derived_fields
list
escrow_required
string
id
string
milestone_reduction
string
private_cap_pct
string
public_cap_pct
string
release_deadline
string
source
string
source_quote
string
state
string
statutory_citation
string
url
string
verified_fields
list
[ "state", "statutory_citation" ]
no (the contractor may provide substitute security instead, and keeps the interest)
arizona
at 50% complete, one-half of the amount retained is released and later retention is capped at five per cent
no statutory cap in Ariz. Rev. Stat. § 32-1182, the prompt-payment section for owners and contractors, which lets the owner withhold "a reasonable amount for retention" and sets no percentage; § 41-2576 governs retention by the state
10%; 5% after the contract is 50% complete; no retention at all for job-order-contracting contracts
within sixty days after final completion and acceptance
https://www.azleg.gov/ars/41/02576.htm
A. Ten per cent of all construction contract payments shall be retained by this state as insurance of proper performance of the contract or, at the option of the contractor, a substitute security may be provided by the contractor in an authorized form pursuant to rules adopted by the director.
Arizona
Ariz. Rev. Stat. § 41-2576 (retention by the state); § 32-1182 (progress payments by an owner, read for the private-project field)
https://referencesource.org/construction-retainage-limits-by-state/arizona/
[ "release_deadline" ]
[ "state", "statutory_citation" ]
not addressed in this statute
california
after 95% of the work has been completed, the department may reduce the funds withheld to an amount not less than 125 percent of the estimated value of the work yet to be completed
5% of each payment, and no more than 5% of the contract price in total, on a private work of improvement under a contract entered into on or after January 1, 2026; not on a residential project that is not mixed-use and does not exceed four stories (Cal. Civ. Code § 8811)
5%
upon final completion and acceptance of the project (state public works contracts, Cal. Pub. Cont. Code § 10261)
https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?sectionNum=10261.&lawCode=PCC
The department shall withhold not more than 5 percent of the contract price until final completion and acceptance of the project. However, at any time after 95 percent of the work has been completed, the department may reduce the funds withheld to an amount not less than 125 percent of the estimated value of the work y...
California
Cal. Pub. Cont. Code § 10261 (state public works contracts); Cal. Civ. Code § 8811 (private works of improvement)
https://referencesource.org/construction-retainage-limits-by-state/california/
null
[ "state", "statutory_citation" ]
not addressed in C.R.S. § 38-46-103
colorado
none
5%
5%
not specified in this section
https://colorado.public.law/statutes/crs_38-46-103
A property owner, contractor, or subcontractor shall not withhold as retainage more than five percent of the price of the work completed under the contract or subcontract.
Colorado
C.R.S. § 38-46-103
https://referencesource.org/construction-retainage-limits-by-state/colorado/
null
[ "state", "statutory_citation" ]
yes on private work — an escrow account shall be established for all retainage, in a state or national bank or a savings and loan domiciled in this state; § 42-158q keeps that duty off any public building or public work of the state or a municipality, so none on public work
connecticut
on a state agency contract the seven and one-half per cent drops to five per cent when fifty per cent of the contract is completed; none for private work
five per cent of the estimated amount of a progress payment for the life of the construction project
7.5% on a state agency contract, reduced to five per cent when fifty per cent of the contract is completed; 2.5% on a Department of Transportation contract; 5% where the awarding authority is a municipality
not later than thirty days after the issuance of a certificate of final completion by the owner or the owner's authorized representative, or thirty days after the owner's equivalent written acceptance of the work (private work); § 49-41b sets no final-release deadline for public work
https://www.cga.ct.gov/current/pub/chap_742b.htm
No construction contract may provide for any retainage in an amount that exceeds five per cent of the estimated amount of a progress payment for the life of the construction project.
