archive_ref
stringlengths
6
78
canonical_url
stringlengths
34
107
char_count
int64
2.51k
2.73M
collection
stringclasses
3 values
doc_id
int64
1
1.69k
document_type
stringclasses
5 values
id
stringlengths
24
27
record_count
int64
1
6.23k
release_policy_version
stringclasses
1 value
rights_status
stringclasses
1 value
selected_extraction_backend
stringclasses
2 values
selected_extraction_score
float64
-0.16
1
source_family
stringclasses
3 values
source_url
stringlengths
34
107
split
stringclasses
1 value
text
stringlengths
2.51k
2.73M
title
stringlengths
7
209
trim_reasons
listlengths
0
8
year
int64
1.88k
1.99k
bellsystem_SD-1C902-03
https://archive.org/details/bellsystem_SD-1C902-03
11,392
archive-org-bell-labs
1,631
technical_report
bella-qwen-pretrain-doc1631
71
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_SD-1C902-03
train
ADDRESS PARITY 17 THROUGH 8 (PARITY OVER ADDRESS BITS 8-17 TO FANOUT BOARD FROfl RAIN STORE CONTROLLER) ADDRESS PARITY 7 THROUGH 1 (PARITY OVER ADDRESS BITS 1-7 TO FANOUT BOARD FROH RAIN STORE CONTROLLER) A REFRESH REOUEST (PRIRARY INDICATOR OF 'REFRESH CYCLE PENDING' FUNCTION) FORCE CHECK ERROR (FORCE NORRAL ...
Common Systems, Main Store Controller and Memory circuit
[]
1,960
bellsystem_BSRS_350.001
https://archive.org/details/bellsystem_BSRS_350.001
13,254
archive-org-bell-labs
1,632
technical_report
bella-qwen-pretrain-doc1632
37
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSRS_350.001
train
This index lists the information that forms a part of, or supplements this specification, authorized issues thereof. Bell Telephone Laboratories, Incorporated - Dept 3751 -HOB/P&D-SC 222140 HRS Printed in U.S.A. 1.01 This specification contains general requirements applicable to the recovery and repair for reissue ...
Station and Outside Plant Apparatus and Equipment - General Requirements
[]
1,980
bellsystem_BSP_002-583-900_PN
https://archive.org/details/bellsystem_BSP_002-583-900_PN
6,239
archive-org-bell-labs
1,637
technical_report
bella-qwen-pretrain-doc1637
18
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_002-583-900_PN
train
This section outlines the procedure to be followed by testrooms, central offices, and field forces when technical assistance is required. 1.02 This section is reissued to conform with the existing new departmental nomenclature due 1.04 Transmission and interference troubles are those conditions which involve: • ...
Field Request for Technical Assistance
[]
1,980
bellsystem_BSP_010-520-111
https://archive.org/details/bellsystem_BSP_010-520-111
9,597
archive-org-bell-labs
1,642
technical_report
bella-qwen-pretrain-doc1642
20
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_010-520-111
train
Dates," and USOs issued in advance as used in the Intercompany Services Coordination (ISC) Plan. 2.01 It is the intent of the Bell System to determine firm due dates (DD) and firm critical dates in advance of completion of negotiations with customers except as modified in this section. critical dates based upon t...
Intercompany Services Coordination Plan / Service Inquiries, About Dated Orders, and Advance Orders
[]
1,980
73-magazine-1981-02
https://archive.org/details/73-magazine-1981-02
520,930
archive-org-bell-labs
1,643
technical_report
bella-qwen-pretrain-doc1643
764
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/73-magazine-1981-02
train
Tempo was the first with a synthesized hand held for amateur uset first with a 220 MHz synthesized hand held, first with a 5 watt output synthesized hand held and once again first in the 440 MHz range with the S-4, a fully synthesized hand held radio. Not only does Temp...
73 Magazine (February 1981)
[]
1,981
attached-processor-interface-3b-1a
https://archive.org/details/attached-processor-interface-3b-1a
36,417
archive-org-bell-labs
1,644
technical_report
bella-qwen-pretrain-doc1644
84
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/attached-processor-interface-3b-1a
train
Not for use or disclosure outside the Bell « System except under written agreement. Developed by The Bell System Training Center Western Electric Company, Incorporated Dublin, Ohio OBJECTIVES oo. .e.neeetesseedeeeseescscseesnunnessscesssseseeeones Introduction Circuit Pack Descriptlon .........cccieeeee eee cs ...
