Job Number
stringlengths 9
10
| Filing Type Name
stringclasses 3
values | Filing Number
stringclasses 21
values | Filing Status Name
stringclasses 17
values | Permit Number
stringlengths 3
15
| Filing Date
stringlengths 3
10
| Permit Issued Date
stringlengths 3
10
| Permit Expiration Date
stringlengths 3
10
| LAASign Off Date
stringlengths 3
10
| Work Type Name
stringclasses 5
values | Location BIN
stringlengths 7
7
| Location House No
stringlengths 1
10
| Location Street Name
stringlengths 3
32
| Location Borough Name
stringclasses 5
values | Proposed Work Summary
stringlengths 1
649
| Building Type Name
stringclasses 5
values | Inspection Type Name
stringclasses 2
values | Inspection Date
stringlengths 3
10
| Latitude
stringlengths 3
9
| Longitude
stringlengths 3
10
| Zip Code
stringclasses 220
values | Community Board
stringclasses 26
values | Council District
stringclasses 52
values | Census Tract
stringlengths 3
8
| NTA
stringclasses 195
values |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
M00136944
|
New Job Filing
|
I1
|
Signed off
|
M00136944-I1-LA
|
03/01/2019
|
03/01/2019
|
03/01/2020
|
04/02/2019
|
Water Plumbing Work
|
1048072
|
107
|
EAST 88 STREET
|
MANHATTAN
|
INSTALL (2) DOMESTIC COLD WATER BOOSTER PUMPS IN CELLAR & RUN AAPROXIMATELY 10 feet OF 2 inches AND 10 feet OF 1 1/2 inches COPPER PIPE AND FITTINGS.
|
Other
|
nan
|
03/31/2019
|
40.781277
|
-73.955745
|
10128.0
|
8.0
|
4.0
|
14802.0
|
Upper East Side-Carnegie Hill
|
B00294242
|
New Job Filing
|
I1
|
Signed off
|
B00294242-I1-LA
|
01/09/2020
|
01/09/2020
|
01/09/2021
|
03/01/2020
|
Water Plumbing Work
|
3168515
|
169
|
BAY 14 STREET
|
BROOKLYN
|
IN APARTMENT 3F ON THE 3RD FLOOR, REPLACE ON EXISTING ROUGHING (1) TOILET, (1) LAV, (1) BATHTUB & (1) RESIDENTIAL KITCHEN SINK.
|
Other
|
Pass-Final
|
02/28/2020
|
40.605502
|
-74.0094
|
11214.0
|
11.0
|
43.0
|
174.0
|
Bath Beach
|
S00294489
|
PAA
|
P3
|
Approved
|
nan
|
10/14/2020
|
nan
|
nan
|
nan
|
Gas Plumbing Work
|
5000129
|
252
|
RICHMOND TERRACE
|
STATEN ISLAND
|
Superseding application no. 510075650. Oil to gas conversion. Replace one boiler. Boiler vents through existing chimney. Install approx. 25 feet of 1 1/4 inches gas piping. No fire stoppings were compromised. Chimney letter attached with plumber feets seal. Register two replacement hot water heaters, which vent through existing chimney.
|
Other
|
nan
|
nan
|
40.647449
|
-74.08146
|
10301.0
|
1.0
|
49.0
|
7.0
|
West New Brighton-New Brighton-St. George
|
Q00393542
|
PAA
|
P1
|
Pre-Filing
|
nan
|
nan
|
nan
|
nan
|
nan
|
Gas Plumbing Work
|
4208955
|
88-12
|
161 STREET
|
QUEENS
|
Filing to remove ECB violations 35515716X, 35445889N, 35445888L, 3544589K,& 35445891M. At cel remove illegal kit sink, gas stove. Remove & cap illegal waste & water piping at cel and remove illegal gas lines at cel. Also reg/rep blr & hwh. Test ext gas meter in cel supplying gas usage for blr & hw in cel. Blr and hwh will be vented thru ext lined chimney which is in good condition. Firestopping will not be compromised.
|
Other
|
nan
|
nan
|
40.707768
|
-73.800825
|
11432.0
|
12.0
|
24.0
|
44602.0
|
Jamaica
|
B00227823
|
New Job Filing
|
I1
|
Permitted
|
B00227823-I1-LA
|
09/17/2019
|
09/17/2019
|
11/30/2020
|
nan
|
Gas Plumbing Work
|
3173817
|
1518
|
EAST 7 STREET
|
BROOKLYN
|
Test gas line to locate leaks. Utility closed gas. Register/replacement of boiler model # GXH 250Z 252000 BTU input mea #25-96-E and 1 AO smith hot water heater model PGC 75 300 75100 BTU input Csa 4.3-2013 no fire stopping to be compromised.
|
1 Family
|
nan
|
nan
|
40.613704
|
-73.967094
|
11230.0
|
12.0
|
44.0
|
440.0
|
Ocean Parkway South
|
M00763355
|
New Job Filing
|
I1
|
Permitted
|
M00763355-I1-LA
|
06/23/2022
|
06/23/2022
|
02/25/2023
|
nan
|
Water Plumbing Work
|
1032551
|
711
|
AMSTERDAM AVENUE
|
MANHATTAN
|
ON THE 6TH FLOOR IN APT 6C, REPLACE ON EXISITING ROUGHING (1) KITCHEN SINK, (1) DISHWASHER, & (1) STOVE. GAS VALVE NOT TO BE TOUCHED. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.793032
|
-73.971097
|
10025.0
|
7.0
|
6.0
|
181.0
|
Upper West Side
|
B-00617071
|
New Job Filing
|
EWN
|
Expired
|
nan
|
10/25/2021
|
nan
|
10/27/2021
|
nan
|
nan
|
3130664
|
1600
|
55 STREET
|
BROOKLYN
|
INSTALLATION OF A TEMPORARY MOBILE BOILER (NYC #20000202584N0001) OUTSIDE THE BUILDING TO PROVIDE TEMPORARY HEAT AND HOT WATER--MOBILE BOILER- WEIL MCLAIN MODEL #1488, CSA#-112973, 4,340,000(INPUT), 3,709,000(OUTPUT). ELECTRICAL WORK PERMIT WAS FILED UNDER DOB APPLICATION B00617054
|
nan
|
nan
|
nan
|
40.627449
|
-73.988648
|
11204.0
|
12.0
|
44.0
|
470.0
|
Borough Park
|
B00424359
|
Subsequent Filing
|
S1
|
Permitted
|
B00424359-S1-LA
|
02/22/2021
|
02/22/2021
|
02/22/2022
|
nan
|
Gas Plumbing Work
|
3002712
|
101
|
ATLANTIC AVENUE
|
BROOKLYN
|
Direct replacement of one (1) gas boiler with one (Burnham IN-10 gas boiler with 315,000 BTU INPUT) Connecting unit to existing gas line and gas meter in cellar . Chimney lined with terra cotta and in good condition.Venting unit to existing chimney to roof.
|
Other
|
nan
|
nan
|
40.690961
|
-73.996917
|
11201.0
|
2.0
|
33.0
|
7.0
|
Brooklyn Heights-Cobble Hill
|
X-00143292
|
New Job Filing
|
EWN
|
Pre-Filing
|
nan
|
nan
|
nan
|
nan
|
nan
|
nan
|
2064074
|
829
|
EAST 229 STREET
|
BRONX
|
Con Ed shut off gas to 2 meters for 2 cooking on first and second floors and one gas fired water heater in basement. Will test for leaks
|
nan
|
nan
|
nan
|
40.889402
|
-73.855016
|
10466.0
|
12.0
|
12.0
|
422.0
|
Williamsbridge-Olinville
|
Q08022829
|
New Job Filing
|
I1
|
Signed off
|
Q08022829-I1-LA
|
11/02/2022
|
11/02/2022
|
05/27/2023
|
11/22/2022
|
Gas Plumbing Work
|
4023766
|
23-39
|
95 STREET
|
QUEENS
|
DUE TO LEAK & GAS SHUTDOWN REPLACE METER BAR FOR EXISTING METER IN BASEMENT & REPLACE APPROX 30 feet OF 3/4 inches GAS PIPE TO THE EXISTING 1ST FL STOVE. METER IS FOR 1ST FL COOKING ONLY. FIRESTOPS WILL BE RESTORED. PIPE THRU APTS & NOT IN HALLWAYS
|
2 Family
|
Pass-Final
|
11/21/2022
|
40.766994
|
-73.874943
|
11369.0
|
3.0
|
21.0
|
357.0
|
East Elmhurst
|
Q08043038
|
New Job Filing
|
I1
|
Permitted
|
Q08043038-I1-LA
|
11/21/2022
|
11/21/2022
|
10/16/2023
|
nan
|
Gas Plumbing Work
|
4224137
|
193-05
|
NERO AVENUE
|
QUEENS
|
IN THE CELL WE WILL REG/REPL 1-GAS BL & 1-GAS HWH VENTING THRU EXSTG CHIMNEY IN GOOD WORKING CONDITION. WE WILL REPLACE APROX. 40 feet OF 1 inches & 30 feet OF 3/4 inches GAS PIPING IN THE CEL & 1ST FLR & REPLACE THE GAS APPLIANCE VALVE & FLEX FOR THE EXSTG GAS STOVE ON THE 1ST FLR ALSO IN THE CEL WE WILL REG/REPL 1-GAS DRYER VENTING THRU THE WALL. FIRESTOP WILL NOT BE COMPROMISED. EXISTING GAS METER IN THE CEL. 1-FAM HOUSE PER COQ 81374 (ATTACHED W/DPL-1).
|
1 Family
|
nan
|
nan
|
40.721544
|
-73.772832
|
11423.0
|
8.0
|
23.0
|
476.0
|
Jamaica Estates-Holliswood
|
Q08041695
|
New Job Filing
|
I1
|
Permitted
|
Q08041695-I1-LA
|
11/21/2022
|
11/21/2022
|
12/31/2022
|
nan
|
Gas Plumbing Work
|
4113236
|
148-09
|
NORTHERN BOULEVARD
|
QUEENS
|
GAS SHUT OFF BY UTILITY DUE TO LEAK. IN APT 2A (2ND FL) REPLACE APPLIANCE VALVE & GAS FLEX. IN THE CELLAR REPLACE METER BAR WITH CLASS 250 AND APPROX 5FT OF 3/4 inches GAS PIPING. PERFORM GAS TEST FROM METER IN CELLAR TO APPLIANCE TO OBTAIN GAS AUTH FOR COOKING. FIRESTOPS NOT COMPROMISED.
|
Other
|
nan
|
nan
|
40.765318
|
-73.817764
|
11354.0
|
7.0
|
20.0
|
1163.0
|
Murray Hill
|
M-08041553
|
New Job Filing
|
EWN
|
Expired
|
nan
|
11/17/2022
|
nan
|
11/21/2022
|
nan
|
nan
|
1013339
|
202
|
9 AVENUE
|
MANHATTAN
|
RENEWAL OF EWN-M-08039547. DUE TO CON EDISON SHUT DOWN PERFORM EMERGENCY REPAIRS TO RE-ESTABLISH HEAT/COOKING TO 4 RESIDENTIAL APARTMENTS.
