e6a3c691-b17f-4c47-8b0e-c52bc299c516 | across adjacent infrastructures, with bulky transport prefer-
entially scheduled during night shifts to limit interference
with daytime works.
CHALLENGES ENVISAGED IN LS3
EXECUTION
The execution of LS3 within the LHC is characterised by
asetofchallengesthatspanfromsafetyandcoordination,
toschedulingrisksanduncertaintie... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 1 |
1f1c3b8b-781a-4dea-b25c-b69c8b42fc76 | concurrent interventions in the LHC tunnel, including other
majorprojects, regulatoryand safetytestsaffectingproject
execution, maintenance of non-replaced systems, and activi-
ties requiring access to the same work areas.
Finally, schedule risks and uncertainties arise from the
dependency of installation slots on equi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 1 |
285d625f-2237-4058-b4fb-6edb7e3f6b15 | ment respecting the safety requirements. To reinforce safety
and mitigate risks during critical phases the electrical safety
managementiscentralisedwithintheESLteam,whichplays
akeyroleinsupportingCERNgroupsparticularlyatthebe-
ginning and at the end of LS3, managing lockout/unlockout
requestsand testpermits. Responsibi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 1 |
0690075e-a36d-4ec5-9e14-a987d5551f53 | generalcoordinationaregeographicallydistributedbyareas,
followingthesameapproachadoptedsinceLS1[ 7]. Each
coordinator is also designated as the reference contact for
a subset of CERN groups and for the other large projects,
such as Beam Screen Treatment [ 15] and the PSS-CONS
programme [ 11]. EN-ACE retains full author... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 2 |
a35c14a8-fa42-4bfb-9c04-80fb1a6b6295 | step approach [ 16]. The first step consists of regular in-
formation exchange between EN-ACE, the CERN groups,
HL-LHC and the other main projects, enabling rapid re-
profiling of activities in response to baseline deviations and
limitingcascadingresourceimpactsacrossfacilities. This
is supported by dedicated meetings ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 2 |
37be8434-2035-44ff-a1ea-284762c6427c | higher organisational levels.
LS3 Reporting Dashboards
During LS2, progress monitoring relied on dashboards
based on group- and project-level schedules and Key Perfor-
manceIndicators(KPIs),periodicallyreportedtotheLS2
committee. Although central schedules from the general co-
ordinationwereavailable,dashboardswerepart... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 2 |
48146ad6-bc45-46c3-8e87-124875e1e269 | Power BI [ 17], enabling data aggregation and online dis-
semination. It is structured around the EN-ACE central
schedules, while allowing the integration of complementary
inputs from the groups. The platform offers a facility-based
view with a variety of filtering options. Progress curves are
the primary monitoring fe... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 2 |
e4916542-1ba0-43bf-aad5-1da088d7be29 | riod. FortheLHC,thefocuswillbeputonkeyaspectssuch
as equipment readiness and installation (Fig. 1), and criti-
calpath,enablingthevisualisationofprogressagainstthe
baseline,andallowingdelaysandbottleneckstobepromptly
identified. Another key dashboard is the estimation of LHC
underground occupancy (Fig. 2), counting the... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 2 |
d5449aeb-7f75-4241-a630-f3fece78d35b | such as the HL-LHC upgrade within a coherent and unified
47-monthschedulethatincludesotherprojects,maintenance,
andconsolidationactivities. Theconditionsexisttoestablish
aconsolidatedandoptimisedLS3LHCschedulebaseline,
with risks and uncertainties identified and assessed. Contin-
gencieshavebeenincorporatedwhereverfeas... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 2 |
67aad3d6-9623-494d-ba2c-4fd2aa15faf9 | ability. ItenhancesglobalawarenessoftheLS3execution
status,supportsinformeddecision-makinginthepresence
of issues, and facilitates the identification of optimisation
opportunities across the shutdown.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 267... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 2 |
6b33c916-b315-4d28-b117-50ec2c6c3964 | REFERENCES
[1]J.-P. Tock, C. Bedel, M. Bernardini, S. Blanchard, A. Bor-
glund, C. Duchemin, J. Etheridge, J. Fernandez, P. Fessia,
A.Herty,S.Marsh,M.Modena,F.DosSantosPedrosa,G.
Riddone, S. Roesler, R. Steerenberg, and M. Vargas Jorba,
“The third long shutdown (LS3) of the cern accelerator com-
plex”, inProc. 16th Int... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 3 |
05845a31-bf19-4e14-a18d-7f0b6b9c387f | inProc. 9th Int. Part. Accel. Conf. (IPAC’18) , Vancouver,
Canada, pp. 240–243, Apr. 2018.
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt418-MOPMF/zero.alt456
[4]CERN,High-Luminosity Large Hadron Collider (HL-LHC):
Technical Design Report . CERN, 2020.
doi:1/zero.alt4.23731/CYRM-2/zero.alt42/zero.alt4-/zero.alt4/zero.alt41... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 3 |
fb38769d-540b-47e6-83c8-155203f744f9 | pp. 1010–1012, Jun. 2014.
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt414-TUPRO/zero.alt4/zero.alt47
[8]A.-L. Perrot, F. Dos Santos Pedrosa, M. Bernardini, S.
Chemli,J. -P.Corso,J.Coupard,J.Etheridge,S.Grillot,J.M.
Jimenez, K. Foraz, B. Nicquevert, S. Petit, J. -P. Tock, and E.
Vergara Fernandez, “The second long shutdow... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 3 |
123da419-93fb-4da4-9e22-c8dc04a72525 | coordination:frompreparationtocompletion”,CERN,Rep.
