id stringlengths 36 36 | text stringlengths 1 1k | source stringlengths 42 191 | page int64 0 1.03k |
|---|---|---|---|
52d6fab6-5650-46e4-a10d-033b2bb0e854 | ____________________________________________
* Work supported by the Fundamental Research Funds for the Central
Universities (WK2310250133 )
† lengyb@ustc.edu.cn 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPA... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 0 |
34461e50-8c52-4e1a-8fa7-b04a89814d98 | Figure 2: A typical set of response functions and spectra .
Considering that these differences are mainly manifested
in the relatively high frequency range, combined with the
design of the bunch- by-bunch feedback processor, we
choose to filter out all frequency components above 2 GHz. This makes the bunch signal... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 1 |
0765840d-fe6a-46f9-a00a-210414d9c589 | not absolute, but an approximation within a certain toler-
ance range. In general data measurements, this error can be
accepted at the level of tens of picoseconds. Nevertheless,
in the sum -and-difference calculation of analog signals for
the bunch- by-bunch feedback system, this p roblem also
causes signal distor... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 1 |
72c484f6-3ed2-4b76-9589-7da456fdd2e6 | and its centroid deviates from the geometric center of the vacuum chamber, the signal also takes different propaga-tion times to reach the probes in the vacuum chamber, af-
fecting the signal arrival time. After comprehensively eval-
uating the measurement accuracy of the entire feedback
processor and the possible tra... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 1 |
e419dd08-17f8-4e2f-87e9-99a5cec217f0 | a software processing method based on the random sam-
pling scheme, HOTCAP [5]. This software package can
quickly obtain response functions with an ultra -high equiv-
alent sampling rate under existing experimental conditions,
and simultaneously obtain the signal arrival time differ-
ences between different channels... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 1 |
7d1ee735-4bb5-470c-b582-15eea4ea27ea | introduced by the calculation process, we added high- qual-
ity RF amplifiers and filters at the end of the front- end to
achieve amplitude matching and further conditioning of
the signals.
BEAM EXPERIMENTS
HALF is still under intensive construction and does not
yet have experimental conditions. The beam experim... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 2 |
a20e1f53-0c7d-44f2-a942-fa01c157e5e8 | eration for many years, HLSII exhibits strong instabilities. Therefore, our experimental objective was mainly func-
tional verification. Its strong longitudinal instabilities and
the presence of interfer ence signals pose significant chal-
lenges to bunch -by-bunch measurements. We collected and
recorded the original... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 2 |
7f10dbb4-42ea-42f4-953e-8abc56995ded | the disturbance process on the signal amplitude, improving the utilization of the processor's dynamic range.
Figure 6: Spectrogram of the bunch X position .
Figure 6 shows the spectra under the two conditions. The
X-direction tune can be clearly observed in both spectra.
However, in the measurement results a... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 2 |
d3fa6f8c-89bf-486e-a10c-d0e8880fde8b | bunch -by-bunch feedback processor. The formal front -end
with remote -controlled closed orbit subtraction capability
is already under fabrication.
After the completion of HALF, further commissioning
and optimization will be required during its operation. Meanwhile, a simplified version of this system is planned
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 2 |
6abe4a17-fb24-4dde-b0c3-515bc8a8adb2 | REFERENCES
[1] Z. Sun and D. L. Feng, “Opportunities of Advanced Physical
Studies at the Hefei Advanced Light Facility”, Chin. Phys.
Lett., vol. 41, no. 3, p. 037303, 2024.
doi:10.1088/0256- 307X/41/3/037303
[2] Y . M. Deng, Y . Leng , Y . Zhou, F. Chen, X. Yang, and H.
Wang, “Current status and latest dev... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 3 |
a089accc-4c1a-4ec1-b0e8-3a6fc599f275 | of the bunch- by-bunch feedback system at SOLARIS ”, in
Proc. IBIC’25, Liverpool, UK, Sep. 2025, pp. 424-427.
doi:10.18429/JACoW- IBIC2025- TUPCO28
[5] X. Y . Xu et al. , “HOTCAP: a new software package for high -
speed oscilloscope -based three-dimensional bunch charge
and position measurement”, Nucl. Sci. Tec... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6682.pdf | 3 |
724b5a77-3c6e-46ce-94b4-5e6a7be5fc24 | INTEGRATING FPGA INTO EPICS FOR
ON-THE -FLY SCAN CONTROL AT THE TPS 35A BEAMLINE
C.-Y. Lin†, C.-Y. Lee, H.-S. Fung, L -Y. Chang, C-C. Yang, S.-C. Haw
National Synchrotron Radiation Research Center , Hsinchu, Taiwan
Abstract
On-the-fly scanning is an effective technique for im-
proving data -collection efficie... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 0 |
20b2edde-30fb-46fe-b38a-1b292f03a008 | perimental Physics and Industrial Control System (EPICS)
control framework. EPICS provides supervisory beamline control, including scan configuration, operation flow man-
agement, and system monitoring, while all time -critic al
synchronization and processing are executed in FPGA hardware. In a fixed master –follower... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 0 |
a5f7aa7e-0838-4bfa-ab8c-44b451513e7c | employed as the beamline -local deterministic data -acquisi-
tion backend. System functionality has been validated
through hardware -in-the-loop testing using simulated mo-
tion trajectories. This EPICS -integrated architecture pro-
vides a scalable, beamline- independent solution prepared
for future commissioning of... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 0 |
f5ff7edd-4261-41f1-820f-277ab0df1db3 | nonlinear relationship between insertion- device gap mo-
tion and monochromator energy. During long continuous
scans, network latency and software -trigge r jitter can de-
grade synchronization accuracy. Therefore, deterministic
master –follower coordination between the undulator gap
and the grating motion is requir... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 0 |
bdb536e9-4b1e-424b-91d8-635951329699 | radiation.
