT-0218 OP-47396 INS ( 58°C ) BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. KL-61231 PROJ. PQR P&ID 744 7"-MK-5297 KL-85058 DDL IZ-8502 7. ERV-8-89 QR-58838 DDL DV-10515 RV-18544 896 5"-GQ-6381 OP-23900 9. N-8 319 13. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. RV-90624 QR-22567 439 EF-22221 KL-26217 DOTTED LINES ARE ALTERNATE. 18. AV-52926 OP-75442 27. GI 4. GRI GRO 260 COMMENTS. DELETED 6"-XG-3237 UV-77889 DV-74232 OP-17709 28. AB-78692 DELETED ST-65693 4"x6" LG-10 IJ-27999 5" SDL AV-67641 CS-76 5. MODIFICATION. 6" 28" RO-10 ORGANIZATION 525 6"-XT-0073 26. CONTRACTOR PROJECT NO. CV-70305 DIMENSIONAL TOLERANCE +/- 1MM. SDL 15Jul11 WX-64856 DV-05737 825 SAMPLE Project PQR VALVE TO BE INSTALLED AT Q POINT. 12. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 16" NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 5" 6"-HS-6568 256 25. 7"-NV-1630 A SDL 2"-GL-8002 APPRV'D 8"-NJ-3132 LG-10 STA 23. 397 DV-08187 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ SDL MN-95761 KL-71598 STA CD-94467 GLR 459 WX-86627 6"-DW-9348 1" SDL CS-97 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. KL-91276 6. 467 LG-10 IJ-84588 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. 2. 11. 24. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 21" 803 8. 521 RV-90622 15/12/21 225 16. 1. ZLC ST-42711 WX-27630 8"-KZ-4741 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. C MADE DDL CONTRACTOR NO. 220 451 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND CS-88 ZLC CONTRACT NAME WX-48276 None 762 1"x1" 10. 8"x2" 566 307 319-1493 W.BPD DELETED QR-23222 501 ABC TO XYZ FOR MAINTAINENCE. WX-96970 392 27" 583 WX-13556 SDL DATE EF-39840 G.HZ CV-79342 DELETED IJ-51107 KL-98986 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. ERV-9-82 LG-10 656 BRC PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS RO-10 SDL RO-10 SAMPLE SDL ERV-9-76 XWKN 4"-KI-2496 23/06/22 8"-MH-8447 CHECK'D QR-70168 REV 484 AB-08172 01499706 17. IJ-49840 5"x7" 8"-SF-2004 UV-78742 DRAWING NAME 488 RV-66692 KL-56432 LG-10 CS-32 RO-10 WX-88297 CONNECTION TO EXHAUST IS PROVIDED. 3. INS ( -31°C ) ST-57742 DRAW/SHEET NO. 414 UV-82855 KL-72207 211 OP-26136 4"-AM-2712 20. 537 ZLC 909 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. ISSUE CONSTR. REV.22 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh WX-23173 DELETED UV-64181 518 XLU-12-74 NOTES CV-18458 2"-OS-8051 TOP CONNECTION. 15. 266 STA 395 ISSUE CONSTR. REV.33 MN-87330 542 751 RX UNIT PROJECT/LOCATION/ASSIGN GRI RV-57708 R.RJ GH-97136 DDL 14. GRO 593 DDL UV-15374
doc_478
[ "BUILDING", "TO", "BE", "IN", "THE", "SLANTING", "PLANE", "THROUGH", "THE", "AXIS", "OF", "PQRS", "4", "\"", "CD", "-", "32571", "24", "/", "09", "/", "24", "22", ".", "2", ".", "ORIENTATION", "OF", "ABCD", "VALVES", "SHALL", "BE", "VERIFIED", "AND",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "6\"-XL-4539", "4\"-QL-4509", "3\"-DY-4112", "8\"-HA-7477", "3\"-ZO-3856", "5\"-GQ-3772", "3\"-SX-7251", "6\"-LF-8894", "8\"-MS-7441", "6\"-ZD-6162", "6\"-OO-5671" ]
BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 4" CD-32571 24/09/24 22. 2. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT AV-15533 13. 1"x9" 882 QYU DELETED 5"x7" KL-17246 733 UNIT INS ( -14°C ) 17. MADE LG-10 11-4067 REV CONTRACTOR NO. 965 674 WX-55439 3"-DY-4112 3. DV-95243 F.N DELETED ERV-5-11 ZLC RO-10 25/11/01 ST-70639 929 RV-49941 WX-26191 DIMENSIONAL TOLERANCE +/- 1MM. YFAV DV-90402 1. Std. 6"-OO-5671 PROJECT/LOCATION/ASSIGN CHECK'D PQR VALVE TO BE INSTALLED AT Q POINT. DRAWING NAME CD-83048 269 20. 8"-HA-7477 STA D.LW CONTRACTOR PROJECT NO. CD-27713 A SCALE 780 202 GH-72276 INSTALLATIONS/OPERATIONS. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME SITE IN CASE OF MISMATCH. INSTALLED. 667 C MAINTAINENCE AND MODIFICATION. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 8"x7" 6. 13779387 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DDL OP-56334 13" D EF-44123 INS ( -40°C ) CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE PUPB MN-59649 IJ-28363 7. 11. ORGANIZATION 9. 5. G.MA OP-46785 10. CD-06188 EW-72-01 23. 4"-QL-4509 592 SDL MN-94551 598 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ RV-07327 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS MN-35206 ERV-7-50 INS ( 11°C ) AV-60124 8. RO-10 ISSUE LG-10 6" AV-26991 742 921 CV-07262 KWh STA 3" LG-10 ISSUE CONSTR. REV.11 6"-ZD-6162 COMMENTS. QR-97264 INS ( -19°C ) CS-36 IJ-59462 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 16. ZLO ISSUE CONSTR. REV.44 U.MS CV-66831 522 M.OC CV-13087 WX-73675 799 CV-03868 SAMPLE Project PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 6"-XL-4539 Q.EB DELETED 22" WX-28663 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 14. CS-26 4. SYNTHETIC PROCESS FLOW DIAGRAM ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE EF-80770 8"-MS-7441 NOTES B CD-68446 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. FOR DETAILS. 24" OP-24841 215 ISSUE CONSTR. REV.33 AV-90664 CONTRACT NAME 21. GH-37521 11/12/23 RV-52248 19. GH-65078 LG-10 431 O.P RO-10 18. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED ST-26588 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, WX-60733 PVL 15. DV-47178 PROJ. XYZ P&ID SAMPLE_8302.JPG 816 STA COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KL-76801 DELETED MN-65708 DESCRIPTION WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. OP-73500 APPRV'D DATE DWG-1.23.23.578, DWG-1.23.23.789. 3"-ZO-3856 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, EF-29058 18/04/04 GI 7"x9" SAMPLE VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE QR-94675 COMPULSORY. DDL CV-70866 DOTTED LINES ARE ALTERNATE. 12. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD RV-86944 916 ISSUE CONSTR. REV.22 GH-99576 15" V.MNJ LG-10 DV-81876 DM-3816 619 UV-09556 KL-96876 5"-GQ-3772 AB-56679 TYPE VALVES. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH CS-71 1 TOP CONNECTION. SDL 423 J-8 3"-SX-7251 DRAW/SHEET NO. IJ-82310 6"-LF-8894 OP-76505
doc_29
[ "PRIMARY", "SUPPORT", "FOR", "THE", "EFGH", "COMPONENTS", "IS", "NOT", "FOUND", "AT", "SITE", ".", "13", "\"", "9", ".", "LG", "-", "10", "B", ".", "BHL", "20", ".", "DELETED", "ISSUE", "4", ".", "2", "\"", "x2", "\"", "IW", "-", "11", "-", "79...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-NN-8485", "7\"-WD-7756", "2\"-NI-3207", "4\"-NM-5688", "7\"-AR-4599", "2\"-MO-0364", "7\"-NR-7403", "3\"-BK-4084", "5\"-PL-2729", "2\"-SD-5468", "3\"-CV-3490", "2\"-FK-3108", "3\"-ZI-2248", "7\"-NJ-4449" ]
PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 13" 9. LG-10 B.BHL 20. DELETED ISSUE 4. 2"x2" IW-11-79 CONTRACTOR PROJECT NO. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 27. CV-95015 H.SEM GRO CHECK'D DELETED 757 298 DELETED CD-36741 DELETED 13/03/01 SDL UV-24893 OP-05727 2"-NI-3207 WX-38683 GI 11" 7"-WD-7756 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 17. CD-87254 6. 22/09/27 17" FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR GI SYNTHETIC PROCESS FLOW DIAGRAM ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE PROJ. XYZ P&ID DDL 12. EF-13363 4 RV-08013 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 430 NJ TOP CONNECTION. 3" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE DV-60502 B 13. LG-10 CONTRACT NAME LG-10 1" 899 PROJECT/LOCATION/ASSIGN DWG-1.23.23.789. 5"-PL-2729 7. SAMPLE Project 20/10/11 DV-51752 7"-NJ-4449 MADE RO-10 23. 18" 358 21" ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN 16. ISSUE CONSTR. REV.22 862 WX-22826 178 SDL RO-10 IDOM ZLC CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 7"-NR-7403 596 693 KL-33409 ZOPT W.GNI 834 21. DATE 911 607 PQR VALVE TO BE INSTALLED AT Q POINT. 22. 513 GH-11788 6" D 8"x1" 515 19. RV-29029 12" 14" ERV-7-96 2"-SD-5468 NOTES UV-42595 DV-64954 DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 829 NY 2" 14. INS ( 12°C ) 4"-NM-5688 DELETED ST-29127 223 VALVES. 27" 2"-FK-3108 747 790 RV-07441 NIJL CONTRACTOR NO. 11. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 577 583 KL-54914 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD APPRV'D ERV-7-06 3"-ZI-2248 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ ABC TO XYZ FOR MAINTAINENCE. DDL CASE OF MISMATCH. CD-50965 6" KL-10308 INSTALLATIONS/OPERATIONS. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 952 AB-33964 GH-06338 3" EF-46792 DK-8767 RO-10 3"-CV-3490 C KVJT IJ-88933 10. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 25. 19" DESCRIPTION 18. UV-37164 ERD 3"-BK-4084 CONNECTION TO EXHAUST IS PROVIDED. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME MAINTAINENCE AND MODIFICATION. INS ( 32°C ) HXA RO-10 28. 759 CV-58530 SAMPLE CD-80179 CV-91637 2"-NN-8485 656 RO-10 22/03/02 SAMPLE_4324.JPG CV-70239 DELETED 539 7"-AR-4599 26. ST-60506 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. RV-09131 REV CS-15 D-6 18" 1. DDL STA ZLC DRAWING NAME LG-10 15. 178 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. OP-85608 COMMENTS. ZLO 16" GH-38132 DV-10172 X.UI 24. ISSUE CONSTR. REV.44 CD-55244 538-3145 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, RV-02818 997 569 SCALE 2"-MO-0364 OP-63233 8" DRAW/SHEET NO. ISSUE CONSTR. REV.11 ERV-5-14 SDL DOTTED LINES ARE ALTERNATE. 24/05/10 798 DDL 5. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. INS ( -55°C ) DETAILS. DDL 27" DIMENSIONAL TOLERANCE +/- 1MM. A 7" UNIT YF PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY GH-73972 5"x1" QR-98431 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh ISSUE CONSTR. REV.33 8. ORGANIZATION RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 2. ERV-4-78 WX-28025 11" 29. ISSUE CONSTR. REV.55 558 4"x1" SE STA DV-88858 3. Std. E 01888263 ZLO A.BV RO-10 DV-10406 CS-03 264 UV-99887
doc_373
[ "EF", "-", "51304", "IJ", "-", "71099", "SYNTHETIC", "PROCESS", "FLOW", "DIAGRAM", "GH", "-", "17445", "CHECK", "'", "D", "ERV", "-", "7", "-", "18", "SAMPLE", "Project", "VALVES", ".", "272", "6", ".", "INS", "(", "44", "°", "C", ")", "ABC", "TR...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-PG-4399", "7\"-HD-1265", "7\"-PE-6338", "7\"-HT-2635", "4\"-MP-1285", "2\"-ME-4094", "3\"-NU-7951", "6\"-ZA-1891", "7\"-UY-8143", "3\"-CK-2606" ]
EF-51304 IJ-71099 SYNTHETIC PROCESS FLOW DIAGRAM GH-17445 CHECK'D ERV-7-18 SAMPLE Project VALVES. 272 6. INS ( 44°C ) ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 955 19/11/09 837 13. 753 AB-01371 LG-10 DELETED 14. OP-03176 MADE CV-45505 ZLO ORGANIZATION PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 471 ISSUE CONSTR. REV.11 AV-80025 90095916 ISSUE CONSTR. REV.33 DRAW/SHEET NO. LG-10 7"-HD-1265 SDL ERV-2-43 17. SDL CONNECTION TO EXHAUST IS PROVIDED. 637 DDL VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. CONTRACTOR PROJECT NO. ERV-7-57 2. 8"x2" 236 None NOTES CFS-01-02 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 23. M-7 7. 091 4"-MP-1285 382 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR ZLC 5. RV-35346 741 18. 14/02/07 Y.WZJ 722 1 ADKO ST-49997 16. 7"-PG-4399 7"-PE-6338 GH-51008 CD-62140 ISSUE WX-88900 CV-29867 3. SDL AV-81505 ZLC 128 CONTRACTOR NO. KL-39606 GRO QGMU APPRV'D BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE KL-95625 K.Y EF-98443 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND GRO RO-10 663 317 A CS-43 WX-46132 MN-75750 ABC TO XYZ FOR MAINTAINENCE. PROJECT/LOCATION/ASSIGN QR-69120 INS ( 25°C ) GH-98017 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. STA RO-10 DV-69095 SDL ISSUE CONSTR. REV.44 STA 11. 789 9. PROJ. DEF P&ID SCALE PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY NN ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. CV-33484 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. MN-98653 GH-48246 11/08/05 398 6"-ZA-1891 SDL 681 ISSUE CONSTR. REV.22 DDL RV-04055 DIMENSIONAL TOLERANCE +/- 1MM. D 7"-UY-8143 AV-11673 7"-HT-2635 AV-67902 705 GH-52571 RV-43327 OP-10120 B INS ( -13°C ) C SAMPLE_5991.JPG ST-24129 STA DRAWING NAME 190 HH DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 2"-ME-4094 B.O 933 692 QR-51969 UV-99391 DATE 8" ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. AB-44868 TW RO-10 CV-35024 MAINTAINENCE AND MODIFICATION. DELETED COMMENTS. 16" QR-26284 INSTALLATIONS/OPERATIONS. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN KL-77195 CV-99841 DDL ILGE CD-45480 21. EF-24277 CD-27009 H.PO 19. H.OD INS ( 29°C ) SAMPLE HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 4. 22. 361 OE-2480 20. RV-87759 UNIT GRO WX-38213 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE CONTRACT NAME 3"-CK-2606 ERV-8-88 WX-69481 828 IJ-40583 7"x3" KL-55893 QR-82869 223 15. CV-80086 1. 587 19" 98-4263 MN-11612 RV-32898 REV T.TAT 8. 16" CS-97 GRP 12. DETAILS. 10. 21" STA CASE OF MISMATCH. DESCRIPTION WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE DV-93941 GH-92397 PQR VALVE TO BE INSTALLED AT Q POINT. 4" CD-81573 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ UV-73510 LG-10 ERV-4-18 EF-56792 11Jul01 DOTTED LINES ARE ALTERNATE. UV-99661 DELETED DELETED TOP CONNECTION. 3"-NU-7951 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 16" BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION,
doc_274
[ "V", ".", "PK", "SDL", "CD", "-", "20986", "CS", "-", "62", "P", ".", "PW", "GH", "-", "75594", "PRIMARY", "SUPPORT", "FOR", "THE", "EFGH", "COMPONENTS", "IS", "NOT", "FOUND", "AT", "SITE", ".", "GRO", "958", "ZLC", "167", "EF", "-", "00635", "AB...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "3\"-SZ-2681", "4\"-BG-0329", "2\"-EH-8196", "5\"-GE-9127", "5\"-GB-0204", "3\"-FQ-7778", "5\"-XU-8573", "2\"-ZS-2887", "2\"-PR-8552" ]
V.PK SDL CD-20986 CS-62 P.PW GH-75594 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. GRO 958 ZLC 167 EF-00635 AB-50199 22. 11/10/26 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. WX-55705 299 RV-75734 695 S.G 881-5370 None 381 RV-72117 UV-59819 744 DRAWING NAME WMBK BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS MN-54315 WX-43757 2"-ZS-2887 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. GLR 274 SDL XX-48-81 606 DWG-1.23.23.578, DWG-1.23.23.789. CHECK'D DELETED 511 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. KWh OP-90090 SCALE COMMENTS. REV DV-28798 CV-86429 GLR STA B 277 OP-99950 680 MN-29970 DIMENSIONAL TOLERANCE +/- 1MM. RP 163 DELETED ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 01918072 DDL GI OP-16557 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE CONNECTION TO EXHAUST IS PROVIDED. STA O.VAV 17. DATE HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 2"-EH-8196 18. A GRO 26. GH-80712 DV-66017 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 3"-FQ-7778 10" C-8 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. NOTES LG-10 CS-82 WX-28500 EF-34942 SDL FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CV-32132 UNIT CS-21 WX-40457 INSTALLED. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME GRO CV-93279 ERV-0-92 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DELETED 1. 24. 9. 16. QR-88087 7. SDL SDL 449 CD-34939 GRI 2. KL-03693 14. 5. 12. 25. 23. 3"-SZ-2681 ERV-3-92 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 TYPE VALVES. 13. INS ( -15°C ) WFW 135 DELETED OP-68637 CV-41980 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, PROJECT/LOCATION/ASSIGN 4"-BG-0329 SAMPLE Project THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ MAINTAINENCE AND MODIFICATION. APPRV'D COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 15. EV 22/02/28 SYNTHETIC PROCESS FLOW DIAGRAM SDL WX-49710 OP-55101 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DELETED 581 QR-16529 DV-51864 WX-62331 TOP CONNECTION. RO-10 301 10. 562 COMPULSORY. 5"-XU-8573 WX-66960 INS ( -32°C ) CS-45 23" RV-88991 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 1" DOTTED LINES ARE ALTERNATE. 2"-PR-8552 ERV-4-98 226 SAMPLE_3120.JPG 945 4. 21. GH-09652 WS-6412 622 CONTRACT NAME 572 GRP 372 20. DESCRIPTION OP-91178 CS-71 AV-10961 DDL 374 3. ISSUE CONSTR. REV.11 SAMPLE PROJ. DEF P&ID 2" IJ-07720 5 ST-67059 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH LG-10 RV-74518 CONTRACTOR NO. DRAW/SHEET NO. INSTALLATIONS/OPERATIONS. ISSUE ERV-3-69 ISSUE CONSTR. REV.33 21Feb13 ISSUE CONSTR. REV.22 CV-02768 8. 19. MADE 12" DELETED 301 FOR DETAILS. 6. ORGANIZATION GI PQR VALVE TO BE INSTALLED AT Q POINT. C CONTRACTOR PROJECT NO. R.Y OP-67227 5"-GB-0204 CS-78 ZLC 15" 27. CD-24082 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 9" 5"-GE-9127 974 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. CD-23472 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 11. INS ( 21°C )
doc_261
[ "18", ".", "FOR", "GENERAL", "NOTES", "AND", "LEGENDS", "SEE", "THE", "DWG", "-", "1", ".", "23", ".", "23", ".", "345", ",", "MN", "-", "29361", "2", ".", "4", "\"", "x3", "\"", "CS", "-", "53", "ORGANIZATION", "5", "\"", "REV", "AV", "-", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-XX-6360", "7\"-HI-6668", "3\"-UT-3216", "5\"-FY-2929", "3\"-BC-3299", "5\"-KI-7719", "5\"-AQ-4062", "4\"-CC-8969", "4\"-DI-4482", "6\"-MS-6067", "2\"-ZN-9821", "6\"-NO-5390", "3\"-HD-4849", "7\"-VH-0918", "3\"-WL-6842" ]
18. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, MN-29361 2. 4"x3" CS-53 ORGANIZATION 5" REV AV-81729 DELETED 11. 7. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 203 ISSUE CONSTR. REV.22 17" IJ-27992 DELETED 12. MN-46580 637 UV-04389 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND SDL FOR DETAILS. EF-37562 3"-UT-3216 DELETED 3"-WL-6842 3"-BC-3299 INS ( -25°C ) 3"-HD-4849 COMMENTS. 19Jan18 ZLC ERV-3-43 RV-82086 CONTRACT NAME ABC TO XYZ FOR MAINTAINENCE. 855 CHECK'D TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. SITE IN CASE OF MISMATCH. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. CV-67779 ERV-4-70 IJ-72151 RV-84375 STA ERV-4-33 1. RV-12095 ISSUE CONSTR. REV.33 17. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE D 14. 045 PROJECT/LOCATION/ASSIGN DOTTED LINES ARE ALTERNATE. DESCRIPTION 13/07/23 855-1903 DRAWING NAME 21. OF-3351 WX-82415 CD-77815 117 4"-DI-4482 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ERV-1-80 DIMENSIONAL TOLERANCE +/- 1MM. AB-67530 21/03/08 RO-10 RV-14551 YDV 10. 5"-KI-7719 GRP 19. WX-18801 QR-55817 PROJ. XYZ P&ID 350 DL-99-64 SAMPLE ERV-5-48 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. MN-32441 ERV-9-96 KL-64171 SCALE 19" I.OAI SYNTHETIC PROCESS ENGINEERING FLOW SCHEME RV-10158 981 MN-17224 DRAW/SHEET NO. 204 251 X.SAW 701 CV-33458 CV-93010 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD SAMPLE_0440.JPG EF-92497 KL-67930 AB-40687 17" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 22. ERV-9-62 KL-29684 L.WOY C 507 5"-AQ-4062 16. 7"-HI-6668 4"-CC-8969 2"-XX-6360 AV-82896 5. A 13/10/17 GH-39865 QR-12167 4. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. OP-90346 NSMN AB-19063 2"-ZN-9821 QR-84171 383 WX-54642 QR-37060 MN-00717 587 RV-49789 CS-85 ISSUE CONSTR. REV.11 XG OP-17491 3 3"x8" IJ-07042 CONTRACTOR PROJECT NO. RO-10 10" CS-74 I.NA DELETED PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT ERV-3-12 MADE 96250861 6"-MS-6067 MN-40869 15. P.CVS 3. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DDL TOP CONNECTION. UV-78526 DELETED 25. 8. DDL 943 GH-64234 NOTES GRO 27. 7"-VH-0918 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED M.OWM AB-32521 UV-19438 AV-03745 X.JF AV-76521 9. DDL 836 20. LG-10 DDL 13" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ OP-84881 CV-65364 23. ST-79155 ST-32592 B 704 6"-NO-5390 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. ZLC DDL AV-92826 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 445 GH-16741 MN-79852 RV-00028 852 9"x3" ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 6. SYNTHETIC PROCESS FLOW DIAGRAM WX-22347 AV-55243 D.ZEX 24. KL-19948 EF-58259 PQR VALVE TO BE INSTALLED AT Q POINT. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 ISSUE CONSTR. REV.44 WI DATE ZLC DDL COMPULSORY. LG-10 CS-47 867 APPRV'D 26. None CONTRACTOR NO. EF-84704 4"x7" 695 5"-FY-2929 ZLO 3" 821 KWh ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE CONNECTION TO EXHAUST IS PROVIDED. INSTALLED. 11" INSTALLATIONS/OPERATIONS. V-1 LG-10 WX-59013 TYPE VALVES. DWG-1.23.23.578, DWG-1.23.23.789. ISSUE SAMPLE Project UNIT BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS EF-66619 QR-14274 13. 7" 943
doc_112
[ "CONTRACT", "NAME", "DESCRIPTION", "CD", "-", "31464", "DRAW", "/", "SHEET", "NO", ".", "ST", "-", "16146", "OP", "-", "89835", "SYNTHETIC", "PROCESS", "FLOW", "DIAGRAM", "TOP", "CONNECTION", ".", "CD", "-", "17272", "5", "\"", "NO", "RELEVANCE", "/", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "3\"-SY-3317", "4\"-PW-2745", "6\"-CT-3502", "5\"-GO-4574", "7\"-RN-2257", "7\"-VX-0543", "8\"-MX-5556", "2\"-VP-6144", "7\"-GT-2378", "8\"-AS-2609", "4\"-II-5645", "7\"-OW-8763", "3\"-EH-6904", "7\"-YG-4275", "7\"-CJ-8575", "5\"-ET-7410", "2\"-DP-4956", "2\"-HY-2249", "7\"-BQ-68...
CONTRACT NAME DESCRIPTION CD-31464 DRAW/SHEET NO. ST-16146 OP-89835 SYNTHETIC PROCESS FLOW DIAGRAM TOP CONNECTION. CD-17272 5" NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. ERV-9-62 AB-97984 186 ST-09459 ST-12943 EF-02174 SDL UV-34626 6"-CT-3502 CONNECTION TO EXHAUST IS PROVIDED. SAMPLE_0888.JPG 482 SAMPLE Project 971 STA CS-44 YZS 7. None VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. AB-66490 6"-GP-2035 1" INS ( 32°C ) 697 8. IJ-88548 EF-66163 7"-YG-4275 ERV-8-91 C IJ-81064 ESZ 4"-II-5645 SCALE ORGANIZATION J.O 4" RV-23495 19. IJ-78690 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. UV-85077 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. IJ-15855 ST-01526 Z.LMB PQR VALVE TO BE INSTALLED AT Q POINT. GX 151 17. 16Feb09 7"-CJ-8575 CHECK'D AV-93815 NOTES IVA CD-42638 ST-31883 830 ISSUE CONSTR. REV.11 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND AV-87670 3" 24/01/13 ST-59002 13" CS-24 REV GH-30617 307 CONTRACTOR PROJECT NO. 9. QR-03194 11/10/02 152 STA HE-8086 ABC TO XYZ FOR MAINTAINENCE. UV-22525 ZLC KL-45106 957 CS-82 WX-61613 1. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 2"x3" 334 RO-10 ZLO 129 SAMPLE 7"-GT-2378 19" 11" OP-98777 ZLC DDL IJ-84815 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. ERV-8-28 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh UNIT PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 7"-RN-2257 12. WX-34898 ZLC 99006940 530 GRO 14" 13. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DELETED DV-97522 13" ERV-6-86 EF-43359 16. DV-41350 569 WX-21275 DV-27694 IJ-50163 LG-10 EF-96751 19" IJ-99874 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. SDL OP-39409 INS ( -12°C ) 6"x9" 755 ISSUE CONSTR. REV.22 ZLO UV-53441 14. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD INS ( 20°C ) KL-67482 CD-45019 CV-40459 321 636 INS ( 38°C ) APPRV'D BSM-28-49 KL-58590 7"-BQ-6857 LG-10 CD-09220 7"-OW-8763 8" 550 STA GRO 3"-HB-9659 21. 309 AB-85760 5"-GO-4574 391 638 ISSUE CONSTR. REV.33 RV-32769 MN-41679 AV-25501 2"-HY-2249 EF-06725 U.A D IJ-34431 15. PROJ. PQR P&ID LG-10 6. DV-67956 ZLC 3. 4" ISSUE CONSTR. REV.44 14Jul25 570 IJ-56668 3" SDL ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. MN-69281 B 675 LG-10 5. WX-22698 11. MN-05650 CD-18376 GLR 11" ZLC ST-71253 DATE 477 20. EF-12431 DRAWING NAME MODIFICATION. B.I PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 2"-DP-4956 DELETED 8"-AS-2609 7" STA SDL ZLO KL-07865 MEIH MN-09118 10. MADE DV-55204 SDL QR-27358 2. STA SYNTHETIC PROCESS ENGINEERING FLOW SCHEME AB-52147 8"-MX-5556 3"-EH-6904 CV-53963 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 837 CV-09864 KL-88578 AV-85542 INS ( -34°C ) PROJECT/LOCATION/ASSIGN UV-32367 355 DELETED A 5"-ET-7410 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 6"-HD-0562 3"-SY-3317 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ INS ( -58°C ) 18. 4"-PW-2745 2"-HP-2118 ZLO 5" SDL 792 KL-04633 4 ISSUE DELETED 7"-VX-0543 2"-VP-6144 4"-QS-5794 P.JB 17" CONTRACTOR NO. WX-73205 INS ( 39°C ) 17" Q.L CD-26289 10" WX-76415 786 CV-16799 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 699 Y.FQM 699 14" COMMENTS. WX-87090 26-4570 SDL 497 WX-73653 4. DV-01124 DV-93954 313 LG-10 2" 5" DV-86260 588 V-3 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD.
doc_115
[ "THESE", "DOCUMENTS", "ARE", "NOT", "INTENDED", "FOR", "VALIDATION", "/", "EVALUATION", "ON", "BASIS", "OF", "PROFESSIONAL", "REVIEWS", "/", "PROJECT", "/", "LOCATION", "/", "ASSIGN", "ERV", "-", "7", "-", "43", "710", "261", "25Aug18", "LG", "-", "10", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-FE-8670", "8\"-RG-2841", "8\"-GI-5291", "2\"-YU-4709", "2\"-AI-3797", "5\"-PT-5239", "2\"-GF-8358", "3\"-WR-6754", "4\"-WW-2735", "6\"-QI-8265", "5\"-BF-6278", "5\"-RN-7645", "8\"-EK-4242", "2\"-AG-2431", "6\"-IQ-8420", "6\"-JR-0138", "7\"-SG-3246", "5\"-FT-7751", "2\"-ZF-35...
THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ PROJECT/LOCATION/ASSIGN ERV-7-43 710 261 25Aug18 LG-10 IJ-11512 ERV-5-40 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. ERV-1-77 DELETED AV-26019 CS-69 SDL CONTRACTOR NO. 8"-OX-7324 298 DELETED 2"-AG-2431 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. EF-21281 UV-70819 ISSUE CONSTR. REV.11 QR-53310 104 UNIT ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 11. 3"-WR-6754 RO-10 CV-69996 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. ST-38567 AV-44761 STA CS-54 SDL 6"-KR-6358 ORGANIZATION 19. AV-67291 979 KL-44345 ISSUE 206 10Mar11 LG-10 5"-FT-7751 RV-91947 6"-IQ-8420 8"-GI-5291 C STA 5" 4"x2" 947 18Jun06 SDL ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 3"-FJ-6564 13. IJ-78526 20. SDL CV-89340 ZLC IJ-93811 CS-55 MN-85119 SDL 8"-EK-4242 B BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. QR-89891 AV-04390 KL-99507 CS-34 4"-WL-2816 778 G.LY EF-24380 220 SDL 12" RO-10 CV-10619 ZLC QHUX 6"-QI-8265 29. 2" 393 CONNECTION TO EXHAUST IS PROVIDED. GH-48022 2. 5 DESCRIPTION 23. None KL-43864 14. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. RO-10 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DDL 19" PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS STA MN-82036 AV-52456 CS-95 GH-14036 AV-70118 LG-10 CS-78 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 24. 424 EF-18630 12. AB-23216 APPRV'D SCALE 6" LG-10 AV-72577 4"-WW-2735 23" IJ-14176 ST-70286 26. EF-91321 RO-10 18" QR-38427 CV-12044 959 OP-65982 852 DOTTED LINES ARE ALTERNATE. V.SI 925 7"-FE-8670 8. M.X AV-02246 ST-48511 2"-YU-4709 QR-80474 101 STA RV-48229 5"x6" GI TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 151 ERV-2-15 1"x3" 9" JR 22. SYNTHETIC PROCESS FLOW DIAGRAM IJ-85441 IJ-63286 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 323 4" 06-0937 6"-JR-0138 DELETED DRAW/SHEET NO. 742 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 139 CONTRACTOR PROJECT NO. ABC TO XYZ FOR MAINTAINENCE. SAMPLE Project 16. ZLC 15. CONTRACT NAME CHECK'D KL-91382 PQR VALVE TO BE INSTALLED AT Q POINT. MADE PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 726 DATE STA QR-87920 17" 8" RO-10 ST-73110 DDL SAMPLE REV 7"-SG-3246 UV-05624 6. ERV-7-21 INS ( 34°C ) 6"-MY-5101 14" DELETED NOTES CS-54 476 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 2"-KB-5646 417 ERV-0-07 AV-90645 11" CV-85363 TOP CONNECTION. 537 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 7"x2" CV-69471 DRAWING NAME P-4 SDL RV-93315 GH-80290 DDL 4. 8" CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. RO-10 AB-53419 CDD RO-10 192 5. SDL GH-98185 UXT-21-21 18. 628 3. 2"-ZF-3506 DELETED CS-47 EF-24897 COMMENTS. OP-53581 939 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 818 S.J DELETED 5"-PT-5239 241 ISSUE CONSTR. REV.22 JM WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. WX-76913 KL-12210 MODIFICATION. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 840 SAMPLE_9715.JPG 8" DIMENSIONAL TOLERANCE +/- 1MM. A SDL 17. 129 UV-86483 WX-92173 42192519 FV-3794 SDL 8"-RG-2841 1. Z.SN ISSUE CONSTR. REV.33 AB-32718 28. 580 2"-GF-8358 AB-01390 7. 2"-AI-3797 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 25. ZLC 27. 680 ZLO VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. ST-60016 5"-BF-6278 459 638 21. 9. 654 5"x3" PROJ. XYZ P&ID 10. 5"-RN-7645 WX-84928 AV-95451
doc_166
[ "DRAWING", "NAME", "5", "\"", "26", ".", "IJ", "-", "38152", "MAINTAINENCE", "AND", "MODIFICATION", ".", "LG", "-", "10", "MN", "-", "45067", "IJ", "-", "25976", "29", ".", "MN", "-", "97309", "LG", "-", "10", "391", "ISSUE", "CONSTR", ".", "REV", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I...
[ "6\"-LJ-7918", "7\"-EK-7092", "3\"-FN-5896", "7\"-LV-9038", "2\"-KP-0567", "5\"-AP-0971", "2\"-EI-6108", "8\"-TK-7597" ]
DRAWING NAME 5" 26. IJ-38152 MAINTAINENCE AND MODIFICATION. LG-10 MN-45067 IJ-25976 29. MN-97309 LG-10 391 ISSUE CONSTR. REV.44 ISSUE 7"-EK-7092 20. IJ-25827 RO-10 6. DDL 15. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. UV-10969 CD-32266 151 802 UV-25667 1. DATE 22/09/12 PROJ. XYZ P&ID 4" B THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ ISSUE CONSTR. REV.22 GI 19. 190 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 17. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 28. PQR VALVE TO BE INSTALLED AT Q POINT. ERV-1-83 15Sep05 UN 6"-LJ-7918 313 2" INS ( 23°C ) GEN 824 25. CD-92334 ERV-7-27 O.RRU SAMPLE_6881.JPG 14/10/09 CD-28813 957 TYPE VALVES. DV-55241 574 ERV-7-94 RO-10 177 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 11. 24. 13. WX-96792 14. CS-98 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH I.JVB CONTRACTOR PROJECT NO. CONTRACTOR NO. IJ-14475 ORGANIZATION I.AV 992 REV PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ST-33165 330 W.LO NOTES CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 27. 58-6981 425 817 7. 585 DELETED 3"-FN-5896 DELETED 696 8. 10. 7"-LV-9038 KE CV-10287 CHECK'D INSTALLED. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD E 594 AB-15499 14" EF-53596 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 12. DWG-1.23.23.578, DWG-1.23.23.789. IJ-91906 KWh WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 6"x3" DELETED 23. G.PXA CONNECTION TO EXHAUST IS PROVIDED. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ISSUE CONSTR. REV.11 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ST-33384 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. DELETED 23/11/26 COMMENTS. SDL 4. 3. 9. P.D CS-22 QR-66508 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE DDL DELETED ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. DDL 4"x7" AV-64937 2. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. GRI ERV-7-21 ST-61264 5"-AP-0971 5. CV-00668 AV-14538 AB-10363 GRI 2"-KP-0567 CS-37 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. PROJECT/LOCATION/ASSIGN SCALE DELETED 18. CD-32153 A IJ-18532 D UNIT MADE G.M NW-94-20 ERV-3-84 STA SDL GRP C RV-00661 VVAM 878 DOTTED LINES ARE ALTERNATE. OP-54043 OP-16265 EF-56085 DDL 152 HQ-6063 EEE ISSUE CONSTR. REV.33 22. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND SYNTHETIC PROCESS ENGINEERING FLOW SCHEME CV-36184 ISSUE CONSTR. REV.55 2"x3" FOR DETAILS. 1" AV-08003 3" APPRV'D WX-32032 2 R.UHQ I.ZNT DV-76981 16. GRI DESCRIPTION RV-08810 SAMPLE LG-10 ABC TO XYZ FOR MAINTAINENCE. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 GH-77041 CS-29 SYNTHETIC PROCESS FLOW DIAGRAM 399 83161959 21. 219 DIMENSIONAL TOLERANCE +/- 1MM. INSTALLATIONS/OPERATIONS. CONTRACT NAME SAMPLE Project TI SITE IN CASE OF MISMATCH. ZLC RV-11762 20May02 None 9" 126 2"-EI-6108 CS-21 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DRAW/SHEET NO. 1"x4" C-8 8"-TK-7597 12" HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT TOP CONNECTION. EF-16623 AV-14862 DV-72657
doc_109
[ "ST", "-", "52395", "DATE", "VALVES", ".", "14", ".", "4", "\"", "-", "EV", "-", "0844", "IJ", "-", "97627", "375", "2", "\"", "-", "EO", "-", "7206", "367", "MN", "-", "72052", "FOR", "GENERAL", "NOTES", "AND", "LEGENDS", "SEE", "THE", "DWG", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O",...
[ "7\"-RX-4448", "6\"-ET-0264", "8\"-XA-5797", "4\"-ZS-7631", "8\"-GE-8781", "4\"-EV-0844", "2\"-EO-7206", "7\"-XK-1374", "2\"-FT-2957", "2\"-IJ-3917", "8\"-FS-3757", "2\"-IV-6103" ]
ST-52395 DATE VALVES. 14. 4"-EV-0844 IJ-97627 375 2"-EO-7206 367 MN-72052 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, LG-10 CONTRACT NAME CUG C KL-12976 13. DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 9"x7" 26. 725 GI 7"-XK-1374 3. OP-10133 STA CL-9980 DESCRIPTION CS-98 R-0 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE STA DWG-1.23.23.789. CONTRACTOR NO. OP-28706 1. 8"-XA-5797 LG-10 2" CV-44586 UNIT SYNTHETIC PROCESS FLOW DIAGRAM DRAW/SHEET NO. QR-17793 12" INS ( 42°C ) ERV-5-75 INSTALLATIONS/OPERATIONS. 25. 663 564-3671 B DELETED TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER IJ-93364 COMMENTS. 2"-FT-2957 INS ( -41°C ) 4"-ZS-7631 14/04/10 8"-GE-8781 654 EF-52729 WX-75093 OP-90985 2"x3" KL-60008 AV-22423 SAMPLE Project MN-99796 ISSUE CONSTR. REV.11 19/11/10 STA 226 DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR ISSUE CONSTR. REV.22 OP-56790 ERV-6-16 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND RO-10 6"-ET-0264 ZNQP 6" A.T ERV-7-14 2"x5" QW S.RR QR-80578 CJC DRAWING NAME 17" 622 665 17" ISSUE CONSTR. REV.33 7"-RX-4448 CHECK'D 8"x7" SDL ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. SDL 24. ERV-1-27 DELETED AB-27216 19659437 DIMENSIONAL TOLERANCE +/- 1MM. 23. DELETED 13" DETAILS. WX-01387 APPRV'D ST-70675 131 4" 9. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. MADE 10/01/19 485 6. IJ-41755 ORGANIZATION GH-91676 2"-IJ-3917 18. 12" HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 489 MAINTAINENCE AND MODIFICATION. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME MN-69803 5" IJ-17846 DELETED NOTES 984 WX-43607 REV A DELETED CD-15909 11. 17. WX-54061 20. C.GXN 6" 12. ZLO 8" 15. PQR VALVE TO BE INSTALLED AT Q POINT. 22. DV-69110 EF-91625 245 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, CONNECTION TO EXHAUST IS PROVIDED. YR STA CV-20210 SAMPLE ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 18" CV-42074 DV-68628 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE ISSUE 8"-FS-3757 CS-18 PHW-26-60 WX-39209 21. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh Std. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 5. SCALE 7. PROJ. PQR P&ID IJ-72201 DV-12499 DOTTED LINES ARE ALTERNATE. CONTRACTOR PROJECT NO. 19. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DV-04382 DDL UV-49168 DDL RV-07669 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 2. KL-37213 SSX 6"x6" 4. SDL 279 CV-37363 ERV-4-76 2 614 MN-44434 RV-39576 6"x8" WX-99591 ABC TO XYZ FOR MAINTAINENCE. SAMPLE_8311.JPG ZLC FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD EF-17311 2"-IV-6103 IJ-36503 PROJECT/LOCATION/ASSIGN CD-63447 10. OP-75321 IJ-70458 OP-18725 DELETED BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE 16. AB-86200 WX-14255 INS ( -12°C ) GRO 8.
doc_394
[ "7", "\"", "-", "ET", "-", "4499", "27", ".", "FOR", "DETAILS", ".", "KWh", "Z", ".", "LL", "A", "18", ".", "6", "\"", "x5", "\"", "Std", ".", "DELETED", "ERV", "-", "5", "-", "50", "DDL", "JMSL", "21", ".", "KL", "-", "19367", "DELETED", "...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "8\"-WU-3804", "7\"-OC-6909", "3\"-WA-2965", "2\"-OX-0506", "4\"-FF-4703", "7\"-ET-4499", "3\"-CW-6533", "5\"-WT-8879", "8\"-FS-7248", "5\"-KV-8465", "2\"-GO-3733", "6\"-OU-9006" ]
7"-ET-4499 27. FOR DETAILS. KWh Z.LL A 18. 6"x5" Std. DELETED ERV-5-50 DDL JMSL 21. KL-19367 DELETED ST-59087 203 ST-63537 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 3. GRP LN 8"-FS-7248 909 IJ-59317 254 26. DV-62288 5"-KV-8465 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 692 DELETED RV-89641 IJ-04304 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME ORGANIZATION PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. CV-79035 RV-40171 24Oct12 ERV-5-93 4"-FF-4703 15/07/15 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. ISSUE 8. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED HD QR-65967 CS-10 LG-10 BZS CONNECTION TO EXHAUST IS PROVIDED. LG-10 CONTRACTOR NO. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE QR-69240 ISSUE CONSTR. REV.44 ST-07379 25. ST-95916 425 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD REV OP-44937 996 18/04/23 INSTALLATIONS/OPERATIONS. M-3 DV-78256 DESCRIPTION ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. B 19. 6" MAINTAINENCE AND MODIFICATION. CHECK'D CONTRACTOR PROJECT NO. WX-53517 620 5"-WT-8879 OP-54358 SAMPLE_5562.JPG Q.R ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 644 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. C 3"-WA-2965 UNIT DRAWING NAME ISSUE CONSTR. REV.55 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 23. 2. PROJ. XYZ P&ID ZVT-31-51 CV-81839 8"-WU-3804 CV-36141 STA 2"-GO-3733 18Mar18 ABC TO XYZ FOR MAINTAINENCE. DELETED 329 CONTRACT NAME ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. ERV-2-37 ST-47085 A.DQ SCALE RO-10 WX-82414 9" INSTALLED. 28. S.SG CV-12093 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ APPRV'D W.ADJ DELETED TYPE VALVES. SAMPLE Project DV-03148 RO-10 24. SDL IJ-10900 199 42-5141 STA 2"-OX-0506 728 PROJECT/LOCATION/ASSIGN ISSUE CONSTR. REV.33 WX-96460 EF-13294 9"x9" M.EBZ RV-19146 3" EC 368 DATE DRAW/SHEET NO. CS-73 RV-85888 5" 95462697 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 6" 12. NOTES 16. RO-10 6. SYNTHETIC PROCESS FLOW DIAGRAM 16" BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, UV-52017 DDL CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. SDL 10. 451 22. A.LCU PQR VALVE TO BE INSTALLED AT Q POINT. TOP CONNECTION. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 13. DIMENSIONAL TOLERANCE +/- 1MM. INS ( -36°C ) 1 RV-95880 DDL ISSUE CONSTR. REV.22 17. 7. 13" 1. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ERV-9-13 ISSUE CONSTR. REV.11 15. 8"x7" 12/02/16 4. AB-82456 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. RI-2255 ST-69203 12" 7"-OC-6909 3"-CW-6533 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND D GH-98976 MADE CS-23 329 COMMENTS. XMRC 14" 20. DOTTED LINES ARE ALTERNATE. W.SXD CV-23778 14. 4"x7" GH-54090 9. OP-00244 EF-48740 SAMPLE SITE IN CASE OF MISMATCH. F.DO COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 DELETED 11. DWG-1.23.23.578, DWG-1.23.23.789. 5. 6"-OU-9006 AV-67224 E
doc_159
[ "760", "J", ".", "L", "EF", "-", "54933", "ALL", "FIXTURES", "ARE", "VALIDATED", "AND", "COMPLIANT", "WITH", "XYZ", ".", "21", ".", "DV", "-", "33587", "AV", "-", "31611", "FOR", "GENERAL", "NOTES", "AND", "LEGENDS", "SEE", "THE", "DWG", "-", "1", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "8\"-OA-1362", "7\"-EM-7796", "6\"-ZS-6092", "4\"-DT-2388", "5\"-XY-2634", "5\"-JP-3440", "8\"-LR-6548", "6\"-YX-1387", "5\"-ZT-4391", "4\"-AF-8324", "6\"-UQ-9043", "6\"-OS-3647", "3\"-BY-2647", "5\"-AH-8683", "4\"-WD-3217" ]
760 J.L EF-54933 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 21. DV-33587 AV-31611 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. 11. 27" GEUS 102 ISSUE CONSTR. REV.44 GLR 4" ISSUE CONSTR. REV.11 14. LQYS LG-10 16. OP-62503 INS ( 27°C ) GH-31776 STA 540 CD-84586 CD-90488 19. 1" GRP 06560640 STA 691 RV-07865 DRAW/SHEET NO. SDL 6" ERV-8-25 QR-64297 9. 5"-AH-8683 ERV-7-08 TOP CONNECTION. ORGANIZATION APPRV'D EF-31754 SCALE MN-86083 AV-03525 389 STA 232 V.W ZLO DRAWING NAME CS-76 884 5. CHECK'D 916 AB-12666 C.BWD STA 447 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. MADE SAMPLE 539 LG-10 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. IJ-89203 ERV-2-44 STA 5" PQR VALVE TO BE INSTALLED AT Q POINT. AV-64003 608 O.E ST-50076 DELETED AV-97025 CD-21563 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 17. PV-6204 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. MN-07076 P.YRE B GH-48024 RO-10 24/05/17 VE AV-12667 CV-28771 LDUG 817 14" A 374 STA LG-10 RV-60090 INS ( 57°C ) J.SIE 799 UNIT QK-74-28 UV-16711 UV-56943 DDL DELETED 704 INS ( 33°C ) HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. KL-78839 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. LG-10 20. AB-74922 E 11/10/10 372 CD-28063 4 SDL COMMENTS. NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. O.H QR-52790 7. 3"-BY-2647 AB-68389 CD-72193 PROJ. DEF P&ID ISSUE CONSTR. REV.22 CV-09698 AB-74283 AB-48401 WX-58067 ISSUE CONSTR. REV.33 MN-66555 GH-29822 INS ( -25°C ) 15/01/13 6"-YX-1387 569 DELETED 826-4352 4. 11" 826 13. DATE 462 C ST-48898 B.ST IJ-95339 CS-89 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME SAMPLE_1854.JPG 793 8"-OA-1362 STA STA 7"-EM-7796 6. 134 CONTRACT NAME CS-88 5"-XY-2634 4"-WD-3217 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND ISSUE SAMPLE Project AV-89332 5"-JP-3440 IJ-70488 15. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. CD-67896 OP-17106 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. O.PYJ PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 8"-LR-6548 MODIFICATION. DV-99513 NOTES 549 RO-10 DESCRIPTION 19/05/15 18. 3" DDL CS-08 DV-15672 SDL RV-70308 RO-10 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 6"-ZS-6092 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 6"-OS-3647 INS ( -29°C ) CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DELETED ZLO 12. CONTRACTOR PROJECT NO. LG-10 2" RO-10 D STA 3. REV 1. PROJECT/LOCATION/ASSIGN None 5" 359 SDL CONTRACTOR NO. X-2 ZLO SYNTHETIC PROCESS FLOW DIAGRAM 937 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 8. 206 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 4"-DT-2388 2. ST-07213 EF-48798 250 Z.K AB-06387 588 4"-AF-8324 AB-64656 STA G.EP 251 DELETED LG-10 AB-02390 MN-17986 STA 10. GH-87734 CD-51513 10Nov06 5"-ZT-4391 STA DDL ERV-5-08 STA 13" 4" 9"x2" QR-70100 ERV-7-59 GH-68196 558 6"-UQ-9043 UV-21193 CV-49167 ISSUE CONSTR. REV.55
doc_98
[ "WX", "-", "36522", "DV", "-", "71890", "KL", "-", "55074", "ISSUE", "OP", "-", "16263", "HAS", "NO", "REVELANCE", "WITH", "ANY", "OTHER", "SIMILAR", "LOOKING", "DOCUMENTS", "FOUND", "IN", "THE", "ANY", "OTHER", "CONCERNED", "ENTIRELY", "RANDOM", "GENERATE...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", ...
[ "8\"-ML-1317", "5\"-YZ-0218", "5\"-RU-3203", "8\"-JJ-3563", "5\"-CU-0880", "4\"-HI-0557", "6\"-EV-9664", "5\"-EF-8165", "4\"-BA-8137", "8\"-LD-8871", "8\"-FL-2068", "7\"-TG-7564", "2\"-VY-3889" ]
WX-36522 DV-71890 KL-55074 ISSUE OP-16263 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH APPRV'D 8"-ML-1317 5"-CU-0880 F.NT SAMPLE QR-11202 S.DJG ZLC DV-98133 DRAW/SHEET NO. DDL CONTRACT NAME LG-10 D C U.WXU MADE N.JD EF-83880 NOTES 865 20. CD-56578 KL-92210 12. 22. 2. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 16. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. INS ( 44°C ) Y-3 IJ-68694 10. STA VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE CS-73 QR-55523 6. 13. FOR DETAILS. LG-10 QOH UV-84685 IJ-91813 PVWJ B IJ-85675 11" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. ST-27938 6"-EV-9664 1" AV-37748 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 4"-BA-8137 A GH-70422 GH-35329 19. KWh UNIT SCALE CONNECTION TO EXHAUST IS PROVIDED. 539 AB-10247 835 23/04/28 CS-37 CS-15 IJ-49450 5" 23" Q.IIO INS ( -56°C ) 839 ISSUE CONSTR. REV.44 AB-86453 ST-23469 625 TOP CONNECTION. 8. 1. CONTRACTOR PROJECT NO. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 20/01/03 IJ-57415 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 225 LG-10 5"-YZ-0218 COMMENTS. INSTALLATIONS/OPERATIONS. ISSUE CONSTR. REV.33 QR-54759 325-7361 RV-84378 DELETED SAMPLE Project 8"-LD-8871 STA GRO PROJECT/LOCATION/ASSIGN DESCRIPTION 6" WX-30347 DATE Std. 18. WX-89393 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 4"-HI-0557 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. CD-92078 N.HSJ 15Sep08 RO-10 SDL 109 973 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME TYPE VALVES. RZ-8375 CD-09079 697 GH-56810 ISSUE CONSTR. REV.11 928 7" DDL ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DELETED WX-07873 RV-18376 1 8"-FL-2068 CHECK'D KL-28035 REV 21. ISSUE CONSTR. REV.22 198 DELETED ST-23931 DELETED DOTTED LINES ARE ALTERNATE. ERV-0-19 DDL T.UW 560 GRP 5"-RU-3203 KL-49570 MAINTAINENCE AND MODIFICATION. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 23. 599 094 17. RO-10 530 RO-10 WX-25151 7"-TG-7564 3" SYNTHETIC PROCESS FLOW DIAGRAM DWG-1.23.23.578, DWG-1.23.23.789. GH-01422 21/11/09 DRAWING NAME 619 ORGANIZATION SDL MN-55573 DELETED CONTRACTOR NO. 8"-JJ-3563 9. INS ( -44°C ) 4"x6" ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 717 90132777 22" ERV-5-95 3. 970 QR-97412 2"-VY-3889 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, WX-70263 14. 7. 371 5. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ CV-15351 724 442 SAMPLE_5370.JPG 11. 15. DELETED 7" H.T PQR VALVE TO BE INSTALLED AT Q POINT. GRP 2" DDL 4. 5"-EF-8165 INSTALLED. 24. ZLC PROJ. DEF P&ID I.ZPE 960 H.ATF RO-10 ZDY-74-69 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING.
doc_376
[ "7", "\"", "-", "QU", "-", "8400", "AV", "-", "59635", "ISSUE", "CONSTR", ".", "REV", ".", "55", "IJ", "-", "01312", "DELETED", "ZLC", "RV", "-", "14087", "3", "\"", "DELETED", "COMPONENTS", "ARE", "AT", "NORMAL", "PRESSURE", "WITH", "POWER", "RATING...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "3\"-EB-9899", "5\"-UZ-9198", "8\"-DA-9324", "5\"-RP-9413", "8\"-GX-1897", "7\"-QZ-3363", "8\"-OE-3366", "7\"-CK-6530", "8\"-AS-1283", "8\"-FF-3807", "7\"-QU-8400", "5\"-LR-8419", "6\"-EM-9259", "3\"-ZC-4791" ]
7"-QU-8400 AV-59635 ISSUE CONSTR. REV.55 IJ-01312 DELETED ZLC RV-14087 3" DELETED COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh ST-44111 10. 649 QR-08924 8"-DA-9324 7"-CK-6530 GLR ST-96962 8"-AS-1283 QR-19274 RV-16889 53-8277 ST-97498 EF-45351 YW-67-59 ZLO 197 554 3"-EB-9899 13. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND MAINTAINENCE AND MODIFICATION. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 337 C EF-47136 PROJECT/LOCATION/ASSIGN 11. 13" 22. CONTRACTOR NO. 530 291 A SDL ERV-4-78 MN-99039 CD-80577 920 365 ISSUE CONSTR. REV.11 DETAILS. 460 CD-20514 RO-10 2. TOP CONNECTION. 29" GRO ORGANIZATION ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN 120 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER T.J COMMENTS. MADE B SDL KL-96770 CONNECTION TO EXHAUST IS PROVIDED. 1. 12. UV-36116 SDL STA HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED RO-10 ZLC 629 472 13/10/03 DDL QR-59003 RV-25194 DIMENSIONAL TOLERANCE +/- 1MM. Std. 4. 5"-UZ-9198 K.BYF 6"-EM-9259 8. D SAMPLE Project 424 ERV-4-14 IJ-10902 OP-88851 KL-50267 PQR VALVE TO BE INSTALLED AT Q POINT. ERV-6-45 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. IJ-60607 9. 973 G.SUA 11/03/14 EF-96506 KL-96557 DDL IJ-49267 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD QR-56512 GRO 752 8"x2" QK ISSUE CONSTR. REV.22 935 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, E 14. STA AV-16932 3. RV-77196 K.G CD-46894 RV-21434 DATE 996 2"x7" CD-92942 U.UR REV VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. DELETED DV-95966 5"-LR-8419 538 19. 20Feb22 EF-67977 15. 905 UV-23534 SDL 8"-OE-3366 INS ( -19°C ) DRAWING NAME CONTRACTOR PROJECT NO. ZLO 262 G.ST CONTRACT NAME DESCRIPTION TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. A.K NOTES INS ( 46°C ) ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. IJ-14396 17. VG-7377 DOTTED LINES ARE ALTERNATE. 992 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR UNIT ST-89348 DDL APPRV'D PROJ. XYZ P&ID LG-10 OP-61016 C.TX 913 10/06/07 CD-32414 8"-GX-1897 8"-FF-3807 CASE OF MISMATCH. CV-27529 SYNTHETIC PROCESS FLOW DIAGRAM WX-66942 12/04/21 CS-17 QR-68407 5 728 ISSUE CONSTR. REV.33 20. 7. RV-04402 CHECK'D SAMPLE_6252.JPG CS-53 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY DV-72536 CS-31 1"x8" 89463772 OP-56840 7"-QZ-3363 ST-65524 D.LZF DV-22517 DV-02164 GRI CS-99 5"-RP-9413 3" AB-55149 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ CV-50576 DWG-1.23.23.789. DELETED H-3 P.RJ 426 DELETED ZLO SDL MN-04089 1" SAMPLE PQ GRI CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. DRAW/SHEET NO. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. ISSUE 16. 5. 18. DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. NXQ SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 5" 6. RV-76542 ISSUE CONSTR. REV.44 3"-ZC-4791 21. SCALE SJ J.EM STA RV-41266 SDL
doc_497
[ "21", ".", "ZLO", "DOTTED", "LINES", "ARE", "ALTERNATE", ".", "WITH", "AS", "MUCH", "SIMILARITY", "AS", "POSSIBLE", ".", "THESE", "EFFORTS", "ARE", "MADE", "TO", "FACILATE", "RESEARCH", "IN", "THE", "FIELD", ".", "ZLC", "SAMPLE", "Project", "REV", "5", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-GD-3892", "6\"-DH-9901", "5\"-FT-2952", "8\"-PC-4485", "8\"-PR-5120", "2\"-CT-5419", "2\"-WG-9629", "6\"-TK-4394", "6\"-MB-4959", "5\"-ZJ-6172" ]
21. ZLO DOTTED LINES ARE ALTERNATE. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. ZLC SAMPLE Project REV 5. SITE IN CASE OF MISMATCH. 24-4498 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 841 17" AV-60613 ZLO SAMPLE_3733.JPG 19. ZLO DATE RO-10 AG ISSUE CONSTR. REV.33 13/02/09 ST-88181 16/07/26 17" DDL 935 CD-72665 DDL ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. GI 581 Y.SEB ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT GRI AV-24995 SCALE Z.I 10. 560 INS ( -19°C ) DV-36080 QR-6349 14. 23. CV-70388 2. Q.JTB INS ( 15°C ) DELETED 8"-PR-5120 377 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED CV-64711 STA 13/03/03 CONTRACT NAME ZLC 4. K.VWT 11. 8. 5"-FT-2952 INSTALLED. 2"-CT-5419 EF-37236 CONTRACTOR PROJECT NO. 18. 911 CS-28 18" 16. ERV-1-46 A 205 571 KTJP FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 23Nov27 IJ-77939 637 24. DELETED PROJ. DEF P&ID GH-28153 MN-37525 IJ-32923 OC 558 SAMPLE CONTRACTOR NO. 810 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 TOP CONNECTION. DESCRIPTION 09847652 8" VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 375 DV-01633 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE PROJECT/LOCATION/ASSIGN 1. STA MADE 537 3. ST-02599 IJ-73364 6"x7" IJ-18977 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS C DQP-69-02 FOR DETAILS. ZLO ERV-7-66 6"-TK-4394 QR-60396 AV-12996 KL-91967 DRAWING NAME 9. NOTES 193 H.W ERV-7-38 RV-48541 12. ST-19699 UV-02581 ISSUE LG-10 6"-MB-4959 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. EF-41999 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. WX-00772 CD-70578 CIU EF-61266 RO-10 ABC TO XYZ FOR MAINTAINENCE. MN-41846 GLR CHECK'D 140 20. DWG-1.23.23.578, DWG-1.23.23.789. RO-10 IJ-60276 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ISSUE CONSTR. REV.11 AB-81172 1"x7" KWh IJ-71332 RV-37803 FR 13. UV-05652 2"-GD-3892 AV-52583 AB-20062 8"-PC-4485 ISSUE CONSTR. REV.44 CONNECTION TO EXHAUST IS PROVIDED. 1" TYPE VALVES. GH-12751 CS-82 UNIT QJ THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ INS ( 58°C ) 237 17. QR-37649 ERV-2-73 A.C 6. QR-84654 AV-40321 DIMENSIONAL TOLERANCE +/- 1MM. SDL DRAW/SHEET NO. ZLO 25" 2"-WG-9629 22. CD-07362 GRI RO-10 ORGANIZATION 6"-DH-9901 833 130 KL-17727 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. APPRV'D 15. Std. 601 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 420 DELETED N-7 COMMENTS. 510 RV-23177 ERV-8-26 KL-19595 RO-10 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS D COMPULSORY. SYNTHETIC PROCESS FLOW DIAGRAM DELETED AB-16153 7. UV-11829 GLR LG-10 DELETED CV-65844 7" ST-82469 713 5"-ZJ-6172 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 295 QR-66337 RV-65753 539 B 3 KL-91414 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ISSUE CONSTR. REV.22 GH-25757 957 DELETED AV-46168 INSTALLATIONS/OPERATIONS. MN-84398
doc_6
[ "TEMPERATURE", "CONTROL", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "BY", "DEFAULT", ".", "ST", "-", "55094", "19", ".", "CONNECTION", "TO", "EXHAUST", "IS", "PROVIDED", ".", "KL", "-", "34292", "SITE", "IN", "CASE", "OF", "MISMATCH", ".", "ST", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", ...