Connecticut
Conn. Gen. Stat. §§ 42-158i, 42-158k, 42-158p and 42-158q (private work); § 49-41b (public work)
https://referencesource.org/construction-retainage-limits-by-state/connecticut/
null
[ "state", "statutory_citation" ]
not addressed in Fla. Stat. § 255.078
florida
none
no statutory cap in Fla. Stat. § 715.12, the Construction Contract Prompt Payment Law, under which an owner and a contractor "may agree to a provision that allows the owner to withhold a portion of each progress payment"; § 255.078 caps public construction only
5%
same time limits for payment of a payment request apply regardless of whether the payment request is for, or includes, retainage
http://www.leg.state.fl.us/statutes/index.cfm?App_mode=Display_Statute&URL=0200-0299/0255/Sections/0255.078.html
a public entity may withhold from each progress payment made to the contractor an amount not exceeding 5 percent of the payment as retainage.
Florida
Fla. Stat. § 255.078 (public construction); Fla. Stat. § 715.12 (Construction Contract Prompt Payment Law, read for the private-project field)
https://referencesource.org/construction-retainage-limits-by-state/florida/
[ "release_deadline" ]
[ "state", "statutory_citation" ]
not addressed in Ga. Code Ann. § 13-10-80
georgia
none
no statutory cap in Ga. Code Ann. § 13-10-80, which governs public works construction contracts only; this record read no private-work statute
5%
within 30 days after invoice at substantial completion
https://codes.findlaw.com/ga/title-13-contracts/ga-code-sect-13-10-80.html
Retainage to a maximum of 5 percent of each progress payment. At the discretion of the owner and with the approval of the contractor, the retainage of each subcontractor may be released separately as the subcontractor completes his or her work.
Georgia
Ga. Code Ann. § 13-10-80 (public works construction contracts)
https://referencesource.org/construction-retainage-limits-by-state/georgia/
null
[ "state", "statutory_citation" ]
not addressed in 815 ILCS 603/20
illinois
at 50% completion, retainage reduced to no more than 5%
10% before 50% complete; 5% after 50% complete
10% before 50% complete; 5% after 50% complete
not specified in this section
https://www.ilga.gov/legislation/ilcs/fulltext.asp?DocName=081506030K20
A construction contract may provide for the withholding of retainage of up to 10% of any payment made prior to the completion of 50% of the contract. When a contract is 50% complete, retainage withheld shall be reduced so that no more than 5% is held. After the contract is 50% complete, no more than 5% of the amount of...
Illinois
815 ILCS 603/20
https://referencesource.org/construction-retainage-limits-by-state/illinois/
null
[ "state", "statutory_citation" ]
yes
indiana
none
no statutory cap in Ind. Code § 5-16-5.5-3, which governs a state agency's contracts for a public building, work or improvement only; this record read no private-work statute
no statutory cap in Ind. Code § 5-16-5.5-3, which governs a state agency's contract for a public building, work or improvement, applies to contracts that "contain provision for retainage" and sets no percentage; whatever is retained must be placed in an escrow account
per contract terms
https://codes.findlaw.com/in/title-5-state-and-local-administration/in-code-sect-5-16-5-5-3.html
provision for retainage shall include in their respective contracts a provision that at the time any retainage is withheld, the state agency and/or contractor shall place such retainage in an escrow account, with a bank, savings and loan institution, or the State of Indiana or an instrumentality thereof, as escrow agen...
Indiana
Ind. Code § 5-16-5.5-3 (a state agency's public works contracts)
https://referencesource.org/construction-retainage-limits-by-state/indiana/
null
[ "state", "statutory_citation" ]
not addressed in Iowa Code § 573.12 or § 573.14, neither of which says how retained funds are to be held; § 573.12(3)(b) is the nearest provision and is about who gets the interest they earn, not about an escrow account
iowa
none
no statutory cap in Iowa Code § 573.12, which governs contracts for public improvements only; this record read no private-work statute
3% of each monthly payment (Iowa Code § 573.12(1)(a), as amended by 2025 Acts, ch. 29, § 1); § 573.12(1)(b) caps what a contractor may retain from each payment to a subcontractor at the lesser of three percent or the amount the subcontract specifies
30 days after the completion and final acceptance of the improvement, when the unpaid fund is released and paid to the contractor, less a sum equal to double the total amount of any claims on file at the end of that period (Iowa Code § 573.14(1))
https://www.legis.iowa.gov/docs/code/573.12.pdf
The public corporation shall retain from each monthly payment not more than three percent of that amount that is determined to be due according to the estimate of the architect or engineer.
