id
stringlengths
36
36
text
stringlengths
1
1k
source
stringlengths
42
191
page
int64
0
1.03k
6a71fcf9-ca88-47c0-a151-8a00f79129ca
lished standards in vacuum systems, alignment methodol- ogy, and mechanical interfaces, while incorporating tar- geted improvements derived from several years of opera- tional experience and progressive beam power ramp -up. These enhancements include water system improvement based on operation experiences, improved t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
1
de09db8a-bccb-473a-9e92-c5499316ebf4
experience, including procurement, fabrication oversight, quality assurance, installation, alignment, RF, power sup- ply, and commissioning. Vendor qualification, in -process inspection, and acceptance testing are critical elements to ensure that components meet stringent technic al specifica- tions and interface s...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
ce5d6a87-8ed7-426a-a8c9-a27636628a08
down period. Waste management planning is also a nontrivial aspect of the project, given the significant volume of removed beamline components and associated materials. A well -de- fined waste handling and disposal strategy —including staging, re-use, and transport —can substantially improve workflow efficiency a...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
74388e97-774b-4846-a38d-ae291d1abdc3
ity. This introduces additional complexity due to work- space congestion and potential interference between work crews. Furthermore, these activities must be coordinated with other maintenance tasks inside tunnel , requiring de- tailed scheduling, spatial conflict analysis, and strict work control procedures to ensur...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
6fb81a31-da50-4d43-a3d1-6ec60a863d1c
ment and vacuum integrity within a tightly constrained shutdown period, that can’t be extended . This effort intro- duces multiple layers of technical risk, including fabrica- tion delays, interface incompatibilities, and machining or assembly deviations that could impact fit -up, alignment tolerances, vacuum level...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
4339920c-96a3-4e6f-9174-2a706fc0b766
impact on the project schedule. In addition, detailed instal-lation sequencing, contingency planning, and resource al- location are used to m aintain schedule integr ity. Despite these measures, residual operational risks re- main, particularly during commissioning, where uncertain- ties in beam conditions and system ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
f64539ed-7cf0-4460-a954-31497e4e5336
Following implementation of these upgrades, a substan- tial reduction in uncontrolled beam losses is expected, leading to a corresponding decrease in operational risk and improved machine reliability. The enhanced beamline ac- ceptance, optimized optics for mu lti-charge -state transport, and upgraded high -heat-loa...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
43c74114-38e0-4813-adcb-26923867c5b9
Beam dynamics studies and engineering assessments project a significant reduction in uncontrolled beam losses relative to current operating conditions. This reduction not only improves operational efficiency but also provides ad- ditional performance margin for high -power operation and future upgrades. SUMMARY ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
cdf2eaaf-d6ad-4f87-af3d-243466dc35f9
trol, replacement of beamline sections with larger -aperture quad rupoles to enhance transverse acceptance and multi - charge- state matching, deployment of a high- heat-load bi- metallic intermediate chamber in FS1 to increase loss tol-erance at its location , and addition of quadrupoles in FS2 to improve matching i...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
2771a3f6-543a-41e3-b08b-7eae1de6abd1
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4301 MC4.A08: Hadron accelerators: Linear Accelerators 3573THP: Poster session THP4301 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
2
63282062-47ac-4c50-a64c-834b0cc25c4e
REFERENCES [1] J. Wei et al. , “FRIB operations: first three years”, in Proc. HIAT'25, East Lansing, MI, USA, Jun. 2025, pp. 1-7. doi:10.18429/JACoW- HIAT2025- MOX01 [2] J. Wei et al. , “Technological developments and accelerator improvements for the FRIB beam power ramp -up”, J. In- strum. , vol. 19, no. 05, p....
