d07b776f-604b-4a6e-9172-9ec0ed9a4fb1 | contours show the rms beam size of the beam passing along
the MEBT, while the red show the same but for the beam
deflected bytwochoppers. Separation is approximately 4𝜎
when collected.
Theinputenergy(65keV)and outputenergy(2.1MeV)
are lower than prior design iterations [ 1]. These changes
providemultipleadvantagestoth... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 1 |
63a84dbe-9e20-4b59-816e-3811d88d793b | diationandactivationconcerns,andalsotoaidwiththestrin-
gentgoalofchoppinganyresidualWNRsatellitebunches.
The dual-chopper scheme, designed into the SNS MEBT
layout, provides significant separation of the unchopped
andchoppedbeams,asshowninFig. 5. Byseparatingthe
beamsbyapproximately 4𝜎,thedual-choppersystemisable
to e... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 1 |
0e9ad94a-5410-42ff-87a5-0b1c1c0d7ab1 | self is modeled after Fermilab’s very fast, low-dispersion
design [11], and the MEBT layout is evolving along with
this effort.
DRIFT-TUBE LINAC
The drift-tube linac (DTL) assumes a six-tank design
verysimilartootherDTLsystems,andisdetailedinother17th International Particle Accelerator Conference, Deauville, France JAC... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 1 |
d7b68f85-dc95-42c0-af5d-69a9ddde02b7 | Figure6: LAMPDTL-tankphaseadvanceplot,comparedto
key parametric resonances. The design intentionally avoids
key resonances, especially at low energy in Tank 1 (purple).
Figure 7: LAMP DTL emittance growth, showing horizon-
tal (blue), vertical (orange), and longitudinal (green). All
emittances are well-managed.
reports... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 2 |
3ea49272-b769-4624-ba42-438d47362f5b | low levels that the RFQ and MEBT generated.
The LAMP design has expanded the distance between
tanks, called inter-tank drifts (ITDs) to approximately 2𝛽𝜆,
enablingmorebeamdiagnosticsandvacuumaccessibility.
Most of the DTL tube focusing will be based on perma-
nentmagnetstopreserveaFODOlattice. However,using
powered q... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 2 |
0b96b4e8-5b40-4c4b-a2db-e8f6daab4968 | and controls can be located very close to the beamline.
with the facility walls. Additional infrastructure includes
facility water, power, RF, HVAC, etc, which are all being
assessed within the project.
Beam diagnostics are a key element of LAMP modern-
ization effort. Monitoring beam quality relates directly to
facili... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 2 |
0601de54-dd93-4aa1-97d8-f96273dc0781 | CONCLUSIONS
The LAMP project at LANL has created a self-consistent
start-to-end conceptual design. This design continues to
evolve, but specific technologies are being leveraged and
developed to meet the project requirements. Each beamline
subsystem (sources, LEBT, RFQ, MEBT, DTL) has been
modeledandevaluated. Critical... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 2 |
4b56a398-6001-4595-bca7-2881166bb83c | LAUR 25-31513, Nov. 2025. doi:1/zero.alt4.2172/3/zero.alt4/zero.alt45578
[2]J. Lewellen et al., “Requirements evolution for the LANSCE
Accelerator Modernization Project (LAMP)”, presented at
IPAC’26,Deauville,France,May2026,paperWEP4329,this
conference.
[3]K. Bishofberger et al., “An overview of the LAMP front-
end upg... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 2 |
202dc422-88e9-4112-a65c-eacba89b4c8f | [4]A.Alexander etal., “LAMP ionsource commissioning and
future plans”, presented at ICIS’25, Oxford, England, Sep.
2025.
[5]M. Howard et al., “Commissioning status of the H–ion
source for the LANSCE Accelerator Modernization Project”,
presented at IPAC’26, Deauville, France, May2026, paper
THP4307, this conference.
[6]... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 3 |
8a980add-17bc-4b91-8bdc-d8328c275a9a | LANL, Los Alamos, USA, Rep. LAUR 24-20338, Jan. 2024.
doi:1/zero.alt4.2172/2281497
[9]K.BishofbergerandH.Xu,“RFQ-structurepowerrequire-
ments: Analysis of two structure designs”, LANL, Los
Alamos, USA, Rep. LAUR 26-23607, Mar. 2026.[10]A. Chrysler et al., “Preliminary investigation towards a pulse
modulator for the LAN... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 3 |
9d4f4bfd-72f2-447d-90e9-9339797751be | France, May 2026, paper WEP4349, this conference.
