archive_ref stringlengths 6 78 | canonical_url stringlengths 34 107 | char_count int64 2.51k 2.73M | collection stringclasses 3
values | doc_id int64 1 1.69k | document_type stringclasses 5
values | id stringlengths 24 27 | record_count int64 1 6.23k | release_policy_version stringclasses 1
value | rights_status stringclasses 1
value | selected_extraction_backend stringclasses 2
values | selected_extraction_score float64 -0.16 1 ⌀ | source_family stringclasses 3
values | source_url stringlengths 34 107 | split stringclasses 1
value | text stringlengths 2.51k 2.73M | title stringlengths 7 209 | trim_reasons listlengths 0 8 | year int64 1.88k 1.99k |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
bellsystem_SD-1C902-03 | https://archive.org/details/bellsystem_SD-1C902-03 | 11,392 | archive-org-bell-labs | 1,631 | technical_report | bella-qwen-pretrain-doc1631 | 71 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_SD-1C902-03 | train | ADDRESS PARITY 17 THROUGH 8 (PARITY
OVER ADDRESS BITS 8-17 TO FANOUT
BOARD FROfl RAIN STORE CONTROLLER)
ADDRESS PARITY 7 THROUGH 1 (PARITY
OVER ADDRESS BITS 1-7 TO FANOUT
BOARD FROH RAIN STORE CONTROLLER)
A REFRESH REOUEST (PRIRARY
INDICATOR OF 'REFRESH CYCLE
PENDING' FUNCTION)
FORCE CHECK ERROR (FORCE NORRAL ... | Common Systems, Main Store Controller and Memory circuit | [] | 1,960 |
bellsystem_BSRS_350.001 | https://archive.org/details/bellsystem_BSRS_350.001 | 13,254 | archive-org-bell-labs | 1,632 | technical_report | bella-qwen-pretrain-doc1632 | 37 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSRS_350.001 | train | This index lists the information that forms a part of, or supplements this specification,
authorized issues thereof.
Bell Telephone Laboratories, Incorporated - Dept 3751 -HOB/P&D-SC 222140 HRS Printed in U.S.A.
1.01 This specification contains general requirements applicable to the
recovery and repair for reissue ... | Station and Outside Plant Apparatus and Equipment - General Requirements | [] | 1,980 |
bellsystem_BSP_002-583-900_PN | https://archive.org/details/bellsystem_BSP_002-583-900_PN | 6,239 | archive-org-bell-labs | 1,637 | technical_report | bella-qwen-pretrain-doc1637 | 18 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_002-583-900_PN | train | This section outlines the procedure to be
followed by testrooms, central offices, and field
forces when technical assistance is required.
1.02 This section is reissued to conform with the
existing new departmental nomenclature due
1.04 Transmission and interference troubles are
those conditions which involve:
• ... | Field Request for Technical Assistance | [] | 1,980 |
bellsystem_BSP_010-520-111 | https://archive.org/details/bellsystem_BSP_010-520-111 | 9,597 | archive-org-bell-labs | 1,642 | technical_report | bella-qwen-pretrain-doc1642 | 20 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_010-520-111 | train | Dates," and USOs issued in advance as used in
the Intercompany Services Coordination (ISC) Plan.
2.01 It is the intent of the Bell System to
determine firm due dates (DD) and firm
critical dates in advance of completion of negotiations
with customers except as modified in this section.
critical dates based upon t... | Intercompany Services Coordination Plan / Service Inquiries, About Dated Orders, and Advance Orders | [] | 1,980 |
73-magazine-1981-02 | https://archive.org/details/73-magazine-1981-02 | 520,930 | archive-org-bell-labs | 1,643 | technical_report | bella-qwen-pretrain-doc1643 | 764 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/73-magazine-1981-02 | train | Tempo was the first with a synthesized
hand held for amateur uset first with a
220 MHz synthesized hand held, first
with a 5 watt output synthesized hand
held and once again first in the 440
MHz range with the S-4, a fully
synthesized hand held radio. Not only
does Temp... | 73 Magazine (February 1981) | [] | 1,981 |
attached-processor-interface-3b-1a | https://archive.org/details/attached-processor-interface-3b-1a | 36,417 | archive-org-bell-labs | 1,644 | technical_report | bella-qwen-pretrain-doc1644 | 84 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/attached-processor-interface-3b-1a | train | Not for use or disclosure outside the Bell
« System except under written agreement.