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
3
dead7bf3-9ebf-452f-a43b-5578e1d7c3ce
doi:10.1103/physrevaccelbeams.23.042002 [5] A. Gonzalec et al., “Suppression of high -intensity stripped heavy-ion beam losses ”, Nucl. Instrum. Methods Phys. Res ., submitted . [6] X. Rao, N. Bultman , S. Miller, P. Ostroumov, and A. Plastun, “Design and fabrication of FRIB normal conducting cavi- ties”, in Proc...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4301.pdf
3
93182727-10e0-414d-9fe6-e5389a04d78b
TECHNOLOGY MATURATION FOR THE LANSCE ACCELERATOR MODERNIZATION PROJECT (LAMP)* J. Lewellen†, M. Holloway, A. Alexander, K. Bishofberger, G. Dale, D. Dimitrov, R. Garnett, H. Gaus, J. Medina, S. Swickley, R. Thornton, Los Alamos National Laboratory, Los Alamos, United States Abstract The LANSCE accelerator is ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
7ee9920a-c2cc-4223-a7cc-7b7f7c89895d
compasses replacement of the upstream portions of the LANSCE accelerator, from the H+ and H - ion sources through the end of the drift -tube linac. In order to meet beam delivery requirements with modern equivalent sys- tems, elements of the LAMP design req uire technical mat- uration. This paper describes the Cri...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
69e2f6b3-d7df-4200-a1ed-dee1d74fc4b8
quency Quadrupole (RFQ) , and replacing the DTL [2]. LAMP’s design approach maintains LANSCE's unique dual-beam capability while reducing facility footprint and operational complexity. However, this configuration incor- porates design elements requiring technology maturation. Four Critical Technology Elemen...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
a5587420-7be9-44c3-8dac-5cc9a5c30cf3
This paper describes the technical challenges of each CTE, the maturation approach, and progress toward achieving TRL -7 for all critical technologies. CRITICAL TECHNOLOGY ELEMENTS The LAMP project has identified three CTEs requiring technology maturation to TRL -7 prior to CD -2 approval. Each addresses unique ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
a42bb05c-9694-41a2-929b-c7c690711a82
Neutron Research (WNR) facility [3] . The 65-keV LEBT chopper faces the challenge of oper- ating in a space- charge dominated environment where beam dynamics are highly sensitive to electric field pertur-bations. The 2.1-MeV MEBT chopper must maintain “clean ” chopping performance to minimize activation of downstre...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
5292c661-be3d-4010-aadb-9b543e7de530
ferences in beam current requirements: high peak bunch charge but low average current for the H - beams to WNR; modest beam current for the concurrently accelerated H+ beams to the Isotope Production Facility (IPF); and mod-erate beam current to the remaining LASNCE user facili-ties [4,5] . Additionally, RF power c...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
78aeb28f-50cd-4c98-b4a3-69893d5df100
cies, but in opposite directions (steering correctors) or planes (quadrupoles) . The LAMP MEBT includes re- buncher cavities to longitudinally match beams into the DTL; these cavities must provide appropriate RF phasing and amplitude for both species despite their different bunch charges exiting the RFQ. _______...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
ad681c25-8e1f-4aab-ae6a-6f189a419161
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4303 MC4.A08: Hadron accelerators: Linear Accelerators 3575THP: Poster session THP4303 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
0
aafb532f-fa47-4368-80e6-cf7859ce9632
An additional complexity arises from the integration of the 2.1-MeV choppers and diagnostics within the MEBT. The choppers must not adversely affect beam quality for either species, while diagnostic instrumentation must char- acterize both beams independently to verify proper transport and matching conditions. Demo...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
e15d73fc-407e-426a-b0d3-77b2b0dc7b67
cility: 55 mA for the WNR facility, and 15 mA for the re- maining LANSCE facilities that require H- beam . This sug- gests using either multiple sources, which increases the technical complexity of the LEBT, or a single source that can modulate the beam current on a macropulse- to-macro- pulse basis . The current L...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
b3aa5dd5-ddc4-49b9-bcb9-a9c0048c3497
technology that has not yet been demonstrated. Therefore, the pulsed focusing electrodes of a single H- source poses a new technical risk to the project and therefore is consid- ered a CTE . MATURATION APPROACH The LAMP technology maturation strategy employs a phased approach utilizing two dedicated test facilit...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
cb8dfd23-751e-4fae-8c67-1edddce12cd1
subsystem demonstration at TRL -6 using the RFQ Test Stand (RFQTS), and (3) full -scale sy stem validation at TRL -7 via LAT . This staged approach allows early identi- fication and mitigation of technical issues while providing multiple decision points for project management. CTE A (choppers) follows a streamlined...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
