id stringlengths 36 36 | text stringlengths 1 1k | source stringlengths 42 191 | page int64 0 1.03k |
|---|---|---|---|
8d7a52ed-dd64-4b20-91b1-d1c281e6353e | domain. Through extensive networking initiatives involv-
ing a broad community of academic, research, and indus-
trial partners – which included four Challenge -Based Inno-
vation events [ 4], the Accelerator Industry Permanent Fo-
rum [ 5], and a dedicated industry exchange program [ 6] –
the project has expanded and... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 0 |
c89f10fc-3203-4729-9a66-28a39927ed18 | ator platforms and applications [8].
This paper provides an overview of the main achieve-
ments of the I.FAST project and their impact on accelerator
technolog y. Detailed technical methodologies and results
are documented in the project’s technological delivery re-
ports , available in [8].
FUTURE CONCEPTUAL DES... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 0 |
e5f53604-6216-4ba4-aac1-92f3fdb1b70e | * This project has received funding from the European Union’s Horizon
2020 Research and Innovation programme under Grant Agreement No.
101004730 .
† maurizio .vretenar @cern.ch
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 0 |
8f5ca9cf-980f-4451-8800-555ee183446f | repetition rates were developed and tested [ 10]. An axipa-
rabola optic was designed and tested at lab oratory scale,
maintaining laser focus over a 15 mm gas jet and i ncreas-
ing the energy gain from 0.3 to 1.1 GeV . These results were
complemented with the development of active feedback
loops to improve beam po... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
11350d97-ddb1-47c6-96d0-d01857e09b99 | record resolution [ 12].
For synchrotron light sources, improvements included
the prototype of a Hybrid Electromagnet- Permanent mag-
net with Tuneable Optics (HEPTO) , a combine d dipole -
quadrupole permanent magnet device to reduc e operating
costs and carbon footprint of synchrotron light accelera-
tors. The ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
2ac127ea-67b0-488c-a206-816811cff1ec | cluded two successful prototypes of C-band RF photocath-
ode guns [15], and a full prototype module of the “Com-
pactLight” X-band accelerating structure [16].
ADV ANCED MATERIALS
Regarding the development of advanced materials for
accelerator applications, chromium -graphite composites
were optimized for use... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
1226ee11-b846-435c-a7d4-a06661bab80a | tering process to reduce production costs, and, for beam
windows, on their full integration of these beam windows
into operational systems .
SUPERCONDUCTING MAGNETS
In the field of magnet technologies, I.FAST explored the
design and produced two demonstrators of Canted Cosine
Theta (CCT) superconducting magnets... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
bb2b8561-9cb2-4630-b8f1-a8c4300b21e0 | Superconducting ( HTS )-based 4T CCT demonstra tor, suc-
cessfully constructed through the a utomated winding of
two-tape REBCO cables, precise in -situ soldering and low -
resistance splicing, and vacuum -assisted wax impregna-
tion, resulting in a fully assembled 4 T -class dipole magnet
ready for cryogenic qualifi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
d9f4269a-241c-4174-9847-d18bd03cc4c3 | high-performance accelerator components. A high -effi-
ciency klystron prototype was developed for the High -Lu-
minosity LHC upgrade , to increase the delivered RF power
from 300 to 350 kW while maintaining the same electrical power consumption [ 24]. This performance gain was
achieved through targeted design modifi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
57226e02-71a1-4641-ae1b-d15abfa1f9c6 | fier operating at 750 MHz was also d esigned and imple-
mented, achieving a maximum gain of 19.14 dB and a
power efficiency of 82.45% for an output power of 1148 W
[25].
ADV ANCED MANUFACTURING
TECH NOLOGIES
A major objective of I.FAST was to broaden the techno-
logical portfolio available for accelerator compo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
b94b438c-6a1c-43e5-995b-8f705537396a | nating the need for complex brazing steps typical of con-ventional fabrication [2 7]. A full RFQ demonstrator was
subjected to vacuum tightness and electromagnetic
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC202... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 1 |
69d41b19-61f7-44f4-ba06-45565e8710f4 | characterization, with ongoing work focused on post -pro-
cessing to meet surface roughness requirements.
Figure 2: View of a dditively manufactured RF cavities (a)
and quadrupole (b) [ 26, 27].