BEAMLINE DESIGN
The 35A Soft X -ray Absorption Spectroscopy beamline
at the Taiwan Photon Source (TPS) is a soft X -ray beamline
driven by an elliptically polarized undulator, EPU66S (pe-
riod 66 mm, magnetic length 0.8 m) [3], supporting 100–
3000 eV via continuous gap tuning. The beamline optical
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 0 |
2397499d-cab9-4104-a005-694111bda5a1 | actuated by a sine- drive mechanism and driven by a stepper
motor. The FPGA generates the grating target accordingly
so that the grating follows the undulator gap as a follower
axis. In the proposed scheme, the EPU66S gap motion is
treated as the master trajectory, and the FPGA backend per-forms real -time control... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 0 |
a71df9f1-f1d3-46f4-a945-e7a3d03019f1 | motion during continuous scans.
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP6685
MC6.T17: Instrumentation: Alignment and Survey 551Monday: Poster session MOP6685
Content from this work may be used under ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 0 |
84125498-5fe6-4221-9773-860df118b2dd | SYSTEM ARCHITECTURE
The control system is organized into three functional lay-
ers: an EPICS supervisory layer that provides scan config-
uration, sequencing, monitoring, and user interaction; an
FPGA real -time backend that executes time -critical func-
tions including deterministic data acquisition, trigger gen-
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 1 |
71e74408-f63e-4b4d-8d13-d62fba5933ee | FPGA backend for on -the-fly synchronization. A Renishaw
absolute optical encoder / readhead is adopted for absolute
position measurement [4].
The FPGA/ADC hardware is installed in the beamline
local instrumentation rack to minimize analog signal path
length and preserve deterministic timing. EPICS com-
municate... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 1 |
6f919fa8-344b-44e8-acd6-c12e89f33b3e | is interfaced to an Analog Devices EV AL‑AD7134FMCZ ADC mezzanine card [6] via an FMC connector. The
FPGA based backend executes deterministic data acquisi-
tion, hardware triggering, and real -time tracking functions
required for on- the-fly synchronization, while EPICS pro-
vides supervisory configuration and moni... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 1 |
21630d3d-6598-4061-bba8-e48071a42af8 | tic signals). This design enables single -command access to time-synchronized data and simplifies correlation between
analog signals and motion states.
Real-time Grating Tracking
In this work, grating tracking is implemented as a fixed
master –follower scheme: the EPU66S undulator gap mo-
tion is treated as the ma... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 1 |
c812e051-fd29-4acc-aa3c-f37e0903a193 | with the measured gratin g position feedback (GR position)
to form the tracking command required for grating motion.
The resulting command is routed through a selector (0/1)
and delivered to the motor controller, which actuates the
grating axis. In the normal on -the-fly operation reported in
this paper, the selec... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 1 |
7b2ec625-70fa-47fa-966a-a12251a06fc8 | ID position is translated to a grating target (“ID to Grating position translate”), combined with grating position feed-
back in “Position Calculate”, and routed to the motor con-
troller to drive grating motion.
ON-THE- FLY SCAN CONTROL FLOW
Figure 4 shows a typical on- the-fly control flow for an
undulator beaml... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 1 |
fbd0efd7-2c53-4e54-aa62-afa70f23a5cb | coder information to generate motor -control commands for
the AM‑PGM grating axis and maintains synchronized
grating tracking, with grating encoder feedback returned to
the motion -control loop. During the s can, elapsed time is
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 1 |
bea1e47f-e647-46e7-b1b6-03a25ff3ba04 | monitored; the scan is terminated when the elapsed time
exceeds the predefined (estimated) acquisition duration,
ensuring full coverage of the configured scan interval.
Figure 4: A Typical On -the-fly Control Flow for Undulator
Beamline. Continuous undulator motion triggers FPGA data acquisition and synchronized... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 2 |
73430096-4a8e-45fa-908d-77c92b40a944 | standard EPICS tools and ensuring seamless integration
into the TPS control environment. The EPICS layer is re-sponsible for scan parameter setup (e.g., energy range and
acquisition settings), operation flow management (arming, start/stop sequencing, and fault handling), and continuous status monitoring.