c190dd62-f8c6-450b-b732-1f7e0fc38a53
lize LAT for final TRL -7 demonstration. RFQ Test Stand (RFQTS) The RFQTS provides an intermediate validation envi- ronment between component testing and full -scale demon- stration. This facility will eventually incorporate 35-keV H⁺ and H⁻ ion source s, a short (~1 meter) 4-rod RFQ oper- ating at 201.25 MHz, ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
79ec6df8-dc80-4ac8-b47f-df3c0a17cfcf
tics. Beam diagnostics at RFQTS include time -resolved current measurements, emittance scanners, energy analyz-ers, and beam loss monitors. The short RFQ section accel- erates beams to approximately 750 keV , sufficient to vali- date key design features while not requiring shielding. LAMP in ADEF Tunnel (LAT) LAT...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
e1329361-096c-4a16-933f-2c9c14700d1f
pulse formatting requirements, enabling validation of ther- mal management, RF power systems, and long -term oper- ational reliability , and providing early confidence in beam quality and other key metrics . Critical validation objectives at LAT include: demon- stration of >95% transmission for both species through t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
d0583483-3147-4e12-b2d5-9caccd055725
stream accelerator sections. Successful operation of LAT with performance meeting LANSCE requirements consti- tutes achievement of TRL -7 for all CTEs , as well as early operational experience at nominal LANSCE operating conditions . MATURATION PATHWAYS • CTE A pathway: Component testing at SNS BTF (TRL -5/6) → I...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
1
802c6cf1-1cac-4be6-9c11-539e28e72412
• CTEs B & C pathway: Physics validation at RFQTS (TRL -6) → Full -scale integrated demonstration at LAT (TRL- 7). Timeline: C Y27 (RFQTS), CY28- CY30 (LAT). • CTE D pathway : Scaled testing on the 35keV RFQTS H- source (TRL -6) → Testing at the SNS Beam Test Facility CY26-CY27. Full-scale integrated demon- stra...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
2
c60c4bca-31ae-4053-bbda-8239173d1c16
on the MEBT chopper power supplies, which have demon- strated fast -switching capabilities approaching the required <3 ns rise/fall times at the ~650 V level; board stacking to achieve the required 1.5 kV is in progress. The project is also exploring engaging with a commer- cial vendor to pursue parallel developme...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
2
4ecd18a8-66b3-45d2-aa6f-ed8665c413bc
cies steering and focusing predictions. CTE C: Dual -Species MEBT The LAMP MEBT lattice is being integrated into the LAT design. A reduced capability MEBT will be designed for the RFQTS to test key aspects of dual -beam transport. CTE D : Fast -pulsed focusing electrostatic lenses An initial analysis of the...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
2
be9f3f16-e78e-466c-9daf-feab1df21cf9
cies operation demonstration planned for CY27. LAT Planning Preliminary design of the LAT facility has commenced. Facility infrastructure requirements including RF power (up to 1 MW peak), cooling systems, and radiation shield- ing have been assessed and are being integrated into facil- ity design. Long- lead pro...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
2
e31dcbee-9dfd-4971-918c-62add4ae27a7
ture with contemporary, supportable technology. The LAMP technology maturation program has identi- fied four CTEs requiring advancement to TRL -7 prior to CD-2 approval. A phased maturation approach , utilizing the RFQTS and LAT, provides systematic risk reduction through incremen- tal validation. The RFQTS enabl...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
2
69c37d7d-d672-4fb0-8e6a-a03cbb3bdb0e
[1] J.W. Lewellen et al., et al. , “LANSCE Accelerator Moderni- zation Project Conceptual Design Report,” Office of Scien- tific and Technical Information (OSTI), Nov. 2025. doi:10.2172/3005578 [2] T. Caldwell, "Program Requirements Document for LANSCE Modernization Project (LAMP)," U.S. Department of Energy / Natio...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
2
7542e500-bda9-4c8b-8708-e8bd42a8fe40
[5] S. Sosa Guitron et al. , "The LANSCE Accelerator Moderni- zation Project front -end physics design and model,” pre- sented at IPAC’26, Deauville, France, May 2026, paper WEP4332, this conference . 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4303.pdf
2
b26e0430-77f8-44c7-a8c6-a97cca662a35
COMMISSIONING STATUS OF THE H- ION SOURCE FOR THE LANSCE ACCELERATOR MODERNIZATION PROJECT∗ M. R. Howard†, A. Alexander, T. P. Grumstrup, E. Loftin, J. T. M. Lyles, B. Sims, A. Smith, R. T. Thornton Los Alamos National Laboratory, Los Alamos, United States Abstract The LANSCE Accelerator Modernization Project (LAMP) wi...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
0
145bfdbf-9d9c-4a84-8e60-4dd40dc0d4ef
source at the LAMP RFQ Test Stand (RFQTS). INTRODUCTION TheLosAlamosMesonPhysicsFacility(LAMPF)was originally commissioned in 1972 [ 1]. Now known as the LosAlamosNeutronScienceCenter(LANSCE),itisone of the oldest high-average-power accelerators in the United States[2]. LANSCEsimultaneouslyproduceshighintensity H+ and ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