[ "8\"-ZC-7662", "6\"-TI-5410", "2\"-EV-9445", "5\"-ND-1717", "7\"-IR-7336", "3\"-VD-6420", "2\"-QI-6333", "4\"-JZ-2121", "4\"-QL-4417", "6\"-XY-6640", "4\"-YC-1715", "2\"-FU-8342", "4\"-DI-9513", "8\"-SQ-5709", "4\"-WO-6658", "8\"-OC-9198", "5\"-WH-8773", "8\"-ZQ-5298", "2\"-IX-35...
TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ST-55094 19. CONNECTION TO EXHAUST IS PROVIDED. KL-34292 SITE IN CASE OF MISMATCH. ST-29302 ST-80624 D KWh 6"-XY-6640 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 5"-ND-1717 ORGANIZATION CWPQ TOP CONNECTION. WX-44858 18/09/09 QR-32520 LG-10 FZ-66-91 21. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS DOTTED LINES ARE ALTERNATE. QR-86873 618 4"-YC-1715 DIMENSIONAL TOLERANCE +/- 1MM. 4"x1" LG-10 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 10. 915 LG-10 5. 18" 218 EF-89355 15. DDX 15-1500 CD-77464 18. 6"-TI-5410 DELETED QR-89326 None 339 SAMPLE Project 2"-EV-9445 EF-31775 ISSUE CONSTR. REV.22 V.IU A.QFY 22. CV-30487 CS-00 2. ISSUE CONSTR. REV.11 DS UV-02717 288 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. KL-92596 4"-QL-4417 443 CONTRACTOR NO. 12. PROJ. PQR P&ID CV-72793 INSTALLED. DV-75572 8"-SQ-5709 293 ERV-5-95 DELETED 213 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME ST-60037 CS-40 CV-72994 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DELETED 8"-ZQ-5298 IJ-19045 MN-15143 455 667 4. COMMENTS. DV-16059 CV-82391 NOTES UV-90332 DRAWING NAME 8"x2" WX-25195 IJ-98201 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND CONTRACTOR PROJECT NO. AB-06982 DWG-1.23.23.578, DWG-1.23.23.789. WX-18796 SAMPLE DELETED OP-93379 ERV-2-32 ST-93135 7. CS-69 C 10548268 WX-20098 MN-46044 2"-IX-3562 V-8 OP-32901 12" 495 DESCRIPTION MN-35459 3. 826 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 5"-WH-8773 DDL 973 RO-10 CHECK'D 20/02/17 S.NRD ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. SDL 289 13" S.TTM 8" FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 3" 192 SAMPLE_6467.JPG SDL CV-91132 GRI STA FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 8. ZWB 9. KL-47616 5"x3" ISSUE CONSTR. REV.33 AB-46953 UNIT FOR DETAILS. 13" DDL 823 4"-WO-6658 3"-VD-6420 DRAW/SHEET NO. 2"-FU-8342 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 2"x2" KL-09349 ST-02743 DELETED UV-68923 14Nov01 ZLC CD-59140 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH REV 23/07/26 8"-OC-9198 IJ-66160 DDL 317 3"x6" 717 231 GI A PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. MJ-1158 609 SCALE ERV-5-27 GRI MADE ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SDL 4"-DI-9513 GI 632 Z.SX DATE ZLO ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. J.W 6. INS ( 12°C ) ERV-8-93 OP-39973 UV-93595 CD-98796 14. 16. ISSUE CONSTR. REV.55 PROJECT/LOCATION/ASSIGN PQR VALVE TO BE INSTALLED AT Q POINT. 5 1. I.OAH C.J 13. AB-64928 DELETED MN-80998 SYNTHETIC PROCESS FLOW DIAGRAM UV-60091 8"-ZC-7662 226 WX-51350 RV-84498 IJ-97791 PB HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED RV-27437 179 MN-55385 DDL 10/05/16 WX-29853 CD-91643 17. UV-55934 EF-53779 RO-10 23. RO-10 LG KL-74088 TYPE VALVES. 11. CONTRACT NAME RV-61281 20. CD-64169 238 2"-QI-6333 OP-63973 OP-45678 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. ISSUE CONSTR. REV.44 ISSUE CS-11 B 4"-JZ-2121 APPRV'D CV-47862 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ STA SDL UV-69571 LAX E 103 GI 7"-IR-7336
doc_176
[ "IJ", "-", "29647", "KL", "-", "03542", "ALL", "DIMENSIONS", "SHALL", "BE", "VERIFIED", "BY", "XYZ", "CONTRACTORS", "BEFORE", "RO", "-", "10", "COMMENTS", ".", "MN", "-", "31368", "10", ".", "814", "AB", "-", "93248", "16", ".", "7", ".", "GRI", "5...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", ...
[ "6\"-HJ-1472", "4\"-KQ-5495", "5\"-RU-9110", "6\"-DB-8826", "2\"-IQ-9895", "7\"-OP-3734", "8\"-HA-2150", "4\"-KJ-0642", "2\"-AU-4859", "5\"-KM-9530" ]
IJ-29647 KL-03542 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE RO-10 COMMENTS. MN-31368 10. 814 AB-93248 16. 7. GRI 582 4"-KJ-0642 DWG-1.23.23.578, DWG-1.23.23.789. 18. DIMENSIONAL TOLERANCE +/- 1MM. ST-31388 J.NOW INS ( 42°C ) ST-06267 SAMPLE SYNTHETIC PROCESS FLOW DIAGRAM ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DELETED DELETED TUM UNIT 739 A 4. ISSUE CONSTR. REV.22 GH-41871 QR-99834 RV-50287 CONTRACT NAME LG-10 MN-10543 MADE FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD EF-62071 8. AB-45632 IJ-86958 21. APPRV'D 12. M.TQJ WX-56845 PROJECT/LOCATION/ASSIGN ZLO SDL ZJ-2761 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS CHECK'D BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 6"-HJ-1472 ISSUE CONSTR. REV.33 INSTALLATIONS/OPERATIONS. STA DELETED E SCALE 24/02/02 9. W.GO 5"-RU-9110 EF-59352 13/04/15 CV-14976 20. 877 309 566 7"-OP-3734 CONTRACTOR PROJECT NO. RO-10 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 None DELETED VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE LYGE 2" B CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE DELETED C 6"-DB-8826 DV-81895 INSTALLED. 159-2561 ISSUE CONSTR. REV.44 CV-19444 29. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH CD-23055 25. 2 WX-75428 KL-52801 MN-47603 ABC TO XYZ FOR MAINTAINENCE. 14" 28. LG-10 IJ-12158 CONTRACTOR NO. 17. V.C UV-89100 22. 275 17" CD-10707 2. A.ZTR 929 3. 27. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 46926188 24. 5. 14. 108 U-8 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 253 TOP CONNECTION. 15. MX DRAW/SHEET NO. 360 K.Z 5"-KM-9530 DATE ERV-4-14 GLR SITE IN CASE OF MISMATCH. KWh LII SDL DESCRIPTION OP-65704 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ST-76278 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND FOR DETAILS. WX-68208 6. REV TYPE VALVES. UV-28333 7" 19" 156 GI SAMPLE Project 11. 19. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. DV-56922 MAINTAINENCE AND MODIFICATION. LG-10 20Jul08 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED H.GKB SYNTHETIC PROCESS ENGINEERING FLOW SCHEME X.AO COMPULSORY. DV-48004 10" 13. 8" ORGANIZATION ST-90019 23. RO-10 26. PROJ. PQR P&ID 450 742 21/12/17 DELETED 635 191 MN-50857 STA ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 1. MEG-69-34 10" 8"-HA-2150 ISSUE CONSTR. REV.55 3"x7" DOTTED LINES ARE ALTERNATE. D DRAWING NAME FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, PQR VALVE TO BE INSTALLED AT Q POINT. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. NEOK INS ( 58°C ) CONNECTION TO EXHAUST IS PROVIDED. EF-63755 NOTES 4"-KQ-5495 2"-AU-4859 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ RV-74802 AB-23472 OP-20600 HUSO 2"-IQ-9895 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT ISSUE SAMPLE_6717.JPG ISSUE CONSTR. REV.11 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 AD 19/05/14
doc_377
[ "IJ", "-", "02172", "D", "ELEVATION", "ARE", "TO", "CENTER", "LINES", "UNLESS", "OTHERWISE", "NOTED", ".", "KL", "-", "74483", "MAINTAINENCE", "AND", "MODIFICATION", ".", "STA", "RO", "-", "10", "KL", "-", "13300", "DDL", "ISSUE", "CONSTR", ".", "REV", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "4\"-ZI-8672", "3\"-NL-2907", "7\"-AX-2128", "7\"-FK-4582", "3\"-DU-7801", "4\"-UU-6888", "4\"-IQ-9739", "7\"-FL-9497", "6\"-QS-4991", "7\"-SW-9262", "6\"-TL-4290", "5\"-GU-2777", "2\"-DX-1222" ]
IJ-02172 D ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. KL-74483 MAINTAINENCE AND MODIFICATION. STA RO-10 KL-13300 DDL ISSUE CONSTR. REV.22 ST-34198 DV-96464 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN LVZX DV-84416 GRO 6. COMMENTS. DATE KL-52166 AB-17248 DV-02733 7"-AX-2128 SYNTHETIC PROCESS FLOW DIAGRAM 8. ZLO MN-09248 GX ST-74439 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 6"-QS-4991 RV-78523 3. MN-29504 1 KL-69757 11. RV-50057 13. SAMPLE LG-10 KL-16401 7"-FK-4582 CS-63 4"-IQ-9739 CS-51 CHECK'D ZLO CD-82177 1. C RV-83153 INS ( 22°C ) 73309136 12. ST-41437 CONNECTION TO EXHAUST IS PROVIDED. 1"x7" ERV-1-72 241 STA 19. DELETED DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ O-5 EF-12565 CONTRACTOR PROJECT NO. CONTRACTOR NO. QR-79036 394 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 10/03/27 GT RO-10 DETAILS. 8"x4" RO-10 9. NOTES BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DELETED 11/03/12 EF-77819 RO-10 ISSUE 709 AV-55129 633 4"-ZI-8672 150 DV-78670 20. 5"-GU-2777 QR-44652 EF-87977 VALVES. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME KL-68027 KL-44213 217 UV-28467 13" 6"x4" DRAW/SHEET NO. 5. 810 CONTRACT NAME SDL DELETED CV-84014 INS ( 37°C ) 6"-TL-4290 MADE 15" UV-34303 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 6" ZLO KL-17375 AV-73197 14. CS-53 15. ORGANIZATION 20/02/05 CD-90232 275 4. KL-14551 WX-86350 None DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DESCRIPTION 230 914 DELETED ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE OUIU X.FQY OP-60352 V.JK UV-23813 DDL UNIT IJ-05779 CS-62 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 2"-DX-1222 633 DOTTED LINES ARE ALTERNATE. 15/02/15 INS ( 25°C ) GH-83417 7"-FL-9497 YHB-58-71 7. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY CS-95 ISSUE CONSTR. REV.11 REV 17. UI-6686 21. 871 A GH-12216 KL-92539 AB-30309 RO-10 146 15" KL-62454 CD-24382 QR-22310 APPRV'D INS ( 47°C ) DRAWING NAME CASE OF MISMATCH. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ST-54742 2. CV-83605 3"-NL-2907 181 TYI SDL ERV-9-05 ST-32669 UV-29799 14" TOP CONNECTION. 11" ISSUE CONSTR. REV.44 MN-67249 DIMENSIONAL TOLERANCE +/- 1MM. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. RV-72619 7"-SW-9262 WX-91448 4"-UU-6888 SCALE RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 10. 3"-DU-7801 SAMPLE_6218.JPG KL-32897 24" LA VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 10" 10" OP-14717 EF-74339 DWG-1.23.23.789. 38-4815 W.NZM 807 621 PJA 18. ISSUE CONSTR. REV.33 PROJECT/LOCATION/ASSIGN PROJ. PQR P&ID INSTALLATIONS/OPERATIONS. ERV-4-58 CGB SAMPLE Project GS OP-38885 16. 135 LG-10 INS ( -52°C ) 15" 184 B FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578,
doc_16
[ "789", "LG", "-", "10", "I", ".", "N", "KL", "-", "81635", "DDL", "WX", "-", "37839", "OP", "-", "23549", "CROSS", "-", "CHECKING", "AT", "CRITICAL", "SITES", "NEAR", "EFGH", "VALVES", "ARE", "ANY", "OTHER", "DOCUMENTS", "OF", "SIMILAR", "FIELDS", "W...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE"...
[ "3\"-CN-6012", "7\"-CC-7255", "6\"-HK-9685", "6\"-KU-7709", "5\"-ZX-4735", "6\"-RW-1068", "5\"-UN-5637", "3\"-KC-9815" ]
789 LG-10 I.N KL-81635 DDL WX-37839 OP-23549 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 16. INS ( -16°C ) 6"-KU-7709 KZEA 19. LG-10 INS ( 39°C ) 982 ISSUE CONSTR. REV.11 493 GI LG-10 2. RO-10 DDL MN-65476 4. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. COMMENTS. 102 SCALE WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 3"-KC-9815 ISSUE THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ STA CV-01705 RO-10 CHECK'D 6"-HK-9685 1. CBCH CS-36 740 MN-65857 599 947 MAINTAINENCE AND MODIFICATION. INSTALLED. DELETED PROJ. DEF P&ID FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. S.X RO-10 12. 15. TOP CONNECTION. 103 LG-10 115 DDL ERV-5-08 18. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, RO-10 APPRV'D KL-37613 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE L.ELY CONNECTION TO EXHAUST IS PROVIDED. DATE ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. HJLR 100 6. GI UV-03249 4" 474 CONTRACT NAME 20. 803 682 CS-59 DF-83-59 AV-48769 ZLC ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 728 23/01/16 B ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE REV 11. ST-30272 GRI 504 WX-98201 WX-56496 3" IJ-21329 SYNTHETIC PROCESS FLOW DIAGRAM CONTRACTOR PROJECT NO. LG-10 DRAW/SHEET NO. DIMENSIONAL TOLERANCE +/- 1MM. ERV-1-79 LG-10 DELETED A MADE CV-65402 29" PROJECT/LOCATION/ASSIGN 2" UDH QR-86766 LG-10 SAMPLE_8782.JPG Std. 21. 329 97816121 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 255 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ISSUE CONSTR. REV.22 860 FOR DETAILS. ERV-5-77 4 6"x6" PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 7"-CC-7255 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME GH-41536 LG-10 18May20 18" MN-63709 632 ISSUE CONSTR. REV.33 512 UV-80379 STA WX-86325 8. WX-52012 LNP 634 LG-10 INS ( 37°C ) B.ION CV-19409 KL-84258 DV-47723 267 7. DDL SITE IN CASE OF MISMATCH. SAMPLE INSTALLATIONS/OPERATIONS. 7" PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 433 10. DV-91985 201 DRAWING NAME 115 17. DOTTED LINES ARE ALTERNATE. CD-75083 INS ( 29°C ) INS ( -43°C ) SAMPLE Project C DV-15756 DELETED 355 3"-CN-6012 14. 532 16/06/28 QR-04709 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH UV-28434 GRO MN-08158 314 STA RV-76794 SDL DV-26993 13. AV-47143 DESCRIPTION DV-43321 CD-61509 823 QR-27316 UNIT CS-05 LG-10 DV-49668 216 642 XG-5474 673 847 DV-58128 NOTES INS ( -11°C ) 697 3" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 5"-ZX-4735 6"-RW-1068 GRO 5. ST-24094 708 AV-42289 3. UV-08343 DELETED COMPULSORY. OP-98699 196 ORGANIZATION 694 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED AB-82949 OP-41024 GRI WX-53541 W-0 AV-13303 9. 5"-UN-5637 CONTRACTOR NO. 265-8712
doc_259
[ "XM", "-", "5346", "LG", "-", "10", "APPRV", "'", "D", "4", "\"", "-", "UP", "-", "2149", "STA", "ET", "DELETED", "11", ".", "KL", "-", "14857", "9", ".", "418", "3", "\"", "-", "QA", "-", "7691", "ABC", "SHUTDOWN", "IF", "PQR", "DETECTS", "1...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O",...
[ "5\"-LK-3329", "7\"-JL-5394", "3\"-VY-0540", "3\"-QA-7691", "7\"-XR-5427", "8\"-NG-1504", "4\"-UP-2149", "8\"-VN-6958", "6\"-YU-3872", "3\"-NU-2922", "7\"-WH-6525" ]
XM-5346 LG-10 APPRV'D 4"-UP-2149 STA ET DELETED 11. KL-14857 9. 418 3"-QA-7691 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 21/01/28 A DRAW/SHEET NO. RV-37009 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS SDL DOTTED LINES ARE ALTERNATE. 20. STA 14" DV-40305 FOR DETAILS. 7"-XR-5427 SDL SAMPLE_6568.JPG CS-40 26. EF-54007 NOTES DELETED CV-69376 ISSUE CONSTR. REV.44 CS-35 UV-10752 ST-55914 3"-VY-0540 AB-75839 SDL RO-10 GH-96741 ERV-2-22 ERV-0-10 LG-10 REV 488 7. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE C 4. IJ-24-83 AV-32754 121 ZLO 24. AZPV LG-10 DELETED FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD EF-50691 ERV-2-68 E.KMT 5"-LK-3329 QR-52235 CUS RV-35825 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. GLR 501 DELETED 2. SAMPLE Project QR-05112 Q.CW KL-90389 R.A KWh 698 167-0247 464 RV-78661 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 5"x1" ORGANIZATION D ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SEJ DDL 403 CONTRACTOR PROJECT NO. E LG-10 CD-66710 ST-46780 ZCM EF-49704 DDL 12. STA UV-79998 CS-16 INS ( -25°C ) AQK 20/02/11 979 ISSUE CONSTR. REV.11 STA SCALE DIMENSIONAL TOLERANCE +/- 1MM. SAMPLE IJ-39406 14" QR-70989 IJ-19351 ST-69985 DV-01365 ZLC KL-95433 955 8"-NG-1504 B UV-13331 13. 13/10/14 DWG-1.23.23.578, DWG-1.23.23.789. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 19Jan02 Z.M 3"x9" SYNTHETIC PROCESS ENGINEERING FLOW SCHEME BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS CONNECTION TO EXHAUST IS PROVIDED. DDL 881 QR-95019 ISSUE CONSTR. REV.33 COMPULSORY. 888 802 16. EJI 17. CHKN FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. INS ( 28°C ) PROJ. XYZ P&ID ST-51159 11" 887 19. 14/06/21 655 MADE ISSUE CONSTR. REV.55 85669563 395 5" 201 8"-VN-6958 791 PROJECT/LOCATION/ASSIGN 7" CHECK'D 1. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 823 RO-10 ISSUE 927 7"-WH-6525 ERV-8-91 5" FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, STA 27. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 3. 979 6" DELETED UNIT 865 AV-76010 ZLC TYPE VALVES. 448 6. 18. UV-85199 X-2 5. LG-10 QR-88038 CONTRACT NAME 25. MN-81215 6"-YU-3872 O.HXO 22. ZLO EF-08801 ST-54115 OP-53892 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED DATE Std. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH DRAWING NAME CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 331 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. STA INSTALLATIONS/OPERATIONS. 10. ABC TO XYZ FOR MAINTAINENCE. F.PT ZLC SYNTHETIC PROCESS FLOW DIAGRAM 378 SITE IN CASE OF MISMATCH. ISSUE CONSTR. REV.22 UV-30853 21. DV-39311 INS ( -22°C ) DELETED DESCRIPTION 806 658 15. TOP CONNECTION. CONTRACTOR NO. 23. PQR VALVE TO BE INSTALLED AT Q POINT. CS-21 1 2" PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 3" COMMENTS. 14. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 3"-NU-2922 QR-67690 XXFQ GRI INS ( 15°C ) 8. 7"-JL-5394
doc_246
[ "FOR", "GENERAL", "NOTES", "AND", "LEGENDS", "SEE", "THE", "DWG", "-", "1", ".", "23", ".", "23", ".", "345", ",", "LG", "-", "10", "GH", "-", "21632", "WX", "-", "73393", "ORIENTATION", "OF", "ABCD", "VALVES", "SHALL", "BE", "VERIFIED", "AND", "CO...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-DJ-8667", "8\"-IS-2132", "7\"-GZ-8679", "4\"-DP-0720", "4\"-GY-3874", "3\"-WG-1863", "2\"-GY-5245", "2\"-HP-3811", "3\"-EY-9741", "8\"-ZM-0013", "2\"-TO-6423", "3\"-ES-1999" ]
FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, LG-10 GH-21632 WX-73393 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT KC 392 TVD-47-10 VP-2597 5"x3" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 404 OP-11867 682 9. KL-74188 DIMENSIONAL TOLERANCE +/- 1MM. 11" CV-08207 SDL CV-78529 REV QR-21023 IJ-99147 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 22. KU MAINTAINENCE AND MODIFICATION. LG-10 ISSUE CONSTR. REV.22 21. INSTALLED. 3. 15" 19. 7"-DJ-8667 SAMPLE_5282.JPG CV-28043 PROJ. PQR P&ID VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 240 R.GL IJ-66051 15. 8. PQR VALVE TO BE INSTALLED AT Q POINT. AB-46843 DRAW/SHEET NO. 107 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS AV-09553 GH-89580 923 956 185 RV-67325 KWh ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. MADE 6. 272 DELETED 7. DATE 4"-DP-0720 19" ISSUE CONSTR. REV.11 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 677 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. CONTRACT NAME CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 106 CONTRACTOR PROJECT NO. OP-98316 8"-ZM-0013 W-6 DDL 127 ST-73160 ERV-3-61 ERV-8-51 642 26. SAMPLE 109 24. 3"-EY-9741 TOP CONNECTION. ABC TO XYZ FOR MAINTAINENCE. 1. 23. DV-56455 ORGANIZATION KL-51659 3"-ES-1999 C UV-89949 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. CONTRACTOR NO. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, K.RFC PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. GRI EF-80021 SCALE 2"-TO-6423 4"x6" JMLM 18. 7"-GZ-8679 95-8268 DV-10772 DELETED CV-70741 LG-10 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ DWG-1.23.23.578, DWG-1.23.23.789. INS ( -44°C ) GLR PROJECT/LOCATION/ASSIGN STA 919 CV-82039 20/10/05 11. 12Apr05 SRZ 21Apr22 CV-94441 DELETED 677 8"-IS-2132 MN-88399 QR-49145 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 587 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED NOTES B 14. ERV-3-47 OP-52148 10. SYNTHETIC PROCESS FLOW DIAGRAM UNIT 20. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. CHECK'D ST-12280 17. 4. SAMPLE Project ST-51510 DDL 535 APPRV'D DRAWING NAME 16. 4"-GY-3874 GH-52135 INSTALLATIONS/OPERATIONS. AB-61281 A.IIU CONNECTION TO EXHAUST IS PROVIDED. 7" SDL EF-78029 27" INS ( -18°C ) GRP KL-69675 A FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE ED Z.ZQ ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE None 2. 901 SITE IN CASE OF MISMATCH. RV-68610 CV-72909 KL-77086 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME ZLC INS ( -47°C ) CD-75568 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. WX-69667 25. COMMENTS. UV-13184 UV-72935 13. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS UV-24683 5. 3 GH-07049 12. ISSUE CONSTR. REV.33 COMPULSORY. WX-61263 ISSUE GH-13375 TYPE VALVES. DELETED 90770074 DELETED RO-10 ST-59023 2"-GY-5245 UV-04050 DESCRIPTION 2" WX-12578 3"-WG-1863 GRP DV-76771 DDL 2"-HP-3811 SDL
doc_348
[ "RV", "-", "04870", "SAMPLE", "Project", "KL", "-", "63740", "DIMENSIONAL", "TOLERANCE", "+", "/", "-", "1MM", ".", "7", "\"", "-", "ER", "-", "6412", "945", "DELETED", "UV", "-", "33413", "RO", "-", "10", "15", "\"", "557", "102", "QR", "-", "78...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "6\"-RB-8458", "6\"-ER-5965", "6\"-GY-7899", "3\"-HA-7295", "4\"-FQ-1076", "4\"-PB-6140", "7\"-ER-6412", "2\"-ND-0069", "3\"-RR-6681", "2\"-UW-6561", "2\"-ZS-1710", "6\"-PM-1542", "5\"-JO-8014", "7\"-AW-3905", "3\"-SE-3149", "7\"-CO-8848", "4\"-VQ-5069", "7\"-NL-7921", "2\"-VZ-77...
RV-04870 SAMPLE Project KL-63740 DIMENSIONAL TOLERANCE +/- 1MM. 7"-ER-6412 945 DELETED UV-33413 RO-10 15" 557 102 QR-78354 2" DESCRIPTION AV-15205 I.S ERV-7-16 INS ( 33°C ) 4" HY-8275 2"-ZS-1710 637 6" INS ( 41°C ) 496 4"-FQ-1076 EF-19457 MN-30398 MN-51667 RO-10 16/07/22 ORGANIZATION IJ-31997 RO-10 DDL CS-25 5. DELETED ZLO 10/07/13 SDL EF-28597 15" E.TR THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 153 6"-RB-8458 DDL OP-27346 8. 937 QR-94293 DV-59004 12. 21Mar04 DV-66274 EF-83045 APPRV'D 3" AB-90443 5"x6" 1" 4"-VQ-5069 4"-BH-1531 ISSUE CONSTR. REV.11 IEFL 4. 7"-KK-2866 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ERV-7-36 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME ERV-7-91 173 KL-88581 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. CONTRACTOR PROJECT NO. 2. ST-52799 CS-77 13. IJ-60726 DELETED MN-31971 20. DV-88470 ISSUE CONSTR. REV.44 Z.TQ MN-13137 UV-28499 AV-23482 DV-66767 KL-85200 QR-48191 QR-58750 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 826 KL-59249 EF-60688 DATE ZLO SDL TKBA 2"-VZ-7775 15/10/18 RV-59732 A.WC GH-74381 ERV-3-54 SDL PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 31645262 KL-81705 15. MADE 949 1. ISSUE CONSTR. REV.55 598 CHECK'D 16. OP-39981 270 CD-84992 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. CS-97 GH-55483 RV-85503 CS-68 944 IJ-60239 5"-JO-8014 21. DV-78174 SDL ERV-3-29 IJ-98705 DV-71851 GH-72399 DOTTED LINES ARE ALTERNATE. SCALE 3 949 6"-PM-1542 COMMENTS. STA 7"-NL-7921 WX-75983 PROJECT/LOCATION/ASSIGN GH-30478 MODIFICATION. DDL FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. DV-34119 MN-82149 8"-WL-1160 AB-48297 7"-VT-0076 MN-60206 INS ( -23°C ) PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 17. 174 CV-86457 IJ-79828 8"-IP-3317 457 453 385 5" 11" B CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. EQH RO WX-79663 6"-GY-7899 GCPR IJ-24687 2" TOP CONNECTION. CD-11313 19. ST-83558 AV-59188 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. C DELETED RV-68883 OP-36885 LG-10 801 MN-39629 8"x5" QR-09606 QR-79461 AB-52626 STA 53-3053 OHIH NOTES ABC TO XYZ FOR MAINTAINENCE. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 884 CD-32941 WX-40553 SAMPLE FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 942 STA EF-14579 CONTRACTOR NO. STA WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DDL 3"-SE-3149 UV-56185 SAMPLE_7320.JPG CV-18402 STA 5"-UL-0865 EF-55708 IJ-21593 ISSUE 130 DRAW/SHEET NO. KXSQ KL-15697 OP-91470 7"-CO-8848 ISSUE CONSTR. REV.33 DDL 3"-ZF-8379 None EF-12806 INS ( -19°C ) GH-33693 7" B.HN AB-76986 11" 11. GT KL-74278 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. LG-10 LG-10 4"-PB-6140 D WX-53124 7. E ISSUE CONSTR. REV.22 3" 9. EF-50503 6. 3"-HA-7295 KL-26998 KL-84900 24/09/15 372 4"x9" ST-60287 SDL 340 ZLO 14. PROJ. DEF P&ID KL-51845 RV-91499 620 DV-44019 25. 2"-GU-7618 CV-00837 18. IJ-45100 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. 22. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED RV-19622 10. ZLO GLR 24. DRAWING NAME EF-73042 8"-GK-2915 FOS-04-33 OP-42988 6"-ER-5965 19" 2"-UW-6561 GLR CONTRACT NAME AB-76067 QR-10555 13" IJ-37700 23. 14" VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 7"-YN-9727 CD-09245 LG-10 QR-43392 981 619 RO-10 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. C-6 4"-ZX-5148 ERV-7-91 OP-73064 SYNTHETIC PROCESS FLOW DIAGRAM UNIT RV-97189 3. L.S 9"x8" STA 3"-RR-6681 CONNECTION TO EXHAUST IS PROVIDED. K.EAI 422 REV 869 GH-93788 QR-85827 OP-38909 UV-68723 2"-ND-0069 OP-94534 RV-14440 CD-44557 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh STA CS-53 CD-04398 9" ERV-6-03 CS-81 2"x1" 7"-AW-3905 OP-50395 8" EF-74609 SDL CV-85305 ST-93347 IJ-16278 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 534 8"x8" STA A PQR VALVE TO BE INSTALLED AT Q POINT. DV-80035
doc_86
[ "DOTTED", "LINES", "ARE", "ALTERNATE", ".", "5", "\"", "-", "YF", "-", "1602", "CV", "-", "00462", "DWG", "-", "1", ".", "23", ".", "23", ".", "578", ",", "DWG", "-", "1", ".", "23", ".", "23", ".", "789", ".", "382", "QR", "-", "45125", "5...