[13]K.Bishofberger, “ExtractingLANSCE macrobunchcharge
from WNR fast pickoff”, LANL, Los Alamos, NM, USA,
Rep. LAUR 24-21226, Jan. 2024. doi:1/zero.alt4.2172/23/zero.alt45297
[14]Y.Zhang etal.,“Capacitivebeampositionmonitorsforthe
low-𝛽beamoftheChineseADSprotonlinac”, ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 3 |
b540f462-5f00-403b-a988-1dd0747aa434 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4317
2152 MC4.A08: Hadron accelerators: Linear AcceleratorsWEP4317 WEP: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4317.pdf | 3 |
bf8f4456-d6d1-4bf9-b678-fed47895a679 | LAT: A 9-MeV PROTOTYPE “FRONT-END” FOR THE LANSCE
ACCELERATOR MODERNIZATION PROJECT
R.T. Thornton∗, A. Alexander, K. Bishofberger, C. Buechler, G. Dale, D. Dimitrov,
E. Espinoza, H. Gaus, T. W. Hall, M. Halloway, C. Hatch, J. Lewellen, J. T. M. Lyles,
J. Medina, M. Sanchez Barrueta, D. Spernjak, S. Swickley, P. Torrez
... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 0 |
c61d562d-df08-42a2-82dd-7b221351d6e6 | theseCTEsandasriskmitigationforanacceleratorthatis
incurrentoperation,weplantoassembleLAMPfromion
sourcesthroughthefirstDTLTank,approximately 9MeV,
in an adjacent facility. This paper discusses the current
status and future work of this plan: LAT.
INTRODUCTION
The LANSCE Accelerator Modernization Project
(LAMP) is a ma... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 0 |
56947edf-b3bf-4431-bf9e-ac5511fa461a | tosimultaneouslyaccelerateandtransporttwooppositely-
charged ion species while supporting five user facilities.
Each user facility requires a different beam timing struc-
ture. These unique operational requirements present special
technical challenges that must be addressed during the mod-
ernization effort. To validat... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 0 |
5300795a-489a-4f75-8b3f-653cebb03f8f | ∗rtthorn@lanl.govwhileincorporatinginnovationsnecessaryfordual-species
operation.
(a)LAMP “front-end” showingRFQ and firstDTL cavity.
(b) Entire LAMP layout in the LANSCE tunnel.
Figure 1: LAMP baseline v2 front end (a) zoomed in and
(b) layout through the DTL tanks in the LANSCE tunnel.
ThedesignextractstheH+andH−beam... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 0 |
0fa48c99-8b04-4ced-b563-94100eeccf60 | and meet Department of Energy requirements to achieve
Critical Decision 3. These elements, MEBT chopper, simul-
taneous dual-beam acceleration of opposite charged beams
in an RFQ, transport of dual beams through a single MEBT
postRFQ,andpulsedfocusingelectrodes,addresstheunique
operational requirements of LANSCE. The f... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 0 |
49a9cd2f-54e9-4386-a61e-a35cf4f0268b | CTE 1: FastChopper Systems
The LEBT and MEBT chopper systems must achieve:
fast rise/fall times of 10 ns for the LEBT and 3 ns for the
MEBT,low timing jitter of 1 ns, and reliable operation in
dual-species mode. This CTE does not require dual-species
testing and can potentially be demonstrated at existing DOE
facilitie... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 1 |
7dfbf233-71f7-4e85-9caf-0171938e0d73 | both species and properly match them into the first DTL
tank. This includes: maintaining beam quality for both
species,properfocusingandsteering, integrationwiththe
fast chopper system, and efficient capture into the DTL that
meets project requirements.
CTE 4: FastPulsed Electrodes
The source extractor chamber requires... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 1 |
27a510aa-2422-4fa5-b282-182d9d826c9f | DOE facility can provide the complete testing environment
neededforCTE maturation. Therefore,a full-scaleLAMP
prototypecalledLATisbeingconstructedatLANL.Asmall-
scale prototype test stand is currently in operation, RFQTS,
see Refs. [ 10,11].
LAT is being installed in the ADEF tunnel, see Fig. 2.
Key advantages of the A... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 1 |
ef92d7da-3a6f-4c38-83d2-3db2ede87774 | (b) LAMP layout in the ADEF tunnel.
Figure 2: LAT (a) location within the LANSCE complex,
and (b) location within the ADEF tunnel.
•Safety Systems: Personnel access controls already im-
plemented
TheLATdesignmaintainstheexistingtestfacilityfoot-
print,utilizingcurrentwaveguidebasementinfrastructure,
electronic rack spa... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 1 |
5aa86ff7-d071-470a-8900-b260312a60f4 | cluded on that list is modern master timing, high-speed data
acquisition,anddigitallow-levelRFsystems. Requirements
forthesesystemsinclude: provideprecisetimingcontrolfor
dual-speciesoperation, enablefasttime-resolvedmeasure-
ments,andsupportbeam“flavor”discriminationbetween
species for diagnostics and control of the h... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 1 |
2723ecc5-8349-43c1-af48-fa91e09019d7 | PROJECT TIMELINE AND MILESTONES
LAT follows an ambitious but achievable schedule
through fiscal year 2030 as shown in Table 1.
Table 1: TimelineforLATMilestones
Milestone Year
Long-lead procurement activities be-
ginJune 2026
ADEF tunnel prep Jan–Dec 2027
Ion source installationand testing July–Dec2027
RFQ and DTL cond... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 2 |
7e915e45-64b6-43ef-92e1-1315432ad72e | period. This approach ensures that all critical technologies
havebeenthoroughlyvalidated,andthatthebeamlinemeets
projectrequirementsthroughthefirstDTLtank,beforein-
stallationintheoperationalfacility,significantlyreducing
implementation/commissioningriskanddowntimeforthe
LANSCE facility users.
CONCLUSION
LATrepresentsa... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 2 |
7cd19348-11d9-4ceb-98a8-070d559784e6 | testing,andvalidationphases. LeveragingexistingADEF
infrastructurewhiledevelopingnewcapabilitiespositions
LAMP for successful implementation.
