num_jobs int64 5 30 | num_machines int64 5 50 | prompt_jobs_first stringlengths 624 1.79k | prompt_machines_first stringlengths 934 3.69k | output stringlengths 53 199 | optimal_makespan int64 663 3.65k |
|---|---|---|---|---|---|
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,69 M1,41 M2,38 M3,47 M4,92
Job 1: M0,81 M1,60 M2,35 M3,51 M4,62
Job 2: M0,41 M1,96 M2,59 M3,96 M4,70
Job 3: M0,68 M1,83 M2,73 M3,48 M4,88
Job 4: M0,79 M1,87 M2,41 M3,47 M4,41
Job 5: M0,66 M1,87 M2,69 M3,66 M4,67
Job 6: M0,84 M1,71 M2,68 M3,84 M4,43
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 69
Job 1: 81
Job 2: 41
Job 3: 68
Job 4: 79
Job 5: 66
Job 6: 84
Job 7: 87
Job 8: 96
Job 9: 75
Job 10: 34
Job 11: 87
Job 12: 87
Job 13: 93
Job 14: 72
Machine 1 processes:
Job 0: 41
Job 1: 60
Job 2: 96
Job 3: 83
Job 4: 87
Job 5: 87
Job 6: 71
J... | Job permutation: J10 → J2 → J5 → J3 → J0 → J14 → J9 → J4 → J1 → J6 → J12 → J11 → J7 → J13 → J8
Makespan: 1315 | 1,315 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,75 M1,90 M2,54 M3,31 M4,51
Job 1: M0,50 M1,98 M2,97 M3,72 M4,72
Job 2: M0,49 M1,54 M2,53 M3,89 M4,83
Job 3: M0,82 M1,48 M2,45 M3,72 M4,61
Job 4: M0,95 M1,55 M2,93 M3,55 M4,32
Job 5: M0,76 M1,37 M2,86 M3,73 M4,79
Job 6: M0,67 M1,87 M2,94 M3,52 M4,81
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 75
Job 1: 50
Job 2: 49
Job 3: 82
Job 4: 95
Job 5: 76
Job 6: 67
Job 7: 35
Job 8: 95
Job 9: 52
Job 10: 97
Job 11: 58
Job 12: 55
Job 13: 32
Job 14: 35
Machine 1 processes:
Job 0: 90
Job 1: 98
Job 2: 54
Job 3: 48
Job 4: 55
Job 5: 37
Job 6: 87
J... | Job permutation: J9 → J11 → J13 → J2 → J6 → J3 → J12 → J8 → J5 → J1 → J7 → J10 → J14 → J4 → J0
Makespan: 1261 | 1,261 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,45 M1,73 M2,87 M3,62 M4,56
Job 1: M0,83 M1,37 M2,76 M3,73 M4,92
Job 2: M0,79 M1,91 M2,69 M3,72 M4,50
Job 3: M0,42 M1,59 M2,37 M3,80 M4,64
Job 4: M0,96 M1,65 M2,84 M3,38 M4,47
Job 5: M0,73 M1,60 M2,70 M3,50 M4,75
Job 6: M0,72 M1,95 M2,83 M3,58 M4,44
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 45
Job 1: 83
Job 2: 79
Job 3: 42
Job 4: 96
Job 5: 73
Job 6: 72
Job 7: 46
Job 8: 77
Job 9: 65
Job 10: 59
Job 11: 73
Job 12: 53
Job 13: 94
Job 14: 78
Machine 1 processes:
Job 0: 73
Job 1: 37
Job 2: 91
Job 3: 59
Job 4: 65
Job 5: 60
Job 6: 95
J... | Job permutation: J3 → J12 → J1 → J6 → J11 → J5 → J10 → J13 → J14 → J0 → J2 → J4 → J7 → J8 → J9
Makespan: 1264 | 1,264 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,49 M1,81 M2,34 M3,44 M4,62
Job 1: M0,89 M1,75 M2,69 M3,71 M4,85
Job 2: M0,52 M1,95 M2,83 M3,90 M4,56
Job 3: M0,65 M1,85 M2,32 M3,42 M4,78
Job 4: M0,34 M1,94 M2,43 M3,63 M4,41
Job 5: M0,79 M1,73 M2,32 M3,60 M4,58
Job 6: M0,86 M1,52 M2,48 M3,82 M4,94
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 49
Job 1: 89
Job 2: 52
Job 3: 65
Job 4: 34
Job 5: 79
Job 6: 86
Job 7: 45
Job 8: 52
Job 9: 79
Job 10: 66
Job 11: 78
Job 12: 79
Job 13: 64
Job 14: 65
Machine 1 processes:
Job 0: 81
Job 1: 75
Job 2: 95
Job 3: 85
Job 4: 94
Job 5: 73
Job 6: 52
J... | Job permutation: J0 → J14 → J10 → J3 → J6 → J7 → J8 → J1 → J9 → J2 → J12 → J5 → J11 → J13 → J4
Makespan: 1258 | 1,258 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,90 M1,39 M2,95 M3,72 M4,92
Job 1: M0,89 M1,60 M2,36 M3,65 M4,42
Job 2: M0,42 M1,37 M2,64 M3,39 M4,66
Job 3: M0,42 M1,39 M2,89 M3,85 M4,41
Job 4: M0,91 M1,81 M2,73 M3,39 M4,54
Job 5: M0,67 M1,53 M2,51 M3,83 M4,32
Job 6: M0,67 M1,42 M2,69 M3,41 M4,96
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 90
Job 1: 89
Job 2: 42
Job 3: 42
Job 4: 91
Job 5: 67
Job 6: 67
Job 7: 42
Job 8: 95
Job 9: 54
Job 10: 54
Job 11: 41
Job 12: 38
Job 13: 57
Job 14: 81
Machine 1 processes:
Job 0: 39
Job 1: 60
Job 2: 37
Job 3: 39
Job 4: 81
Job 5: 53
Job 6: 42
J... | Job permutation: J2 → J7 → J12 → J9 → J0 → J13 → J6 → J5 → J3 → J8 → J11 → J14 → J1 → J10 → J4
Makespan: 1213 | 1,213 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,85 M1,99 M2,58 M3,54 M4,95
Job 1: M0,61 M1,40 M2,51 M3,32 M4,69
Job 2: M0,84 M1,32 M2,53 M3,68 M4,87
Job 3: M0,71 M1,85 M2,42 M3,72 M4,68
Job 4: M0,92 M1,62 M2,87 M3,64 M4,82
Job 5: M0,50 M1,64 M2,40 M3,72 M4,31
Job 6: M0,31 M1,98 M2,62 M3,65 M4,30
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 85
Job 1: 61
Job 2: 84
Job 3: 71
Job 4: 92
Job 5: 50
Job 6: 31
Job 7: 34
Job 8: 60
Job 9: 42
Job 10: 88
Job 11: 94
Job 12: 80
Job 13: 91
Job 14: 44
Machine 1 processes:
Job 0: 99
Job 1: 40
Job 2: 32
Job 3: 85
Job 4: 62
Job 5: 64
Job 6: 98
J... | Job permutation: J14 → J13 → J6 → J1 → J9 → J7 → J2 → J0 → J4 → J3 → J10 → J11 → J8 → J5 → J12
Makespan: 1215 | 1,215 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,89 M1,30 M2,41 M3,85 M4,97
Job 1: M0,95 M1,83 M2,33 M3,77 M4,52
Job 2: M0,93 M1,46 M2,32 M3,72 M4,65
Job 3: M0,77 M1,31 M2,95 M3,48 M4,65
Job 4: M0,44 M1,37 M2,42 M3,71 M4,85
Job 5: M0,57 M1,44 M2,99 M3,35 M4,43
Job 6: M0,74 M1,94 M2,67 M3,30 M4,48
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 89
Job 1: 95
Job 2: 93
Job 3: 77
Job 4: 44
Job 5: 57
Job 6: 74
Job 7: 72
Job 8: 48
Job 9: 34
Job 10: 87
Job 11: 65
Job 12: 62
Job 13: 35
Job 14: 88
Machine 1 processes:
Job 0: 30
Job 1: 83
Job 2: 46
Job 3: 31
Job 4: 37
Job 5: 44
Job 6: 94
J... | Job permutation: J9 → J13 → J4 → J8 → J5 → J7 → J6 → J0 → J3 → J12 → J1 → J10 → J2 → J14 → J11
Makespan: 1194 | 1,194 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,98 M1,33 M2,38 M3,33 M4,73
Job 1: M0,63 M1,93 M2,37 M3,90 M4,80
Job 2: M0,98 M1,35 M2,72 M3,49 M4,40
Job 3: M0,87 M1,96 M2,34 M3,33 M4,64
Job 4: M0,62 M1,64 M2,65 M3,69 M4,94
Job 5: M0,51 M1,94 M2,43 M3,42 M4,90
Job 6: M0,78 M1,57 M2,63 M3,45 M4,87
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 98
Job 1: 63
Job 2: 98
Job 3: 87
Job 4: 62
Job 5: 51
Job 6: 78
Job 7: 85
Job 8: 73
Job 9: 68
Job 10: 64
Job 11: 69
Job 12: 96
Job 13: 64
Job 14: 93
Machine 1 processes:
Job 0: 33
Job 1: 93
Job 2: 35
Job 3: 96
Job 4: 64
Job 5: 94
Job 6: 57
J... | Job permutation: J5 → J6 → J4 → J11 → J9 → J12 → J14 → J1 → J7 → J8 → J10 → J3 → J13 → J2 → J0
Makespan: 1357 | 1,357 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,60 M1,67 M2,33 M3,59 M4,35
Job 1: M0,35 M1,64 M2,98 M3,92 M4,81
Job 2: M0,74 M1,44 M2,63 M3,75 M4,65
Job 3: M0,38 M1,57 M2,47 M3,88 M4,94
Job 4: M0,40 M1,72 M2,62 M3,66 M4,51
Job 5: M0,30 M1,52 M2,54 M3,36 M4,39
Job 6: M0,63 M1,45 M2,72 M3,79 M4,55
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 60
Job 1: 35
Job 2: 74
Job 3: 38
Job 4: 40
Job 5: 30
Job 6: 63
Job 7: 74
Job 8: 85
Job 9: 70
Job 10: 84
Job 11: 54
Job 12: 86
Job 13: 43
Job 14: 83
Machine 1 processes:
Job 0: 67
Job 1: 64
Job 2: 44
Job 3: 57
Job 4: 72
Job 5: 52
Job 6: 45
J... | Job permutation: J5 → J9 → J3 → J4 → J2 → J7 → J13 → J6 → J12 → J8 → J0 → J1 → J11 → J14 → J10
Makespan: 1206 | 1,206 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,46 M1,80 M2,99 M3,73 M4,36
Job 1: M0,30 M1,95 M2,41 M3,31 M4,95
Job 2: M0,76 M1,51 M2,77 M3,41 M4,72
Job 3: M0,53 M1,75 M2,47 M3,95 M4,62
Job 4: M0,56 M1,55 M2,39 M3,31 M4,38
Job 5: M0,42 M1,46 M2,88 M3,58 M4,42
Job 6: M0,64 M1,36 M2,70 M3,65 M4,86
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 46
Job 1: 30
Job 2: 76
Job 3: 53
Job 4: 56
Job 5: 42
Job 6: 64
Job 7: 33
Job 8: 38
Job 9: 88
Job 10: 70
Job 11: 76
Job 12: 97
Job 13: 54
Job 14: 37
Machine 1 processes:
Job 0: 80
Job 1: 95
Job 2: 51
Job 3: 75
Job 4: 55
Job 5: 46
Job 6: 36
J... | Job permutation: J8 → J7 → J5 → J1 → J6 → J3 → J2 → J13 → J10 → J12 → J14 → J9 → J0 → J11 → J4
Makespan: 1196 | 1,196 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,37 M1,50 M2,65 M3,62 M4,84
Job 1: M0,56 M1,98 M2,35 M3,62 M4,60
Job 2: M0,94 M1,55 M2,92 M3,56 M4,53
Job 3: M0,49 M1,40 M2,56 M3,71 M4,65
Job 4: M0,88 M1,95 M2,30 M3,45 M4,76
Job 5: M0,45 M1,92 M2,83 M3,96 M4,40
Job 6: M0,64 M1,41 M2,71 M3,80 M4,96
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 37
Job 1: 56
Job 2: 94
Job 3: 49
Job 4: 88
Job 5: 45
Job 6: 64
Job 7: 84
Job 8: 44
Job 9: 98
Job 10: 69
Job 11: 30
Job 12: 39
Job 13: 41
Job 14: 50
Machine 1 processes:
Job 0: 50
Job 1: 98
Job 2: 55
Job 3: 40
Job 4: 95
Job 5: 92
Job 6: 41
J... | Job permutation: J12 → J3 → J0 → J11 → J13 → J14 → J8 → J5 → J1 → J7 → J4 → J6 → J10 → J9 → J2
Makespan: 1277 | 1,277 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,67 M1,83 M2,35 M3,97 M4,87
Job 1: M0,83 M1,52 M2,72 M3,68 M4,42
Job 2: M0,72 M1,87 M2,76 M3,83 M4,37
Job 3: M0,67 M1,39 M2,81 M3,45 M4,78
Job 4: M0,81 M1,99 M2,83 M3,94 M4,62
Job 5: M0,39 M1,74 M2,58 M3,31 M4,77
Job 6: M0,96 M1,62 M2,35 M3,60 M4,61
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 67
Job 1: 83
Job 2: 72
Job 3: 67
Job 4: 81
Job 5: 39
Job 6: 96
Job 7: 33
Job 8: 34
Job 9: 71
Job 10: 67
Job 11: 37
Job 12: 76
Job 13: 85
Job 14: 90
Machine 1 processes:
Job 0: 83
Job 1: 52
Job 2: 87
Job 3: 39
Job 4: 99
Job 5: 74
Job 6: 62
J... | Job permutation: J7 → J3 → J11 → J5 → J0 → J13 → J4 → J2 → J9 → J1 → J14 → J6 → J12 → J10 → J8
Makespan: 1242 | 1,242 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,41 M1,60 M2,91 M3,38 M4,69
Job 1: M0,47 M1,91 M2,75 M3,71 M4,90
Job 2: M0,61 M1,58 M2,99 M3,46 M4,56
Job 3: M0,59 M1,50 M2,38 M3,83 M4,86
Job 4: M0,63 M1,50 M2,73 M3,80 M4,85
Job 5: M0,62 M1,50 M2,94 M3,92 M4,65
Job 6: M0,84 M1,77 M2,48 M3,75 M4,75
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 41
Job 1: 47
Job 2: 61
Job 3: 59
Job 4: 63