CERN-ACC-NOTE-2022-0036, 2022.
[10]E. V. Fernandez, M. B. Marin, M. Bernardini, and S. Fleury,
“Schedulemanagementforlargescaleprojects: theexample
of HL-LHC at CERN”, in Proc. IPAC’24 , Nashville, TN,
USA, pp. 1641–1644, Jul. 2024.
doi:1/zero.alt4.18429/JACoW-IPAC2/z... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 3 |
3325236d-b8f6-4482-ae23-b772bd62ccdc | dini, J.-P.Tock, E. VergaraFernandez, K. Foraz,B. Daudin,
D. Klem, and R. Lanza, “PLAN - from LS2 to Run 3-LS3
and outcomes from the first Run 3-ls3 PLAN exercise”, in
Proc. 14th Int. Part. Accel. Conf. (IPAC’23) , Venice, Italy,
pp. 2367–2370, May 2023.
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt423-TUPM/zero.alt474
[1... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 3 |
9af6964c-43dc-406d-ae40-94be8a8df090 | [16]E.VergaraFernandez,M.Pirozzi,M.Bernardini,A.Ansel,
M. Barberan Marin, S. Chemli, J. Coupard, K. Foraz, D.
Hay, J. M. Jimenez, D. J. McFarlane, F. Dos Santos Pedrosa,
and J.-P. Tock, “Processes and tools to manage CERN pro-
grammedstopsappliedtothesecondlongshutdownofthe
accelerator complex”, in Proc. 13th Int. Part... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1091.pdf | 3 |
b51c3fcb-712c-4e7e-9712-a9defd0a15fe | FERMI LINAC UPGRADE: COMMISSIONING EXPERIENCE OF THE
FIRST S-BAND HIGH-GRADIENT MODULE
N. Shafqat∗, F. Gelmetti, C. Maschiovecchio, M. Milloch, A. Milocco, M. Trovo
Elettra Sincrotrone Trieste S.C.p.A., Trieste, Italy
Abstract
The FERMI seeded free-electron laser (FEL), located at
the Elettra laboratory in Trieste, is ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 0 |
02ecd1af-4c8d-4fbd-8c1d-ab313f2a0791 | commissioned at the FERMI linac up to an accelerating
gradientof27MV/mwiththeBDRofaround 5×10−8bpp/m.
In this paper, we share the commissioning experience of
the HG module from installation, conditioning, high power
operation, and commissioning with the beam.
INTRODUCTION
FERMI FEL, located at Elettra Sincrotrone, Trie... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 0 |
b8a9fa78-ef3b-48c1-9fa4-8fdeed973ac4 | Backward Traveling Wave (BTW) accelerating structures
and SLEDs pulse compressors with the newly designed HG
accelerating structures and spherical pulse compressors, as
shown in Fig. 2.
COMMISSIONING OF HG MODULE
HG modules are designed to fulfill the FERMI require-
mentof30MV/macceleratinggradientwiththebreakdown
rate... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 0 |
1797b611-2417-45f5-9a09-a7d9470d3385 | Cell radius 𝑏41.610–41.076 mm
𝑅shunt 72–81 M Ω/m
𝑄0 ≈ 15850 –
𝑣𝑔/𝑐 2.07–0.97 –
𝑡𝑓 ≈ 645 ns
𝜏 0.385 Neper
Installation of HG Module
Aftersuccessfultestingand conditioningofthe firstHG
structure (HG1) at the Elettra high-power test facility, the
2ndHGstructure(HG2)wasdirectlyinstalledintheFERMI
linac at K15 in p... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 0 |
8f144d9b-f2e3-425c-8688-3d7f20087dde | klystronusedtofeedtheHGmodule,4thportofwhichister-
minatedwithasmallferrite-basedRFterminator. Initially,
thebadvacuuminthisregionwasattributedtodegassingbut
whenitpersisted,andfurtherinvestigationswereperformed,17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 0 |
f0877000-574d-4bfb-8164-19479c07118d | Figure3: HG1structureinstalledintheFERMIlinactunnel.
Figure4: HG2structureinstalledintheFERMIlinactunnel.
itwasfoundthattheferriteintheterminatorwascracked,re-
sultinginbadvacuumandslowingtheconditioningprocess.
TheRFterminatorwasfinallyreplacedwiththeRFwater
load as shown in Fig. 5, solving the issue of bad vacuum.
Th... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 1 |
0ef67960-fcc9-4170-a655-19eff1c99d8b | of the klystron. These events were accompanied with the
huge vacuum spikes. BOC was moved from the test facility
where it operated to the peak powers of 125 MW, but these
arcs were happening as low as 20 MW power from BOC.
Further complicating the issue was the fact that such arcs
mostly occur in series where one fault... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 1 |
cda786c9-e28d-47c0-9b07-740743c50953 | pushfullpowerfrom45MW,4.5 𝜇sklystrontoHGmodule.
Theenergygainwasmeasuredwiththeelectronbeamtrans-
latingtoanacceleratinggradientof27MV/m,abitshyof
the target 30 MV/m. Figure 8shows the RF pulses at full
power.
Constant Power Operation
During2025,K15wasputonlineforuserbeamoperation
at full power from klystron. Figure 9... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 1 |
c683e79b-9a82-4155-9aaa-dd6a4aef2703 | Figure 7: The replacement of the bends after BOC due to
arcing issue.
