Dataset Viewer
Auto-converted to Parquet Duplicate
slug
stringlengths
9
30
name
stringlengths
9
35
url
stringlengths
54
75
state
stringlengths
2
2
state_name
stringlengths
4
14
city
stringlengths
4
15
⌀
county
stringlengths
10
21
⌀
latitude
float64
29.4
46
longitude
float64
-122.93
-75.02
location_precision
stringclasses
3 values
location_source_url
stringclasses
11 values
stage
stringclasses
3 values
stage_date
stringdate
2021-01-01 00:00:00
2026-08-30 00:00:00
stage_source_name
stringclasses
1 value
stage_source_url
stringclasses
1 value
developer
stringclasses
12 values
developer_source_url
stringclasses
1 value
developer_source_date
stringdate
2026-01-15 00:00:00
2026-11-05 00:00:00
⌀
tenant
stringclasses
7 values
tenant_source_url
stringclasses
1 value
tenant_source_date
stringlengths
10
10
⌀
planned_mw
int64
24
2.72k
planned_mw_source_url
stringclasses
1 value
planned_mw_source_date
stringdate
2026-01-15 00:00:00
2026-11-05 00:00:00
announced_investment_usd
float64
announced_investment_usd_source_url
float64
announced_investment_usd_source_date
float64
epoch_capital_cost_estimate_usd
int64
656M
85.7B
epoch_capital_cost_estimate_usd_source_url
stringclasses
1 value
epoch_capital_cost_estimate_usd_source_date
stringdate
2026-01-15 00:00:00
2026-11-05 00:00:00
acres
float64
acres_source_url
float64
acres_source_date
float64
buildings
float64
buildings_source_url
float64
buildings_source_date
float64
general_contractor
stringclasses
4 values
general_contractor_source_url
stringclasses
1 value
general_contractor_source_date
stringclasses
6 values
utility_or_energy_company
stringclasses
14 values
utility_or_energy_company_source_url
stringclasses
1 value
utility_or_energy_company_source_date
stringdate
2026-02-13 00:00:00
2026-11-01 00:00:00
⌀
last_changed
stringdate
2026-01-15 00:00:00
2026-11-05 00:00:00
microsoft-fairwater-wisconsin
Microsoft Fairwater Wisconsin
https://joltrents.com/data-centers/projects/microsoft-fairwater-wisconsin/
WI
Wisconsin
Mount Pleasant
Racine County
42.674891
-87.894854
address
https://epoch.ai/data/ai-data-centers
Operating
2026-04-16
Epoch AI
https://epoch.ai/data/ai-data-centers
Microsoft
https://epoch.ai/data/ai-data-centers
2026-05-15
null
null
null
2,715
https://epoch.ai/data/ai-data-centers
2026-05-15
null
null
null
85,726,966,000
https://epoch.ai/data/ai-data-centers
2026-05-15
null
null
null
null
null
null
null
null
null
WE Energies
https://epoch.ai/data/ai-data-centers
2026-05-15
2026-05-15
openai-stargate-new-mexico
OpenAI Stargate New Mexico
https://joltrents.com/data-centers/projects/openai-stargate-new-mexico/
NM
New Mexico
null
Doña Ana County
32.349919
-106.834968
county
https://projectjupitertogether.com/
Under construction
2026-02-06
Epoch AI
https://epoch.ai/data/ai-data-centers
Oracle
https://epoch.ai/data/ai-data-centers
2026-06-22
OpenAI
https://epoch.ai/data/ai-data-centers
2026-06-22
2,450
https://epoch.ai/data/ai-data-centers
2026-06-22
null
null
null
66,293,500,000
https://epoch.ai/data/ai-data-centers
2026-06-22
null
null
null
null
null
null
null
null
null
Bloom Energy
https://epoch.ai/data/ai-data-centers
2026-06-22
2026-06-22
anthropic-amazon-new-carlisle
Anthropic-Amazon New Carlisle
https://joltrents.com/data-centers/projects/anthropic-amazon-new-carlisle/
IN
Indiana
New Carlisle
St. Joseph County
41.693774
-86.460524
address
https://epoch.ai/data/ai-data-centers
Operating
2025-06-23
Epoch AI
https://epoch.ai/data/ai-data-centers
Amazon
https://epoch.ai/data/ai-data-centers
2026-10-19
Anthropic
https://epoch.ai/data/ai-data-centers
2026-10-19
2,310
https://epoch.ai/data/ai-data-centers
2026-10-19
null
null
null
72,922,850,000
https://epoch.ai/data/ai-data-centers
2026-10-19
null
null
null
null
null
null
null
null
null
null
null
null
2026-10-19
meta-hyperion
Meta Hyperion
https://joltrents.com/data-centers/projects/meta-hyperion/
LA
Louisiana
Holly Ridge
Richland Parish
32.467642
-91.626788
city
https://epoch.ai/data/ai-data-centers
Under construction
2025-10-19
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-04-19
Meta
https://epoch.ai/data/ai-data-centers
2026-04-19
2,203
https://epoch.ai/data/ai-data-centers
2026-04-19
null
null
null
61,823,424,000
https://epoch.ai/data/ai-data-centers
2026-04-19
null
null
null
null
null
null
Mortenson
https://epoch.ai/data/ai-data-centers
2026-04-19
Entergy
https://epoch.ai/data/ai-data-centers
2026-04-19
2026-04-19
colossus-2
Colossus 2
https://joltrents.com/data-centers/projects/colossus-2/
TN
Tennessee
Memphis
Shelby County