EPICS doe... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 2 |
8664a0c7-10f6-454a-8165-6ace497a5767 | Because TPS 35A is still under construction, the system
has been validated using hardware -in-the-loop testing.
Simulated undulator trajectories and corresponding grating
mapping profiles were used to verify deterministic trigger-
ing and stable acquisition f raming, and robustness of EP-
ICS–FPGA supervision (armin... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 2 |
2e5382d1-9dd1-435f-824a-2eaac6843b7d | full scan range during continuous scans. The system has been validated through hardware- in-the-loop testing and is
prepared for future beam co mmissioning.
ACKNOWLEDGMENT
The FPGA based “A Typical On -the-fly Control Flow for
an Undulator Beamline” concept was proposed by H. -S.
Fung, and the FPGA hardware/fir... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 2 |
12aed87b-c367-4e84-8479-5f6a8b4a3ce2 | ation of the APPLE undulator at TPS ”, J. Instrum., vol. 19, p.
03004, March 2024.
doi:10.1088/1748-0221/19/03/P03004
[4] RESOLUTE ™, https://www.renishaw.com/en/resolute -opti-
cal-absolute -encoder -series --37823
[5] ZedBoard Zynq- 7000 ARM/FPGA,
https://digilent.com/shop/zedboard-zynq-7000-arm -fpga -
soc... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6685.pdf | 2 |
ea9a0ede-6ee7-4a64-b322-5cdaefe6e3dd | OVERVIEW OF THE ACCELERATOR OPERATION AT CHINA
SPALLATION NEUTRON SOURCE SINCE ITS OFFICIAL OPENING
Y. Yuan†,1,2, J. Zeng1,2, Y. An1,2, Y. Chen1,2, M. Liu1,2, Y. Zhang1,2
1Institute of High Energy Physics Chines Academy Sciences, Beijing , China
2Spallation Neutron Source Science Center , Dongguan, China
Ab... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 0 |
383d8d10-0385-478f-be00-d2d9177e0cab | 2023 -2024 period, it achieved a maximum beam on target
time of 5,433 hours and the highest beam availability of
97.4%, which are the best among similar international fa-
cilities. This article will comprehensively introduce the op-
erational performance of the accelerator over the past seven years, including annual ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 0 |
d6a224e9-8e91-4499-ac53-831d3daf9188 | proton beam energy at the target is 1.6 GeV , and the pulse repetition rate is 25 Hz. After passing national acceptance
in 2018, the facility was officially opened to external users.
The schematic layout of the facility is shown in Fig. 1[1].
Figure 1: Schematic layout of CSNS .
At acceptance the beam -on-targ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 0 |
4a894629-32cd-40d9-83a0-ee389a13784b | increased the proton beam power delivered to the target
while gradually extending delivered beam time and im-
proving beam availability. In the 2021 –2022 operational
year, delivered beam time first exceed ed 5,000 hours and
beam availability first exceeded 95%. In 2023 –2024 the fa-
cility achieved its highest valu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 0 |
179c5787-cdba-49a2-88f1-6c6cbef46fa6 | tion, requiring a balance between ongoing operation and upgrade works; together with an unexpected failure in the target station, this caused the summer maintenance shut-
down in the 2024– 2025 operational year to be roughly one
month longer than usual, resulting in a noticeable reduction
in delivered beam hours that... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 0 |
677c3540-5f4e-4549-bb88-d54855d6c0e0 | Figure 3: Delivered Beam Time and Beam Availability by
Operational Yea r.
Accelerator Down T ime of Different Systems
In the accelerator's fault and machine‑time logging sys-
tem, on‑duty operators manually record each subsystem's
downtime, while delivered beam time is automatically cal-
culated in the backend f... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 1 |
d53227d0-6f9a-4fe4-be5d-4d9636a1b426 | RF(LRF) , ion source, Ring RF(RRF) , warm cavities ,
pulsed power supplies . The front -end systems in the figure
include the ion source and the RFQ. After commissioning
a new RF ion source in 2021, ion -source -related failures
decreased markedly.
The vacuum, magnet, beam -diagnostics, control, and ra-
diation ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 1 |
f9b41e8d-dbd0-40f8-8d0f-351251fe537e | Figure 5: Annual downtime (hours) by system (b) .
Reliability Assurance and Improvement
To improve accelerator operational reliability, we have
undertaken numerous measures, including training and
competency assessment of on‑duty operators, hardware
upgrades, software optimization, and the implementation of appro... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 1 |
6ba32ffb-74ed-4c83-aa93-35da5959d48b | amounts of cesium as a catalyst. Excess cesium tended to
deposi t on the extraction electrode, causing frequent elec-
trode arcing and extraction‑overcurrent events.
The RF ion source installed in 2021 greatly reduced
front‑end system downtime, achieving nearly fault‑free
stable operation for one operational yea... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 1 |
197092f4-162f-4224-bed6-6190db89edd9 | Figure 6: Operational performance of the RF ion source
during the 2021 –2022 operational year.