Iowa
Iowa Code § 573.12 (payments and retention from payments on public improvement contracts), as amended by 2025 Acts, ch. 29, § 1; § 573.14 (retention of unpaid funds, and when they are released)
https://referencesource.org/construction-retainage-limits-by-state/iowa/
null
[ "state", "statutory_citation" ]
not addressed in KRS 371.410
kentucky
retainage held after fifty-one percent (51%) of the construction project has been completed shall not be more than five percent (5%)
10% until 50% complete, then 5%
10% until 50% complete, then 5%
30 days after substantial completion
https://apps.legislature.ky.gov/law/statutes/statute.aspx?id=35259
until fifty percent (50%) of the construction project has been completed in accordance with the contract, a contracting entity, contractor, or subcontractor may withhold no more than ten percent (10%) retainage from the amount of any undisputed payment due, and retainage held after fifty-one percent (51%) of the constr...
Kentucky
KRS 371.410
https://referencesource.org/construction-retainage-limits-by-state/kentucky/
[ "milestone_reduction" ]
[ "state", "statutory_citation" ]
yes on private work — under R.S. 9:4857 retainage withheld on a private contract of fifty thousand dollars or more shall be deposited into an interest bearing escrow account, and the Section does not reach a single or double family residence or the listed industrial facilities; none on public work, where R.S. 38:2249 i...
louisiana
none in this Section; the cap turns on the size of the project rather than on a completion milestone
no statutory cap; the Private Works Act governs how private retainage is escrowed and bonded rather than how much may be withheld, and R.S. 9:4858 leaves the amount to the contract
ten percent of the contract price on projects of less than five hundred thousand dollars, and five percent of the contract price on projects of five hundred thousand dollars or more
on public work, until the expiration of forty-five days after the recordation of formal acceptance of such work, or notice of default by the contractor or subcontractor
https://www.legis.la.gov/legis/Law.aspx?d=94968
A. No contracts for the construction, alteration, or repair of any public works executed in conformity with this Part shall provide that the state or any of its agencies, boards, or subdivisions or any other public entity letting such a contract may withhold payment of more than ten percent of the contract price on pro...
Louisiana
La. Rev. Stat. §§ 38:2248 and 38:2249 on public works, and §§ 9:4857 and 9:4858 of the Private Works Act on private works; the public Section may not be waived and does not apply to the Department of Transportation and Development
https://referencesource.org/construction-retainage-limits-by-state/louisiana/
[ "public_cap_pct" ]
[ "state", "statutory_citation" ]
optional (public retainage may be deposited in an interest-bearing escrow account, and interest is then paid pro rata)
maryland
none
5% of the contract price, where the contractor has furnished 100% performance and payment security; the section does not apply to a contract under $100,000
5% of the total amount, where the contractor has furnished 100% payment security and 100% performance security (State procurement contracts)
within 90 days after the date of substantial completion
https://mgaleg.maryland.gov/mgawebsite/Laws/StatuteText?article=grp&section=9-304&enactments=false
(e) Undisputed retention proceeds retained by an owner under this section shall be paid within 90 days after the date of substantial completion, as defined by the applicable contract or subcontract.