Figure8: TheRFpulsesatK15,blueistheamplitudeand
red is the phase.
trendsinthewaveguidesystemandtwoHGstructures,while
Fig.10showsthefaulttrendduringonesampleperiod. In
Fig.10,theklyfaultsarethefaultsduetothearcingatthe
klystronwhileRFLAfaultsrepresent... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 2 |
f694c796-fa5d-4389-bc80-6e034bf4ee76 | sometimes trigger series of faults, an example of which is
shown in Fig. 12.
Figure 10: Faulttrend for the HG module for 21 weeks of
operation with the beam.
Figure 11: Exampleof the long faultin the BOCregion.
Figure 12: Exampleof long faultat the HG1.
CONCLUSION
The first S-band HG module is successfully installed an... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 2 |
badda14f-68b0-49ad-a1f8-0879dd1d9aba | REFERENCES
[1]L. Gianessi et al., “FERMI 2.0 Conceptual De-
sign Report,” Elettra Sincrotrone Trieste, 2022.
https://www.elettra.eu/lightsources/fermi/
fermi-machine/fermicdr.html
[2]N.Shafqat etal.,“Fabrication,conditioningandinstallation
of the 1st high gradient S-band accelerating module for the
energy upgrade of th... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1092.pdf | 2 |
efe9e686-f3ac-4905-a569-9e2a8e407b83 | IMPACT OF RAPID ACCELERATION ON BEAM DYNAMICS IN THE
RAPID-CYCLING SYNCHROTRONS OF A MUON COLLIDER∗
L. Soubirou†,1, A. Chance‡,1, D. Amorim2, H. Damerau3, E. Lamb3, E. Metral3, L. Thiele3,4
1Université Paris-Saclay - CEA, France
2École Polytechnique Fédérale de Lausanne, Lausanne, Switzerland
3CERN, Geneva, Switzerland... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 0 |
49a7ac79-506e-4b53-969b-570dc2800aa0 | complex: attaininghighluminosityrequiresamuonsurvival
rate of up to 70%throughout the acceleration chain, which
impliesaccelerationwithinafewmilliseconds. Suchrapid
acceleration causes a mismatch between the beam energy
in the arcs and the linearly ramped fields of the dipoles and
quadrupoles. The corresponding field e... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 0 |
0c1e5d68-4286-48ba-9fdf-f1a017e07337 | is currently under investigation [2]. After production, the
muon beam is cooled to reduce its transverse and longitu-
dinal emittance. It is then accelerated to 63GeV, using a
linear accelerator followed by two recirculating linacs. Sub-
sequently, a chain of Rapid-Cycling Synchrotrons (RCS)
accelerates the beam to col... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 0 |
4b13e263-7aa2-4e7d-a940-295a95a56042 | notnecessarilyreflectthoseoftheEUorEuropeanResearchExecutive
Agency (REA). Neither the EU nor the REA can be held responsible for
them.
†lisa.soubirou@cea.fr
‡antoine.chance@cea.frtotal survival rate of up to 70%throughout the acceleration
chain, which demands for acceleration through the entire
chainofRCSinabouttenmil... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 0 |
1cb5e1c1-6dc9-4bc3-8d04-b3ef3ddef4fd | ing fieldfora compactring. Due tothe extremelyfast accel-
eration,thepulsedmagnetsmustberampedatratesofupto
4.2kT/sforRCS1. Suchrampscreateamismatchbetween
thediscretelyincreasedbeamenergyandthecontinuously
ramped fields of the pulsed magnets, which include dipoles
and quadrupoles. For RCS1, with a distribution of radi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 0 |
ce9f0013-2975-4d12-8cc4-a717fe736478 | ing90°FODO cells and a dispersion suppressor at entrance
andexitof theRFinsertions. Thetransverseand longitudi-
nalemittances, 𝜀x,yand𝜀s,aresetat 25µmand0.025eVs ,
respectively.
ANALYTICAL MODEL
Weconsideradipoleoflength 𝐿withitsentryfaceplaced
at𝑠0, with the reference 𝑠=0at the beginning of the arc.
Following the... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 0 |
68b193fb-c85c-42ff-98a7-1b0a60160bea | 𝑀=𝑀 𝑠0→𝑠 0+𝐿,𝛿𝑋(𝑠),𝛿𝑀(𝑠), and𝛿𝑇(𝑠)the infinitesimal
offset,matrix,andT-matrixperturbationin 𝑠,andΔ𝑋and17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP1094
256 MC1.A09: Muon Accelerators, Neutri... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 0 |
9fd22aab-6b97-4017-bc96-f3137d45f925 | Figure 1: Muon collider facility layout [3].
Δ𝑅theintegratedoffsetandmatrixperturbationoftheele-
ment. We are looking to express the transport matrix of the
pulsed dipole𝑀 pulsedas
𝑀pulsed=𝑀+Δ𝑀(2)
The integrated offset and matrix perturbation of a pulsed
dipole can be defined as
Δ𝑋(𝑠 0)=∫𝑠0+𝐿
𝑠0𝑀𝑠→𝑠 0+𝐿𝛿... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 1 |
fa8ecc79-bfd1-4e04-88dd-f3d46f61ca16 | with𝑘′
1=¤𝐺/(𝐵𝜌𝑐) , with¤𝐺the gradient ramp. A pulsed
quadrupole does not generate any offset, 𝛿𝑋=0, and the
only non-null terms of𝛿𝑀 qd(𝑠)are
𝛿𝑀qd2,1(𝑠)=−𝑘′
1(𝑠−𝑠∗)(8)
𝛿𝑀qd4,3(𝑠)=𝑘′
1(𝑠−𝑠∗)(9)
The results of the analytical model are implemented and
compared with those obtained using the codeXsui... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 1 |
7ef6523f-37a1-45f3-b12c-427c914193ac | error.