34.999488
-90.042976
address
https://epoch.ai/data/ai-data-centers
Operating
2025-10-19
Epoch AI
https://epoch.ai/data/ai-data-centers
SpaceXAI
https://epoch.ai/data/ai-data-centers
2026-06-15
Anthropic, Cursor, SpaceXAI
https://epoch.ai/data/ai-data-centers
2026-06-15
2,065
https://epoch.ai/data/ai-data-centers
2026-06-15
null
null
null
57,997,342,000
https://epoch.ai/data/ai-data-centers
2026-06-15
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-15
openai-stargate-shackelford
OpenAI Stargate Shackelford
https://joltrents.com/data-centers/projects/openai-stargate-shackelford/
TX
Texas
Abilene
null
32.453618
-99.731133
city
https://epoch.ai/data/ai-data-centers
Under construction
2026-01-18
Epoch AI
https://epoch.ai/data/ai-data-centers
Oracle
https://epoch.ai/data/ai-data-centers
2026-09-04
OpenAI
https://epoch.ai/data/ai-data-centers
2026-09-04
1,960
https://epoch.ai/data/ai-data-centers
2026-09-04
null
null
null
53,034,800,000
https://epoch.ai/data/ai-data-centers
2026-09-04
null
null
null
null
null
null
null
null
null
null
null
null
2026-09-04
qts-cedar-rapids
QTS Cedar Rapids
https://joltrents.com/data-centers/projects/qts-cedar-rapids/
IA
Iowa
Fairfax
Linn County
41.905594
-91.751082
address
https://epoch.ai/data/ai-data-centers
Under construction
2025-10-27
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
1,587
https://epoch.ai/data/ai-data-centers
2026-10-23
null
null
null
42,920,306,000
https://epoch.ai/data/ai-data-centers
2026-10-23
null
null
null
null
null
null
null
null
null
Alliant Energy
https://epoch.ai/data/ai-data-centers
2026-10-23
2026-10-23
openai-stargate-michigan
OpenAI Stargate Michigan
https://joltrents.com/data-centers/projects/openai-stargate-michigan/
MI
Michigan
Saline Township
Washtenaw County
42.117881
-83.841486
city
https://www.related-digital.com/michigan
Under construction
2026-03-12
Epoch AI
https://epoch.ai/data/ai-data-centers
Oracle
https://epoch.ai/data/ai-data-centers
2026-03-12
OpenAI
https://epoch.ai/data/ai-data-centers
2026-03-12
1,383
https://epoch.ai/data/ai-data-centers
2026-03-12
null
null
null
37,427,416,000
https://epoch.ai/data/ai-data-centers
2026-03-12
null
null
null
null
null
null
null
null
null
null
null
null
2026-03-12
meta-prometheus
Meta Prometheus
https://joltrents.com/data-centers/projects/meta-prometheus/
OH
Ohio
New Albany
null
40.081175
-82.808786
city
https://epoch.ai/data/ai-data-centers
Operating
2025-10-14
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-08-31
Meta
https://epoch.ai/data/ai-data-centers
2026-08-31
1,328
https://epoch.ai/data/ai-data-centers
2026-08-31
null
null
null
38,715,404,000
https://epoch.ai/data/ai-data-centers
2026-08-31
null
null
null
null
null
null
null
null
null
Williams, American Electric Power
https://epoch.ai/data/ai-data-centers
2026-08-31
2026-08-31
openai-stargate-wisconsin
OpenAI Stargate Wisconsin
https://joltrents.com/data-centers/projects/openai-stargate-wisconsin/
WI
Wisconsin
Port Washington
Ozaukee County
43.384921
-87.884134
city
https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin
Under construction
2026-02-14
Epoch AI
https://epoch.ai/data/ai-data-centers
Oracle
https://epoch.ai/data/ai-data-centers
2026-07-24
OpenAI
https://epoch.ai/data/ai-data-centers
2026-07-24
1,300
https://epoch.ai/data/ai-data-centers
2026-07-24
null
null
null
34,169,564,000
https://epoch.ai/data/ai-data-centers
2026-07-24
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-24
goodnight
Goodnight
https://joltrents.com/data-centers/projects/goodnight/
TX
Texas
Claude
null
35.10811
-101.362741
city
https://epoch.ai/data/ai-data-centers
Under construction
2025-10-16
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
1,294
https://epoch.ai/data/ai-data-centers
2026-04-16
null
null
null
38,109,292,000
https://epoch.ai/data/ai-data-centers
2026-04-16
null
null
null
null
null
null
Crusoe, Hoffman
https://epoch.ai/data/ai-data-centers
2026-04-16
Serena
https://epoch.ai/data/ai-data-centers
2026-04-16
2026-04-16
openai-stargate-milam
OpenAI Stargate Milam
https://joltrents.com/data-centers/projects/openai-stargate-milam/
TX
Texas
null
Milam County
30.791242
-96.984395
county
https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/
Under construction
2026-01-04
Epoch AI
https://epoch.ai/data/ai-data-centers
Softbank
https://epoch.ai/data/ai-data-centers
2026-03-23
OpenAI
https://epoch.ai/data/ai-data-centers
2026-03-23
1,200
https://epoch.ai/data/ai-data-centers
2026-03-23
null
null
null
32,464,874,000
https://epoch.ai/data/ai-data-centers