[ "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE"...
[ "4\"-NW-3193", "2\"-KV-3243", "7\"-EI-4515", "5\"-NK-6107", "7\"-CI-6552", "7\"-YP-3093", "8\"-NV-7920", "6\"-JF-7780", "3\"-JW-3815", "5\"-YF-1602", "6\"-UI-7024", "5\"-GV-7386" ]
DOTTED LINES ARE ALTERNATE. 5"-YF-1602 CV-00462 DWG-1.23.23.578, DWG-1.23.23.789. 382 QR-45125 5"-GV-7386 CS-14 GRP TT-3568 PQR VALVE TO BE INSTALLED AT Q POINT. 4"x7" C 555 CONTRACTOR NO. NOTES 5"-NK-6107 29" 717 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE AB-24013 SITE IN CASE OF MISMATCH. WX-98899 ERV-4-71 126 42-2708 219 B ABC TO XYZ FOR MAINTAINENCE. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME QR-81014 AV-93104 29. TOP CONNECTION. 3"-JW-3815 4. ISSUE CONSTR. REV.44 KWh 17/05/25 IJ-53596 BK COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 ZLO LG-10 ERV-8-08 8"-NV-7920 23. 3" 4" CV-67108 4"-NW-3193 O.MKD MADE 534 KH ORGANIZATION 21. 25. TYPE VALVES. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. ZLC 7. CD-32424 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT QR-25763 17Oct17 60055727 237 8. A SCALE 6. UNIT 7"-CI-6552 IJ-07643 7" WX-65957 SDL H.CF WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 161 897 1 CD-14490 EF-62073 INSTALLED. 2. MN-49101 10. DELETED 516 GRI DELETED COMPULSORY. E ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ISSUE CONSTR. REV.22 MN-13152 J.NTU PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 665 AV-76960 13/08/02 CONTRACTOR PROJECT NO. 791 QR-79073 3" 309 7"-YP-3093 QR-69779 DV-31900 24. ISSUE CONSTR. REV.33 CS-96 L.B 27. MAINTAINENCE AND MODIFICATION. 6"-UI-7024 607 WX-89992 DV-14322 SYNTHETIC PROCESS FLOW DIAGRAM GH-53748 H-9 16. NEU 729 CV-21479 CONTRACT NAME SAMPLE_3393.JPG DV-09280 AB-72567 829 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. ST-49441 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. IOT COMMENTS. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE IJ-21398 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 11. 7"-EI-4515 V.XN 184 ISSUE CONSTR. REV.55 AB-77765 REV 14. D AB-42171 RO-10 RO-10 SAMPLE Project 15. ZLO CONNECTION TO EXHAUST IS PROVIDED. DRAWING NAME DESCRIPTION STA DATE LG-10 28. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DV-21075 5. OP-61576 WX-91837 B.NN APPRV'D 3" DRAW/SHEET NO. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 LY DDL STA 7" 3. DELETED 2"-KV-3243 EF-65681 19. SDL 569 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, ERV-6-51 14/09/24 23/08/05 12. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. WX-48478 PROJ. XYZ P&ID 500 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. FY BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 17" GH-75602 DELETED 18. ERV-3-55 CV-13336 ZLO WX-06089 Std. X.W THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ AV-06845 OP-12384 9. 22. RO-10 DV-33879 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 20. INS ( -57°C ) PROJECT/LOCATION/ASSIGN 9"x6" 607 420 SDL 13. RO-10 DIMENSIONAL TOLERANCE +/- 1MM. IJ-74725 492 1. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, LG-10 964 IJ-07520 7" SAMPLE ST-61896 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE WMOU FOR DETAILS. 17. 705 942 ISSUE CONSTR. REV.11 ISSUE CHECK'D 2"x5" ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. TVY-88-14 CV-37003 ZLO DELETED UV-99654 26. GI RO-10 DDL 869 ZLO INSTALLATIONS/OPERATIONS. ZSM 27" 6"-JF-7780 DELETED
doc_412
[ "LG", "-", "10", "27", "\"", "148", "ZLC", "OP", "-", "25162", "7", "\"", "-", "TK", "-", "7631", "SYNTHETIC", "PROCESS", "FLOW", "DIAGRAM", "ISSUE", "RV", "-", "10706", "DELETED", "PROJ", ".", "PQR", "P", "&", "ID", "5", "\"", "-", "PT", "-", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE",...
[ "2\"-MP-1473", "3\"-DA-6748", "6\"-KF-2202", "8\"-FD-5876", "4\"-TU-7988", "2\"-UW-7512", "7\"-TK-7631", "5\"-PT-2968", "6\"-IM-4628" ]
LG-10 27" 148 ZLC OP-25162 7"-TK-7631 SYNTHETIC PROCESS FLOW DIAGRAM ISSUE RV-10706 DELETED PROJ. PQR P&ID 5"-PT-2968 98067646 23. 14" 2"-MP-1473 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME INS ( 17°C ) VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE A.XEM REV SDL DELETED DV-21814 14" DDL KWh AH-7491 20. 419 None CS-63 DOTTED LINES ARE ALTERNATE. AB-15455 RGO 15" RO-10 19. SAMPLE DV-58415 CONTRACT NAME SAMPLE_6333.JPG 13. ERV-8-62 19" 206 GH-26367 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED SDL DELETED GRO 7. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 11" 4"-TU-7988 11. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DDL GRI 6"-IM-4628 22/01/10 325 4" 2" EF-47728 756 CS-78 AV-21007 UNIT WX-29817 25. 9. EF-21783 ISSUE CONSTR. REV.11 C ISSUE CONSTR. REV.44 STA GH-17378 UV-45571 CONNECTION TO EXHAUST IS PROVIDED. PQR VALVE TO BE INSTALLED AT Q POINT. INSTALLED. SDL TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. UV-05844 DRAW/SHEET NO. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH GH-27035 ZLC INS ( -22°C ) DIMENSIONAL TOLERANCE +/- 1MM. CD-63620 2. T.UJ 2"-UW-7512 589 6"-KF-2202 3. BQB PROJECT/LOCATION/ASSIGN 714-8827 24/09/12 699 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 22. ISSUE CONSTR. REV.22 ABC TO XYZ FOR MAINTAINENCE. KL-66770 TOP CONNECTION. ERV-0-73 713 NOTES CHECK'D ZLC MAINTAINENCE AND MODIFICATION. GRI 19" 10. SITE IN CASE OF MISMATCH. W.J RV-52431 EX-24-15 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 812 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 15/09/16 793 801 CV-30266 MN-98537 SDL OP-86016 5. CS-89 MADE GH-07335 ERV-0-56 F.RU 688 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 DELETED WX-36922 382 18. CS-22 16. DELETED V.IK ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. WX-99265 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 1. 5 708 ORGANIZATION 17. STA 465 EW DDL 7"x3" LG-10 10" CV-52360 B 8"-FD-5876 OP-30143 GLR PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND EF-41835 XNII XD CS-51 COMMENTS. CV-15717 569 8. 6. 687 CD-74704 CS-94 A INSTALLATIONS/OPERATIONS. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 24. RV-77901 14. AB-83574 TYPE VALVES. Y-1 CS-34 CV-30949 MN-13961 D 15. 784 SAMPLE Project 226 ISSUE CONSTR. REV.33 DATE SCALE KL-89028 ZLO 100 SDL APPRV'D IJ-05376 23/10/23 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS CONTRACTOR NO. 4. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. CONTRACTOR PROJECT NO. ST-25954 12. MH 188 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 3"x7" EF-93031 21. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DRAWING NAME PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. DESCRIPTION 725 SDL RBKZ AB-31026 796 3"-DA-6748 EF-89877 AB-43455 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 1" CD-69579 FOR DETAILS.
doc_349
[ "INS", "(", "52", "°", "C", ")", "NO", "RELEVANCE", "/", "SIMILARITY", "WITH", "ANY", "OTHER", "DOCUMENTS", "OF", "SIMILAR", "FIELDS", "WHATSOEVER", ".", "6", "\"", "-", "WY", "-", "2163", "5", ".", "STA", "AV", "-", "32096", "HAS", "NO", "REVELANCE"...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "5\"-EP-1009", "7\"-WI-6125", "8\"-KY-2088", "6\"-GW-6024", "4\"-SA-8142", "6\"-AF-3921", "7\"-ZX-5044", "4\"-LJ-4168", "8\"-AF-9795", "6\"-PK-2900", "5\"-TZ-1372", "6\"-YD-9929", "6\"-RJ-4436", "2\"-GA-0473", "8\"-JR-2745", "2\"-MN-9127", "4\"-EV-3377", "6\"-WY-2163" ]
INS ( 52°C ) NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 6"-WY-2163 5. STA AV-32096 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED STA 13. CD-73600 SDL 5"-TZ-1372 25. LG-10 222 899 4. ISSUE CONSTR. REV.44 7"-WI-6125 362 15. 6"-GW-6024 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CD-37657 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. RO-10 GH-15422 GH-75679 EF-77486 26. IJ-44884 15" 9. SCALE 24May23 MN-04533 ERV-8-92 21. FZ CONTRACTOR PROJECT NO. DELETED SYNTHETIC PROCESS ENGINEERING FLOW SCHEME RV-64418 RV-91266 CS-54 17" UV-95877 IJ-78123 GRP 13/02/03 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. ORGANIZATION STA 8"-KY-2088 U-1 B CHECK'D STA FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 1" AB-24797 4" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ AB-47878 PROJ. DEF P&ID CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. GH-53003 KL-85506 EF-38166 C 8"-JR-2745 3" STA 2"-GA-0473 REV SAMPLE 1" 16. 713 QR-55333 IJ-16758 QR-12482 E 10. CV-98670 8" 4"-LJ-4168 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 24. RO-10 ERV-4-19 ISSUE CONSTR. REV.55 16" CD-34402 529 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. QR-11316 AB-19360 LG-10 A 2" EF-73027 DIMENSIONAL TOLERANCE +/- 1MM. CV-61901 6"-PK-2900 KL-43854 MN-30037 204 CV-90599 PROJECT/LOCATION/ASSIGN D.A 2"x3" 26" 4"-EV-3377 KL-26394 522 658 LG-10 OP-47482 AV-47792 DRAW/SHEET NO. 15Sep20 565 CS-07 339 OP-31443 SAMPLE Project DV-54756 ISSUE CONSTR. REV.22 7"x1" GH-02122 ABC TO XYZ FOR MAINTAINENCE. 702 2"-MN-9127 APPRV'D DV-68979 5"-EP-1009 Z.M SDL D ST-23272 CD-25094 TOP CONNECTION. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. RV-77271 58385163 18. 756 SYNTHETIC PROCESS FLOW DIAGRAM NOTES AO-76-35 8"-AF-9795 ZLC DELETED QR-01384 MODIFICATION. CS-02 3"x5" SDL OP-38586 UNIT OP-75113 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. DV-62842 CD-83456 11. KDC DDL 939 CV-14648 QR-63734 STA GI 1. 812 IJ-49266 IJ-18415 DRAWING NAME DDL GH-72364 ZLC ST-34499 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS CS-97 AW DELETED DELETED 825 17. 1"x9" CS-85 DATE KL-46394 CV-55735 X.PUS 558 15" 824 23. 3. CV-09020 WX-82062 CS-01 6"-YD-9929 541 IJ-70338 20/02/26 RV-19614 978 Std. 5" 320 CS-27 KH-6510 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 2"x6" DESCRIPTION 309 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 649 GRI CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. DELETED GRYW MADE 4"-SA-8142 GH-21767 256 ZLO CONTRACTOR NO. 8. 12" ST-19160 CV-56092 2. 6"-AF-3921 553 EF-30480 6"-RJ-4436 2 RAH GH-82904 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. G.PW LG-10 IJ-31648 UV-70831 ST-61046 12/03/01 987 303 262 20. 7" DV-24914 19. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 12. QM CONTRACT NAME UV-06538 OI OP-31354 EF-80737 CD-43888 SDL ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. RO-10 RV-36652 SAMPLE_3130.JPG ST-82049 6. SDL KDO COMMENTS. EBD BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND STA GRI MN-24831 Z.KJX 14. RV-45950 8" 773 ISSUE DOTTED LINES ARE ALTERNATE. 273 7"-ZX-5044 GI 8"x1" ISSUE CONSTR. REV.33 ISSUE CONSTR. REV.11 N.XK 498-7480 AV-56162 OP-52094 ST-64109 6" LG-10 AV-67087 AV-51416 9" 22. CV-25767 581 DDL 3"x5" UV-06309 KL-96418 DV-17983 CS-81 7. DELETED MN-85782
doc_474
[ "GH", "-", "04261", "ISSUE", "CONSTR", ".", "REV", ".", "55", "DRAWING", "NAME", "UV", "-", "24621", "4", ".", "19", ".", "AB", "-", "84335", "IJ", "-", "98827", "PROJ", ".", "PQR", "P", "&", "ID", "ABC", "TO", "XYZ", "FOR", "MAINTAINENCE", ".", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-CL-6270", "6\"-IE-1279", "6\"-QJ-3053", "5\"-JG-6587", "3\"-XS-1095", "8\"-EM-0295", "8\"-JI-7404", "8\"-QN-4402", "6\"-BW-3083", "8\"-VI-7532", "5\"-AI-0254" ]
GH-04261 ISSUE CONSTR. REV.55 DRAWING NAME UV-24621 4. 19. AB-84335 IJ-98827 PROJ. PQR P&ID ABC TO XYZ FOR MAINTAINENCE. 25. 21/04/15 817 HH-70-78 ISSUE CONSTR. REV.33 Std. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. DV-89890 ERV-9-10 DDL PQR VALVE TO BE INSTALLED AT Q POINT. 11. EF-96821 124 DV-66599 AV-95177 117 3" 828 20. 10. 3" 5"-AI-0254 STA J.M LG-10 CS-47 KL-97764 OP-76756 6"-IE-1279 INS ( -45°C ) 402 PROJECT/LOCATION/ASSIGN FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 18May27 TM 770 SDL DDL MN-43557 TOP CONNECTION. LG-10 306 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS KWh VDQG C-0 SAMPLE Project SDL ERV-5-48 196 23. CV-38993 DELETED VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE CONTRACTOR PROJECT NO. KL-71201 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED A 9. 15Sep05 2. C.Q 14. MN-02580 3"x5" 8"-QN-4402 LG-10 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 494 212 CV-33035 DESCRIPTION INS ( -24°C ) ERV-5-17 AV-85142 UV-25635 SAMPLE_7719.JPG GRP ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 757 FOR DETAILS. 762 CHECK'D 18Sep10 REV 5"-CL-6270 8"-JI-7404 374 6"-QJ-3053 24. Y.O DL-3640 5. CV-15099 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. CD-04239 ST-25766 B.MJS CS-25 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ AB-54945 21. DWG-1.23.23.578, DWG-1.23.23.789. 17Apr14 833 6"-BW-3083 AB-88019 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS ISSUE CONSTR. REV.11 STA OUF W.J DELETED 8" STA COMMENTS. CONTRACT NAME INS ( 24°C ) TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. EF-07476 DDL DELETED F.I KL-86033 APPRV'D 1" FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 3"-XS-1095 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. A.LI B 8"x9" DRAW/SHEET NO. 3. 5"-JG-6587 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME GI 8" SAMPLE ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 29826779 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. LG-10 478 8. 765 LG-10 D.IHD 988 959 3 AV-28455 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 101 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE MADE LG-10 16. DELETED DIMENSIONAL TOLERANCE +/- 1MM. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 980 15. Z.Q RO-10 11" CS-26 AV-07517 6" ORGANIZATION 713 UNIT 5"x1" OP-66212 18. 574 OP-41990 OP-12489 488 INS ( 49°C ) RV-46138 DELETED CD-44277 EF-65302 12. 563 AV-18040 UV-04344 DATE IJ-22864 570 WX-82169 LG-10 SYNTHETIC PROCESS FLOW DIAGRAM TYPE VALVES. CS-49 INSTALLATIONS/OPERATIONS. DDL EF-09914 ERV-4-19 7. 13. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 7" LTO C JCC CS-68 IJ-62989 6. 6" 22. RO-10 UV-56184 8"-VI-7532 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD H.U RV-20263 8"-EM-0295 INS ( -54°C ) SCALE DELETED ISSUE CONSTR. REV.22 ISSUE CONSTR. REV.44 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND OP-01435 17. AV-93833 AV-11595 MN-04858 ISSUE IJ-35623 CONNECTION TO EXHAUST IS PROVIDED. COMPULSORY. 1. E NOTES D 74-1819 AV-98670 9" INSTALLED. ST-36739 CONTRACTOR NO.
doc_313
[ "ALL", "FIXTURES", "ARE", "VALIDATED", "AND", "COMPLIANT", "WITH", "XYZ", ".", "CS", "-", "13", "GLR", "EF", "-", "50213", "DELETED", "DDL", "EF", "-", "30176", "PQR", "VALVE", "TO", "BE", "INSTALLED", "AT", "Q", "POINT", ".", "CD", "-", "66198", "25...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "8\"-DJ-4240", "3\"-IY-4343", "3\"-OA-6195", "4\"-DQ-8812", "6\"-AL-6880", "7\"-MB-6254", "8\"-VO-5043", "7\"-NF-2895", "6\"-GX-5256", "4\"-OQ-9145", "6\"-VI-2164", "4\"-XX-9003", "8\"-DK-4305" ]
ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. CS-13 GLR EF-50213 DELETED DDL EF-30176 PQR VALVE TO BE INSTALLED AT Q POINT. CD-66198 25. QR-87049 6. 16. DRAWING NAME 457 ST-82345 21/11/01 SDL 6"-VI-2164 GRP PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 14/08/20 180 B ISSUE CONSTR. REV.44 REV 9. CHECK'D 3"x2" ORGANIZATION GRI 5"x9" N.G DDL VI 692 DRAW/SHEET NO. 11" RV-72818 19. CD-48510 IJ-30273 UV-01936 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. CD-04644 26. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. CONNECTION TO EXHAUST IS PROVIDED. 6"-GX-5256 619 AV-77972 SDL PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND UV-93218 NOTES 14" 491 ERV-7-05 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. UV-82525 ST-35922 SDL COMMENTS. 22/09/20 Z-1 8"-DJ-4240 INSTALLATIONS/OPERATIONS. CVKY KL-25551 SDL 51430175 5. ATWY WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE RO-10 4"-DQ-8812 OP-12365 SDL SAMPLE 153 14. 133 440 AB-63787 AB-25543 ST-56083 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 4"-XX-9003 ERV-8-54 7"-MB-6254 DDL CV-45761 7. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 8" 5" MN-29058 KL-01456 ISSUE 252 SAMPLE Project 15. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 712 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE KL-97552 8" 3"-IY-4343 GRI GDLZ PITA 65-4908 MN-96301 DIMENSIONAL TOLERANCE +/- 1MM. 1" Q.VS PROJ. PQR P&ID 27. CONTRACTOR NO. CD-75217 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. CV-25406 APPRV'D 7"-NF-2895 GTUG GH-65467 23/02/21 583 IJ-07078 QR-34488 UV-81827 CS-72 D 21. 533 23. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN MN-55988 DWG-1.23.23.789. P.QM 13. 6"-AL-6880 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 3. CS-54 719 INS ( 52°C ) MADE SDL 799 OT-6446 C AB-69733 ABC TO XYZ FOR MAINTAINENCE. DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. OP-85217 ERV-5-57 E 3 303 6"x1" LG-10 DDL MN-90709 8. UV-84690 8" AV-20241 7" BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, CONTRACTOR PROJECT NO. OP-91871 RO-10 TW 7"x7" 480 AB-29011 2. 939 14" INS ( -39°C ) INS ( -50°C ) 392 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. LV-56-48 DELETED SCALE MAINTAINENCE AND MODIFICATION. EF-60875 KL-78502 CS-27 DV-05315 ISSUE CONSTR. REV.33 O.DH 18/10/27 L.ILC SDL DELETED 686 12. CASE OF MISMATCH. UV-79303 DDL 11. RO-10 4"-OQ-9145 171 24. SAMPLE_3575.JPG ZLC 846 QR-79268 19" 357 416 SDL 578 ISSUE CONSTR. REV.55 8"-VO-5043 617 DV-64785 10. 349 VALVES. DETAILS. DDL 220 17. RO-10 1. CONTRACT NAME SDL OP-78316 ISSUE CONSTR. REV.22 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh DOTTED LINES ARE ALTERNATE. 4. 22. DELETED UNIT 20. XX A 3"x1" DATE MN-97944 443 519 WX-74639 None DDL 355 KL-59283 CD-94441 PROJECT/LOCATION/ASSIGN ERV-7-13 ERV-4-70 F.KSF IJ-23979 ZLC TOP CONNECTION. 6"x7" 3"-OA-6195 423 DESCRIPTION SYNTHETIC PROCESS FLOW DIAGRAM QR-76424 ST-81542 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE RO-10 ISSUE CONSTR. REV.11 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 851 18. MN-21581 CS-40 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED RV-27481 8"-DK-4305 RO-10 OP-88520 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 961 DELETED SYNTHETIC PROCESS ENGINEERING FLOW SCHEME LG-10 ST-29391 E.GK DELETED
doc_316
[ "COMPONENTS", "ARE", "AT", "NORMAL", "PRESSURE", "WITH", "POWER", "RATINGS", "15", ".", "4", "KWh", "WITH", "AS", "MUCH", "SIMILARITY", "AS", "POSSIBLE", ".", "THESE", "EFFORTS", "ARE", "MADE", "TO", "FACILATE", "RESEARCH", "IN", "THE", "FIELD", ".", "THES...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-DH-3043", "8\"-CA-8685", "8\"-RU-7306", "5\"-VL-2474", "5\"-BO-9503", "3\"-LF-1366", "3\"-TL-1853", "5\"-NM-7883", "7\"-AG-3055", "4\"-XX-1645", "3\"-WT-9880", "2\"-RU-6239", "2\"-XB-2929" ]
COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE INS ( 46°C ) KL-61952 SCALE 27. CASE OF MISMATCH. G.BKO GH-87651 8"-CA-8685 349 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 16. 14. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 173 CS-54 18" 2. 9. STA UV-39852 AV-91438 CS-82 8"x6" KL-97388 580 QR-40969 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 24. ZLO EO AB-54940 DOTTED LINES ARE ALTERNATE. MN-13214 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. EF-31503 1" 18" 18" A ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. KL-22921 TOP CONNECTION. C CS-44 269 21/08/05 OK-5746 SYNTHETIC PROCESS FLOW DIAGRAM APPRV'D LG-10 DDL CHECK'D 135 674 11. 26. DELETED DIMENSIONAL TOLERANCE +/- 1MM. 594 ISSUE B.CW 134 ZLO CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. CS-50 SDL 721 4"-XX-1645 DATE WP-22-14 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 3"-WT-9880 MN-57653 29" CV-42832 6. RV-60534 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. DELETED TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. UNIT IJ-28206 795 IJ-37750 ZLO UV-93049 IJ-92762 17. ISSUE CONSTR. REV.11 REV ISSUE CONSTR. REV.33 CV-01903 CONTRACT NAME 18" 3. SAMPLE_5798.JPG RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER ISSUE CONSTR. REV.22 LG-10 AV-21019 ERV-9-57 SDL 5"x9" CS-43 951 3"-LF-1366 4" EF-44766 ERV-5-54 QR-03439 DRAWING NAME CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 3"-TL-1853 IJ-04712 8" DDL AB-52901 DWG-1.23.23.789. 735 CS-34 H.MZN EOOS HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED STA CS-57 5. 325 COMMENTS. LG-10 5"-VL-2474 CONTRACTOR PROJECT NO. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 72039461 594 427 B 884 CV-23403 V.FFX DELETED 18. RV-14270 LG-10 720 RO-10 25. DV-98785 12. GH-76370 CD-25254 5"-DH-3043 DV-45480 5"-NM-7883 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. NOTES PROJECT/LOCATION/ASSIGN 9"x6" IJ-94946 8. 23/11/07 PROJ. PQR P&ID QR-68730 944 RO-10 597 ZLC QR-65020 SDL ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 29. F-2 20. F.Q ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN RV-44757 DETAILS. 13. 5"-BO-9503 SDL QR-24367 4" CV-97908 SAMPLE Project INSTALLATIONS/OPERATIONS. CONNECTION TO EXHAUST IS PROVIDED. MN-72612 28" LG-10 ABC TO XYZ FOR MAINTAINENCE. 10. IJ-18634 KL-52079 STA RV-98594 CONTRACTOR NO. 28. MAINTAINENCE AND MODIFICATION. KL-86807 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 7" 5 ZLO OP-59977 EF-01250 397 681-1886 993 2"-RU-6239 DELETED 7. 11/02/01 INS ( 58°C ) 23. ORGANIZATION GRI ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE DELETED U.JB CD-15089 542 745 OP-67210 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 4. 2" 2"-XB-2929 DELETED 15. None T.QE ZLC DDL DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ PQR VALVE TO BE INSTALLED AT Q POINT. 22. DRAW/SHEET NO. ST-27600 GI 1. KL-22492 7"-AG-3055 CV-32327 UV-42775 SAMPLE 935 OP-10778 452 RV-86250 21. INS ( 54°C ) 8" 8"-RU-7306 814 WX-66400 19. 802 DESCRIPTION VALVES. ST-81157 972 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE MADE PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND
doc_232
[ "4", "\"", "-", "NX", "-", "5325", "RO", "-", "10", "4", "\"", "-", "FN", "-", "2909", "INS", "(", "-", "36", "°", "C", ")", "5", ".", "DDL", "689", "23", ".", "1", "\"", "x8", "\"", "RO", "-", "10", "21", ".", "PRIMARY", "SUPPORT", "FOR"...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O",...
[ "2\"-HZ-3955", "6\"-MU-4317", "8\"-EO-9104", "2\"-SX-7224", "4\"-DT-8683", "2\"-WP-7534", "3\"-TG-7126", "2\"-EQ-2096", "8\"-YG-5506", "4\"-FN-2909", "8\"-YJ-2426", "7\"-EZ-6004", "2\"-WH-9060", "6\"-QS-3911", "4\"-BH-2075", "3\"-QD-5599", "7\"-LW-2726", "4\"-ZC-1873", "4\"-JY-40...