The horizontal trajectory offset in the first arc of RCS1 is
showninFig.2,demonstratingexcellentagreementbetween
the analytical model and the sliced simulation. In the first
halfofthearc, thetrajectoryoffsetispositivebecausethe
magnetic field is weaker than the value corresponding to
the reference beam energy. I... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 1 |
02c07093-dab0-4031-8f3e-f46cfa281f1f | the maximum trajectory excursion on the ramp speed. This
behaviourisconfirmedbyperformingascanwithacceler-
ationtimeslongerthanthenominalvalue 𝑡acc. Theresults
are shown in Fig. 4.
Figure2: HorizontaltrajectoryoffsetinthefirstarcofRCS1.
Figure 3: Horizontal trajectory offset for the entire accelera-
tion in RCS1.
The ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 1 |
1164c587-57c9-4060-a81c-6b685612ace3 | scenarios displayed in Fig. 5, an error on the normalised
dispersionisobserved,reachingupto 0.1m1/2. Whenonly
pulseddipolesareconsidered,thebeta-beatingremainsmod-
erate. However, when pulsed quadrupoles are included, it
increases to as much as 20%in both the horizontal and
vertical planes. This represents a significan... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 2 |
e592409e-52b7-4764-a6ca-de44ea5bd2e0 | in RCS1.
TRACKING STUDIES
Without considering the ramp in the pulsed elements,
tracking studies performed on the lattice with 8arcsand
the nominal longitudinal emittance show a horizontal emit-
tancegrowthexceeding 500%,aspresentedinFig.6. When
the longitudinalemittance is reducedby almost afactor 10,
reaching 0.0026eV... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 2 |
14947655-d91a-4b55-b5f4-666b685bddab | spread of the beam (up to 4%) combined with the strong
energy kicks delivered by the RF cavities. These effects are
transferred to the horizontal plane through synchro-betatron
coupling. The potential contribution of second-order disper-
sion in the cavity still needs to be investigated.
In a second phase, we aim to qu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 2 |
9a37e436-eb8a-487d-8054-86f23db68fed | ber of sections is necessary to mitigate emittance growth
induced by the fast ramp.
Figure 6: Start-to-end tracking results for RCS1 for lattices
with 8 and 28 arcs, considering nominal and reduced longi-
tudinalemittanceandthefastrampinthepulsedelements
(ramp) or not (no ramp).
CONCLUSION
Theimpactofrapidaccelerationi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 2 |
91720052-3f3e-4e4e-80f9-e33f0fb890f1 | system must be distributed over more than 8 stations to pre-
servethebeamemittance. Alatticefeaturing28RFstations
isfoundtolimittheemittancegrowthtoapproximately 10%
when ramp errors are included.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-53... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 2 |
3281833a-bab9-450e-b60e-08ef8cd2d192 | REFERENCES
[1]MA.Palmer,“TheUSMuonAcceleratorProgram”,inProc.
IPAC’14, Dresden, Germany, Jun. 2014, pp. 1367–1369.
doi:10.18429/JACoW-IPAC2014-TUPME012
[2]C. Accetturaet al., “Interim report for the International Muon
Collider Collaboration (IMCC)”,arXiv, 2025.
doi:10.48550/arXiv.2407.12450[3] R. Tayloret al., “Consoli... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 3 |
f6bf2bd2-b27a-470e-a4c9-6aa2f2a2c76f | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP1094
MC1.A09: Muon Accelerators, Neutrino Factories, Muon Colliders 259Monday: Poster session MOP1094
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1094.pdf | 3 |
5e20579c-4c94-468c-be7b-9d09d97515e9 | ESSNUSB+: TARGETSTATIONSTUDIES
J. Hiegel∗, E. Baussan, Institut Pluridisciplinaire Hubert Curien, Strasbourg, France
On behalf of the ESS 𝜈SB+ collaboration
Abstract
The ESSnuSB+ project aims to accurately measure the
neutrino cross-sections for ESSnuSB leptonic CP violation
measurements and to perform sterile neutrin... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 0 |
59329921-2fe2-434a-a03c-b3eb64aea965 | tion. Thedesignofallthesecomponents,whichareexposed
to high levels of radioactivity, is essential for validating the
feasibility of the target station facility, assessing the lifetime
of the components, and guiding the design of the cooling
and shielding systems.
THE ESSNUSB+ TARGET STATION
The next generation of neutr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 0 |
fb5d3fdb-41e8-4abb-b07c-89b87257adc2 | proposes to exploit the high-power proton linac of the Euro-
peanSpallationSource(ESS)toproduceanintenseneutrino
superbeam.
Mechanical Design update
ESS-4965198
2025/09/23 8Accumulator
RingTransfer Line
LEnuSTORM
Near DetectorNear Detector
ESSnuSB +
TargetLEnuSTORM
RacetrackLEMNB
R2TFacility
Buildings
Figure 1: Faci... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 0 |
2efcd804-3e4e-4855-a676-38f0a98c978f | intense radiation fields while ensuring efficient secondary
particle production and collection. The optimisation of this
systeminvolvesatrade-off betweenmaximisingthe useful
𝜋+(or𝜋−) flux and limiting energy deposition in sensi-
tivecomponents, suchas thetarget,horn, anddownstream
elements. In this work, the simulati... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 0 |
ad35eb90-1bd3-418c-8cbb-834481944e6e | componentsoftheESSnuSB+targetstation,describedbe-
low.