Job 5: 62
Job 6: 84
Job 7: 67
Job 8: 47
Job 9: 92
Job 10: 65
Job 11: 68
Job 12: 76
Job 13: 86
Job 14: 64
Machine 1 processes:
Job 0: 60
Job 1: 91
Job 2: 58
Job 3: 50
Job 4: 50
Job 5: 50
Job 6: 77
J... | Job permutation: J14 → J0 → J10 → J3 → J8 → J7 → J6 → J4 → J11 → J1 → J2 → J12 → J9 → J5 → J13
Makespan: 1265 | 1,265 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,44 M1,53 M2,84 M3,42 M4,57
Job 1: M0,55 M1,81 M2,39 M3,50 M4,56
Job 2: M0,30 M1,54 M2,66 M3,91 M4,40
Job 3: M0,37 M1,84 M2,30 M3,93 M4,49
Job 4: M0,46 M1,58 M2,87 M3,67 M4,54
Job 5: M0,68 M1,31 M2,71 M3,38 M4,74
Job 6: M0,30 M1,62 M2,71 M3,53 M4,57
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 44
Job 1: 55
Job 2: 30
Job 3: 37
Job 4: 46
Job 5: 68
Job 6: 30
Job 7: 79
Job 8: 50
Job 9: 75
Job 10: 94
Job 11: 59
Job 12: 94
Job 13: 34
Job 14: 96
Machine 1 processes:
Job 0: 53
Job 1: 81
Job 2: 54
Job 3: 84
Job 4: 58
Job 5: 31
Job 6: 62
J... | Job permutation: J2 → J6 → J13 → J3 → J8 → J0 → J4 → J1 → J5 → J9 → J7 → J10 → J12 → J14 → J11
Makespan: 1279 | 1,279 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,90 M1,31 M2,72 M3,90 M4,93
Job 1: M0,70 M1,64 M2,82 M3,62 M4,89
Job 2: M0,32 M1,55 M2,45 M3,37 M4,50
Job 3: M0,81 M1,56 M2,36 M3,40 M4,44
Job 4: M0,62 M1,69 M2,96 M3,69 M4,85
Job 5: M0,55 M1,74 M2,36 M3,33 M4,94
Job 6: M0,46 M1,40 M2,59 M3,94 M4,47
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 90
Job 1: 70
Job 2: 32
Job 3: 81
Job 4: 62
Job 5: 55
Job 6: 46
Job 7: 85
Job 8: 63
Job 9: 65
Job 10: 65
Job 11: 83
Job 12: 46
Job 13: 38
Job 14: 57
Machine 1 processes:
Job 0: 31
Job 1: 64
Job 2: 55
Job 3: 56
Job 4: 69
Job 5: 74
Job 6: 40
J... | Job permutation: J2 → J5 → J8 → J13 → J14 → J12 → J10 → J9 → J3 → J0 → J4 → J6 → J7 → J1 → J11
Makespan: 1254 | 1,254 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,51 M1,75 M2,48 M3,96 M4,39
Job 1: M0,65 M1,48 M2,98 M3,51 M4,75
Job 2: M0,90 M1,35 M2,85 M3,43 M4,93
Job 3: M0,86 M1,91 M2,39 M3,66 M4,75
Job 4: M0,73 M1,36 M2,43 M3,81 M4,38
Job 5: M0,77 M1,31 M2,89 M3,85 M4,44
Job 6: M0,89 M1,38 M2,76 M3,71 M4,38
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 51
Job 1: 65
Job 2: 90
Job 3: 86
Job 4: 73
Job 5: 77
Job 6: 89
Job 7: 30
Job 8: 59
Job 9: 52
Job 10: 92
Job 11: 87
Job 12: 97
Job 13: 58
Job 14: 34
Machine 1 processes:
Job 0: 75
Job 1: 48
Job 2: 35
Job 3: 91
Job 4: 36
Job 5: 31
Job 6: 38
J... | Job permutation: J7 → J14 → J0 → J9 → J13 → J8 → J1 → J4 → J3 → J5 → J2 → J11 → J10 → J12 → J6
Makespan: 1269 | 1,269 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,77 M1,99 M2,98 M3,85 M4,88
Job 1: M0,42 M1,56 M2,58 M3,44 M4,47
Job 2: M0,98 M1,91 M2,87 M3,42 M4,89
Job 3: M0,60 M1,73 M2,37 M3,68 M4,44
Job 4: M0,71 M1,44 M2,37 M3,68 M4,44
Job 5: M0,94 M1,77 M2,43 M3,92 M4,97
Job 6: M0,95 M1,60 M2,31 M3,36 M4,74
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 77
Job 1: 42
Job 2: 98
Job 3: 60
Job 4: 71
Job 5: 94
Job 6: 95
Job 7: 35
Job 8: 68
Job 9: 43
Job 10: 34
Job 11: 66
Job 12: 77
Job 13: 79
Job 14: 84
Machine 1 processes:
Job 0: 99
Job 1: 56
Job 2: 91
Job 3: 73
Job 4: 44
Job 5: 77
Job 6: 60
J... | Job permutation: J9 → J7 → J11 → J12 → J5 → J0 → J8 → J2 → J3 → J14 → J13 → J6 → J1 → J4 → J10
Makespan: 1278 | 1,278 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,40 M1,46 M2,33 M3,86 M4,50
Job 1: M0,93 M1,35 M2,44 M3,40 M4,78
Job 2: M0,36 M1,67 M2,71 M3,60 M4,86
Job 3: M0,45 M1,55 M2,85 M3,46 M4,78
Job 4: M0,94 M1,84 M2,74 M3,97 M4,42
Job 5: M0,56 M1,46 M2,47 M3,95 M4,75
Job 6: M0,47 M1,79 M2,46 M3,84 M4,47
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 40
Job 1: 93
Job 2: 36
Job 3: 45
Job 4: 94
Job 5: 56
Job 6: 47
Job 7: 77
Job 8: 89
Job 9: 58
Job 10: 77
Job 11: 53
Job 12: 39
Job 13: 79
Job 14: 63
Machine 1 processes:
Job 0: 46
Job 1: 35
Job 2: 67
Job 3: 55
Job 4: 84
Job 5: 46
Job 6: 79
J... | Job permutation: J3 → J0 → J2 → J13 → J12 → J5 → J14 → J9 → J4 → J1 → J11 → J10 → J8 → J6 → J7
Makespan: 1210 | 1,210 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,82 M1,66 M2,49 M3,73 M4,38
Job 1: M0,68 M1,47 M2,93 M3,85 M4,38
Job 2: M0,32 M1,92 M2,83 M3,74 M4,36
Job 3: M0,59 M1,67 M2,80 M3,44 M4,68
Job 4: M0,62 M1,85 M2,79 M3,34 M4,91
Job 5: M0,75 M1,46 M2,91 M3,31 M4,51
Job 6: M0,86 M1,51 M2,74 M3,41 M4,39
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 82
Job 1: 68
Job 2: 32
Job 3: 59
Job 4: 62
Job 5: 75
Job 6: 86
Job 7: 88
Job 8: 87
Job 9: 34
Job 10: 89
Job 11: 58
Job 12: 46
Job 13: 89
Job 14: 42
Machine 1 processes:
Job 0: 66
Job 1: 47
Job 2: 92
Job 3: 67
Job 4: 85
Job 5: 46
Job 6: 51
J... | Job permutation: J9 → J2 → J14 → J11 → J1 → J3 → J4 → J5 → J7 → J8 → J0 → J6 → J10 → J13 → J12
Makespan: 1198 | 1,198 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,35 M1,31 M2,71 M3,91 M4,59
Job 1: M0,81 M1,43 M2,32 M3,85 M4,82
Job 2: M0,87 M1,67 M2,54 M3,59 M4,86
Job 3: M0,90 M1,63 M2,37 M3,34 M4,92
Job 4: M0,82 M1,45 M2,56 M3,46 M4,46
Job 5: M0,78 M1,48 M2,87 M3,58 M4,56
Job 6: M0,86 M1,82 M2,98 M3,84 M4,31
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 35
Job 1: 81
Job 2: 87
Job 3: 90
Job 4: 82
Job 5: 78
Job 6: 86
Job 7: 55
Job 8: 44
Job 9: 97
Job 10: 45
Job 11: 50
Job 12: 70
Job 13: 78
Job 14: 97
Machine 1 processes:
Job 0: 31
Job 1: 43
Job 2: 67
Job 3: 63
Job 4: 45
Job 5: 48
Job 6: 82
J... | Job permutation: J8 → J6 → J10 → J2 → J0 → J11 → J9 → J5 → J7 → J3 → J1 → J14 → J13 → J12 → J4
Makespan: 1268 | 1,268 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,42 M1,71 M2,80 M3,43 M4,34
Job 1: M0,38 M1,78 M2,95 M3,76 M4,45
Job 2: M0,38 M1,34 M2,48 M3,72 M4,98
Job 3: M0,67 M1,83 M2,37 M3,60 M4,34
Job 4: M0,69 M1,87 M2,85 M3,67 M4,54
Job 5: M0,34 M1,75 M2,69 M3,87 M4,79
Job 6: M0,48 M1,75 M2,35 M3,55 M4,93
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 42
Job 1: 38
Job 2: 38
Job 3: 67
Job 4: 69
Job 5: 34
Job 6: 48
Job 7: 57
Job 8: 88
Job 9: 77
Job 10: 64
Job 11: 66
Job 12: 92
Job 13: 69
Job 14: 99
Machine 1 processes:
Job 0: 71
Job 1: 78
Job 2: 34
Job 3: 83
Job 4: 87
Job 5: 75
Job 6: 75
J... | Job permutation: J2 → J5 → J9 → J1 → J4 → J11 → J7 → J6 → J8 → J14 → J12 → J0 → J13 → J10 → J3
Makespan: 1199 | 1,199 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,91 M1,93 M2,86 M3,75 M4,71
Job 1: M0,50 M1,94 M2,34 M3,93 M4,69
Job 2: M0,65 M1,72 M2,41 M3,88 M4,35
Job 3: M0,49 M1,84 M2,63 M3,50 M4,44
Job 4: M0,43 M1,49 M2,94 M3,50 M4,85
Job 5: M0,41 M1,69 M2,34 M3,44 M4,37
Job 6: M0,52 M1,65 M2,35 M3,63 M4,64
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 91
Job 1: 50
Job 2: 65
Job 3: 49
Job 4: 43
Job 5: 41
Job 6: 52
Job 7: 51
Job 8: 50
Job 9: 49
Job 10: 40
Job 11: 43
Job 12: 75
Job 13: 53
Job 14: 35
Machine 1 processes:
Job 0: 93
Job 1: 94
Job 2: 72
Job 3: 84
Job 4: 49
Job 5: 69
Job 6: 65
J... | Job permutation: J10 → J1 → J8 → J2 → J11 → J6 → J4 → J14 → J12 → J7 → J0 → J3 → J13 → J9 → J5
Makespan: 1227 | 1,227 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,68 M1,62 M2,43 M3,91 M4,45
Job 1: M0,87 M1,96 M2,74 M3,90 M4,66
Job 2: M0,91 M1,52 M2,78 M3,68 M4,32
Job 3: M0,99 M1,94 M2,78 M3,93 M4,31
Job 4: M0,87 M1,81 M2,94 M3,82 M4,40
Job 5: M0,93 M1,95 M2,40 M3,58 M4,48
Job 6: M0,56 M1,33 M2,78 M3,62 M4,84
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 68
Job 1: 87
Job 2: 91
Job 3: 99
Job 4: 87
Job 5: 93
Job 6: 56
Job 7: 47
Job 8: 47
Job 9: 69
Job 10: 31
Job 11: 55
Job 12: 61
Job 13: 76
Job 14: 42
Machine 1 processes:
Job 0: 62
Job 1: 96
Job 2: 52
Job 3: 94
Job 4: 81
Job 5: 95
Job 6: 33
J... | Job permutation: J6 → J11 → J0 → J9 → J12 → J13 → J7 → J5 → J2 → J10 → J1 → J4 → J8 → J14 → J3
Makespan: 1412 | 1,412 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,37 M1,37 M2,89 M3,35 M4,86
Job 1: M0,49 M1,47 M2,35 M3,39 M4,79
Job 2: M0,96 M1,79 M2,85 M3,57 M4,66
Job 3: M0,45 M1,48 M2,98 M3,51 M4,54
Job 4: M0,91 M1,86 M2,93 M3,93 M4,30
Job 5: M0,83 M1,74 M2,56 M3,58 M4,89
Job 6: M0,83 M1,81 M2,63 M3,68 M4,90
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 37
Job 1: 49
Job 2: 96
Job 3: 45
Job 4: 91
Job 5: 83
Job 6: 83
Job 7: 79
Job 8: 30
Job 9: 89
Job 10: 98
Job 11: 92
Job 12: 59
Job 13: 45
Job 14: 73
Machine 1 processes:
Job 0: 37
Job 1: 47
Job 2: 79
Job 3: 48
Job 4: 86
Job 5: 74
Job 6: 81
J... | Job permutation: J8 → J0 → J13 → J3 → J1 → J12 → J14 → J6 → J4 → J2 → J10 → J9 → J11 → J5 → J7
Makespan: 1298 | 1,298 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,73 M1,99 M2,73 M3,52 M4,46
Job 1: M0,64 M1,45 M2,67 M3,34 M4,71
Job 2: M0,78 M1,91 M2,34 M3,88 M4,55
Job 3: M0,89 M1,44 M2,82 M3,31 M4,57
Job 4: M0,40 M1,83 M2,95 M3,58 M4,40
Job 5: M0,84 M1,83 M2,63 M3,91 M4,73
Job 6: M0,46 M1,74 M2,37 M3,73 M4,53
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 73
Job 1: 64
Job 2: 78
Job 3: 89
Job 4: 40
Job 5: 84
Job 6: 46
Job 7: 93
Job 8: 75
Job 9: 35
Job 10: 69
Job 11: 55
Job 12: 65
Job 13: 65
Job 14: 91
Machine 1 processes:
Job 0: 99
Job 1: 45
Job 2: 91
Job 3: 44
Job 4: 83
Job 5: 83
Job 6: 74
J... | Job permutation: J9 → J11 → J13 → J14 → J4 → J10 → J5 → J7 → J12 → J0 → J1 → J2 → J3 → J6 → J8
Makespan: 1247 | 1,247 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,53 M1,58 M2,67 M3,67 M4,90
Job 1: M0,57 M1,79 M2,40 M3,57 M4,34
Job 2: M0,55 M1,97 M2,45 M3,85 M4,45
Job 3: M0,81 M1,70 M2,75 M3,69 M4,41
Job 4: M0,49 M1,91 M2,65 M3,34 M4,85
Job 5: M0,86 M1,82 M2,60 M3,49 M4,92
Job 6: M0,89 M1,48 M2,67 M3,51 M4,64