4"-NX-5325 RO-10 4"-FN-2909 INS ( -36°C ) 5. DDL 689 23. 1"x8" RO-10 21. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. SAMPLE_1789.JPG AV-98120 ISSUE CONSTR. REV.44 DRAWING NAME SAMPLE RV-16292 2"-EQ-2096 XBSA SDL UV-61965 UV-77389 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. ZLC INS ( 46°C ) 25. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD CV-24521 SDL 3"-QD-5599 714 DDL ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 8. PQR VALVE TO BE INSTALLED AT Q POINT. 4"-UF-9397 STA 9. ST-75550 MODIFICATION. OP-88574 SDL B RV-45788 500 3. 27. 7"-EZ-6004 AV-97152 DDL DELETED DDL STA 7"-LW-2726 TCNI ZLO 488 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. CV-68814 CHECK'D 495 Z.CF 16. 503 NOTES AV-00157 784 CONTRACTOR PROJECT NO. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. F.L 4"-ZC-1873 147 515 314 457 GRO GH-29028 2"x4" 1"x7" None CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 14. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. ST-56471 CD-33249 26. UV-00766 RO-10 MN-40657 24. ST-45000 8"-EO-9104 7" 19. CV-84513 992 8" WX-02271 ERV-0-88 SCALE AV-25332 182 DELETED 8"x3" 944 789 4"-BH-2075 643 WX-36694 12. 13. 876 775 CONNECTION TO EXHAUST IS PROVIDED. ST-70576 7"-QB-4098 11. CS-73 GI SAMPLE Project BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. 10. APPRV'D 3"-TG-7126 CV-21625 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. CX DELETED SDL 2"-HZ-3955 22. GRP B-0 ISSUE CONSTR. REV.22 794 21" 3"-HT-7870 B.D I.XI 4"-PA-8325 SDL EF-90377 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 18/03/12 2"-WH-9060 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. CS-88 ISSUE CONSTR. REV.33 AB-26131 CONTRACT NAME DIMENSIONAL TOLERANCE +/- 1MM. 308 DOTTED LINES ARE ALTERNATE. 410 6"-MU-4317 ZLC CD-16069 MN-08466 AB-82029 ZLC WFHC 8"-YG-5506 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 6" MN-43697 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 26" FF-00-77 DESCRIPTION ISSUE SDL 538 SDL EF-08485 ORGANIZATION GH-77037 RV-77034 D 8"-YJ-2426 S.VEJ 12" MADE ERV-9-06 661 STA 17. AV-31052 17" CS-61 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 911 OP-37651 4" OP-11782 GH-31328 OP-75199 946 13" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ CS-84 AV-17439 DDL QR-13540 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 581 CV-93598 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. 14" 686 3" AB-05076 CS-03 DV-10415 MN-02461 9"x1" 392 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS ZLO 23/09/02 15. AV-21851 PBXR 18" 20/11/02 A COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 20. 18. RV-72949 WX-56650 QR-56081 WX-31397 AV-06682 CV-34325 CS-00 443 7. ERV-1-44 STA SDL GRO 16" F.JM 4"-DT-8683 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 7"x3" 12026827 EF-05883 4. DRAW/SHEET NO. SDL SDL VAO DDL STA OP-24989 INS ( 50°C ) 13" 875 WX-34278 PC-5808 OP-08015 MN-91191 4"-PF-1869 WX-98266 EF-84211 WX-57938 INS ( -49°C ) OP-49252 367 UNIT STA DDL 58-9130 DATE DELETED CS-78 AV-69256 C 15Jun17 UV-72577 6"-QS-3911 6. ISSUE CONSTR. REV.11 GH-13715 6"-XK-8375 2"-SX-7224 SDL MN-00339 WX-45153 617 CV-27757 QR-63638 RO-10 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED PROJ. XYZ P&ID 5"-YA-2502 STA WX-23692 7"x3" ABC TO XYZ FOR MAINTAINENCE. 4"-JY-4096 540 INS ( 41°C ) SDL FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. INS ( -29°C ) AB-33318 SYNTHETIC PROCESS FLOW DIAGRAM GRP AV-60944 1. COMMENTS. REV CONTRACTOR NO. 608 MN-65184 5"-RH-4940 PROJECT/LOCATION/ASSIGN ST-73680 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 5 2"-WP-7534 2. DELETED
doc_182
[ "4", ".", "UV", "-", "61276", "17", ".", "513", "DV", "-", "48771", "WX", "-", "53203", "RV", "-", "06620", "AV", "-", "00760", "CV", "-", "40360", "RV", "-", "92799", "COMMENTS", ".", "STA", "FOR", "GENERAL", "NOTES", "AND", "LEGENDS", "SEE", "T...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "8\"-DE-7437", "8\"-KJ-7013", "5\"-GV-2833", "8\"-UF-8568", "8\"-KF-9104", "5\"-WK-8345", "4\"-YC-1215", "4\"-OK-4653", "7\"-DF-1604", "8\"-CW-7825", "3\"-FX-8856", "3\"-LE-0044", "5\"-HM-6814", "8\"-FT-3810" ]
4. UV-61276 17. 513 DV-48771 WX-53203 RV-06620 AV-00760 CV-40360 RV-92799 COMMENTS. STA FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 9. 968 18. CU-3571 INS ( -33°C ) DETAILS. ZLC SAMPLE Project 847 5"x1" WX-56218 PROJ. DEF P&ID COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh WX-84625 CONTRACT NAME IJ-68011 19. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 3"-LE-0044 NOTES FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR SDL 5"-HM-6814 LG-10 1" ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. MN-39568 B A UNIT 4"-OK-4653 DV-91380 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 7"-DF-1604 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 10. JXXD 699 QR-08875 QR-38065 ST-70346 LG-10 535 509 N.YCK 105-6897 AV-07211 7. 2. ZLC 3. 447 8"x8" ISSUE CONSTR. REV.11 468 CS-07 RV-68609 PQR VALVE TO BE INSTALLED AT Q POINT. DRAWING NAME ZLO AB-55922 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 650 STA 5"-GV-2833 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 14. INS ( -35°C ) WX-20251 FUY-14-60 8. DELETED GRP KL-80414 CV-99997 STA 292 O-0 4"-YC-1215 CQVE None 429 8"-KF-9104 12. OP-84168 666 INS ( -14°C ) PROJECT/LOCATION/ASSIGN ST-19979 735 5. MN-29121 ERV-8-77 613 8"-DE-7437 DELETED 344 B.EGU QR-19757 237 INSTALLATIONS/OPERATIONS. ISSUE CONSTR. REV.22 MAINTAINENCE AND MODIFICATION. 6. CD-85342 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. STA 554 ZLC MADE 8"-KJ-7013 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ RV-26749 EF-69550 DELETED AV-95129 966 21. DIMENSIONAL TOLERANCE +/- 1MM. B.BGX 439 ERV-8-89 RV-35946 GRI QR-84031 DELETED RO-10 SDL SCALE 8"-UF-8568 AV-99207 SDL 13. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ORGANIZATION DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. QR-22918 UV-15499 8" 656 16. LG-10 DATE 11. 81657189 DESCRIPTION TOP CONNECTION. QR-21742 727 20/07/24 8"-FT-3810 STA T.P HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED IJ-17591 SAMPLE 816 681 2"x8" DV-49780 SYNTHETIC PROCESS FLOW DIAGRAM RMV ISSUE CONSTR. REV.33 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 1. DRAW/SHEET NO. RO-10 15. EF-23007 JFPV 11Feb24 ST-10218 GRI SAMPLE_9924.JPG 9" 5"-WK-8345 C OP-47286 ZLO WX-71449 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. EF-35116 MN-08548 7" RV-44402 REV CHECK'D DELETED 576 LG-10 5" 3"-FX-8856 227 CONTRACTOR PROJECT NO. CONTRACTOR NO. Z.AZL 3" 8"-CW-7825 UV-60570 ERV-6-03 667 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MN-22405 1" CV-57044 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. AV-75100 416 556 LG-10 DWG-1.23.23.789. 7" 1 11/03/18 APPRV'D GRI OP-70361 LG-10 RO-10 20. CD-44870 IJ-82278 901 CS-70 ISSUE RO-10
doc_284
[ "665", "TEMPERATURE", "CONTROL", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "BY", "DEFAULT", ".", "254", "CD", "-", "18130", "140", "CV", "-", "98304", "606", "20", "/", "04", "/", "18", "LG", "-", "10", "DDL", "ABC", "TO", "XYZ", "FOR", "MAINT...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-NW-3139", "6\"-FU-3316", "2\"-UH-3679", "2\"-CG-7233", "7\"-TH-3421", "3\"-DB-6665", "7\"-ZC-3481", "4\"-ED-3167", "7\"-NF-6537" ]
665 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 254 CD-18130 140 CV-98304 606 20/04/18 LG-10 DDL ABC TO XYZ FOR MAINTAINENCE. 8. UV-29847 ZLO CONTRACTOR NO. 95-7209 DELETED UV-23267 965 QR-68007 841 ST-02349 407 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 3. 594 6"x7" 468 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 164 CV-50691 15. 20. RV-29115 5" IJ-70450 XKJ K.DK ISSUE CONSTR. REV.33 NOTES UV-97851 SCALE DV-21483 MAINTAINENCE AND MODIFICATION. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 455 ZLO 384 MN-07170 LG-10 UE GH-84557 AB-08142 STA ST-97638 MN-66283 DDL QR-46075 RO-10 8" ISSUE CONSTR. REV.22 14" DELETED BE ZLC SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 9. KWh ISSUE 515 Z.HE ZLO APPRV'D OP-77515 16" CS-27 KL-73553 ERV-6-87 23" 6. ST-23691 ZLC CS-93 756 2"-CG-7233 17. TOP CONNECTION. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. B EF-67593 19. REV WX-69395 WX-33340 743 280 12. 18. 2" CV-86673 MN-60751 DELETED ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 293 RO-10 EF-10899 AB-38158 10. 2"x5" 1" 21. 16. 7"-NF-6537 OP-68952 DATE 2. 493 QR-76963 DOTTED LINES ARE ALTERNATE. C 607 Q-6 465 RO-10 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS AV-42152 MN-90415 4"-ED-3167 5"-NW-3139 STA 3"-DB-6665 21" CV-64443 SAMPLE_8341.JPG DELETED OFR AB-58357 L.Y ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 11. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. ZLO LG-10 IJ-99550 INSTALLATIONS/OPERATIONS. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. GRI A EF-04221 UNIT KL-35684 5. 234 ZLO CS-38 SAMPLE PROJECT/LOCATION/ASSIGN AV-70152 DESCRIPTION None SDL 5 13. 227 DDL UV-80196 7. 6"x6" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 22. STA ST-41142 376 AB-36184 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 14. 17" SAMPLE Project EJY 16" 2"-UH-3679 SITE IN CASE OF MISMATCH. 533 337 7"-ZC-3481 PQR VALVE TO BE INSTALLED AT Q POINT. IJ-84730 CV-46230 ISSUE CONSTR. REV.11 CHECK'D CS-60 786 IJ-63891 586 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. SDL AV-31680 UV-94224 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT DDL MADE CONTRACT NAME RO-10 GRO SYNTHETIC PROCESS FLOW DIAGRAM RV-78644 972 DRAWING NAME 36663379 AV-09276 PROJ. XYZ P&ID PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DELETED LG-10 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 495 MN-62559 FOR DETAILS. RV-99859 DRAW/SHEET NO. TQ-63-19 18Nov11 COMMENTS. AB-36330 LG-10 C.CKQ ST-63412 935 AV-73085 973 STA 4. ORGANIZATION DWG-1.23.23.578, DWG-1.23.23.789. 7"-TH-3421 1"x3" COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 6"-FU-3316 1. 21/06/22 RO-10 KL-96905 CONNECTION TO EXHAUST IS PROVIDED. JZ-1750 ERV-2-24 CD-92463 398 DDL CONTRACTOR PROJECT NO. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION,
doc_486
[ "7", "\"", "x5", "\"", "ELEVATION", "ARE", "TO", "CENTER", "LINES", "UNLESS", "OTHERWISE", "NOTED", ".", "ORIENTATION", "OF", "ABCD", "VALVES", "SHALL", "BE", "VERIFIED", "AND", "CORRECTED", "AT", "KL", "-", "48025", "8", ".", "22", ".", "77", "-", "74...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-...
[ "5\"-OQ-9300", "3\"-EP-0182", "2\"-KE-9512", "5\"-LG-9816", "4\"-BV-6967", "5\"-LG-7983", "2\"-WJ-8359", "3\"-RP-5112", "3\"-UQ-2233", "4\"-XB-0687", "6\"-BN-7626", "4\"-EL-5134" ]
7"x5" ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT KL-48025 8. 22. 77-7419 20/12/20 DRAW/SHEET NO. 2"-KE-9512 11. 10. 6"-BN-7626 615 10" COMMENTS. 16/07/27 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS IJ-20167 18" KL-19410 14. MADE BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ST-21643 UV-33495 CD-96550 GI WX-12074 DA-1892 7. 23. 235 REV QR-64292 DDL DELETED GRO AV-86614 A EF-57291 RO-10 KL-11920 955 RV-72309 653 CV-56031 806 1. AV-97087 4"-EL-5134 PQR VALVE TO BE INSTALLED AT Q POINT. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ K.M 570 OP-34101 334 4"-XB-0687 DV-92498 LG-10 935 SITE IN CASE OF MISMATCH. UV-92851 UV-19503 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED WX-83945 16. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. OP-54587 KWh PROJ. XYZ P&ID PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. SCALE DV-35840 933 DELETED 26" STA PROJECT/LOCATION/ASSIGN 59309532 AB-97334 18. OP-95160 DIMENSIONAL TOLERANCE +/- 1MM. SYNTHETIC PROCESS FLOW DIAGRAM OP-99555 AB-65411 LG-10 CD-84256 UV-29869 A.ZCM CS-76 682 SAMPLE INSTALLED. ISSUE 561 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH C ZLC AV-80019 474 UV-39758 NOTES 853 COMPULSORY. 25Jul22 GRI ORGANIZATION U.KHO 362 2. RO-10 15. 3"-UQ-2233 ST-01836 439 QR-01134 UNIT RO-10 SDL 5. P.FJR DELETED FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 659 ISSUE CONSTR. REV.11 MN-17089 DWG-1.23.23.578, DWG-1.23.23.789. 278 DESCRIPTION RV-87569 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 6. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DELETED 26. DRAWING NAME 3. LG-10 SDL 21. RO-10 None 5"-OQ-9300 INS ( -39°C ) T-3 APPRV'D AB-16285 B CV-37103 RO-10 421 MAINTAINENCE AND MODIFICATION. DATE TOP CONNECTION. 704 20. CONNECTION TO EXHAUST IS PROVIDED. DOTTED LINES ARE ALTERNATE. 3"-EP-0182 24. O.GDZ 384 5"-LG-7983 2"-WJ-8359 ERV-1-09 OP-24766 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 RO-10 838 291 MN-32792 4. DDL EF-27279 DELETED GH-83822 AV-79372 STA X.N CV-37199 3" WX-92846 DDL SDL 9. 777 165 968 192 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE D.G CONTRACT NAME SAMPLE Project QL 223 P.DL 12. 3 CONTRACTOR PROJECT NO. EF-86424 QR-34861 RV-52075 GH-96816 4"-BV-6967 ISSUE CONSTR. REV.22 17. 8" EF-00305 YV-51-98 25. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 5"-LG-9816 GRP 704 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME DDL RV-20274 SDL CONTRACTOR NO. DELETED SAMPLE_1620.JPG STA 19. MN-27411 CHECK'D INSTALLATIONS/OPERATIONS. CV-44078 13. 3"-RP-5112 GRO WX-70218 RO-10 OP-32665 ISSUE CONSTR. REV.33 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE IJ-44340
doc_14
[ "CLOSED", "VESSEL", "HEATER", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "AT", "30", "°", "C", "AND", "50", "°", "C", ".", "POX", "GH", "-", "50002", "UV", "-", "98846", "DV", "-", "85494", "S", ".", "M", "CV", "-", "39952", "ZLO", "6", "\"...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "8\"-JV-9514", "5\"-EX-6272", "2\"-CI-1825", "8\"-YI-3193", "5\"-YQ-0865", "2\"-OW-7544", "6\"-KU-9012", "8\"-WA-2507", "2\"-YJ-5080", "5\"-GQ-1265", "3\"-HY-5407", "6\"-PY-8496", "4\"-UK-9205", "7\"-EG-8615" ]
CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. POX GH-50002 UV-98846 DV-85494 S.M CV-39952 ZLO 6" EF-08295 AB-27885 DELETED PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ST-16432 C 2"-CI-1825 287 18/11/02 TOP CONNECTION. LG-10 CONNECTION TO EXHAUST IS PROVIDED. 268 DOTTED LINES ARE ALTERNATE. WX-13728 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT AV-31105 DELETED DRAW/SHEET NO. QR-53480 233 14" KL-60215 DELETED RXHP DV-56324 2"-OW-7544 ORGANIZATION 512 926 CV-67728 AB-32911 INS ( 36°C ) PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS EF-68709 ISSUE DV-26261 Z.TL 5"-YQ-0865 DDL KL-76872 378 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. EF-07973 ISSUE CONSTR. REV.44 VFJE DELETED MN-04502 11. GH-88713 UV-08380 GRO ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 5. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE WX-94720 REV EF-81176 16. MAINTAINENCE AND MODIFICATION. RV-34679 ABC TO XYZ FOR MAINTAINENCE. ERV-7-79 13. DV-88351 ISSUE CONSTR. REV.22 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 2. LG-10 UJ-8309 497 971 855 17. QR-91872 ST-20878 WX-81712 7" FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, PROJECT/LOCATION/ASSIGN 8"-JV-9514 4"-UK-9205 MN-16181 177 KL-50236 R.ZXQ SITE IN CASE OF MISMATCH. DDL UV-01017 LG-10 DDL B.HU DELETED LG-10 5 EF-46036 CD-63253 UNIT ZLC INS ( 48°C ) UV-70102 CONTRACT NAME A DESCRIPTION SCALE LG-10 23/07/03 DV-55710 ERV-0-05 22. DDL 4"x9" 523 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME GLR 623 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, GI 3. 206 4. RO-10 LG-10 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS ISSUE CONSTR. REV.33 D ISSUE CONSTR. REV.11 NOTES SYNTHETIC PROCESS FLOW DIAGRAM FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 COMMENTS. 15" None 15. FOR DETAILS. 6"-KU-9012 8"x9" K-2 5"-EX-6272 B ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 685 CG 338 180 5"-GQ-1265 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 16" 493 DRAWING NAME MADE OP-55111 GH-70574 545 WX-96412 SAMPLE_9559.JPG 8"-WA-2507 14. DV-59978 APPRV'D RV-02030 M.IC 19. ST-97256 8"-YI-3193 6"-PY-8496 WX-10500 AV-91485 DIMENSIONAL TOLERANCE +/- 1MM. 9" 7. PQR VALVE TO BE INSTALLED AT Q POINT. CD-49134 KL-17723 KL-63646 22/02/25 678 INS ( 44°C ) MN-86146 21. OP-72025 986 2"-YJ-5080 CONTRACTOR NO. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DATE 6. ERV-3-88 721 18. SAMPLE SAMPLE Project QR-32835 CV-48345 PROJ. XYZ P&ID IJ-55631 NH WB KWh AB-79934 645 7"-EG-8615 9. STA COMPULSORY. TYPE VALVES. AV-43409 RV-93060 AV-09933 3"-HY-5407 EF-88968 IJ-39065 66525364 LG-10 21Feb14 997 UW-44-89 SDL EF-39155 12. 16" GH-28392 397 DWG-1.23.23.578, DWG-1.23.23.789. 10. ST-87907 CONTRACTOR PROJECT NO. GLR CHECK'D 8. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 20. 31-8373 JJB KL-19829 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 208 UV-54343 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 553 1. 248
doc_228
[ "9", "\"", "5", "\"", "-", "YB", "-", "3922", "STA", "P", ".", "I", "GH", "-", "08877", "LG", "-", "10", "C", "E", ".", "DG", "ERV", "-", "4", "-", "59", "RV", "-", "42712", "IJ", "-", "90517", "7", ".", "IJ", "-", "57690", "INS", "(", ...
[ "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "4\"-GU-7295", "8\"-SV-5335", "7\"-WD-6843", "8\"-NH-7216", "2\"-QX-0316", "5\"-YB-3922", "4\"-HH-5085", "8\"-ZS-4086", "5\"-MI-6947", "6\"-DL-1222", "2\"-TH-4832", "6\"-VP-3579", "6\"-WU-8212", "5\"-PA-6631", "3\"-DL-9811" ]
9" 5"-YB-3922 STA P.I GH-08877 LG-10 C E.DG ERV-4-59 RV-42712 IJ-90517 7. IJ-57690 INS ( -25°C ) BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE INSTALLATIONS/OPERATIONS. A 522 16" SAMPLE Project 6. MN-65695 UV-07210 DELETED L.GEK SYNTHETIC PROCESS ENGINEERING FLOW SCHEME AB-77340 DRAWING NAME 8"-ZS-4086 GH-34706 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 9. UV-10003 ERV-1-90 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, AV-79154 KL-69871 DELETED KL-00224 GI DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DELETED RO-10 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. SYNTHETIC PROCESS FLOW DIAGRAM AV-50234 AB-03170 13. AB-20618 5 ERV-6-53 DWG-1.23.23.789. SAMPLE_8713.JPG SAMPLE CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. 191 QR-52961 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND OP-91940 26. INS ( -44°C ) WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 459 16/11/26 256 COMMENTS. 2" DELETED DV-63712 Y-3 ISSUE AB-15285 MN-76978 CS-03 14" SWEL TOP CONNECTION. 6"-VP-3579 27. 6"x3" 6"-DL-1222 EF-31588 CS-94 29. 797 STA INS ( 14°C ) 28. RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER DDL QK-5051 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 366 7"-WD-6843 8"-NH-7216 CS-53 ST-03367 10. MN-70467 STA 07871385 888 2"-QX-0316 GLR 4. RV-56446 APPRV'D WX-63873 LG-10 N.J MADE 859 CHECK'D CONTRACTOR NO. 19. 6" T.EW 24. 19" ST-01703 UV-14333 IJ-00530 DESCRIPTION REV CS-34 22. 14. CD-45839 ZLO QR-16937 QR-93159 2. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN ISSUE CONSTR. REV.33 DRAW/SHEET NO. ZLO RO-10 10" 5. ISSUE CONSTR. REV.11 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. CV-30296 13" DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ LG-10 QR-67463 DETAILS. 269 SDL 467 513 ORGANIZATION MN-43669 WX-12322 12. 6"-WU-8212 CASE OF MISMATCH. 4"-GU-7295 WX-12115 8"-SV-5335 UV-87900 RO-10 ST-58739 11. DQZ 1. 6" DV-25329 GH-10787 AV-48164 ABC TO XYZ FOR MAINTAINENCE. GRP OP-04572 06-8330 5"-MI-6947 RV-19993 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE KL-42286 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. GRP SDL INS ( 13°C ) B 494 DIMENSIONAL TOLERANCE +/- 1MM. 9" ISSUE CONSTR. REV.22 PROJ. DEF P&ID DOTTED LINES ARE ALTERNATE. 772 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 247 AB-49051 5"-PA-6631 VALVES. CONTRACTOR PROJECT NO. NOTES 456 MN-61633 678 18. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, CS-11 3. ZLC 8. 4" 12" STA GH-59110 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 999 QR-94013 482 ZLO ERV-8-29 DV-00206 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 2"-TH-4832 CV-99880 ERV-5-47 402 AV-60142 4"-HH-5085 GH-46174 15" 15. 25. R.KB QR-24048 DATE ABNY 17. 7"x2" CS-27 SCALE IJ-96407 PQR VALVE TO BE INSTALLED AT Q POINT. UNIT CD-22527 21. 3"-DL-9811 16. CONNECTION TO EXHAUST IS PROVIDED. CONTRACT NAME RO-10 ST-73680 PROJECT/LOCATION/ASSIGN CS-40 CS-99 900 927 RV-56760 DV-46574 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 225 20. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ZLO 610 DELETED 23. UV-81524 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. QR-47434 Std. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY LKC-99-32 KL-68134 11/06/02 15/03/13 MAINTAINENCE AND MODIFICATION. DELETED
doc_411
[ "LQZ", "C", "DOTTED", "LINES", "ARE", "ALTERNATE", ".", "12", ".", "490", "SYNTHETIC", "PROCESS", "FLOW", "DIAGRAM", "AV", "-", "27826", "1", ".", "DWG", "-", "1", ".", "23", ".", "23", ".", "578", ",", "DWG", "-", "1", ".", "23", ".", "23", "....
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "3\"-DL-4927", "4\"-SF-9522", "7\"-EI-4224", "4\"-YH-5389", "2\"-JY-5048", "8\"-ZZ-1709", "2\"-YY-0372", "5\"-NJ-9859", "5\"-FC-3167", "4\"-IU-5493", "5\"-EY-1921" ]
LQZ C DOTTED LINES ARE ALTERNATE. 12. 490 SYNTHETIC PROCESS FLOW DIAGRAM AV-27826 1. DWG-1.23.23.578, DWG-1.23.23.789. IJ-96602 K.UXU 115 CD-13512 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 ERV-6-82 18. 3"-DL-4927 4"x6" IJ-41085 931 13. 906 OP-52127 ST-75797 4. DDL 25Jul27 779 SCALE DRAWING NAME QM-8356 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 126 IJ-82960 EF-60137 UV-64949 AB-46707 379 GEA OP-91933 3 ISSUE CONSTR. REV.33 CS-26 CHECK'D INS ( -27°C ) 19. PROJ. PQR P&ID 6" ISSUE INS ( -49°C ) LG-10 WX-41708 YY CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 23. DRAW/SHEET NO. 9. 24. 8"-ZZ-1709 COMPULSORY. AB-84711 21/11/09 741 SDL ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT LG-10 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME EF-10766 DELETED CONTRACTOR PROJECT NO. DMH 4"-YH-5389 FOR DETAILS. CS-67 DATE 68-6901 530 REV AB-52014 YQE DELETED ST-81004 ABC TO XYZ FOR MAINTAINENCE. CV-48351 PJ IJ-91461 MN-45735 A 25. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. SAMPLE 413 EF-32514 145 4" RO-10 AB-58354 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 2"-JY-5048 CONTRACT NAME DELETED CS-85 GRO DIMENSIONAL TOLERANCE +/- 1MM. INSTALLED. 21. CS-52 ZLC EF-97261 JOA-29-35 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. IJ-20019 4"-IU-5493 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. RO-10 ERV-5-28 25" TYPE VALVES. 6" ST-18228 26. 679 5. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 11. 16. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DDL MN-14125 20. 650 PROJECT/LOCATION/ASSIGN APPRV'D EF-44609 IJ-26159 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. GRO SDL ZLO 205 ERV-8-60 MADE 5"-EY-1921 15. KL-32056 CONNECTION TO EXHAUST IS PROVIDED. 5" S.NX ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 7. Std. AV-37207 RV-00055 CD-75871 578 N-5 MN-21216 GRI 8" 442 SAMPLE_9607.JPG OP-83848 GI GH-77369 8. RV-88097 UV-46470 SITE IN CASE OF MISMATCH. IJ-57423 CS-95 INS ( 54°C ) EF-77913 17. 01185526 AV-02619 4"-SF-9522 DELETED 2"-YY-0372 957 HMDH CV-34542 QR-10646 14. 148 5"-NJ-9859 B IJ-21105 K.XG 588 10. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND WX-66853 2. AB-58301 QR-86177 ISSUE CONSTR. REV.44 6. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INS ( -33°C ) 10" DDL FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD INS ( 33°C ) TOP CONNECTION. ISSUE CONSTR. REV.22 CV-00218 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 828 19" 7"x4" 480 ZLO CS-30 SDL KL-33712 921 GH-97110 22. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ SDL 138 KWh ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. NOTES PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ZWTX CV-69873 UNIT 896 ORGANIZATION 7"-EI-4224 CV-32235 21Jun12 DELETED 3. INSTALLATIONS/OPERATIONS. CONTRACTOR NO. COMMENTS. LG-10 DESCRIPTION UV-39756 5"-FC-3167 SAMPLE Project VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ISSUE CONSTR. REV.11 14May20 PQR VALVE TO BE INSTALLED AT Q POINT. ZLC TMZ D 4"x4"
doc_25
[ "9", ".", "4", ".", "RV", "-", "03559", "CONTRACTOR", "PROJECT", "NO", ".", "14", "\"", "SQ", "CONTRACT", "NAME", "560", "AB", "-", "1187", "CV", "-", "99160", "KL", "-", "68235", "LG", "-", "10", "BOTH", "XYZ", "VALVES", "AND", "BCD", "VALVES", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "8\"-XF-2275", "5\"-ZP-9116", "5\"-PJ-5418", "5\"-PV-8936", "5\"-TN-2461", "3\"-EY-5516", "4\"-YZ-0812", "2\"-GB-3698", "7\"-AC-8812", "6\"-RL-3665", "8\"-QA-6521" ]
9. 4. RV-03559 CONTRACTOR PROJECT NO. 14" SQ CONTRACT NAME 560 AB-1187 CV-99160 KL-68235 LG-10 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, SDL ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 26" DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, RV-24993 494 1. CV-01175 755 CS-44 OP-78001 QD ST-85621 11" None 7. CONNECTION TO EXHAUST IS PROVIDED. INS ( 59°C ) ISSUE CONSTR. REV.22 693 DV-58152 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 5"-TN-2461 NOTES DELETED 13. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 5"-PV-8936 MADE 22. PQR VALVE TO BE INSTALLED AT Q POINT. B 14. SDL BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE 7" 8"-QA-6521 CD-93341 DV-68443 ERV-1-42 UNIT APPRV'D DRAW/SHEET NO. ERV-1-24 D 145 YPY 620 15" STA N.NEN MAINTAINENCE AND MODIFICATION. DELETED 2. 4"-YZ-0812 PROJ. XYZ P&ID SAMPLE_2448.JPG DV-48866 KL-85913 LP WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE GH-89872 5" DV-04665 AB-80374 EF-88493 7"-AC-8812 IJ-20513 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 26" RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 16. ISSUE CONSTR. REV.11 DESCRIPTION LG-10 299 8. 827 ZLC 704 COMMENTS. DIMENSIONAL TOLERANCE +/- 1MM. 8"-XF-2275 AB-20206 100 24. 2"-GB-3698 DWG-1.23.23.789. TOP CONNECTION. CD-37112 SAMPLE Project 6" 590 STA YF-30-16 VALVES. HLG 5. ISSUE 11. DETAILS. 17. AB-30946 IJ-77775 5"-PJ-5418 26. MN-32928 SDL 17-4770 928 9" DELETED 8" 25/05/28 GRP DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ REV 19" SAMPLE PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. AV-67017 15/09/05 ECP WX-70947 ERV-8-62 GRP 5 5"-ZP-9116 INS ( 14°C ) DOTTED LINES ARE ALTERNATE. 707 SYNTHETIC PROCESS FLOW DIAGRAM 6. CD-49058 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME DATE CS-92 DELETED IJ-14963 MN-18855 3. 21/09/20 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 17" RO-10 18/07/26 ST-03093 WX-45514 612 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. IJ-23515 05446947 DDL CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR MN-20809 20. PAB 23. ZLC CV-21660 CV-90303 AV-15194 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. OP-75506 951 18. DRAWING NAME 10. WX-33978 ORGANIZATION 19. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. CONTRACTOR NO. CHECK'D Y.D DV-41682 CS-63 D.NTN ISSUE CONSTR. REV.44 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 15. 25. OP-95792 3" DELETED INS ( 51°C ) GH-00163 INSTALLATIONS/OPERATIONS. SCALE CD-84268 C 3"-EY-5516 INS ( -32°C ) ST-01548 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY ZLC MN-99959 EF-05572 OP-66798 CD-43533 CS-99 AV-65384 RV-56170 12. 21. DDL EPST ZLC CS-07 915 OP-52057 IJ-79690 A 929 DELETED PROJECT/LOCATION/ASSIGN N.T CV-66810 QR-78315 INS ( 18°C ) STA H-9 6"-RL-3665 ISSUE CONSTR. REV.33 9"
doc_276
[ "12", ".", "6", ".", "678", "2", ".", "8", ".", "EF", "-", "54877", "21", ".", "DELETED", "DDL", "26", ".", "8", "\"", "-", "YP", "-", "1590", "ELEVATION", "ARE", "TO", "CENTER", "LINES", "UNLESS", "OTHERWISE", "NOTED", ".", "DELETED", "359", "AB...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "2\"-NU-4390", "2\"-QQ-8615", "5\"-TI-1827", "3\"-LZ-9892", "2\"-DQ-2010", "3\"-IU-7311", "8\"-YP-1590", "3\"-EL-4234", "5\"-DV-7746", "4\"-XB-2928", "8\"-PA-7964", "6\"-NC-0233", "5\"-YO-2326", "6\"-OD-1538", "5\"-CE-8697", "7\"-GS-8748", "6\"-BP-5104" ]
12. 6. 678 2. 8. EF-54877 21. DELETED DDL 26. 8"-YP-1590 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DELETED 359 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. JQ 700 14. AB-52271 ST-89091 20/06/25 GRO SAMPLE_8928.JPG 6"-BP-5104 4"-XB-2928 B LG-10 5"-CE-8697 2"-DQ-2010 GI 2"-QQ-8615 Q.M F.Y N.PN 17. 10. PROJ. XYZ P&ID OP-04413 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE DELETED 2"-NU-4390 CD-84862 514 ST-96195 DELETED REV 22/08/16 IJ-24787 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 513 IJ-94762 CONTRACTOR NO. 4. 8"-PA-7964 U.ILQ 25. RO-10 16. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. UV-23834 SCALE 454 936 A DV-57581 W-5 5"-DV-7746 MN-09709 QQR UV-14580 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. GH-68171 TN-7886 894 5. 2"x5" GI KWh 18. 935 ZLO GH-27094 DZFG 872 DRAWING NAME MADE 424 OP-33664 ST-20257 OP-55173 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 23. MN-99256 PROJECT/LOCATION/ASSIGN 3"-EL-4234 LG-10 EI-50-05 CD-72015 SITE IN CASE OF MISMATCH. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME KL-89025 12" DDL CS-76 C DDL ISSUE CONSTR. REV.44 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 526-4329 CV-78441 11Aug25 107 CONTRACTOR PROJECT NO. 510 OP-96977 ST-30963 GH-61466 SAMPLE Project 763 CS-98 2 9. 1. QR-58998 INSTALLATIONS/OPERATIONS. DATE WX-54802 19. ABC TO XYZ FOR MAINTAINENCE. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE UV-68666 6"-NC-0233 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND RO-10 7"-GS-8748 CHECK'D INS ( -24°C ) 22. COMMENTS. 155 SAMPLE I.YWE EF-67600 D 324 711 ISSUE 11. 17" WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 353 IJ-37695 3"-IU-7311 DELETED HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 3"-LZ-9892 772 DELETED 14/07/28 11" PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD LG-10 944 ZLC 862 629 CV-35157 ERV-1-81 Std. TOP CONNECTION. NOTES CONNECTION TO EXHAUST IS PROVIDED. 901 7. OP-04797 OP-92069 DV-95957 ERV-2-89 GRI 990 DWG-1.23.23.578, DWG-1.23.23.789. ISSUE CONSTR. REV.33 3"x4" DV-61771 GRP RO-10 DIMENSIONAL TOLERANCE +/- 1MM. DRAW/SHEET NO. ZLO 20. 410 5"-YO-2326 X.MW 329 ORGANIZATION 12598792 INS ( 54°C ) ISSUE CONSTR. REV.11 GH-55353 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 5"-TI-1827 TYPE VALVES. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 466 RO-10 19" RO-10 ARS SDL INS ( -50°C ) FOR DETAILS. 24. PQR VALVE TO BE INSTALLED AT Q POINT. CD-56614 KL-98146 AB-96739 15. EF-44886 MVUW MN-43033 EF-83616 RO-10 RO-10 OQU INSTALLED. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 6"-OD-1538 3" 3. DESCRIPTION CS-03 DOTTED LINES ARE ALTERNATE. GLR APPRV'D BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS INS ( -14°C ) FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, UNIT WX-60867 13. ISSUE CONSTR. REV.22 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. SYNTHETIC PROCESS FLOW DIAGRAM CONTRACT NAME
doc_30
[ "549", "ISSUE", "CONSTR", ".", "REV", ".", "33", "2", ".", "M", ".", "PJ", "ISSUE", "CONSTR", ".", "REV", ".", "22", "ELEVATION", "ARE", "TO", "CENTER", "LINES", "UNLESS", "OTHERWISE", "NOTED", ".", "AB", "-", "75578", "PQ", "LG", "-", "10", "ABC",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "4\"-BI-4443", "5\"-QX-0320", "4\"-HO-7786", "7\"-TV-8393", "2\"-AZ-5086", "6\"-ZQ-9426", "6\"-WH-3416", "6\"-VC-4406", "7\"-FO-3779", "8\"-IX-8369", "8\"-JT-1069", "5\"-EZ-9308", "4\"-CY-6367", "7\"-EW-6574", "2\"-RP-0760", "3\"-YC-5749", "8\"-OE-9351", "3\"-ZS-6503", "2\"-NB-88...