Maryland
Md. Code, Real Prop. § 9-304; Md. Code, State Fin. & Proc. § 13-225
https://referencesource.org/construction-retainage-limits-by-state/maryland/
[ "release_deadline" ]
[ "state", "statutory_citation" ]
not addressed in Mass. Gen. Laws ch. 149, § 29F; Mass. Gen. Laws ch. 30, § 39K
massachusetts
none
5% of any progress payment, on a contract for construction with an original contract price of not less than $3,000,000, excluding projects of 1 to 4 dwelling units
5% of the approved amount of each periodic payment on public building contracts
not later than 30 days following submission of the application
https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXXI/Chapter149/Section29F
(b) No contract for construction shall include retainage that exceeds 5 per cent of any progress payment.
Massachusetts
Mass. Gen. Laws ch. 149, § 29F; Mass. Gen. Laws ch. 30, § 39K
https://referencesource.org/construction-retainage-limits-by-state/massachusetts/
[ "release_deadline" ]
[ "state", "statutory_citation" ]
public only (deposited in an interest bearing account in a regulated financial institution in this state, unless the retained funds are to come from a state or federal grant and have not yet been paid to the public agency)
michigan
After the work is 50% in place, additional retainage shall not be withheld unless the public agency determines that the contractor is not making satisfactory progress
no statutory cap; Act 524 of 1980 reaches only a facility that is paid for with public funds or a special assessment
Not more than 10% of the dollar value of all work in place until work is 50% in place
released to a contractor together with the final progress payment, which § 125.1562(3) times at thirty days after the architect or professional engineer certifies the work is in place, or fifteen days after the public agency receives the state or federal funds, whichever is later
https://www.legislature.mi.gov/Laws/MCL?objectName=mcl-125-1563
(1) To assure proper performance of a construction contract by the contractor, a public agency may retain a portion of each progress payment otherwise due as provided in this section.
Michigan
Mich. Comp. Laws §§ 125.1561 to 125.1563 (Act 524 of 1980); § 125.1561(c) puts a contract worth less than $30,000.00, or one providing for 3 or fewer payments, outside "construction contract", and § 125.1561(h) puts the state transportation department, a school district, a junior or community college, the Michigan stat...
https://referencesource.org/construction-retainage-limits-by-state/michigan/
[ "milestone_reduction", "public_cap_pct" ]
[ "state", "statutory_citation" ]
not addressed in Minn. Stat. § 337.10
minnesota
owner may reduce or eliminate retainage if work is progressing satisfactorily
5%
5%
60 days after substantial completion
https://www.revisor.mn.gov/statutes/cite/337.10
Retainage on a building and construction contract may not exceed five percent. An owner or owner's agent may reduce the amount of retainage and may eliminate retainage on any monthly contract payment if, in the owner's opinion, the work is progressing satisfactorily.
Minnesota
Minn. Stat. § 337.10
https://referencesource.org/construction-retainage-limits-by-state/minnesota/
null
[ "state", "statutory_citation" ]
not addressed in RSMo § 34.057
missouri
public owner may reduce or eliminate retainage if work is proceeding satisfactorily
10% of each payment due from the owner to the contractor, on private construction projects other than single-family residential construction and other residential construction of four or fewer units; the contract may let the owner retain more if the contractor's performance is not in accordance with the contract (RSMo ...
5%
30 days after acceptance and receipt of required documentation (public works, RSMo § 34.057)
https://revisor.mo.gov/main/OneSection.aspx?bid=905&hl=&section=34.057
Retainage withheld on any construction contract or subcontract for public works projects shall not exceed five percent of the value of the contract or subcontract.
Missouri
RSMo § 34.057 (public works); RSMo §§ 436.303 and 436.336 (private construction work)
https://referencesource.org/construction-retainage-limits-by-state/missouri/
null
[ "state", "statutory_citation" ]
not addressed in Neb. Rev. Stat. §§ 45-1202, 45-1203, 45-1204
nebraska
at 50% complete, no more than five percent of any additional progress payment, conditional on assurances of continued performance and financial responsibility
10%, and no more than 5% of additional progress payments once the withheld scope is 50% complete
10% for a political subdivision; the Construction Prompt Pay Act does not reach State of Nebraska contracts
within forty-five days after the project, or a designated portion thereof, is substantially complete
https://nebraskalegislature.gov/laws/statutes.php?statute=45-1204
(1) For retainage, in an amount not to exceed the amount specified in the applicable contract, which shall not exceed a rate of ten percent. If the scope of work for the contractor or subcontractor from which retainage is withheld is fifty percent complete and if the contractor or subcontractor has performed work in ac...