Significant progress was made in superconducting thin-
film technologies for RF cavities, with systematic optimi-
zat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
7b3f6328-7c55-485e-bfe3-d8fded715c9a | tures above 17 K and RF surface resistances as low as
23 nΩ at 4.5 K, 20 mT, and 400 MHz. Specific cavity con-
figurations, including choke cavities, open and closed
6 GHz cavities, and quadrupole resonators, proved essen-
tial for the optimization and validation of thin -film super-
conducting RF performance. Based... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
41f5bfe5-bc1b-4bcc-99b2-bf0d8748a746 | osition on ALD -coated coupons was successful, prelimi-
nary tests revealed partial film delamination. In parallel,
laser annealing was performed to improve the microstruc-
ture and adhesion of thin niobium films on copper, provid-
ing localized heating of the inner cavity surface without af-
fecting th e bulk materia... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
40fed6d3-9bb4-4bf3-908f-0c1f13fc2785 | techniques were explored to classify beam pulses based on subtle differences in measured current, phase, and position,
to identify errant beam conditions in real time [ 33]. A low -
latency architecture based on field -programmable gate ar-
rays (FPGAs) was established, demonstrating beam shape
discrimination capabil... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
6cd29dcb-fd32-473f-84e7-e10516197e07 | sued the definition of strategic roadmaps for further ad-
vancement of its technology portfolio. These documents
provide the foundation for identifying the next steps in the
development process . Some have already been used in the
preparation of the EPITA proposal [35], the project that
succeeded I.FAST as the fla... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
8198b483-8f35-4742-ad15-0a5cdb2e077d | Infrastructure [43].
SUMMARY AND CONCLUSIONS
By promoting technological progress and strengthening
coordination across the accelerator community, the I.FAST
project has reinforced the foundation for the development
of next -generation accelerator infrastructures. Throughout
its duration, the project c ontributed... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
21af1983-29b3-430e-a560-e20f2294fd59 | coating technologies. These advances were complemented
by conceptual designs and technical solutions for novel ac-
celerator systems – including multi -TeV muon colliders,
laser-plasma accelerators, and high -brightness synchrotron
light sources – that enable more compact, energy -efficient,
and sustainable facilit... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
a584e4ae-df88-4f77-baaa-3f169ab72010 | 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7185
MC7.T37: Innovation Processes 1003Monday: Poster session MOP7185
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any d... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 2 |
fa3fee5b-4bc1-4100-9ee3-785d1f72e9da | the next generation of high- performance, sustainable, and
socially impactful accelerator technologies.
REFERENCES
[1] R. Aleksan and O. Napoly , “CARE - Coordinated Accelera-
tor Research in Europe: Integrating Activity implemented as
Integrated Infrastructure Initiative ”, EuCARD Editorial Ser.
Accel. Sci. Te... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
4df72a35-0ce8-428d-a2f7-fc26cda50160 | Phys. Conf. Ser., vol. 2687, pp. 092014, 2024.
doi:10.1088/1742- 6596/2687/9/092014
[5] AIPF: Accelerator Science and Technology Industry Perma-
nent Forum , https://aipf.web.cern.ch/
[6] T. Ekelöf et al , “Industrial training scheme”, 2025 .
doi:10.5281/zenodo.16685869
[7] I.FAST Innovation Fund,
https:... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
3f23ad3f-b6ed-4530-b820-1953ae1cd46c | [12] P. Forck et al., “Ripple mitigation for slow e xtraction beam
quality improvement ”, 2025.
doi:10.5281/zenodo.15100607
[13] A. Hinton, B. Shepherd et al , “Prototype adjustable PM
quadrupole and combined function magnets ”, 2025 .
doi:10.5281/zenodo.17579915
[14] Y . Papaphilippou et al, “Longitudina... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
20b7c794-a1bf-4581-9e42-8411e3f33675 | [18] F. Carra, S. Marin, F. Salvat -Pujol, J. Swieszek, M. Tomut ,
N. Vejnovic , “Manufacturing and testing of two beam -win-
dows prototypes ”, 2024 .
doi:10.5281/zenodo.11502668
[19] E. De Matteis, G. Ceruti, S. Mariotto, M. Prioli , S. Sorti ,
“Conceptual Design of combined CCT in LTS”, 2022.
doi:10.5281/z... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
83364511-0c34-4be0-b2e6-c9c4cc5b645e | cling Nuclotron HTS cable design ”, 2024 .
doi:10.5281/zenodo.10697495
[24] N. Catalan Lasheras et al, “Klystron prototype completed
and validated ”, 202 5. doi:10.5281/zenodo.15322729
[25] D. Dancila and A. Mohadeskasaei , “GaN RF a mplifier mod-
ule at kW level ”, 2023. doi:10.5281/zenodo.10410699
[26] A... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
7100e4b1-888c-4b07-a963-aec1fef948fd | “RF test on coated resonant cavity”, 2025 .
doi:10.5281/zenodo.17662354
[30] T. Proslier et al, “Deposition of SC multilayers on cavities ”,
2025. doi:10.5281/zenodo.14980085
[31] O. Malyshev et al, “1.3 GHz Nb -coated cavity irradiated by
laser in argon atmosphere and RF tested ”, 2025 .
doi:10.5281/zenodo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
41611516-5aa2-47b2-a7eb-3787c7a57307 | [37] L. A. Gizzi et al, “LASPLA s trateg y”, 2025.