2026-03-23
null
null
null
null
null
null
null
null
null
null
null
null
2026-03-23
openai-stargate-abilene
OpenAI Stargate Abilene
https://joltrents.com/data-centers/projects/openai-stargate-abilene/
TX
Texas
Abilene
Taylor County
32.494232
-99.800907
city
https://epoch.ai/data/ai-data-centers
Operating
2025-09-26
Epoch AI
https://epoch.ai/data/ai-data-centers
Oracle
https://epoch.ai/data/ai-data-centers
2026-11-01
OpenAI
https://epoch.ai/data/ai-data-centers
2026-11-01
1,154
https://epoch.ai/data/ai-data-centers
2026-11-01
null
null
null
31,214,768,000
https://epoch.ai/data/ai-data-centers
2026-11-01
null
null
null
null
null
null
Mortenson
https://epoch.ai/data/ai-data-centers
2026-11-01
American Electric Power
https://epoch.ai/data/ai-data-centers
2026-11-01
2026-11-01
google-fort-wayne
Google Fort Wayne
https://joltrents.com/data-centers/projects/google-fort-wayne/
IN
Indiana
Fort Wayne
Allen County
41.031167
-85.057768
address
https://epoch.ai/data/ai-data-centers
Under construction
2024-09-13
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-08-19
null
null
null
1,035
https://epoch.ai/data/ai-data-centers
2026-08-19
null
null
null
32,692,166,000
https://epoch.ai/data/ai-data-centers
2026-08-19
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-19
amazon-ridgeland
Amazon Ridgeland
https://joltrents.com/data-centers/projects/amazon-ridgeland/
MS
Mississippi
Ridgeland
Madison County
32.399544
-90.120486
address
https://epoch.ai/data/ai-data-centers
Operating
2026-05-15
Epoch AI
https://epoch.ai/data/ai-data-centers
Amazon
https://epoch.ai/data/ai-data-centers
2026-05-15
null
null
null
1,008
https://epoch.ai/data/ai-data-centers
2026-05-15
null
null
null
31,820,880,000
https://epoch.ai/data/ai-data-centers
2026-05-15
null
null
null
null
null
null
null
null
null
Entergy
https://epoch.ai/data/ai-data-centers
2026-05-15
2026-05-15
crusoe-abilene-expansion
Crusoe Abilene Expansion
https://joltrents.com/data-centers/projects/crusoe-abilene-expansion/
TX
Texas
Abilene
Taylor County
32.494232
-99.800907
city
https://epoch.ai/data/ai-data-centers
Site work
2025-11-02
Epoch AI
https://epoch.ai/data/ai-data-centers
Microsoft
https://epoch.ai/data/ai-data-centers
2026-01-15
null
null
null
941
https://epoch.ai/data/ai-data-centers
2026-01-15
null
null
null
25,456,704,000
https://epoch.ai/data/ai-data-centers
2026-01-15
null
null
null
null
null
null
null
null
null
null
null
null
2026-01-15
microsoft-fairwater-atlanta
Microsoft Fairwater Atlanta
https://joltrents.com/data-centers/projects/microsoft-fairwater-atlanta/
GA
Georgia
Fayetteville
Fayette County
33.445341
-84.525447
address
https://epoch.ai/data/ai-data-centers
Operating
2025-10-14
Epoch AI
https://epoch.ai/data/ai-data-centers
Microsoft
https://epoch.ai/data/ai-data-centers
2026-06-14
null
null
null
859
https://epoch.ai/data/ai-data-centers
2026-06-14
null
null
null
24,092,952,000
https://epoch.ai/data/ai-data-centers
2026-06-14
null
null
null
null
null
null
null
null
null
Georgia Power
https://epoch.ai/data/ai-data-centers
2026-06-14
2026-06-14
amazon-madison-mega-site
Amazon Madison Mega Site
https://joltrents.com/data-centers/projects/amazon-madison-mega-site/
MS
Mississippi
Canton
null
32.612602
-90.036751
city
https://epoch.ai/data/ai-data-centers
Operating
2025-06-23
Epoch AI
https://epoch.ai/data/ai-data-centers
Amazon
https://epoch.ai/data/ai-data-centers
2026-06-04
null
null
null
819
https://epoch.ai/data/ai-data-centers
2026-06-04
null
null
null
25,873,406,000
https://epoch.ai/data/ai-data-centers
2026-06-04
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-04
coreweave-helios
Coreweave Helios
https://joltrents.com/data-centers/projects/coreweave-helios/
TX
Texas
Afton
Dickens County
33.780639
-100.867099
address
https://epoch.ai/data/ai-data-centers
Operating
2026-08-30
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-08-30
null
null
null
800
https://epoch.ai/data/ai-data-centers
2026-08-30
null
null
null
20,001,696,000
https://epoch.ai/data/ai-data-centers
2026-08-30
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-30
meta-bowling-green
Meta Bowling Green
https://joltrents.com/data-centers/projects/meta-bowling-green/
OH
Ohio
Bowling Green
Wood County
41.458267
-83.636217
address
https://epoch.ai/data/ai-data-centers
Under construction
2026-02-14
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-07-30
Meta
https://epoch.ai/data/ai-data-centers
2026-07-30
570
https://epoch.ai/data/ai-data-centers
2026-07-30
null
null
null
15,986,204,000