0
2ae6653c-ac5e-4378-a337-77ba6f14e319
SCE Accelerator Modernization Project (LAMP) include replacing the Cockroft-Walton generators with a dual-beam Radio-Frequency Quadrupole (RFQ) [ 2–4] and replacing thefilamentbasedH-ionsourcewithanRF(2and13MHz) based ion source heavily inspired by SNS. The RFQ Test Stand(RFQTS)wasdevelopedtodemonstratesimultaneous dua...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
0
92132990-a7f5-46fd-b7fe-b5d24f07f058
Security Administration of U.S. Department of Energy under contract 89233218CNA000001. †mrhoward@lanl.gov Figure 1: a.) Image of the fully assembled H- source. b.) Downstream view of the H- source showing the outlet elec- trode and e-dump. c.) Image of the fully assembled antenna flange. d.) Imageof the components in t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
0
7e5474d9-583f-4950-8da2-5d21b5e355ac
needs of the LAMP project. Thesourcebodycanbeseparatedintothreeprimaryparts: thebackflange,whichcontainstheplasmachamberandper- manent magnets to confine it, the antenna flange, which couples the RF power to the gas to produce the plasma, and the outlet electrode, which contains the cesium converter, Pierce electrode, ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
0
ca244cf2-74c4-4020-ae95-211b34dd5c56
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4307 3578 MC4.T01: Hadron accelerators: Proton and Ion SourcesTHP4307 THP: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s)...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
0
40e75e23-f2cb-4e1c-8d19-10d81342aca0
This flange also contains several feedthroughs for the water and air cooling lines on the outlet electrode assembly. Both theantennaflangeandoutletelectrodeassemblymountonto this flange, as shown in Fig. 1a and b. Theantennaflange,asshowninFig. 1c,holdstheinternal RF antenna, and hydrogen gas feedthrough. An optical po...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
1
5236f62c-b5d7-48ce-b36b-9cf3a0c0ceeb
in which cesium chromate cartridges are placed. These car- tridges are then heated by the plasma and release elemental cesium that is deposited onto the molybdenum converter underneath. The cesiated converter increases the H- yield through negative ion conversion on its surface [ 14]. The filtermagnetskeephighenergyele...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
1
5f752d25-0a44-4aff-be8e-39b9b4fb5c11
A custom flange (see Fig. 2a) was designed and manufac- turedin-housewhichallowedforthecuspmagnetwellsin the back flange to be accessible while the source was under vacuum, as the wells themselves should not be under vac- uum. With this flange, we could test each well individually withheliumandethanol. Whenethanolwassp...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
1
d57659a5-ef8a-47ae-961a-e6165d03ee02
a13.56MHz source that provides CW ”starter” plasma and a2MHzmode which provides a high-power, pulsed plasma thatisusedtoproducetheH-ionsourcebeam. The13.56 MHz CW plasma reduces the gas pressure and power re- quired to produce the pulsed beam. Efficient power transfer tothe plasma requiresa matchingnetworkbetweenthe RF...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
1
0a34bb9c-fe1d-433c-a815-5b84abf6ffb1
onlythe13MHzRFsourceison(e.g. the13MHzsource is unmatched while the 2 MHz source is on) [ 15]. This sim- plifies the matching network design. The matching network floats at the same potential as the ion source, and thus must be isolated from the RF sources, which are at ground. A circuit diagram created in LTspice® [ 1...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
1
f047f365-9491-4877-bf19-0c7b0c0c793f
”Gen2”,utilizessmallscalecomponents,aVNA,andthe transformerwhichwillbeusedinthefinaldesign. TheGen2 prototypeisshowninFig. 5a. WiththeVNA,weconfirmed that the system is matched at 13.56MHz with a high signal, as shown in Fig. 5b. For the final 13.56MHz matching network, we will use larger variable capacitors which rang...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
1
1f7e946c-c2a3-4954-a0af-2545317ac030
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4307 MC4.T01: Hadron accelerators: Proton and Ion Sources 3579THP: Poster session THP4307 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s)...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
1
6c42e22e-d91a-405c-9e90-f638db0dd90f
Figure4: ImpedanceplotoftheLTspice®[ 16]simulation for the 13.56MHz matchingnetwork. Figure5: a.) ”Gen2”matchingnetworkprototype. b.) VNA results for the Gen 2 prototype.CONCLUSIONS AND NEXT STEPS A SNS style H- source is being commissioned for use on the RFQTS as part of the LAMP project. The source was assembledon-si...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
2
a0f99a7f-3d59-4b0d-9fa6-0b4f365430b0
source team at SNS for their collaboration and support. WorkwasperformedundertheauspicesoftheUSDepart- mentofEnergybyTriadNationalSecurityundercontract 89233218CNA000001. REFERENCES [1]L. Rosen, “LAMPF: Its origins, history, and accomplish- ments”,Prog. Theor. Phys. Suppl. , vol. 85, pp. 168–189, 1985. doi:1/zero.alt4....