doi:10.5281/zenodo.15025840
[38] A. Mochihashi et al , “Report on enabling technology for ul-
tra low emittance ring”, 2025.
doi:10.5281/zenodo.14831811
[39] A. Ballarino and L. Rossi , “HTS European strategy group
for accelerator magnets”, 2022.
doi:... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
0ea1556d-def5-4af3-bfe7-a90556041f8d | [43] D. Alesini et al, “Strategy for the development of the AMICI
TI”, 2023. doi:10.5281/zenodo.10091759 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7185
1004 MC7.T37: Innovation ProcessesMOP7185 Mond... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7185.pdf | 3 |
f7a1db93-2449-48c0-a880-c3d093502b83 | FROM LATTICE TO ENGINEERING DESIGN: A RAPID, RELIABLE
DEVELOPMENT CYCLE
B. List∗, M. Diercks, L. Hagge, M. Huening, C. Kula,
Deutsches Elektronen-Synchrotron DESY, Hamburg, Germany
Abstract
The future PETRA IV synchrotron radiation facility at
DESY, Hamburg will be a 4th generation light source in
the 2.3km long PETRA ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 0 |
6e129c80-b0e6-4df7-aafc-0d34d28c03c2 | differingtunnelcrosssectionsintroducesubstantialvariabil-
ity of girders, cells, and arcs, increasing the engineering
effort.
Wehavesetupanengineeringprocess,supportedbyaset
of automated tools, that establishes a rapid, reliable transla-
tion of the lattice to the positions of all components that act
on the beam. More ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 0 |
4a466d1f-0966-44c7-ad49-04d23d57937c | and the full engineering model. The lattice, as the physi-
cist’s model, is the result of beam optics calculations and is
the authoritative specification of how the accelerator works.
The engineering model, must also account for the concrete
physical shape of components, power cables and cooling
pipes, vacuum bellows, ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 0 |
a90b2f27-fe62-41a4-8192-4854ab9b5822 | positionedexactlyaccordingtothelatticespecification. This
correspondencemustbetraceableandverifiableatanypoint
in the project. For PETRA IV, with more than 4000 individ-
ual beamlineelements placedalong 2.3km ofstorage ring,
maintaining this traceability by hand is not feasible.
∗benno.list@desy.deAfurthercomplicationa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 0 |
eb203575-c034-464d-a6ae-e5e1d6b5715d | cal structure of the lattice and the physical variant structure
oftheengineeringmodel,anddoingsoconsistentlyacross
hundreds of assemblies, requires a systematic approach.
Finally, the lattice is notstatic. It evolvesas engineering
constraintsareidentifiedandfedbackintotheopticsdesign,
anditwillcontinuetoevolvethroughou... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 0 |
f55f394e-2d1c-4084-9f21-852e0983f133 | rectlyneedalsobetakenintoaccount. Thelatticedirectly
governs the positionsof beam-influencing elements – mag-
nets and beamposition monitors. But the vacuum system,
the mechanical support structure, and the routing of ser-
vicessuchascoolingwaterandelectricalcablingmustallfit
around these components, and therefore have... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 0 |
67d7adc0-e482-4da4-8f67-7080a0f58b2f | process for translating a new lattice version into an updated
engineering model; ensuring that changes propagate only
where they are genuinely needed, preserving the stability of
released designs elsewhere; and maintaining the integrity
of the full assembly hierarchy as both the lattice and the
engineering design evolv... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 0 |
a6466d5c-a931-4218-a13f-6b72b37e9d5e | Figure 1: Iterative process for implementing a lattice speci-
fication into CAD. After the lattice list is provided by beam
physics, it is adjusted for CAD implementation. The lat-
ticeisthenanalysedforvariantsandchangescomparedto
thepreviousversion. Avariantmanagementsystemtracks
variants of all associated technical s... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 1 |
b3e6404f-c759-4053-97fc-939e8e35e0c3 | WithintheCADenvironment(SiemensNX),eachassembly
level – girder, cell, arc – uses a dedicated positioning file,
the Base Orphan List (BOL), which contains only coordi-
nate systems and no geometry (Fig. 2). These coordinate
systems are generated by a Python script that reads directly
from the lattice data maintained as ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 1 |
4e8e5907-55ee-4128-a93e-c03fb16b9d21 | pipeline processes the lattice list and compares it element
byelement againstthepreviousversion. Theanalysisiden-
tifies which components have changed in type or position,
flagstheaffectedgirdersandcells,andproducesastructured
summaryofdifferences. Thisallowstheengineeringteam
to assess the scope of a lattice update be... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 1 |
506c285a-56ed-4d77-8b5e-452800d22b58 | The repetitive structure of the ring, as depicted in Fig. 3 –
eight arcs, each comprising nine cells, each cell with four
girders and one insertion device – means that a system-
atic analysisof variants isboth possibleand essential. The
scriptedlatticeanalysiscategoriseseverygirderaccordingto
the combination of element... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 1 |
bdf1be4d-68b0-430a-ac51-8136cebef03d | updated with each lattice iteration and forms the basis for
procurement and assembly planning.