https://epoch.ai/data/ai-data-centers
2026-07-30
null
null
null
null
null
null
null
null
null
Williams
https://epoch.ai/data/ai-data-centers
2026-07-30
2026-07-30
coreweave-ellendale-nd
CoreWeave Ellendale ND
https://joltrents.com/data-centers/projects/coreweave-ellendale-nd/
ND
North Dakota
Ellendale
Dickey County
46.006143
-98.568736
address
https://epoch.ai/data/ai-data-centers
Operating
2025-10-27
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-06-30
null
null
null
520
https://epoch.ai/data/ai-data-centers
2026-06-30
null
null
null
15,152,800,000
https://epoch.ai/data/ai-data-centers
2026-06-30
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-30
stack-infrastructure-nva02
STACK Infrastructure NVA02
https://joltrents.com/data-centers/projects/stack-infrastructure-nva02/
VA
Virginia
Manassas
Prince William County
38.749819
-77.535848
address
https://epoch.ai/data/ai-data-centers
Operating
2024-10-01
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
487
https://epoch.ai/data/ai-data-centers
2026-02-14
null
null
null
13,182,936,000
https://epoch.ai/data/ai-data-centers
2026-02-14
null
null
null
null
null
null
null
null
null
null
null
null
2026-02-14
google-omaha
Google Omaha
https://joltrents.com/data-centers/projects/google-omaha/
NE
Nebraska
Omaha
Douglas County
41.335728
-96.088471
address
https://epoch.ai/data/ai-data-centers
Operating
2024-04-08
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-06-30
null
null
null
474
https://epoch.ai/data/ai-data-centers
2026-06-30
null
null
null
14,963,390,000
https://epoch.ai/data/ai-data-centers
2026-06-30
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-30
meta-montgomery
Meta Montgomery
https://joltrents.com/data-centers/projects/meta-montgomery/
AL
Alabama
Montgomery
Montgomery County
32.264997
-86.363512
address
https://epoch.ai/data/ai-data-centers
Operating
2026-06-18
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-06-18
Meta
https://epoch.ai/data/ai-data-centers
2026-06-18
465
https://epoch.ai/data/ai-data-centers
2026-06-18
null
null
null
13,561,756,000
https://epoch.ai/data/ai-data-centers
2026-06-18
null
null
null
null
null
null
Hensel Phelps
https://epoch.ai/data/ai-data-centers
2026-06-18
null
null
null
2026-06-18
google-columbus
Google Columbus
https://joltrents.com/data-centers/projects/google-columbus/
OH
Ohio
Columbus
Franklin County
39.861452
-83.003999
address
https://epoch.ai/data/ai-data-centers
Operating
2024-04-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-08-05
null
null
null
464
https://epoch.ai/data/ai-data-centers
2026-08-05
null
null
null
14,622,452,000
https://epoch.ai/data/ai-data-centers
2026-08-05
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-05
colossus-1
Colossus 1
https://joltrents.com/data-centers/projects/colossus-1/
TN
Tennessee
Memphis
Shelby County
35.082847
-90.076383
city
https://epoch.ai/data/ai-data-centers
Operating
2024-08-11
Epoch AI
https://epoch.ai/data/ai-data-centers
SpaceXAI
https://epoch.ai/data/ai-data-centers
2026-06-15
Anthropic
https://epoch.ai/data/ai-data-centers
2026-06-15
442
https://epoch.ai/data/ai-data-centers
2026-06-15
null
null
null
12,879,880,000
https://epoch.ai/data/ai-data-centers
2026-06-15
null
null
null
null
null
null
null
null
null
MLGW
https://epoch.ai/data/ai-data-centers
2026-06-15
2026-06-15
google-pryor-north
Google Pryor (North)
https://joltrents.com/data-centers/projects/google-pryor-north/
OK
Oklahoma
Pryor
Mayes County
36.241172
-95.330047
address
https://epoch.ai/data/ai-data-centers
Operating
2024-07-19
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-09-06
null
null
null
442
https://epoch.ai/data/ai-data-centers
2026-09-06
null
null
null
13,940,576,000
https://epoch.ai/data/ai-data-centers
2026-09-06
null
null
null
null
null
null
null
null
null
null
null
null
2026-09-06
anthropic-lake-mariner
Anthropic Lake Mariner
https://joltrents.com/data-centers/projects/anthropic-lake-mariner/
NY
New York
Barker
Niagara County
43.34894
-78.603357
address
https://epoch.ai/data/ai-data-centers
Operating
2026-05-31
Epoch AI
https://epoch.ai/data/ai-data-centers
AI XPV Platform
https://epoch.ai/data/ai-data-centers
2026-10-31
null
null
null
441
https://epoch.ai/data/ai-data-centers
2026-10-31
null
null
null
14,319,396,000
https://epoch.ai/data/ai-data-centers
2026-10-31
null
null
null
null
null
null
null
null
null
null
null
null
2026-10-31
qts-eagle-mountain
QTS Eagle Mountain
https://joltrents.com/data-centers/projects/qts-eagle-mountain/
UT
Utah
Eagle Mountain
Utah County