|
nan
|
nan
|
nan
|
40.746076
|
-74.001617
|
10011.0
|
4.0
|
3.0
|
93.0
|
Hudson Yards-Chelsea-Flatiron-Union Square
|
Q00798441
|
New Job Filing
|
I1
|
Permitted
|
Q00798441-I1-LA
|
08/23/2022
|
08/23/2022
|
08/23/2023
|
nan
|
Gas Plumbing Work
|
4175492
|
84-38
|
250 STREET
|
QUEENS
|
Replacing Oil Boiler with new Gas Fired Navien Combo for Heat and DHW.Upgrading Meter Bar Class 500 A and Installing 30 feet Feet 1-1/4 inches Black Piping ;25 feet Feet 1 inches Black Pipe;15 feet Feet 3/4 inches Black Pipe,To connect dryer in Cellar & 3/4 inches existing gas line to kitchen range stove (existing) on first floor. END USE for COOK HEAT DRYER OTHER HW COIL COMBO TANKLESS. Navien Boiler is Directly Vented Please see sketch in documents tab.
|
1 Family
|
nan
|
nan
|
40.734398
|
-73.71709
|
11426.0
|
13.0
|
23.0
|
157101.0
|
Bellerose
|
M08043469
|
New Job Filing
|
I1
|
Permitted
|
M08043469-I1-LA
|
11/21/2022
|
11/21/2022
|
12/31/2022
|
nan
|
Water Plumbing Work
|
1047418
|
1140
|
FIFTH AVENUE
|
MANHATTAN
|
To Renew and Supersede our LAA# 140158816 which states: LOCATED ON 15TH/PH FLOOR, TO REPLACE LEAKING GALVANIZED OVERHEAD DOMESTIC WATER PIPING HOT AND COLD , ALL PIPING EXPOSED, USING APPROX 40FT OF 4 inches,100FT OF 21/2 inches AND 70FT OF 11/2 ALL COPPER PIPING AND RECONNECT TO EXISTING.IF ANY FURTHER WORK IS NEEDED TO BE DONE AND WILL EXCEED COSTS VALUE A PLAN WILL BE DRAWN AND SUPERCEDE THIS APPLICATION. Firestop not to be compromised.
|
Other
|
nan
|
nan
|
40.787205
|
-73.95594
|
10128.0
|
8.0
|
4.0
|
16001.0
|
Upper East Side-Carnegie Hill
|
B00744313
|
New Job Filing
|
I1
|
Signed off
|
B00744313-I1-LA
|
05/25/2022
|
05/25/2022
|
01/30/2023
|
11/22/2022
|
Water Plumbing Work
|
3157652
|
7115
|
13 AVENUE
|
BROOKLYN
|
ON THE 2ND FLOOR, WE WILL REPLACE ONE (1) LAVATORY, ONE (1) WATER CLOSET, ONE (1) TUB AND ONE (1) KITCHEN SINK ON EXISTING ROUGHING. NO CHANGE OF USE, EGRESS OR OCCUPANCY
|
Other
|
Pass-Final
|
11/21/2022
|
40.622437
|
-74.005194
|
11228.0
|
10.0
|
43.0
|
196.0
|
Dyker Heights
|
Q08043123
|
New Job Filing
|
I1
|
Pre-Filing
|
nan
|
nan
|
nan
|
02/20/2023
|
nan
|
Gas Plumbing Work
|
4253937
|
130-41
|
118 STREET
|
QUEENS
|
FILE CONJUCTON WITH EWN#Q08041105,GAS TURN OFF BY UTILITY. LEAK AT HEADER. TASK 87 MADE REPAIRS. LINE TESTED GAS TURN ON ON 11/21@ 4:00 PM REG/REP. (1) EXISTING FURNACE & (1) HOWWATER HEATER, VENTED THRU EXISTING CHIMNEY IN GOOD WORKING CONDITION. REP. 45 FT OF 11/4 inches & 30 FT OF 3/4 inches GAS PIPE.
|
1 Family
|
nan
|
nan
|
40.674048
|
-73.820778
|
11420.0
|
10.0
|
32.0
|
840.0
|
South Ozone Park
|
M00748458
|
Subsequent Filing
|
S1
|
Permitted
|
M00748458-S1-LA
|
11/21/2022
|
11/21/2022
|
06/27/2023
|
nan
|
Gas Plumbing Work
|
1044830
|
310
|
EAST 70 STREET
|
MANHATTAN
|
IN THE 10TH FLOOR IN APARTMENT 10K EXTEND GAS LINE ABOUT 3 FEET FROM EXISTING GAS VALVE TO INSTALL NEW COOKTOP. ORIGINAL GAS RISER VALVE TO REMAIN.
|
Other
|
nan
|
nan
|
40.767233
|
-73.958722
|
10021.0
|
8.0
|
5.0
|
126.0
|
Lenox Hill-Roosevelt Island
|
B-08041516
|
New Job Filing
|
EWN
|
Expired
|
nan
|
11/17/2022
|
nan
|
11/21/2022
|
nan
|
nan
|
3078620
|
218
|
WEIRFIELD STREET
|
BROOKLYN
|
GAS LEAK & SHUTDOWN. TEST EXISTING GAS LINE FOR HW HEATER & RESIDENTIAL COOKING. MAKE NECESSARY REPAIRS. HEAT IS OIL
|
nan
|
nan
|
nan
|
40.691385
|
-73.910824
|
11221.0
|
4.0
|
37.0
|
413.0
|
Bushwick South
|
M07998682
|
PAA
|
P1
|
Approved
|
nan
|
11/21/2022
|
nan
|
nan
|
nan
|
Water Plumbing Work
|
1000794
|
88
|
GREENWICH STREET
|
MANHATTAN
|
CAP/REMOVE (1) ONE KITCHEN SINK AND (1) ONE GAS RANGE IN APT. 1020 ON 10th FLOOR. COMBINING TWO APARTMENTS. FILED IN CONJUNCTION WITH GC APPLICATION M08011127-I1.
|
Other
|
nan
|
nan
|
40.707731
|
-74.013706
|
10006.0
|
1.0
|
1.0
|
13.0
|
Battery Park City-Lower Manhattan
|
M00398661
|
New Job Filing
|
I1
|
Signed off
|
M00398661-I1-LA
|
09/14/2020
|
09/14/2020
|
03/25/2023
|
11/22/2022
|
Oil Work
|
1062257
|
551
|
WEST 152 STREET
|
MANHATTAN
|
SUPERSEDE LAA#140433243 (LETTER ATTACHED). IN THE CELLAR WE WILL REGISTER/REPLACE (1) WEIL MCLAIN-BL (MDL#380; 340,000 BTU) & (1)BECKETT BURNER (MDL#CF500-W; 340,000 BTU) VENTED THROUGH THE EXISTING CHIMNEY IN GOOD WORKING CONDITION. THIS IS A OIL TO OIL REPLACEMENT. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
Pass-Final
|
11/18/2022
|
40.830431
|
-73.946209
|
10031.0
|
9.0
|
7.0
|
237.0
|
Hamilton Heights
|
M00734067
|
New Job Filing
|
I1
|
Signed off
|
M00734067-I1-LA
|
05/09/2022
|
05/09/2022
|
02/08/2023
|
11/22/2022
|
Water Plumbing Work
|
1043038
|
155
|
EAST 73 STREET
|
MANHATTAN
|
IN UNIT 6B ON THE 6TH FLOOR, IN THE MAIN BATHROOM, REPLACE TOILET, LAV AND TUB W/ NEW SHOWER BODY ALL IN THE SAME LOCATIONS USING APPROX 10 FT OF 2 inches NO HUB PIPE AND 35 FT OF 1/2 inches COPPER PIPE. ALSO REPLACE HOT & COLD WATER VALVES AND BRANCH LINES BACK TO RISERS. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
Pass-Final
|
11/21/2022
|
40.770901
|
-73.961193
|
10021.0
|
8.0
|
4.0
|
128.0
|
Upper East Side-Carnegie Hill
|
Q00732247
|
New Job Filing
|
I1
|
Permitted
|
Q00732247-I1-LA
|
05/05/2022
|
05/05/2022
|
03/25/2023
|
nan
|
Gas Plumbing Work
|
4166385
|
222-13
|
BRADDOCK AVENUE
|
QUEENS
|
to remove violation No# 39056419P to remove the tees in line going to the second floor and on the boiler and HWH. and remove the bushing from the boiler gas line and the union on the gas to the boiler need gas test and finish all work done in the cellar existing meters
|
Other
|
nan
|
nan
|
40.728847
|
-73.737625
|
11428.0
|
13.0
|
23.0
|
1301.0
|
Bellerose
|
B08043207
|
New Job Filing
|
I1
|
Pre-Filing
|
nan
|
nan
|
nan
|
01/30/2023
|
nan
|
Gas Plumbing Work
|
3157651
|
7117
|
13 AVENUE
|
BROOKLYN
|
IN CELLAR WE feetLL REGISTER/REPLACE (1) GAS BOIER BURNHAM MODEL 205NIL-GEZ 130,000 BTU feetS, ANSI Z21.13B-2007 AND (1) HWH AO SMITH MODEL XCV40 100 40,000 BTU feetS CSA 4.1B-2006. ADDITIONATLLY WE WILL ISNTALL APPROX 60 feet OF 1 1/4 inches AND 30 feet OF 3/4 inches GAS PIPE IN CELLAR. VENTILATION THRU EXISTING CHIMNEY IN GOOD CONDITION GAS TEST AND GAS AUTHORIZATION REQUIRED. FIRE STOPS WILL NOT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.622429
|
-74.005202
|
11228.0
|
10.0
|
43.0
|
196.0
|
Dyker Heights
|
B00776319
|
PAA
|
P1
|
Approved
|
nan
|
11/21/2022
|
nan
|
nan
|
nan
|
Oil Work
|
3163419
|
8002
|
21 AVENUE
|
BROOKLYN
|
Installation of a temporary mobile steam trailer outside the building to provide temporary heat and hot water. Mobile boiler is a Best 4B-60 rated at 60 H.P. boiler registration #MD112518-01. In conjunction with electrical application #B00775611.
|
Other
|
nan
|
nan
|
40.606589
|
-73.992624
|
11214.0
|
11.0
|
47.0
|
272.0
|
Bensonhurst West
|
Q08043233
|
New Job Filing
|
I1
|
Pre-Filing
|
nan
|
nan
|
nan
|
05/01/2023
|
nan
|
nan
|
4037053
|
86-10
|
ROOSEVELT AVENUE
|
QUEENS
|
Office space 2B and 2C.
|
Other
|
nan
|
nan
|
40.748039
|
-73.879988
|
11372.0
|
4.0
|
21.0
|
26901.0
|
Elmhurst
|
B08043014
|
New Job Filing
|
I1
|
Pre-Filing - Penalty Review
|
nan
|
nan
|
nan
|
03/11/2023
|
nan
|
Gas Plumbing Work
|
3169978
|
2014
|
CROPSEY AVENUE
|
BROOKLYN
|
FILING TO PERFORM MINOR GAS REPAIRS ON THE 2 inches EXISTING RISER REMOVE ILLEGAL GAS FITTINGS ON THE RISER AS NECESSARY REPACE APPROX 4FT OF 2 inches GAS PIPE AND PERFORM A GAS PRESSURE TEST AS GAS WAS SHUT BY UTILITY CO. RISER SERVICING 3 EXISTING HVAC UNITS ON THE ROOF INSTALLED AND SIGNED OFF UNDER APPLICATION# 301298708 AND AN EXT HW HEATER IN THE CELLAR. GAS TEST AND AUTHORIZATION REQUIRED. GAS USES ARE HVAC, HW HEATER.