ACKNOWLEDGMENTS
This work is supported by Triad National Security,
LLC, for the National Nuclear Security Administra-tion of the U.S. Department of Energy under contract
89233218... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 2 |
de4531a1-d061-4c1e-a4fc-596fca4ee8c8 | [3]A. Chrysler et al., “Present status of LAMP chopper R&D”,
presented at IPAC’26, Deauville, France, May 2026, paper
TUP7362, this conference.
[4]G. Daleet al., “The LANSCE Accelerator Modernization
Project (LAMP): Status and recent progress”, presented at
IPAC’26,Deauville,France,May2026,paperWEP4328,this
conference.... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 2 |
c335f8cb-98f8-41bc-8e8e-0fbf66f3cb56 | conference.
[8]M.Halloway etal.,“TechnicalmaturationfortheLANSCE
Accelerator Modernization Project (LAMP)”, presented at
IPAC’26,Deauville,France,May2026,paperTHP4303,this
conference.
[9]K. R. Crandall, “Simultaneous acceleration of H+ and H- in
RFQlinacs”,in Proc.PAC’91 ,SanFrancisco,CA,USA,May
1991,pp. 401–403. doi:1... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 2 |
1eb78405-ca80-4b38-b2e2-374a87362be0 | IPAC’12,pp.3449–3451,May2012. https://jacow.org/
IPAC2/zero.alt412/papers/THPPC/zero.alt47/zero.alt4.pdf17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4318
MC4.A08: Hadron accelerators: Linear Accelerators 21... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4318.pdf | 2 |
fd501755-255c-4041-89cd-e86b4e12824f | PERFORMANCE BOUNDARIES IN THE NOVEL
MULTI -BEAM LANSCE FRONT END
Y. Batygin, H. Salazar, T. Tajima, Los Alamos National Laboratory, Los Alamos, NM , USA
Abstract
The proposed 100 MeV injector is designed to renovate
LANSCE accelerator facility by replacing the 750 -keV
Cockcroft -Walton injectors, supporti... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 0 |
d5edf05a-02e5-4b6c-bd31-fc78c67de0e5 | ing with accelerator structures. Unavoidable transients of
beam chopping in Low Energy Beam Transport result in
the development of satellite bunches after the 3-MeV RFQ
accelerator and force the removal of these using a sophis-
ticated chopper system after the RFQ. The paper addresses
critical challenges within... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 0 |
4af71fa1-0d4a-4651-b732-494781d266ce | beam is delivered to the Isotope Production Facility (IPF),
while 800 MeV H- beams are distributed to four experi-
mental areas: the Lujan Neutron Scattering Center, the
Weapons Neutron Research facility (WNR), the Proton Ra-
diography facility (pRad), and the Ultra -Cold Neutron facility (UCN). Time structures of ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 0 |
30ea2b33-1d3e-421f-a9ea-f4bf2fe3468f | within the Low Energy Beam Transport (LEBT). A key
challenge in this new injector design is managing the dis-
tinct space charge neutralization of t he low -energy beams .
The estimated time for a 100 keV beam to ionize the resid-
ual gas at the given pressure of 10-6 Torr is 56 μ s [5]. With
a pulse duration of 62... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 0 |
62a42c82-9179-472b-b8ce-54ea3f7b35bf | tions in LEBT using the Molflow code [ 6]. Pumping is per-
formed at the six pump- out ports with a 1000 L/s pump on
each port. Within a beamline of diameter 8 cm, and an out-
gassing rate of 7 ⋅10-11 mbar⋅L/s⋅cm-2, which is a typical
outgassing rate after pumping down a stainless steel
beamline for ~33 hours [ 7], ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 0 |
c18ce3e5-adf9-4968-916b-47a432498a19 | Figure 2: Vacuum simulation using Molflow program [6].
The necessity to remove beam space charge neutraliza-
tion in LEBT results in (i) space charge induced beam
emittance growth, which limits beam intensity in accelera-
tor; (ii) unavoidable mismatch of the different H- beam
components due to difference in beam ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 1 |
ed07528c-d196-426b-bb96-4688ef4ba198 | passes through the Low Frequency Buncher (LFB), where it undergoes longitudinal momentum modulation. Subse-quently, the WNR bunch experiences a longitudinal phase -
space rotation within the drift space, and, following com-
pression, it is captured into the RFQ . Details of the for-
mation of a highly charged short pu... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 1 |
3950e1a2-b2e1-461e-8334-8db56774ec53 | (b)
(c)
Figure 4: (Left) v ertical beam profile and (right) vertical
beam emittance in LEBT chopper: (a) inside chopper, (b) after chopper, (c) after chopper beam stop .
chopper length
L with velocity chβ having the following
dependence of vertical field:
1( ) [1 ]
1( )yo
front n
frontEEξξξαξ= −−+, ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 1 |
cc769260-b3f8-460d-8a50-8c71ee7ae684 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4319
MC4.A08: Hadron accelerators: Linear Accelerators 2157WEP: Poster session WEP4319
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 1 |
b126a2b4-fce7-4ca1-8497-9fd166c37e88 | determine pulse front and top. A good approximation of the
chopper pulse is achieved with α= 32 and n= 4.