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 53
Job 1: 57
Job 2: 55
Job 3: 81
Job 4: 49
Job 5: 86
Job 6: 89
Job 7: 85
Job 8: 58
Job 9: 72
Job 10: 88
Job 11: 51
Job 12: 31
Job 13: 49
Job 14: 86
Machine 1 processes:
Job 0: 58
Job 1: 79
Job 2: 97
Job 3: 70
Job 4: 91
Job 5: 82
Job 6: 48
J... | Job permutation: J12 → J11 → J0 → J2 → J4 → J5 → J9 → J13 → J14 → J10 → J7 → J3 → J1 → J6 → J8
Makespan: 1208 | 1,208 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,91 M1,84 M2,33 M3,71 M4,55
Job 1: M0,75 M1,88 M2,35 M3,78 M4,33
Job 2: M0,46 M1,50 M2,82 M3,40 M4,67
Job 3: M0,72 M1,83 M2,64 M3,56 M4,97
Job 4: M0,88 M1,61 M2,30 M3,56 M4,92
Job 5: M0,80 M1,31 M2,80 M3,83 M4,82
Job 6: M0,30 M1,99 M2,31 M3,99 M4,74
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 91
Job 1: 75
Job 2: 46
Job 3: 72
Job 4: 88
Job 5: 80
Job 6: 30
Job 7: 37
Job 8: 42
Job 9: 42
Job 10: 47
Job 11: 64
Job 12: 99
Job 13: 81
Job 14: 91
Machine 1 processes:
Job 0: 84
Job 1: 88
Job 2: 50
Job 3: 83
Job 4: 61
Job 5: 31
Job 6: 99
J... | Job permutation: J8 → J4 → J2 → J10 → J12 → J11 → J3 → J5 → J6 → J9 → J14 → J0 → J13 → J7 → J1
Makespan: 1332 | 1,332 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,83 M1,64 M2,79 M3,77 M4,60
Job 1: M0,65 M1,89 M2,86 M3,38 M4,56
Job 2: M0,36 M1,62 M2,51 M3,93 M4,60
Job 3: M0,79 M1,99 M2,36 M3,73 M4,71
Job 4: M0,44 M1,86 M2,73 M3,41 M4,71
Job 5: M0,56 M1,73 M2,50 M3,72 M4,64
Job 6: M0,83 M1,49 M2,67 M3,67 M4,55
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 83
Job 1: 65
Job 2: 36
Job 3: 79
Job 4: 44
Job 5: 56
Job 6: 83
Job 7: 45
Job 8: 45
Job 9: 71
Job 10: 71
Job 11: 44
Job 12: 60
Job 13: 93
Job 14: 99
Machine 1 processes:
Job 0: 64
Job 1: 89
Job 2: 62
Job 3: 99
Job 4: 86
Job 5: 73
Job 6: 49
J... | Job permutation: J2 → J7 → J13 → J8 → J0 → J3 → J11 → J1 → J4 → J14 → J9 → J6 → J5 → J12 → J10
Makespan: 1296 | 1,296 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,40 M1,73 M2,40 M3,93 M4,43
Job 1: M0,72 M1,62 M2,42 M3,93 M4,57
Job 2: M0,37 M1,52 M2,50 M3,30 M4,52
Job 3: M0,62 M1,37 M2,87 M3,80 M4,54
Job 4: M0,93 M1,45 M2,80 M3,70 M4,71
Job 5: M0,45 M1,32 M2,84 M3,48 M4,51
Job 6: M0,59 M1,75 M2,54 M3,44 M4,95
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 40
Job 1: 72
Job 2: 37
Job 3: 62
Job 4: 93
Job 5: 45
Job 6: 59
Job 7: 48
Job 8: 85
Job 9: 88
Job 10: 41
Job 11: 53
Job 12: 39
Job 13: 64
Job 14: 57
Machine 1 processes:
Job 0: 73
Job 1: 62
Job 2: 52
Job 3: 37
Job 4: 45
Job 5: 32
Job 6: 75
J... | Job permutation: J0 → J2 → J1 → J5 → J10 → J11 → J14 → J8 → J7 → J6 → J13 → J3 → J9 → J4 → J12
Makespan: 1290 | 1,290 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,79 M1,64 M2,72 M3,50 M4,63
Job 1: M0,74 M1,46 M2,90 M3,71 M4,47
Job 2: M0,66 M1,81 M2,77 M3,87 M4,88
Job 3: M0,94 M1,76 M2,74 M3,73 M4,83
Job 4: M0,53 M1,44 M2,34 M3,49 M4,90
Job 5: M0,73 M1,99 M2,83 M3,51 M4,44
Job 6: M0,93 M1,84 M2,38 M3,65 M4,45
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 79
Job 1: 74
Job 2: 66
Job 3: 94
Job 4: 53
Job 5: 73
Job 6: 93
Job 7: 42
Job 8: 70
Job 9: 34
Job 10: 54
Job 11: 98
Job 12: 87
Job 13: 71
Job 14: 71
Machine 1 processes:
Job 0: 64
Job 1: 46
Job 2: 81
Job 3: 76
Job 4: 44
Job 5: 99
Job 6: 84
J... | Job permutation: J3 → J4 → J8 → J7 → J13 → J2 → J1 → J5 → J11 → J6 → J12 → J9 → J0 → J14 → J10
Makespan: 1290 | 1,290 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,60 M1,45 M2,36 M3,62 M4,83
Job 1: M0,94 M1,85 M2,49 M3,47 M4,70
Job 2: M0,34 M1,49 M2,41 M3,37 M4,66
Job 3: M0,69 M1,34 M2,83 M3,54 M4,78
Job 4: M0,82 M1,65 M2,81 M3,53 M4,34
Job 5: M0,68 M1,65 M2,68 M3,97 M4,48
Job 6: M0,76 M1,41 M2,40 M3,85 M4,80
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 60
Job 1: 94
Job 2: 34
Job 3: 69
Job 4: 82
Job 5: 68
Job 6: 76
Job 7: 45
Job 8: 86
Job 9: 74
Job 10: 50
Job 11: 98
Job 12: 38
Job 13: 97
Job 14: 92
Machine 1 processes:
Job 0: 45
Job 1: 85
Job 2: 49
Job 3: 34
Job 4: 65
Job 5: 65
Job 6: 41
J... | Job permutation: J12 → J9 → J10 → J2 → J6 → J14 → J3 → J0 → J8 → J5 → J1 → J11 → J4 → J7 → J13
Makespan: 1235 | 1,235 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,47 M1,47 M2,81 M3,96 M4,99
Job 1: M0,45 M1,56 M2,95 M3,39 M4,37
Job 2: M0,93 M1,78 M2,60 M3,83 M4,53
Job 3: M0,84 M1,46 M2,80 M3,33 M4,63
Job 4: M0,75 M1,35 M2,65 M3,53 M4,60
Job 5: M0,35 M1,48 M2,88 M3,71 M4,83
Job 6: M0,37 M1,45 M2,92 M3,60 M4,36
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 47
Job 1: 45
Job 2: 93
Job 3: 84
Job 4: 75
Job 5: 35
Job 6: 37
Job 7: 90
Job 8: 44
Job 9: 50
Job 10: 80
Job 11: 72
Job 12: 79
Job 13: 84
Job 14: 92
Machine 1 processes:
Job 0: 47
Job 1: 56
Job 2: 78
Job 3: 46
Job 4: 35
Job 5: 48
Job 6: 45
J... | Job permutation: J6 → J8 → J0 → J9 → J5 → J12 → J3 → J10 → J11 → J13 → J14 → J4 → J1 → J2 → J7
Makespan: 1248 | 1,248 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,61 M1,96 M2,79 M3,69 M4,45
Job 1: M0,59 M1,81 M2,80 M3,64 M4,84
Job 2: M0,45 M1,40 M2,88 M3,56 M4,71
Job 3: M0,92 M1,33 M2,48 M3,34 M4,42
Job 4: M0,52 M1,90 M2,79 M3,41 M4,70
Job 5: M0,48 M1,61 M2,74 M3,48 M4,59
Job 6: M0,95 M1,71 M2,51 M3,53 M4,89
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 61
Job 1: 59
Job 2: 45
Job 3: 92
Job 4: 52
Job 5: 48
Job 6: 95
Job 7: 83
Job 8: 79
Job 9: 72
Job 10: 95
Job 11: 57
Job 12: 34
Job 13: 62
Job 14: 64
Machine 1 processes:
Job 0: 96
Job 1: 81
Job 2: 40
Job 3: 33
Job 4: 90
Job 5: 61
Job 6: 71
J... | Job permutation: J2 → J5 → J4 → J13 → J12 → J10 → J1 → J0 → J14 → J9 → J6 → J8 → J11 → J7 → J3
Makespan: 1171 | 1,171 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,30 M1,66 M2,89 M3,33 M4,39
Job 1: M0,84 M1,94 M2,95 M3,76 M4,49
Job 2: M0,76 M1,41 M2,96 M3,94 M4,96
Job 3: M0,44 M1,54 M2,89 M3,95 M4,42
Job 4: M0,46 M1,57 M2,68 M3,37 M4,82
Job 5: M0,72 M1,41 M2,44 M3,47 M4,52
Job 6: M0,97 M1,48 M2,51 M3,56 M4,75
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 30
Job 1: 84
Job 2: 76
Job 3: 44
Job 4: 46
Job 5: 72
Job 6: 97
Job 7: 46
Job 8: 46
Job 9: 73
Job 10: 93
Job 11: 99
Job 12: 69
Job 13: 64
Job 14: 90
Machine 1 processes:
Job 0: 66
Job 1: 94
Job 2: 41
Job 3: 54
Job 4: 57
Job 5: 41
Job 6: 48
J... | Job permutation: J0 → J13 → J3 → J8 → J12 → J5 → J4 → J2 → J1 → J9 → J14 → J6 → J11 → J7 → J10
Makespan: 1203 | 1,203 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,38 M1,79 M2,47 M3,35 M4,43
Job 1: M0,77 M1,69 M2,39 M3,39 M4,40
Job 2: M0,70 M1,77 M2,64 M3,34 M4,46
Job 3: M0,64 M1,40 M2,53 M3,80 M4,65
Job 4: M0,71 M1,67 M2,72 M3,94 M4,67
Job 5: M0,58 M1,73 M2,47 M3,72 M4,96
Job 6: M0,78 M1,78 M2,78 M3,57 M4,90
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 38
Job 1: 77
Job 2: 70
Job 3: 64
Job 4: 71
Job 5: 58
Job 6: 78
Job 7: 69
Job 8: 52
Job 9: 99
Job 10: 74
Job 11: 49
Job 12: 97
Job 13: 87
Job 14: 41
Machine 1 processes:
Job 0: 79
Job 1: 69
Job 2: 77
Job 3: 40
Job 4: 67
Job 5: 73
Job 6: 78
J... | Job permutation: J11 → J8 → J6 → J5 → J4 → J9 → J0 → J12 → J7 → J3 → J14 → J10 → J13 → J2 → J1
Makespan: 1249 | 1,249 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,97 M1,78 M2,46 M3,73 M4,68
Job 1: M0,89 M1,94 M2,45 M3,40 M4,73
Job 2: M0,73 M1,98 M2,47 M3,78 M4,39
Job 3: M0,65 M1,37 M2,78 M3,80 M4,41
Job 4: M0,41 M1,46 M2,55 M3,79 M4,40
Job 5: M0,46 M1,45 M2,98 M3,78 M4,72
Job 6: M0,77 M1,97 M2,75 M3,42 M4,61
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 97
Job 1: 89
Job 2: 73
Job 3: 65
Job 4: 41
Job 5: 46
Job 6: 77
Job 7: 92
Job 8: 67
Job 9: 55
Job 10: 41
Job 11: 33
Job 12: 81
Job 13: 78
Job 14: 53
Machine 1 processes:
Job 0: 78
Job 1: 94
Job 2: 98
Job 3: 37
Job 4: 46
Job 5: 45
Job 6: 97
J... | Job permutation: J11 → J4 → J5 → J9 → J2 → J13 → J14 → J0 → J3 → J6 → J8 → J7 → J10 → J1 → J12
Makespan: 1209 | 1,209 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,52 M1,49 M2,61 M3,70 M4,87
Job 1: M0,91 M1,41 M2,92 M3,63 M4,70
Job 2: M0,78 M1,77 M2,93 M3,35 M4,66
Job 3: M0,37 M1,86 M2,87 M3,98 M4,43
Job 4: M0,81 M1,84 M2,83 M3,44 M4,69
Job 5: M0,67 M1,36 M2,78 M3,74 M4,99
Job 6: M0,89 M1,99 M2,92 M3,44 M4,98
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 52
Job 1: 91
Job 2: 78
Job 3: 37
Job 4: 81
Job 5: 67
Job 6: 89
Job 7: 47
Job 8: 58
Job 9: 87
Job 10: 96
Job 11: 87
Job 12: 57
Job 13: 79
Job 14: 40
Machine 1 processes:
Job 0: 49
Job 1: 41
Job 2: 77
Job 3: 86
Job 4: 84
Job 5: 36
Job 6: 99
J... | Job permutation: J7 → J0 → J5 → J8 → J9 → J12 → J1 → J14 → J6 → J13 → J10 → J3 → J2 → J4 → J11
Makespan: 1340 | 1,340 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,57 M1,45 M2,32 M3,44 M4,61
Job 1: M0,70 M1,67 M2,53 M3,47 M4,62
Job 2: M0,83 M1,48 M2,87 M3,60 M4,61
Job 3: M0,57 M1,69 M2,84 M3,54 M4,32
Job 4: M0,32 M1,44 M2,52 M3,96 M4,57
Job 5: M0,52 M1,86 M2,95 M3,41 M4,96
Job 6: M0,79 M1,43 M2,53 M3,69 M4,48
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 57
Job 1: 70
Job 2: 83
Job 3: 57
Job 4: 32
Job 5: 52
Job 6: 79
Job 7: 66
Job 8: 51
Job 9: 89
Job 10: 49
Job 11: 87
Job 12: 66
Job 13: 81
Job 14: 77
Machine 1 processes:
Job 0: 45
Job 1: 67
Job 2: 48
Job 3: 69
Job 4: 44
Job 5: 86
Job 6: 43
J... | Job permutation: J8 → J4 → J5 → J10 → J0 → J12 → J7 → J2 → J14 → J1 → J13 → J9 → J11 → J6 → J3
Makespan: 1243 | 1,243 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,43 M1,82 M2,54 M3,96 M4,81
Job 1: M0,56 M1,52 M2,56 M3,31 M4,57
Job 2: M0,41 M1,35 M2,33 M3,56 M4,36
Job 3: M0,75 M1,39 M2,36 M3,51 M4,74