40.268886
-112.034294
city
https://epoch.ai/data/ai-data-centers
Under construction
2026-05-02
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
411
https://epoch.ai/data/ai-data-centers
2026-05-02
null
null
null
11,516,128,000
https://epoch.ai/data/ai-data-centers
2026-05-02
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-02
aws-new-albany
AWS New Albany
https://joltrents.com/data-centers/projects/aws-new-albany/
OH
Ohio
New Albany
Licking County
40.115782
-82.739512
address
https://newalbanyohio.org/community-development/project-updates/
Operating
2024-12-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Amazon
https://epoch.ai/data/ai-data-centers
2026-05-18
null
null
null
405
https://epoch.ai/data/ai-data-centers
2026-05-18
null
null
null
12,804,116,000
https://epoch.ai/data/ai-data-centers
2026-05-18
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-18
google-new-albany
Google New Albany
https://joltrents.com/data-centers/projects/google-new-albany/
OH
Ohio
New Albany
null
40.081175
-82.808786
city
https://epoch.ai/data/ai-data-centers
Operating
2024-04-20
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-05-18
null
null
null
400
https://epoch.ai/data/ai-data-centers
2026-05-18
null
null
null
12,614,706,000
https://epoch.ai/data/ai-data-centers
2026-05-18
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-18
coreweave-denton-tx
CoreWeave Denton TX
https://joltrents.com/data-centers/projects/coreweave-denton-tx/
TX
Texas
Denton
Denton County
33.219273
-97.174715
city
https://epoch.ai/data/ai-data-centers
Operating
2025-05-31
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-09-01
null
null
null
395
https://epoch.ai/data/ai-data-centers
2026-09-01
null
null
null
10,682,724,000
https://epoch.ai/data/ai-data-centers
2026-09-01
null
null
null
null
null
null
null
null
null
null
null
null
2026-09-01
google-storey-county
Google Storey County
https://joltrents.com/data-centers/projects/google-storey-county/
NV
Nevada
null
Storey County
39.438385
-119.524646
county
https://datacenters.google/locations/storey-county-nevada/
Operating
2023-08-30
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-04-13
null
null
null
389
https://epoch.ai/data/ai-data-centers
2026-04-13
null
null
null
11,364,600,000
https://epoch.ai/data/ai-data-centers
2026-04-13
null
null
null
null
null
null
null
null
null
null
null
null
2026-04-13
google-lincoln
Google Lincoln
https://joltrents.com/data-centers/projects/google-lincoln/
NE
Nebraska
Lincoln
Lancaster County
40.907472
-96.645783
city
https://epoch.ai/data/ai-data-centers
Operating
2026-05-12
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-05-12
null
null
null
339
https://epoch.ai/data/ai-data-centers
2026-05-12
null
null
null
10,720,606,000
https://epoch.ai/data/ai-data-centers
2026-05-12
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-12
qts-richmond-3
QTS Richmond 3
https://joltrents.com/data-centers/projects/qts-richmond-3/
VA
Virginia
Sandston
null
37.510723
-77.311556
city
https://epoch.ai/data/ai-data-centers
Operating
2026-02-13
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
336
https://epoch.ai/data/ai-data-centers
2026-05-14
null
null
null
9,091,680,000
https://epoch.ai/data/ai-data-centers
2026-05-14
null
null
null
null
null
null
null
null
null
Dominion Energy
https://epoch.ai/data/ai-data-centers
2026-05-14
2026-05-14
qts-richmond-1
QTS Richmond 1
https://joltrents.com/data-centers/projects/qts-richmond-1/
VA
Virginia
Sandston
Henrico County
37.488827
-77.24749
address
https://epoch.ai/data/ai-data-centers
Operating
2024-01-29
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
333
https://epoch.ai/data/ai-data-centers
2026-02-13
null
null
null
9,015,916,000
https://epoch.ai/data/ai-data-centers
2026-02-13
null
null
null
null
null
null
null
null
null
Dominion Energy
https://epoch.ai/data/ai-data-centers
2026-02-13
2026-02-13
google-cedar-rapids
Google Cedar Rapids
https://joltrents.com/data-centers/projects/google-cedar-rapids/
IA
Iowa
Cedar Rapids
Linn County
41.921946
-91.71563
address
https://epoch.ai/data/ai-data-centers
Under construction
2025-10-27
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-04-16
null
null
null
314
https://epoch.ai/data/ai-data-centers
2026-04-16
null
null
null
9,887,202,000
https://epoch.ai/data/ai-data-centers
2026-04-16
null
null
null
null
null
null
null
null
null
null
null
null
2026-04-16
anthropic-barber-lake
Anthropic Barber Lake
https://joltrents.com/data-centers/projects/anthropic-barber-lake/
TX
Texas