Effective rising/falling time includes the transient time
of chopper/beam interaction (e.g. , stray capacitance, fring-
ing fields, beam size) and that of the pulse generator
22..front trans gent tt= ++ .... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 2 |
134c38fc-7e56-424c-8aa6-34421d1047c8 | LEBT to provide successful capture and acceleration in the novel RFQ.
BEAM CHOPPING IN MEBT
Unavoidable beam -chopping transients from finite-aper-
ture limitations in the Low -Energy Beam Transport chop-
per result in the creation of a longitudinal WNR bunch size
larger than the longitudinal RF bucket of 201.... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 2 |
a2dcf845-68a3-48a5-9c00-c2606f8e6f83 | Since the proton IPF beam is accelerated at the same RF
pulse as the WNR H- beam, the chopper also cuts a fraction
of H+ beam. Because the time interval between
201.25 MHz bunches is ~ 5 ns, the chopper has a tight re-
quirement for short rising/falling times. Figure 6 illustrates
the process of coincident chop... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 2 |
a9e84f72-d4ba-43a9-92ed-ce8b61dd79e5 | confirms effectiveness of 3 -MeV multi- beam transport
with simultaneous chopping of H- and H+ beams .
Figure 6: 3- MeV Medium Energy Beam Transport chop-
ping of (red) H+ IPF proton beam and (blue) H- WNR
beam.
ACKNOWLEDGEMENT
The research presented in this paper was supported by
the Laboratory Directed Rese... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 2 |
531f066c-7e73-4819-a090-e103a7ccecb4 | Brazil, May 2021, pp. 1894 -1896.
doi:10.18429/JACoW- IPAC2021- TUPAB205
[3] Y . K. Batygin et al ., “Novel Multi-Beam Front End for
LANSCE Acceleration Facility”, J. Phys.: Conf. Ser , vol.
2687, p. 052006 , 2024 .
doi:10.1088/1742- 6596/2687/5/052006
[4] Y . Batygin, “Low energy multi -beam dynamics in no... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 2 |
fde57bd1-cc9b-4712-95a8-bbcf9aee46ed | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4319
2158 MC4.A08: Hadron accelerators: Linear AcceleratorsWEP4319 WEP: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 2 |
83c4a4d2-e140-4039-ad36-8040d52e3b00 | [6] Molflow code, https://molflow.docs.cern.ch
[7] H. F. Dylla, D. M. Manos and P. H. LaMarche, “ Correlation
of outgassing of stainless steel and aluminum with various
surface treatments,” J. Vac. Sci. Technol. A 11, vol. 11, no. 5,
pp. 2623 -2636, Sep, 1993 . doi:10.1116/1.578617
[8] Y . K. Batygin, “Particle... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 3 |
87415112-9701-4f5c-af30-14e8f54a3db2 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4319
MC4.A08: Hadron accelerators: Linear Accelerators 2159WEP: Poster session WEP4319
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4319.pdf | 3 |
7da3c3a6-7102-4b5a-96b1-e5d0cea8ac40 | HIGH- GRADIENT BOOSTER LINAC FOR MULTI -GeV
PROTON RADIOGRAPHY AT LANSCE
S. S. Kurennoy , Y. K. Batygin, H . Xu
Los Alamos National Laboratory, Los Alamos, NM, USA
Abstract
Increasing energy of proton beam at the Los Alamos
Neutron Science Center (LANSCE) from 800 MeV to 3- 5
GeV will improve radiograp... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
c7e33c23-ca2f-4efe-86fb-7c5fa33f662d | will be based on S - and C -band cavities. An L -band de -
buncher at the booster end can reduce the beam energy spread if needed for pRad experiments. We are devel oping
proton cryo- cooled HG standing- wave structures with dis-
tributed RF coupling for the booster. Prototype cavity structures at S - and C -band are ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
194d3830-c1da-4ddf-b10b-447b8c4b36f6 | uses 800- MeV H
- beam. For dynamic experiments, multi-
ple pulses from the linac produce movies up to a few tens
of frames. Each short pRad beam pulse consists of several
successive bunches from the linac, which follow at the linac DTL repetition rate of 201.25 MHz, to multiply the
pulse total intensity. This is be... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
d82f3673-951f-4ea5-9785-ab1b046ff674 | be also imaged. We aim to develop the most efficient way
to provide proton beams at energies of 3- 5 GeV for en-
hanced proton radiography at LANSCE . A high- gradient
(HG) proton booster linac after the existing LANSCE linac
offers a viable cost -efficient solution [2]. Its potential loca-
tion is shown in Fig. ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
4dbeffb2-f91c-4251-b513-5cb470ea1a44 | (LDRD) program at LANL supported our work on the HG
pRad booster as an Exploratory Research (ER) project in
2021 -2023. The ER results were presented in [2 -4] and
summarized in [5]. A larger LDRD Directed Research (DR) project started in Oct. 2025 with the main goal to de-
velop accelerator technology of cryo- coo... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
42fa1522-a9f3-4258-b23c-c5a8bdd54d06 | tures (cryo -cooled), gradients up to 250 MV/m were
achieved. HG C -band cavities at room temperature provide
gradients 50- 60 MV/m, but at LN2 temperature one can
expect gradients two times higher. 800- MeV protons at the
exit of the LANSCE linac have velocity β = 0.84 ; at 5 GeV
β = 0.9 87. Therefore, HG cavit... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
5fd54096-9c7e-4d24-ac8e-8d6d5d1a30af | control the relative momentum spread of the beam . It is
Δp/p = 10-3 at the exit of our 800- MeV linac, and in [2] the
beam dynamics design reduce d it as 1/p, i.e., to 3.3·10-4 at
3 G e V. However, this requirement depends on specific
pRad experiment.