Figure3: TheCADStructureandModularity. Eachlevelcan
be further subdivided. Modules appear in multiple variants,
andarecomposedofmodulesfromthelowerlevelwiththeir
own variants.
Localised Change Propagation
A central requiremen... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 1 |
b5106b63-7599-435e-97ac-c46588832da4 | changed elsewhere in the ring. Girder assemblies whose
BOLfilesareunmodifiedarethereforeguaranteedtoremain
valid aftera latticeupdate, andany thathavebeen released
for manufacturing retain that status. This localised revision
disciplinebecomesincreasinglyimportantastheprojectma-
tures and an growing fraction of girder ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 1 |
d8c896f7-9ab3-4183-ad1a-82e18e93343b | Figure 4: The modules of a girder assembly: beamline components, vacuum system, photon vacuum, support system, and
media supply.
Assembly Hierarchy Versioning
TheBOLfilesarenottheonlypartofthemodelthatmay
beaffectedbyalatticechange. Thevacuumsystem,mechan-
icalsupportstructure,andservicerouting–coolingwater,
electrical... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 2 |
4da437c6-a478-428f-90fb-cb9e72bcff55 | upward: thebeamlinecomponentassemblythatreferences
that BOL receives a new revision, which in turn triggers
revision of the vacuum assembly and the girder assembly
above it. Each revision in the chain signals that the cor-
responding assembly must be reviewed and, if necessary,
modified. The revision history provides a... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 2 |
e7577277-d10e-45fc-9a5e-10e91a6123ea | CADmodelhasadirect,documentedcorrespondencetoa
lattice element, with its position uniquely derived from the
lattice data. No manual placement is required, eliminating a
significantsourceoferrorandprovidingaverifiableaudit
trailfrombeamopticsspecificationtoengineeringgeometry.
Speed:thecombinationofautomatedlatticeanaly... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 2 |
60f2b7a0-6e17-4de2-a947-fd33738405bb | maintained automatically and updated with each lattice iter-
ation. The resulting girder model and its structure is shown
in Fig. 4.
Stabilityofreleaseddesigns:thelocalisedchangepropa-
gation mechanism ensures that girder assemblies unaffected
byalatticeupdateremainvalidandretaintheirreleasestatus.
Asmoregirderdesignsa... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 2 |
f0149770-3edd-4999-a90e-bc01b39d6bd1 | model has been presented, and applied to the PETRA IV
storage ring at DESY. The approach addresses the four chal-
lengesidentifiedintheintroduction: directautomatedderiva-
tion of component positions from the lattice, rapid propaga-
tion of lattice updates into the engineering model, localised
change management that pr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 2 |
870429a1-7bc2-488b-b5c1-aec1b30e8f95 | andprocessesestablishedforPETRAIVaregenericinna-
tureandareexpectedtobeapplicabletofutureaccelerator
projects of comparable scale and complexity.
REFERENCES
[1]B. Listet al., “CAD integration for the PETRA IV project”,
presented at IPAC’26, Deauville, France, May 2026, paper
MOP7186, this conference,17th International ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7187.pdf | 2 |
346e3be3-a542-459e-9f71-7f3dab889376 | MOVING TONS OF FRAGILE CRYSTALS WITH CARE:
THE CMS ECAL ENFOURNEUR2 PROJECT
R. Bianco† On behalf of the CMS ECAL Group, Istituto Nazionale di Fisica Nucleare, Rome, Italy
Abstract
The CMS experiment at the CERN Large Hadron Col-
lider features a high -precision electromagnetic calorimeter
(ECAL) made of 61,2... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 0 |
844685a6-5975-4dc9-ba2f-fa74bdecfedf | has been developed, replacing hydraulic actuators with
electrical motors and controls. The new system manages
three movements: rotation to the insertion angle, forward-
backward motion, and controlled SM push- pull. Safety of
SMs handling is ensured by numerous sensors and an ad-
vanced control system. A touchpad i... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 0 |
657179ca-5e90-4e75-8dae-e6f558cef179 | ter an intensive testing campaign carried out at CERN.
INTRODUCTION
ECAL is the high- precision electromagnetic calorimeter
in CMS experiment at CERN [ 1, 2]. It s barrel is made of
61,200 lead tungstate crystals, distributed in 36 supermod-
ules (SM), each weighing about 3 tons. During Long Shut-
down 3 (LS3), ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 0 |
3d2ab7e1-82ae-4848-ac67-2d460303ceec | ing structures, and be compatible with the confined geom-
etry of the CMS cavern. Safety is a primary concern, both
for the protection of the ECAL detector elements and for
personnel. The system must provide continuous monitor-
ing of applied forces, structural deformations and posi-
tions, and include multiple inte... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 0 |
6a38e7d5-e592-4359-9f17-0675b5b6bea2 | sion, reducing the activity time and ensuring the highest
possible level of safety - for people and objects - guaran-
teed by the certification of the machine in accordance with the latest regulations in force, issued by the manufactur er.