TargetandCanister Thegranulartargetconsistsofa
78 cm long cylinder with 3 cm diameter filled with 3 mm
titaniumspheres. The cylinderis surroundedbya titanium
canister equipped with slits on top and bottom to allow a
pressurizedheliumgascirculationforanefficienttran... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 0 |
93a845d8-70dd-42d3-b659-834bd41c58fc | Shielding-Collimator Ashieldingelement,referred
to as the collimator, is placed between 𝑧 = 300 cmand
𝑧 = 450cm. It is primarily made of iron and includes a
tungsten ring to enhance radiation absorption (see Fig 3).
The aperture of the tungsten insert is 30cm, which imposes
constraintsonthehornfocusingperformancetoen... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 0 |
f91d124c-b94c-412c-8716-9dd6e2ab86cc | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP1095
260 MC1.A09: Muon Accelerators, Neutrino Factories, Muon CollidersMOP1095 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 0 |
278ca32b-5e1c-433f-8d95-f88d0581ee77 | Figure2: Schematiclayoutofthe ESSnuSB+targetstation. The colourmap representsthe energydeposition [GeV/cm3]
across the simulation, averaged over 5 simulation of 100k primary protons.
ShieldMagnet
Coils
Tungsten
ring
Figure 3: Illustrationof the shield and C-shaped dipole.
high radiation and energy deposition levels. Th... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 1 |
cb4b7ccf-c103-4581-9774-233ef9b8fdd4 | setup, the transfer line includes seven quadrupole elements.
No magnetic field is implemented at this stage, and this sec-
tionisusedasafirst-orderapproximationtoevaluateenergy
deposition in downstream components.
Walls and Decay Tunnel All the experimental is en-
closedinahelium-filledenvironmenttolimittheproduction
r... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 1 |
f8f54411-7086-4815-b69f-2db5530cf76e | residual particle in particular the protons.POWER DEPOSITION STUDIES
Figure2shows the energy deposition map simulation
layout. Particular attention is given to regions exposed to
highradiationlevels,asthesedirectlyimpactmaterialdegra-
dation and component lifetime. In addition, Table 1sum-
marises the total power depos... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 1 |
4bced7b5-4004-4798-8b4b-379c0e8983f4 | ring. Thecoppercoilsofthedipolereceiveapproximately
0.97kW,whichmayleadtorapidmaterialdegradation. Mit-
igationstrategiesarecurrentlyunderinvestigation,suchas
the addition of a tungsten plate to provide additional shield-
ing. The beam dump absorbs the remaining proton beam
andthereforeexperiencesahighlevelofpowerdepos... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 1 |
e029af42-0fde-4f04-a165-c356d4010b94 | 𝜋+flux. Figure 4shows the distribution of 700MeV ±10%
𝜋+attheentranceofthetransferline(T2R).Theboundaries
of the T2R are indicated by black lines. Each dot represents
thepositionofa 𝜋+,anditscolourcorrespondstotheangle
𝜃at which the particle is deflected by the dipole. The mean
value of 𝜃is−30°, slightly above the... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 1 |
31477266-db01-40c8-8e9f-375847862404 | Table 1: Power deposited in the main components of the
targetstation. Thedepositedpowercorrespondstothemean
valueobtainedfrom1000independentsimulationsof10k
primary protons each. The standard error is computed as
𝜎/√𝑁, where𝜎is the standard deviation across simulations
and𝑁 = 1000 is the number of simulations.
Comp... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 2 |
94b566a6-a6c9-4bd2-b7b9-223494bcdec6 | transfer line, corresponding to a loss of approximately 85%.
Futureoptimisationofthehorndesignisexpectedtoreduce
these losses.
100
75
50
25
0255075100y [cm]+ position
700 800 900 1000 1100
z [cm]050100150counts<z> = 968.91 cm0 200 400
counts<y> = -0.13 cm
45
40
35
30
25
20
[degree]
Figure 4: Distribution of 𝜋+at the ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 2 |
ed3a03c7-2166-4f06-b0f6-aeb8161b2a5d | results provide quantitative estimates of deposited power
andenergy,supportingthevalidationofthetargetstationde-
sign and informing engineering decisions related to cooling,
shielding,andmaterialselection. Inparticular,thesimula-
tionshighlightcriticalregionssuchasthetargetandhorn,the
dipolecoils,andthefirstquadrupole,... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 2 |
ac7fb77d-0ec4-4da2-999c-1bd8d3a7fe82 | high-dose components, and optimising the magnetic ele-
ments to maximise the useful 𝜋+flux, thereby enhancing
the overall performance of the ESSnuSB+ facility.
ACKNOWLEDGEMENTS
FundedbytheEuropeanUnion. Viewsandopinionsex-
pressedarehoweverthoseoftheauthor(s)onlyanddonot
necessarily reflect those of the European Union... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 2 |
2b6b6c7e-10d0-4f0d-9dab-080d58576ebd | 2015. doi:1/zero.alt4.1/zero.alt493/ptep/ptv/zero.alt461
[3]E. Baussan et al., “A very intense neutrino super beam experi-
mentforleptoniccpviolationdiscoverybasedontheeuropean
spallation source linac”, Nucl. Phys. B , vol. 885, pp. 127–149,
Aug. 2014. doi:1/zero.alt4.1/zero.alt416/j.nuclphysb.2/zero.alt414./zero.alt45... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 2 |
bb8dce62-efc8-4bb7-8b0a-5318942c237c | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP1095
262 MC1.A09: Muon Accelerators, Neutrino Factories, Muon CollidersMOP1095 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1095.pdf | 2 |
0aff28d8-45f9-418f-866c-dfd62d578367 | LEnuSTORM: A LOW-ENERGY MUON STORAGE RING FOR
NEUTRINO CROSS-SECTION MEASUREMENTS
T. W. Choi∗, M. Olvegård, Uppsala University, Uppsala, Sweden
M. Topp-Mugglestone, CERN, Geneva, Switzerland
Abstract
The LEnuSTORM (Low-Energy neutrinos from STORed
Muons)isaproposedfacilitythatenhancestheperformance
of the ESSnuSB (Euro... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 0 |
f7f69ebb-710e-457c-93a6-6f55f7294dd6 | bestoredintheringforafewtensofturns. Theneutrinos
emittedinthemuondecayinoneofthestraightsectionswill
travel to a water Cherenkov detector, where the interactions
are monitored.