Operating the HG pRad booster at 77K makes structures... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
07636ad2-2afe-4bd2-a0d4-c50bfdffad7d | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4320
2160 MC4.A08: Hadron accelerators: Linear AcceleratorsWEP4320 WEP: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 0 |
4dfaeb6c-c4e2-4862-91a4-686e68e60906 | additional breakdown rate data, which would help to ad-
vance understanding of high gradient RF cavities. The
cryo-cooled operation of pRad booster i s practical because
pRad needs only 1- 20 beam pulses spread by about 1 µs
per event , and there are only a few events per day. We es-
timate the fraction of nit... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
f6d0f4ff-c7ee-4792-9cca-770cc541732c | the existing switchyard. The exiting beam spreads in this
drift, so we need to lower RF frequency in the first cavities
to capture it longitudinally. All the above requirements led
to a multi- stage compact booster design [ 2, 3].
pRad Booster Design
The booster starts with an L -band buncher operating at
1408... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
3ceea2f8-15db-4d1b-9a7c-0105072c0241 | beam focusing requirements and cavity apertures . That de-
sign had the total length of the booster 92.5 m , but it as-
sumed a high real-estate gradient, E
acc = 100 MV/m, in C -
band structures . High RF fields cause strong beam defo-
cusing, which is prevented by strong quadrupole focusing
with permanent -magnet... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
8b574368-5011-4c49-ac94-03ebeb3e06a4 | erate gradients, E acc = 25 MV/m in S -band and 40 MV/m
in C-band, made the booster longer, 156.3 m, which re-
quire d achromatic bends to fit the folded linac in the exist-
ing buildings. The total peak RF power became noticeably
lower, 0.75 GW in C -band and 0.3 GW in S -band. The RF
costs w ould be reduced,... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
1806b0d6-66dd-408c-932f-5df88ec1e902 | project is to confirm that experimentally.
Our previous beam dynamics efforts [2- 4] assumed that
the normalized transverse acceptance of the pRad booster
linac should be no less than that at the exit of the LANSCE
linac, 3.12 π cm∙mrad. However, this assumption, typical
for high power applications, can be... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
05ca9f39-eeee-4f87-9a02-466a6b658fde | tures operate in a standing- wave π-mode. A short 2-cell C-
band prototype was fabricated and tested at the HG RF test
stand – the C-band Engineering Research Facility in New
Mexico (CERF -NM) [8] at LANL . We measured RF
breakdown rates (BDR) at accelerating gradients up to
100 MV/m in that room -temperature t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
354f63bc-4a38-44b6-83d6-29cae84d664d | linac will have the required custom frequencies.
Based on this experience , we optimize d the design of the
accelerating structures for the pRad booster linac . The test
structures for S- and C-band will contain 4 cells with dis-
tributed RF coupling. The number of cells i s limited by the
available peak RF p... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
afb5025c-47d3-4b68-a035-33e65c34dba0 | will be limited by 12 MW due to the installed circulator.
A 4-cell C -band test structure with distributed RF power
coupling was designed for protons at 1.6 GeV ( β = 0.9 3).
It corresponds to the beginning of the C -band section in
Fig. 2 and has a beam aperture radius of 6.5 mm, the largest
one in the C-band ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
df7faae4-b459-47e9-aab6-76d79be0ca60 | 17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4320
MC4.A08: Hadron accelerators: Linear Accelerators 2161WEP: Poster session WEP4320
Content from this work may be used under the terms of the CC BY 4.0 licenc... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 1 |
9c7f5bcf-3400-4e8f-b592-342cef64a6c7 | Figure 3: Vacuum volume of the 4- cell C -band test struc-
ture with distributed RF coupling .
The cell shape was optimized using multiple objectives:
minimizing the maximum surface electric and magnetic
fields as well as the maximum value of the Pointing vector,
while maximizing the shunt impedance. The multi- o... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 2 |
9cddabd2-eeec-40df-8d91-37db619f9afa | parameters of th e structure are summarized in Table 1,
where Z´eff = Z´T2 is the effective shunt impedance per unit
length and Z 0 = 120 π Ω is the impedance of free space.
Table 1: C -band 4- cell Test Structure Parameters
Parameter Value Units
Frequency 5712.0 MHz
Unloaded Q @ LN2 32,496
Z´eff @ LN... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 2 |
5beab3b9-06d3-405c-9e4a-61f229e0fafd | reached on the walls of RF couplers, is higher than that in
the cell without coupler, but not very high: the ratio 1.18 becomes 1.72 in Table 1, cf. [10]. This is important for re-
ducing RF breakdown rate and was achieved by the coupler design that was inspired by work on HG str uctures at
SLAC. The calculated fie... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 2 |
4d54e638-28be-4521-8ffd-e2be083dc1d1 | conducting cryo-cooled HG accelerating structures with
distributed RF coupling adapted for protons in the energy
range from 800 MeV to 5 GeV . We already have two op-
tions of beam dynamics design for the booster linac [2, 3].