|
Other
|
nan
|
nan
|
40.599955
|
-74.002467
|
11214.0
|
11.0
|
43.0
|
286.0
|
Bath Beach
|
M08023068
|
New Job Filing
|
I1
|
Permitted
|
M08023068-I1-LA
|
10/19/2022
|
10/19/2022
|
12/31/2022
|
nan
|
Gas Plumbing Work
|
1089351
|
115
|
EAST 97 STREET
|
MANHATTAN
|
FILING IN CONJUNCTION W/ APPLICATION #121189864 TO PROVIDE TEMPORARY HEAT FOR THE BOILER ON THE 10TH FL & HVAC UNIT ON THE ROOF.RUN APPROX 200 feet X 6 inches & 40 feet X 4 inches GAS PIPE FOR BOILER & APPROX 130 feet OF 2 inches GAS PIPE FOR HVAC.GAS ROUGH INSPECTION DONE UNDER #121189864.GAS TURRENTS & FLAME HOODS ON 8TH & 9TH FL ALSO CONNECTED TO EXG METER.INSTALL (3) SPRINKLER HEADS IN CELLAR BOILER ROOM & RUN APPROX 100 feet X 3/4 inches COPPER PIPE. CONNECTING TO EXISTING DOMESTIC WATER SERVICE.FIRESTOPS WILL NOT BE COMPROMISED
|
Other
|
nan
|
nan
|
40.786874
|
-73.951206
|
10029.0
|
11.0
|
5.0
|
15802.0
|
East Harlem South
|
B08043625
|
New Job Filing
|
I1
|
Pre-Filing - Penalty Review
|
nan
|
nan
|
nan
|
11/26/2022
|
nan
|
Gas Plumbing Work
|
3080319
|
37
|
GRANITE STREET
|
BROOKLYN
|
REPLACE THE DEFECTIVE 1/2 inches GAS LINE WITH NEW 3/4 inches SCHEDULE #40 BLACK PIPE AND FITTINGS, BEGINNING FROM THE EXISTING METER BAR IN THE CELLAR, RUN AND CONNECT TO THE EXISITNG STOVE ON THE FIRST FLOOR FOR APARTMENT #1R. FIRE STOPPING WILL BE RESTORED TO PRIOR LEGAL CONDITIONS.
|
2 Family
|
nan
|
nan
|
40.682714
|
-73.907641
|
11207.0
|
4.0
|
37.0
|
403.0
|
Bushwick South
|
X08043438
|
New Job Filing
|
I1
|
Permitted
|
X08043438-I1-LA
|
11/21/2022
|
11/21/2022
|
01/01/2023
|
nan
|
Gas Plumbing Work
|
2001630
|
1088
|
BROOK AVENUE
|
BRONX
|
Need to perform integrity test on existing gas piping for three of the commercial spaces in building to provide Utility Company with blue card to unlock gas service. No firestopping will be compromised. No gas piping will be installed in public hallways.
|
Other
|
nan
|
nan
|
40.8293
|
-73.910769
|
10456.0
|
3.0
|
16.0
|
143.0
|
East Concourse-Concourse Village
|
Q00737747
|
New Job Filing
|
I1
|
Signed off
|
Q00737747-I1-LA
|
07/20/2022
|
07/20/2022
|
05/31/2023
|
11/22/2022
|
Gas Plumbing Work
|
4081605
|
280
|
ONDERDONK AVENUE
|
QUEENS
|
DUE TO LL152 INSPECTION FOR (4) RES.APTS.1L,1R,2L,2R;BSMT-2ND FL.REPL. APPROX. 300FT OF 3/4 inches BLK PIPE FROM BSMT-2ND FL.REPL.5-METER BARS & 1 1/4 inches GAS MANIFOLD HEADER FOR COOKING&HHW.ALL MTRS EXISTING & IN BSMT.PIPING THRU APTS.NOT HALLWAYS.FIRESTOPS TO BE RESTORED.REPL.APPROX. 75 FT OF 1 1/4 inches BLK PIPE & APPROX. 20 FT OF 3/4 inches BLK PIPE FOR (1)BLR&(1)WH.REGISTER EXISTING BURNHAM KIN7 BLR,INPUT:210,000BTUS & REGISTER REPLACE 1-AO SMITH PCG75, INPUT:75,100 WH.CONNECT TO EXISTG.CHMNY IN GOOD CONDITION
|
Other
|
Pass-Final
|
11/21/2022
|
40.709285
|
-73.916203
|
11385.0
|
5.0
|
34.0
|
539.0
|
Ridgewood
|
X08019699
|
New Job Filing
|
I1
|
Permitted
|
X08019699-I1-LA
|
11/21/2022
|
11/21/2022
|
02/19/2023
|
nan
|
Gas Plumbing Work
|
2013088
|
1973
|
SOUTHERN BOULEVARD
|
BRONX
|
THE REPAIR OF EXISTING GAS LINE TO THE EXISTING HVAC UNIT ON THE ROOF INSTALL UNDER PERMIT #201132452;REPLACE OLD METER BAR AND INSTALL A NEW CLASS 250 METER BAR REQUIRED BY CON EDISON. USING ABOUT 15 feet OF 1 inches BLACK PIPE .NO FIRE STOP WILL BE COMPROMISE AND NO WORK WILL BE DONE IN PUBLIC HALLWAY
|
Other
|
nan
|
nan
|
40.843171
|
-73.885581
|
10460.0
|
6.0
|
17.0
|
36501.0
|
East Tremont
|
B00739670
|
PAA
|
P1
|
Approved
|
nan
|
11/21/2022
|
nan
|
nan
|
nan
|
Oil Work
|
3171510
|
1012
|
AVENUE K
|
BROOKLYN
|
Installation of a temporary mobile steam trailer outside the building to provide temporary heat and hot water. Mobile boiler is a Best Boiler registration #MD112518-01. In conjunction with electrical application #B00734999-I1-EL.
|
Other
|
nan
|
nan
|
40.622281
|
-73.96548
|
11230.0
|
12.0
|
44.0
|
454.0
|
Ocean Parkway South
|
B08043751
|
New Job Filing
|
I1
|
Permitted
|
B08043751-I1-LA
|
11/21/2022
|
11/21/2022
|
04/05/2023
|
nan
|
Gas Plumbing Work
|
3011049
|
4307
|
8 AVENUE
|
BROOKLYN
|
REPLACE OLD GAS BL WITH A NEW GAS BL & A HWH AT EX BL RM IN CEL. RUN APPROX. 25 feet OF 3/4 inches GAS PIPING FOR BL & HWH. VENT USE EX. CHIMNEY WHICH IS IN GOOD WORKING CONDITION. NO GAS PIPING AT PUBLIC HALLWAY. FIRE STOP IS NOT COMPROMISED.
|
Other
|
nan
|
nan
|
40.644928
|
-73.999741
|
11232.0
|
12.0
|
38.0
|
92.0
|
Sunset Park East
|
Q00774702
|
PAA
|
P1
|
Pre-Filing
|
nan
|
nan
|
nan
|
nan
|
nan
|
Gas Plumbing Work
|
4187957
|
7617
|
101 AVENUE
|
QUEENS
|
Gas shut off by utility company due to gas leak. Tighten elbow that is leaking. Perform gas test for 1 ext gas meter in cellar supplying gas usage to 1 hot water heater in cellar, 1 salamander on 1st floor, 1 pizza oven on 1st floor, 1 six burner stove on 1st floor and 1 deep fryer on 1st floor. Firestopping will not be compromised.
|
Other
|
nan
|
nan
|
40.679945
|
-73.861226
|
11416.0
|
9.0
|
32.0
|
42.0
|
Woodhaven
|
X-00359015
|
New Job Filing
|
EWN
|
Pre-Filing
|
nan
|
nan
|
nan
|
nan
|
nan
|
nan
|
2074206
|
2866
|
HARRINGTON AVENUE
|
BRONX
|
Gas turned off to three apartments. We will test existing gas lines. Theses are the only gas lines in building . Laa to follow
|
nan
|
nan
|
nan
|
40.839759
|
-73.833353
|
10461.0
|
10.0
|
13.0
|
264.0
|
Schuylerville-Throgs Neck-Edgewater Park
|
M08020605
|
New Job Filing
|
I1
|
Permitted
|
M08020605-I1-LA
|
10/13/2022
|
10/13/2022
|
12/06/2022
|
nan
|
Water Plumbing Work
|
1001988
|
5
|
WHITE STREET
|
MANHATTAN
|
REPLACE ON EXISTING ROUGHING (1) KITCHEN SINK, (1) TOILET & (1) TUB. RELOCATE (1) LAV & RUN APPROX 2 feet OF 2 inches NO HUB PIPE. RELOCATE (1) STOVE APPROX 10 feet & RUN APPROX 12 feet OF 3/4 inches GAS PIPE. COMMON METER IS EXISTING. FIRESTOPS WILL NOT BE COMPROMISED. ALL WORK DONE IN APT #4A ON THE 4TH FL. LOFT BUILDING PER #120624770
|
Other
|
nan
|
nan
|
40.719322
|
-74.005887
|
10013.0
|
1.0
|
1.0
|
33.0
|
SoHo-TriBeCa-Civic Center-Little Italy
|
M00524405
|
New Job Filing
|
I1
|
Signed off
|
M00524405-I1-LA
|
05/18/2021
|
05/18/2021
|
11/21/2021
|
10/16/2021
|
Water Plumbing Work
|
1078988
|
15
|
BROAD STREET
|
MANHATTAN
|
Location: 36th floor. Apt. 3610: Replace on existing roughing (1) bathtub, (1) lavatory sink, (1) water closet, (1) kitchen sink, (1) dishwasher. No firestopping to be compromised.
|
Other
|
Pass-Final
|
10/15/2021
|
40.706531
|
-74.011022
|
10005.0
|
1.0
|
1.0
|
7.0
|
Battery Park City-Lower Manhattan
|
Q-00094333
|
New Job Filing
|
EWN
|
Expired
|
nan
|
10/30/2018
|
nan
|
11/01/2018
|
nan
|
nan
|
4084039
|
59-09
|
CATALPA AVENUE
|
QUEENS
|
DUE TO CRACKED BOILER, TEST EXISTING GAS LINE AND MAKE NECESSARY REPAIRS.
|
nan
|
nan
|
nan
|
40.702545
|
-73.900685
|
11385.0
|
5.0
|
30.0
|
585.0
|
Ridgewood
|
Q00594692
|
PAA
|
P1
|
Pre-Filing
|
nan
|
nan
|
nan
|
nan
|
nan
|
Water Plumbing Work
|
4207643
|
139-08
|
85 DRIVE
|
QUEENS
|
CAP/REMOVE ONE (3 )PIECE BATHROOM(TOILET, SHOWER, LAVATORY) AT CELLAR LEVEL, CAP/REMOVE (1) RESIDENTIAL SINK AT CELLAR LEVEL, THERE IS NO CHANGE OF USAGE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION, THERE IS NO FIRE STOPPING TO BE COMPROMISED.THIS IS ONE FAMILY DWELLING ONLY, WE CAP/REMOVE ONLY 3 PIECE BATHROOM, DIDN feetT TOUCH THE FIRST FLOOR KITCHEN, SO THERE IS NO CHANGE OF OCCUPANCY. PLEASE SEE THE ATTACHED C OF O.