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP6687
MC6.T22: Reliability, Operability 555Monday: Poster se... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 1 |
2c940c61-4cad-40f8-aab5-531f7dd42f0b | CONCLUSION
While continuously increasing beam power, the acceler-
ator has maintained efficient and stable operation. In the
2023 –2024 operational year, the metrics for delivered
beam time and beam availability reached the best records
among comparable facilities world wide, at 5,433 hours and
97.4%, respectively... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 2 |
853ad57d-216c-4b2b-ad59-ed5ac4b7deb0 | RF-driven negative hydrogen ion source developed at
CSNS,” IEEE Open J. Instrum. Meas. , vol. 18, no. 04, p.
P04030, Apr. 2023.
doi:10.1088/1748- 0221/18/04/p04030
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-I... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6687.pdf | 2 |
97d146e5-96b6-4ebb-877c-3979bc35e985 | RECENT UPGRADE AND OPERATIONAL EXPERIENCE OF THE
VIBRATION MONITORING SYSTEM AT TPS
K.-H. Hsu†, Ch.- K. Kuan, T.- Ch. Tseng, H.- S. Wang, National Synchrotron Radiation Research
Center, Hsinchu, Taiwan
Abstract
In late 2024, the vibration monitoring system at the Tai-
wan Photon Source (TPS) was upgraded to en... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 0 |
c5b12269-d032-4bda-82ad-00be3da1c699 | to record vibration behavior during events such as earth-
quakes and typhoons. This paper presents the upgraded
system architecture, new analysis functio ns, operational
experience, and examples of post -event vibration analysis.
INTRODUCTION
For the low -emittance and high -stability Taiwan Photon
Source (TPS... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 0 |
84677588-b8f1-4de9-8d1c-0ce5994c2527 | data independently at each station, provided only inte-
grated vibration levels, and did not preserve raw data com-
pletely. These limitations made cross -station comparison
and event tracing inefficient.
In late 2024, the system was upgraded to improve stabil-
ity and usability. This paper presents the upgraded arc... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 0 |
798daff2-3777-4e07-8b9c-7881ac71af51 | Figure 1: Architecture of the upgraded vibration monitor-
ing system at TPS.
Vibration signals are acquired at the DAQ sites and pro-
cessed in real time. The real -time data are transmitted
within the vibration monitoring system by shared varia-
bles, while time -domain waveforms and overall vibration
level (OA)... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 0 |
8a987a80-a3a6-43c7-97d3-1fe7743dc93a | ground, and beamline floor . The X, Y , and Z directions cor-
respond to horizontal transverse , vertical , and longitudinal
directions, respectively.
DAQ Sites and Data P rocessing
Each DAQ site is based on either a PXI -4496 or an
MCM -100 system . At each DAQ site, f ast Fourier trans-
form (FFT) spectra a... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 0 |
e13d8392-e0f1-4c9d-9c52-ba38e936c900 | power spectral density over a specified frequency range.
Two frequency bands are used: 1– 100 Hz and 4– 100 Hz.
Signals measured by accelerometers or velocity sensors are
converted to displacement spectra in the frequency do-main, and all OA values are expres sed in nm RMS .
Program updates can be distributed from ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 1 |
e8fb14c8-4008-4a37-b40e-054b4936d7d1 | aged, which simplifies sensor replacement and future chan-nel expansion. The data processing module performs data aggregation, OA statistics, report generation , and CSV ex-
port. Abnormal channels can be flagged and excluded from
statistical reports, reducing the influence of sensor or con-nection faults on long- te... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 1 |
ea0ba873-663f-487b-95a9-777724650c50 | havior.
Figure 3: Comparison of vibration amplitudes at a selected
frequency across multiple measurement points .
Figure 4: Waterfall and colormap displays of vibration
spectra.
Time -domain waveforms, OA values (nm RMS), daily
statistics, and monthly reports are stored in the vibration system’s central dat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 1 |
a602a180-045f-4721-b094-7e686bc00152 | function, as shown in Fig. 7.
Figure 6: Mobile web interface showing real -time OA lev-
els.
Figure 7: Web interface for FFT spectra and spectrum over-
lay comparison.
The system has three main data flows: real -time data
through shared variables, time -domain waveforms and OA
data through FTP upload, and p... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 1 |
37dc86f9-d76d-4d4d-ac95-cf00caf8cf0a | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP6689
558 MC6.T22: Reliability, OperabilityMOP6689 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the wo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 1 |
216deb1b-3c44-4dca-89a2-9234a0b51125 | OPERATIONAL EXPERIENCE
During more than a year of operation, abnormal sensor
signals, DAQ faults , and station instability were encoun-
tered and resolved.
Sensor and Signal Issues
Abnormal high or low vibration values were observed at
several measurement points. The main causes were loose
or degraded connect... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 2 |
51505804-04c3-4c79-85a8-9beb5aa1c13b | bration. Several station crashes were also traced to aging
SSD storage devices. After SSD replacement, system sta-bility was improved.