Attached Processor Interface
[]
1,981
bellsystem_BSRS_353.714
https://archive.org/details/bellsystem_BSRS_353.714
6,365
archive-org-bell-labs
1,645
technical_report
bella-qwen-pretrain-doc1645
34
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSRS_353.714
train
1.01 This specification covers the connections for recovered multislot coin collectors. assembly, a strap lead (P-476703, red-white, 5-1/ 2 inches long) may be required to enable the gong transmitter lead to reach the BKX or R terminal in the upper housing. The A or E terminal on the steel coin chute shall be used...
Multislot Coin Collectors - Connections
[]
1,981
bellsystem_BSRS_361.023
https://archive.org/details/bellsystem_BSRS_361.023
9,075
archive-org-bell-labs
1,646
technical_report
bella-qwen-pretrain-doc1646
39
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSRS_361.023
train
Bell Telephone Laboratories, Incorporated - Dept 3315-BTL~KJP/FJR-512, IndjPl'Btpd in U.S.A. 1.03 This specification includes certain requirements which need special consideration and, in some cases, action on the part of the telephone company. The paragraph numbers and a brief description of these requirements are...
Subscriber Sets - 685-, 686-, 687-, 688-, 690-, 696-, 1690-, and 2690-types
[]
1,981
bellsystem_BSP_010-110-005
https://archive.org/details/bellsystem_BSP_010-110-005
8,803
archive-org-bell-labs
1,660
technical_report
bella-qwen-pretrain-doc1660
37
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_010-110-005
train
1.02 Whenever this section is reissued, the rea- son(s) for reissue will be given in this para- graph. 2.02 When floors are being refinished or washed, observe caution signs and proceed with care. 2.03 If water or other foreign substances are found on the floor, remove them or report them at 2.04 Pick up small o...
General Office Safety
[]
1,981
bellsystem_BSP_010-110-007
https://archive.org/details/bellsystem_BSP_010-110-007
44,448
archive-org-bell-labs
1,661
technical_report
bella-qwen-pretrain-doc1661
83
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_010-110-007
train
1.01 This section defines specific safety precau- tions to be observed by Materials Manage- ment (MM) personnel in the performance of their day-to-day job. 2.01 Some areas and operations in warehouses and yards present hazards that can result in foot 2.02 In order to minimize the severity and number of foot inju...
Safety Precautions for Materials Management Operations
[]
1,981
bellsystem_BSRS_361.004
https://archive.org/details/bellsystem_BSRS_361.004
12,376
archive-org-bell-labs
1,670
technical_report
bella-qwen-pretrain-doc1670
46
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSRS_361.004
train
1.01 This specification covers the requirements for the recovery of ElA, ElB, ElC, ElD, ElAM, and ElCM Ringers. 1.02 The applicable 'requirements of the specification listed on the index as SUPL SPEC shall be followed in the recovery of this apparatus in addition to the requirements specified herein. 1.02A This sp...
Ringers - E Type
[]
1,982
bellsystem_BSP_010-505-100
https://archive.org/details/bellsystem_BSP_010-505-100
153,957
archive-org-bell-labs
1,672
technical_report
bella-qwen-pretrain-doc1672
344
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_010-505-100
train
(c) To revise definitions of EIRD, CEIRD, DLRD, RID, RAD, FCD, SWC, and IAD in Part 6, B(c). A BOC ADS Methods Steering Committee is established on the headquarters staff of each BOC to coordinate overall management and implementation of policy decisions for special service, message, routing, and carrier provisio...
Administration of Designed Services / Description / General Methods
[]
1,982
bstj61-9-2423
https://archive.org/details/bstj61-9-2423
29,386
archive-org-bell-labs
1,673
technical_report
bella-qwen-pretrain-doc1673
42
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bstj61-9-2423
train
The Bell System's newest addition to its family of electronic switch- ing systems is the No. 5 ess (Electronic Switching System). 1 It repre- sents a departure from past local switching systems and it presented a unique opportunity to apply the principles of database management to a distributed switching network ch...