The optimization of linac design continues aiming to find
the most c ompact and efficien... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 2 |
bd2b3538-caf1-44fc-bf52-062e6f278f23 | tested cryo-cooled at RadiaBeam [9]. In both cases,
cryostats for LN2 operations will be built.
The authors a cknowledge useful discussions with and
help from our LANL colleagues, both in Accelerator Oper-
ation and Technology and in Physics Divisions .
17th International Particle Accelerator Conference, Deauvi... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 2 |
4045be50-d437-4e0d-8b52-ae4974901ea3 | REFERENCES
[1] R. W. Garnett et al. , “A c onceptual 3-GeV LANSCE l inac
upgrade for e nhanced proton radiography”, in Proc.
IPAC'12 , New Orleans, LA, USA, May 2012, pp. 4130-
4132.
[2] S. S. Kurennoy and Y. K. Batygin, “High -gradient booster
for enhanced proton radiography at LANSCE”, in Proc.
IPAC'21 , Cam... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 3 |
cbf3b902-bff0-46fc-a353-89149353e66a | doi:10.18429/JACoW- IPAC2023- TUPM007
[5] M. Zuboraj, Y. K. Batygin, S. S. Kurennoy, E. R. Olivas, E.
I. Simakov, and H. Xu, “High- gradient performance of a
prototype accelerator cavity for a 3 GeV proton radiography
booster,” Phys. Rev. Accel. Beams , vol. 27, no. 2, Feb. 2024.
doi:10.1103/physrevaccelbeams.27.... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 3 |
abf93b32-5cb9-4c7d-a766-5fd7ecb47979 | [8] E. I. Simakov et al. , “Update on the status of C -band high
gradient program at LANL”, in Proc. IPAC'23 , Venice, It-
aly, May 2023, pp. 2057 -2060 .
doi:10.18429/JACoW- IPAC2023- TUPL138
[9] RadiaBeam Technologies , LLC. https://radia-
beam.com
[10] H. Xu et al. , “Plans for cryogenic C -band protot... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4320.pdf | 3 |
4f404318-68c7-46b6-aeb9-d226ad849b0e | PERSPECTIVE ON PROCUREMENTS OF MAJOR COMPONENTS FOR
THE LANSCE ACCELERATOR MODERNIZATION PROJECT (LAMP)
D. A. Dimitrov∗, R. Lujan, H. Xu, D. Gorelov, T. Grumstrup, R. Roquemore, T. Hartzell,
L. Rybarcyk, S. Kurennoy, D. Dominguez, J. Montross, J. Medina, J. Lyles, M. Barrueta,
M. Gulley, M. Pieck, M. Holloway, M. Johns... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 0 |
97e163a5-2763-4228-9033-188c85ddb5bb | LANSCE.LAMPseekstoreplacethetwo750-keVCockroft-
Waltons with a single Radio Frequency Quadrupole (RFQ),
and a new 100-MeV Drift Tank Linac (DTL). Procurements
representasignificantportionoftheproject’sfundingand
drive schedule decisions. We discuss the process to procure
major accelerator components for LAMP with our i... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 0 |
4a89d680-e3d4-40af-9d9f-8795012258c4 | species, H+and H−, and to support simultaneous user oper-
ationsatfiveseparatefacilities[ 1]: theIsotopeProduction
Facility, the Lujan Neutron Scattering Center, the Weapons
NeutronResearchfacility,Proton Radiography,andtheUl-
tracold Neutron source. LANSCE also supports specific
run modes enabling direct access to the... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 0 |
576e098b-3944-47d0-a44d-25f3dd30c69f | In recent years, it has become apparent that the 750 keV
Cockcroft-Walton (C-W) based injectors and 100 MeV drift-
tubelinac(DTL),inparticular,havereachedtheendoftheir
service lives.
∗dandd@lanl.govThe LANSCE Accelerator Modernization Project
(LAMP) will replace the “front end” of the LANSCE
accelerator,from the ion so... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 0 |
3ca9df17-c1e5-4375-bf30-837c14d812bf | celerate the beams from the ion sources for injection into
the DTL.
The project has a strategy for efficient execution reflected
in its schedule shown in Fig. 1. We have developed an ap-
proachforphasedearlyprocurementstimedtocoincidewith
design maturity, prototyping, removal and installation to
meet the schedule. The ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 0 |
b01cb50c-eb87-4ddd-b5c3-568934bf82a2 | performance beam chopper development, the RFQ Test
Stand (RFQTS), and the LAMP in the ADEF (Accelera-
tor Development and Engineering Facility) Tunnel (LAT)
demonstration accelerator.
For LAT, we will construct through the first DTL tank
in the ADEF tunnel for CTE demonstration and pre-
commissioning activities. The LA... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 0 |
3bab0362-7a71-4f32-b9b9-24a3ccc57b88 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4322
2164 MC4.A08: Hadron accelerators: Linear AcceleratorsWEP4322 WEP: Poster session
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 0 |
42a2d7ad-212e-4f61-abc9-304f33c4f8db | Figure1: Theprojectscheduleisdesignedforefficientmanagementanddeliveryofthenewfrontend. Theredlineindicates
the critical path. It highlights the critical importance of delivering procurements to maintain the schedule.