Job 4: M0,58 M1,59 M2,30 M3,34 M4,49
Job 5: M0,53 M1,47 M2,74 M3,91 M4,40
Job 6: M0,86 M1,71 M2,71 M3,85 M4,48
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 43
Job 1: 56
Job 2: 41
Job 3: 75
Job 4: 58
Job 5: 53
Job 6: 86
Job 7: 82
Job 8: 62
Job 9: 79
Job 10: 65
Job 11: 66
Job 12: 42
Job 13: 32
Job 14: 31
Machine 1 processes:
Job 0: 82
Job 1: 52
Job 2: 35
Job 3: 39
Job 4: 59
Job 5: 47
Job 6: 71
J... | Job permutation: J13 → J11 → J3 → J14 → J1 → J0 → J7 → J6 → J9 → J5 → J12 → J8 → J10 → J4 → J2
Makespan: 1151 | 1,151 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,97 M1,45 M2,84 M3,37 M4,80
Job 1: M0,61 M1,75 M2,56 M3,67 M4,49
Job 2: M0,61 M1,72 M2,98 M3,68 M4,33
Job 3: M0,83 M1,94 M2,92 M3,86 M4,74
Job 4: M0,64 M1,96 M2,84 M3,57 M4,95
Job 5: M0,99 M1,66 M2,77 M3,36 M4,46
Job 6: M0,49 M1,78 M2,43 M3,99 M4,95
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 97
Job 1: 61
Job 2: 61
Job 3: 83
Job 4: 64
Job 5: 99
Job 6: 49
Job 7: 60
Job 8: 33
Job 9: 55
Job 10: 64
Job 11: 36
Job 12: 92
Job 13: 85
Job 14: 31
Machine 1 processes:
Job 0: 45
Job 1: 75
Job 2: 72
Job 3: 94
Job 4: 96
Job 5: 66
Job 6: 78
J... | Job permutation: J14 → J9 → J8 → J11 → J6 → J12 → J7 → J4 → J3 → J13 → J0 → J1 → J10 → J2 → J5
Makespan: 1218 | 1,218 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,71 M1,61 M2,88 M3,55 M4,63
Job 1: M0,61 M1,55 M2,41 M3,52 M4,70
Job 2: M0,73 M1,46 M2,59 M3,87 M4,87
Job 3: M0,83 M1,85 M2,55 M3,57 M4,51
Job 4: M0,42 M1,94 M2,95 M3,78 M4,32
Job 5: M0,49 M1,95 M2,65 M3,71 M4,35
Job 6: M0,80 M1,84 M2,73 M3,80 M4,41
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 71
Job 1: 61
Job 2: 73
Job 3: 83
Job 4: 42
Job 5: 49
Job 6: 80
Job 7: 63
Job 8: 73
Job 9: 97
Job 10: 75
Job 11: 47
Job 12: 34
Job 13: 38
Job 14: 90
Machine 1 processes:
Job 0: 61
Job 1: 55
Job 2: 46
Job 3: 85
Job 4: 94
Job 5: 95
Job 6: 84
J... | Job permutation: J12 → J13 → J11 → J4 → J5 → J1 → J7 → J2 → J9 → J6 → J0 → J8 → J3 → J14 → J10
Makespan: 1185 | 1,185 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,92 M1,72 M2,64 M3,57 M4,70
Job 1: M0,94 M1,89 M2,77 M3,54 M4,49
Job 2: M0,42 M1,41 M2,45 M3,96 M4,40
Job 3: M0,86 M1,45 M2,80 M3,70 M4,42
Job 4: M0,69 M1,91 M2,54 M3,47 M4,35
Job 5: M0,33 M1,91 M2,83 M3,54 M4,56
Job 6: M0,49 M1,36 M2,77 M3,50 M4,95
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 92
Job 1: 94
Job 2: 42
Job 3: 86
Job 4: 69
Job 5: 33
Job 6: 49
Job 7: 47
Job 8: 90
Job 9: 64
Job 10: 42
Job 11: 44
Job 12: 39
Job 13: 50
Job 14: 57
Machine 1 processes:
Job 0: 72
Job 1: 89
Job 2: 41
Job 3: 45
Job 4: 91
Job 5: 91
Job 6: 36
J... | Job permutation: J2 → J12 → J6 → J7 → J8 → J10 → J13 → J0 → J11 → J3 → J5 → J1 → J9 → J14 → J4
Makespan: 1220 | 1,220 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,61 M1,48 M2,48 M3,75 M4,58
Job 1: M0,42 M1,84 M2,76 M3,67 M4,68
Job 2: M0,93 M1,54 M2,34 M3,77 M4,34
Job 3: M0,72 M1,90 M2,37 M3,66 M4,87
Job 4: M0,44 M1,94 M2,52 M3,62 M4,66
Job 5: M0,41 M1,95 M2,83 M3,38 M4,35
Job 6: M0,75 M1,77 M2,55 M3,40 M4,48
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 61
Job 1: 42
Job 2: 93
Job 3: 72
Job 4: 44
Job 5: 41
Job 6: 75
Job 7: 59
Job 8: 53
Job 9: 88
Job 10: 44
Job 11: 67
Job 12: 92
Job 13: 88
Job 14: 86
Machine 1 processes:
Job 0: 48
Job 1: 84
Job 2: 54
Job 3: 90
Job 4: 94
Job 5: 95
Job 6: 77
J... | Job permutation: J7 → J11 → J3 → J0 → J8 → J10 → J4 → J13 → J1 → J14 → J12 → J5 → J9 → J6 → J2
Makespan: 1230 | 1,230 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,66 M1,97 M2,95 M3,84 M4,30
Job 1: M0,74 M1,40 M2,38 M3,73 M4,73
Job 2: M0,84 M1,51 M2,49 M3,64 M4,98
Job 3: M0,82 M1,45 M2,64 M3,59 M4,31
Job 4: M0,41 M1,89 M2,90 M3,31 M4,74
Job 5: M0,99 M1,77 M2,46 M3,62 M4,87
Job 6: M0,82 M1,51 M2,67 M3,33 M4,58
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 66
Job 1: 74
Job 2: 84
Job 3: 82
Job 4: 41
Job 5: 99
Job 6: 82
Job 7: 62
Job 8: 52
Job 9: 78
Job 10: 72
Job 11: 52
Job 12: 45
Job 13: 36
Job 14: 93
Machine 1 processes:
Job 0: 97
Job 1: 40
Job 2: 51
Job 3: 45
Job 4: 89
Job 5: 77
Job 6: 51
J... | Job permutation: J13 → J4 → J10 → J11 → J2 → J12 → J6 → J9 → J1 → J8 → J0 → J14 → J5 → J7 → J3
Makespan: 1271 | 1,271 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,99 M1,36 M2,88 M3,60 M4,62
Job 1: M0,40 M1,84 M2,31 M3,49 M4,70
Job 2: M0,87 M1,59 M2,33 M3,69 M4,54
Job 3: M0,65 M1,95 M2,47 M3,62 M4,88
Job 4: M0,44 M1,61 M2,42 M3,55 M4,83
Job 5: M0,35 M1,38 M2,96 M3,88 M4,66
Job 6: M0,43 M1,75 M2,97 M3,88 M4,35
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 99
Job 1: 40
Job 2: 87
Job 3: 65
Job 4: 44
Job 5: 35
Job 6: 43
Job 7: 63
Job 8: 49
Job 9: 78
Job 10: 67
Job 11: 91
Job 12: 88
Job 13: 48
Job 14: 73
Machine 1 processes:
Job 0: 36
Job 1: 84
Job 2: 59
Job 3: 95
Job 4: 61
Job 5: 38
Job 6: 75
J... | Job permutation: J4 → J1 → J12 → J7 → J10 → J8 → J2 → J13 → J3 → J5 → J14 → J9 → J11 → J0 → J6
Makespan: 1274 | 1,274 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,80 M1,92 M2,45 M3,44 M4,33
Job 1: M0,83 M1,32 M2,91 M3,66 M4,56
Job 2: M0,89 M1,66 M2,74 M3,47 M4,66
Job 3: M0,84 M1,52 M2,45 M3,64 M4,45
Job 4: M0,45 M1,80 M2,65 M3,56 M4,58
Job 5: M0,30 M1,93 M2,75 M3,97 M4,32
Job 6: M0,47 M1,71 M2,43 M3,34 M4,66
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 80
Job 1: 83
Job 2: 89
Job 3: 84
Job 4: 45
Job 5: 30
Job 6: 47
Job 7: 31
Job 8: 68
Job 9: 57
Job 10: 89
Job 11: 62
Job 12: 34
Job 13: 57
Job 14: 84
Machine 1 processes:
Job 0: 92
Job 1: 32
Job 2: 66
Job 3: 52
Job 4: 80
Job 5: 93
Job 6: 71
J... | Job permutation: J7 → J5 → J8 → J12 → J10 → J4 → J1 → J11 → J6 → J2 → J13 → J14 → J0 → J3 → J9
Makespan: 1147 | 1,147 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,72 M1,37 M2,85 M3,60 M4,59
Job 1: M0,48 M1,86 M2,54 M3,67 M4,80
Job 2: M0,95 M1,99 M2,40 M3,40 M4,54
Job 3: M0,95 M1,35 M2,79 M3,87 M4,91
Job 4: M0,82 M1,45 M2,96 M3,70 M4,31
Job 5: M0,48 M1,79 M2,91 M3,51 M4,77
Job 6: M0,39 M1,54 M2,64 M3,50 M4,73
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 72
Job 1: 48
Job 2: 95
Job 3: 95
Job 4: 82
Job 5: 48
Job 6: 39
Job 7: 79
Job 8: 93
Job 9: 66
Job 10: 64
Job 11: 36
Job 12: 78
Job 13: 40
Job 14: 80
Machine 1 processes:
Job 0: 37
Job 1: 86
Job 2: 99
Job 3: 35
Job 4: 45
Job 5: 79
Job 6: 54
J... | Job permutation: J11 → J6 → J13 → J12 → J0 → J5 → J14 → J10 → J1 → J3 → J7 → J4 → J9 → J8 → J2
Makespan: 1260 | 1,260 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,67 M1,93 M2,99 M3,81 M4,95
Job 1: M0,53 M1,53 M2,51 M3,96 M4,51
Job 2: M0,91 M1,37 M2,72 M3,63 M4,71
Job 3: M0,68 M1,51 M2,56 M3,47 M4,95
Job 4: M0,43 M1,94 M2,62 M3,79 M4,66
Job 5: M0,49 M1,71 M2,82 M3,71 M4,70
Job 6: M0,59 M1,74 M2,93 M3,98 M4,64
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 67
Job 1: 53
Job 2: 91
Job 3: 68
Job 4: 43
Job 5: 49
Job 6: 59
Job 7: 63
Job 8: 57
Job 9: 32
Job 10: 67
Job 11: 31
Job 12: 48
Job 13: 54
Job 14: 57
Machine 1 processes:
Job 0: 93
Job 1: 53
Job 2: 37
Job 3: 51
Job 4: 94
Job 5: 71
Job 6: 74
J... | Job permutation: J9 → J1 → J5 → J3 → J11 → J2 → J8 → J13 → J7 → J14 → J0 → J4 → J6 → J12 → J10
Makespan: 1247 | 1,247 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,53 M1,31 M2,60 M3,69 M4,90
Job 1: M0,69 M1,36 M2,55 M3,48 M4,47
Job 2: M0,40 M1,95 M2,37 M3,76 M4,65
Job 3: M0,95 M1,42 M2,53 M3,53 M4,35
Job 4: M0,87 M1,44 M2,87 M3,43 M4,70
Job 5: M0,33 M1,41 M2,93 M3,86 M4,30
Job 6: M0,33 M1,61 M2,62 M3,32 M4,53
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 53
Job 1: 69
Job 2: 40
Job 3: 95
Job 4: 87
Job 5: 33
Job 6: 33
Job 7: 69
Job 8: 64
Job 9: 66
Job 10: 64
Job 11: 84
Job 12: 97
Job 13: 78
Job 14: 31
Machine 1 processes:
Job 0: 31
Job 1: 36
Job 2: 95
Job 3: 42
Job 4: 44
Job 5: 41
Job 6: 61
J... | Job permutation: J14 → J5 → J6 → J2 → J0 → J10 → J8 → J9 → J1 → J7 → J13 → J4 → J11 → J12 → J3
Makespan: 1146 | 1,146 |
15 | 5 | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,79 M1,36 M2,63 M3,49 M4,99
Job 1: M0,37 M1,80 M2,63 M3,83 M4,36
Job 2: M0,84 M1,83 M2,79 M3,58 M4,86
Job 3: M0,47 M1,35 M2,64 M3,55 M4,52
Job 4: M0,46 M1,47 M2,33 M3,91 M4,37
Job 5: M0,92 M1,33 M2,48 M3,42 M4,51
Job 6: M0,99 M1,36 M2,77 M3,40 M4,70
Job... | PFSP with 15 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 79
Job 1: 37
Job 2: 84
Job 3: 47
Job 4: 46
Job 5: 92
Job 6: 99
Job 7: 38
Job 8: 93
Job 9: 30
Job 10: 52
Job 11: 64
Job 12: 38
Job 13: 53
Job 14: 57
Machine 1 processes:
Job 0: 36
Job 1: 80
Job 2: 83
Job 3: 35
Job 4: 47
Job 5: 33
Job 6: 36
J... | Job permutation: J14 → J3 → J13 → J4 → J10 → J0 → J7 → J2 → J8 → J6 → J1 → J5 → J9 → J12 → J11
Makespan: 1166 | 1,166 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,111 M1,117 M2,115 M3,113 M4,60
Job 1: M0,71 M1,67 M2,113 M3,76 M4,58
Job 2: M0,92 M1,80 M2,51 M3,87 M4,74
Job 3: M0,91 M1,48 M2,65 M3,84 M4,78
Job 4: M0,119 M1,52 M2,48 M3,41 M4,104
Job 5: M0,43 M1,107 M2,114 M3,60 M4,78
Job 6: M0,106 M1,70 M2,54 M3,69 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 111
Job 1: 71
Job 2: 92
Job 3: 91
Job 4: 119
Job 5: 43
Job 6: 106
Job 7: 60
Job 8: 65
Job 9: 104
Job 10: 104
Job 11: 88
Job 12: 57
Job 13: 103
Job 14: 50
Job 15: 100
Job 16: 83
Job 17: 54
Job 18: 78
Job 19: 40
Machine 1 processes:
Job 0: 11... | Job permutation: J18 → J14 → J5 → J2 → J4 → J17 → J7 → J16 → J0 → J10 → J8 → J3 → J12 → J15 → J13 → J11 → J1 → J19 → J6 → J9
Makespan: 1924 | 1,924 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,75 M1,60 M2,72 M3,54 M4,53