At LEnuSTORM, the beam is large and very divergent,
andthusdifficulttocontain. Theringdesignpresentedinthis
paper uses iron-dominated magnets ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 0 |
60f4814b-d7d7-4815-9003-2af59940337a | tionSourceNeutrinoSuperBeam)longbaselineexperiment
tomeasure the leptonic charge-parity violation will bepro-
duced using the ESS proton linear accelerator. The ESS
5W,2.5GeV,2.86msproton beam will be sent to an accu-
mulatorringandcompressedintofoursub-pulses,eachof
1.2µs duration beforehitting a target[ 1].
As an ext... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 0 |
b8dae14d-3242-4d5e-b47d-781d823d78c5 | canetoseparatethepionsfromtheotherchargedparticles
emerging from the target, including remaining protons, and
will also serve as a momentum selection stage. The pions
∗ting.choi@physics.uu.seare injected into the storage ring at the end of one of the arc
sections. Thepionswilldecayintomuonswhiletraveling
in the straigh... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 0 |
ddae1573-b787-4bb6-a755-348c4cfdc182 | chosen600MeV/c muons as the reference circulating par-
ticle and 1000MeV/c pions for the injection. When these
pionsdecay,theywillproduce 600MeV/c muonsatangles
small enough to fall within the ring acceptance.
LATTICE DESIGN
Duetotheshortlifetimeofpionsandmuons,thegeometry
of the racetrack ring and the particle momenta... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 0 |
2af15d1e-7e47-4a44-9842-e09fee2686ca | in a dispersive region [ 2]. The arc must thus offer sufficient
dispersion for the physical separation of the beams before
the merge.
Sincethemuonstobestoredintheringhaveanunusually
large transverse emittance and a large momentum spread,
our primary goal is to maximise both the transverse and
themomentumacceptance. For... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 0 |
53c418ca-9612-4742-98ff-340c9372e92f | explore the use of FODO cells exclusively.
To maximize the number of stored muons, the transverse
acceptance of the FODO-cell should be maximized, which
impliesthatthecelllengthisminimized. Weemployafairly17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 0 |
798361f4-ce49-4cbe-97b6-0d5ec85376f2 | shortquadrupolelengthof 0.25m. Thelengthofeachdipole
hastobelongenoughtoreducenon-linearkinematiceffects
and fringe field effects, while short enough to keep the peak
dispersioninthedipoledown. Wesetthedipolelengthto
0.7m to balance these aspects. With 0.2m spacing between
each dipole and quadrupole, we reach an arc FO... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 1 |
a57878ed-f08f-4e42-9144-ff9170c6131d | Twiss functions from the arc to the outgoing periodic Twiss
functions in the straight-FODO segment, and vice versa.
ThequadrupolestrengthsintheFODOcellaredetermined
by optimising the phase advance per cell. Initially, both
the horizontal and the vertical phase advance, 𝜇𝑥and𝜇𝑦
respectively, are set to 77°to minimiz... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 1 |
884b2751-6761-47c2-bedc-7872d4a97638 | Figure 1: The beta and dispersion functions of the FODO
cell in the straight section.
The number of FODO cells in the straight section is cho-
sensothatthetotallengthofthestraightsectionisjustabove
80m,inthiscase24cells. Duetotheperiodicity,thelength
can be easily adjusted up or down in units of the FODO cell
length.
A... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 1 |
8baf89b5-a074-4a0c-a1f5-ab1d546c7634 | the arc. The condition for dispersion closure is given by
𝜇𝑥= 2𝜋𝑛/𝑁cell, where𝑛is any positive integer and 𝑁cell
isthenumberofcellsinthearc. Thevalue 𝑛indicatesthe
number of dispersion peaks in an arc section. In this design,
we choose 𝑛 = 2to facilitate pion injection because the two
peaks will be located at ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 1 |
6988e047-89a1-45b4-8528-22e6c1ec3ed9 | phase advance of 𝜇𝑥= 4𝜋/5=144°per supercell, or 72°
perFODOcell. Theverticalphaseadvanceisagainsetto
𝜇𝑦= 154°persupercell,or 77°perFODOcell,toprovide
the smallest possible vertical beam size.
Withthesephaseadvancevalues,weobtainquadrupole
strengths of −3.8m−2and3.4m−2. The corresponding
dipole strength is 𝑘0=0.45... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 1 |
6a073a81-f9e6-45d5-8ed9-1d52827a5383 | fivequadrupolesanddriftspaces. Thehalf-quadrupoleatthe
beginning and end of the cell retain the fixed strengths used
inthearc-supercellandthestraight-FODOcell,respectively.