Figure2: Thelow-energybeamtransport(LEBT),theradiofrequencyquadrupole(RFQ),themedium-energybeamtranspo... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 1 |
43875993-26ff-4cd2-9ce2-9b4a5e6bc5c3 | as the software for procurements.
LANLspecifiesdifferentpurchasingthresholds. Acom-
mercial, low-hazard, low-risk, firm fixed price procurement
withacostoflessthan$250Kusesthesimplifiedacquisition
process. For the purpose of the LAMP project, we consider
anyprocurement with an independent costestimate exceed-
ing $250K... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 1 |
4cde4b0e-6d20-4a34-9d73-44ff05ee432c | ule and technical capability are critical for the RFQ and the
DTLtank1procurementsforLAT,wearefollowingthebest
value approach for them.
Asthefirststepfortheseprocurements,theLAMPproject
hasissuedrequestsforinformation(RFIs)tocommunitiesof vendors through the LANL procurement process. The
RFIs and Ariba discovery postin... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 1 |
9fb8a7a4-ea32-472d-ad4a-ab4552d70492 | codesincludestheCURLI,RFQUICK,PARI,PARMTEQM,
and VANES programs. RFQ 3D solid modeling, quasistatic
(electrostatic)simulations,andparticle-in-cellsimulations
were performed using the CST Studio Suite [ 5].
TheCSTsimulationresultswereinexcellentagreement
with the RFQCodes predictions. The RFQ tank will consist
ofmultipl... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 1 |
abcea78c-ad3f-48d5-b869-f36222d7e188 | ISBN: 978-3-95450-252-3 ISSN: 2673-5350 doi: 10.18429/JACoW-IPAC2026-WEP4322
MC4.A08: Hadron accelerators: Linear Accelerators 2165WEP: Poster session WEP4322
Content from this work may be used under the terms of the CC BY 4.0 licence (© 2026). Any distribution of this work must maintain attribution to the author(s), t... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 1 |
7afd4d94-9b67-43fa-8f42-875c157254a2 | deignoftheRFQanditsrequiredperformanceparameters
are described in the technical requirements of the SOW.
Figure3: Longitudinalelectricfielddistributionalongthe
RFQbeamaxis. ResultfromtheCSTElectrostaticSolver
simulation is shown.
SimilarlytotheRFQ,wedesignedthefirsttankoftheDLT
and described it in a SOW that vendors ca... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 2 |
a7ebd9e0-27e4-4fcb-8027-0b7820171e11 | slug tuners and post-couplers.
In addition to the SOW, the RFPs for major procurement
includeseveralotherexhibitsthataredevelopedbydifferent
organizationsatLANLworkingasateam. Theseexhibits
define environmental and safety requirements, institutional
quality requirements, physical and cyber security require-
ments,legal... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 2 |
63aa7338-7870-467c-8807-a1eebd38eb9c | tance tests are passed. Our implemented approach and team
that is in place allows us to effectively manage the major
project procurements to insure their successfuly delivery,
meet the project schedule, and best support the project’s
objectives.
SUMMARY
The costof the RFQ and the DTL represent a significant
portion of ... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 2 |
656dcd45-e581-4929-869c-0549a473c245 | capability and schedule are critical and could be prioritized
toobtainbestvalue. Sincescheduleandtechnicalcapability
arecriticalfortheRFQandtheDTLtank1procurementsfor
LAT,wearefollowingthebestvalueapproachforthemin
ordertoretirescheduleandtechnicalrisktotheLAMPbase-
line. This approach is expected to enable timely acqu... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 2 |
73397b4c-c4e5-428a-b4a7-87150bb26d4e | Nashville, TN, USA, May 2024, pp. 2702-4.
doi:1/zero.alt4.18429/JACoW-IPAC2/zero.alt424-WEPS/zero.alt45
[3]J.W.Lewellen etal.,“LANSCEacceleratormodernization
project conceptual design report”, LANL, NM, USA, Rep.
LA-UR-25-31513, Nov. 2025.
[4]K. R. Crandall et al., “RFQ Design Codes”, LANL, NM,
USA, Rep. LA-UR-96-1836,... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4322.pdf | 2 |
4cab5de7-ea18-4d65-8ba6-984c515811a4 | MATCHING OF CRYSTALLINE BEAMS INTO THE BNL BOOSTER∗
S.J. Brooks†
Brookhaven National Laboratory, Upton, NY, USA
Abstract
A method has been developed to match large three-
dimensional Coulomb crystals into existing accelerators.
Simulationsshowbunchtemperaturesbelow1Kelvinper-
sistingforthousandsofturnsintheBNLBoosteran... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 0 |
66a3792b-c22e-4388-9a19-2e0be13a9b0c | linear stability analysis.
BOOSTER FIELD MODEL
The calculations that follow require a 3D Maxwellian
field model of the booster that is free from discontinuities
near the beam orbit. The basic superperiod lattice from [1]
was implemented, which contains identical bending dipoles
2.4m long and F and D quadrupoles 0.50375... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 0 |
b9df0b1c-4c42-4480-8754-208bed3b6014 | thecomplexcomponentsof tanh(𝑧+𝑖𝑦) .B1isthefieldof
a unit strength dipole, in general it is scaled toB=𝐵 dipB1.