Job 1: M0,106 M1,61 M2,40 M3,108 M4,109
Job 2: M0,108 M1,114 M2,49 M3,96 M4,50
Job 3: M0,115 M1,48 M2,52 M3,57 M4,81
Job 4: M0,104 M1,112 M2,73 M3,75 M4,111
Job 5: M0,78 M1,75 M2,55 M3,119 M4,108
Job 6: M0,63 M1,97 M2,99 M3,78... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 75
Job 1: 106
Job 2: 108
Job 3: 115
Job 4: 104
Job 5: 78
Job 6: 63
Job 7: 119
Job 8: 65
Job 9: 96
Job 10: 51
Job 11: 62
Job 12: 66
Job 13: 44
Job 14: 48
Job 15: 51
Job 16: 82
Job 17: 53
Job 18: 100
Job 19: 95
Machine 1 processes:
Job 0: 60
... | Job permutation: J13 → J15 → J14 → J1 → J8 → J5 → J16 → J12 → J9 → J17 → J4 → J19 → J7 → J6 → J2 → J3 → J10 → J0 → J18 → J11
Makespan: 1836 | 1,836 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,71 M1,67 M2,51 M3,94 M4,106
Job 1: M0,64 M1,87 M2,45 M3,113 M4,107
Job 2: M0,68 M1,52 M2,48 M3,42 M4,87
Job 3: M0,93 M1,97 M2,64 M3,46 M4,57
Job 4: M0,101 M1,46 M2,66 M3,96 M4,48
Job 5: M0,113 M1,40 M2,92 M3,73 M4,48
Job 6: M0,109 M1,47 M2,47 M3,56 M4,9... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 71
Job 1: 64
Job 2: 68
Job 3: 93
Job 4: 101
Job 5: 113
Job 6: 109
Job 7: 43
Job 8: 94
Job 9: 48
Job 10: 78
Job 11: 91
Job 12: 95
Job 13: 98
Job 14: 43
Job 15: 80
Job 16: 107
Job 17: 56
Job 18: 92
Job 19: 88
Machine 1 processes:
Job 0: 67
Jo... | Job permutation: J7 → J9 → J14 → J17 → J1 → J2 → J0 → J10 → J15 → J19 → J11 → J18 → J3 → J8 → J12 → J16 → J13 → J6 → J4 → J5
Makespan: 1885 | 1,885 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,49 M1,63 M2,59 M3,97 M4,62
Job 1: M0,44 M1,100 M2,71 M3,60 M4,119
Job 2: M0,60 M1,77 M2,64 M3,99 M4,88
Job 3: M0,63 M1,101 M2,47 M3,86 M4,117
Job 4: M0,50 M1,84 M2,58 M3,54 M4,83
Job 5: M0,65 M1,81 M2,70 M3,67 M4,110
Job 6: M0,113 M1,103 M2,48 M3,98 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 49
Job 1: 44
Job 2: 60
Job 3: 63
Job 4: 50
Job 5: 65
Job 6: 113
Job 7: 64
Job 8: 98
Job 9: 114
Job 10: 99
Job 11: 105
Job 12: 48
Job 13: 88
Job 14: 93
Job 15: 61
Job 16: 66
Job 17: 58
Job 18: 67
Job 19: 106
Machine 1 processes:
Job 0: 63
Jo... | Job permutation: J0 → J16 → J12 → J2 → J5 → J4 → J11 → J1 → J3 → J9 → J15 → J7 → J14 → J10 → J17 → J8 → J19 → J6 → J18 → J13
Makespan: 2040 | 2,040 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,72 M1,101 M2,82 M3,100 M4,45
Job 1: M0,57 M1,102 M2,53 M3,86 M4,119
Job 2: M0,51 M1,46 M2,49 M3,96 M4,53
Job 3: M0,76 M1,46 M2,115 M3,58 M4,82
Job 4: M0,40 M1,90 M2,102 M3,92 M4,114
Job 5: M0,84 M1,62 M2,112 M3,85 M4,87
Job 6: M0,65 M1,62 M2,53 M3,88 M4... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 72
Job 1: 57
Job 2: 51
Job 3: 76
Job 4: 40
Job 5: 84
Job 6: 65
Job 7: 118
Job 8: 68
Job 9: 90
Job 10: 65
Job 11: 53
Job 12: 44
Job 13: 52
Job 14: 99
Job 15: 112
Job 16: 81
Job 17: 103
Job 18: 78
Job 19: 45
Machine 1 processes:
Job 0: 101
Jo... | Job permutation: J2 → J12 → J11 → J6 → J5 → J10 → J3 → J4 → J1 → J17 → J13 → J9 → J14 → J18 → J19 → J7 → J8 → J16 → J15 → J0
Makespan: 1957 | 1,957 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,95 M1,63 M2,114 M3,93 M4,81
Job 1: M0,73 M1,75 M2,87 M3,82 M4,57
Job 2: M0,117 M1,63 M2,50 M3,53 M4,47
Job 3: M0,87 M1,47 M2,48 M3,78 M4,50
Job 4: M0,50 M1,84 M2,75 M3,92 M4,102
Job 5: M0,77 M1,76 M2,96 M3,55 M4,51
Job 6: M0,109 M1,86 M2,85 M3,118 M4,66... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 95
Job 1: 73
Job 2: 117
Job 3: 87
Job 4: 50
Job 5: 77
Job 6: 109
Job 7: 44
Job 8: 59
Job 9: 88
Job 10: 54
Job 11: 74
Job 12: 88
Job 13: 61
Job 14: 101
Job 15: 75
Job 16: 119
Job 17: 74
Job 18: 110
Job 19: 109
Machine 1 processes:
Job 0: 63
... | Job permutation: J11 → J15 → J10 → J4 → J1 → J18 → J0 → J8 → J7 → J19 → J14 → J9 → J6 → J17 → J16 → J13 → J12 → J3 → J5 → J2
Makespan: 1877 | 1,877 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,113 M1,113 M2,116 M3,97 M4,72
Job 1: M0,62 M1,78 M2,70 M3,71 M4,85
Job 2: M0,76 M1,55 M2,90 M3,109 M4,114
Job 3: M0,93 M1,52 M2,100 M3,98 M4,93
Job 4: M0,41 M1,93 M2,70 M3,83 M4,84
Job 5: M0,115 M1,102 M2,115 M3,104 M4,67
Job 6: M0,47 M1,78 M2,82 M3,49 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 113
Job 1: 62
Job 2: 76
Job 3: 93
Job 4: 41
Job 5: 115
Job 6: 47
Job 7: 104
Job 8: 101
Job 9: 58
Job 10: 67
Job 11: 95
Job 12: 80
Job 13: 98
Job 14: 62
Job 15: 96
Job 16: 93
Job 17: 100
Job 18: 41
Job 19: 78
Machine 1 processes:
Job 0: 113
... | Job permutation: J18 → J19 → J2 → J14 → J1 → J10 → J15 → J4 → J17 → J12 → J3 → J16 → J5 → J0 → J8 → J6 → J13 → J9 → J7 → J11
Makespan: 1894 | 1,894 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,117 M1,93 M2,112 M3,46 M4,73
Job 1: M0,42 M1,117 M2,48 M3,87 M4,44
Job 2: M0,114 M1,53 M2,49 M3,64 M4,59
Job 3: M0,105 M1,100 M2,108 M3,61 M4,69
Job 4: M0,47 M1,72 M2,56 M3,63 M4,48
Job 5: M0,51 M1,74 M2,87 M3,88 M4,96
Job 6: M0,109 M1,58 M2,55 M3,103 M... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 117
Job 1: 42
Job 2: 114
Job 3: 105
Job 4: 47
Job 5: 51
Job 6: 109
Job 7: 53
Job 8: 119
Job 9: 96
Job 10: 99
Job 11: 41
Job 12: 57
Job 13: 115
Job 14: 78
Job 15: 41
Job 16: 45
Job 17: 96
Job 18: 84
Job 19: 88
Machine 1 processes:
Job 0: 93
... | Job permutation: J16 → J4 → J17 → J15 → J14 → J7 → J5 → J1 → J8 → J10 → J18 → J19 → J6 → J9 → J13 → J12 → J0 → J3 → J2 → J11
Makespan: 1903 | 1,903 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,109 M1,104 M2,75 M3,84 M4,80
Job 1: M0,77 M1,103 M2,44 M3,102 M4,74
Job 2: M0,65 M1,91 M2,56 M3,65 M4,80
Job 3: M0,92 M1,59 M2,102 M3,80 M4,71
Job 4: M0,52 M1,89 M2,88 M3,75 M4,52
Job 5: M0,52 M1,61 M2,94 M3,71 M4,45
Job 6: M0,59 M1,72 M2,54 M3,99 M4,69... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 109
Job 1: 77
Job 2: 65
Job 3: 92
Job 4: 52
Job 5: 52
Job 6: 59
Job 7: 73
Job 8: 65
Job 9: 109
Job 10: 118
Job 11: 40
Job 12: 102
Job 13: 48
Job 14: 82
Job 15: 89
Job 16: 99
Job 17: 88
Job 18: 44
Job 19: 71
Machine 1 processes:
Job 0: 104
J... | Job permutation: J13 → J5 → J19 → J6 → J14 → J4 → J2 → J3 → J7 → J15 → J16 → J18 → J9 → J8 → J1 → J12 → J17 → J0 → J10 → J11
Makespan: 1914 | 1,914 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,100 M1,107 M2,92 M3,97 M4,97
Job 1: M0,84 M1,118 M2,44 M3,110 M4,52
Job 2: M0,96 M1,104 M2,96 M3,54 M4,46
Job 3: M0,42 M1,45 M2,69 M3,85 M4,80
Job 4: M0,98 M1,94 M2,64 M3,58 M4,52
Job 5: M0,40 M1,47 M2,117 M3,105 M4,83
Job 6: M0,61 M1,109 M2,119 M3,73 M... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 100
Job 1: 84
Job 2: 96
Job 3: 42
Job 4: 98
Job 5: 40
Job 6: 61
Job 7: 109
Job 8: 76
Job 9: 55
Job 10: 46
Job 11: 90
Job 12: 77
Job 13: 43
Job 14: 84
Job 15: 95
Job 16: 44
Job 17: 54
Job 18: 97
Job 19: 102
Machine 1 processes:
Job 0: 107
Jo... | Job permutation: J5 → J13 → J1 → J15 → J16 → J14 → J9 → J0 → J11 → J6 → J17 → J12 → J19 → J4 → J3 → J18 → J10 → J8 → J2 → J7
Makespan: 1862 | 1,862 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,87 M1,72 M2,48 M3,61 M4,104
Job 1: M0,86 M1,76 M2,46 M3,95 M4,41
Job 2: M0,86 M1,49 M2,62 M3,107 M4,47
Job 3: M0,117 M1,52 M2,94 M3,72 M4,48
Job 4: M0,114 M1,81 M2,111 M3,89 M4,103
Job 5: M0,83 M1,109 M2,116 M3,64 M4,94
Job 6: M0,61 M1,105 M2,85 M3,53 M... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 87
Job 1: 86
Job 2: 86
Job 3: 117
Job 4: 114
Job 5: 83
Job 6: 61
Job 7: 98
Job 8: 96
Job 9: 80
Job 10: 89
Job 11: 59
Job 12: 73
Job 13: 105
Job 14: 113
Job 15: 105
Job 16: 80
Job 17: 111
Job 18: 114
Job 19: 118
Machine 1 processes:
Job 0: 7... | Job permutation: J11 → J6 → J12 → J16 → J9 → J5 → J2 → J0 → J10 → J8 → J7 → J15 → J14 → J4 → J13 → J19 → J17 → J3 → J18 → J1
Makespan: 2133 | 2,133 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,54 M1,107 M2,117 M3,46 M4,84
Job 1: M0,97 M1,62 M2,74 M3,60 M4,76
Job 2: M0,86 M1,44 M2,52 M3,54 M4,51
Job 3: M0,97 M1,92 M2,92 M3,42 M4,105
Job 4: M0,50 M1,106 M2,74 M3,80 M4,115
Job 5: M0,93 M1,67 M2,62 M3,79 M4,81
Job 6: M0,64 M1,87 M2,40 M3,100 M4,6... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 54
Job 1: 97
Job 2: 86
Job 3: 97
Job 4: 50
Job 5: 93
Job 6: 64
Job 7: 93
Job 8: 96
Job 9: 119
Job 10: 102
Job 11: 61
Job 12: 91
Job 13: 41
Job 14: 96
Job 15: 89
Job 16: 113
Job 17: 50
Job 18: 77
Job 19: 82
Machine 1 processes:
Job 0: 107
Jo... | Job permutation: J19 → J15 → J13 → J11 → J17 → J4 → J0 → J2 → J12 → J6 → J8 → J7 → J18 → J5 → J14 → J1 → J10 → J3 → J9 → J16
Makespan: 1978 | 1,978 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,67 M1,47 M2,66 M3,76 M4,48
Job 1: M0,66 M1,93 M2,113 M3,72 M4,68
Job 2: M0,104 M1,79 M2,75 M3,110 M4,119
Job 3: M0,44 M1,97 M2,103 M3,52 M4,88
Job 4: M0,62 M1,80 M2,109 M3,48 M4,76
Job 5: M0,84 M1,45 M2,44 M3,93 M4,75
Job 6: M0,92 M1,68 M2,105 M3,96 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 67
Job 1: 66
Job 2: 104
Job 3: 44
Job 4: 62
Job 5: 84
Job 6: 92
Job 7: 95
Job 8: 46
Job 9: 66
Job 10: 110
Job 11: 91
Job 12: 47
Job 13: 73
Job 14: 118
Job 15: 61
Job 16: 62
Job 17: 50
Job 18: 91
Job 19: 89
Machine 1 processes:
Job 0: 47
Job... | Job permutation: J12 → J3 → J4 → J9 → J11 → J8 → J2 → J19 → J1 → J10 → J14 → J18 → J15 → J5 → J6 → J13 → J17 → J0 → J7 → J16
Makespan: 1861 | 1,861 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,61 M1,85 M2,71 M3,87 M4,40
Job 1: M0,94 M1,64 M2,115 M3,53 M4,48
Job 2: M0,49 M1,50 M2,69 M3,42 M4,72
Job 3: M0,44 M1,80 M2,72 M3,49 M4,70
Job 4: M0,85 M1,64 M2,90 M3,92 M4,40
Job 5: M0,60 M1,47 M2,96 M3,49 M4,91