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
2
5c60bb19-2afa-4855-9969-4d36acf4487f
[4]S.S.Guitron etal.,“DesignoftheH-beamlinefortheLANL RFQteststand”,in 15thInternationalParticleAccelerator Conference , Nashville, TN, USA, pp. 3043–3045, May 2024. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt424-THPC28 [5]A. Alexander et al., “The LAMP RFQTS: status, capabilities and plans”, presented at the 17th Inter...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
2
e6061918-10b8-4bfb-a588-b41feebf3a3c
doi:1/zero.alt4.1/zero.alt488/1367-263/zero.alt4/aaa39e [8]R. Welton et al., “Negative hydrogen ion sources for particle accelerators: Sustainabilityissues and recent improvements in long-term operations”, Journal of Physics: Conference Series,vol.2244, no. 1, p. 012045, Apr.2022. doi:1/zero.alt4.1/zero.alt488/1742-659...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
2
0ac90f3d-caaf-42f1-9aac-82c004b1186b
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4307 3580 MC4.T01: Hadron accelerators: Proton and Ion SourcesTHP4307 THP: Poster session Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s)...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
2
37b4b4ae-d4a5-406b-a262-62cb9ac2aca3
[10]B.Hanetal.,“Breakingthrough100mAH-ionsourceoutput currentatSNS”,in Proc.32ndLinearAcceleratorConference (LINAC2024) , Chicago, IL, USA, pp. 1–4, Aug. 2024. doi:1/zero.alt4.18429/JACoW-LINAC2/zero.alt424-MOYA/zero.alt4/zero.alt41 [11]I. N. Draganic, G. Rouleau, and D. W. Kleinjan, “H+ and H- ion beam injectors at LA...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
3
a1adc464-cd37-4658-893e-f15f05d0c12d
SpallationNeutronSource”, ReviewofScientificInstruments ,vol.73, no. 2, pp. 1008–1012, Feb.2002. doi:1/zero.alt4.1/zero.alt463/1.1431416 [14]B. X. Han et al., “Recent performance of the SNS H- ion sourcewitharecordlongrun”, AIPConferenceProceedings , vol.2373, no. 1, p. 040004, Jul. 2021. doi:1/zero.alt4.1/zero.alt463/...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
3
09dba1a4-d79c-47ad-91a0-516af8ed1c24
ltspice-simulator.html ,17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4307 MC4.T01: Hadron accelerators: Proton and Ion Sources 3581THP: Poster session THP4307 Content from this work may be used under the te...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4307.pdf
3
1997a990-eb31-49f0-b44e-deb98b458f2a
SLOW EXTRACTION BEAM COMMISSIONING FOR THE Mu2e EXPERIMENT AT Fermilab* V. Nagaslaev†, G.Annala, J.Berlioz, G.Deinlein, B.Drendel, J.Morgan, A.Narayanan J.StJohn, D.Still, D.VanderMeulen Fermi National Accelerator Laboratory, Batavia, IL, USA Abstract Following the successful completion of the Muon g- 2 ex- ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
0
e8b9f358-f189-4232-ad75-bb2208101372
BEAM REQUIREMENTS The Mu2e experiment [1] requires a slowly extracted 8 kW proton beam delivered in short (<200 ns) pulses sep- arated by ~1. 6 µs intervals. To achieve this, beam is slowly extracted from the Delivery Ring (DR), where a single har- monic H = 4 RF bunch circulates with a revolution period of 1.695 ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
0
1fb46c80-7d64-48ce-b9e8-d229cac9a1f3
Beam power 8kW Spill Duty Factor >60% Extraction efficiency >98% While beam intensity and time structure are dictated by experimental requirements, beam loss control is critical for machine operation. Due to radiation constraints, excessive losses may significantly limit the achievable beam power. DELIVER...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
0
d63b216e-2693-461f-a2bd-fe7049de421d
The ring circumference is 505 m and consists of three arcs and three straight sections (SS). The lattice follows a regu-lar FODO structure with maximum beta functions of 15 m in both planes. Dispersion reaches up to 2 m in the arcs and is suppressed in the straights using the “missing dipole” scheme Figure 1 Latti...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
0
114b8b4e-58db-4236-955c-d9f3ce311210
septum planes consist of 25 µm thick, 1 mm wide W/Re foils with 2.5 mm spacing. Downstream, two magnetic septa —a Lambertson magnet (ELAM) and a C -magnet (CMAG) —deflect the extracted beam vertically into the ___________________________________________ * This work is supported by Fermi Forward Discovery Group, L...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
0
0f8a32ad-d042-43d7-b243-e0cd397aa5cd
beamline. With an additio nal contribution from quadrupole Q205, the total vertical bend is 112 mrad. Two sextupole circuits, SXCOS and SXSIN, are in- stalled in SS10 and SS50. Each circuit includes three sex- tupoles positioned near focusing quadrupoles, with phase advances of ~60°. The circuit locations are c...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
1
fe88a55c-2762-42ff-8bcc-6724dacf3b0f
reset back within 5ms, the QX fast switching supply has been augmented with the high voltage regulation module. Dynamic Orbit bump (DEX): A dynamic orbit bump is built to provide fast extraction orbit corrections during the spill. It uses four dipole correctors in SS30 and can be con- figured to provide angle an...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