Data Transmission and Software Issues
Several software- related issues were also observed dur-
ing operation. For newly added stations, the daily day/night
OA statistics and chart... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 2 |
3c1ce6dc-098f-495c-8ee8-31e262d6f406 | reducing the loading of t he data host, both the scheduled
calculation and web data update became stable.
A problem was also found when exporting raw data and
spectra across different time periods. The first 10 min seg-ment of exported CSV data was sometimes filled with zero
values. This was caused by the raw -dat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 2 |
a32a6997-81ee-496e-8dd5-cade87b0a8b6 | were retrieved separately from a web -based database of ac-
celerator operation data. Although the vibration and BPM
data were acquired by independent systems, these compar-isons help examine the relationship between external dis-
turbances, structural vibration, and beam position response.
These examples demonstra... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 2 |
17746ebd-d494-4d64-b896-c434b969d2be | measurement center. The upgrade enhances data integra-
tion, real- time monitoring, spectral analysis , and auto-
mated reporting.
Operational experience shows that most issues are re-
lated to sensors, DAQ hardware, storage devices , or soft-
ware logic, and can be resolved through systematic mainte-
nance. The upg... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 2 |
5ef9d142-f03d-4279-8a82-3a40d89ec527 | 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP6689
MC6.T22: Reliability, Operability 559Monday: Poster session MOP6689
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). An... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 2 |
707c1759-dc42-47ef-ad05-97516ae0f68c | REFERENCES
[1] D.-J. Wang, et al. , “Ground Vibration Measurement at
NSRRC Site ”, in Proc. EP AC'06, Edinburgh, UK, Jun 2006,
paper THPLS074, pp. 3454- 3456 .
[2] K. H. Hsu et al. , “Vibration Monitoring at TPS Storage
Ring ”, in Proc. MEDSI'18, Paris, France, Jun 2018, pp. 227-
230.
doi:10.18429/JACo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6689.pdf | 3 |
4630ff71-22b5-439a-aa92-c27ff55871dd | LOW-ENERGY INJECTION STUDY FOR TPS BOOSTER RING DURING
LINAC MODULATOR DEGRADATION
W. Y. Lin∗, H. J. Tsai, T. W. Hsu, T. Y. Lee, C. Y. Hung, B. Y. Huang,
National Synchrotron Radiation Research Center (NSRRC), Hsinchu, Taiwan
Abstract
In early 2025, Linac modulator 3 at the Taiwan Photon
Source(TPS)exhibitedsignsofperf... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 0 |
272336d5-b5d4-40c3-ba82-52863679857d | 0.168 mA cannot satisfy the 5-second top-up window. At
140 MeV, a mean of 0.342 mA meets the >0.3mA opera-
tional criterion, and this 140 MeV rescue mode maintained
uninterrupted userservice throughout themodulator degra-
dation period.
INTRODUCTION
The Taiwan Photon Source (TPS) is a 3 GeV third-
generationsynchrotron... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 0 |
eb6541fc-8933-4b8e-a92a-bb962aa7c489 | age was reduced, lowering the Linac output energy below
150 MeV. This paper analyses the two dominant physical
mechanismsresponsiblefortheobservedperformancedegra-
dation and reports the operational results of the 140 MeV
rescue mode.
EFFECT OF LINAC ENERGY ON
BEAM EMITTANCE
TheTPSLinacisspecifiedwithanormalisedemittan... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 0 |
8d6e158b-ca56-422d-aa0c-9de30ad088a3 | and the measured beam profiles during the BR energy ramp
(Fig.2)andthecorrespondingbeamsizesasafunctionof
ramp energy (Fig. 3) are both consistent with this scaling
behaviour.
Figure 1: Theoretical geometric emittance vs. Linac energy
from Eq. ( 1) with𝜀𝑛= 50𝜋mm⋅mrad.
Figure 2: Measured transverse beam profiles at t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 0 |
c6edcd62-f80e-42d0-9da0-dcb0dbc4350c | Figure3: Measured horizontal and vertical beam sizes as a
function of beam energy during the BR ramp.
BR POWER SUPPLY STABILITY AT
REDUCED INJECTION ENERGY
Previouswork[ 2]establishedthatBRinjectionefficiency
iscriticallysensitivetotheshot-to-shotreproducibilityofthe
booster power supply (PS) waveforms at the injection... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 1 |
e38e5fa4-f13c-4e74-a6e7-2c2dad46a26f | the100-shotPSwaveformoverlay(Fig. 4),thenormalised
tracking errors of all power supplies far exceed their alert
boundariesatthisearlierphase,becausethePSwaveformis
optimisedforthe150MeVtimingandhasnotyetentered
its stable regime. The resulting degradation in waveform
reproducibility directly reduces the dynamic apertur... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 1 |
591c0f58-7ece-4f55-98c7-ef7ed327a175 | EXPERIMENTAL RESULTS
Before interpreting the results, it is important to note that
theBRcurrentsreportedinthisstudyreflectafilling-pattern-
optimised operating point, not the hardware ceiling of the
injection system. During user operations, the Linac pulse
width is intentionally limited to 256 ns (128 bunches) to
ensur... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 1 |
fdcf10ab-c9c2-4ba0-a40d-408d94c4a04c | (Fig.5), approximately three times the value reported under
standard user conditions. The comparisons in this study are
therefore made on a consistent, operationally representative
basis across all three energies.