Colorado City
Mitchell County
32.399486
-100.858304
city
https://www.datacenterdynamics.com/en/news/cipher-mining-secures-fluidstack-as-a-customer-and-google-as-an-investor/
Under construction
2025-11-29
Epoch AI
https://epoch.ai/data/ai-data-centers
Cipher Mining
https://epoch.ai/data/ai-data-centers
2026-07-30
Anthropic
https://epoch.ai/data/ai-data-centers
2026-07-30
300
https://epoch.ai/data/ai-data-centers
2026-07-30
null
null
null
7,841,574,000
https://epoch.ai/data/ai-data-centers
2026-07-30
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-30
openai-stargate-lordstown
OpenAI Stargate Lordstown
https://joltrents.com/data-centers/projects/openai-stargate-lordstown/
OH
Ohio
Warren
Trumbull County
41.143721
-80.883293
address
https://epoch.ai/data/ai-data-centers
Under construction
2026-02-27
Epoch AI
https://epoch.ai/data/ai-data-centers
Softbank
https://epoch.ai/data/ai-data-centers
2026-07-30
OpenAI
https://epoch.ai/data/ai-data-centers
2026-07-30
300
https://epoch.ai/data/ai-data-centers
2026-07-30
null
null
null
8,106,748,000
https://epoch.ai/data/ai-data-centers
2026-07-30
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-30
google-bristow
Google Bristow
https://joltrents.com/data-centers/projects/google-bristow/
VA
Virginia
Bristow
Prince William County
38.782544
-77.579717
address
https://epoch.ai/data/ai-data-centers
Operating
2024-04-29
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-05-20
Google DeepMind
https://epoch.ai/data/ai-data-centers
2026-05-20
286
https://epoch.ai/data/ai-data-centers
2026-05-20
null
null
null
9,015,916,000
https://epoch.ai/data/ai-data-centers
2026-05-20
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-20
google-council-bluffs-east
Google Council Bluffs (East)
https://joltrents.com/data-centers/projects/google-council-bluffs-east/
IA
Iowa
Council Bluffs
Pottawattamie County
41.167418
-95.793108
address
https://epoch.ai/data/ai-data-centers
Operating
2024-11-19
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-07-07
null
null
null
284
https://epoch.ai/data/ai-data-centers
2026-07-07
null
null
null
8,978,034,000
https://epoch.ai/data/ai-data-centers
2026-07-07
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-07
google-papillion
Google Papillion
https://joltrents.com/data-centers/projects/google-papillion/
NE
Nebraska
Papillion
null
41.154443
-96.042238
city
https://epoch.ai/data/ai-data-centers
Operating
2023-01-23
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-05-04
null
null
null
284
https://epoch.ai/data/ai-data-centers
2026-05-04
null
null
null
8,978,034,000
https://epoch.ai/data/ai-data-centers
2026-05-04
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-04
meta-los-lunas
Meta Los Lunas
https://joltrents.com/data-centers/projects/meta-los-lunas/
NM
New Mexico
Los Lunas
Valencia County
34.830165
-106.783827
address
https://epoch.ai/data/ai-data-centers
Operating
2026-03-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-10-26
Meta
https://epoch.ai/data/ai-data-centers
2026-10-26
273
https://epoch.ai/data/ai-data-centers
2026-10-26
null
null
null
8,258,276,000
https://epoch.ai/data/ai-data-centers
2026-10-26
null
null
null
null
null
null
null
null
null
null
null
null
2026-10-26
stream-phoenix
Stream Phoenix
https://joltrents.com/data-centers/projects/stream-phoenix/
AZ
Arizona
Goodyear
Maricopa County
33.419503
-112.35784
address
https://www.streamdatacenters.com/locations/phoenix/
Operating
2026-05-01
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
267
https://epoch.ai/data/ai-data-centers
2026-05-01
null
null
null
8,334,040,000
https://epoch.ai/data/ai-data-centers
2026-05-01
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-01
microsoft-goodyear
Microsoft Goodyear
https://joltrents.com/data-centers/projects/microsoft-goodyear/
AZ
Arizona
Goodyear
Maricopa County
33.408991
-112.3648
address
https://epoch.ai/data/ai-data-centers
Operating
2023-04-24
Epoch AI
https://epoch.ai/data/ai-data-centers
Microsoft
https://epoch.ai/data/ai-data-centers
2026-04-27
Microsoft
https://epoch.ai/data/ai-data-centers
2026-04-27
263
https://epoch.ai/data/ai-data-centers
2026-04-27
null
null
null
7,652,164,000
https://epoch.ai/data/ai-data-centers
2026-04-27
null
null
null
null
null
null
null
null
null
null
null
null
2026-04-27
qts-richmond-2
QTS Richmond 2
https://joltrents.com/data-centers/projects/qts-richmond-2/
VA
Virginia
Sandston
null
37.510723
-77.311556
city
https://epoch.ai/data/ai-data-centers
Operating
2025-02-04
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