|
1 Family
|
nan
|
nan
|
40.70879
|
-73.816562
|
11435.0
|
8.0
|
24.0
|
214.0
|
Briarwood-Jamaica Hills
|
B00776544
|
New Job Filing
|
I1
|
Signed off
|
B00776544-I1-LA
|
07/18/2022
|
07/18/2022
|
12/31/2022
|
12/03/2022
|
Fire Suppression Work
|
3388854
|
699
|
92 STREET
|
BROOKLYN
|
Rearrange 10 feet-0 inches of 1 inches piping and replace 1 feet-0 inches of 2 inches piping on the 1st floor. FDNY notification not required as the system will be down less the 8 hours. No change to use, occupancy or egress.
|
Other
|
Pass-Final
|
12/02/2022
|
40.614879
|
-74.023372
|
11228.0
|
10.0
|
43.0
|
152.0
|
Dyker Heights
|
M08048826
|
New Job Filing
|
I1
|
Permitted
|
M08048826-I1-LA
|
12/02/2022
|
12/02/2022
|
01/06/2023
|
nan
|
Fire Suppression Work
|
1087665
|
333
|
EAST 91 STREET
|
MANHATTAN
|
IN APT #32CD ON THE 32ND FLOOR, WILL REARRANGE/REPLACE (5) SPRINKLER HEADS USING APPROX 30 feet OF 1 inches PIPE. SPRINKLER SYSTEM WILL BE SHUTDOWN FOR LESS THAN 8 HOURS. SPRINKLER SYSTEM IS EXISTING AS PER ALT#104723060. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.780692
|
-73.948521
|
10128.0
|
8.0
|
5.0
|
154.0
|
Yorkville
|
M00777523
|
New Job Filing
|
I1
|
Signed off
|
M00777523-I1-LA
|
07/19/2022
|
07/19/2022
|
01/24/2023
|
10/26/2022
|
Fire Suppression Work
|
1081691
|
423
|
EAST 23 STREET
|
MANHATTAN
|
REARRANGEMENT OF (4) SPRINKLER HEADS WITH 40 feet OF 1 inches PIPING CONNECTED TO THE WET SYSTEM ON THE 6TH FLOOR. THE SYSTEM WILL BE DOWN FOR LESS THAN 6 HOURS.
|
Other
|
Pass-Final
|
10/25/2022
|
40.736492
|
-73.977787
|
10010.0
|
6.0
|
4.0
|
62.0
|
Murray Hill-Kips Bay
|
B00794401
|
PAA
|
P1
|
Approved
|
nan
|
09/08/2022
|
nan
|
nan
|
nan
|
Gas Plumbing Work
|
3069610
|
750
|
GRAND STREET
|
BROOKLYN
|
In apts 3C on 3rd floor, and 4E, 4F and 4G on 4th floor, direct replacement of 1 toilet, 1 lav sink, 1 bathtub and 1 kitchen sink on existing roughing in each apt. Cap/remove gas stove in each apt. (Valve to be capped in each individual apt, building is Common/master meter). All stove in all 4 apt to be converted to electric under electrical application B00736418-S1 No firestops compromised.
|
Other
|
nan
|
nan
|
40.711716
|
-73.943041
|
11211.0
|
1.0
|
34.0
|
495.0
|
East Williamsburg
|
B00777326
|
New Job Filing
|
I1
|
Signed off
|
B00777326-I1-LA
|
07/19/2022
|
07/19/2022
|
07/01/2023
|
10/27/2022
|
Gas Plumbing Work
|
3244508
|
212
|
NEPTUNE AVENUE
|
BROOKLYN
|
EWN#B00776338;OIL TO GAS CONV;REPLACE BOILER&INSTALL WATER HTR(WEIL MCLAIN, EG-50, 175,000 BTU, CSA 1052-81 & AO SMITH, XCRL-50, 40,000 BTU INP, CSA 2901-05)CONNECT TO EXIST CHIMN-LINED&IN GOOD COND-INSTALL NEW METER BAR & APP 50 FT OF 1 1/4 inches GAS PIPE FROM NEW METER TO NEW EQUIP IN CEL/BLR RM W/ NEW APPLIANCE VALVE.FIRESTOPS TO BE RESTORED TO CODE COMPLIANT CONDITION;NO PIPE IN HALLWAY.TEST ALL NEW PIPE.275 GAL OIL TANK TO BE REMOVED.REQ 1 ADDTL METER FOR HEAT&WH. EXIST EQUIP S/O ON 320804395.
|
Other
|
Pass-Final
|
10/26/2022
|
40.581665
|
-73.961274
|
11235.0
|
13.0
|
48.0
|
364.0
|
Brighton Beach
|
M00799030
|
New Job Filing
|
I1
|
Permitted
|
M00799030-I1-LA
|
08/24/2022
|
08/24/2022
|
05/01/2023
|
nan
|
Water Plumbing Work
|
1078070
|
267
|
BOWERY
|
MANHATTAN
|
We will install 3 new hand wash sinks on the first floor, on approx 280 feet of 1/2 inches type L copper piping with 1/2 inches fiberglass insulation & 6 feet of 1 1/2 inches rough brass drain piping draining into 3 existing floor sinks. ALL DISTURBED FIREPROOFING WILL BE RESTORED AS PER CODE
|
Other
|
nan
|
nan
|
40.723483
|
-73.992835
|
10002.0
|
3.0
|
1.0
|
3601.0
|
Chinatown
|
B00754578
|
New Job Filing
|
I1
|
Permitted
|
B00754578-I1-LA
|
06/14/2022
|
06/14/2022
|
06/01/2023
|
nan
|
Gas Plumbing Work
|
3030191
|
83
|
KINGSTON AVENUE
|
BROOKLYN
|
IN THE CELLAR REPLACE H/W/H WITH 1-NEW HOT WATER HEATER. NOT TOUCHING THE APPLIANCE VALVE. CONNECTED TO EXISTING CHIMNEY IN GOOD WORKING CONDITION. HOT WATER HEATER ORIGINALLY FILED UNDER #300935558 AND SIGNED OFF. FIRESTOPS WILL NOT BE COMPROMISED. THERE WILL BE NO PIPE IN HALLWAYS.
|
Other
|
nan
|
nan
|
40.676983
|
-73.941473
|
11213.0
|
8.0
|
36.0
|
311.0
|
Crown Heights North
|
B08048694
|
New Job Filing
|
I1
|
Permitted
|
B08048694-I1-LA
|
12/02/2022
|
12/02/2022
|
05/12/2023
|
nan
|
Gas Plumbing Work
|
3110472
|
179
|
EAST 31 STREET
|
BROOKLYN
|
REGISTER/REPLACE 2-GAS BOILERS & 2-HW HEATERS IN CEL.VENT TO EXG CHIMNEY IN GOOD WORKING CONDITION.CHIMNEY IS ADEQUATELY SIZED TO HANDLE THE EQUIPMENT.DUE TO INACTIVITY & GAS SHUTDOWN TEST EXG GAS LINES FOR 2-BOILERS & 2-HW HEATERS IN CEL & FOR EXG 1ST & 2ND FL STOVES.METERS ARE EXG.A PAA WILL FOLLOW IF ADDITIONAL WORK IS REQUIRED.
|
3 Family
|
nan
|
nan
|
40.646261
|
-73.948095
|
11226.0
|
17.0
|
45.0
|
826.0
|
Erasmus
|
M08040753
|
New Job Filing
|
I1
|
Signed off
|
M08040753-I1-LA
|
11/16/2022
|
11/16/2022
|
02/08/2023
|
12/03/2022
|
Gas Plumbing Work
|
1030333
|
239
|
WEST 63 STREET
|
MANHATTAN
|
IN CELLAR LAUNDRY ON CO # JOB 102465832.ON EXISTING (3)GAS DRYERS. REPLACE WITH APROX.6 feetOF3/4 inchesGASPIPE BEHIND EACH DRYER TOTAL APROX.20 feetOF3/4 inches GASPIPE..**REPLACE GAS PIPE AFTER SHUT OFF VALVE**ALL VENTED THRU EXISTING EXHAUST SYSTEM.NO GASPIPE IN PUBLIC HALLWAYS. FIRESTOPS WILL NOT BE COMPROMISED. EXISTING SPRINKLER ON JOB # 103108469-01-EW SP.
|
Other
|
Pass-Final
|
12/02/2022
|
40.773819
|
-73.987919
|
10023.0
|
7.0
|
6.0
|
151.0
|
Lincoln Square
|
B00778119
|
New Job Filing
|
I1
|
Signed off
|
B00778119-I1-LA
|
07/20/2022
|
07/20/2022
|
07/20/2023
|
08/23/2022
|
Gas Plumbing Work
|
3024917
|
237
|
GARFIELD PLACE
|
BROOKLYN
|
REGISTER/REPLACE (1) GAS BOILER & (1) HW HEATER IN CELLAR. VENTING TO EXISTING CHIMNEY IN GOOD WORKING CONDITION. GAS REPAIR NEEDED PER LL152 INSPECTION. REMOVE ILLEGAL FITTINGS & FUTURE CONNECTIONS & REPLACE APPROX 45 feet OF 1 1/4 inches GAS PIPE IN CELLAR & APPROX 30 feet OF 3/4 inches GAS PIPE IN CELLAR & TO THE EXISTING BASEMENT STOVE. METER IS EXISTING. FIRESTOPS WILL BE RESTORED. PIPE THRU APTS & NOT IN HALLWAYS.
|
3 Family
|
Pass-Final
|
08/22/2022
|
40.671797
|
-73.975962
|
11215.0
|
6.0
|
39.0
|
157.0
|
Park Slope-Gowanus
|
M00528145
|
New Job Filing
|
I1
|
Signed off
|
M00528145-I1-LA
|
05/25/2021
|
05/25/2021
|
05/01/2023
|
09/08/2022
|
Gas Plumbing Work
|
1064025
|
371
|
WADSWORTH AVENUE
|
MANHATTAN
|
INSTALL NEW GAS METER OSP AND RUN APPROX. 100 feet OF WELDED 4 inches BLACK PIPE AND APPROX. 10 feet OF 2.5 inches BLACK PIPE TO EXISTING DUAL FUEL BURNER IN BASEMENT-ICI MMG-42P. BOILER IS FEDERAL FST-100(4,200,000 BTU). EXISTING BOILER AND DUAL FUEL BURNER FILED UNDER #104575210. INSTALL APPROX. 90 feet OF 2 inches SWINGOVER PIPING. FIRE STOPPING WILL BE RESTORED. GAS PIPING WILL NOT BE RUN THROUGH PUBLIC HALLWAYS.