E2 design and construction were entirely coordinated by
INFN Rom a, as a co... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 0 |
bcbe5ac1-4c56-491d-acd8-d4b79b22a153 | chine [3]: Bati, Cradle, Cage and Yellow Beam (Fig. 2).
The Bati is the metal carpentry structure that supports
the other components during the operations, offers walk-
ways and harnesses connections to allow operators to
safely work on the machine , also at height, allows first
level of adjustment system to en... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 0 |
b74baba2-5228-4869-b070-406700cba417 | Figure 1: one side along the beam axis of ECAL barrel
SMs installed in 20 07.
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7188
1008 MC7.T38: Mechanical designMOP7188 Monday: Poster session
Content from... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 0 |
93ee0c07-519f-472e-be93-8aa4ac0e5b1e | measured positioning repeatability of less than one milli-
metre, despite the overall displacement of a mass of nearly
15 tonnes. To reach all the 18 ECAL barrel sectors , the cy-
lindrical structure called Cage is mounted on 4 radial
wheels on the Cradle. It is equipped with a rack installed in
the central ring ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 1 |
a9d22257-6f0e-4153-a24f-f9b47515ede4 | by a dedicated touchpad interface, developed to provide in-
tuitive and precise control of the system (Fig. 4). The op-
erator can select predefined motion sequences for standard
operations or perform fine manual adjustments when re-
quired.
Moreover, Enfourneur 2 is equipped with an advanced
control system integ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 1 |
3663dbac-2da6-453a-be27-f5e212276382 | safe operation throughout all handling phases [4]. This ap-
proach significantly reduces the risk of operator error and
enhances overall operational safety.
COMMISSIONING AND TESTING
Enfourneur 2 has been delivered by the manufacturer
partially assembled at CERN (Fig . 5), where the assembly
has been performe... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 1 |
8ceb69bb-26ca-491f-b543-623811fd923f | it has been possible to train the team of technicians who
will operate the machine in real conditions.
Cradle
BatiCageYellow Beam
Figure 2: Exploded view of main parts of E2.
Figure 3: Cradle translation (left), Cage rotation ( centre ),
and SM translation (right) systems.
Figure 5: Enfourneur 2 arrived at CE... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 1 |
3dc71198-edb6-4522-ac82-c93ff2f29b27 | A dedicated test setup has been used, to closely repro-
duce the interfaces between the machine and the actual
CMS environment . The test setup (Fig. 6) includes two
sliding rails for the Cradle. These are located at the side of
the Bati, and they are repres entative of the Vacuum Tank
rails inside the CMS det... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 2 |
c4dc8d30-dc90-4545-ae58-b797fe4f6068 | capacity, due to the maximum momentum defined by the
eccentric position of the SM weight .
For the test execution , an ECAL s upermodule mock -up
has been used. It simulates the same geometry , weight dis-
tribution , and mechanical interfaces of a real SM.
The commissioning process followed an iterative ap-
p... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 2 |
fa2b217c-2662-4a2b-aa23-b8e7ded3c882 | schedule and components.
After the extensive testing campaign, Enfourneur 2 pro-
vides improved precision, high repeatability, enhanced safety and increased operational flexibility. The system is
fully integrated into the CMS ECAL upgrade workflow
and is expected to play a key role in the successful comple-
tion ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 2 |
36a3cde4-7c2a-429b-9263-e9bc5bc06aba | work together and in parallel with Enfourneur 1, with each
machine focused on one side of the CMS experiment.
Enfourneur2 has arrived at CERN after an intense design
and construction time [ 5] ready to be tested and commis-
sioned, after an acceptance test carried out and passed at
the manufacturer's facility. The... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 2 |
d2948794-3a0d-44d7-9224-c9903c7ab174 | and confirming the readiness of Enfourneur 2 for LS3 op-
erations. Thanks to the various improvements implemented
during the tests , this machine also reduces the time re-
quired to perform the same operations compared to the pre-
vious model, while requiring less personnel due to the level
of automation achieved. ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 2 |
df3a5dc2-4527-442d-b2ee-d7f00d6dc559 | doi:10.1088/1748- 0221/19/05/P05064
[3] Zhihong Sun et al . “The CMS electromagnetic calorimeter-
Supermodule insertion tooling”, Nucl. Instrum. Methods
Phys. Res. A , vol. 572, Issue 1 , pp 141-144, 2007 .