252
https://epoch.ai/data/ai-data-centers
2026-05-14
null
null
null
6,818,760,000
https://epoch.ai/data/ai-data-centers
2026-05-14
null
null
null
null
null
null
null
null
null
Dominion Energy
https://epoch.ai/data/ai-data-centers
2026-05-14
2026-05-14
meta-cheyenne
Meta Cheyenne
https://joltrents.com/data-centers/projects/meta-cheyenne/
WY
Wyoming
Cheyenne
Laramie County
41.139981
-104.820246
city
https://epoch.ai/data/ai-data-centers
Operating
2026-07-25
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-07-25
Meta
https://epoch.ai/data/ai-data-centers
2026-07-25
249
https://epoch.ai/data/ai-data-centers
2026-07-25
null
null
null
7,841,574,000
https://epoch.ai/data/ai-data-centers
2026-07-25
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-25
meta-qts-hillsboro-2
Meta-QTS Hillsboro 2
https://joltrents.com/data-centers/projects/meta-qts-hillsboro-2/
OR
Oregon
Hillsboro
Washington County
45.556953
-122.931942
address
https://epoch.ai/data/ai-data-centers
Operating
2023-08-02
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
243
https://epoch.ai/data/ai-data-centers
2026-04-17
null
null
null
6,818,760,000
https://epoch.ai/data/ai-data-centers
2026-04-17
null
null
null
null
null
null
null
null
null
Portland General Electric, Avangrid
https://epoch.ai/data/ai-data-centers
2026-04-17
2026-04-17
meta-jeffersonville
Meta Jeffersonville
https://joltrents.com/data-centers/projects/meta-jeffersonville/
IN
Indiana
Jeffersonville
Clark County
38.279118
-85.739097
address
https://epoch.ai/data/ai-data-centers
Operating
2026-06-04
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-06-04
Meta
https://epoch.ai/data/ai-data-centers
2026-06-04
241
https://epoch.ai/data/ai-data-centers
2026-06-04
null
null
null
6,742,996,000
https://epoch.ai/data/ai-data-centers
2026-06-04
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-04
meta-rosemount
Meta Rosemount
https://joltrents.com/data-centers/projects/meta-rosemount/
MN
Minnesota
Rosemount
Dakota County
44.73882
-93.057005
address
https://epoch.ai/data/ai-data-centers
Operating
2026-06-19
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-06-19
Meta
https://epoch.ai/data/ai-data-centers
2026-06-19
241
https://epoch.ai/data/ai-data-centers
2026-06-19
null
null
null
6,742,996,000
https://epoch.ai/data/ai-data-centers
2026-06-19
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-19
google-mesa
Google Mesa
https://joltrents.com/data-centers/projects/google-mesa/
AZ
Arizona
Mesa
Maricopa County
33.400626
-111.716487
city
https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/
Operating
2025-07-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-08-15
null
null
null
237
https://epoch.ai/data/ai-data-centers
2026-08-15
null
null
null
6,932,406,000
https://epoch.ai/data/ai-data-centers
2026-08-15
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-15
meta-temple
Meta Temple
https://joltrents.com/data-centers/projects/meta-temple/
TX
Texas
Temple
Bell County
31.126017
-97.36
address
https://epoch.ai/data/ai-data-centers
Operating
2025-12-09
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-09-30
Meta
https://epoch.ai/data/ai-data-centers
2026-09-30
231
https://epoch.ai/data/ai-data-centers
2026-09-30
null
null
null
6,742,996,000
https://epoch.ai/data/ai-data-centers
2026-09-30
null
null
null
null
null
null
JE Dunn
https://epoch.ai/data/ai-data-centers
2026-09-30
null
null
null
2026-09-30
microsoft-project-osmium
Microsoft Project Osmium
https://joltrents.com/data-centers/projects/microsoft-project-osmium/
IA
Iowa
Cumming
null
41.483324
-93.762444
city
https://epoch.ai/data/ai-data-centers
Operating
2021-01-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Microsoft
https://epoch.ai/data/ai-data-centers
2026-06-16
null
null
null
228
https://epoch.ai/data/ai-data-centers
2026-06-16
null
null
null
7,197,580,000
https://epoch.ai/data/ai-data-centers
2026-06-16
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-16
aws-berwick
AWS Berwick
https://joltrents.com/data-centers/projects/aws-berwick/
PA
Pennsylvania
Berwick
Luzerne County
41.083849
-76.143533
address
https://epoch.ai/data/ai-data-centers
Operating
2025-09-09
Epoch AI
https://epoch.ai/data/ai-data-centers
Amazon
https://epoch.ai/data/ai-data-centers
2026-08-01
null
null
null
212
https://epoch.ai/data/ai-data-centers
2026-08-01
null
null
null
6,402,058,000
https://epoch.ai/data/ai-data-centers
2026-08-01
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-01
meta-huntsville
Meta Huntsville