Onlythefivequadrupole strengthsinbetweenare adjusted
to match the Twiss functions between the arc supercells
andthestraightFODOcellswhilekeepingthe... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 1 |
e5763f68-5c08-4304-9c55-3d6eaaa2b25c | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP1098
264 MC1.A09: Muon Accelerators, Neutrino Factories, Muon CollidersMOP1098 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 1 |
58245266-551e-4e57-b8d2-efa0bed4bd24 | under-constrained and not unique. When matching from the
straight-FODOcelltothearcsection,thefirsttwoquadru-
plesareinitiatedatthesamestrengthsasthestraightFODO
cell, while the last two quadruples start with the strengths
from the arc cell. The middle quadrupole is assigned the
averageofthevaluesfromthestraight-FODOcel... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 2 |
4ee02618-df1b-4913-9e13-614ea367a8af | fromthearcsectiontothestraight-FODOcells. Thatmeans
thatthefullstraightsectioniscomposedof,insequence,the
mirrored matching section, 24 straight-FODO cells, and the
original matching section.
The Whole Ring
By combining two 27m arcs and two 81m straight sec-
tions, we reach a full ring circumference of 216m, and a
stra... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 2 |
da1fde57-929f-4260-9f3f-76d8ca7a1c9a | acceptance of 8.9mmrad.
The high chromaticity and the large beam momentum
spreadcouldpotentiallydriveparticlesintoresonanceand
result in beam losses. It could be reduced by including sex-
tupoles in the design. However, sextupoles are non-linear
objects, likely to reduce the dynamic aperture and, through
this,thefinaln... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 2 |
40d59963-151e-4463-9951-09807522ab7b | beam emittance of 8.9mmrad, optically matched to the ring.
Themomentum acceptanceof thering isevaluatedbyfirst
assigningarandomuniformrelativemomentumdeviation,
𝛿,intherangefrom-0.1to0.1tothewater-bagdistribution.
Thebeamisthentrackedintheringfor40turns,atwhich
point 90% of the muons will have decayed (although decay
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 2 |
5b72781d-2e0a-4888-8591-21d15bad0b32 | cles (51%) survivethe 40-turn tracking.
CONCLUSION
Anopticaldesignforamuonstorageringhasbeenpro-
duced forthe ESS-based LEnuSTORMfacility. It aims at
maximising both the transverse acceptance and the momen-
tumacceptance. TheringemploysacompleteFODOlattice
design and features a high linear transverse acceptance of
abou... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 2 |
92291058-02ee-43be-9aff-c04be632df21 | held responsible for them. The author thanks Dr. Shinji
MachidaandDr. Jean-BaptisteLagrange(ASTeCIntense
Beam Group, STFC) for stimulating discussions.
REFERENCES
[1]A.Alekou etal.,“TheEuropeanSpallation Sourceneutrino
super-beamconceptualdesignreport”, Eur.Phys.J.Spec.Top. ,
vol. 231, no. 21, pp. 3779–3955, Nov. 2022.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 2 |
989ca3a1-ed99-4d5a-bd68-caa95b3fdb02 | [2]D.Neuffer,“Designconsiderationsforamuonstoragering”,
(Accessed on 03/31/2024), 1980, https : / / inspirehep .
net/files//zero.alt412/zero.alt457/zero.alt4/zero.alt47c5746a3feb1972a97f/zero.alt46ab/zero.alt4 ,
[3]A. Liu, “Design and simulation of the nustorm facility”, Ph.D.
thesis, FNAL, Apr. 2015. doi:1/zero.alt4.2... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 3 |
24227b82-247b-4485-9f8b-dde6c2352dc2 | lation Framework”, JACoW, vol. HB2023, TUA2I1, 2024.
doi:1/zero.alt4.18429/JACoW-HB2/zero.alt423-TUA2I117th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP1098
266 MC1.A09: Muon Accelerators, Neutrino Factories, M... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1098.pdf | 3 |
a379ddc0-2978-401e-910e-a15c9bc9a524 | POWERING CONCEPTS FOR RESISTIVE MAGNETS IN THE MUON
COLLIDER RAPID CYCLING SYNCHROTRON∗
F. Boattini†, D. Aguglia, L. Bottura
European Organization for Nuclear Research, Geneva, Switzerland
D. Fazioli‡, M. Breschi, University of Bologna, Bologna, Italy
M. Gast§, Karlsruhe Institute of Technology, Karlsruhe, Germany
Abst... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 0 |
279184b9-4306-4a78-8ed5-2f8872a2aa7c | the cells, while limiting the insulation voltage to ground. A
key design requirement is a highly repeatable current ramp
across successive pulses, with deviations at or below 100
ppm. Given the very short acceleration times, a pulse-to-
pulse Iterative Learning Control (ILC) strategy is proposed
to progressively meet t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 0 |
285380dc-e3dd-4807-90b2-7eb135d0edeb | andmagnet specifications[ 1]result inverylargemagnetic
stored energy that must be delivered over very short inter-
vals, implying peak power levels of 100 GW and operating
voltagesof 10MV.Despitetheseextremerequirements,the
lowrepetitionrate of5 Hz keepstheduty cyclevery small,
with current flowing for at most 6 ms per... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 0 |
8cebd579-0a77-42ee-9caf-ba561ad0968b | ∗This work was supported by the European Union grant agreement
101094300 and is endorsed by the IMCC.
†fulvio.boattini@cern.ch
‡davide.fazioli@studio.unibo.it
§marco.gast15@gmail.comcells. Figure 1shows the two possible single-cell topolo-
gies: unipolar (two-quadrant, allowing positive current and
bipolarvoltage)andbi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 0 |
89c592f8-8cde-4a7e-904f-1b57cdc1bb85 | Scenario 𝐸inj𝐸extType𝑡ramp 𝐿tot
[GeV] [GeV] [ms] [m]
RCS1-C 63 350 U 0.45 4103
RCS2-C 350 1600 U 2.60 18650
HCS3-C 1600 3800 B 4.42 12940
RCS1-GF 63 314 U 0.35 3654
HCS2-GF 314 750 B 1.10 2539
HCS3-GF 750 1500 B 2.37 4366
HCS4-GF 1500 5000 B 6.37 20376
In both power-cell topologies, the underlying operating
princip... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 0 |
fb9cbc0f-dc1d-4230-836b-d2ebaffa39a4 | coilsareconnectedinseriesandinterleavewiththepower
cells,theoverallsystembehavesasasingleelectricalcircuit,
which avoids the need for independent current control of
separate sectors.