Developed by
The Bell System Training Center
Western Electric Company, Incorporated
Dublin, Ohio
OBJECTIVES oo. .e.neeetesseedeeeseescscseesnunnessscesssseseeeones
Introduction
Circuit Pack Descriptlon .........cccieeeee eee cs ... | Attached Processor Interface | [] | 1,981 |
bellsystem_BSRS_353.714 | https://archive.org/details/bellsystem_BSRS_353.714 | 6,365 | archive-org-bell-labs | 1,645 | technical_report | bella-qwen-pretrain-doc1645 | 34 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSRS_353.714 | train | 1.01 This specification covers the connections for recovered multislot
coin collectors.
assembly, a strap lead (P-476703, red-white, 5-1/ 2 inches long)
may be required to enable the gong transmitter lead to reach the BKX or R
terminal in the upper housing. The A or E terminal on the steel coin
chute shall be used... | Multislot Coin Collectors - Connections | [] | 1,981 |
bellsystem_BSRS_361.023 | https://archive.org/details/bellsystem_BSRS_361.023 | 9,075 | archive-org-bell-labs | 1,646 | technical_report | bella-qwen-pretrain-doc1646 | 39 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSRS_361.023 | train | Bell Telephone Laboratories, Incorporated - Dept 3315-BTL~KJP/FJR-512, IndjPl'Btpd in U.S.A.
1.03 This specification includes certain requirements which
need special consideration and, in some cases, action
on the part of the telephone company. The paragraph numbers
and a brief description of these requirements are... | Subscriber Sets - 685-, 686-, 687-, 688-, 690-, 696-, 1690-, and 2690-types | [] | 1,981 |
bellsystem_BSP_010-110-005 | https://archive.org/details/bellsystem_BSP_010-110-005 | 8,803 | archive-org-bell-labs | 1,660 | technical_report | bella-qwen-pretrain-doc1660 | 37 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_010-110-005 | train | 1.02 Whenever this section is reissued, the rea-
son(s) for reissue will be given in this para-
graph.
2.02 When floors are being refinished or washed,
observe caution signs and proceed with care.
2.03 If water or other foreign substances are found
on the floor, remove them or report them at
2.04 Pick up small o... | General Office Safety | [] | 1,981 |
bellsystem_BSP_010-110-007 | https://archive.org/details/bellsystem_BSP_010-110-007 | 44,448 | archive-org-bell-labs | 1,661 | technical_report | bella-qwen-pretrain-doc1661 | 83 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_010-110-007 | train | 1.01 This section defines specific safety precau-
tions to be observed by Materials Manage-
ment (MM) personnel in the performance of their
day-to-day job.
2.01 Some areas and operations in warehouses and
yards present hazards that can result in foot
2.02 In order to minimize the severity and number
of foot inju... | Safety Precautions for Materials Management Operations | [] | 1,981 |
bellsystem_BSRS_361.004 | https://archive.org/details/bellsystem_BSRS_361.004 | 12,376 | archive-org-bell-labs | 1,670 | technical_report | bella-qwen-pretrain-doc1670 | 46 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSRS_361.004 | train | 1.01 This specification covers the requirements for the recovery
of ElA, ElB, ElC, ElD, ElAM, and ElCM Ringers.
1.02 The applicable 'requirements of the specification listed on the
index as SUPL SPEC shall be followed in the recovery of this
apparatus in addition to the requirements specified herein.
1.02A This sp... | Ringers - E Type | [] | 1,982 |
bellsystem_BSP_010-505-100 | https://archive.org/details/bellsystem_BSP_010-505-100 | 153,957 | archive-org-bell-labs | 1,672 | technical_report | bella-qwen-pretrain-doc1672 | 344 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_010-505-100 | train | (c) To revise definitions of EIRD, CEIRD, DLRD,
RID, RAD, FCD, SWC, and IAD in Part 6, B(c).
