question stringclasses 4
values | answers stringclasses 4
values | context stringclasses 4
values |
|---|---|---|
What is an organization's role in protecting assets? | an organization considers important so as to be protected | INFORMATION SECURITY RISK ANALYSIS
RISK
RISK
Potential that a given threat will exploit vulnerabilities of and assets or group of assets and thereby cause harm to the organizarion.
Risk = Impact of a threat exploiting the vulnerability *likelihood of a threat attempting to exploit the vulnerability .
Impact : The... |
What is a single loss expectancy assigned to? | single threat event | For eg, a resource, process, product, computing infrastructure etc.
The loss of the asset could effect CIA or could have an overall adverse business impact.
Threat
A threat is the presence of any potential event that could cause an adverse impact on the organization.
Safeguard
A safeguard is the ‘control’ or ‘counterme... |
What is the value of an organization's loss from a single threat? | Single loss expectancy(SLE) | It represents an organization’s loss from a single threat.
SLE= Asset value * EF
eg; asset value=USD 45000, EF =20% then SLE will be (45000* 0.2)
i.e |
What is the estimated probability of a specific threat taking place within a one-year time | USD 900 Annualized rate of occurrence(ARO): Represents the estimated | USD 900
Annualized rate of occurrence(ARO): Represents the estimated probability of a specific threat taking place within a one-year time frame.
The range of probability is from 0.0 to 1.0
Eg, Probability of flood is once in 1000 years, ARO value is 0.001
Annualized loss expectancy(ALE): Is a monetary value derived fro... |
README.md exists but content is empty.
- Downloads last month
- 5