BSTJ 61: 9. November 1982: Database Systems: A Real-Time Database Management System for No. 5 ESS. (Barclay, D.K.; Byrne, E.R.; Ng, F.K.)
[]
1,982
unix-system-graphics-guide-release-5-0
https://archive.org/details/unix-system-graphics-guide-release-5-0
3,398
archive-org-bell-labs
1,676
technical_report
bella-qwen-pretrain-doc1676
5
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/unix-system-graphics-guide-release-5-0
train
This document was prepared with specific references to use of the UNIX system on a particular processor, the Western Electric 3B20S, which is not presently available except for internal use within the Bell System. However, the information contained herein is generally applicable to use of the UNIX system on various ...
UNIX System Graphics Guide - Release 5.0
[]
1,983
bellsystem_BSP_007-220-301
https://archive.org/details/bellsystem_BSP_007-220-301
3,621
archive-org-bell-labs
1,677
technical_report
bella-qwen-pretrain-doc1677
9
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_007-220-301
train
the need for a system development project. Typically, the phase is performed by the sponsoring or user or- ganization though Information Systems Organiza- tion personnel may be involved on a consulting basis. A project team is not usually formed for this phase except in special cases (eg, very large projects, inte...
Total System Development / Proposal Phase Guidelines
[]
1,983
bellsystem_BSP_007-220-302
https://archive.org/details/bellsystem_BSP_007-220-302
16,834
archive-org-bell-labs
1,678
technical_report
bella-qwen-pretrain-doc1678
33
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_007-220-302
train
1.01 The purpose of the Feasibility Phase is to de- fine specific user requirements for a system, 1.02 Whenever this section is reissued, the rea- son^) for reissue will be included in this para- graph. 1.03 This section is a guideline. It provides ex- panded information in support of the concepts of Total Syste...
Total System Development / Feasibility Phase Guidelines
[]
1,983
bellsystem_BSP_007-220-303
https://archive.org/details/bellsystem_BSP_007-220-303
12,877
archive-org-bell-labs
1,679
technical_report
bella-qwen-pretrain-doc1679
18
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_007-220-303
train
1.01 The purpose of the Definition Phase is to de- velop the detailed requirements and functions for the system model approved at the end of the Fea- sibility Phase. Some of these details may have been documented during feasibility if the details were un- covered during examination of the existing environ- ment o...
Total System Development / Definition Phase Guidelines
[]
1,983
bellsystem_BSP_007-220-306
https://archive.org/details/bellsystem_BSP_007-220-306
12,460
archive-org-bell-labs
1,682
technical_report
bella-qwen-pretrain-doc1682
25
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_007-220-306
train
1 .01 During the Implementation Phase, the system is constructed and tested according to detail 1.02 Whenever this section is reissued, the rea- son(s) for reissue will be included in this para- graph. 1.03 This section is a guideline. It provides ex- panded information in support of the concepts of total system...
Total System Development / Implementation Guidelines
[]
1,983
bellsystem_BSP_010-300-011
https://archive.org/details/bellsystem_BSP_010-300-011
16,665
archive-org-bell-labs
1,690
technical_report
bella-qwen-pretrain-doc1690
45
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_010-300-011
train
1 .02 This section is reissued to change the title and to update Table A and to provide additional information on the new format ETL. Revision arrows are used to emphasize significant changes. 1 .03 The title for each figure includes a number(s) in parentheses which identifies the para- 1.04 Recommendations for c...
Equipment Test Lists / Description and Use
[]
1,984
bellsystem_BSP_002-502-900_PN
https://archive.org/details/bellsystem_BSP_002-502-900_PN
31,377
archive-org-bell-labs
1,691
technical_report
bella-qwen-pretrain-doc1691
113
hf_public_v1
public_domain
null
null
archive_org
https://archive.org/details/bellsystem_BSP_002-502-900_PN
train
1.01 This section provides procedures for reporting abnormal or hazardous conditions which have already or could interrupt telephone service or cause major plant damage. structures to comply with the Modified Final Judgement (HFJ). Included are: (c) Revision of Form P7098 Notification chart for Service Emergenc...
Service Emergency Report
[]
1,984