Nebraska
Neb. Rev. Stat. §§ 45-1202, 45-1203, 45-1204
https://referencesource.org/construction-retainage-limits-by-state/nebraska/
[ "release_deadline" ]
[ "state", "statutory_citation" ]
not addressed in NRS 338.515
nevada
after 50% of the work has been completed, the public body may pay remaining progress payments without withholding additional retainage
5% of each payment to the prime contractor, where the agreement authorizes the owner to withhold a retention amount; NRS 624.609 does not apply to an agreement with a natural person who owns a single-family residence or to a public work (NRS 624.622)
5%
within 30 days after occupancy, use, or recording of notice of completion, whichever occurs first (public works, NRS 338.515)
https://www.leg.state.nv.us/nrs/nrs-338.html
Ninety-five percent of the amount of any progress payment must be paid and 5 percent withheld as retainage until 50 percent of the work required by the contract has been performed.
Nevada
NRS 338.515 (public works); NRS 624.609 and 624.622 (private works of improvement)
https://referencesource.org/construction-retainage-limits-by-state/nevada/
null
[ "state", "statutory_citation" ]
no — the act prohibits withholding outright rather than regulating how retainage is held
new-mexico
none — withholding is prohibited from the first progress payment
0% — the same prohibition binds a private owner, but the Prompt Payment Act does not apply to construction contracts for residential property containing four or fewer dwelling units
0% — the act repeals the retainage provisions of Chapter 57, Article 28 and prohibits the withholding of amounts due for work performed
no retainage may be withheld, so there is nothing to release; an undisputed request for payment must be paid within twenty-one days after the owner receives it
https://www.nmlegis.gov/sessions/07%20regular/final/SB0604.html
RELATING TO TRADE PRACTICES; CHANGING THE NAME OF THE RETAINAGE ACT TO THE PROMPT PAYMENT ACT; ELIMINATING PROVISIONS OF CHAPTER 57, ARTICLE 28 NMSA 1978 CONCERNING RETAINAGE; PROHIBITING THE WITHHOLDING OF AMOUNTS DUE FOR WORK PERFORMED; AMENDING AND REPEALING SECTIONS OF THE NMSA 1978.
New Mexico
NMSA 1978 §§ 57-28-1 to 57-28-11 (Prompt Payment Act), as amended by Laws 2007, ch. 213 (S.B. 604, 2007 Regular Session); § 57-28-2 puts the department of transportation outside the act’s definition of "owner"
https://referencesource.org/construction-retainage-limits-by-state/new-mexico/
null
[ "state", "statutory_citation" ]
not addressed in N.Y. Gen. Bus. Law § 756-c or Gen. Mun. Law § 106-b
new-york
none
5%
5% of each progress payment; up to 10% where the public owner does not require both a performance bond and a labor and material bond in the full amount of the contract
30 days after final approval of the work (private contracts, Gen. Bus. Law § 756-c)
https://newyork.public.law/laws/n.y._general_business_law_section_756-c
By mutual agreement of the relevant parties an owner may retain no more than five per centum of the contract sum as retainage. A contractor or subcontractor may also retain no more than five per centum for retainage and in no case shall retainage exceed the actual percentage retained by the owner. Retainage shall be re...
New York
N.Y. Gen. Mun. Law § 106-b (public work); N.Y. Gen. Bus. Law § 756-c (private contracts)
https://referencesource.org/construction-retainage-limits-by-state/new-york/
null
[ "state", "statutory_citation" ]
not addressed in N.C. Gen. Stat. § 143-134.1
north-carolina
retainage eliminated after 50% complete with surety consent
no statutory cap in N.C. Gen. Stat. ch. 22C (Payments to Subcontractors), which sets no percentage for an owner and limits what a contractor may withhold from a subcontractor to "a reasonable amount for retainage not to exceed the initial percentage retained by the owner" (§ 22C-4); § 143-134.1 governs public construct...