|
Other
|
Pass-Final
|
09/07/2022
|
40.856409
|
-73.930069
|
10040.0
|
12.0
|
10.0
|
279.0
|
Washington Heights North
|
B00116253
|
New Job Filing
|
I1
|
Signed off
|
B00116253-I1-LA
|
01/07/2019
|
01/07/2019
|
04/04/2020
|
04/18/2019
|
Gas Plumbing Work
|
3029632
|
85
|
EASTERN PARKWAY
|
BROOKLYN
|
SUPERSEDING LAA: # 340257144 and LAAs 320649704, 320649688, && 320649679 in order to remove SWO --- On 2nd and 3rd floor(Apts 2E , 3B and 3E) in each apartment will replace 1 STOVE (DIRECT REPLACEMENT), 1 WC, 1 LAV, 1 TUB w/ SHOWER BODY on existing roughing . FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
nan
|
04/16/2019
|
40.672676
|
-73.966001
|
11238.0
|
8.0
|
35.0
|
215.0
|
Prospect Heights
|
B08022512
|
New Job Filing
|
I1
|
Signed off
|
B08022512-I1-LA
|
10/17/2022
|
10/17/2022
|
06/17/2023
|
12/03/2022
|
Gas Plumbing Work
|
3125290
|
497
|
MC DONALD AVENUE
|
BROOKLYN
|
In the Cellar: Due to gas leak National Grid shut off gas meter for gas stove in Apt #3R on 3 Flr. Will replace with NEW approx 40 feet of 3/4 inches gas piping for Apt #3R on 3 Flr, from Cellar to 3 Flr only. Gas Authorization required by National Grid. Fire stops will not be compromised.
|
Other
|
Pass-Final
|
12/02/2022
|
40.642017
|
-73.979277
|
11218.0
|
12.0
|
39.0
|
486.0
|
Kensington-Ocean Parkway
|
M00278680
|
New Job Filing
|
I1
|
Permitted
|
M00278680-I1-LA
|
12/10/2019
|
12/10/2019
|
01/26/2023
|
nan
|
Gas Plumbing Work
|
1042042
|
145
|
EAST 62 STREET
|
MANHATTAN
|
We are removing six (6) existing gas meters in the cellar & installing one master meter in the cellar to provide cooking gas to 6 units with 30 feet of 2 inches, 30 feet of 1 1/4 inches , 20 feet of 1 inches, & 20 feet of 3/4 inches black gas piping. All fire stopping will be restored as per code.
|
Other
|
nan
|
nan
|
40.76398
|
-73.966493
|
10065.0
|
8.0
|
4.0
|
11402.0
|
Upper East Side-Carnegie Hill
|
X00797100
|
New Job Filing
|
I1
|
Permitted
|
X00797100-I1-LA
|
08/22/2022
|
08/22/2022
|
01/31/2023
|
nan
|
Gas Plumbing Work
|
2017878
|
414
|
EAST 204 STREET
|
BRONX
|
DUE TO LEAK & GAS SHUTDOWN REPLACE METER BAR & L/W VALVE FOR EXISTING METER IN APT #5J ON THE 5TH FL & REPLACE APPROX 5 feet OF 1 inches & 20 feet OF 3/4 inches GAS PIPE TO THE EXISTING STOVE. REPLACE GAS VALVE & FLEX BEHIND STOVE. FOR COOKING ONLY. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.870664
|
-73.876419
|
10467.0
|
7.0
|
11.0
|
425.0
|
Norwood
|
M00787591
|
PAA
|
P1
|
Approved
|
nan
|
12/02/2022
|
nan
|
nan
|
nan
|
Water Plumbing Work
|
1083349
|
100
|
BEEKMAN STREET
|
MANHATTAN
|
DIRECT REPLACE 1 GAS RANGE AT THE EXISTING GAS ROUGHING, DIRECT REPLACEMENT OF THE FOLLOWING PLUMBING FIXTURES ON EXISTING PLUMBING SYSTEM ROUGH-IN 1 WATER CLOSET, 1 LAVATORY,1 BATHTUB AND 1 KITCHEN SINK IN APT. #19N ON 19TH FLOOR. NO EXISTING BUILDING MATERIALS DISTURBED AND NO EXISTING FIRE STOPS COMPROMISED.
|
Other
|
nan
|
nan
|
40.708275
|
-74.003556
|
10038.0
|
1.0
|
1.0
|
1501.0
|
Battery Park City-Lower Manhattan
|
M00434766
|
New Job Filing
|
I1
|
Permitted
|
M00434766-I1-LA
|
12/01/2020
|
12/01/2020
|
03/31/2023
|
nan
|
Gas Plumbing Work
|
1082418
|
787
|
9 AVENUE
|
MANHATTAN
|
EWN# M00433529, PREV# M00431559&M00430168; REPLACE BOILER (WEIL MCLAIN, LGB-6, 650,000 BTU INP, CSA 1502-01), S/O ON 103636736 IN CEL/BLR RM, CONNECT TO EXST CHIMNEY-LINED/IN GOOD CONDITION. INSTALL APP 40FT OF 2 inches GAS PIPE FROM EXIST MTR TO NEW BLR IN CEL/BLR RM, W/ NEW APPLIANCE VALVE. FIRESTOPS TO BE RESTORED TO CODE COMPLIANT CONDITIONS; NO PIPING IN HALLWAY. TEST ALL NEW PIPE. EXIST HOT WTR BLR (AO SMITH, HW-300, 300,000 BTU INPUT, CSA2902-93) S/O ON 103636736 TO REMAIN.
|
Other
|
nan
|
nan
|
40.765
|
-73.987856
|
10019.0
|
4.0
|
3.0
|
133.0
|
Clinton
|
X00719082
|
New Job Filing
|
I1
|
Permitted
|
X00719082-I1-LA
|
04/14/2022
|
04/14/2022
|
01/16/2023
|
nan
|
Gas Plumbing Work
|
2009615
|
546
|
EAST 170 STREET
|
BRONX
|
DUE TO GAS SHUTDOWN BY UTILITY CO BECAUSE OF LEAK ON HOUSE PIPE, WILL TEST GAS LINES TO (2) MODINE UNIT HEATERS AT 1ST FL. REG/REP 2-MODINE HEATERS VENTED THRU THE ROOF OF 1-STORY BUILDING. WILL INSTALL NEW CL500 METER BAR ON EXISITING METER & REPLACE APPROX 35 feet OF 1-1/4 inches & 65 feet OF 1 inches BLACK PIPE & FITTINGS. NO GAS PIPE IN PUBLIC HALLWAYS. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.834829
|
-73.902783
|
10456.0
|
3.0
|
16.0
|
14701.0
|
Claremont-Bathgate
|
B00772655
|
New Job Filing
|
I1
|
Permitted
|
B00772655-I1-LA
|
07/11/2022
|
07/11/2022
|
02/07/2023
|
nan
|
Water Plumbing Work
|
3064337
|
305
|
MCGUINESS BOULEVARD
|
BROOKLYN
|
Work on the floors: Cellar. Scope of the work: Installation of new 3 inches RPZ and connecting to existing 3 inches meter . Installation of 6 inches DCDA as per DEP approved cross connection letter# 22091376. RPZ will be drained through the nearest 4 inches floor drain according to approved cross connection letter.
|
Other
|
nan
|
nan
|
40.732677
|
-73.95204
|
11222.0
|
1.0
|
33.0
|
575.0
|
Greenpoint
|
M00662724
|
New Job Filing
|
I1
|
Permitted
|
M00662724-I1-LA
|
01/13/2022
|
01/13/2022
|
01/14/2023
|
nan
|
Fire Suppression Work
|
1081694
|
530
|
FIRST AVENUE
|
MANHATTAN
|
REARRANGEMENT OF (1) UPRIGHT SPRINKLER HEAD WITH 7 feet OF 1 inches PIPING CONNECTED TO THE WET SYSTEM ON THE CELLAR. THE SYSTEM WILL BE DOWN FOR LESS THAN 4 HOURS.
|
Other
|
nan
|
nan
|
40.741659
|
-73.975049
|
10016.0
|
6.0
|
4.0
|
62.0
|
Murray Hill-Kips Bay
|
M00755413
|
New Job Filing
|
I1
|
Permitted
|
M00755413-I1-LA
|
06/14/2022
|
06/14/2022
|
01/31/2023
|
nan
|
Gas Plumbing Work
|
1062962
|
504
|
WEST 167 STREET
|
MANHATTAN
|
LEAK/GAS SHUTDOWN-REPLACE 3 inches FLANGE BEFORE THE EXG METER IN CEL & TEST EXG GAS LINE FOR EXG BOILER, B.PILOT & HW HEATER IN CEL.PREVIOUSLY FILED UNDER #140417742. REPLACE APX 100 feet X 1 1/4 inches GAS PIPE FROM CEL TO 5TH FL FOR EXG STOVES IN (21) RESID APTS-1A-5A,1B-5B,1C-5C,1D-5D (FLS 1-5) & FOR SUPERS APT IN CEL.REPLACE METER BAR & LW VALVE FOR EXG METER & APX 20 feet X 3/4 inches GAS PIPE & REPLACE GAS VALVE & FLEX IN EACH APT. FIRESTOPS WILL BE RESTORED.PIPE THRU APTS.NOT IN HLLWY.HEAT & HW RESTORED ON 7/21
|
Other
|
nan
|
nan
|
40.839429
|
-73.937687
|
10032.0
|
12.0
|
10.0
|
251.0
|
Washington Heights South
|
M00788109
|
New Job Filing
|
I1
|
Permitted
|
M00788109-I1-LA
|
08/04/2022
|
08/04/2022
|
01/24/2023
|
nan
|
Fire Suppression Work
|
1036223
|
299
|
PARK AVENUE
|
MANHATTAN
|
INSTALLATION OF (4) SPRINKLER HEADS WITH 40 feet OF 1 inches PIPING, CONNECTED TO THE WET SYSTEM ON THE 37TH FLOOR. THE SYSTEM WILL BE DOWN FOR LESS THAN 6 HOURS.
|
Other
|
nan
|
nan
|
40.756456
|
-73.974495
|
10171.0
|
5.0
|
4.0
|
92.0
|
Turtle Bay-East Midtown
|
B08031214
|
New Job Filing
|
I1
|
Permitted
|
B08031214-I1-LA
|
10/31/2022
|
10/31/2022
|
07/01/2023
|
nan
|
Gas Plumbing Work
|
3327739
|
3001
|
CHURCH AVENUE
|
BROOKLYN
|
SUPERSEDE LAA# 340199485 OIL TO GAS CONVERSION; BOILER (WEIL MCLAIN, EG-75, CSA 1052-81, 282,000 BTU INPUT), CONNECTED TO EXISTING CHIMNEY-LINED & IN GOOD CONDITION IN CELLAR/BOILER ROOM. EXISTING EQUIPMENT FILED AND GAS AUTHORIZED ON 340199485. NO NEW PIPING. EXISTING METER & RISER TO REMAIN. NO GAS TEST REQUIRED.
|
Other
|
nan
|
nan
|
40.650824
|
-73.949424
|
11226.0
|
17.0
|
40.0
|
818.0
|
Erasmus
|
Q08048825
|
New Job Filing
|
I1
|
Permitted
|
Q08048825-I1-LA
|
12/02/2022
|
12/02/2022
|
07/04/2023
|
nan
|
Gas Plumbing Work
|
4052427
|
71-36
|
110 STREET
|
QUEENS
|
GAS SHUT DUE TO LEAK AT CELLAR GAS METER FOR APT 3J COOKING ONLY. REPLACE 3/4 inches APPLIANCE VALVE AND FLEXIBLE CONNECTORNO GAS IN STAIRWEELS , SHAFTS OR PUBLIC CORRIDORS FIRES TOP WILL NOT BE COMPROMISED
|
Other
|
nan
|
nan
|
40.721494
|
-73.841131
|
11375.0
|
6.0
|
29.0
|
739.0
|
Forest Hills
|
B00776390
|
New Job Filing
|
I1
|
Permitted
|
B00776390-I1-LA
|
07/18/2022
|
07/18/2022
|
07/01/2023
|
nan
|
Gas Plumbing Work
|
3330612
|
438
|
12 STREET
|
BROOKLYN
|
REPLACE 2 GAS BOILERS (LOCHINVAR, PBN0502-M13, CSA 112397, 500,000 BTU INPUT EACH), CONNECTED TO EXISTING CHIMNEY-LINED & IN GOOD CONDITION IN CELLAR/BOILER ROOM. EXISTING BOILERS SIGNED OFF ON 320829957. NO NEW PIPING. EXISTING METER & RISER TO REMAIN. NO GAS TEST REQUIRED.