RCS1 CERN Case Study
As a representative design exercise, the switched-
resonance converter is dimensioned for the RCS1 CERN17th Internat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 0 |
745965c7-30cb-45f5-b845-0838c7d5e804 | Figure 2: Dipole windings and powercells connection.
Table 2: RCS1CERN Converter Parameterscomparison
Parameter 𝑥grad 1.02 1.20 1.40
Peak current 𝐼ext[A] 11674
Ramp time 𝑡ramp[ms] 0.45
Capacitor voltage 𝑈target
𝐶0[kV] 10
RMSmagnetcurrent 𝐼RMS[A] 501 528 560
Capacitor energy per cell [kJ] 318 36 23
Total number of... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 1 |
89ac36d7-00ae-4ba8-8313-86fbaeb15151 | 𝑥grad. Thisistheratioofthepeakinstantaneous d𝐼/d𝑡ofthe
resonantwaveformtotheaverage d𝐼/d𝑡ofthecorresponding
linear ramp. For 𝑥grad= 1, the ramp is perfectly linear;
highervaluesincreasethedeviationfromlinearity,affecting
power converter ratings and required peak RF power.
Wecompare 𝑥grad= {1.02, 1.20, 1.40} (Tab... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 1 |
95434ece-b84b-4b02-b213-6f90910068f6 | 0.0 0.2 0.4 0.6 0.8 1.0
Time [ms]020004000600080001000012000Imag [A]
0.0 0.2 0.4 0.6 0.8 1.0
Time [ms]2345678910UC,boost [kV]
0.0 0.2 0.4 0.6 0.8 1.0
Time [ms]1.5
1.0
0.5
0.00.51.01.5Imag [p.u.]
0.0 0.2 0.4 0.6 0.8 1.0
Time [ms]100000
50000
050000100000Pcell [kW]
xgrad = 1.02 xgrad = 1.20 xgrad = 1.40Figure3: Compariso... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 1 |
b32f0f19-c0b4-4b24-99a5-ad6995cdaba5 | linear due to magnetic saturation and eddy currents in the
vacuum chamber.
Theswitchinginstantsof 𝑆1and𝑆2ineachcellserveas
controlvariablesto shapetheramp. Giventheshortacceler-
ationtimes,thiscontrolisimplementedoff-lineviaIterative
Learning Control (ILC), a technique well suited to systems
repeatedlyexecutingthesam... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 1 |
488efb2b-31f4-44b1-b686-b7da9118098e | profile and the relative error of the 𝑖-th ramp with respect to
the mean are defined as:
̄𝐼(𝑡𝑗) =1
𝑁𝑁
∑
𝑖=1𝐼𝑖(𝑡𝑗), 𝜀𝑖(𝑡𝑗) =𝐼𝑖(𝑡𝑗)−̄𝐼(𝑡𝑗)
̄𝐼(𝑡𝑗)(1)
Thestandarddeviationof 𝜀𝑖acrossall 𝑁rampsiscomputed
at each time instant, and the worst-case time instant 𝑡∗is
defined as the point where this s... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 1 |
3fe1c666-f6b4-4de9-a451-867341da2799 | Theintrinsicrepeatabilityofthesystemisthencharacterised
by𝜎∗= 𝜎(𝑡∗). Assuming the relative errors follow a Gaus-
siandistribution,approximately95.4%oframpswilldeviate
from the mean by less than ±2𝜎∗at any time instant. The
design requirement is that this worst-case spread remains
within±100ppm:
2𝜎∗< 100ppm (3)
Thi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 2 |
170563c7-9a70-430c-9fc9-70d8632cc690 | and 500 cells (bottom). The green dashed lines mark the
±100ppm criterion.
ILC Controller
ILC exploits the repetitive nature of RCS operation to
correctthevoltagereferencepulsebypulse[ 5]. Thegeneral
update law is:
𝑢𝑗+1(𝑘) = 𝑄(𝑞)[𝑢𝑗(𝑘)+𝐿(𝑞)𝑒𝑗(𝑘 +1)] (4)
where𝑄(𝑞)and𝐿(𝑞)are the𝑄-filter and learning fun... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 2 |
bd0b9ddb-cf44-4547-ac26-c041310b2c1a | tracking and per-cell capacitor voltages in the last iteration;
capacitor voltages of the different powercells followdiffer-
entdischarge-rechargeprofilesaccordingtowhentheyare
switchedONandOFF.Thisisthepeculiarwaytheglobal
modulatoroperatesontherequestofagiven 𝑉ref,𝑗+1(𝑘)pro-
file.
0 20 40 60 80 100
ILC iteration0.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 2 |
28277521-2e8a-47bf-b14f-a4303f981c5a | iterations). Bottom: lastiteration—currenttracking(top)
and per-cell capacitor voltages (bottom).
CONCLUSION
A modular switched-resonance power converter for the
Muon Collider RCS magnets has been presented and di-
mensionedfortheRCS1-Cscenario. Themulti-cellseries
architecture distributes the tens-of-megavolt operatin... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP1099.pdf | 2 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.