549 ISSUE CONSTR. REV.33 2. M.PJ ISSUE CONSTR. REV.22 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. AB-75578 PQ LG-10 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 468 8"-OE-9351 DELETED CONNECTION TO EXHAUST IS PROVIDED. 4"-HO-7786 REV M.ZY 6"-WH-3416 AV-39481 958 DRAWING NAME RO-10 H.EV 756 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 784 QR-90776 DELETED GRP 2"-OO-7421 OP-05313 OP-66034 8"-JT-1069 AB-39760 691 CD-93479 QR-89591 4"-DU-9770 QR-42360 ZQ EF-26820 B.VL ERV-4-69 8"x7" MODIFICATION. 26" AB-65971 2"-NB-8871 OP-98635 EF-42173 AB-37422 3" INS ( -53°C ) 856 RO-10 C 18/01/21 ISSUE CONSTR. REV.44 890 MN-91990 INS ( -34°C ) WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. STA ZLO YN-6939 ST-78953 ISSUE 17. 3. CD-00184 4"-RY-4304 MN-18299 12. 17" KL-67841 MN-03617 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. QR-28280 OP-90687 128 9"x6" CONTRACT NAME 4"-OQ-3660 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. GRI IJ-77235 2"x5" RV-35383 RV-67693 QR-30888 ST-08329 CS-30 QR-97033 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND SCALE STA 992 101 8"-FW-8267 DV-65543 SDL 414 688 SYNTHETIC PROCESS FLOW DIAGRAM CV-82052 7. DDL 3"-ZS-6503 DDL SAMPLE 107 OP-84658 C.C DESCRIPTION DATE WX-68215 RV-37868 ORGANIZATION 7"-EW-6574 A LG-10 ERV-9-24 AB-52231 EF-37556 OP-35122 GI 2"x9" LG-10 993 19. 18. GH-76096 10" 636 166 INS ( -42°C ) CD-99223 978 UV-68198 QR-38222 877 RV-58535 AV-68908 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. DELETED SAMPLE Project KL-25489 WHI 4. DDL MN-28817 DELETED GI CV-65926 363 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. AV-14069 ERV-4-09 B CV-90537 268 PROJECT/LOCATION/ASSIGN 375 930 446 MTGS GH-89621 3" UV-55039 RV-08469 OP-09408 GRP KL-28940 1. PQR VALVE TO BE INSTALLED AT Q POINT. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 491 RV-97361 2"-RP-0760 COMMENTS. DIMENSIONAL TOLERANCE +/- 1MM. UNIT 14" KL-78144 D SDL DDL BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 5. OP-34508 4"-BI-4443 KL-75594 KL-02122 3"-HR-0673 MADE OP-94232 KL-07061 ERV-8-35 5"-QX-0320 13" ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. ZLC GH-79628 MN-35296 UV-32848 GRP AV-35351 EF-69120 14. 729 UV-87909 ERV-0-41 ABC TO XYZ FOR MAINTAINENCE. 9. INS ( 47°C ) ST-16177 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 2" WX-17207 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 3"-YC-5749 25/09/21 773 533 CONTRACTOR PROJECT NO. 8"-ZB-7777 INS ( -46°C ) RO-10 INS ( 46°C ) 6"-VC-4406 875 GRI AV-28670 21. RV-54938 16. 203 8"x4" SYNTHETIC PROCESS ENGINEERING FLOW SCHEME AB-40037 AB-15853 RO-10 2"-AZ-5086 903 STA FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD QR-40191 TOP CONNECTION. ST-33049 STA NOTES SDL J.BF E-2 CD-17497 PROJ. XYZ P&ID APPRV'D 980 LG-10 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 624 GRO CS-39 UV-22494 GLR LG-10 71-2788 CV-16722 DV-44497 804 OP-43310 CV-85120 4"-CY-6367 DDL 8. 15. 7"-ZK-9229 QR-89735 CONTRACTOR NO. 928 CV-83761 CD-76394 CV-45154 5"-EZ-9308 11. GH-42533 6"-ZQ-9426 GRO 991 UV-31166 CHECK'D 1 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. WX-93428 362 3"x3" 20. 952 8"-IX-8369 6. S.MJL CS-79 SAMPLE_2627.JPG 10. 62303983 438 ZLO PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 14" 338 13. UA-25-65 KL-88613 RO-10 GLR W.TB DRAW/SHEET NO. RV-58744 ISSUE CONSTR. REV.11 DDL MN-82466 WX-31499 EF-91661 LG-10 970 5" 4"x8" 7"-FO-3779 DDL 23/07/07 EF-88159 582 ST-15698 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 554 12May18 AB-69147 Std. 7"-TV-8393 OP-35313 6"-UO-7807 130 AV-83705 GRO SDL STA 22.
doc_9
[ "PLEASE", "READ", "THIS", "DISCLAIMER", "CAREFULLY", ".", "THIS", "DOCUMENT", "IS", "COMPLETELY", "SYNTHETICALLY", "GENERATED", "AND", "DRAW", "/", "SHEET", "NO", ".", "8", "\"", "-", "FZ", "-", "4848", "RO", "-", "10", "RV", "-", "82859", "709", "1", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "4\"-QU-5647", "5\"-FS-5423", "8\"-FZ-4848", "5\"-KR-9759", "4\"-FD-4682", "5\"-VT-6336", "8\"-TW-8268", "4\"-BL-5523", "8\"-RQ-3851", "5\"-CE-3619", "6\"-KZ-9691" ]
PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DRAW/SHEET NO. 8"-FZ-4848 RO-10 RV-82859 709 1"x5" THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ DESCRIPTION QR-41334 AV-28141 DELETED MN-05827 454 EF-06706 PROJ. DEF P&ID WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. CS-43 INSTALLED. 8"-RQ-3851 9" ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 4 10. ISSUE CONSTR. REV.11 617 19. ABC TO XYZ FOR MAINTAINENCE. 14-9456 AB-85428 DELETED EF-88692 23. 619 4. F.UO 766 24/03/21 DELETED STA CD-47826 AV-24076 ERV-9-07 DELETED ANE 692 667 None 25. RO-10 GH-34451 CS-44 646 8"-TW-8268 SAMPLE 20. 8. CS-73 CS-61 AB-94292 KL-97275 S.OCU 304 02162181 DRAWING NAME 2. COMMENTS. C 3. MN-73873 1. ZLO GLR 21. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED K.E STA 17. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 GRO FOR DETAILS. EF-72520 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD ERV-2-14 220 SAMPLE_1751.JPG LG-10 TOP CONNECTION. CD-17485 18. STA WX-53798 MN-98019 GRP ST-78008 11. APPRV'D Z.H D-3 CONNECTION TO EXHAUST IS PROVIDED. 575 12. 9. 6" DELETED OP-42402 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME MN-52282 QR-02030 AB-88555 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, INS ( -43°C ) 5"-CE-3619 CV-75438 128 NEV-35-15 EX 15. 3"x9" ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE ZLO AV-96309 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, ISSUE CONSTR. REV.33 LG-10 559 KWh 5"-VT-6336 PROJECT/LOCATION/ASSIGN MAINTAINENCE AND MODIFICATION. SDL IJ-46900 INS ( 52°C ) CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS SAMPLE Project PQR VALVE TO BE INSTALLED AT Q POINT. 6"-KZ-9691 GLR 5"-KR-9759 A DV-34654 24. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. MADE 4"-QU-5647 8" 22. 201 11" 9"x7" 634 ISSUE UV-24404 UV-80902 LG-10 923 15" DV-30705 18" 5. CONTRACT NAME L.CN KL-44057 UV-09685 825 DDL CS-89 D.D COMPULSORY. STA ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT DELETED DWG-1.23.23.578, DWG-1.23.23.789. SYNTHETIC PROCESS FLOW DIAGRAM DOTTED LINES ARE ALTERNATE. 783 CHECK'D UV-01495 DV-32502 8" 16" CONTRACTOR PROJECT NO. DIMENSIONAL TOLERANCE +/- 1MM. KL-62698 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE REV RO-10 GH-26911 26. 5"-FS-5423 4"-FD-4682 EF-30818 ORGANIZATION B IJ-16739 INSTALLATIONS/OPERATIONS. 818 OP-41046 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DATE LG-10 16. INS ( 48°C ) SYP ST-71789 SDL 794 14. 137 13. 6"x1" 20/08/24 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH UNIT KL-61393 26" 27" 651 2"x1" SCALE ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ISSUE CONSTR. REV.22 647 AV-40297 CONTRACTOR NO. 11" LG-10 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 485 645 4"-BL-5523 DDL IO-4485 RO-10 NOTES VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE SITE IN CASE OF MISMATCH. 19Jun08 6. 415 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 7. EF-81691 27. DDL DV-55269
doc_125
[ "TEMPERATURE", "CONTROL", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "BY", "DEFAULT", ".", "2", "\"", "x8", "\"", "22", ".", "8", ".", "DRAW", "/", "SHEET", "NO", ".", "C", "13", ".", "ORGANIZATION", "CS", "-", "70", "ST", "-", "58046", "EF", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "3\"-DP-8184", "3\"-XU-5815", "6\"-PS-6883", "8\"-RU-7094", "3\"-UV-3647", "6\"-LO-4751", "3\"-KN-2004", "3\"-ZW-6189" ]
TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 2"x8" 22. 8. DRAW/SHEET NO. C 13. ORGANIZATION CS-70 ST-58046 EF-55150 481 593 OL OP-92047 SDL SDL WX-96491 ZLO UV-35923 INS ( -16°C ) 11. N.NJ 41-8648 12. IJ-40562 149 CONNECTION TO EXHAUST IS PROVIDED. 7. DV-03052 SDL 961 875 3. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 3"-UV-3647 539 INS ( 45°C ) GH-68524 RV-15467 OKF ISSUE CONSTR. REV.11 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 14" 10Dec11 6"-PS-6883 14" EF-82715 DELETED 3"-KN-2004 CV-83132 3"-DP-8184 CS-41 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. KWh DATE CV-76148 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD DDL DSJ-00-78 QR-96805 PROJECT/LOCATION/ASSIGN CV-60831 MADE PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 219 860 19Oct16 ISSUE 572 4. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 875 QR-47645 AB-45797 ZLO IJ-45223 936 16" 238 20. ISSUE CONSTR. REV.33 DELETED 23. INSTALLED. 145 STA DDL INS ( -54°C ) CONTRACTOR NO. 3"x9" EF-24815 EF-53787 14/03/04 RO-10 RV-73756 DDOY DOTTED LINES ARE ALTERNATE. DELETED INS ( 50°C ) DESCRIPTION AB-80803 2" CONTRACT NAME GRO 9. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 CD-30517 PROJ. XYZ P&ID FOR DETAILS. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 697 2. DELETED 951 AB-30447 ST-24681 MX A NOTES YGZO KC-6016 DELETED STA GH-59318 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS SAMPLE IJ-96621 INSTALLATIONS/OPERATIONS. APPRV'D KL-66410 CS-00 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 397 LG-10 STA AB-24286 21. REV 546 AB-79321 OP-01213 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS KL-10880 908 PQR VALVE TO BE INSTALLED AT Q POINT. QR-34660 O-8 MN-86746 16. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 1. GLR RV-76351 WX-42750 SDL 3" AB-36751 15. TOP CONNECTION. 18. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 6. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE QR-45187 3 3"-XU-5815 AB-40711 INS ( 48°C ) EF-09607 GRO UNIT SCALE OP-35408 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 3"-ZW-6189 CHECK'D CD-94878 DDL DRAWING NAME CONTRACTOR PROJECT NO. IJ-27804 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 DIMENSIONAL TOLERANCE +/- 1MM. DV-02787 TYPE VALVES. STA WX-84712 SYNTHETIC PROCESS FLOW DIAGRAM B SAMPLE Project Std. 5. GH-10281 UV-79149 COMPULSORY. ABC TO XYZ FOR MAINTAINENCE. KBM 14. COMMENTS. 5" ISSUE CONSTR. REV.22 SITE IN CASE OF MISMATCH. GRO CD-30938 8"-RU-7094 25. 7"x8" 23302240 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DV-16511 17. INS ( 26°C ) X.RZ DDL WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. ERV-9-69 6"-LO-4751 10. CV-08208 C.U IJ-95780 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 24. 19. QR-89085 SAMPLE_4713.JPG GH-08683
doc_477
[ "ELEVATION", "ARE", "TO", "CENTER", "LINES", "UNLESS", "OTHERWISE", "NOTED", ".", "12", ".", "PLEASE", "READ", "THIS", "DISCLAIMER", "CAREFULLY", ".", "THIS", "DOCUMENT", "IS", "COMPLETELY", "SYNTHETICALLY", "GENERATED", "AND", "UV", "-", "52557", "CD", "-", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-FU-0497", "2\"-UN-0952", "7\"-CF-8602", "5\"-DY-0946", "6\"-QA-9922", "3\"-NS-5074", "2\"-BO-3951", "7\"-MI-0366" ]
ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 12. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND UV-52557 CD-51975 ISSUE CONSTR. REV.11 A DELETED CS-67 7. 973 2" KL-37709 CHECK'D 2 8" DELETED L.JH CD-64073 SAMPLE 222-8652 8. INS ( -54°C ) ZLO IJ-47484 C BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS RO-10 9. 2"-BO-3951 ABC TO XYZ FOR MAINTAINENCE. AI-1351 455 879 QR-78772 LG-10 INS ( 43°C ) DIMENSIONAL TOLERANCE +/- 1MM. PROJECT/LOCATION/ASSIGN GH-85887 IJ-28634 APPRV'D 401 CONTRACTOR NO. CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. ZLO B 6"-QA-9922 ORGANIZATION ISSUE CONSTR. REV.22 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH OP-74590 GH-59867 3"-NS-5074 134 SCALE DELETED CD-89342 1. COMMENTS. QR-21445 CD-88789 VZH LG-10 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DATE 16. 379 E.RRV 747 14/04/12 LG-10 22. CONTRACTOR PROJECT NO. PROJ. PQR P&ID OP-94785 INS ( -27°C ) DOTTED LINES ARE ALTERNATE. CS-00 XA D.OC 71810024 IJ-01592 778 TC GRP DWG-1.23.23.578, DWG-1.23.23.789. CS-18 TOP CONNECTION. CS-44 WX-27198 7"-CF-8602 KT INS ( 14°C ) AB-68064 S.QNY 15/10/18 INS ( 26°C ) CONTRACT NAME AB-77362 5. 685 STA WX-84550 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ST-71348 REV ZLO SAMPLE_5658.JPG EF-43778 ISSUE CONSTR. REV.55 GI 24. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 21. RV-49067 IJ-30772 QR-25498 DRAW/SHEET NO. DELETED 933 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 5" 19" UV-04971 14. EF-85392 CD-14771 MADE GH-80034 7"-MI-0366 IJ-13177 QR-70994 10Apr08 TYPE VALVES. ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 23. DV-79131 STA IJ-82760 SDL KWh 162 DESCRIPTION DELETED INS ( -45°C ) 10. CONNECTION TO EXHAUST IS PROVIDED. 2"-UN-0952 840 FOR DETAILS. None CV-15632 INSTALLED. WX-61512 15. 426 STA IJ-05959 STA 13/09/11 AV-83845 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 2"-FU-0497 3. IPTJ PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ERV-8-77 3" AV-73545 K.F UNIT SYNTHETIC PROCESS FLOW DIAGRAM MN-47850 CS-88 WX-14072 3" ST-44479 DELETED AV-12563 11. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 7" 5"-DY-0946 OP-48680 20. ISSUE CONSTR. REV.33 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME NOTES UV-82802 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 565 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED ISSUE XQR DV-51725 I-1 YMBG 17. GH-96036 QR-93912 6. INS ( -10°C ) RO-10 5" MN-32644 EF-30305 ST-56781 2. 19. 4. 106 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, E MAINTAINENCE AND MODIFICATION. SDL 15" QKW-74-91 18. 18/06/01 ZLC SAMPLE Project D LIK DRAWING NAME 16" 215 DV-53023 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE Z.G 13. 139 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 3"x3" INS ( 41°C ) BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, ISSUE CONSTR. REV.44 DV-10685 YRV COMPULSORY.
doc_153
[ "11", "\"", "SCALE", "235", "13", ".", "8", "\"", "x1", "\"", "COMPONENTS", "ARE", "AT", "NORMAL", "PRESSURE", "WITH", "POWER", "RATINGS", "15", ".", "4", "KWh", "921", "CONTRACTOR", "NO", ".", "PLEASE", "READ", "THIS", "DISCLAIMER", "CAREFULLY", ".", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "6\"-UB-9641", "4\"-TJ-2652", "4\"-AV-2804", "7\"-SW-8471", "3\"-AD-8846", "3\"-WM-5326", "4\"-XN-8066", "2\"-LH-5977", "7\"-TW-3553", "4\"-II-5165", "6\"-TB-2318", "5\"-IE-7751", "5\"-RG-2188", "4\"-GC-2501", "2\"-VG-1496", "5\"-YX-0788", "3\"-RQ-8021", "7\"-ZJ-5630", "4\"-ZA-63...
11" SCALE 235 13. 8"x1" COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 921 CONTRACTOR NO. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND PQR VALVE TO BE INSTALLED AT Q POINT. GH-45971 PROJ. XYZ P&ID 422 17. DDL AV-58025 144 DDL 7"-TW-3553 SAMPLE Project ISSUE CONSTR. REV.33 COMMENTS. UV-45481 UNIT ERV-3-76 MGVB DV-75090 STA GH-88598 469 5" AB-80516 7"-SW-8471 KL-64801 CS-92 AV-99414 2" EF-46589 WX-19222 16" APPRV'D ERV-4-22 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DIMENSIONAL TOLERANCE +/- 1MM. DRAW/SHEET NO. ZLC OP-11182 588 ABC TO XYZ FOR MAINTAINENCE. 13" 1" AV-82110 STA FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD STA HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 26. AB-71653 24" 4"-TJ-2652 DOTTED LINES ARE ALTERNATE. 14" WX-63869 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. RO-10 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. X.KID DELETED 27" OP-65533 21. LG-10 7"-ZJ-5630 STA 990 EF-26157 2"-VG-1496 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. X.H M.R 4"-GC-2501 CD-45634 26" 4"-AV-2804 491 GH-24682 AB-06204 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. SDL CD-16840 9. 5. 176 DESCRIPTION ST-54310 546 AB-36004 ISSUE CONSTR. REV.11 AV-83069 QR-45728 SAMPLE AB-14041 2" ISSUE CONSTR. REV.22 198 AV-98028 22. GH-73878 MADE OP-26223 13" 25. STA 9"x6" 6"-TB-2318 9" EF-79711 WX-26087 KL-55298 619 QR-63918 IET-64-69 789 INS ( -43°C ) CS-94 3"-AD-8846 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 10" 6" GH-63963 GH-77700 825 ST-17325 CD-83818 KL-38169 5"-RG-2188 B EF-53909 UV-64393 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. DELETED CONTRACTOR PROJECT NO. SAMPLE_5706.JPG ERV-2-25 REV WX-57380 CS-28 628 LG-10 6"-UB-9641 OP-59946 16. 12. 3. ERV-1-87 2" 6. 478 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME DATE PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS MN-37864 9" ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. 4"-XN-8066 IJ-82713 P-5 KL-41713 524 MH-7705 4"-II-5165 2"-LH-5977 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 18. H.OUD WX-26877 15. PROJECT/LOCATION/ASSIGN DRAWING NAME 10" 18/08/15 23. MN-98067 GRO RO-10 MN-37745 OP-86450 ST-25028 QR-04859 N.Y WX-09794 8. DV-71876 AB-37216 TOP CONNECTION. CD-15280 STA ISSUE 5"-IE-7751 3 DV-72521 OP-88325 585 DDL 4"-ZA-6370 Std. LG-10 IJ-79635 3"-WM-5326 STA 24. CHECK'D 6"x4" INS ( 56°C ) CD-50756 20. GH-97827 UV-48697 A WX-56629 15/11/23 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. QR-27650 961 LG-10 UV-36256 352 OP-50719 4. INS ( 33°C ) UV-39648 51073436 GRP 2. C GRI DV-15259 CS-72 RO-10 5"-YX-0788 CS-46 12Nov25 QR-08813 830 SYNTHETIC PROCESS FLOW DIAGRAM MN-13315 247 14. CD-39031 KL-98768 U.J ZLO SDL 27. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. VL 11. WX-58551 DELETED KL-49461 DELETED 1. 7. 3"-RQ-8021 ZLC ST-53570 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. DELETED CONNECTION TO EXHAUST IS PROVIDED. DELETED CS-34 M.L GH-76046 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. DDL 938 NOTES 19. CV-46588 10. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ZLO GH-34207 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 32-9514 ORGANIZATION 10" 2"-BP-7830 CV-73822 MN-53995 791 CV-67249 ERV-6-82 232 ST-86809 CONTRACT NAME
doc_229
[ "7", "\"", "-", "CZ", "-", "7423", "DELETED", "AV", "-", "60356", "CV", "-", "56458", "21", ".", "2", "\"", "-", "TR", "-", "6223", "IJ", "-", "50431", "776", "DOCUMENTS", "OF", "SIMILAR", "FIELDS", "WHATSOEVER", ".", "RO", "-", "10", "WX", "-", ...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O",...
[ "8\"-VA-9393", "3\"-KW-1420", "2\"-TR-6223", "8\"-JS-7694", "6\"-XL-3715", "4\"-PL-4866", "7\"-BQ-3963", "8\"-GP-2488", "7\"-YB-1084", "2\"-AH-3019", "7\"-WT-8297", "7\"-CZ-7423", "3\"-EP-8037", "6\"-EY-8387" ]
7"-CZ-7423 DELETED AV-60356 CV-56458 21. 2"-TR-6223 IJ-50431 776 DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. RO-10 WX-73512 CD-22825 B CD-10859 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 7. 6"-XL-3715 RO-10 ZLO ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. RV-32738 8" APPRV'D CD-96627 JX-6626 Std. ORGANIZATION AB-38498 RO-10 KL-27583 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ EG HWKF YHD 13" C ISSUE CONSTR. REV.22 ISSUE CONSTR. REV.33 1. OMQ-15-99 INS ( -50°C ) STA GH-14294 MN-32492 245 10. 3" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 551 1 8"-GP-2488 GRP ISSUE 4"-PL-4866 ERV-0-84 VALVES. 11. DRAWING NAME CS-85 945 UV-25656 INS ( 25°C ) CHECK'D 18. CV-74552 UV-97425 20. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD DATE 3. 22. OP-37894 CONTRACTOR PROJECT NO. AV-71141 3"-KW-1420 CONTRACTOR NO. CS-72 358 733 UV-95014 GRO PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY UNIT FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 9"x3" OP-17231 13. 743 DELETED 429 24. E-8 AV-54916 M.LY 2. KL-52270 13" DIMENSIONAL TOLERANCE +/- 1MM. DDL ABC TO XYZ FOR MAINTAINENCE. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 16" UV-31951 Y.BE 5" MADE CS-79 16" ZLO 730 CONTRACT NAME ZLC TOP CONNECTION. CMJV 517 774 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DWG-1.23.23.789. MN-27507 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN ERV-9-48 638 QR-15024 SAMPLE_4819.JPG UV-67989 INS ( -19°C ) DETAILS. COMMENTS. ZLC A FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 3"-EP-8037 SDL DELETED DRAW/SHEET NO. 19. 23. UV-17054 JJ AV-40514 6" KL-91429 434 INS ( 14°C ) 682 IJ-75829 GH-42637 491 25277799 208-0590 21/08/25 ZLO ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. ERV-8-42 ST-71159 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. SAMPLE CV-36854 3" CD-47296 7"-BQ-3963 837 17. REV WX-13576 GRP PROJECT/LOCATION/ASSIGN RV-05648 748 RV-21794 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 2" 8. J.MSN GH-73619 SCALE 5. RV-29745 CASE OF MISMATCH. INS ( 11°C ) 16. UV-83001 4"x1" PROJ. PQR P&ID INSTALLATIONS/OPERATIONS. ZLO 134 MN-24804 6. CS-76 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 8"-JS-7694 GH-24818 12. 7"x9" GI 699 2"-AH-3019 4. QR-56275 7"-YB-1084 MN-68530 DESCRIPTION 15. LG-10 MAINTAINENCE AND MODIFICATION. SAMPLE Project TRK RV-65948 SDL SYNTHETIC PROCESS FLOW DIAGRAM GLR DELETED IJ-76626 NOTES PQR VALVE TO BE INSTALLED AT Q POINT. QR-82456 9. DV-84202 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. AB-25336 OP-39970 DV-52065 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE RV-73682 CONNECTION TO EXHAUST IS PROVIDED. GH-84525 DV-70117 ISSUE CONSTR. REV.11 19Apr17 17/05/01 8"-VA-9393 EF-55463 7"-WT-8297 DDL ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 6"-EY-8387 759 CD-72562 2" CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. DELETED 4" AB-27027 DV-18711 ST-93745 14. 5" KL-65297 419 EF-84768
doc_320
[ "BUILDING", "TO", "BE", "IN", "THE", "SLANTING", "PLANE", "THROUGH", "THE", "AXIS", "OF", "PQRS", "TYPE", "VALVES", ".", "ISSUE", "CONSTR", ".", "REV", ".", "44", "QR", "-", "86136", "RO", "-", "10", "4", ".", "WX", "-", "48618", "346", "479", "SYN...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-YW-2652", "5\"-YZ-0386", "6\"-DH-4437", "8\"-TY-4270", "8\"-LZ-4632", "6\"-IT-3714", "4\"-VR-6699", "5\"-CY-9715", "2\"-PJ-4904", "8\"-LK-6052", "2\"-NN-1260", "7\"-RV-4122", "4\"-TN-2890", "2\"-UM-1398", "6\"-FF-2938", "6\"-NQ-6043", "2\"-FZ-2503", "2\"-BH-5368", "4\"-LI-83...
BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. ISSUE CONSTR. REV.44 QR-86136 RO-10 4. WX-48618 346 479 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME INS ( 28°C ) EF-34040 DATE C.H CD-95156 B ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. SYNTHETIC PROCESS FLOW DIAGRAM MN-69719 455 AV-92840 AB-21200 CS-65 PROJECT/LOCATION/ASSIGN INS ( -35°C ) HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED RO-10 7. 21/10/17 DRAWING NAME FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. 2"-UM-1398 QR-80858 13May15 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD KL-98046 ABC TO XYZ FOR MAINTAINENCE. 8"-LK-6052 MODIFICATION. 11. 45327404 OP-36331 188 STA INS ( -38°C ) SDL 7"x9" RO-10 6"-IT-3714 SDL M.LIH DELETED IJ-03560 AB-22780 7"-SJ-2115 TOP CONNECTION. UV-22055 DV-20349 SDL ISSUE CONSTR. REV.55 13. AV-13661 4"-LI-8392 5. ISSUE CONSTR. REV.33 MN-46689 IJ-05155 KL-45950 UV-89225 12" 4"x6" STA MN-66884 22. GH-85585 9"x9" 4"-VR-6699 13" 442 755 GLR LG-10 144 ERV-5-08 315 15" 6"-DH-4437 WX-39452 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND CD-70587 RO-10 GI RV-41237 WX-98198 24. DESCRIPTION GRP C.L 2. OP-97282 WX-76076 21. 985 NGD W.U SDL FLZE 2" 5" TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. MN-45746 WX-07463 E CONNECTION TO EXHAUST IS PROVIDED. DELETED PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS ST-45492 189 OP-92286 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. ISSUE CONSTR. REV.22 MN-12597 E.B SAMPLE Project 2" AV-32061 PQR VALVE TO BE INSTALLED AT Q POINT. 2"-NN-1260 782 611 358 2"-VL-3896 15. KL-11818 2"-PJ-4904 5"-CY-9715 ERV-9-91 23. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. CV-28396 RV-79979 17. CD-84882 26. 15Nov16 1 IJ-16812 R.NF 5"-SH-4473 RV-67412 ISSUE 596 189 566 DELETED ML 864 SDL GH-34419 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. SDL ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 18. 7" RO-10 REV OP-86155 LG-10 16" 5"x2" WX-89123 467 19. DV-04467 16May14 4"-TN-2890 LG-10 Z-2 8. ERV-4-10 INS ( -56°C ) DELETED 768 MN-76758 6"-NQ-6043 INS ( -56°C ) OP-59665 None 4" 915 9" APPRV'D 698 OP-22895 OCA-16-69 KL-61876 ST-61618 STA CHECK'D ERV-4-75 20. WX-75338 QR-28963 3. CS-69 RO-10 MN-59936 6. 10" 8"-TY-4270 RV-84426 6"-FF-2938 998 UV-47055 ST-55815 695 QR-46750 AV-01123 OP-48171 CONTRACTOR NO. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 557 A CD-13489 OP-40598 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. KL-84364 EF-45503 1"x5" ISSUE CONSTR. REV.11 DIMENSIONAL TOLERANCE +/- 1MM. 429 RO-10 RO-10 78-7287 TKB DELETED 4"-UO-0594 553 WX-87415 AV-32791 UV-07384 6"-JY-9906 UNIT CS-35 12" 4"x8" SCALE QR-05188 CD-94670 7"-YW-2652 KL-96103 5"-YZ-0386 800 RO-10 668 10. IJ-10324 WX-08641 6"-XD-0089 CS-14 SAMPLE_5411.JPG P.KF STA PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. DRAW/SHEET NO. QR-18521 9. MN-75924 981 2"-BH-5368 MADE PROJ. DEF P&ID UV-27231 CD-74912 ERV-0-61 ORGANIZATION CONTRACTOR PROJECT NO. NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. LG-10 14. 25. STA OP-44331 QR-47142 6" ERV-3-10 F.BQC UV-13359 6"-BC-9931 TK SDL COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND SAMPLE LG-5085 16. 12/02/07 1. EF-52333 D 12. 881 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ ERV-5-33 KL-20220 2"-FZ-2503 CD-59712 1" ERV-1-77 K.A CONTRACT NAME ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. QR-74902 7"-RV-4122 C 4"-YO-5557 754 AV-67931 COMMENTS. WX-59826 5" GLR O.AWN 630 IJ-09955 8"-LZ-4632 7" RV-83535 WX-95131 LG-10 623 CD-48768 INS ( 21°C ) DDL LG-10 CD-20265 898 NOTES CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. INS ( 22°C ) CD-59017
doc_299
[ "CLOSED", "VESSEL", "HEATER", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "AT", "30", "°", "C", "AND", "50", "°", "C", ".", "ST", "-", "28128", "SDL", "5", ".", "ABC", "TRANSMITTOR", "TO", "BE", "USED", "AS", "BACKUP", "FOR", "KMO", "TRANSMITTOR",...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-P...
[ "6\"-DV-5159", "3\"-KJ-6731", "3\"-BU-0700", "5\"-NS-8492", "4\"-GG-0799", "7\"-BW-2815", "3\"-HR-7397", "6\"-GY-6559" ]
CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. ST-28128 SDL 5. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 3"-HR-7397 PROJECT/LOCATION/ASSIGN DDL DDL DELETED ISSUE CONSTR. REV.33 226 6"-GY-6559 CS-90 RO-10 AV-32600 LG-10 ERV-4-57 15May27 UV-45771 3"-KJ-6731 B.WQ None ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 122 KL-70866 ST-11736 UR-94-43 ISSUE CONSTR. REV.22 SAMPLE_8549.JPG LG-10 EF-75192 CONTRACTOR NO. STA 4. 2. DFUF 6" FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 9"x1" RV-15919 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ DATE DELETED 22. 3. CHECK'D GHG HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 14. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS A B 409 809 16" COMPULSORY. 9" 6. 1. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 117-6180 DWG-1.23.23.578, DWG-1.23.23.789. H-9 13. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS STA INS ( -46°C ) EF-90507 WX-94462 SYNTHETIC PROCESS FLOW DIAGRAM 604 DOTTED LINES ARE ALTERNATE. CS-61 OP-68711 ZLO ORGANIZATION CONTRACT NAME 8. B.TB ERV-3-08 ISSUE WX-48774 APPRV'D 827 5"x4" MADE IHG EF-76666 5 IJ-74036 PQR VALVE TO BE INSTALLED AT Q POINT. TOP CONNECTION. OP-32395 EHEY 6"-DV-5159 DRAW/SHEET NO. SDL INS ( -10°C ) ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. ERV-6-46 288 15. RV-03103 SAMPLE Project RV-02405 931 17. PROJ. PQR P&ID DELETED HST SITE IN CASE OF MISMATCH. 19. 14" WX-43857 23. I.KI 371 DELETED 11" 784 ZLO INS ( -57°C ) ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 7" EF-51983 COMMENTS. 131 7"-BW-2815 WX-83470 135 TYPE VALVES. DDL 174 5"-NS-8492 DV-17347 AV-38793 938 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. GLR DELETED AV-31438 KL-04408 UNIT D IR 13" 820 CV-20908 66326383 D.A 21. LG-10 WX-32535 KWh SCALE IJ-04014 INSTALLATIONS/OPERATIONS. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 DV-46532 AB-94949 5"x4" ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH AB-51981 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE RO-10 AB-13735 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. UE-0154 NOTES 782 ABC TO XYZ FOR MAINTAINENCE. CV-71850 UCS SAMPLE 11. 14Apr18 12" CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 16. UV-13359 932 18/02/12 MN-65637 6"x6" 15/01/04 REV 629 CS-02 AB-25383 DDL 10. INSTALLED. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 569 ZLO DRAWING NAME CV-96642 IJ-43325 WX-64560 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND UV-36532 INS ( -44°C ) FOR DETAILS. 309 112 3"-BU-0700 ISSUE CONSTR. REV.44 CS-79 DDL DV-52508 12. 18. DESCRIPTION 20. ZLO ZLO ISSUE CONSTR. REV.11 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 EF-86550 130 9. CONTRACTOR PROJECT NO. 4"-GG-0799 AM C 7. CS-36 CS-88
doc_323
[ "RV", "-", "10076", "SDL", "AB", "-", "67051", "None", "16", ".", "5", ".", "ZLO", "CV", "-", "10883", "NOTES", "LG", "-", "10", "GH", "-", "86792", "299", "QR", "-", "52219", "18", ".", "DELETED", "RV", "-", "98509", "11", "\"", "WX", "-", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "5\"-BM-8620", "8\"-KO-7772", "8\"-PG-9904", "7\"-JU-4464", "2\"-FU-4706", "7\"-JO-5284", "2\"-IZ-5348", "2\"-QL-1032", "5\"-EC-6638", "6\"-OB-2129", "8\"-DI-8096", "4\"-PH-8691", "8\"-FS-3580", "5\"-FE-7623", "2\"-UM-7645", "8\"-ZT-7118", "6\"-DB-9686", "5\"-PO-3074", "7\"-WU-19...
RV-10076 SDL AB-67051 None 16. 5. ZLO CV-10883 NOTES LG-10 GH-86792 299 QR-52219 18. DELETED RV-98509 11" WX-62225 8"x2" ERV-0-39 8" CONTRACTOR PROJECT NO. 8"-FS-3580 GRP 7"-JO-5284 MODIFICATION. ORGANIZATION EF-53752 CV-47068 OP-17937 CD-00366 13. 2"-UM-7645 QR-66693 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD DV-41973 SAMPLE Project COMMENTS. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 196 24. 4" QR-64610 4"-PH-8691 CS-15 UV-96301 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. GH-58978 459 29. CS-74 GLR IJ-37675 A 1" 227 14" 29" 7"-WU-1961 OP-37281 DRAW/SHEET NO. C.RN 131 EF-60019 SDL TOP CONNECTION. 5"-PO-3074 18" 8"-DI-8096 10" 6"-DB-9686 M.MZ PROJECT/LOCATION/ASSIGN GI 28. ST-77126 96-8918 ST-19488 GH-50804 Z.B SAMPLE QR-41138 CD-36558 2. QR-19687 ERV-6-84 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED CS-16 8"-KO-7772 14. ISSUE IJ-19746 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 997 4"-RM-0949 10. APPRV'D 26. SDL WX-05547 769 ZLO 317 19. CV-13666 PROJ. PQR P&ID THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ WIF OP-47747 REV FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. CONTRACTOR NO. IR-5783 OP-99400 ERV-9-33 MN-63385 5"-EC-6638 ZLC DESCRIPTION ST-42729 DELETED KL-62175 ISSUE CONSTR. REV.33 838 7"-JU-4464 QR-89266 8"-RR-9181 8" 1. IJ-07247 CS-95 5"-FE-7623 875 STA 589 SDL 15" STA 2"-IZ-5348 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME T.BTJ ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. AV-13896 STA 22. 564 QR-29055 GRP 19Apr14 8"-ZT-7118 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. SG UV-10530 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 189 ZLC 2"-EG-1856 GI 20. DELETED DELETED 2"-QL-1032 6. MADE ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. DRAWING NAME COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh ST-62900 13" 461 EF-10611 6"-OB-2129 8. CONTRACT NAME SCALE MN-02235 DOTTED LINES ARE ALTERNATE. ZLC LG-10 12. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. CHECK'D 5"-BM-8620 UV-62701 KL-64408 656 ZLC 8"x7" 10/10/16 ERV-0-31 AB-95520 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 352 8"-PG-9904 IJ-05181 B ABC TO XYZ FOR MAINTAINENCE. 851 842 27. NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 714 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. DATE CS-54 296 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. CG INS ( 33°C ) 890 IJ-10472 7"-ON-8463 GRI MN-52654 INS ( -37°C ) 235 OP-07860 P.XVL DV-23710 DELETED CD-57302 LG-10 GI LG-10 AB-23632 3"x5" 571 484 2"-FU-4706 9"x7" 25. SYNTHETIC PROCESS FLOW DIAGRAM STA WX-12252 688 492 SDL GH-63525 277 CONNECTION TO EXHAUST IS PROVIDED. WX-34585 LG-10 18760193 179 21. KL-68182 CD-36389 KL-37962 4" DDL ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 13/05/09 ISSUE CONSTR. REV.11 STA QR-92507 INS ( -49°C ) KG E-1 QR-52070 8"-HR-4022 WX-70234 DIMENSIONAL TOLERANCE +/- 1MM. 15. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 4. ST-97864 STA CD-72118 3 165 AV-61876 IJ-01879 17. C 11. PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. QR-36767 DV-28214 7. DELETED ST-88430 UNIT PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 3. ISSUE CONSTR. REV.22 ERV-7-97 13" SAMPLE_5792.JPG CS-48 23. 9. PN-16-96 452 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND PQR VALVE TO BE INSTALLED AT Q POINT. 9"
doc_150
[ "INS", "(", "-", "17", "°", "C", ")", "SDL", "1", ".", "855", "ERV", "-", "2", "-", "35", "6", "\"", "-", "EA", "-", "9063", "17", "\"", "13", ".", "GI", "CROSS", "-", "CHECKING", "AT", "CRITICAL", "SITES", "NEAR", "EFGH", "VALVES", "ARE", "C...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "6\"-EA-9063", "8\"-CK-5031", "4\"-PA-7021", "5\"-OO-7320", "5\"-VQ-9034", "5\"-FM-6977", "4\"-HB-1961", "7\"-DT-3754", "7\"-NK-7961", "3\"-MY-5288", "4\"-PG-0967", "6\"-FP-5594", "8\"-SU-7009", "7\"-LV-2066", "6\"-TH-6609", "2\"-YF-6044", "6\"-GX-7411", "8\"-FF-7964" ]
INS ( -17°C ) SDL 1. 855 ERV-2-35 6"-EA-9063 17" 13. GI CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. SCALE B CD-64954 17/10/28 96937431 WX-65928 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. 579 DELETED 16Mar09 544 875 LAN EF-91444 984 110 Q.A 493 CV-77878 750 LG-10 DDL EF-97151 KL-83346 10. RV-89653 N.OBU 7"-DT-3754 326 25Oct21 647 UV-47356 5"-FM-6977 ISSUE CONSTR. REV.11 DV-17021 389 2. APPRV'D Std. 9" DESCRIPTION NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. F.PJ ERV-4-57 ERV-6-38 DELETED GRP 582 442-3712 5"-OO-7320 154 OP-29170 516 EF-07696 ZLC DV-65810 DRAWING NAME HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 4"-PA-7021 530 RO-10 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. RV-26332 ABC TO XYZ FOR MAINTAINENCE. UV-23562 UNIT XXDF DDL RO-10 2" GRP 2"-YF-6044 QR-69042 RO-10 DELETED DDL DELETED QR-20047 611 16Nov21 26. 17. INS ( 43°C ) ISSUE CONSTR. REV.55 GH-68206 271 RO-10 5. CD-85758 ST-07629 AB-90165 6"-GX-7411 GH-70070 OP-74327 DATE QR-44838 CD-11093 4"-HB-1961 CONNECTION TO EXHAUST IS PROVIDED. 962 GRP 14. DOTTED LINES ARE ALTERNATE. DELETED DV-56286 KL-69029 COMMENTS. ISSUE CONSTR. REV.33 CS-73 CHECK'D WX-32708 RO-10 20. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. OP-89077 CONTRACTOR NO. QR-87513 D F.KQ ISSUE CS-79 QR-23523 ERV-1-26 DV-43946 CD-98248 QR-30810 RO-10 25. 27. FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. GLR 23. 947 4. PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS MN-39514 QR-76485 ISSUE CONSTR. REV.44 DDL 952 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. BM 28. G-3 323 OP-27439 GH-74936 6. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND CV-39420 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 7"-LV-2066 NOTES 763 ZLC 17/04/13 MN-26483 13" SAMPLE Project QR-02010 ISSUE CONSTR. REV.22 AB-00351 SAN DV-57305 ZLO EF-99468 RV-48591 G.NAD CV-29012 826 DV-02800 AV-61680 RO-10 SYNTHETIC PROCESS FLOW DIAGRAM LG-10 6"-FP-5594 868 7"-NK-7961 SDL 12. KL-57649 PROJECT/LOCATION/ASSIGN KL-96640 QR-27603 9. 8"-FF-7964 KL-17896 CONTRACT NAME PW-57-72 382 CV-82721 UV-13287 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 11. RV-66220 QR-92862 OP-49586 RV-11290 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DETAILS. MN-9595 21. CD-11264 29. UV-72266 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME C OP-18210 CD-59701 897 262 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. LG-10 CS-04 ST-46390 CS-88 CD-57622 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. CD-11056 MODIFICATION. 15. YV DV-10010 16" 22. GI HTX GH-48840 8"-CK-5031 V.ET SAMPLE ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. STA PQR VALVE TO BE INSTALLED AT Q POINT. 7. INS ( 35°C ) DDL TOP CONNECTION. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 992 663 827 REV 820 3. 964 CD-20340 GH-04374 8. Z.H DDL 24. ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 506 3"-MY-5288 DIMENSIONAL TOLERANCE +/- 1MM. MN-14941 RO-10 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. A 16" 958 STA 8"x9" GH-86134 DRAW/SHEET NO. DELETED IJ-54224 UV-84967 18. GLR MADE MN-30362 5"-VQ-9034 OP-67398 IJ-89077 367 SDL 5"x2" ST-55565 CV-73372 NNL CD-44715 CONTRACTOR PROJECT NO. ST-15490 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 828 E MN-10998 RV-03624 LG-10 ORGANIZATION 8"-SU-7009 ERV-3-28 19. 6"-TH-6609 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND 6" ZK 4"-PG-0967 OP-77189 16. STA CV-93196 CD-71734 PROJ. DEF P&ID 4 2" 19" CV-48605 SAMPLE_9294.JPG CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C.
doc_457
[ "4", "\"", "-", "MA", "-", "9323", "SDL", "AV", "-", "32880", "DELETED", "QR", "-", "75191", "12", "/", "12", "/", "21", "365", "KL", "-", "61362", "210", "ELEVATION", "ARE", "TO", "CENTER", "LINES", "UNLESS", "OTHERWISE", "NOTED", ".", "ST", "-", ...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "6\"-BI-6837", "8\"-UM-8984", "7\"-TM-2811", "4\"-CD-1223", "6\"-RP-2995", "3\"-CE-3751", "6\"-VU-9330", "6\"-GF-9994", "8\"-QJ-3677", "6\"-TF-9191", "4\"-MA-9323", "3\"-EV-9173" ]
4"-MA-9323 SDL AV-32880 DELETED QR-75191 12/12/21 365 KL-61362 210 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. ST-31112 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. NOTES UV-17912 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED QR-86369 AB-98371 RV-24012 6. ZLC 174 HEX 5" FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 MN-75033 21. IJ-14243 11. CHECK'D ERV-9-60 PQR VALVE TO BE INSTALLED AT Q POINT. ABC TO XYZ FOR MAINTAINENCE. 17/01/17 922 17. 659 STA ZLC CONTRACT NAME SAMPLE Project A COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 24Feb08 181 20. OP-65572 ZN-7814 13. CD-09186 SDL 4 ISSUE CONSTR. REV.33 GH-31421 FOR DETAILS. DEQ AV-48381 SDL INSTALLED. DIMENSIONAL TOLERANCE +/- 1MM. ISSUE LG-10 COMPULSORY. CONTRACTOR PROJECT NO. 870 DOTTED LINES ARE ALTERNATE. 284 DRAWING NAME AV-55366 1" 53-8662 DELETED 826 CS-56 B 8"-UM-8984 DV-65675 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. KUD 749 5. CONNECTION TO EXHAUST IS PROVIDED. CD-36736 ISSUE CONSTR. REV.44 MAINTAINENCE AND MODIFICATION. UV-91054 8. 9. KL-72214 APPRV'D 6"-BI-6837 ZLO XLV-05-45 TYPE VALVES. AB-59292 WX-56405 DELETED G.A 12. 2"x3" NDWQ LG-10 PROJECT/LOCATION/ASSIGN BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, ATNG GH-77157 CD-67236 INS ( -41°C ) 27. STA DV-25540 D ISSUE CONSTR. REV.11 RO-10 17" ISSUE CONSTR. REV.22 MADE CONTRACTOR NO. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. ZLC INS ( -58°C ) OP-64340 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ORGANIZATION REV INSTALLATIONS/OPERATIONS. OP-12329 19/01/07 XG DATE UNIT 9"x9" 26. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 8"-QJ-3677 076 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, J.YP 15" AV-30664 10" RV-53760 RO-10 7"-TM-2811 35475989 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 24. SITE IN CASE OF MISMATCH. 16. AB-12651 22. 7. SCALE FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 630 10" BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 3" QR-20274 GRO 3. CV-46089 10. QR-31355 DELETED DRAW/SHEET NO. 3"-EV-9173 19. 405 DELETED CS-09 QR-35554 MN-44996 456 ERV-2-93 CV-34433 CV-39873 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS RV-99445 AB-02811 KL-02654 COMMENTS. MN-65315 ST-16292 28. ZLC CV-27883 RV-02747 Std. K.LYA 1. 6"-VU-9330 15. 6"-GF-9994 OP-19031 DELETED ZRVX CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE DDL CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. SAMPLE 867 TOP CONNECTION. THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ LG-10 STA 487 C 6"-RP-2995 23. CS-20 INS ( 21°C ) WX-11568 WX-29659 EF-04173 18. 4"-CD-1223 598 25. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE 4. 655 SYNTHETIC PROCESS FLOW DIAGRAM STA GH-87100 CS-72 CV-08101 581 8" 14. GH-24856 29. MN-98278 RO-10 OP-60120 EF-40405 U-9 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. PROJ. DEF P&ID RV-28834 IJ-82276 3"-CE-3751 CV-18331 AB-03774 ZSV 6"-TF-9191 2. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. J.GK SAMPLE_1030.JPG SYNTHETIC PROCESS ENGINEERING FLOW SCHEME CV-49476 DWG-1.23.23.578, DWG-1.23.23.789. OP-64232 DESCRIPTION 396 STA ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT UV-38268 KWh
doc_367
[ "CD", "-", "15348", "3", "\"", "-", "WO", "-", "7426", "AV", "-", "93101", "V", "-", "0", "DRAWING", "NAME", "ISSUE", "CONSTR", ".", "REV", ".", "22", "AB", "-", "04039", "4", "\"", "-", "OH", "-", "0025", "UNIT", "OP", "-", "14419", "LG", "-...
[ "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O",...