5%
60 days after substantial completion or beneficial occupancy
https://www.ncleg.gov/EnactedLegislation/Statutes/HTML/BySection/Chapter_143/GS_143-134.1.html
The owner shall not retain more than five percent (5%) of any periodic payment due a prime contractor.
North Carolina
N.C. Gen. Stat. § 143-134.1 (public construction contracts); N.C. Gen. Stat. § 22C-4 (payments to subcontractors, read for the private-project field)
https://referencesource.org/construction-retainage-limits-by-state/north-carolina/
[ "public_cap_pct" ]
[ "state", "statutory_citation" ]
optional, public work only — money due is paid to the contractor or deposited in an escrow account selected by mutual agreement between the contractor and the public owner
ohio
none
no statutory cap in Ohio Rev. Code § 4113.61, the prompt-payment section, under which a contractor may reduce a subcontractor's payment "by any retainage provision contained in the contract"; §§ 153.12 and 153.13 govern public improvements only
4% (payments at not less than 96%)
within thirty days of substantial completion, occupation, use or acceptance of the project; any amount still withheld pending final completion, not later than thirty days after final completion
https://codes.ohio.gov/ohio-revised-code/section-153.12
Partial payments to the contractor for labor performed under either a unit or lump sum price contract shall be made at a rate of not less than ninety-six per cent of the estimates prepared by the contractor and approved by the architect or engineer.
Ohio
Ohio Rev. Code §§ 153.12, 153.13 and 153.63 (public improvements); § 4113.61 (prompt payment, read for the private-project field)
https://referencesource.org/construction-retainage-limits-by-state/ohio/
null
[ "state", "statutory_citation" ]
yes (contracts exceeding $500,000)
oregon
none
5%
5%
interest commences 30 days after completion and acceptance
https://oregon.public.law/statutes/ors_701.420
An owner, contractor or subcontractor may withhold as retainage an amount equal to not more than five percent of the contract price of the work completed.
Oregon
ORS 701.420
https://referencesource.org/construction-retainage-limits-by-state/oregon/
null
[ "state", "statutory_citation" ]
not addressed in 73 P.S. § 509 (Contractor and Subcontractor Payment Act, Section 9)
pennsylvania
contractor or subcontractor may post a maintenance bond for 120% of retainage upon reaching substantial completion to facilitate release (private work, 73 P.S. § 509)
no statutory percentage cap in the Contractor and Subcontractor Payment Act (73 P.S. § 509), which sets when retainage must be released and no percentage; a contractor may withhold retainage from a subcontractor "in accordance with their agreement"
10% of the amount due the contractor until 50% of the contract is completed, then no more than 5% after that, of the value of completed work based on monthly progress payment requests (62 Pa.C.S. § 3921(a)); a lower limit applies where the Department of General Services is the government agency (§ 3921(b))
30 days after final acceptance of the work (private work, 73 P.S. § 509, the Contractor and Subcontractor Payment Act)
https://legis.state.pa.us/WU01/LI/LI/US/HTM/1994/0/0007..HTM?1=
If payments under a construction contract are subject to retainage, any amounts which have been retained during the performance of the contract and which are due to be released to the contractor upon final completion shall be paid within 30 days after final acceptance of the work.