1
43c2b4b9-743b-49b0-8ae9-006da6627764
livering up to 10kHz decision rate for fast feedback regu- lation. Not all the design functionality has been imple- mented in the board at the time of first runs . The block diagram of the SRS is shown in Fig . 3 SRS is driving the QX ramp to manage the spill squeeze. The fast spill feedback corrections are super...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
1
36cb6b32-6a7f-45e5-95d9-d14205e4fe17
board. The ripple controller analyses the harmonic and phase content of the ripple structure and produces the feed-forward corrections to the squeeze. It may also send the feedforward correction waveforms to the relevant power supplies. BEAM COMMISSIONING Resonance C ontrol Optimization of the resonance term is...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
1
941cae67-379a-4c05-ad12-696b162ab675
in this case is quite marginal , commissioning has so far re- lied primarily on SXCOS . The Spill Regulation System In the absence of the Mu2e Extinction Monitor, the spill characteristics have been monitored using the Wall Current Monitor (WCM) in the extraction beam line M4. Figure 5 is showing a typical time ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
1
60103090-b2f4-4d33-ae5d-5fdbb81666da
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4310 MC4.T12: Hadron accelerators: Beam Injection/Extraction and Transport 3583THP: Poster session THP4310 Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
1
8a7f9ad9-a0ab-42f4-addb-1d6b34d84ac6
WCM waveform is digitally integrated in the FPGA into currently supported bandwidth ( here 10kHz, as shown in Fig. 7). The slow spill regulation controller at this time has been temporarily implemented externally , using piecewise ramp tuning algorithm . Figure 6 shows evolution of the QX ramp from the initial ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
2
3a6f384d-2d7d-4c07-8a05-19ec9f314a07
septum losses. In our case the septum losses are estimated to be about 2% and this can be further reduced. However, there still remain several other sources of beam losses in the machine. Currently, the beam losses limit the available beam power to target at about 5kW. One of the sources is the steering errors in t...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
2
7fe4d578-e959-46e7-bb0b-646cba98f8d5
This only allows running a few individual spills per mi- nute, with intensity reduced by a factor of 5. However, as a proof of principle we also demonstrated a multi -spill mode, running 4 spills during a Main Injector cycle; the design mode of 8 spills can be achieved by extending this sequence. Dynamic B ump T...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
2
b426a7aa-1415-4bef-826f-31434b15d09c
Figure 8 shows the water -fall display of the beam cen- troid measured in one of the beam line beam profile moni- tors. Horizonal axis shows the wire number (1mm pitch) and vertical axis shows time in msec . The upper trace shows beam position shifting during the spill as a result of the extraction angle drift . ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
2
3a7bb44e-bb22-4fb1-abbc-f75d74ded21d
ter than 2% and will be further improved. The Spill Duty factor has been shown to reach over 90%. Multi -spill oper- ation mode and efficient orbit stabilisation using DEX bump have been demonstrated. With that, there is a signif- icant list of improvements that need t o be addressed before the Mu2e experiment run,...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
2
ba5632b8-0661-4ff8-9131-8e48fe97d3ed
17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4310 3584 MC4.T12: Hadron accelerators: Beam Injection/Extraction and TransportTHP4310 THP: Poster session Content from this work may be used under the terms of ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
2
4b813a36-5149-4051-a362-a84b6e79c3e6
[3] J. Grange et al ., G-2 Technical Design Report, FER- MILAB -FN-0992- E doi: 10.48550/arXiv.1501.06858 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-THP4310 MC4.T12: Hadron accelerators: Beam Injection/Ex...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4310.pdf
3
33bddacd-ec38-46a3-949b-3ed2313cb9fb
SECOND GENERATION FERMILAB MAIN INJECTOR 8 GEV BEAMLINE COLLIMATION FINAL DESIGN, INSTALLATION AND COMMISSIONING K. Hazelwood∗, P. Adamson, B. Babacan, K. Danison-Fieldhouse, R. Donahue, B. Flanagan, T. Funk, M. Galante, M. Kucera, C. Montiel, D. Morris, R. Neswold, P. Neville, F. Novak, C. Olsen, A. Saewert, M. Stec, ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
0
c0bb99b1-98e7-4dce-bacc-b020127c66f7
well as initial results from its commissioning. INTRODUCTION TheMainInjector 8GeVBeamline( MI8)allowsforbeam extractedfromtheFermilabBoostertobeinjectedintothe Booster Neutrino Beamline ( BNB), the Main Injector accel- erator(MI),ortheRecyclerRing( RR).Duetothelimited aperture of the Recycler Ring, it is necessary to c...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