A BOC ADS Methods Steering Committee is
established on the headquarters staff of each
BOC to coordinate overall management and
implementation of policy decisions for special
service, message, routing, and carrier provisio... | Administration of Designed Services / Description / General Methods | [] | 1,982 |
bstj61-9-2423 | https://archive.org/details/bstj61-9-2423 | 29,386 | archive-org-bell-labs | 1,673 | technical_report | bella-qwen-pretrain-doc1673 | 42 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bstj61-9-2423 | train | The Bell System's newest addition to its family of electronic switch-
ing systems is the No. 5 ess (Electronic Switching System). 1 It repre-
sents a departure from past local switching systems and it presented
a unique opportunity to apply the principles of database management
to a distributed switching network ch... | BSTJ 61: 9. November 1982: Database Systems: A Real-Time Database Management System for No. 5 ESS. (Barclay, D.K.; Byrne, E.R.; Ng, F.K.) | [] | 1,982 |
unix-system-graphics-guide-release-5-0 | https://archive.org/details/unix-system-graphics-guide-release-5-0 | 3,398 | archive-org-bell-labs | 1,676 | technical_report | bella-qwen-pretrain-doc1676 | 5 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/unix-system-graphics-guide-release-5-0 | train | This document was prepared with specific references to use of the UNIX system on a
particular processor, the Western Electric 3B20S, which is not presently available
except for internal use within the Bell System. However, the information contained
herein is generally applicable to use of the UNIX system on various ... | UNIX System Graphics Guide - Release 5.0 | [] | 1,983 |
bellsystem_BSP_007-220-301 | https://archive.org/details/bellsystem_BSP_007-220-301 | 3,621 | archive-org-bell-labs | 1,677 | technical_report | bella-qwen-pretrain-doc1677 | 9 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_007-220-301 | train | the need for a system development project. Typically,
the phase is performed by the sponsoring or user or-
ganization though Information Systems Organiza-
tion personnel may be involved on a consulting basis.
A project team is not usually formed for this phase
except in special cases (eg, very large projects, inte... | Total System Development / Proposal Phase Guidelines | [] | 1,983 |
bellsystem_BSP_007-220-302 | https://archive.org/details/bellsystem_BSP_007-220-302 | 16,834 | archive-org-bell-labs | 1,678 | technical_report | bella-qwen-pretrain-doc1678 | 33 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_007-220-302 | train | 1.01 The purpose of the Feasibility Phase is to de-
fine specific user requirements for a system,
1.02 Whenever this section is reissued, the rea-
son^) for reissue will be included in this para-
graph.
1.03 This section is a guideline. It provides ex-
panded information in support of the concepts
of Total Syste... | Total System Development / Feasibility Phase Guidelines | [] | 1,983 |
bellsystem_BSP_007-220-303 | https://archive.org/details/bellsystem_BSP_007-220-303 | 12,877 | archive-org-bell-labs | 1,679 | technical_report | bella-qwen-pretrain-doc1679 | 18 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_007-220-303 | train | 1.01 The purpose of the Definition Phase is to de-
velop the detailed requirements and functions
for the system model approved at the end of the Fea-
sibility Phase. Some of these details may have been
documented during feasibility if the details were un-
covered during examination of the existing environ-
ment o... | Total System Development / Definition Phase Guidelines | [] | 1,983 |
bellsystem_BSP_007-220-306 | https://archive.org/details/bellsystem_BSP_007-220-306 | 12,460 | archive-org-bell-labs | 1,682 | technical_report | bella-qwen-pretrain-doc1682 | 25 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_007-220-306 | train | 1 .01 During the Implementation Phase, the system
is constructed and tested according to detail
1.02 Whenever this section is reissued, the rea-
son(s) for reissue will be included in this para-
graph.
1.03 This section is a guideline. It provides ex-
panded information in support of the concepts
of total system... | Total System Development / Implementation Guidelines | [] | 1,983 |
bellsystem_BSP_010-300-011 | https://archive.org/details/bellsystem_BSP_010-300-011 | 16,665 | archive-org-bell-labs | 1,690 | technical_report | bella-qwen-pretrain-doc1690 | 45 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_010-300-011 | train | 1 .02 This section is reissued to change the title and
to update Table A and to provide additional
information on the new format ETL. Revision arrows
are used to emphasize significant changes.
1 .03 The title for each figure includes a number(s)
in parentheses which identifies the para-
1.04 Recommendations for c... | Equipment Test Lists / Description and Use | [] | 1,984 |
bellsystem_BSP_002-502-900_PN | https://archive.org/details/bellsystem_BSP_002-502-900_PN | 31,377 | archive-org-bell-labs | 1,691 | technical_report | bella-qwen-pretrain-doc1691 | 113 | hf_public_v1 | public_domain | null | null | archive_org | https://archive.org/details/bellsystem_BSP_002-502-900_PN | train | 1.01 This section provides procedures for
reporting abnormal or hazardous
conditions which have already or could
interrupt telephone service or cause major
plant damage.
structures to comply with the Modified Final
Judgement (HFJ). Included are:
(c) Revision of Form P7098 Notification
chart for Service Emergenc... | Service Emergency Report | [] | 1,984 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.