pruhtopia/bert-toc-classification-95k
Text Classification
•
0.2B
•
Updated
•
1
text
stringlengths 9
324
| label
int64 0
10
|
|---|---|
architectural, functional, design, or performance requirements in the fPRD or as Statement of
| 9
|
. — The Director of
| 9
|
COUNTRY, ORDAIN1NG FOR THIS
| 7
|
and participating VFR aircraft.
| 3
|
Serve as a means of relating the lesson to the objectives
| 3
|
Bundesministerium der Finanzen:
| 9
|
prescribed in Article 30-13, paragraph (1) of the Act to provide information
| 3
|
meet the minimum
| 6
|
, That notwithstanding section
| 9
|
Variation of the Dorset and Wiltshire Fire and Rescue Authority Combination Scheme
| 7
|
which is shown in
| 9
|
Anlage 4 (zu § 1 Abs. 4 des Gesetzes)
| 7
|
Levy on Alcoholic Beverages Fund
| 7
|
price of the contract [excluding travel expenses]].
| 9
|
any conflict with or breach the terms of any easement and/or other legal or land interest of Cadent
| 9
|
supplement AC 91
| 9
|
RITERES DE SELECTION
| 7
|
ENROLLED IN PATIENT ENROLLMENT SYSTEM OF DEPART-
| 7
|
COMPLIANCE WITH TENDER SPECIFICATION AND MINIMUM REQUIREMENTS
| 7
|
II.23.3 Interest on late payment
| 7
|
関し相当の経験を有する医師、歯科医師、薬剤師、看護師、歯科衛生士、臨床検査
| 3
|
not more than four persons may be appointed as Minister or Assistant Minister from
| 3
|
Windshield Surface Seal Coating
| 7
|
a bad bounce since airspeed diminishes very rapidly in the
| 9
|
If the generator cannot maintain the required voltage level,
| 9
|
paper versions
| 7
|
Article 2 With regard to export of goods conducted, as permitted, by a person
| 3
|
The NOT Gate
| 7
|
Article 7 -
| 7
|
Accomplishing a constant radius ground track requires
| 9
|
are listed in the EU
| 9
|
⦁ $_{Time after completion of group tasks for learners to systematically reflect upon how they worked together as }$
| 3
|
Check the reservoir level of two-stroke engines with oil
| 9
|
approach clearance.
| 9
|
Personen)
| 9
|
Fully Articulated Rotor System
| 7
|
Collaborating with ANG on all aspects of NextGen Integrated Safety Management to
| 3
|
direction of the initial loss of lift and con-
| 9
|
Kostenermittlung und Umlagepflicht im Aufgabenbereich Banken und sonstige
| 3
|
instrument approach procedure (IAP) chart provides
| 9
|
hold more than one office unless expressly so provided by law. But this section
| 9
|
REARWARD FLIGHT
| 7
|
Constitution of offices
| 7
|
Allowances payable to members of a combined fire and rescue authority
| 7
|
certificate of English proving at least a B2 level.
| 9
|
OFF SCHED
| 6
|
Rolling friction is created
| 9
|
with the autopilot. Pilots must be aware of the mode
| 3
|
Notice that a further increase
| 9
|
Pre-cast units for kerbs and surface drainage
| 7
|
this engagement in accordance with the IFAC standards and ethics set out in these ToR.
| 3
|
Reference is to be made to service conditions above for the rating of components and equipment to be installed
| 9
|
Annex 6. Financial offer form
| 7
|
Rigger check number 1.
| 3
|
around? Subtracting 200 from 305 and adding 20,
| 3
|
of the Vice President and the Office of the Chaplain
| 9
|
die Auszubildenden zur Ausübung einer qualifizierten beruflichen Tätigkeit im Sinne des § 1 Abs. 2 des
| 9
|
designed with straight threads to receive flared tube
| 9
|
office of a person who engages in foreign exchange business or other person
| 3
|
(highlighted in green in the example above) begins at the MAP and continues until the desig-
| 3
|
incl. identification & briefing
| 7
|
II.4.1.10 Certificate of conformity
| 7
|
sod or runway texture. Focus direct central vision at a
| 9
|
Motor routine 1
| 7
|
Materials: Nylon supertack, 3-ring housings of the
| 3
|
that allows a metered amount of oxygen to continuously
| 9
|
during touchdown and maintain directional control
| 9
|
Improper mixing of materials.
| 3
|
Type-7 Webbing.
| 0
|
在地及び代表者の氏名)
| 9
|
transformer establishes a magnetic field. When the breaker
| 9
|
a collective control to change the pitch of the rotor
| 9
|
organisations participating in EU calls for tenders
| 9
|
range of
| 9
|
Air conditioning inlet
| 6
|
Monitor (PRM) Approaches
| 7
|
ARRANGEMENT/COORDINATION OF INTERVIEWS
| 7
|
Many aircraft are affected to some degree by this characteristic,
| 9
|
Manual Opening:
| 8
|
contractors.
| 9
|
Appropriate for 47 mm membrane filter
| 3
|
payments or payment of the balance. Where the payment of the balance takes the form of a
| 9
|
Igor Sikorsky designed the VS-300 helicopter
| 0
|
configuration, there are two options how to do this:
| 3
|
signed by both parties.
| 9
|
by the lifting. Conversely, it is possible for dry heated air
| 9
|
由空気中の空気カーマ率(以下「空気カーマ率」という。)になるようにしやへい
| 3
|
ratios are a carbon fiber material or
| 9
|
safeguard night vision.
| 9
|
Minimum Factors
| 7
|
るおそれのある部分がロの(1)及び(2)に掲げる要件を満たしているこ
| 3
|
control of FMD in Botswana between financial years 2010 and 2014.
| 9
|
Shipment Type 1
| 7
|
the ‘European
| 9
|
Additional
| 6
|
Shear strength—10 kilopounds
| 6
|
Within protected distance and altitude range, but
| 6
|
Cultivation of Ground
| 7
|
II.25 SÉCURITÉ
| 7
|
Figure 4-15. RNAV RNP approach procedure with curved flight tracks.
| 0
|