0
1832a1c0-87c9-46f7-a454-cd72ed16dd3d
after thePIP-IIupgrade is completed [ 6,7]. FINAL DESIGN Anextensivealternativesdecisionprocesswasundertaken to decide on the design for the second generation of MI8 collimators [ 7]. The final design utilizes two approximately 88toncollimators each consisting of four jaws, with pairs dedicated to either horizontal or ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
0
96b7f9db-888a-4a37-9a05-fc353a5ff800
heatdissipationoccursviaconduction;thermalcontactwith ∗kjh@fnal.gov †This manuscript has been authored by Fermi Forward Discovery Group, LLCunderContractNo. 89243024CSC000002withtheU.S.Department ofEnergy,Office of Science, Office of High Energy Physics.thesurroundingvacuumvesselismadewithAlBrconduc- tionpads. Opposite...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
0
28e491d5-6e19-4e5d-9f99-aaeac2502b67
from the activated collimator steel during tunnel accesses. PROTOTYPE Aone-jawprototypewasconstructedtotovalidatekeyde- signassumptions. Theprototypeconsistsofonefull‑sizejaw insideavacuumvessel,twomotionmotors,a 1kWheater tapeaffixedtotheinsidejawaperture,andthermocouples both inside and outside the vacuum. A vacuumwi...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
0
a8409327-f6c7-4663-9438-2c14cc350974
strength and reduced long‑term wear [ 9]. Figure1: IllustrationoftheMI8Collimatorprototypetest stand. INSTALLATION DuetothesizeandcomplexityofthenewMI8collimators, the installation was done in stages.17th International Particle Accelerator Conference, Deauville, France JACoW Publishing ISBN: 978-3-95450-252-3 ISSN: 267...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
0
fb067e19-c8ab-4396-bf4d-93d652238bd3
Preparation Inthesummerof2023,preparationofthecollimatorin- stallation locations began. Modifications had to be made to thebeamlinevacuum,includingtheinstallationofadditional ion pumps ( IP) and new vacuum flanges for collimator mat- ing.LCWheaders and air lines had to be raised to allow for the large amount of transve...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
1
3e563df7-5545-4be1-8e4c-2116db9ee188
in-placeattunnellocations825and827toprepareforthe layingofthecollimatorsteel. Temporarybeampipespool pieceswereinstalledbetweenflangestoallowresumedbeam operation between installation stages. Jaw Connection Clevis Adapter Failure Final installation of the new MI8 collimators began in summer 2024; about three‑quarters o...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
1
9a05b03b-8b3c-446b-b6b6-74b6c6204ee6
part. However, to prevent recurrence, the team replaced the AlBr fixtures with ones machined from stainless steel. It wasdecidedthattheincreaseinstrengthprovidedbymaking the clevis adapters from stainless steel was more significant thantheadditionalthermalconductanceprovidedbyAlBr. The failure forced a pause for the re...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
1
0078e20c-4008-4d4b-abe6-566ad06186f0
were used to capture and secure the marble plates. When possible,Alcomponentswereusedonthecollimatorexte- rior. Al does not become as radio-activated; this reduces personnel exposure to highly activated components in the future (Fig. 3). A great deal of time was spent installing the motioncontrolhardwarecomponents,test...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
1
99366618-7bb5-4ce6-b70f-d6ffecc945d2
Figure3: New MI8collimatorinstalledatstation827,the other installation is seen in the distance at location 825. COMMISSIONING Multiple commissioning studies wereperformed to vali- date the collimator installation before operational use. Motion Testing Allcollimatorjawsweredrivenwithbothlocalandremote controllers while ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
1
be3f7158-22c7-48d9-a996-8c0e2c93e908
collimators to studies only while a permanent solution is under development. First Collimation Despite the issues with the stepper motor controls, initial collimationtestswerecompleted. Thetestsprovedthecol- limators functional, that the jaw apertures were sufficient, andthattherewerenobeamapertureobstructions(Fig. 4)....
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
1
9249175d-1fad-444d-b41c-829428008a62
degradation to vacuum during sustained collimation was observed. Figure 4: Protons lost vs jaw position. Flat regions show beam aperture with no obstructions. BLMProtons Loss Calibration Adedicated BLMsystem,similartooneinplaceonthe originalMI8collimators at tunnel locations 836 and 838, was installed for the new colli...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
2
26caba41-2863-4529-814c-cb304ce609fe
machineprotectionsystem( MPS).Ifanyone BLMlossor calculated jaw proton loss exceeds expert defined limits, the beam is automatically disabled. Figure5: JawC825VU BLMlossreadingsvsprotons lost. TCResponse and Jaw Temperature Estimation Using the prototype test data, the TCreadings were fit to find each TCs thermal time ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