A quadrupole with soft ends does not have an analytic
formula, so the series expansion in [2] is used with a fringe
field function again shaped like1
2+1
2tanh(𝑧/𝑓) . For the
quadrupoles, 𝑓=0.05mandthes... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 0 |
9d0d57c9-522a-4626-816b-a2b10206d064 | Coulombcrystals,whilevelocityspreadandemittanceare
nearzero. Thus,thebunchismodelledasauniformellipsoid
ofcharge withzerotemperature,parametrisedasshownin
Fig.2. Theellipsoidisdefinedbyitscentroid s=⟨(x,v)⟩ ,
covariance matrix 𝐶=⟨𝛿x𝛿x𝑇⟩and velocity distribution 𝑉
where𝛿v=𝑉𝛿x . Space charge forces are linear wit... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 0 |
c2ba20f8-b6d0-4c62-887d-f8cbd8e882e9 | (8 mm)/𝑣 bunch. The centroid dynamics are independent, so
the closed orbit with sin=s outcan be found fairly stan-
dardly using multi-variable Newton iteration, taking care
to find𝑡outthat stops the particle exactly at the end of the
turn. A similar iteration with 15 variables can also solve
(𝐶,𝑉) in=(𝐶,𝑉) outand... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 0 |
487aecb8-61c2-4bb8-8aff-e1ddd0b1a37b | eter and goal vectors are chosen to make 𝐶and𝑉similar
magnitude. A second issue is that for some lattices, 𝑉tends
to infinity after a few cells because one of the ellipsoid’s
axes tries to invert. Unintuitively, the model passes through17th International Particle Accelerator Conference, Deauville, France JACoW Publi... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 0 |
0c05f1d6-9d50-4563-9e6c-7e336a291035 | infinitechargedensityatthistime. Thiscanoccurbecause
althoughshrinkinga3Dchargedistributiontoa0Dpointor
1Dlinetakesinfiniteenergy,a2Dsurfacecanbeobtained
withfiniteenergy. Inreality,thiswouldleadtosemi-random
pairwise scattering between the ions in the crystal, so is not
desired. Thesolutionistoreducethefocussinginthel... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 1 |
3e7a0dae-9e93-45d6-95dc-9e528203c2b8 | axis. This does not happen for the six-variable optimisation
to find s, sincerotations in anevennumber of dimensions
mustonlyleaveapointinvariant. Thelocationontheinvari-
antaxisisafreeparameter,meaningthematchedellipsoid
solution for(𝐶,𝑉)is non-unique. In the case of the booster,
this parameter was observed to corre... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 1 |
1345a4c2-94c8-4a9d-b29d-0646ca9e0d86 | Parameter Value Unit
Ion species Ca+
Kinetic energy per mass 3.2332 MeV/u
Main dipole field𝐵 dip 0.75301 T
F quadrupole gradient 0 T/m
D quadrupole gradient 0.2255 T/m
Machine circumference 201.78 m
Revolution frequency 123.47 kHz
Zero current tunes𝑄 0𝑥,𝑦1.0100, 1.0979 cycles
Table 2: Matched bunch ellipsoid parame... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 1 |
5aac4952-9002-48ba-8450-0387b4cd046f | MULTIPARTICLE SIMULATION
Paultypeiontrapshavebeenbuiltatseveralaccelerator
labs [10–12] and the addition of laser Doppler cooling [13]
can produce Coulomb crystals with a solid structure and
temperaturesinthemilli-Kelvinrange[14]. Asimulationof
such a cooled trap, using the same code as [7], produced an
input distribut... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 1 |
09795b76-2255-4992-82d7-0241f2994ab0 | with only a small amount of emittance growth visible.
Figure 4: Temperature evolution during tracking.
Figure 4 shows how temperature changes during the sim-
ulation, with an average heating rate of 0.5291K/s. The17th International Particle Accelerator Conference, Deauville, France JACoW Publishing
ISBN: 978-3-95450-25... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 1 |
c1a6ea32-22ff-4f22-820d-5ef4103cecb4 | temperature is defined by 𝑇𝑛=𝑚
3𝑘𝐵⟨|v−p 𝑛(x)|2⟩where
p𝑛(x)is the𝑛thorder polynomial least squares fit to v(x).
Thus,𝑇1subtracts both bunch average motion and linear lat-
ticemotionbeforecalculatingthetemperature,whereas 𝑇2
alsoremovesaquadraticcomponent,whichmakesanegligi-
bledifferencehere. Thereisaninitialj... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 2 |
3993ab47-27c5-4a30-9a91-f4e36424b699 | of the model and above ∼0.27T/m the solution has unstable
eigenvalues. The temperature rise shown is due to higher
order effects, likely crystal shear heating from the bunch
aspect ratio changing, with minimal heating occuring close
to where𝜎 𝑧/𝜎𝑥≃1and exponential growth either side.
Figure 6: Covariance matrix evo... | D:\Daily_ihep\Conferences\IPAC2026\WEP\WEP4324.pdf | 2 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.