doi:10.1016/j.nima.2006.10.170
[4] V . Pettinacci, “The CMS ECAL Enfourneur: A Gigantic Ma-chine with a Sof... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 2 |
8ab1c841-3a15-40ea-83fc-5e0fd6e3bfd3 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7188
1010 MC7.T38: Mechanical designMOP7188 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, pu... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7188.pdf | 2 |
97b82534-ef0b-4dc7-91d3-0038cad3c656 | DEVELOPMENT OF A HARMONISED FRAMEWORK FOR
ELECTRICAL SAFETY COMPLIANCE AT CERN
R. Simpson, L. Scibile, CERN, Geneva, Switzerland
Abstract
Electrical safety has been identified as one of the main
risksinlargeresearchinfrastructures. AtCERN,newreg-
ulations for electrical safety are being reviewed to align
with current b... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 0 |
8c36f05d-a539-4c00-8e9c-12ababfe26b2 | that was implemented to provide a practical guide for ap-
plying electrical compliance in the context of a research
infrastructure. Itwasdevelopedbasedonananalysisofbest
practices,validatedthroughapplicationtocurrentCERNin-
stallations, and verified by industry experts. The framework
optimisesorganisationalefficiencyby... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 0 |
40fba4c9-f9ab-41ec-a126-3ac1fd789690 | the late 19th century, the inherent risks associated with
electrical power have necessitated the development of rigor-
ous safety frameworks, evolving into a sophisticated legal
landscape. InEurope,thisischaracterisedbyEUDirectives
forElectricalEquipment[ 2],andnationallawsforElectrical
Installations [ 3,4].
This paper... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 0 |
b3e95ecf-6699-4266-823f-d0fa5d1903be | inherentlysafesystems. Thismethodologywasdeveloped
forthreekeyobjectives: toreducetheriskofaccidents,to
savetimeandcostbysimplifyingdesignprocesses,andto
standardise the application of the legal requirements.
Theframeworkdistinguishesbetweentwoprimarysubcat-egories: Electrical Equipment Compliance and Electrical
Instal... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 0 |
a3fd9c54-0f39-4b80-83d4-c8282db65289 | fiedintotwodomains: ElectricalEquipmentandElectrical
Installations.
1.Electrical Equipment is defined as an item used for
thegeneration,conversion,transmission,distribution,
or utilization of electrical energy , [5]. Equipment
complianceismodelledthroughEuropeanDirectives
and Standards.
2.Electrical Installations are d... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 0 |
f00f24b2-71e3-4396-b523-5af7c7caa2fb | Todefine the roles of installations and equipment within
a complex research environment, a simple top-down model
wasdeveloped. Thismodelisbasedonhowsystemsareelec-
tricallyconnected,startingwiththeconcept ofa‘Facility’,
a widespread area housing multiple electrical installations.
AsshowninFig. 1,eachfacilityiscomposedo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 0 |
3797b720-9d42-4ffc-942e-437c98ae4e1a | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7191
MC7.T21: Infrastructures 1011Monday: Poster session MOP7191
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 0 |
59fb2376-ac66-4004-b035-5b4d467dfe72 | Figure 1: A model for a typical research infrastructure, bro-
ken down into facilities that are made up of installations,
comprising of multiple pieces of equipment.
process applies to in-house or in-kind equipment.
The core principle of the equipment compliance frame-
work is the ‘3D’process. Equipmentmustbe:
1.Develo... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 1 |
c43d3d1f-ba78-408f-a566-bd7eadc7f974 | tailored to research infrastructures such as CERN.
The project identified the following four regulations and
directives as the most relevant for electrical equipment: the
Low Voltage Directive (LVD), which mandates comprehen-
siveproductsafety[ 6];theElectromagneticCompatibility
Directive (EMC), ensuring devices operat... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 1 |
c9297d7b-838d-4ca4-8a05-f8f0909b9537 | permanent,predefinedlocation[ 8,10]. Iftheequipmentis
classified as a fixed installation, it is exempt from the full
conformityassessmentprocessfortheEMCDirectiveand
the RoHS Directive.
Table1showsasimplifiedexplanationoftheapplicability
criteria, although it should be noted that exceptions may
apply. The framework can... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 1 |
576e9618-1d80-40b4-ac26-0829c577b580 | Directive Applicability Criteria
LVD Voltage between 50–1000 V ac or 75–1500 V
dc.
GPSR VoltageoutsidetheLVDlimits,either<50V
ac, <75 V dc, >1000 V ac, or >1500 V dc).
EMC Not applicable for fixed installations.
RoHS Not applicable for large-scale fixed installa-
tions.
Documentation in the Equipment Technical File
The... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 1 |
6ab9a1c4-cc0e-43e2-9fee-a7b17901def6 | a CE marking DoC [ 2]. However, equipment exclusively
underthescopeoftheGPSRcannotbeCEmarked[ 9],sothe
frameworkproposesaspecificDoCtoformallydocument
compliance.
