ride-silver / README.md
clementelliker's picture
Update README.md
bfecc4a verified
|
Raw
History Blame Contribute Delete
4.26 kB
metadata
license: cc-by-4.0
pretty_name: RIDE Silver
tags:
  - railway-networks
  - train-delay-prediction
  - relational-data
  - transportation
configs:
  - config_name: events
    data_files:
      - split: full
        path: events/*.parquet
  - config_name: journeys
    data_files:
      - split: full
        path: journeys/*.parquet
  - config_name: op_nodes
    data_files:
      - split: full
        path: static/op_nodes.parquet
  - config_name: line_sections
    data_files:
      - split: full
        path: static/line_sections.parquet
  - config_name: node_links
    data_files:
      - split: full
        path: static/node_links.parquet
  - config_name: weather
    data_files:
      - split: full
        path: static/weather.parquet

RIDE Silver

arXiv Code

RIDE Silver is the cleaned relational release of the RIDE dataset. It contains Belgian passenger railway operations from 2023 to 2025, organized as event, journey, infrastructure, operational-point, and weather tables.

This release is intended as a reusable intermediate data layer. It can be used to inspect the underlying railway data, build alternative train-delay prediction tasks, construct model-specific datasets, or reproduce the RIDE Gold benchmark releases.

Links

Files

Path Description
events/events_YYYYMM.parquet Monthly train event records with train ID, service date, operation node, event type, planned and observed timestamps, line IDs, and delay in seconds.
journeys/journeys_YYYYMM.parquet Monthly journey summaries with train-level metadata, start/end nodes, planned/observed start and end timestamps, event counts, delay summaries, and inferred paths.
static/op_nodes.parquet Operational points with identifiers, names, types, latitude, and longitude.
static/line_sections.parquet Railway line sections with geometry, line ID, endpoint operation nodes, number of tracks, and matched operation nodes.
static/node_links.parquet Directed links between consecutive operation nodes with distances.
static/weather.parquet Hourly weather variables aligned to operation nodes.
metadata.yaml Build metadata.
ride_silver_croissant.json Croissant metadata with schema, Responsible AI, and provenance information.

Coverage

  • Time period: January 2023 to December 2025
  • Operational points: 1,355
  • Line sections: 1,212
  • Node links: 1,797
  • Events: 94.5M
  • Journeys: 3.6M

Loading Example

import pandas as pd

events = pd.read_parquet("events/events_202501.parquet")
journeys = pd.read_parquet("journeys/journeys_202501.parquet")
op_nodes = pd.read_parquet("static/op_nodes.parquet")
node_links = pd.read_parquet("static/node_links.parquet")
weather = pd.read_parquet("static/weather.parquet")

Construction

RIDE Silver was generated with the RIDE data-processing pipeline from public railway and weather sources. See the code repository linked above for the construction code and manifests.

Notes

RIDE Silver contains operational railway records and weather observations. It does not intentionally contain passenger identities, employee identities, ticketing records, device identifiers, or direct personal information.

Responsible AI, provenance, and limitation metadata are provided in ride_silver_croissant.json.

Sources

RIDE Silver is derived from public railway and weather sources:

When using RIDE Silver, please attribute RIDE, Infrabel Open Data, and Open-Meteo.

License

RIDE Silver is released under CC BY 4.0.

Citation

@misc{elliker2026rideopendatasetbenchmark,
      title={RIDE: An Open Dataset and Benchmark for Train Delay Prediction},
      author={Clément Elliker and Mathis Le Bail and Clément Mantoux and Jesse Read and Sonia Vanier},
      year={2026},
      eprint={2606.05070},
      archivePrefix={arXiv},
      primaryClass={cs.LG},
      url={https://arxiv.org/abs/2606.05070},
}