|
Other
|
nan
|
nan
|
40.664459
|
-73.98179
|
11215.0
|
6.0
|
39.0
|
151.0
|
Park Slope-Gowanus
|
S00753959
|
New Job Filing
|
I1
|
Signed off
|
S00753959-I1-LA
|
06/08/2022
|
06/08/2022
|
05/01/2023
|
07/02/2022
|
Gas Plumbing Work
|
5164857
|
38B
|
MONTGOMERY AVENUE
|
STATEN ISLAND
|
Gas meter was removed by National Grid in 2020. Install 3 PSI test on all gas pipe & fittings from outlet side of meter bar to all gas appliances.
|
3 Family
|
Pass-Final
|
07/01/2022
|
40.640729
|
-74.078551
|
10301.0
|
1.0
|
49.0
|
11.0
|
West New Brighton-New Brighton-St. George
|
M00795076
|
New Job Filing
|
I1
|
Permitted
|
M00795076-I1-LA
|
08/17/2022
|
08/17/2022
|
01/24/2023
|
nan
|
Fire Suppression Work
|
1020338
|
240
|
EAST 38 STREET
|
MANHATTAN
|
REARRANGEMENT OF (8) BRANCH LINES OF SPRINKLER PIPING WITH APROX 120 feet of 2 1/2 inches PIPING CONNECTED TO THE WET SYSTEM ON THE 16th FLOOR. THE SYSTEM WILL BE DOWN FOR LESS THAN 7 HOURS.
|
Other
|
nan
|
nan
|
40.747681
|
-73.974975
|
10016.0
|
6.0
|
4.0
|
78.0
|
Murray Hill-Kips Bay
|
Q08048703
|
New Job Filing
|
I1
|
Permitted
|
Q08048703-I1-LA
|
12/02/2022
|
12/02/2022
|
05/01/2023
|
nan
|
Gas Plumbing Work
|
4019402
|
23-92
|
23 STREET
|
QUEENS
|
Replace existing boiler with new Burnham Steam Max 200 of 200,000 BTU connected to existing piping, vented to existing chimney. Register replacement boiler and existing hwh AO Smith PCG75 of 75000 BTU. Test gas line from existing meter in cel to boiler and hwh. No firestops to be compromised.
|
Other
|
nan
|
nan
|
40.776062
|
-73.920344
|
11105.0
|
1.0
|
22.0
|
97.0
|
Steinway
|
B07994284
|
New Job Filing
|
I1
|
Signed off
|
B07994284-I1-LA
|
09/08/2022
|
09/08/2022
|
04/15/2023
|
10/29/2022
|
Gas Plumbing Work
|
3245039
|
3101
|
BRIGHTON 1 PLACE
|
BROOKLYN
|
REMOVE & CAP OFF 1- GAS BOILER & 1- HOT WATER HEATER IN THE BASEMENT, INSTALLED UNDER ARA #301844440. INSTALL 1- NAVIEN NCB-240/130H (NG) 240,000 BTUs INPUT COMBINATION BOILER & HOT WATER HEATER WITH NEUTRALIZING KIT. PERFORM GAS TEST. FIRESTOPS WON feetT BE COMPROMISED.
|
2 Family
|
Pass-Final
|
10/28/2022
|
40.576237
|
-73.965752
|
11235.0
|
13.0
|
48.0
|
36001.0
|
Brighton Beach
|
M08020720
|
New Job Filing
|
I1
|
Permitted
|
M08020720-I1-LA
|
10/13/2022
|
10/13/2022
|
04/24/2023
|
nan
|
Gas Plumbing Work
|
1003332
|
93
|
MADISON STREET
|
MANHATTAN
|
(EWN-M-08014223/M08016373) DUE TO GAS SHUTDOWN BY UTILITY CO, WE TESTED EXISTING GAS LINES TO APPLIANCES (1-BOILER FOR HEAT & 1-AO SMITH BOILER FOR DOM HW IN CEL). WILL REPLACE APPROX 20 feet OF 2 inches GAS PIPE & FITTINGS & INSTALL NEW ROTARY GAS METER IN CEL. GAS IS FOR HEAT/HW ONLY. REGISTER/REPLACE 1-BL FOR HEAT & 1-BL FOR DOMESTIC HW VENTED THRU EXIST CHIMNEY IN GOOD WORKING CONDITION. NO GAS PIPE IN PUBLIC HALLWAYS. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.712197
|
-73.995657
|
10002.0
|
3.0
|
1.0
|
8.0
|
Chinatown
|
B00416304
|
New Job Filing
|
I1
|
Permitted
|
B00416304-I1-LA
|
10/20/2020
|
10/20/2020
|
03/29/2023
|
nan
|
Gas Plumbing Work
|
3257168
|
2501
|
SNYDER AVENUE
|
BROOKLYN
|
GAS TO GAS DIRECT APPLIANCE REPLACEMENT OF (1) GAS BOILER AND (1) GAS FIRED HOT WATER HEATER IN BASEMENT-WILLIAMSON GWA-210(210,000 BTU INPUT) AND AO SMITH FCG-75(75,100 BTU) . CONNECT TO EXISTING LINED CHIMNEY IN GOOD CONDITION.INITIAL GAS BOILER INSTALLATION FILED UNDER NB 136/87(PROOF UPLOADED WITH DPL). GAS COCKS WILL NOT BE TOUCHED.NO GAS TEST NECESSARY FOR THIS JOB.FINISH INSPECTIONS ONLY. NO GAS AUTHORIZATION REQUIRED.FIRE STOPPING WILL NOT BE COMPROMISED.C OF O-1989-NO ACP-5 NECESSARY.
|
Other
|
nan
|
nan
|
40.648737
|
-73.953898
|
11226.0
|
17.0
|
40.0
|
794.0
|
Erasmus
|
M00650354
|
New Job Filing
|
I1
|
Signed off
|
M00650354-I1-LA
|
12/22/2021
|
12/22/2021
|
12/22/2022
|
12/03/2022
|
Gas Plumbing Work
|
1001040
|
125
|
CEDAR STREET
|
MANHATTAN
|
DUE TO GAS SHUTDOWN BY UTILITY CO BECAUSE OF LEAK, WILL TEST EXIST GAS LINE FROM METER TO APPLIANCE (BOILER PILOT IN CELLAR). REGISTER/REPLACE BOILER PILOT WITH APPROX 100 feet X 3/4 inches PIPE IN CELLAR. CAP & REMOVE RESIDENTIAL GAS STOVES IN 22 APTS ON FLRS 002-013 AS TENANTS WILL CONVERT TO ELECTRIC AS PER ELECTRICAL PERMITS #M00781793 (SEE ATTACHED). NO GAS PIPE IN ANY PUBLIC HALLWAYS. FIRESTOPS TO BE RESTORED AS PER NYC CODE. CO# 104294942 W/ DPL1.
|
Other
|
Pass-Final
|
12/02/2022
|
40.70963
|
-74.012635
|
10006.0
|
1.0
|
1.0
|
13.0
|
Battery Park City-Lower Manhattan
|
M00691080
|
New Job Filing
|
I1
|
Signed off
|
M00691080-I1-LA
|
03/03/2022
|
03/03/2022
|
03/03/2023
|
04/26/2022
|
Water Plumbing Work
|
1031730
|
22
|
WEST 96 STREET
|
MANHATTAN
|
IN APT #1-2 ON THE FIRST FLOOR, WILL REPLACE/RELOCATE 1-WATER CLOSET, REPLACE 1-LAV W/ 2-LAVS & RELOCATE IN EXISTING BATHROOM & REMOVE BATHTUB & INSTALL SHOWER STALL W/ NEW SHOWER BODY. WILL REPLACE APPROX 40 feet OF 2 inches CAST IRON, 5 feet OF 4 inches CAST IRON, 20 feet OF 3/4 inches COPPER & 20 feet OF 1/2 inches COPPER WATER PIPING. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
Pass-Final
|
04/25/2022
|
40.791965
|
-73.965424
|
10025.0
|
7.0
|
6.0
|
181.0
|
Upper West Side
|
X00798646
|
New Job Filing
|
I1
|
Signed off
|
X00798646-I1-LA
|
08/24/2022
|
08/24/2022
|
05/01/2023
|
10/01/2022
|
Gas Plumbing Work
|
2017146
|
210
|
EAST 198 STREET
|
BRONX
|
DUE TO LEAK AND CON ED SHUTDOWN, REPLACE/RELOCATE GAS METER BAR AND APPROX. 20 feet OF 3/4 inches BLACK PIPE TO EXISTING STOVE IN APARTMENT #F1 ON THE FIFTH FLOOR FOR COOKING USE ONLY. REPLACE 3/4 inches GAS COCK AND GAS FLEX BEHIND STOVE. FIRE STOPPING WILL NOT BE COMPROMISED. NO GAS PIPING IN PUBLIC HALLWAY.
|
Other
|
Pass-Final
|
09/30/2022
|
40.869841
|
-73.890453
|
10458.0
|
7.0
|
15.0
|
40302.0
|
Bedford Park-Fordham North
|
X00567661
|
New Job Filing
|
I1
|
Signed off
|
X00567661-I1-LA
|
07/07/2022
|
07/07/2022
|
05/01/2023
|
09/07/2022
|
Gas Plumbing Work
|
2013832
|
2615
|
GRAND CONCOURSE
|
BRONX
|
DUE TO LEAK AND CON ED SHUTDOWN, REPLACE APPROX. 80 feet OF 3/4 inches BLACK PIPE FROM CELLAR TO 2ND FLOOR ON PIPING FEEDING EXISTING STOVES FOR APTS:1E-6E(FLRS 1-6). PIPING RUN IN APARTMENTS. TEST GAS LINE FOR APT #1H ON THE FIRST FLOOR-EXISTING COOKING USE ONLY. METERS IN CELLAR. COOKING USE ONLY. REPLACE 3/4 inches GAS COCKS BEHIND STOVES. NO GAS PIPING IN PUBLIC HALLWAYS. FIRESTOPPING WILL NOT BE RESTORED.
|
Other
|
Pass-Final
|
09/06/2022
|
40.864998
|
-73.895204
|
10468.0
|
7.0
|
14.0
|
401.0
|
Bedford Park-Fordham North
|
Q00778420
|
Subsequent Filing
|
S1
|
Pre-Filing
|
nan
|
nan
|
nan
|
03/25/2023
|
nan
|
Water Plumbing Work
|
4016179
|
23-71
|
36 STREET
|
QUEENS
|
Subsequent filing for amend the work level from cellar to basement for LAA Q00778420, no work will be done under subsequent filing, work all done under LAA Q00778420( Cap/Remove the illegal residential sink at the basement level, legalize (3) piece bathroom((TOILET, SINK, SHOWER) at the basement, remove violations 35638048J 35643700H 35643702L 35643703N 35638049L, there is no change of egress and C/O, there is no firestopping compromised.)