ELECTRICAL INSTALLATION
COMPLIANCE
The core priniciple of the installationcompliance frame-
work is the ‘3DI’process. Installationsmustbe:
1.Developed in acc... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 1 |
ceb055d3-4f68-4ecf-a5d5-a99688ca5fca | ent countries. At CERN, the national standards of France
are used, such as NF C15-100 [ 12] and NF C13-200 [ 13].17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7191
1012 MC7.T21: InfrastructuresMOP7191 Monday... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 1 |
e3a0aa87-f816-4abe-afc7-b3db00f7fd84 | Figure2: Theprocessforequipmentcompliance,andatwhichstageeachpartofthetechnicalfileiscreated. Theapplicable
directives for each document are given in brackets: ‘G=GPSR’,‘L=LVD’,‘E=EMC’,‘R=RoHS’.
Documentation in the Installation Technical File
For electrical installations, the technical file remains
largely consistent ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 2 |
9370ab12-9391-4913-89a1-d5f7dda8828c | thattheinstallationiscompliant. TheAttestationisadoc-
ument specific to the organisation, which is required for
the transition from development to operation. It attests
that the installation has been realised in accordance with
standards, that it has the required documentation, that it has
been inspected, and if applic... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 2 |
dae0c6dc-a77b-4509-97fa-521487b34d8d | tives and regulations.
•Recommended standards.
•Checklists for documentation.
•Documentation templates.
•Case studies and examples.
Toensuretheaccuracyofthelegalinterpretationspresented
in the guidelines, they were validated by two different third-
party consulting firms, who specialise in compliance.
CONCLUSION
To add... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 2 |
3e01a2c1-302c-4564-a166-cea7ed6749df | guidelines were verified by industry experts, creating an
accessible,actionablepathwaytocompliance,withconcrete
examples.
Future work includes tailored training sessions addressed
to technical groups. It is also planned to publish a gener-
alisedframeworkforotherresearchinfrastructuresandan
extension to cover additiona... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 2 |
e12d5bfa-07aa-4e73-bf4a-1efce3ed48a7 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7191
MC7.T21: Infrastructures 1013Monday: Poster session MOP7191
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, publ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 2 |
af18b304-d90b-458b-ae10-60e49073eed6 | [3]Légifrance,“Codedutravail(versionconsolidée)”,Online,
France,
[4]“Arrêté du 26 décembre 2011 relatif aux vérifications ou
processus de vérification des installations électriques ainsi
qu’au contenu des rapports correspondants”, France, 2011,
[5]International Electrotechnical Commission, “International
electrotechnic... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 3 |
b4d46a3c-0951-4507-bdc6-6454e86518b8 | (emc), 2014.
[8]Directive2011/65/euontherestrictionoftheuseofcertain
hazardous substances in electrical and electronic equipment
(rohs), 2011.
[9]Regulation(eu)2023/988ongeneralproductsafety(gpsr) ,
2023.[10]Guide for the EMCD (Directive 2014/30/EU) , Directorate-
GeneralforInternalMarket,Industry,Entrepreneurshipand
S... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 3 |
80389f91-58a8-4d3e-b88f-6bca6de7c389 | [14]République Française, “Arrêté du 20 avril 2012 relatif au
dossiertechniquedesinstallationsélectriques”,JORFn°0105
du 4 mai 2012, Apr. 2012, https://www.legifrance.
gouv.fr/loda/id/JORFTEXT/zero.alt4/zero.alt4/zero.alt4/zero.alt425795/zero.alt477/ (visited on
05/22/2024),
[15]Guidelines to Compliance at CERN: Electr... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7191.pdf | 3 |
9a946e18-83a8-40de-b4c3-15e0c920104b | DESIGN OF AN RF -GRIDDED GUN
FOR A HIGH-EFFICIENCY TRISTRON
A. S. Thakur†, W. L. Millar, I. Syratchev , European Organization for Nuclear Research, Geneva,
Switzerland
G. Burt, Z. Un Nisa, Lancaster University, Lancaster, United Kingdom
Abstract
The RF gridded gun is a key component of the RF power
sources... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 0 |
149be9f8-8dd8-4189-9e66-8b8fe3b8de57 | For continuous wave tristron operation at an RF power
level of 0.5 MW in the UHF band, particular attention must
be paid to several critical design aspects, including beam
grid interception, beam optics design, thermomechanical effects, and stress. These factors strongly influence the op-
erational stability, de... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 0 |
b408b304-978d-4865-b88a-ceac8bfb78c8 | Therefore , the multibeam (MB) tristron has emerged re-
cently as a promising RF power source for FCC- ee [3]. In
this work, the conceptual design and numerical investiga-tion of a gridded gun for an MB tristron are presented, with emphasis on beam formation , beam -grid interception, and
current modulation.