Job 6: M0,80 M1,76 M2,88 M3,68 M4,56
Jo... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 61
Job 1: 94
Job 2: 49
Job 3: 44
Job 4: 85
Job 5: 60
Job 6: 80
Job 7: 56
Job 8: 96
Job 9: 113
Job 10: 104
Job 11: 102
Job 12: 109
Job 13: 94
Job 14: 44
Job 15: 100
Job 16: 54
Job 17: 76
Job 18: 117
Job 19: 49
Machine 1 processes:
Job 0: 85
... | Job permutation: J14 → J3 → J2 → J16 → J15 → J17 → J13 → J10 → J11 → J12 → J7 → J9 → J6 → J19 → J4 → J8 → J5 → J18 → J0 → J1
Makespan: 1979 | 1,979 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,75 M1,119 M2,40 M3,89 M4,90
Job 1: M0,61 M1,63 M2,51 M3,84 M4,60
Job 2: M0,51 M1,74 M2,68 M3,57 M4,76
Job 3: M0,67 M1,112 M2,95 M3,118 M4,49
Job 4: M0,42 M1,102 M2,62 M3,90 M4,58
Job 5: M0,94 M1,61 M2,115 M3,49 M4,52
Job 6: M0,60 M1,81 M2,111 M3,113 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 75
Job 1: 61
Job 2: 51
Job 3: 67
Job 4: 42
Job 5: 94
Job 6: 60
Job 7: 40
Job 8: 97
Job 9: 48
Job 10: 60
Job 11: 59
Job 12: 61
Job 13: 102
Job 14: 112
Job 15: 78
Job 16: 57
Job 17: 40
Job 18: 89
Job 19: 112
Machine 1 processes:
Job 0: 119
Jo... | Job permutation: J7 → J4 → J1 → J17 → J6 → J18 → J19 → J8 → J14 → J3 → J5 → J9 → J11 → J15 → J0 → J16 → J2 → J12 → J13 → J10
Makespan: 1895 | 1,895 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,57 M1,94 M2,71 M3,84 M4,56
Job 1: M0,88 M1,47 M2,109 M3,107 M4,63
Job 2: M0,117 M1,115 M2,80 M3,49 M4,66
Job 3: M0,94 M1,99 M2,111 M3,117 M4,42
Job 4: M0,92 M1,117 M2,113 M3,102 M4,42
Job 5: M0,103 M1,116 M2,87 M3,42 M4,89
Job 6: M0,119 M1,88 M2,68 M3,8... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 57
Job 1: 88
Job 2: 117
Job 3: 94
Job 4: 92
Job 5: 103
Job 6: 119
Job 7: 116
Job 8: 101
Job 9: 105
Job 10: 43
Job 11: 41
Job 12: 73
Job 13: 85
Job 14: 57
Job 15: 60
Job 16: 65
Job 17: 88
Job 18: 117
Job 19: 88
Machine 1 processes:
Job 0: 94... | Job permutation: J11 → J10 → J16 → J14 → J13 → J17 → J0 → J15 → J19 → J8 → J4 → J3 → J7 → J6 → J12 → J1 → J5 → J2 → J18 → J9
Makespan: 1987 | 1,987 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,69 M1,81 M2,48 M3,79 M4,52
Job 1: M0,55 M1,80 M2,71 M3,97 M4,54
Job 2: M0,49 M1,79 M2,103 M3,51 M4,54
Job 3: M0,97 M1,81 M2,110 M3,69 M4,52
Job 4: M0,44 M1,79 M2,105 M3,62 M4,114
Job 5: M0,101 M1,48 M2,72 M3,59 M4,83
Job 6: M0,44 M1,61 M2,107 M3,65 M4,9... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 69
Job 1: 55
Job 2: 49
Job 3: 97
Job 4: 44
Job 5: 101
Job 6: 44
Job 7: 65
Job 8: 94
Job 9: 116
Job 10: 67
Job 11: 117
Job 12: 53
Job 13: 103
Job 14: 41
Job 15: 60
Job 16: 59
Job 17: 95
Job 18: 53
Job 19: 59
Machine 1 processes:
Job 0: 81
Jo... | Job permutation: J14 → J12 → J15 → J8 → J6 → J4 → J11 → J17 → J1 → J13 → J10 → J5 → J3 → J9 → J0 → J18 → J2 → J19 → J7 → J16
Makespan: 1918 | 1,918 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,88 M1,49 M2,100 M3,71 M4,67
Job 1: M0,69 M1,97 M2,114 M3,59 M4,50
Job 2: M0,58 M1,60 M2,77 M3,51 M4,85
Job 3: M0,62 M1,62 M2,80 M3,69 M4,65
Job 4: M0,40 M1,47 M2,100 M3,57 M4,45
Job 5: M0,113 M1,83 M2,75 M3,107 M4,116
Job 6: M0,44 M1,56 M2,61 M3,48 M4,5... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 88
Job 1: 69
Job 2: 58
Job 3: 62
Job 4: 40
Job 5: 113
Job 6: 44
Job 7: 44
Job 8: 93
Job 9: 57
Job 10: 111
Job 11: 86
Job 12: 46
Job 13: 66
Job 14: 69
Job 15: 82
Job 16: 40
Job 17: 102
Job 18: 77
Job 19: 77
Machine 1 processes:
Job 0: 49
Job... | Job permutation: J6 → J2 → J12 → J4 → J13 → J16 → J7 → J9 → J3 → J19 → J18 → J17 → J15 → J11 → J0 → J10 → J8 → J5 → J14 → J1
Makespan: 1914 | 1,914 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,54 M1,50 M2,42 M3,69 M4,70
Job 1: M0,92 M1,78 M2,113 M3,106 M4,89
Job 2: M0,115 M1,101 M2,53 M3,99 M4,55
Job 3: M0,48 M1,98 M2,112 M3,53 M4,72
Job 4: M0,83 M1,80 M2,85 M3,76 M4,44
Job 5: M0,40 M1,104 M2,107 M3,78 M4,63
Job 6: M0,87 M1,86 M2,41 M3,61 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 54
Job 1: 92
Job 2: 115
Job 3: 48
Job 4: 83
Job 5: 40
Job 6: 87
Job 7: 46
Job 8: 111
Job 9: 103
Job 10: 57
Job 11: 118
Job 12: 97
Job 13: 102
Job 14: 88
Job 15: 46
Job 16: 72
Job 17: 50
Job 18: 92
Job 19: 114
Machine 1 processes:
Job 0: 50
... | Job permutation: J5 → J10 → J7 → J0 → J13 → J15 → J16 → J18 → J11 → J17 → J1 → J19 → J8 → J12 → J3 → J2 → J9 → J6 → J4 → J14
Makespan: 1994 | 1,994 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,64 M1,103 M2,95 M3,91 M4,87
Job 1: M0,89 M1,53 M2,87 M3,84 M4,83
Job 2: M0,45 M1,77 M2,43 M3,40 M4,40
Job 3: M0,60 M1,68 M2,73 M3,115 M4,63
Job 4: M0,82 M1,76 M2,117 M3,69 M4,53
Job 5: M0,59 M1,82 M2,46 M3,61 M4,63
Job 6: M0,82 M1,51 M2,103 M3,91 M4,104... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 64
Job 1: 89
Job 2: 45
Job 3: 60
Job 4: 82
Job 5: 59
Job 6: 82
Job 7: 80
Job 8: 53
Job 9: 49
Job 10: 79
Job 11: 46
Job 12: 87
Job 13: 98
Job 14: 114
Job 15: 99
Job 16: 75
Job 17: 104
Job 18: 106
Job 19: 48
Machine 1 processes:
Job 0: 103
Jo... | Job permutation: J19 → J8 → J1 → J6 → J9 → J12 → J11 → J15 → J3 → J10 → J16 → J18 → J0 → J13 → J17 → J7 → J4 → J5 → J14 → J2
Makespan: 1903 | 1,903 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,70 M1,54 M2,74 M3,55 M4,106
Job 1: M0,91 M1,77 M2,60 M3,112 M4,102
Job 2: M0,53 M1,67 M2,71 M3,90 M4,70
Job 3: M0,89 M1,95 M2,102 M3,73 M4,50
Job 4: M0,89 M1,48 M2,71 M3,82 M4,66
Job 5: M0,78 M1,63 M2,95 M3,63 M4,107
Job 6: M0,76 M1,108 M2,99 M3,57 M4,5... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 70
Job 1: 91
Job 2: 53
Job 3: 89
Job 4: 89
Job 5: 78
Job 6: 76
Job 7: 44
Job 8: 53
Job 9: 48
Job 10: 78
Job 11: 93
Job 12: 71
Job 13: 118
Job 14: 84
Job 15: 76
Job 16: 46
Job 17: 50
Job 18: 91
Job 19: 118
Machine 1 processes:
Job 0: 54
Job ... | Job permutation: J16 → J7 → J12 → J5 → J15 → J8 → J19 → J1 → J13 → J3 → J0 → J14 → J9 → J17 → J4 → J2 → J18 → J6 → J10 → J11
Makespan: 1887 | 1,887 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,86 M1,75 M2,47 M3,60 M4,65
Job 1: M0,54 M1,74 M2,45 M3,108 M4,94
Job 2: M0,84 M1,83 M2,80 M3,54 M4,42
Job 3: M0,63 M1,71 M2,65 M3,114 M4,79
Job 4: M0,85 M1,70 M2,84 M3,66 M4,67
Job 5: M0,49 M1,54 M2,53 M3,107 M4,69
Job 6: M0,40 M1,97 M2,44 M3,61 M4,45
... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 86
Job 1: 54
Job 2: 84
Job 3: 63
Job 4: 85
Job 5: 49
Job 6: 40
Job 7: 61
Job 8: 80
Job 9: 54
Job 10: 112
Job 11: 53
Job 12: 74
Job 13: 102
Job 14: 103
Job 15: 46
Job 16: 82
Job 17: 69
Job 18: 71
Job 19: 111
Machine 1 processes:
Job 0: 75
Jo... | Job permutation: J5 → J17 → J15 → J1 → J8 → J12 → J3 → J19 → J16 → J18 → J0 → J13 → J14 → J9 → J10 → J6 → J4 → J7 → J11 → J2
Makespan: 1899 | 1,899 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,44 M1,94 M2,57 M3,86 M4,58
Job 1: M0,69 M1,60 M2,64 M3,65 M4,116
Job 2: M0,64 M1,79 M2,100 M3,61 M4,79
Job 3: M0,91 M1,59 M2,61 M3,108 M4,56
Job 4: M0,45 M1,77 M2,54 M3,113 M4,92
Job 5: M0,85 M1,76 M2,49 M3,58 M4,60
Job 6: M0,64 M1,105 M2,54 M3,69 M4,98... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 44
Job 1: 69
Job 2: 64
Job 3: 91
Job 4: 45
Job 5: 85
Job 6: 64
Job 7: 67
Job 8: 98
Job 9: 118
Job 10: 119
Job 11: 41
Job 12: 73
Job 13: 107
Job 14: 48
Job 15: 64
Job 16: 99
Job 17: 59
Job 18: 48
Job 19: 103
Machine 1 processes:
Job 0: 94
Jo... | Job permutation: J18 → J0 → J5 → J1 → J4 → J6 → J17 → J12 → J2 → J7 → J11 → J15 → J3 → J8 → J13 → J16 → J9 → J19 → J10 → J14
Makespan: 1950 | 1,950 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,80 M1,79 M2,93 M3,84 M4,117
Job 1: M0,73 M1,96 M2,84 M3,109 M4,90
Job 2: M0,86 M1,45 M2,54 M3,50 M4,96
Job 3: M0,64 M1,96 M2,81 M3,45 M4,78
Job 4: M0,105 M1,81 M2,99 M3,118 M4,92
Job 5: M0,84 M1,41 M2,102 M3,64 M4,56
Job 6: M0,77 M1,51 M2,101 M3,95 M4,7... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 80
Job 1: 73
Job 2: 86
Job 3: 64
Job 4: 105
Job 5: 84
Job 6: 77
Job 7: 99
Job 8: 97
Job 9: 79
Job 10: 82
Job 11: 85
Job 12: 97
Job 13: 115
Job 14: 100
Job 15: 89
Job 16: 87
Job 17: 110
Job 18: 93
Job 19: 96
Machine 1 processes:
Job 0: 79
Jo... | Job permutation: J4 → J6 → J10 → J18 → J7 → J8 → J15 → J19 → J1 → J13 → J0 → J12 → J16 → J5 → J2 → J3 → J17 → J9 → J11 → J14
Makespan: 2030 | 2,030 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,48 M1,115 M2,98 M3,90 M4,74
Job 1: M0,110 M1,91 M2,54 M3,70 M4,105
Job 2: M0,95 M1,84 M2,53 M3,58 M4,61
Job 3: M0,67 M1,72 M2,85 M3,43 M4,86
Job 4: M0,57 M1,71 M2,93 M3,112 M4,87
Job 5: M0,118 M1,109 M2,70 M3,115 M4,68
Job 6: M0,76 M1,77 M2,45 M3,41 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 48
Job 1: 110
Job 2: 95
Job 3: 67
Job 4: 57
Job 5: 118
Job 6: 76
Job 7: 51
Job 8: 44
Job 9: 66
Job 10: 90
Job 11: 71
Job 12: 44
Job 13: 52
Job 14: 62
Job 15: 117
Job 16: 61
Job 17: 50
Job 18: 49
Job 19: 66
Machine 1 processes:
Job 0: 115
Jo... | Job permutation: J12 → J8 → J7 → J13 → J4 → J19 → J3 → J1 → J0 → J9 → J10 → J14 → J17 → J5 → J16 → J11 → J15 → J18 → J6 → J2
Makespan: 2024 | 2,024 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,108 M1,81 M2,47 M3,65 M4,80
Job 1: M0,97 M1,102 M2,65 M3,95 M4,85
Job 2: M0,102 M1,98 M2,77 M3,57 M4,107
Job 3: M0,84 M1,47 M2,61 M3,94 M4,95
Job 4: M0,108 M1,108 M2,52 M3,113 M4,102
Job 5: M0,65 M1,52 M2,65 M3,86 M4,85
Job 6: M0,81 M1,73 M2,80 M3,88 M4... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 108
Job 1: 97
Job 2: 102
Job 3: 84
Job 4: 108
Job 5: 65
Job 6: 81
Job 7: 62
Job 8: 91