Pennsylvania
73 P.S. § 509 (Contractor and Subcontractor Payment Act, Section 9 — private work); 62 Pa.C.S. § 3921 (retainage on a government agency's public works contract)
https://referencesource.org/construction-retainage-limits-by-state/pennsylvania/
null
[ "state", "statutory_citation" ]
not addressed in S.C. Code Ann. § 29-6-40
south-carolina
none
no statutory cap in S.C. Code Ann. Title 29, Chapter 6, where § 29-6-40 lets an owner, contractor or subcontractor withhold "a reasonable amount for retainage" and sets no percentage
3.5% of each progress payment or installment on a contract or subcontract for construction with the State or a general contractor (S.C. Code Ann. § 11-35-3030(4)(a)); Title 29, Chapter 6, whose prompt-payment rules reach a government owner too, sets no percentage
21 days for owner to contractor; 7 days for contractor to subcontractor after receipt (S.C. Code Ann. § 29-6-30, in the prompt-payment chapter, whose "owner" includes a government agency)
https://www.scstatehouse.gov/code/t29c006.php
Nothing in this chapter prevents the owner, the contractor, or a subcontractor from withholding application and certification for payment because of the following: unsatisfactory job progress, defective construction not remedied, disputed work, third party claims filed or reasonable evidence that claim will be filed, f...
South Carolina
S.C. Code Ann. § 29-6-40 (prompt payment, whose "owner" includes any state, local, or municipal government agency); S.C. Code Ann. § 11-35-3030(4) (retention on state construction contracts)
https://referencesource.org/construction-retainage-limits-by-state/south-carolina/
null
[ "state", "statutory_citation" ]
yes
tennessee
none
5%
5%
90 days after completion of the work or 90 days after substantial completion
https://law.justia.com/codes/tennessee/title-66/chapter-34/part-1/section-66-34-103/
(a) All construction contracts on any project in this state, both public and private, may provide for the withholding of retainage; provided, however, that the retainage amount may not exceed five percent (5%) of the amount of the contract.
Tennessee
Tenn. Code Ann. § 66-34-103
https://referencesource.org/construction-retainage-limits-by-state/tennessee/
[ "private_cap_pct", "public_cap_pct" ]
[ "state", "statutory_citation" ]
optional (contracts ≥$10M, by agreement)
texas
none
no statutory cap in Tex. Prop. Code ch. 53, which treats retainage as "the amount specified to be retained in the contract" (§ 53.025) and separately requires the owner to reserve part of the contract price until 30 days after the work is completed (§ 53.101); Gov't Code § 2252.032 governs public works contracts only
10% (contracts <$5M); 5% (contracts ≥$5M)
upon completion of the work required to be performed under the contract
https://tcss.legis.texas.gov/resources/GV/htm/GV.2252.htm
if the total value of a public works contract is less than $5 million, a governmental entity may not withhold retainage in an amount that exceeds 10 percent of the contract price and the rate of retainage may not exceed 10 percent for any item in a bid schedule or schedule of values for the project, including materials...
Texas
Tex. Gov't Code § 2252.032 (public works contracts); Tex. Prop. Code §§ 53.025 and 53.101 (read for the private-project field)
https://referencesource.org/construction-retainage-limits-by-state/texas/
null
[ "state", "statutory_citation" ]
not addressed in Va. Code § 2.2-4333
virginia
none
no statutory cap in Va. Code § 11-4.6, the payment section for construction contracts with an owner other than a public body, one subdivision of which says it does not "apply to or prohibit the inclusion of any retainage provisions in a construction contract"; § 2.2-4333 governs public contracts only
5%
included in the final payment
https://law.lis.virginia.gov/vacode/2.2-4333/
the contractor shall be paid at least ninety-five percent of the earned sum when payment is due, with no more than five percent being retained to ensure faithful performance of the contract. All amounts withheld may be included in the final payment.