The injection septum voltage and timing were adjusted
for each energy point to match the corresponding inj... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 1 |
e0b0c1e6-de68-4eff-9279-68da834c899f | 0.3 mA threshold. The histogram shows a near-Gaussian
distributionpeakedat0.35–0.40mA.Thelowpulsecount
(669)confirmsthateachtop-upcycleiscompletedwithonly
asmallnumberofinjections,withstableshot-to-shotperfor-
mance. The140 MeVrescuemodesatisfies alloperational
criteria.
At150MeV(nominalreference), 𝐼BR(mean) = 0.436 m... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 1 |
f46c99d5-fb7f-4c39-890c-8779203f8a4a | zero unplanned beam downtime.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP6690
562 MC6.T22: Reliability, OperabilityMOP6690 Monday: Poster session
Content from this work may be used under the terms of the C... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 1 |
70bca653-f3f1-4113-beb4-63f44e80bf09 | Figure 5: BR beam current at 140 MeV for128, 228, and 332 bunches. Left: normalised bunch current ( ∼4 µA/bunch for
allfillingmodes),confirmingpreservedper-bunchquality. Right: totalBRcurrentexceeding1.25mAwith332bunches,
demonstrating that the reported values reflect an operationally constrained, not hardware-limited,... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 2 |
8ed32246-face-43d2-878d-29a4a9a9e4c3 | Valid pulses ( >0.1 mA) 2919 669 754
Meets>0.3mA criterion No Yes Yes
Top-up within 5 s No Yes Yes
User service viable No Yes Yes
At140MeV,theBRPSwaveformreproducibilityremains
withinacceptableboundsand the9.3%emittance increase
is still within the tolerance of the dynamic aperture — es-
tablishing 140 MeV as the lower... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 2 |
476f2a33-15ec-49f8-a987-ecf649f9d67b | andPSwaveformreproducibilityevaluationoffersabroadly
applicable methodology for facilities facing analogous in-
jector hardware constraints.
REFERENCES
[1]TPS Design Handbook , version 16, NSRRC, Taiwan, Jun.
2009.
[2]W.Y.Lin etal.,“TPSboosterpowersupplyperformanceexper-
iment and monitoring program”, in Proc. IPAC’24 ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6690.pdf | 2 |
255b6565-de2c-45ed-a96f-340fa54d3be1 | DEVELOPMENT OF A REAL-TIME WAVEFORM MONITORING SYSTEM
FOR PULSED POWER SUPPLIES AT TAIWAN PHOTON SOURCE
W. Y. Lin∗, H. J. Tsai, T. W. Hsu, T. Y. Lee, C. Y. Hung, B. Y. Huang
National Synchrotron Radiation Research Center, NSRRC, Hsinchu, Taiwan
Abstract
A real-time waveform monitoring system has been devel-
oped for th... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 0 |
fe08a24a-ceb1-4610-81e2-1101cb43f030 | deviations from a stored reference, and compares them
against physics-motivated alarm thresholds derived from
dedicated machine study experiments. The thresholds are
expressed as time-resolved curves that directly map wave-
formerrortoinjectionefficiencydegradation. Thesystem
has been deployed and is currently in opera... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 0 |
4dbdab61-e9d4-432a-b79b-581cf0538075 | motivated this work. The first occurred on June 25, 2025:
injection into the storage ring was completely lost despite
normal BTS transport, and post-incident investigation re-
vealedawaveformdeviationsosubtlethatitwasvirtually
indistinguishable by visual inspection (Fig. 1b) — a peak
amplitudedeviationofonlyafewpercent... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 0 |
3389454d-8843-4b63-9d2e-a3500c1b51ed | Thesystemmonitorseightpulsedpowersupplydevices
covering the complete injection path from the BR injection
∗lin.lucien@nsrrc.org.tw
Figure1: Operationalincidentsmotivatingthiswork. (a)In-
jectionefficiencyrecordedonJuly17,2025,showingsevere
fluctuation due to unstable SR Injection Septum 1 output.