|
2 Family
|
nan
|
nan
|
40.771154
|
-73.912096
|
11105.0
|
1.0
|
22.0
|
117.0
|
Steinway
|
M00763656
|
New Job Filing
|
I1
|
Signed off
|
M00763656-I1-LA
|
06/23/2022
|
06/23/2022
|
01/24/2023
|
10/28/2022
|
Fire Suppression Work
|
1023161
|
1301
|
SIXTH AVENUE
|
MANHATTAN
|
REARRANGEMENT OF (14) SPRINKLER HEADS WITH 140 feet OF 1 inches DIAMETER CONNECTED TO THE WET SYSTEM ON THE 6TH FLOOR. THE SYSTEM WILL BE DOWN FOR LESS THAN 7 HOURS.
|
Other
|
Pass-Final
|
10/27/2022
|
40.761244
|
-73.979457
|
10019.0
|
5.0
|
4.0
|
131.0
|
Midtown-Midtown South
|
Q00759212
|
New Job Filing
|
I1
|
Signed off
|
Q00759212-I1-LA
|
06/16/2022
|
06/16/2022
|
05/01/2023
|
11/11/2022
|
Water Plumbing Work
|
4434637
|
86-72
|
208 STREET
|
QUEENS
|
IN THE CELLAR, REPLACE (64) 1/2 inches DRAIN VALVES, (32) 1 inches WATER RISER VALVES AND (32) 3/4 inches WATER RISER VALVES THROUGHOUT COMPLEX. SEPARATE LAA feetS TO BE FILED FOR EACH BIN#. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
Pass-Final
|
11/10/2022
|
40.723763
|
-73.759879
|
11427.0
|
8.0
|
23.0
|
492.0
|
Jamaica Estates-Holliswood
|
Q00789969
|
New Job Filing
|
I1
|
Permitted
|
Q00789969-I1-LA
|
08/09/2022
|
08/09/2022
|
06/05/2023
|
nan
|
Gas Plumbing Work
|
4466304
|
4
|
ESSEX WALK
|
QUEENS
|
DUE TO INACTIVITY & GAS SHUTDOWN TEST EXISTING GAS LINE FOR HW HEATER & COOKING. METER IS EXISTING. A PAA WILL FOLLOW IF ADDITIONAL REPAIR WORK IS REQUIRED.
|
1 Family
|
nan
|
nan
|
40.557108
|
-73.916002
|
11697.0
|
14.0
|
32.0
|
91601.0
|
Breezy Point-Belle Harbor-Rockaway Park-Broad Channel
|
B00791545
|
New Job Filing
|
I1
|
Signed off
|
B00791545-I1-LA
|
08/11/2022
|
08/11/2022
|
06/29/2023
|
12/03/2022
|
Gas Plumbing Work
|
3066774
|
112A
|
NASSAU AVENUE
|
BROOKLYN
|
REMOVE OIL TANK AND OIL BOILER INSTALLED UNDER 300262686. INSTALL NEW CLASS 400 METER BAR IN THE CELLAR. INSTALL 1.25 inches GAS LINE. INSTALL GAS FIRED BOILER AND HOT WATER HEATER IN THE CELLAR. HOOK UP TO EXISTING BRICK CHIMNEY. USE APPROXIMATELY 50 feet OF 1.25 inches GAS PIPING , 15 feet OF 3/4 inches GAS PIPING, AND 20 feet OF 3/4 inches WATER PIPING. FIRE STOPPING WILL NOT BE COMPROMISED.
|
Other
|
Pass-Final
|
12/02/2022
|
40.72426
|
-73.949289
|
11222.0
|
1.0
|
33.0
|
571.0
|
Greenpoint
|
Q00747214
|
New Job Filing
|
I1
|
Signed off
|
Q00747214-I1-LA
|
05/27/2022
|
05/27/2022
|
01/29/2023
|
06/30/2022
|
Gas Plumbing Work
|
4160228
|
56-16
|
217 STREET
|
QUEENS
|
REGISTER/REPLACE (1) HW HEATER IN CELLAR.VENTING TO EXISTING CHIMNEY IN GOOD WORKING CONDITION. REGISTER/REPLACE DRYER IN CELLAR VENTED THRU THE WALL.DUE TO LEAK & GAS SHUTDOWN REPLACE (1) METER BAR FOR EXISTING METER & REPLACE APPROX 40 feet OF 1 inches & 50 feet OF 3/4 inches GAS PIPE IN CELLAR TO HW HEATER & DRYER & TO THE EXISTING 1ST FL STOVE.REPLACE (1) METER BAR FOR EXISTING METER & CONNECT TO EXISTING GAS LINE FOR EXISTING 2ND FL STOVE. FIRESTOPS WILL BE RESTORED.PIPE THRU APTS & NOT IN HALLWAYS.HEAT IS OIL
|
2 Family
|
Pass-Final
|
06/29/2022
|
40.751202
|
-73.762145
|
11364.0
|
11.0
|
23.0
|
1399.0
|
Bayside-Bayside Hills
|
Q08036396
|
New Job Filing
|
I1
|
Permitted
|
Q08036396-I1-LA
|
11/08/2022
|
11/08/2022
|
04/15/2023
|
nan
|
Gas Plumbing Work
|
4002458
|
41-00
|
43 AVENUE
|
QUEENS
|
REPLACE 1- GAS VALVE BEHIND GAS RANGE IN APT. 3CW ON THE 3RD FLOOR. PERFORM GAS TEST FROM METER IN THE CELLAR TO 3RD FLOOR FOR THE GAS RANGE IN THE APT. FIRESTOPS WON feetT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.745413
|
-73.922852
|
11104.0
|
2.0
|
26.0
|
18102.0
|
Hunters Point-Sunnyside-West Maspeth
|
B08046502
|
New Job Filing
|
I1
|
Permitted
|
B08046502-I1-LA
|
11/29/2022
|
11/29/2022
|
05/01/2023
|
nan
|
Gas Plumbing Work
|
3325940
|
107
|
SMITH STREET
|
BROOKLYN
|
DUE TO VACANCY AND UTILITY SHUTDOWN, REPLACE METER BAR FEEDING EXISITING COOKING GAS FOR APARTMENT 1R ON THE SECOND FLOOR. REPLACE 3/4 inches GAS COCK AND GAS FLEX BEHIND STOVE IN APARTMENT. METER IS IN CELLAR. PERFORM INTEGRITY TEST. NO GAS PIPING IN PUBLIC HALLWAYS. FIRESTOPPING WILL NOT BE COMPROMISED.
|
Other
|
nan
|
nan
|
40.68818
|
-73.989467
|
11201.0
|
2.0
|
33.0
|
43.0
|
DUMBO-Vinegar Hill-Downtown Brooklyn-Boerum Hill
|
Q00661285
|
New Job Filing
|
I1
|
Revoked
|
Q00661285-I1-LA
|
01/12/2022
|
01/12/2022
|
01/12/2023
|
nan
|
Water Plumbing Work
|
4052987
|
48-22
|
45 STREET
|
QUEENS
|
REMOVE & CAP OFF 2- GAS FIRED BOILERS IN THE CELLAR, 1- WATER HEATER IN THE CELLAR, 1- GAS METER IN THE CELLAR AND 1- GAS RANGE ON THE 1ST FLOOR (THE BUILDING WILL BE HEATED WITH AN HVAC HEAT PUMP SYSTEM UNDER 5 TON - NO HVAC PERMIT REQUIRED, UNDER ELECTRICAL PERMIT #Q00658985-I1-EL)). INSTALL 1- A.O.SMITH HPTU-66 66 GALLON VOLTEX HYBRID ELECTRIC HEAT PUMP WATER HEATER. FIRE STOPS WON feetT BE COMPROMISED.
|
2 Family
|
nan
|
nan
|
40.738758
|
-73.920536
|
11377.0
|
2.0
|
26.0
|
18501.0
|
Hunters Point-Sunnyside-West Maspeth
|
M00679946
|
New Job Filing
|
I1
|
Signed off
|
M00679946-I1-LA
|
02/14/2022
|
02/14/2022
|
02/14/2023
|
05/14/2022
|
Water Plumbing Work
|
1009208
|
826
|
BROADWAY
|
MANHATTAN
|
ON THE FIRST FLOOR (STRAND BOOKSTORE), WE WILL INSTALL (1)NEW 3-COMPARTMENT SINK, (1)HAND WASHING SINK & (1) FUNNEL DRAIN USING APPROX 150 feet OF 2 inches NO HUB & APPROX 50 feet OF 1/2 inches COPPER PIPING TIED INTO EXISTING WATER/SANITARY PIPING. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
Pass-Final
|
05/13/2022
|
40.733326
|
-73.991077
|
10003.0
|
2.0
|
2.0
|
61.0
|
West Village
|
X00661181
|
New Job Filing
|
I1
|
Signed off
|
X00661181-I1-LA
|
01/12/2022
|
01/12/2022
|
01/12/2023
|
02/26/2022
|
Water Plumbing Work
|
2003266
|
1150
|
OGDEN AVENUE
|
BRONX
|
Filing to install (1) 3/4 inches RPZ. Watts LF009M3QT at the first floor. Install 2 inches no hub drain pipe with 4 inchesX2 inches no hub cup fitting for the RPZ discharge. DEP approval number 21089620. Installation will be in compliance with NYC Plumbing code and table 608.1.
|
Other
|
Pass-Final
|
02/25/2022
|
40.83656
|
-73.927315
|
10452.0
|
4.0
|
16.0
|
199.0
|
Highbridge
|
M07994301
|
New Job Filing
|
I1
|
Signed off
|
M07994301-I1-LA
|
08/26/2022
|
08/26/2022
|
06/22/2023
|
09/17/2022
|
Water Plumbing Work
|
1001201
|
80
|
NASSAU STREET
|
MANHATTAN
|
IN THE CELLAR WE WILL INSTALL NEW WATER LINE FOR (1) NEW 80 GALLON ELECTRIC WATER HEATER (ELECTRICAL PERMIT #M07993303) USING APPROX 2 feet OF 1-1/2 inches & 60 feet OF 3/4 inches COPPER PIPE & FITTINGS. FIRESTOPS WILL NOT BE COMPROMISED.
|
Other
|
Pass-Final
|
09/16/2022
|
40.709823
|
-74.008119
|
10038.0
|
1.0
|
1.0
|
1502.0
|
Battery Park City-Lower Manhattan
|
B00712549
|
New Job Filing
|
I1
|
Signed off
|
B00712549-I1-LA
|
04/05/2022
|
04/05/2022
|
04/05/2023
|
07/21/2022
|
Water Plumbing Work
|
3076848
|
350
|
IRVING AVENUE
|
BROOKLYN
|
CELLAR - INSTALL 1 inches WILKINS 975XL2 BACKFLOW PREVENTER ON EXISTING WATER SERVICE DEP APPROVAL # 21089364. DRAIN TO EXISTING DRAIN. ASSE 1013 CSA B64.4
|
Other
|
Pass-Final
|
07/20/2022
|
40.69791
|
-73.912453
|
11237.0
|
4.0
|
37.0
|
435.0
|
Bushwick North
|
M08031218
|
New Job Filing
|
I1
|
Signed off
|
M08031218-I1-LA
|
11/01/2022
|
11/01/2022
|
12/31/2022
|
12/03/2022
|
Gas Plumbing Work
|
1042800
|
115
|
EAST 71 STREET
|
MANHATTAN
|
REPLACEMENT OF (1) HW HEATER IN CELLAR. ORIGINALLY INSTALLED UNDER #100103335. VENTING TO EXISTING CHIMNEY IN GOOD WORKING CONDITION. METER IS EXISTING. GAS VALVE NOT TO BE TOUCHED. GAS AUTHORIZATION NOT REQUIRED FROM DOB. FILING IN CONJUNCTION W/ #122590847 TO REFILE LAA FOR SIGN OFF PURPOSES ONLY.