Job 9: 106
Job 10: 44
Job 11: 91
Job 12: 44
Job 13: 40
Job 14: 71
Job 15: 101
Job 16: 75
Job 17: 97
Job 18: 80
Job 19: 95
Machine 1 processes:
Job 0: 81
J... | Job permutation: J7 → J10 → J5 → J6 → J16 → J3 → J18 → J2 → J13 → J9 → J15 → J4 → J17 → J1 → J8 → J14 → J11 → J19 → J0 → J12
Makespan: 1968 | 1,968 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,107 M1,110 M2,88 M3,49 M4,82
Job 1: M0,115 M1,84 M2,60 M3,76 M4,44
Job 2: M0,69 M1,40 M2,97 M3,42 M4,49
Job 3: M0,96 M1,81 M2,118 M3,69 M4,61
Job 4: M0,48 M1,81 M2,115 M3,42 M4,91
Job 5: M0,56 M1,63 M2,114 M3,94 M4,70
Job 6: M0,41 M1,81 M2,109 M3,65 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 107
Job 1: 115
Job 2: 69
Job 3: 96
Job 4: 48
Job 5: 56
Job 6: 41
Job 7: 85
Job 8: 43
Job 9: 76
Job 10: 83
Job 11: 75
Job 12: 64
Job 13: 61
Job 14: 116
Job 15: 115
Job 16: 41
Job 17: 43
Job 18: 101
Job 19: 81
Machine 1 processes:
Job 0: 110
... | Job permutation: J17 → J9 → J19 → J15 → J5 → J14 → J3 → J7 → J13 → J0 → J16 → J10 → J12 → J11 → J1 → J4 → J8 → J6 → J18 → J2
Makespan: 2034 | 2,034 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,89 M1,70 M2,94 M3,47 M4,88
Job 1: M0,87 M1,101 M2,43 M3,53 M4,66
Job 2: M0,46 M1,63 M2,43 M3,44 M4,100
Job 3: M0,53 M1,96 M2,83 M3,45 M4,109
Job 4: M0,114 M1,84 M2,49 M3,108 M4,61
Job 5: M0,102 M1,85 M2,76 M3,51 M4,83
Job 6: M0,108 M1,48 M2,63 M3,86 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 89
Job 1: 87
Job 2: 46
Job 3: 53
Job 4: 114
Job 5: 102
Job 6: 108
Job 7: 90
Job 8: 110
Job 9: 82
Job 10: 80
Job 11: 70
Job 12: 40
Job 13: 104
Job 14: 61
Job 15: 77
Job 16: 79
Job 17: 67
Job 18: 98
Job 19: 111
Machine 1 processes:
Job 0: 70
... | Job permutation: J12 → J2 → J3 → J14 → J17 → J11 → J15 → J9 → J16 → J10 → J0 → J7 → J18 → J5 → J13 → J19 → J8 → J4 → J1 → J6
Makespan: 1906 | 1,906 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,86 M1,42 M2,94 M3,65 M4,75
Job 1: M0,102 M1,104 M2,52 M3,112 M4,43
Job 2: M0,96 M1,98 M2,64 M3,65 M4,96
Job 3: M0,102 M1,51 M2,111 M3,65 M4,117
Job 4: M0,118 M1,43 M2,89 M3,113 M4,88
Job 5: M0,119 M1,42 M2,95 M3,90 M4,112
Job 6: M0,55 M1,75 M2,99 M3,80 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 86
Job 1: 102
Job 2: 96
Job 3: 102
Job 4: 118
Job 5: 119
Job 6: 55
Job 7: 76
Job 8: 65
Job 9: 78
Job 10: 116
Job 11: 60
Job 12: 47
Job 13: 104
Job 14: 97
Job 15: 50
Job 16: 68
Job 17: 96
Job 18: 85
Job 19: 50
Machine 1 processes:
Job 0: 42
... | Job permutation: J12 → J19 → J15 → J16 → J11 → J6 → J7 → J18 → J8 → J0 → J2 → J17 → J14 → J13 → J5 → J4 → J3 → J1 → J10 → J9
Makespan: 1927 | 1,927 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,117 M1,111 M2,108 M3,47 M4,108
Job 1: M0,113 M1,107 M2,73 M3,59 M4,84
Job 2: M0,103 M1,107 M2,105 M3,58 M4,84
Job 3: M0,88 M1,72 M2,54 M3,82 M4,106
Job 4: M0,79 M1,98 M2,89 M3,76 M4,85
Job 5: M0,103 M1,47 M2,108 M3,83 M4,51
Job 6: M0,82 M1,88 M2,69 M3,1... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 117
Job 1: 113
Job 2: 103
Job 3: 88
Job 4: 79
Job 5: 103
Job 6: 82
Job 7: 80
Job 8: 101
Job 9: 119
Job 10: 98
Job 11: 44
Job 12: 101
Job 13: 44
Job 14: 79
Job 15: 42
Job 16: 90
Job 17: 115
Job 18: 96
Job 19: 50
Machine 1 processes:
Job 0: 1... | Job permutation: J15 → J11 → J13 → J19 → J4 → J7 → J6 → J3 → J16 → J10 → J8 → J5 → J2 → J17 → J12 → J0 → J1 → J9 → J18 → J14
Makespan: 2009 | 2,009 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,106 M1,101 M2,67 M3,95 M4,43
Job 1: M0,45 M1,57 M2,92 M3,96 M4,109
Job 2: M0,64 M1,88 M2,81 M3,78 M4,99
Job 3: M0,59 M1,93 M2,52 M3,58 M4,118
Job 4: M0,87 M1,80 M2,114 M3,107 M4,75
Job 5: M0,51 M1,77 M2,102 M3,108 M4,102
Job 6: M0,76 M1,83 M2,85 M3,103 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 106
Job 1: 45
Job 2: 64
Job 3: 59
Job 4: 87
Job 5: 51
Job 6: 76
Job 7: 58
Job 8: 59
Job 9: 111
Job 10: 119
Job 11: 89
Job 12: 83
Job 13: 98
Job 14: 76
Job 15: 113
Job 16: 55
Job 17: 45
Job 18: 67
Job 19: 83
Machine 1 processes:
Job 0: 101
J... | Job permutation: J3 → J15 → J7 → J2 → J11 → J6 → J4 → J8 → J18 → J1 → J10 → J5 → J14 → J13 → J17 → J12 → J9 → J16 → J0 → J19
Makespan: 1991 | 1,991 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,86 M1,81 M2,45 M3,119 M4,49
Job 1: M0,117 M1,40 M2,91 M3,57 M4,108
Job 2: M0,61 M1,80 M2,47 M3,87 M4,47
Job 3: M0,106 M1,70 M2,68 M3,55 M4,65
Job 4: M0,109 M1,79 M2,89 M3,113 M4,44
Job 5: M0,101 M1,119 M2,66 M3,118 M4,88
Job 6: M0,64 M1,52 M2,40 M3,56 M... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 86
Job 1: 117
Job 2: 61
Job 3: 106
Job 4: 109
Job 5: 101
Job 6: 64
Job 7: 102
Job 8: 70
Job 9: 113
Job 10: 51
Job 11: 90
Job 12: 89
Job 13: 46
Job 14: 113
Job 15: 41
Job 16: 104
Job 17: 41
Job 18: 71
Job 19: 88
Machine 1 processes:
Job 0: 8... | Job permutation: J15 → J17 → J13 → J10 → J2 → J6 → J8 → J18 → J0 → J19 → J12 → J11 → J5 → J7 → J16 → J3 → J1 → J4 → J9 → J14
Makespan: 1917 | 1,917 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,52 M1,75 M2,98 M3,103 M4,103
Job 1: M0,72 M1,96 M2,119 M3,110 M4,48
Job 2: M0,62 M1,40 M2,119 M3,114 M4,42
Job 3: M0,101 M1,40 M2,48 M3,117 M4,49
Job 4: M0,98 M1,65 M2,79 M3,58 M4,98
Job 5: M0,48 M1,64 M2,96 M3,55 M4,78
Job 6: M0,112 M1,114 M2,105 M3,10... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 52
Job 1: 72
Job 2: 62
Job 3: 101
Job 4: 98
Job 5: 48
Job 6: 112
Job 7: 83
Job 8: 96
Job 9: 94
Job 10: 61
Job 11: 70
Job 12: 106
Job 13: 95
Job 14: 69
Job 15: 68
Job 16: 110
Job 17: 73
Job 18: 92
Job 19: 109
Machine 1 processes:
Job 0: 75
J... | Job permutation: J5 → J0 → J10 → J2 → J1 → J8 → J13 → J4 → J19 → J7 → J6 → J18 → J3 → J16 → J9 → J11 → J17 → J12 → J14 → J15
Makespan: 1944 | 1,944 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,43 M1,77 M2,97 M3,92 M4,82
Job 1: M0,92 M1,91 M2,108 M3,95 M4,82
Job 2: M0,77 M1,69 M2,118 M3,74 M4,61
Job 3: M0,87 M1,47 M2,57 M3,48 M4,61
Job 4: M0,84 M1,97 M2,101 M3,81 M4,111
Job 5: M0,69 M1,92 M2,57 M3,110 M4,58
Job 6: M0,76 M1,81 M2,111 M3,114 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 43
Job 1: 92
Job 2: 77
Job 3: 87
Job 4: 84
Job 5: 69
Job 6: 76
Job 7: 91
Job 8: 48
Job 9: 97
Job 10: 106
Job 11: 92
Job 12: 93
Job 13: 77
Job 14: 115
Job 15: 119
Job 16: 76
Job 17: 74
Job 18: 97
Job 19: 66
Machine 1 processes:
Job 0: 77
Job... | Job permutation: J0 → J6 → J4 → J5 → J2 → J17 → J1 → J11 → J19 → J16 → J13 → J7 → J15 → J8 → J10 → J14 → J18 → J3 → J12 → J9
Makespan: 1981 | 1,981 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,56 M1,93 M2,97 M3,68 M4,60
Job 1: M0,103 M1,85 M2,117 M3,82 M4,95
Job 2: M0,52 M1,115 M2,46 M3,103 M4,86
Job 3: M0,117 M1,43 M2,109 M3,97 M4,119
Job 4: M0,55 M1,114 M2,56 M3,72 M4,57
Job 5: M0,40 M1,44 M2,87 M3,105 M4,81
Job 6: M0,119 M1,70 M2,71 M3,62 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 56
Job 1: 103
Job 2: 52
Job 3: 117
Job 4: 55
Job 5: 40
Job 6: 119
Job 7: 80
Job 8: 67
Job 9: 59
Job 10: 98
Job 11: 112
Job 12: 103
Job 13: 52
Job 14: 84
Job 15: 43
Job 16: 47
Job 17: 52
Job 18: 41
Job 19: 113
Machine 1 processes:
Job 0: 93
... | Job permutation: J5 → J18 → J16 → J7 → J8 → J14 → J11 → J2 → J3 → J19 → J13 → J0 → J12 → J1 → J17 → J10 → J6 → J4 → J15 → J9
Makespan: 1870 | 1,870 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,91 M1,74 M2,114 M3,65 M4,104
Job 1: M0,111 M1,106 M2,72 M3,87 M4,94
Job 2: M0,108 M1,42 M2,60 M3,70 M4,73
Job 3: M0,46 M1,93 M2,79 M3,42 M4,93
Job 4: M0,112 M1,95 M2,68 M3,69 M4,52
Job 5: M0,108 M1,103 M2,103 M3,117 M4,94
Job 6: M0,71 M1,74 M2,76 M3,61 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 91
Job 1: 111
Job 2: 108
Job 3: 46
Job 4: 112
Job 5: 108
Job 6: 71
Job 7: 83
Job 8: 117
Job 9: 73
Job 10: 73
Job 11: 71
Job 12: 89
Job 13: 84
Job 14: 118
Job 15: 71
Job 16: 93
Job 17: 50
Job 18: 93
Job 19: 117
Machine 1 processes:
Job 0: 74... | Job permutation: J3 → J17 → J15 → J6 → J11 → J9 → J10 → J7 → J13 → J0 → J16 → J18 → J5 → J1 → J19 → J4 → J8 → J12 → J14 → J2
Makespan: 2024 | 2,024 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,104 M1,82 M2,109 M3,52 M4,87
Job 1: M0,112 M1,68 M2,49 M3,94 M4,50
Job 2: M0,100 M1,97 M2,98 M3,65 M4,48
Job 3: M0,57 M1,56 M2,69 M3,76 M4,64
Job 4: M0,47 M1,85 M2,73 M3,51 M4,99
Job 5: M0,96 M1,72 M2,93 M3,113 M4,70
Job 6: M0,93 M1,81 M2,87 M3,73 M4,41... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 104
Job 1: 112
Job 2: 100
Job 3: 57
Job 4: 47
Job 5: 96
Job 6: 93
Job 7: 55
Job 8: 46
Job 9: 108
Job 10: 98
Job 11: 40
Job 12: 94
Job 13: 42
Job 14: 46
Job 15: 59
Job 16: 116
Job 17: 112
Job 18: 70
Job 19: 119
Machine 1 processes:
Job 0: 82... | Job permutation: J13 → J11 → J8 → J4 → J3 → J7 → J15 → J18 → J6 → J12 → J5 → J10 → J0 → J9 → J17 → J1 → J16 → J19 → J2 → J14
Makespan: 1999 | 1,999 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,93 M1,69 M2,68 M3,103 M4,64
Job 1: M0,68 M1,65 M2,66 M3,79 M4,94
Job 2: M0,50 M1,87 M2,118 M3,88 M4,67
Job 3: M0,47 M1,105 M2,107 M3,86 M4,61
Job 4: M0,51 M1,54 M2,72 M3,75 M4,84
Job 5: M0,43 M1,60 M2,81 M3,60 M4,50
Job 6: M0,64 M1,83 M2,97 M3,87 M4,83
... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 93
Job 1: 68
Job 2: 50
Job 3: 47
Job 4: 51
Job 5: 43
Job 6: 64
Job 7: 48
Job 8: 118
Job 9: 112
Job 10: 79
Job 11: 85
Job 12: 41
Job 13: 111
Job 14: 75
Job 15: 46
Job 16: 68
Job 17: 62
Job 18: 110
Job 19: 53
Machine 1 processes:
Job 0: 69