GRIDDE... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 0 |
b1eb1c69-4a48-4531-99ae-aab73c5da1ed | pology (Fig. 1 , right ) was selected based on a comparative
analysis with other grid configurations, where the HEX grid appeared to be superior in terms of heat evacuation.
Contrary to the spherical cathodes with electrostatic focusing (beam area compression) normally used in con-
ventional IOTs [1, 5], we selected... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 0 |
770ccbe2-c9a2-4d15-8e4e-0f9090261de3 | power intercepted on grid (circles) versus bias voltage .
To avoid current emission from the cathode when the in-
put RF signal is inhibited, the grid is operated at DC bias
with respect to the cathode voltage [5]. The optimum value
of this bias voltage depends on the ratio between the cath-ode-grid gap and the g... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 0 |
83a0af5f-e006-4987-b712-0e9147b4588b | (Fig. 2). Here a -165 V DC voltage should be applied to
block the current emission . It shall be noted that , following
the standard approach applied in CST user community, the
cathode in simulations is assigned to a ground potential and
anode is set to a positive potential.
In an
approximation of very short ... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 0 |
1f04525b-8b1d-4ce0-a2c2-55268c85d574 | beam power can be calculated using interpolated data from
TRK simulations shown in Fig. 2:
𝑉𝑉grid =𝑉𝑉bias + |𝑉𝑉rf|𝑠𝑠𝑠𝑠𝑠𝑠(𝜔𝜔𝜔𝜔) (1)
𝐼𝐼,𝑃𝑃�𝑉𝑉grid�=𝐼𝐼,𝑃𝑃�𝑉𝑉bias + 𝑉𝑉rf𝑠𝑠𝑠𝑠𝑠𝑠(𝜔𝜔𝜔𝜔)�. (2)
Here, 𝑉𝑉grid is an instantaneous grid potential , as a
super position of an RF volt... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 1 |
c8eb7b14-87af-417d-a2f5-180818cdf150 | envelope calculated using the TRK + analytical (TRK_A)
approach are shown in Fig. 3. To reach the desired value of
the average transmitted current, an RF voltage of amplitude
305 V is applied at the grid.
Figure 3: Bunch current profiles (left) and transient
intercepted beam power (right) envelopes cal... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 1 |
41526ddf-0381-4634-a8d5-5536a645ee5f | the presence of the space charge and an external magnetic
field. To obtain a more accurate analysis of the bunch
generation from the gun, we used the CST 3D PIC solver .
Unfortunately, we cannot apply the space- charge limited
current emission in the CST PIC simulations, which was
applied in the CST TRK 3D si... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 1 |
9b0d2878-f41c-4c98-9b35-02dac46d5ba0 | achieving a converged value for the current intercepted on the grid in TRK simulations requires an order of magnitude higher number of emission sites; however, the simulation
time required to generate the dataset shown in Fig. 2 is only
3 hour s.
Figure 4: Discrete current emission profile generated
through a Pyt... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 1 |
453a1e11-1d4d-4760-8aa1-3a709511f07b | particles were emitted near the end of the positive RF cycle
but were unable to pass through the grid before the grid voltage reversed polarity . However, t he large st difference
(35 %) was observed when measuring the average beam
power intercepted on the g rid (Fig. 5).
Figure 5: Bunch current profiles (left... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 1 |
4c625013-2be7-4bd8-a348-73d1e6d87d13 | we firstly employed the concept of the mini cathode
(Fig. 6). This is a very compact arrangement with 7 kV
high voltage applied to the short (10 mm) DC gap provides
the same blocking biased voltage as in the big cathode,
whilst beam currents and intercepted beam power are
simply scaled as a ratio of the emissi... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 1 |
4b838b36-c9b0-47da-918d-1f3ed769131d | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-MOP7192
1016 MC7.T08: RF Power SourcesMOP7192 Monday: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), title of the work, pub... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 1 |
edad9ddd-b7a7-4dd3-9706-766f8a029fc5 | the cathode and emitted current density on the surface
through [6]
𝐽𝐽=𝐴𝐴𝐸𝐸2𝑒𝑒𝑒𝑒𝑒𝑒�−𝐵𝐵
𝐸𝐸�. (3)
Figure 7: Current density v ersus electric field on the
cathode surface. TRK raw data (circles) for 0 V (orange),
75 V (green) and 1 50 V (blue) bias voltages , space- charge
limited law fit (sq... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 2 |
7925648f-838f-44f6-96de-e54a9d9e2fc7 | tire cathode surface for different values of the grid bias
voltage . It allowed to map the current density to the cath-
ode surface electric field including the electric field due to
space- charge. This data is shown as circles in Fig. 7. The
noise in the simulated data points is a numerical artefact .
As expe... | D:\Daily_ihep\Conferences\IPAC2026\MOP\MOP7192.pdf | 2 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.