|
Other
|
Pass-Final
|
12/02/2022
|
40.770147
|
-73.963641
|
10021.0
|
8.0
|
4.0
|
128.0
|
Upper East Side-Carnegie Hill
|
Q00554018
|
New Job Filing
|
I1
|
Signed off
|
Q00554018-I1-LA
|
07/08/2021
|
07/08/2021
|
12/15/2022
|
01/25/2022
|
Gas Plumbing Work
|
4138572
|
41-28
|
218 STREET
|
QUEENS
|
REPLACE OIL BOILER W/ 1-DIRECT VENT HIGH EFFICINECY COMBI GAS BOILER IN CELLAR.REGISTER/REPLACE DRYER IN CELLAR VENTED THRU WALL.RELOCATE EXG METER TO OSP & REPLACE METER BAR & RUN APPROX 8 feet X 1 1/4 inches GAS PIPE TO CELLAR & 50 feet X 1 1/4 inches GAS PIPE IN CELLAR & APPROX 30 feet X 3/4 inches GAS PIPE IN CELLAR TO DRYER & TO THE EXG 1ST FL STOVE.FIRESTOPS WILL BE RESTORED. THIS IS A CONDENSING BOILER BEING DRAINED INTO AN INDIRECT WASTE NEUTRALIZER KIT CONNECTING TO A CONDENSATE PUMP THAT LEADS TO EXG LAUNDRY SINK
|
1 Family
|
Pass-Final
|
01/24/2022
|
40.763495
|
-73.764537
|
11361.0
|
11.0
|
19.0
|
1471.0
|
Bayside-Bayside Hills
|
Q00657539
|
New Job Filing
|
I1
|
Signed off
|
Q00657539-I1-LA
|
01/06/2022
|
01/06/2022
|
01/06/2023
|
02/18/2022
|
Water Plumbing Work
|
4024079
|
24-25
|
86 STREET
|
QUEENS
|
REMOVE & CAP OFF 1- OIL BOILER WITH COIL IN THE CELLAR (THE BUILDING WILL BE HEATED WITH AN HVAC HEAT PUMP SYSTEM UNDER 5 TON). INSTALL 1- A.O.SMITH HPTU-66 66 GALLON VOLTEX HYBRID ELECTRIC HEAT PUMP WATER HEATER.
|
1 Family
|
Pass-Final
|
02/17/2022
|
40.76473
|
-73.883232
|
11369.0
|
3.0
|
22.0
|
329.0
|
Jackson Heights
|
B08048613
|
New Job Filing
|
I1
|
Pre-Filing - Penalty Review
|
nan
|
nan
|
nan
|
03/31/2023
|
nan
|
Gas Plumbing Work
|
3020358
|
782
|
PRESIDENT STREET
|
BROOKLYN
|
DUE TO LEAK TEST EXISTING GAS LINE FOR EXISTING BOILER (BOILER NO: 39945-01) & HW HEATERS IN CELLAR. METER IS EXISTING. A PAA WILL FOLLOW W/ ADDITIONAL REPAIR WORK
|
Other
|
nan
|
nan
|
40.674265
|
-73.977032
|
11215.0
|
6.0
|
39.0
|
157.0
|
Park Slope-Gowanus
|
X08015166
|
New Job Filing
|
I1
|
Permitted
|
X08015166-I1-LA
|
11/25/2022
|
11/25/2022
|
05/01/2023
|
nan
|
Gas Plumbing Work
|
2049732
|
615
|
PELHAM PARKWAY NORTH
|
BRONX
|
FILING TO CLEAR VIOLATION #39044295Y,#39037297M,#39037302H,#39037298Y. REMOVE & CAP WATER & WASTE & GAS LINES FOR (3)WASHERS AND (3) DRYERS IN BASEMENT. ALL ILLEGAL FIXTURES WILL BE REMOVED AND CAPPED. GAS LINE FOR DRYERS IS COMING FROM SUPERS APARTMENT METER IN BASEMENT. REMOVE T FEEDING DRYERS WITH 3/4 inches NIPPLES/FITTINGS AND PERFORM INTEGRITY TEST ON GAS LINE. REPLACE 3/4 inches GAS COCK BEHIND STOVE. FIRE STOPPING WILL NOT BE COMPROMISED. NO GAS PIPING IN PUBLIC HALLWAYS.
|
Other
|
nan
|
nan
|
40.857452
|
-73.870392
|
10467.0
|
11.0
|
15.0
|
33201.0
|
Bronxdale
|
M00307686
|
New Job Filing
|
I1
|
Permitted
|
M00307686-I1-LA
|
01/31/2020
|
01/31/2020
|
02/15/2023
|
nan
|
Water Plumbing Work
|
1040043
|
339
|
EAST 58 STREET
|
MANHATTAN
|
Second Floor - APT 2F - Replace existing bathroom fixtures on existing roughing, new water closet, lavatory sink and replace bathtub with new shower. no new piping and no fire stop disturbed
|
Other
|
nan
|
nan
|
40.75944
|
-73.963488
|
10022.0
|
6.0
|
5.0
|
108.0
|
Turtle Bay-East Midtown
|
B00739002
|
New Job Filing
|
I1
|
Signed off
|
B00739002-I1-LA
|
05/16/2022
|
05/16/2022
|
01/24/2023
|
08/11/2022
|
Fire Suppression Work
|
3338243
|
370
|
VANDERVOORT AVENUE
|
BROOKLYN
|
RELOCATION OF AN EXISTING SPRINKLER PIPING WITH 150 feet OF 1 inches CONNECTED TO THE WET SYSTEM ON THE GOUND FLOOR. THE SYSTEM WILL BE DOWN FOR LESS THAN 6 HOURS.
|
Other
|
Pass-Final
|
08/10/2022
|
40.719546
|
-73.935736
|
11222.0
|
1.0
|
34.0
|
449.0
|
East Williamsburg
|
Q00710022
|
Subsequent Filing
|
S1
|
Signed off
|
Q00710022-S1-LA
|
05/11/2022
|
05/11/2022
|
04/15/2023
|
05/24/2022
|
Water Plumbing Work
|
4052987
|
48-22
|
45 STREET
|
QUEENS
|
Remove & cap off 2-gas fired boilers, 1 gas fired DHW and 1 gas meter in the cellar. Remove and cap off 1 gas stove on the first floor, The house willbe heated with HVAC heat pump under 5 tons, and electric stove installed on 1st fl. Install 1 AO Smith HPTU-66N 66G in cellar. Register/replace 1gas fired Rheem XG40T12HE40U0 40G DHW in the cellar. EL-Q00658985 filed. Fire stop is not compromised. No occupancy change. Perform gas test cellar to 2nd fl gas piping. Supercede Q00661285.
|
2 Family
|
Pass-Final
|
05/23/2022
|
40.738758
|
-73.920536
|
11377.0
|
2.0
|
26.0
|
18501.0
|
Hunters Point-Sunnyside-West Maspeth
|
B00366125
|
New Job Filing
|
I1
|
Permitted
|
B00366125-I1-LA
|
07/02/2020
|
07/02/2020
|
03/17/2023
|
nan
|
Fire Suppression Work
|
3326208
|
2726
|
LINDEN BOULEVARD
|
BROOKLYN
|
In cellar - Replacing ( 2) existing sprinkler heads and approx. 15 feet of 1 inch associated existing sprinkler piping for compactor machine in compactor room. work will be complete in less that 6 hours and fire stopping will not be compromised.
|
Other
|
nan
|
nan
|
40.669323
|
-73.863681
|
11208.0
|
5.0
|
42.0
|
1214.0
|
East New York
|
M08048793
|
New Job Filing
|
I1
|
Permitted
|
M08048793-I1-LA
|
12/02/2022
|
12/02/2022
|
01/01/2023
|
nan
|
Gas Plumbing Work
|
1026947
|
530
|
WEST 46 STREET
|
MANHATTAN
|
We will perform integrity test for the gas piping from cellar to apartment 1F existing appliance valve behind stove because the gas has been turned off more than 6 months. No firestopping will be compromised. No gas piping will be installed in public hallways.
|
Other
|
nan
|
nan
|
40.762736
|
-73.99495
|
10036.0
|
4.0
|
3.0
|
129.0
|
Clinton
|
B08009832
|
New Job Filing
|
I1
|
Permitted
|
B08009832-I1-LA
|
09/25/2022
|
09/25/2022
|
06/29/2023
|
nan
|
Gas Plumbing Work
|
3024905
|
14
|
FISKE PLACE
|
BROOKLYN
|
IN CEL, REGISTER REPLACEMENT BOILER & INSTALL 2 INDIRECT HOT WATER STORAGE TANKS. BOILER VENTS THRU EXISTING LINED CHIMNEY. UPGRADE EXISTING METER BAR AND REPLACE APROX 30 feet OF 1-1/4 inches GAS PIPE & 15 feet OF 3/4 GAS PIPE TO BOILER. NO GAS PIPE WILL BE INSTALLED IN ANY PUBLIC SPACE AND FIRESTOPS WILL BE RESTORED.
|
Other
|
nan
|
nan
|
40.672113
|
-73.975047
|
11215.0
|
6.0
|
39.0
|
157.0
|
Park Slope-Gowanus
|
M00683645
|
New Job Filing
|
I1
|
Signed off
|
M00683645-I1-LA
|
02/23/2022
|
02/23/2022
|
12/31/2022
|
12/03/2022
|
Water Plumbing Work
|
1041655
|
49
|
EAST 74 STREET
|
MANHATTAN
|
REGISTER/REPLACEMENT OF 1-GAS BOILER & REPLACE 2-INDIRECT HWHS W/ 1-GAS HWH & 1-HW STORAGE TANK IN CEL.VENT TO EXG CHIMNEY IN GOOD WORK CONDITION. DUE TO LEAK & GAS SHUTDOWN REPLACE METER BAR FOR EXG METER & REPLACE APX 40 feet X 1 1/2 inches,20 feet X 1 inches & 10 feet X 3/4 inches GAS PIPE IN CEL TO BOILER & HWH & APX 60 feet X 1 inches & 20 feet X 3/4 inches GAS PIPE TO EXG DRYERS IN CEL (#104238479) FIRESTOPS NOT COMPROMISED.
|
Other
|
Pass-Final
|
12/02/2022
|
40.772894
|
-73.963965
|
10021.0
|
8.0
|
4.0
|
130.0
|
Upper East Side-Carnegie Hill
|
End of preview. Expand
in Data Studio
README.md exists but content is empty.
- Downloads last month
- 12