Jo... | Job permutation: J12 → J4 → J3 → J1 → J7 → J17 → J6 → J19 → J0 → J13 → J10 → J2 → J18 → J9 → J16 → J11 → J14 → J8 → J5 → J15
Makespan: 1903 | 1,903 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,76 M1,87 M2,85 M3,118 M4,53
Job 1: M0,74 M1,108 M2,48 M3,110 M4,81
Job 2: M0,69 M1,107 M2,60 M3,99 M4,97
Job 3: M0,116 M1,107 M2,110 M3,63 M4,59
Job 4: M0,83 M1,101 M2,61 M3,88 M4,88
Job 5: M0,86 M1,115 M2,61 M3,52 M4,107
Job 6: M0,112 M1,65 M2,98 M3,80... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 76
Job 1: 74
Job 2: 69
Job 3: 116
Job 4: 83
Job 5: 86
Job 6: 112
Job 7: 103
Job 8: 42
Job 9: 64
Job 10: 80
Job 11: 60
Job 12: 59
Job 13: 82
Job 14: 103
Job 15: 77
Job 16: 64
Job 17: 83
Job 18: 95
Job 19: 69
Machine 1 processes:
Job 0: 87
Jo... | Job permutation: J8 → J12 → J11 → J9 → J16 → J19 → J2 → J1 → J0 → J15 → J4 → J7 → J14 → J5 → J6 → J13 → J17 → J3 → J18 → J10
Makespan: 1957 | 1,957 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,99 M1,117 M2,53 M3,43 M4,115
Job 1: M0,77 M1,48 M2,72 M3,90 M4,81
Job 2: M0,54 M1,80 M2,86 M3,69 M4,88
Job 3: M0,108 M1,52 M2,69 M3,57 M4,54
Job 4: M0,46 M1,47 M2,46 M3,64 M4,44
Job 5: M0,104 M1,82 M2,104 M3,82 M4,47
Job 6: M0,46 M1,118 M2,104 M3,84 M4,... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 99
Job 1: 77
Job 2: 54
Job 3: 108
Job 4: 46
Job 5: 104
Job 6: 46
Job 7: 116
Job 8: 104
Job 9: 77
Job 10: 58
Job 11: 44
Job 12: 77
Job 13: 92
Job 14: 78
Job 15: 91
Job 16: 116
Job 17: 60
Job 18: 73
Job 19: 58
Machine 1 processes:
Job 0: 117
... | Job permutation: J4 → J11 → J19 → J15 → J18 → J2 → J17 → J6 → J13 → J0 → J1 → J9 → J8 → J10 → J12 → J14 → J3 → J16 → J5 → J7
Makespan: 1836 | 1,836 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,73 M1,60 M2,59 M3,86 M4,78
Job 1: M0,47 M1,50 M2,49 M3,93 M4,66
Job 2: M0,46 M1,67 M2,98 M3,84 M4,65
Job 3: M0,87 M1,64 M2,102 M3,82 M4,106
Job 4: M0,72 M1,55 M2,50 M3,92 M4,76
Job 5: M0,52 M1,111 M2,56 M3,112 M4,109
Job 6: M0,64 M1,85 M2,73 M3,119 M4,6... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 73
Job 1: 47
Job 2: 46
Job 3: 87
Job 4: 72
Job 5: 52
Job 6: 64
Job 7: 56
Job 8: 72
Job 9: 67
Job 10: 119
Job 11: 93
Job 12: 40
Job 13: 84
Job 14: 48
Job 15: 42
Job 16: 99
Job 17: 76
Job 18: 63
Job 19: 102
Machine 1 processes:
Job 0: 60
Job ... | Job permutation: J12 → J15 → J18 → J11 → J1 → J0 → J7 → J14 → J4 → J2 → J16 → J6 → J3 → J9 → J19 → J8 → J10 → J5 → J17 → J13
Makespan: 1899 | 1,899 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,81 M1,94 M2,74 M3,42 M4,84
Job 1: M0,74 M1,94 M2,49 M3,117 M4,65
Job 2: M0,73 M1,94 M2,97 M3,81 M4,107
Job 3: M0,59 M1,62 M2,78 M3,64 M4,86
Job 4: M0,82 M1,62 M2,57 M3,77 M4,45
Job 5: M0,55 M1,63 M2,92 M3,100 M4,73
Job 6: M0,80 M1,75 M2,75 M3,93 M4,75
... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 81
Job 1: 74
Job 2: 73
Job 3: 59
Job 4: 82
Job 5: 55
Job 6: 80
Job 7: 62
Job 8: 81
Job 9: 72
Job 10: 102
Job 11: 44
Job 12: 113
Job 13: 81
Job 14: 55
Job 15: 46
Job 16: 96
Job 17: 110
Job 18: 57
Job 19: 52
Machine 1 processes:
Job 0: 94
Job... | Job permutation: J15 → J11 → J10 → J19 → J5 → J3 → J1 → J16 → J17 → J13 → J8 → J2 → J6 → J14 → J0 → J12 → J7 → J9 → J4 → J18
Makespan: 1853 | 1,853 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,49 M1,80 M2,110 M3,73 M4,116
Job 1: M0,82 M1,112 M2,83 M3,57 M4,63
Job 2: M0,52 M1,103 M2,89 M3,45 M4,90
Job 3: M0,103 M1,102 M2,107 M3,83 M4,72
Job 4: M0,105 M1,78 M2,113 M3,45 M4,49
Job 5: M0,74 M1,88 M2,41 M3,76 M4,70
Job 6: M0,49 M1,113 M2,78 M3,75 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 49
Job 1: 82
Job 2: 52
Job 3: 103
Job 4: 105
Job 5: 74
Job 6: 49
Job 7: 75
Job 8: 47
Job 9: 88
Job 10: 47
Job 11: 66
Job 12: 94
Job 13: 113
Job 14: 65
Job 15: 63
Job 16: 48
Job 17: 58
Job 18: 96
Job 19: 106
Machine 1 processes:
Job 0: 80
Jo... | Job permutation: J16 → J11 → J2 → J7 → J18 → J15 → J17 → J6 → J12 → J0 → J8 → J13 → J3 → J1 → J9 → J14 → J10 → J5 → J19 → J4
Makespan: 1804 | 1,804 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,96 M1,112 M2,74 M3,80 M4,62
Job 1: M0,106 M1,115 M2,114 M3,66 M4,81
Job 2: M0,97 M1,72 M2,114 M3,102 M4,87
Job 3: M0,45 M1,87 M2,61 M3,55 M4,94
Job 4: M0,42 M1,79 M2,42 M3,94 M4,94
Job 5: M0,84 M1,93 M2,43 M3,114 M4,93
Job 6: M0,54 M1,42 M2,100 M3,113 M... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 96
Job 1: 106
Job 2: 97
Job 3: 45
Job 4: 42
Job 5: 84
Job 6: 54
Job 7: 105
Job 8: 67
Job 9: 87
Job 10: 87
Job 11: 110
Job 12: 103
Job 13: 57
Job 14: 70
Job 15: 46
Job 16: 45
Job 17: 58
Job 18: 101
Job 19: 46
Machine 1 processes:
Job 0: 112
... | Job permutation: J15 → J4 → J9 → J17 → J16 → J5 → J6 → J3 → J19 → J18 → J8 → J13 → J14 → J10 → J2 → J0 → J12 → J1 → J11 → J7
Makespan: 1905 | 1,905 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,64 M1,72 M2,69 M3,54 M4,49
Job 1: M0,60 M1,48 M2,112 M3,53 M4,45
Job 2: M0,110 M1,50 M2,64 M3,95 M4,47
Job 3: M0,43 M1,115 M2,80 M3,104 M4,77
Job 4: M0,41 M1,107 M2,92 M3,115 M4,50
Job 5: M0,57 M1,45 M2,60 M3,112 M4,46
Job 6: M0,52 M1,77 M2,111 M3,55 M4... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 64
Job 1: 60
Job 2: 110
Job 3: 43
Job 4: 41
Job 5: 57
Job 6: 52
Job 7: 86
Job 8: 109
Job 9: 92
Job 10: 72
Job 11: 45
Job 12: 107
Job 13: 60
Job 14: 116
Job 15: 85
Job 16: 80
Job 17: 57
Job 18: 87
Job 19: 50
Machine 1 processes:
Job 0: 72
Jo... | Job permutation: J5 → J19 → J13 → J10 → J9 → J1 → J17 → J8 → J3 → J12 → J14 → J18 → J2 → J4 → J6 → J16 → J15 → J7 → J0 → J11
Makespan: 1852 | 1,852 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,118 M1,85 M2,94 M3,114 M4,112
Job 1: M0,63 M1,94 M2,79 M3,64 M4,108
Job 2: M0,75 M1,59 M2,84 M3,55 M4,90
Job 3: M0,76 M1,61 M2,45 M3,81 M4,71
Job 4: M0,83 M1,78 M2,106 M3,108 M4,115
Job 5: M0,119 M1,64 M2,98 M3,49 M4,55
Job 6: M0,111 M1,40 M2,103 M3,60 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 118
Job 1: 63
Job 2: 75
Job 3: 76
Job 4: 83
Job 5: 119
Job 6: 111
Job 7: 88
Job 8: 92
Job 9: 108
Job 10: 83
Job 11: 97
Job 12: 101
Job 13: 65
Job 14: 46
Job 15: 80
Job 16: 100
Job 17: 108
Job 18: 60
Job 19: 42
Machine 1 processes:
Job 0: 85... | Job permutation: J14 → J2 → J1 → J3 → J15 → J11 → J12 → J18 → J19 → J13 → J4 → J10 → J7 → J8 → J16 → J9 → J17 → J6 → J0 → J5
Makespan: 2068 | 2,068 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,76 M1,65 M2,91 M3,91 M4,42
Job 1: M0,40 M1,113 M2,41 M3,49 M4,83
Job 2: M0,75 M1,76 M2,88 M3,103 M4,119
Job 3: M0,107 M1,90 M2,64 M3,107 M4,46
Job 4: M0,116 M1,97 M2,95 M3,118 M4,105
Job 5: M0,89 M1,109 M2,49 M3,59 M4,68
Job 6: M0,84 M1,55 M2,109 M3,58 ... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 76
Job 1: 40
Job 2: 75
Job 3: 107
Job 4: 116
Job 5: 89
Job 6: 84
Job 7: 78
Job 8: 40
Job 9: 88
Job 10: 56
Job 11: 118
Job 12: 83
Job 13: 53
Job 14: 108
Job 15: 82
Job 16: 48
Job 17: 51
Job 18: 77
Job 19: 63
Machine 1 processes:
Job 0: 65
Jo... | Job permutation: J8 → J6 → J1 → J7 → J15 → J10 → J13 → J18 → J16 → J0 → J2 → J4 → J9 → J17 → J14 → J12 → J3 → J19 → J5 → J11
Makespan: 1808 | 1,808 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,103 M1,93 M2,110 M3,118 M4,40
Job 1: M0,93 M1,110 M2,94 M3,94 M4,64
Job 2: M0,41 M1,57 M2,48 M3,82 M4,50
Job 3: M0,63 M1,44 M2,119 M3,91 M4,49
Job 4: M0,102 M1,94 M2,48 M3,79 M4,113
Job 5: M0,77 M1,66 M2,66 M3,50 M4,73
Job 6: M0,112 M1,108 M2,54 M3,78 M... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 103
Job 1: 93
Job 2: 41
Job 3: 63
Job 4: 102
Job 5: 77
Job 6: 112
Job 7: 100
Job 8: 107
Job 9: 109
Job 10: 63
Job 11: 107
Job 12: 69
Job 13: 102
Job 14: 47
Job 15: 104
Job 16: 104
Job 17: 71
Job 18: 89
Job 19: 78
Machine 1 processes:
Job 0:... | Job permutation: J2 → J14 → J3 → J10 → J12 → J17 → J5 → J19 → J18 → J1 → J7 → J13 → J4 → J0 → J8 → J9 → J6 → J15 → J11 → J16
Makespan: 1998 | 1,998 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,95 M1,98 M2,48 M3,50 M4,68
Job 1: M0,83 M1,90 M2,64 M3,83 M4,112
Job 2: M0,59 M1,97 M2,46 M3,115 M4,76
Job 3: M0,110 M1,66 M2,87 M3,94 M4,83
Job 4: M0,71 M1,43 M2,69 M3,88 M4,47
Job 5: M0,47 M1,54 M2,85 M3,51 M4,55
Job 6: M0,54 M1,55 M2,46 M3,61 M4,58
... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 95
Job 1: 83
Job 2: 59
Job 3: 110
Job 4: 71
Job 5: 47
Job 6: 54
Job 7: 75
Job 8: 116
Job 9: 89
Job 10: 73
Job 11: 104
Job 12: 105
Job 13: 65
Job 14: 69
Job 15: 61
Job 16: 101
Job 17: 55
Job 18: 40
Job 19: 51
Machine 1 processes:
Job 0: 98
J... | Job permutation: J6 → J10 → J18 → J5 → J2 → J15 → J19 → J13 → J17 → J3 → J14 → J11 → J1 → J16 → J12 → J0 → J9 → J7 → J4 → J8
Makespan: 1924 | 1,924 |
20 | 5 | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Job 0: M0,45 M1,42 M2,50 M3,90 M4,51
Job 1: M0,114 M1,90 M2,80 M3,59 M4,93
Job 2: M0,99 M1,47 M2,98 M3,95 M4,106
Job 3: M0,115 M1,116 M2,88 M3,59 M4,42
Job 4: M0,65 M1,60 M2,104 M3,117 M4,40
Job 5: M0,90 M1,63 M2,51 M3,84 M4,99
Job 6: M0,118 M1,56 M2,118 M3,70 M4... | PFSP with 20 Jobs, 5 Machines. Makespan Minimize.
Machine 0 processes:
Job 0: 45
Job 1: 114
Job 2: 99
Job 3: 115
Job 4: 65
Job 5: 90
Job 6: 118
Job 7: 117
Job 8: 101
Job 9: 61
Job 10: 81
Job 11: 66
Job 12: 119
Job 13: 117
Job 14: 63
Job 15: 60
Job 16: 68
Job 17: 113
Job 18: 60
Job 19: 57
Machine 1 processes:
Job 0: 4... | Job permutation: J0 → J15 → J4 → J16 → J5 → J14 → J9 → J10 → J8 → J7 → J12 → J1 → J6 → J18 → J2 → J19 → J3 → J17 → J13 → J11
Makespan: 1989 | 1,989 |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.