2
cde310f6-9a94-4e4c-9e0e-135ce0239c8b
the beam is automatically disabled if any one TCreading exceedsvalueswherethejawtemperatureestimateishigher than desired. More work is planned to use the jaw tem- peraturemodelalongwiththededicated BLMprotonloss calculation to continuously estimate the jaw temperature, detect anomalous TCreadings or model estimate erro...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
2
51258606-82fb-49e2-a8d7-ec8976cb7116
and scheduled to be installed this summer to replace the hardwarecurrentlylimitingthe operationaluse ofthecolli- mators. Thenew MI8collimatorswillbereadybyfall2026; in time for the long awaited resumption of beam operations in Main Injector [ 14].17th International Particle Accelerator Conference, Deauville, France JAC...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
2
1bc90b34-b44b-47be-ab0c-4044bf0c4b78
REFERENCES [1]B. C. Brown, D. Capista, I. Kourbanis, N. V. Mokhov, and V. Sidorov, “Collimation for the Fermilab Booster to Main Injector Transfer Line”, Conf. Proc. C , vol. 070625, p. 1673, 2007. doi:1/zero.alt4.11/zero.alt49/PAC.2/zero.alt4/zero.alt47.444/zero.alt486/zero.alt4 [2]B. C. Brown et al., “Studies of beam...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
3
195750cd-8326-4a47-9385-a27cd7727e02
fnal.gov/cgi-bin/sso/ShowDocument?docid=2359 [5]N. V. Mokhov and B. C. Brown, “MARS15 calculations for MI8 collimator design”, Rep., Oct. 2006. https : / / beamdocs.fnal.gov/cgi-bin/sso/ShowDocument? docid=2426 [6]M. Ballet al., “The PIP-II conceptual design report”, United States,Rep.FERMILAB-DESIGN-2017-01;FERMILAB- ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
3
c37b59a4-7c79-4d87-9cf8-4b69da4a971a
tors prototype testing report”, Rep., Jun. 2024. https : / / beamdocs . fnal . gov / cgi - bin / sso / RetrieveFile ? docid = 8965&filename = mi8 _ collimators_prototype_test_report.pdf [10]K. Hazelwood, “MI8 collimators motion control specifica- tions”, Rep., Aug. 2024. https://beamdocs.fnal.gov/ cgi-bin/sso/RetrieveF...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
3
cba2f86a-d3fd-4d7b-9aca-498d31bfe5bf
“Optimizingcollimatorpositionsusingbayesianoptimization in the Fermilab MI-8 transferline”, in Proc. IPAC’25 , Taipei, Taiwan, Jun. 2025, pp. 2711–2714. doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt425-THPM/zero.alt412 [14]K. Hazelwood et al., “1 MW Beam Power in the Fermilab MainInjector”,presentedatIPAC’26,Deauville,Fra...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP4311.pdf
3
03361c30-f688-47b5-92d8-0575acaecaf0
RECENT DEVELOPMENTS OF BLOND FOR NEW LARGE SCALE ACCELERATOR FACILITIES S. Lauber∗, S. Albright, C. Becker, H. Damerau, J. Flowerdew, N. Gallou, P. Hickersberger, L. Intelisano, B. E. Karlsen-Bæck, I. Karpov, E. Lamb, A. Lasheen, M. Marchi, O. Smedt, H. Timko, L. Valle, J. Wulff, M. Zampetakis, European Organization fo...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP5005.pdf
0
5c165491-72fc-496a-a734-cce321b52cc4
as J-PARC, ISIS, and CERN. Furthermore, BLonD is applied for the design of new synchrotrons such as the Future Circular Collider (FCC) and the Muon Collider. Both projects demand more complex simulations, as effects like strong synchrotron radiation or wake fields due to counter-rotatingbeamsbecomeimportant. Inrecentye...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP5005.pdf
0
e9096f83-1de4-4d09-a057-a9641edf24d6
ment of particle-tracking simulations for next-generation accelerators, while facilitating the analysis of existing synchrotrons. INTRODUCTION With over a decade of development, the Beam Longitudi- nalDynamics(BLonD)[ 1,2]particle-trackingsoftwareis usedtodescribetheevolutionofadistributionofparticles in the longitudin...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP5005.pdf
0
f01e542e-a9b4-4ebc-9a59-5ea83166748e
tensive support for generating initial distributions for single- and multi-bunch beams with arbitrary filling patterns and provides numerous implementations to model low-level ra- dio frequency (LLRF) systems. Thanks to these features, ∗simon.fabian.lauber@cern.chBLonDhasbeenemployedtostudylongitudinalbeamdy- namics in...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP5005.pdf
0
5ea2ab4d-f3af-4159-b6c9-42acc94c203f
object-oriented system, which affects the majority of the code. Thissubstantialreworkingalsoallowedso-calledtype hints to be integrated into the major revision to simplify development. Furthermore, the ongoing research and devel- opmentfortheFutureCircularCollider(FCC)[ 5,11,12]and theMuonCollider[ 6,13,14]requiredadju...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP5005.pdf
0
6ced2d59-2900-44ab-89a4-9fe1e5e6da3d
tion of the longitudinal coordinate Δ𝐸𝑖+1= Δ𝐸𝑖+𝑓(Δ𝑡). The kickcan contain energychangesdue to the RF system, induced voltages, synchrotron radiation, etc. Second, the time coordinate is updated by the drift equation, based on thenewenergycoordinateas Δ𝑡𝑖+1= Δ𝑡𝑖+𝑔(Δ𝐸𝑖+1). In addition, the properties of the ...
D:\Daily_ihep\Conferences\IPAC2026\THP\THP5005.pdf
0