(b) SR Injection Septu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 0 |
27ecdd01-14e3-4436-b376-5d0e54863596 | formdata viaEPICSChannel Access[2]. After eachinjec-
tiontrigger,abackgroundthreadaccumulates30consecu-
tive waveforms and computes their average for comparison
against a stored reference. The graphical interface is built
withQtandprovidesthreeviews: aStatusOverviewshow-
ingreal-timeMeanDiff,MaxDiff,andalarmstatusforal... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 0 |
6b865738-f98c-4bdb-a6fe-a85fec3807d3 | defined according to device type.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP6691
564 MC6.T22: Reliability, OperabilityMOP6691 Monday: Poster session
Content from this work may be used under the terms of t... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 0 |
6ccf08ea-eff9-4ee7-ad89-59d1a71bdb2d | Figure 2: Graphical user interface of the monitoring system.
(Top)StatusOverviewshowingreal-timeMeanDiff,Max
Diff, and peak position error for all eight devices, with all
channelsreportingnormalstatus. (Bottom)WaveformView
for SR Injection Septum 2, showing the 30-shot averaged
waveform(blue),reference(reddashed),monit... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 1 |
f91acc05-6d47-454e-9ff5-351ca462a718 | systematic offsets that would otherwise arise from timing
differences between machine study and real-time operation.
A fixed-width monitor window of ±1.5𝜇s around the refer-
encepeakcenter(totalwidth3.0 𝜇s)isapplied,ensuringthe
comparisonregionalwaysalignswiththemostsensitivepor-
tion of the waveform. Within this win... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 1 |
d12407a5-c430-42ca-9cd6-0c961da55c05 | thereforeservesasanindependenttimingmonitordedicated
todetectingsuchevents. Ashiftexceeding2.0 𝜇sissuesa
Warning; a shift exceeding 4.0𝜇s issues an Alarm.
Kickerdevices.Thewindowendpointisfixedatapre-
configuredtimeboundary;thewindowstartisdetermined
dynamicallybylocatingthefirstpointatwhichthereference
waveform reac... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 1 |
d8f28123-f7ad-4c33-9c12-6243ffbb32d2 | be dominated by the inter-pulse valley; the system therefore
appliesindependentwindowstoeachsegment—Segment1
covering6.0–6.9 𝜇sandSegment2covering7.6–8.5 𝜇s—
withMeanDiffandMaxDiffcomputedseparately,raising
an alarm if either segment exceeds its threshold.
Waveform Difference Metric
Withinthemonitorwindow, thepoint-w... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 1 |
bb89acb5-2017-4db4-bf7f-2fed2061427c | computed as described above.
MACHINE STUDY AND THRESHOLD
DERIVATION
Experimental Method and Characteristic Be-
haviours
Toestablishaquantitativemappingbetweenwaveformer-
ror and injection efficiency degradation, dedicated machine
studyexperimentswereperformedforeachdevice. Withthe
machineinstableoperation,theHVsettingw... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 1 |
174d9d6b-e300-482e-91ec-cf2b8a878d71 | efficiencycurvewithsmallshot-to-shotvariancethroughout,
confirming stable and well-characterised behaviour.
Three-Curve Threshold Derivation
Fromthecalibrationdata,threeefficiencytargetlevelsare
definedrelativetoeachdevice’sbaseline: −5%(Warning),
−10%(Caution), and−15%(Alarm). At each target level,
theHVsetpointcorres... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 1 |
2029937c-7b61-4586-83dc-4403a9c17abe | and standard deviation 𝜎(𝑡)of𝐷(𝑡)at each level are then
computedpoint-wise. Threeindependentthresholdcurves
are produced, one per level, as defined in Table 1.
Table 1: Alarm Threshold Curve Definitions
Curve Colour Definition
Warning Yellow𝜇(𝑡)+2𝜎(𝑡)at−5%level
Caution Orange𝜇(𝑡)+2𝜎(𝑡)at−10%level
Alarm Red�... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 2 |
af7b2a06-1156-4ae9-9c07-d42a9e67a039 | The thresholds are expressed astime-resolved curves
rather than singlescalar values(Fig.4), reflecting the fact
that different portions of the waveform have different sen-
sitivities to injection efficiency. For septa, the flat top is
highlyuniformandallthreethresholdsremainnearlycon-
stant across the entire monitor wi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 2 |
7b192fcb-2a9d-4625-bdac-d6c869f6a00a | zontallinesindicatetheWarning( −5%),Caution(−10%),
andAlarm(−15%)efficiencytargetlevelsusedforthreshold
derivation.
CONCLUSION
Areal-timewaveformmonitoringsystemforpulsedpower
supplieshas beendevelopedand deployedat TPS.Thesys-tem was motivated by two operational incidents in which
waveform anomalies imperceptible to v... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 2 |
e7e340ed-51af-45f3-8e7a-fc7f0b9fda0d | failure. Throughdedicatedmachinestudyexperiments,three
physics-motivated alarm threshold curves — Warning, Cau-
tion, and Alarm — were derived independently for each
device, each defined as 𝜇(𝑡)+2𝜎(𝑡) of the waveform er-
ror at the corresponding efficiency-drop level ( −5%,−10%,
−15%). For septum-type devices, the ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 2 |
5216b5e8-e463-4398-9766-490d1c8e1f32 | alarm performance and support predictive maintenance.