[ "5\"-XK-8576", "8\"-QK-8132", "6\"-BN-0298", "2\"-DH-2087", "3\"-ZL-6317", "2\"-OC-7069", "2\"-FN-0473", "2\"-ZR-1802", "8\"-NQ-5428", "8\"-VP-3243", "4\"-OH-0025", "2\"-DZ-0782", "3\"-WO-7426", "8\"-BI-3272", "3\"-XB-1830", "8\"-OP-5364", "2\"-CB-6872" ]
CD-15348 3"-WO-7426 AV-93101 V-0 DRAWING NAME ISSUE CONSTR. REV.22 AB-04039 4"-OH-0025 UNIT OP-14419 LG-10 353 957 GH-38126 DELETED 8. QR-74197 9. 296 RV-58802 CV-64174 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, MAINTAINENCE AND AV-52481 CONTRACT NAME 507 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, DWG-1.23.23.789. DV-66488 ERV-5-83 ST-46206 10" 749 GU ISSUE CONSTR. REV.33 EF-18751 3" STA ST-38563 LG-10 AV-91850 ZLO 14" DV-03746 WX-31815 10. 20. DDL SYNTHETIC PROCESS FLOW DIAGRAM B OP-24922 ISSUE CONSTR. REV.11 PQR VALVE TO BE INSTALLED AT Q POINT. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE VALVES. OP-50910 AB-41634 660 649 VOM 11. DDL 705 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. 420 DELETED ST-76789 8"-BI-3272 2"-CB-6872 PX-09-18 CD-49045 VE-7036 AB-94397 104 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 958 7. DESCRIPTION 44-8648 CS-25 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY RANDOM GENERATED, IT HAS 2. SDL INS ( -22°C ) CV-74319 CS-78 APPRV'D ERV-7-71 738 IJ-70903 ISSUE RV-40214 DV-05913 1. 387 8" ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 489 DV-57191 899 6. 3. DOTTED LINES ARE ALTERNATE. GH-64915 IJ-58372 MN-95864 CHECK'D DV-69019 DATE QR-68316 AB-66527 NO RELEVANCE/SIMILARITY WITH ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. RO-10 181 QR-05263 17. 8"-NQ-5428 17" ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. WX-71906 ZLO T.C DRAW/SHEET NO. DDL QR-26964 CONTRACTOR PROJECT NO. SAMPLE_0112.JPG 780 GH-39592 IJ-57777 N.QQB DDL ST-82765 DDL 3"-ZL-6317 17" CONNECTION TO EXHAUST IS PROVIDED. 825 WX-38108 8"-VP-3243 198 LG-10 17" 19" AV-64140 WX-98108 AV-16704 16. 24. 22. GH-52362 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 233 546 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 5"x9" AV-34531 ORGANIZATION 5. TOP CONNECTION. Std. CS-31 PROJ. DEF P&ID CD-15912 ERV-1-88 KKXM 29" EF-75214 ERV-4-49 5"-XK-8576 OP-53548 KL-66656 GRO ZLO 8"-QK-8132 CV-14826 1" ST-11610 6" OP-15331 ABC TO XYZ FOR MAINTAINENCE. SDL FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 14Dec06 SAMPLE MN-81793 4"x6" V.PM MN-68503 EF-06885 IJ-89670 RO-10 DV-92719 2"-DZ-0782 EF-74589 WX-20076 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN CASE OF MISMATCH. ST-12623 340 562 8" MN-97287 AV-73259 SAMPLE Project 2"-OC-7069 A GH-55997 AV-08116 10/06/13 IJ-40584 EF-72497 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. ZLC 13. CONTRACTOR NO. R.MJV SDL HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED CD-61861 15. NOTES 3" IJ-30097 CV-05915 8"-OP-5364 2"-ZR-1802 DELETED ZLC 14. 14" 667 MADE 6"-BN-0298 23. COMMENTS. REV 21. CS-35 QR-89935 2 3" 18" GH-37678 SCALE 426 OP-97215 765 487 395 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. IJ-28376 GH-98860 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 3"-XB-1830 PROJECT/LOCATION/ASSIGN 15" F.Y 912 4. IJ-04409 DDL ZLC RV-89805 AV-81304 OP-87504 IJ-50803 AV-23625 C QR-64512 IJ-90841 CD-46193 AB-31646 18. 602 2"-DH-2087 AB-27989 284 RO-10 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh 12. 154 DDL 36909679 STA RV-78741 2"-FN-0473 MN-39311 DELETED CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. RO-10 K.G RO-10 12Oct18 MN-67544 ERV-8-18 INS ( -12°C ) 19. IJ-99384 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. 25. MODIFICATION. EF-31146 GH-51238 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. AB-60966 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME DV-81690 DDL KL-77133 SDL 23" SDL
doc_400
[ "LG", "-", "10", "MN", "-", "26645", "22", ".", "TEMPERATURE", "CONTROL", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "BY", "DEFAULT", ".", "LG", "-", "10", "THESE", "DOCUMENTS", "ARE", "NOT", "INTENDED", "FOR", "VALIDATION", "/", "EVALUATION", "ON", ...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "3\"-TI-1242", "6\"-HR-0019", "5\"-PJ-7541", "6\"-UW-8717", "6\"-RI-5611", "6\"-VL-7033", "2\"-ZE-0053", "5\"-GK-8448", "4\"-TY-8079" ]
LG-10 MN-26645 22. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. LG-10 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ ADCG 303 CD-81615 INSTALLED. F.CH ABC TO XYZ FOR MAINTAINENCE. 74508045 STA RV-97498 C 320 17" REV 852 6"-UW-8717 457 104 GH-30224 EF-83682 20. IJ-46476 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 273 UV-27587 ZLC INS ( 45°C ) None KL-81809 V.S 958 YDEN SAMPLE DDL 18" M.G 090 DWG-1.23.23.578, DWG-1.23.23.789. 110 DDL 4. 19" ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. 166 NOTES 176 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 13" FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 5"-GK-8448 WX-66475 ZJY-55-24 CONTRACT NAME 15Oct22 8"x2" DELETED 369-6380 GH-58483 EF-43397 7. CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE 13. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. RO-10 TYPE VALVES. RO-10 COMPULSORY. 5. 690 179 DDL IJ-52078 SAMPLE_5351.JPG ERV-4-84 FOR DETAILS. MN-02745 DDL 9. DELETED BX-2539 SYNTHETIC PROCESS FLOW DIAGRAM 3. 2" 776 6"-HR-0019 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 16" ST-30873 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. RO-10 AV-66559 APPRV'D 2"-ZE-0053 MN-45562 19. 572 DDL RO-10 11. DRAWING NAME GXD DIMENSIONAL TOLERANCE +/- 1MM. CS-02 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. GH-16667 15. CONTRACTOR PROJECT NO. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 533 IJ-93851 ERV-2-96 10. INSTALLATIONS/OPERATIONS. GH-89940 842 SAMPLE Project KL-81809 21. KWh INS ( 33°C ) 862 UNIT LG-10 1 ZLO B WAY ST-62493 ZLC QR-86150 ST-29398 6"-RI-5611 FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 966 878 ERV-4-02 ISSUE CONSTR. REV.11 RV-22157 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND TOP CONNECTION. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ST-01248 INS ( -28°C ) 13" KL-60328 EF-27653 PROJECT/LOCATION/ASSIGN HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED 4"-TY-8079 KL-32302 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 LG-10 DOTTED LINES ARE ALTERNATE. COMMENTS. 12. CONNECTION TO EXHAUST IS PROVIDED. MADE QR-73435 STA MN-78305 PROJ. XYZ P&ID ZLO L-1 CV-05198 19" 8" ORGANIZATION DESCRIPTION DATE 23. 3"-TI-1242 9" A DV-34195 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE UV-67977 6"-VL-7033 RO-10 1. 8. DELETED CV-37000 16/04/18 DV-30071 GH-23359 QR-58944 EF-39884 J.W CHECK'D SDL DELETED RV-59492 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS 306 IJ-16307 122 14. GH-49037 GH-11413 SCALE 17. 18. ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 5"-PJ-7541 16. AB-81750 U.RC 582 2. DV-26921 ISSUE CONSTR. REV.22 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 8"x5" OP-75896 DRAW/SHEET NO. CONTRACTOR NO. 384 KL-86842 179 22/05/19 ZLC 6. ISSUE ISSUE CONSTR. REV.33 21" GLR QR-06711 8" GH-23500 AB-03817 739
doc_448
[ "123", "261", "ENTIRELY", "RANDOM", "GENERATED", ",", "IT", "HAS", "NO", "RELEVANCE", "/", "SIMILARITY", "WITH", "706", "24Mar23", "DELETED", "6", ".", "DRAWING", "NAME", "KWh", "3", ".", "D", ".", "CHK", "SYV", "-", "30", "-", "21", "SDL", "IJ", "-"...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "4\"-GQ-7150", "5\"-MU-4033", "7\"-CM-2169", "6\"-DU-1211", "7\"-VM-2974", "2\"-PN-2866", "3\"-KP-5533", "8\"-FO-7154", "6\"-AL-9023", "2\"-UK-1897", "6\"-FV-4101", "3\"-FL-5845" ]
123 261 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH 706 24Mar23 DELETED 6. DRAWING NAME KWh 3. D.CHK SYV-30-21 SDL IJ-34914 1. KL-29654 None DIMENSIONAL TOLERANCE +/- 1MM. SAMPLE 7. 990 PROJ. PQR P&ID DELETED 3"-FL-5845 CHECK'D PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DOTTED LINES ARE ALTERNATE. INS ( 51°C ) KL-89189 GH-26119 QR-85731 19" WX-03606 ERV-6-42 KL-59267 23. SAMPLE Project SDL 361 7"-VM-2974 16. 11. DDL EF-22214 MN-68841 14" AV-90560 LG-10 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. MN-19960 DDL UV-76980 QV-9900 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. 4. AB-48537 15" 8"-FO-7154 MADE CONTRACT NAME 15" STA RO-10 6"x2" 23" SITE IN CASE OF MISMATCH. RV-24945 SDL RO-10 MAINTAINENCE AND MODIFICATION. A GRO 12. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT 924 14" AJT SCALE 6"-DU-1211 11" 833 14. 20. 1"x4" T.EY FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD AB-51908 ERV-8-45 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMMENTS. 2"-PN-2866 STA INSTALLED. B BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, GI COMPULSORY. UNIT QR-55285 5. 15. CONNECTION TO EXHAUST IS PROVIDED. TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 732 ERV-9-85 IJ-83896 605 IJ-78769 DDL ISSUE CONSTR. REV.22 691 DELETED CS-33 13. 6" DELETED KL-11059 QR-46067 JN OP-05006 4 18. FD KL-29492 9. 170 PROJECT/LOCATION/ASSIGN SYNTHETIC PROCESS ENGINEERING FLOW SCHEME WX-25211 284 834 ORGANIZATION 17. 540 GH-77174 710 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 21. 625 657 DESCRIPTION 727 AV-79737 KL-32823 UV-82442 16" ISSUE CONSTR. REV.11 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 848 432 AB-57150 DDL 22. 22" 6"-FV-4101 AB-33555 UV-85293 ERV-5-78 CONTRACTOR NO. GLR X.GJC SAMPLE_8316.JPG 2. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED AB-12337 ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. STA ERV-3-38 14" CS-03 CV-94282 AV-92161 WX-47617 6"x4" ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 CONTRACTOR PROJECT NO. 420 DV-93080 19. PQR VALVE TO BE INSTALLED AT Q POINT. NOTES APPRV'D 128 3"-KP-5533 RG 3" INS ( -36°C ) 4"-GQ-7150 60542163 IJ-44975 C 10. ERV-2-08 RV-37989 LG-10 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. ABC TO XYZ FOR MAINTAINENCE. 2"-UK-1897 8. G.RR 24/03/13 410-1175 25/10/26 L-8 WX-13917 CD-50519 UV-86099 DRAW/SHEET NO. 6"-AL-9023 6" DV-67916 DATE ISSUE CD-27880 INS ( 12°C ) SDL ISSUE CONSTR. REV.33 OP-49875 ZLO 7"-CM-2169 UV-45652 5"-MU-4033 CS-99 SYNTHETIC PROCESS FLOW DIAGRAM K.CG LG-10 IJ-03360 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ REV AB-95357 ZLO TOP CONNECTION. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND DELETED AB-37462
doc_21
[ "2", "\"", "-", "DN", "-", "2011", "CV", "-", "07116", "GRP", "18", ".", "593", "13", "/", "09", "/", "28", "SCALE", "DDL", "10", "/", "11", "/", "07", "895", "25", ".", "ORIENTATION", "OF", "ABCD", "VALVES", "SHALL", "BE", "VERIFIED", "AND", "...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "8\"-IH-1600", "6\"-FG-9611", "3\"-OP-8325", "3\"-AO-2571", "5\"-NR-2751", "6\"-BO-3673", "2\"-YW-4624", "8\"-XF-2558", "8\"-ZM-0714", "2\"-DN-2011" ]
2"-DN-2011 CV-07116 GRP 18. 593 13/09/28 SCALE DDL 10/11/07 895 25. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN I.N KL-97970 NJH CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. DELETED SAMPLE Project 14. DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 24. CV-25470 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE 27. AV-78587 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. DIMENSIONAL TOLERANCE +/- 1MM. GRP RYRU ABC TO XYZ FOR MAINTAINENCE. 3" CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND SYNTHETIC PROCESS FLOW DIAGRAM ZLO UV-28078 VALVES. STA TZNR 6"-FG-9611 IJ-64912 ERV-1-42 ORGANIZATION 11. IJ-34547 3"-OP-8325 RO-10 AV-95723 534 OP-29579 8. REV 19/10/24 AV-53546 RZW CV-41353 736 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE 432 RV-21390 RO-10 PQR VALVE TO BE INSTALLED AT Q POINT. SDL GH-82534 2"-YW-4624 ISSUE CONSTR. REV.44 UV-95204 INS ( 52°C ) SAMPLE DELETED PROJECT/LOCATION/ASSIGN 137 LG-10 INS ( 25°C ) KL-78167 IJ-35090 AB-68555 SDL 954 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED D 13" 6"-BO-3673 12" ZLO A.Y EF-87043 ISSUE CONSTR. REV.22 I-4 ISSUE CONSTR. REV.33 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD KL-20428 MN-16780 DELETED 576 A 6" GLR DDL KL-74063 13. STA 25" DESCRIPTION 123 ST-01408 DOTTED LINES ARE ALTERNATE. 442 17. AV-88224 GLR OP-52349 DDL INS ( 39°C ) 16. DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. DDL CV-43138 7. CV-87466 GRO AV-68854 9. GRP 8"-ZM-0714 QR-87948 COMMENTS. 22. AV-01651 583 5" 285 16" 459 TOP CONNECTION. DDL JHP 761 529 UV-19016 17" INSTALLATIONS/OPERATIONS. DELETED CD-05208 6. CHECK'D DV-46407 CONTRACTOR PROJECT NO. KL-69064 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DRAW/SHEET NO. 8"-XF-2558 MAINTAINENCE AND MODIFICATION. RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER 20. ERV-7-23 23. 188 GM CONTRACTOR NO. DV-94245 BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 55920890 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 3"-AO-2571 ZLC 959 ZLC 890 5. 10. 3. 165-0095 CS-16 12. UNIT KL-41049 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. GH-42524 LG-10 737 LG-10 C CASE OF MISMATCH. 21. 1 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY STA IJ-73149 KL-38715 5"-NR-2751 DRAWING NAME DV-66083 GE-42-43 15. 935 ZLC 4. OP-27722 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 513 GLR 549 29. KL-07474 DELETED 22/06/18 MADE ERV-4-00 PROJ. PQR P&ID 3" 465 ST-63851 STA DWG-1.23.23.789. None NOTES ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. U.AS 1. 975 UV-63926 380 DATE 206 28. XWM DV-32169 ISSUE CONSTR. REV.11 AV-53728 ERV-9-09 QR-30564 ISSUE 2. CONNECTION TO EXHAUST IS PROVIDED. CONTRACT NAME APPRV'D 901 DELETED COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh UV-13391 CD-22077 DETAILS. ZLO SYNTHETIC PROCESS ENGINEERING FLOW SCHEME OP-61794 RTQ 19. INS ( -10°C ) B AV-38997 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 26. 23" ZLC VJ-7942 ERV-3-70 6"x2" 724 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE 733 AB-00354 SAMPLE_6318.JPG PJ SDL 321 STA MN-98502 422 8"-IH-1600
doc_378
[ "597", "DIMENSIONAL", "TOLERANCE", "+", "/", "-", "1MM", ".", "CONTRACTOR", "NO", ".", "ISSUE", "CONSTR", ".", "REV", ".", "11", "22", ".", "599", "GH", "-", "93639", "OP", "-", "83219", "GH", "-", "94286", "ALL", "FIXTURES", "ARE", "VALIDATED", "AND...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "2\"-VE-3560", "8\"-ZB-8398", "6\"-VY-4512", "3\"-AL-0781", "4\"-JU-0370", "2\"-OW-7033", "7\"-OY-7388", "5\"-HK-5689", "3\"-FS-4174", "5\"-EY-0999", "6\"-DC-6429" ]
597 DIMENSIONAL TOLERANCE +/- 1MM. CONTRACTOR NO. ISSUE CONSTR. REV.11 22. 599 GH-93639 OP-83219 GH-94286 ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 10/07/13 DDL 2" DDL CONTRACT NAME B CV-54313 3. ST-57640 CD-65279 7. 8"-ZB-8398 646 VALVES. T.L SAMPLE_3439.JPG 7" DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. CD-42550 SDL BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, INS ( -52°C ) OP-22494 499 ST-46998 KL-62581 106 DDL COMMENTS. DDL 1. CASE OF MISMATCH. CS-99 AV-64167 AB-79112 RV-96849 29. 5" MAINTAINENCE AND MODIFICATION. ZLC 8. AB-22624 GH-54612 11. DDL INSTALLATIONS/OPERATIONS. MADE WX-46669 21. CD-27703 K.J EF-44467 1 CV-79763 R.KAN AWQ CV-83716 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD KL-59719 APPRV'D RO-10 DV-74046 2" INS ( 58°C ) CONTRACTOR PROJECT NO. 17" 697 DOTTED LINES ARE ALTERNATE. PQR VALVE TO BE INSTALLED AT Q POINT. 15. SYNTHETIC PROCESS ENGINEERING FLOW SCHEME SDL 9"x6" STA ABC TO XYZ FOR MAINTAINENCE. 302 LG-10 645 3"-FS-4174 23. 2. 19. OP-40540 6" 13Dec07 STA DWG-1.23.23.789. RO-10 6"-DC-6429 OW-1266 OP-54531 8" A IJ-27713 CV-23529 INS ( 25°C ) CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. 647 MN-63635 DRAW/SHEET NO. QZP-37-09 RO-10 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. CD-59527 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 250 EF-05483 DELETED 4"-JU-0370 192 CONNECTION TO EXHAUST IS PROVIDED. OP-67900 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER DV-59654 R.OR ISSUE CONSTR. REV.33 RV-73863 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. REV 3" 236 CD-25464 LRGP SDL 27. ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. 226 28. UV-88258 STA STA 2"-VE-3560 NOTES 24. 891 OP-53551 5"-HK-5689 WX-21969 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. S.W 907 60952638 IJ-02195 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY WX-20299 DDL OP-42508 INS ( 47°C ) EF-99284 18/06/05 QR-07388 20. GRO 406 ORGANIZATION CS-77 264 9. DATE O-4 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. GH-43007 483 10. DELETED DRAWING NAME SYNTHETIC PROCESS FLOW DIAGRAM 346 ZLO KL-66744 978 DELETED CS-70 GI R.Z TOP CONNECTION. 4. KL-17242 LG-10 ZLO CHECK'D 12. DESCRIPTION 496 26. 18. CS-20 362 26-6629 17. DELETED UNIT CD-16325 DELETED PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, QR-17959 RO-10 2"-OW-7033 CV-82490 HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED Std. ERV-4-69 16. 13. IJ-14666 SAMPLE EF-60728 694 AB-26671 ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE RO-10 193 GH-76894 ERV-4-76 27" GI 846 SAMPLE Project DETAILS. 4"x8" C SCALE 140 ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN 3"-AL-0781 NGC DELETED INS ( 39°C ) ISSUE CONSTR. REV.22 COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh ZLO 698 PROJECT/LOCATION/ASSIGN 5. BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE RV-39616 ISSUE 14. ERV-2-53 SDL DV-36581 CD-83426 5"-EY-0999 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR 889 6"-VY-4512 GLR ST-22164 25. 6. PROJ. DEF P&ID 7"-OY-7388
doc_311
[ "RO", "-", "10", "21", ".", "ML", "-", "9777", "ABC", "TRANSMITTOR", "TO", "BE", "USED", "AS", "BACKUP", "FOR", "KMO", "TRANSMITTOR", ".", "WITH", "AS", "MUCH", "SIMILARITY", "AS", "POSSIBLE", ".", "THESE", "EFFORTS", "ARE", "MADE", "TO", "FACILATE", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "...
[ "7\"-LY-8678", "7\"-BW-0317", "7\"-JA-3562", "3\"-ON-8229", "2\"-ON-2629", "3\"-QS-3908", "4\"-DA-9264", "8\"-CG-5267", "8\"-ME-3891", "8\"-SV-1417", "3\"-NF-6720", "6\"-XN-2493", "4\"-PX-5412", "3\"-CM-2383", "2\"-QO-0928", "5\"-RZ-9476" ]
RO-10 21. ML-9777 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE CS-41 ISSUE CHECK'D DV-42306 15" QR-26330 19. 410-9236 ISSUE CONSTR. REV.33 366 CONTRACTOR PROJECT NO. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED OP-24860 BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE RO-10 UV-38785 SAMPLE Project 27" H-4 ERV-7-30 UV-25309 6"-XN-2493 15" AB-62413 50022569 MN-31121 OP-77637 3" EF-97971 ERV-9-52 DV-54816 CV-27081 ZLO 119 DV-04984 DDL INS ( -20°C ) ST-47679 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER A 4"-DA-9264 2"-QO-0928 TB-57-12 AB-75468 913 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 5" 2. 17" 139 SCALE 18. ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN GI RO-10 7"-JA-3562 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. 3"-ON-8229 6. 1. MN-17494 097 SAMPLE 765 UV-04302 DV-17252 2"-ON-2629 ABC TO XYZ FOR MAINTAINENCE. SAMPLE_3866.JPG 7"-LY-8678 COMMENTS. APPRV'D 923 CV-89600 ISSUE CONSTR. REV.11 OP-03126 3"-QS-3908 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY MADE 2 WX-93060 12. PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND EF-28775 5"-RZ-9476 CS-70 DELETED OP-22926 16. CD-38268 3"-CM-2383 WX-59994 7"x6" AV-49404 EF-19591 DV-56763 PQR VALVE TO BE INSTALLED AT Q POINT. 9" LG-10 EF-15216 QR-23121 IJ-52951 5"x2" VALVES. 22/02/10 CONTRACT NAME UNIT 5"x4" 6"x5" CS-33 DIMENSIONAL TOLERANCE +/- 1MM. 5. ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE ISSUE CONSTR. REV.22 INS ( 16°C ) 871 CS-16 MN-21686 700 WX-19660 GLR GH-39099 695 500 3. MN-84051 OP-01608 UAG 18/06/05 PROJ. XYZ P&ID GRP 3"-NF-6720 21/07/26 NBA 20. BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh CASE OF MISMATCH. DV-69087 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 FOR DELETED 905 DV-72182 11. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. WX-12077 LG-10 ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. DATE 13" 27" CD-85222 B REV CS-52 6"x4" DDL 15. 10" 17. V.T ST-62160 RO-10 7"-BW-0317 EF-95722 CV-23959 MAINTAINENCE AND MODIFICATION. CD-06649 EF-73928 Std. MN-74524 DDL 389 ERV-7-86 DDL PROJECT/LOCATION/ASSIGN IJ-39466 INSTALLATIONS/OPERATIONS. WX-97230 ST-63113 CD-18587 7. NOTES 541 14. DRAW/SHEET NO. A.IF CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. 8"-ME-3891 OSWQ YN EF-71483 ST-32361 396 897 DRAWING NAME DELETED CS-50 CV-05171 DESCRIPTION 9. 520 8"-CG-5267 GH-67994 EF-24221 10. KL-34187 UV-62078 13. ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 127 CD-99351 DDL SYNTHETIC PROCESS ENGINEERING FLOW SCHEME QYN CV-29058 UKY CS-54 SDL UV-86549 ORGANIZATION IJ-30742 4"-PX-5412 590 UV-43920 DV-25420 CONTRACTOR NO. 8. DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ CD-01138 346 C DETAILS. 8"-SV-1417 UV-73278 DOTTED LINES ARE ALTERNATE. DDL OP-29730 447 EF-29350 4. YQDV DELETED SYNTHETIC PROCESS FLOW DIAGRAM CD-66470 STA ZLO
doc_372
[ "ZLO", "APPRV", "'", "D", "PLEASE", "NOTE", "EVERY", "DATA", "PROVIDED", "HERE", "(", "BELOW", "COLUMN", ")", "IS", "ENTIRELY", "6", ".", "6", "\"", "-", "DQ", "-", "8129", "10", "/", "06", "/", "03", "19", ".", "F", ".", "QUT", "None", "WX", "...
[ "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", ...
[ "4\"-GU-1649", "6\"-YS-4964", "2\"-NE-0914", "3\"-JW-9369", "7\"-DW-3036", "3\"-WI-3543", "5\"-RP-0296", "8\"-PV-0814", "5\"-HN-1827", "5\"-ET-1300", "6\"-DQ-8129", "2\"-YL-5049", "4\"-DZ-1699", "2\"-LA-6558", "6\"-QV-6722", "6\"-OJ-2392" ]
ZLO APPRV'D PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS ENTIRELY 6. 6"-DQ-8129 10/06/03 19. F.QUT None WX-85965 ZLC DRAW/SHEET NO. CONTRACTOR NO. GH-70497 4. OT-2883 10. R.EP FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD DRAWING NAME 4"-DZ-1699 4 1. UNIT 835 ST-39884 CONNECTION TO EXHAUST IS PROVIDED. AV-67816 WX-06983 DELETED AB-46021 3"-WI-3543 23. CD-69080 GRO 606 SAMPLE_0459.JPG RV-11520 RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH ANY OTHER CS-30 C K.S KL-06698 7" 22. RV-58819 KL-94096 207 8"-PV-0814 399 6"-OJ-2392 TJIX COMPONENTS ARE AT NORMAL PRESSURE WITH POWER RATINGS 15.4 KWh AV-45774 881 ZLC W.XO 363 CROSS-CHECKING AT CRITICAL SITES NEAR EFGH VALVES ARE COMPULSORY. RV-94902 GRI STA 2" INS ( 28°C ) WX-90427 CD-50447 IJ-06858 447 16. LG-10 TEMPERATURE CONTROL IS SET TO ON/OFF TYPE BY DEFAULT. WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. THESE N.S MHXD 5"-ET-1300 CASE OF MISMATCH. DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. IJ-36215 7"-DW-3036 GH-76082 ISSUE CONSTR. REV.44 DELETED PROJECT/LOCATION/ASSIGN 5"-RP-0296 572 IJ-10853 SAMPLE EF-87792 UV-24565 WX-60508 OP-31607 MN-82567 D.X XHC RO-10 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 693 22Sep14 DDL 2"-NE-0914 PNW A DV-85937 MN-98135 513 CONTRACT NAME OP-47808 IJ-11155 751 PQR VALVE TO BE INSTALLED AT Q POINT. DELETED ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE INSTALLATIONS/OPERATIONS. DWG-1.23.23.789. KL-81593 T.JHU 11/06/06 CS-28 324 DV-83162 SCALE 5"-HN-1827 QR-61941 3. P.IYW 794 DV-22988 AB-71629 GH-28704 4"-GU-1649 18. 250 CEIW 11/09/27 DV-49867 ST-34795 OP-27491 5" 7. KL-52857 6"-YS-4964 GH-27841 OP-94932 12" SYNTHETIC PROCESS FLOW DIAGRAM 7" ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. RV-49360 CS-27 CONTRACTOR PROJECT NO. KL-56708 11. DELETED ISSUE CONSTR. REV.33 ZLO SYNTHETIC PROCESS ENGINEERING FLOW SCHEME LG-10 E-0 NOTES SDL ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT SITE IN DELETED 2"x5" ST-23582 ISSUE 5" PROJ. DEF P&ID ISSUE CONSTR. REV.55 939 AB-24407 WX-72071 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. ERV-1-90 15. 3" ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. SDL 2. ISSUE CONSTR. REV.11 786 ZLC MN-59436 CV-15373 VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE INSTALLED. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED QYZU UU E 472 CD-74159 21. D 2"-LA-6558 DOTTED LINES ARE ALTERNATE. 12. MADE VALVES. 6"-QV-6722 EF-39939 CS-07 CHECK'D QR-50525 QR-13615 5. GH-31282 KMS-66-36 B BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS TYPE QR-18976 DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 20. SAMPLE Project 727 705 2"-YL-5049 DIMENSIONAL TOLERANCE +/- 1MM. ERV-3-85 CD-61871 13. 680 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. CV-82720 MN-27419 ISSUE CONSTR. REV.22 ABC TO XYZ FOR MAINTAINENCE. REV FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, DWG-1.23.23.578, 9. DATE UV-96285 17. LG-10 14. 8. ERV-6-97 TOP CONNECTION. AB-36153 ERV-6-18 DDL 81-7304 COMMENTS. LG-10 3"-JW-9369 DESCRIPTION 48554691 24. IJ-51995 14" 389 ORGANIZATION 13/09/01
doc_260
[ "4", "\"", "-", "SX", "-", "4129", "CLOSED", "VESSEL", "HEATER", "IS", "SET", "TO", "ON", "/", "OFF", "TYPE", "AT", "30", "°", "C", "AND", "50", "°", "C", ".", "AV", "-", "16642", "7", ".", "FOR", "DETAILS", ".", "PROJECT", "/", "LOCATION", "/"...
[ "B-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "I-PIPE", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "O", "B-PIPE", "...
[ "4\"-WO-2427", "2\"-FY-2242", "6\"-SS-4880", "7\"-PB-4669", "3\"-GJ-2839", "2\"-CK-4302", "3\"-EQ-2527", "7\"-BD-7896", "4\"-BT-8577", "8\"-FX-6187", "7\"-ZC-0582", "4\"-SX-4129", "3\"-ZT-4018" ]
4"-SX-4129 CLOSED VESSEL HEATER IS SET TO ON/OFF TYPE AT 30°C AND 50°C. AV-16642 7. FOR DETAILS. PROJECT/LOCATION/ASSIGN INTE 7"-PB-4669 ST-58877 REV 264 13. ERV-2-09 200 LG-10 INSTALLATIONS/OPERATIONS. OP-62805 EF-02210 19. 359 SYNTHETIC PROCESS ENGINEERING FLOW SCHEME 247 766 MAINTAINENCE AND MODIFICATION. ISSUE 7"-BD-7896 ST-06457 23" 1" 22/07/21 FOLLOWING XYZ SCHEMES ARE REQUIRED. SEE ABC DWG-1.23.45.67.89 374 EF-37452 6"-SS-4880 GLR WX-10244 ENTIRELY RANDOM GENERATED, IT HAS NO RELEVANCE/SIMILARITY WITH STA GRO 7"-ZC-0582 PLEASE READ THIS DISCLAIMER CAREFULLY. THIS DOCUMENT IS COMPLETELY SYNTHETICALLY GENERATED AND 10. 185 ORGANIZATION EF-56751 QR-56492 12. HAS NO REVELANCE WITH ANY OTHER SIMILAR LOOKING DOCUMENTS FOUND IN THE ANY OTHER CONCERNED STA GXB X.BT RO-10 470 18. 1. B 4"x7" GI MN-65304 20. ISSUE CONSTR. REV.11 TOP CONNECTION. LG-10 SCALE ALL FIXTURES ARE VALIDATED AND COMPLIANT WITH XYZ. 319 3"-ZT-4018 876 ZLO AB-26596 GHF 788 A 2. W.NIH CV-83780 SDL 3"-GJ-2839 DDL OP-46409 ST-82887 272 AV-83769 UV-79363 DESCRIPTION 3"x8" ORIENTATION OF ABCD VALVES SHALL BE VERIFIED AND CORRECTED AT CV-60641 563 11. 4"-BT-8577 LV ISSUE CONSTR. REV.22 5"x2" 14. CS-99 None DV-35669 AB-53027 21. BVNP LG-10 CHECK'D IJ-74343 UV-54362 GRI 12Dec03 ABC SHUTDOWN IF PQR DETECTS 123 IS NOT WORKING. CONTRACTOR PROJECT NO. VERIFY IF HOT WATER SYSTEM REQUIRED OR ELSE XYZ TO BE ERV-3-40 276 D WU STA ERV-1-48 AB-37872 AV-26378 23. EF-31588 PLEASE NOTE EVERY DATA PROVIDED HERE (BELOW COLUMN) IS DRAW/SHEET NO. 4"-WO-2427 SAMPLE K.ESJ 697 RO-10 LG-5197 PRIMARY SUPPORT FOR THE EFGH COMPONENTS IS NOT FOUND AT SITE. 619 ABC TRANSMITTOR TO BE USED AS BACKUP FOR KMO TRANSMITTOR. 8" ISSUE CONSTR. REV.33 22. EF-37474 DDL UV-70871 NOTES ANY OTHER DOCUMENTS OF SIMILAR FIELDS WHATSOEVER. KL-08519 INS ( 55°C ) 8. 26" ALL DIMENSIONS SHALL BE VERIFIED BY XYZ CONTRACTORS BEFORE BUILDING TO BE IN THE SLANTING PLANE THROUGH THE AXIS OF PQRS 466 A.CWW QR-49645 GH-22606 725 PQR VALVE TO BE INSTALLED AT Q POINT. XMP-85-00 ERV-4-33 AB-17388 2 ST-62735 APPRV'D DOTTED LINES ARE ALTERNATE. CS-38 LG-10 INSTALLED. ELEVATION ARE TO CENTER LINES UNLESS OTHERWISE NOTED. OP-46932 178 2"-FY-2242 315 QR-14900 2"-CK-4302 SITE IN CASE OF MISMATCH. CONNECTION TO EXHAUST IS PROVIDED. OP-41797 MN-44049 GH-44934 99-8740 RV-59920 DRAWING NAME GH-42387 22/12/10 17" DIMENSIONAL TOLERANCE +/- 1MM. JZU 4" MADE 819 SAMPLE_1291.JPG 6" E 2" 18" DV-47575 ZLO SAMPLE Project DWG-1.23.23.578, DWG-1.23.23.789. W.H LNX 15. EF-03564 325 DELETED GRI QR-67535 742 122 ZLO DATE DDL 976 FIELDS. ALL INFORMATION GENERATED HERE IS TO SIMULATE THE NORMAL DOCUMENTS FOUND IN THE FIELD 956 CD-82467 ERV-9-53 3. DELETED 337 LG-10 ISSUE CONSTR. REV.55 WITH AS MUCH SIMILARITY AS POSSIBLE. THESE EFFORTS ARE MADE TO FACILATE RESEARCH IN THE FIELD. DDL 5. WX-68299 18Oct22 SDL BOTH XYZ VALVES AND BCD VALVES ARE ACCESSIBLE FOR INSPECTION, 6. COMMENTS. LG-10 920 721 3" U-0 UV-94475 MN-55158 ISSUE CONSTR. REV.44 231 C 14Dec07 17. TYPE VALVES. Q.RUI 118 SDL 3" FOR GENERAL NOTES AND LEGENDS SEE THE DWG-1.23.23.345, 16. RO-10 DV-21646 8"-FX-6187 THESE DOCUMENTS ARE NOT INTENDED FOR VALIDATION /EVALUATION ON BASIS OF PROFESSIONAL REVIEWS/ 4. SYNTHETIC PROCESS FLOW DIAGRAM 9. DELETED ST-34634 45426679 3"-EQ-2527 RO-10 DELETED OP-30023 7"x5" ERV-9-57 CONTRACT NAME AV-30197 ST-25243 UUMF CONTRACTOR NO. EF-29183 8" 412 UNIT PROJ. DEF P&ID AB-50094