Virginia
Va. Code § 2.2-4333 (public contracts); Va. Code § 11-4.6 (construction contracts with a private owner, read for the private-project field)
https://referencesource.org/construction-retainage-limits-by-state/virginia/
[ "release_deadline" ]
[ "state", "statutory_citation" ]
optional
washington
contractor may request retainage be reduced to 100% of the value of work remaining
5% of the contract price of the work completed, on private construction projects other than single-family residential construction of less than 12 units (RCW 60.30.010)
5%
60 days after completion of all contract work (public improvement contracts, RCW 60.28.011)
https://app.leg.wa.gov/rcw/default.aspx?cite=60.28.011
public improvement contracts must provide, and public bodies must reserve, a contract retainage not to exceed five percent of the moneys earned by the contractor as a trust fund for the protection and payment of: (i) The claims of any person arising under the contract
Washington
RCW 60.28.011 (public improvement contracts); RCW 60.30.010 (private construction projects)
https://referencesource.org/construction-retainage-limits-by-state/washington/
null
[ "state", "statutory_citation" ]
not addressed in Wis. Stat. § 66.0901(9)(b)
wisconsin
at 50% completion, no further retainage withheld (full payments resume)
no statutory cap in Wis. Stat. § 66.0901(9)(b), which governs a municipality's contracts for a public work or building only; this record read no private-work statute
5% until 50% complete; 0% after 50% complete (unless unsatisfactory progress)
not specified in this section — payment of an amount retained upon substantial completion is permissive, not a deadline
https://docs.legis.wisconsin.gov/document/statutes/66.0901
The retainage shall be an amount equal to not more than 5 percent of the estimate until 50 percent of the work has been completed. At 50 percent completion, further partial payments shall be made in full to the contractor and no additional amounts may be retained unless the architect or engineer certifies that the job ...
Wisconsin
Wis. Stat. § 66.0901(9)(b) (a municipality's public works contracts)
https://referencesource.org/construction-retainage-limits-by-state/wisconsin/
null

Construction retainage limits by US state — maximum withholding percentages, release deadlines, escrow requirements, and public vs private distinctions with statutory citations

Canonical, always-current version: https://referencesource.org/construction-retainage-limits-by-state/ Machine-readable: https://referencesource.org/construction-retainage-limits-by-state/data.json — this mirror is a point-in-time copy.

  • Last verified: 2026-08-16
  • Stale after: 2027-08-16 (past this date, prefer the canonical copy — it re-verifies on a cadence this snapshot does not)
  • Records: 30

State-by-state comparison of the statutory rules governing retainage (retention) on construction contracts. Each record is one state with the maximum retainage percentage for public and private projects, the deadline for releasing retained funds after substantial completion, whether retainage must be held in an interest-bearing escrow account, whether the cap is reduced after a completion milestone (e.g. 50% complete), and the statutory citation. Caps range from 0% (New Mexico) to 10%, with a strong trend toward 5%. Answers 'how much retainage can be withheld on my project in [state]', 'when must retainage be released', and 'does my state require retainage escrow'.

Provenance — what every record carries

Every record carries source (the URL the value was read from) and source_quote (a verbatim quote from that page stating it). A value you cannot check against its page is indistinguishable from an invented one; these can all be checked. Each record is also individually addressable on the canonical site at its url.

Licence position

Facts from state statutes; statutory text is government work and the facts in it are not copyrightable (Feist, 1991). Each record quotes a short attributed excerpt and links back to the page it was read from. Citation note, checked 2026-10-14: The Georgia row is cited to codes.findlaw.com rather than to an official state host, because Georgia does not publish its code anywhere a single section can be fetched at a stable URL — Georgia's own free O.C.G.A., which the General Assembly contracts LexisNexis to publish, is a JavaScript application at advance.lexis.com that serves no statutory text to a fetch. That mirror now sits behind a Cloudflare challenge and returns 403 to everyone, an invented-slug control included, so these rows cannot at present be re-checked against the page they cite. The values were read from those pages when the records were harvested and nothing here has changed them; what is missing is any ongoing check that they are still current.

Facts are not copyrightable; what this dataset takes from each source is a fact plus a short attributed quote linking back to the page that states it.

Sources

Fields

See any record in data/records.jsonl — field names are self-describing, and the canonical page for each record renders them with labels: https://referencesource.org/construction-retainage-limits-by-state/