REFERENCES
[1]C. C. Kuoet al., “Commissioning of the Taiwan Photon
Source”,inProc.IPAC’15,Richmond,VA,USA,May2015,
pp. 1314–1316.doi:10.18429/JACoW-IPAC2015-TUXC3
[2]L. R. Dalesioet al., “The Experimental Physics and Industrial
Control System architecture: Past, pre... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6691.pdf | 2 |
842e2f1d-123c-426a-99a8-766876f16ece | NEURAL NETWORK-BASED AMPLITUDE FEEDFORWARD
CONTROL ALGORITHM FOR LLRF SYSTEMS∗
Yuchen Wang, Xiaofang Hu†, Shenghua Yang, Jian Pang,
Fangfang Wu, Kai Zhang, Shancai Zhang
National Synchrotron Radiation Laboratory, University of Science and Technology of China,
Hefei, Anhui, 230029, China
Abstract
Infree-electronlaserfac... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 0 |
526ae328-9b3b-4d58-a329-aac5792ff6b7 | from1.208%to0.398%,andtheaveragepeak-to-peakvari-
ation was reduced from 4.683%to1.353%, demonstrating
a significant compensation effect.
INTRODUCTION
For linear accelerators with relatively high average beam
currents, the beam loading effect within the accelerating
tubes is significant, leading to inconsistent energy ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 0 |
1b6293ed-8c5d-4656-8572-5d7843125375 | (LLRF) vector modulator (VM) after transmission and am-
plification, upon reaching the entrance of the accelerating
tube, also impacting beam quality. To ensure uniformity in
theacceleratingfieldsexperiencedbyeachbunch,theLLRF
control system and the microwave high-frequency system
must provide RF power with stable intr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 0 |
d4ebc479-808c-42dc-be3a-7152aa7a6094 | linear distortion, traditional fixed-model-based feedforward
methodsoftenprovecomplextoimplementunderconditions
∗Supported by National Natural Science Foundation of China (12505182)
SupportedbyNationalKeyResearchandDevelopmentProgramofChina
(2024YFA1612200)
†Corresponding author,email: huxiaofang@ustc.edu.cnwhereamplit... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 0 |
5efc55d5-8e48-46c7-a305-4a388999a8c4 | amplitudeoutputofthemicrowavehigh-frequencysystem
to the ideal amplitude input is directly learned, serving as a
pre-distortion model to implement feedforward control.
MODEL AND DATASET DESIGN
The core objective of this study is to construct a deep
neural network model capable of accurately learning the
nonlinear inver... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 0 |
55d5329d-afe3-4fa5-bdbc-34a1bab1c2be | networkinputandthemeasuredVMoutputwaveformsas
the target output. This training process yields a deep neural
networkthatlearnsthemappingfromthedistortedoutput
of the RF power system to the ideal low-level input (i.e., the
inverse model of the power chain). During the online appli-
cation phase, this deep neural network ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 0 |
fd10b860-03de-4771-a5a7-4a15a6eea155 | system.
Network Architecture: 1D U-Net Convolutional
Neural Network
Toeffectivelyprocesslong-sequencetime-domainwave-
forms and capture their local features along with global
context,weadopted a one-dimensional U-Netarchitecture.
This network adopts an encoder-decoder structure as its17th International Particle Acceler... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 0 |
0440cfe2-8332-4ce8-baf4-5e0d93490632 | main body, specifically optimized for the characteristicsof
RF pulse waveforms.
In the encoder-decoder backbone, the network employs
symmetric contracting and expanding paths. The encoder
progressivelyextractsmulti-levelfeaturesthroughaseries
ofdown-samplingblockswhilecompressingthesequence
length. Conversely,thedecode... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 1 |
5f8be74c-1bdd-4c42-b690-7d8b21414515 | Dataset Processing and Construction
The dataset utilized in this study originates from a test
platformcomprisingaphysicallyimplementedLLRFcon-
trol system and an SSA. By systematically acquiring the
system’s responses under various excitation parameters, a
large-scale collection of waveform pairs was constructed
for tr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 1 |
fad8ae99-2dcb-467d-befc-289c393640cf | attenuatedbacktoanappropriatelevelviatheattenuatorand
routedbacktotheacquisitionchanneloftheLLRFcontroller.
Finally, the Process Variables (PVs) of the corresponding
channelsarerecordedbythehostcomputer’sInput-Output
Controller(IOC)basedontheEPICSframework. Thesetup
of the data acquisition system is illustrated in Fig.... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 1 |
20422040-2dce-4356-835c-d48fb4579927 | through the actual physical system.
ThemodelistrainedusingtheAdamWoptimizer,com-
binedwithalearningrateschedulerthatdynamicallyadjusts
the learning rate upon plateaus. To prevent overfitting, in
additiontomonitoringwithanindependentvalidationset,
weemployanearlystoppingstrategy,terminatingtraining
when the validation l... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP6697.pdf | 1 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.