https://joltrents.com/data-centers/projects/meta-huntsville/
AL
Alabama
Toney
null
34.898144
-86.73357
city
https://epoch.ai/data/ai-data-centers
Operating
2026-03-04
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-06-02
Meta
https://epoch.ai/data/ai-data-centers
2026-06-02
198
https://epoch.ai/data/ai-data-centers
2026-06-02
null
null
null
5,530,772,000
https://epoch.ai/data/ai-data-centers
2026-06-02
null
null
null
null
null
null
null
null
null
Tennessee Valley Authority, NextEra Energy Resources, First Solar
https://epoch.ai/data/ai-data-centers
2026-06-02
2026-06-02
meta-kuna
Meta Kuna
https://joltrents.com/data-centers/projects/meta-kuna/
ID
Idaho
Kuna
Ada County
43.459233
-116.421077
address
https://epoch.ai/data/ai-data-centers
Operating
2026-06-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-06-01
Meta
https://epoch.ai/data/ai-data-centers
2026-06-01
198
https://epoch.ai/data/ai-data-centers
2026-06-01
null
null
null
5,758,064,000
https://epoch.ai/data/ai-data-centers
2026-06-01
null
null
null
null
null
null
null
null
null
Idaho Power Company
https://epoch.ai/data/ai-data-centers
2026-06-01
2026-06-01
coreweave-chester-va
CoreWeave Chester VA
https://joltrents.com/data-centers/projects/coreweave-chester-va/
VA
Virginia
Chester
Chesterfield County
37.361745
-77.325259
address
https://epoch.ai/data/ai-data-centers
Operating
2024-01-31
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-05-20
null
null
null
197
https://epoch.ai/data/ai-data-centers
2026-05-20
null
null
null
4,280,666,000
https://epoch.ai/data/ai-data-centers
2026-05-20
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-20
google-red-oak
Google Red Oak
https://joltrents.com/data-centers/projects/google-red-oak/
TX
Texas
Red Oak
Ellis County
32.529976
-96.799788
address
https://epoch.ai/data/ai-data-centers
Operating
2025-08-25
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-02-06
null
null
null
185
https://epoch.ai/data/ai-data-centers
2026-02-06
null
null
null
5,833,828,000
https://epoch.ai/data/ai-data-centers
2026-02-06
null
null
null
null
null
null
null
null
null
null
null
null
2026-02-06
google-the-dalles
Google The Dalles
https://joltrents.com/data-centers/projects/google-the-dalles/
OR
Oregon
The Dalles
Wasco County
45.625389
-121.202389
city
https://epoch.ai/data/ai-data-centers
Operating
2025-03-07
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-04-29
null
null
null
185
https://epoch.ai/data/ai-data-centers
2026-04-29
null
null
null
5,833,828,000
https://epoch.ai/data/ai-data-centers
2026-04-29
null
null
null
null
null
null
null
null
null
null
null
null
2026-04-29
coreweave-muskogee-ok
CoreWeave Muskogee OK
https://joltrents.com/data-centers/projects/coreweave-muskogee-ok/
OK
Oklahoma
Muskogee
Muskogee County
35.696923
-95.383856
address
https://epoch.ai/data/ai-data-centers
Under construction
2026-04-09
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-06-13
null
null
null
181
https://epoch.ai/data/ai-data-centers
2026-06-13
null
null
null
5,795,946,000
https://epoch.ai/data/ai-data-centers
2026-06-13
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-13
meta-eagle-mountain
Meta Eagle Mountain
https://joltrents.com/data-centers/projects/meta-eagle-mountain/
UT
Utah
Eagle Mountain
null
40.309349
-112.011982
city
https://epoch.ai/data/ai-data-centers
Operating
2025-12-07
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-05-02
Meta
https://epoch.ai/data/ai-data-centers
2026-05-02
179
https://epoch.ai/data/ai-data-centers
2026-05-02
null
null
null
5,038,306,000
https://epoch.ai/data/ai-data-centers
2026-05-02
null
null
null
null
null
null
Mortenson
https://epoch.ai/data/ai-data-centers
2026-05-02
Williams
https://epoch.ai/data/ai-data-centers
2026-05-02
2026-05-02
vantage-tx1
Vantage TX1
https://joltrents.com/data-centers/projects/vantage-tx1/
TX
Texas
San Antonio
Bexar County
29.416684
-98.788564
address
https://epoch.ai/data/ai-data-centers
Operating
2026-02-15
Epoch AI
https://epoch.ai/data/ai-data-centers
null
null
null
null
null
null
179
https://epoch.ai/data/ai-data-centers
2026-02-15
null
null
null
4,848,896,000
https://epoch.ai/data/ai-data-centers
2026-02-15
null
null
null
null
null
null
null
null
null
null
null
null
2026-02-15
meta-aiken
Meta Aiken
https://joltrents.com/data-centers/projects/meta-aiken/
SC
South Carolina
Trenton
null
33.741656
-81.842339
city
https://epoch.ai/data/ai-data-centers
Operating
2026-08-07
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-11-05
Meta
https://epoch.ai/data/ai-data-centers
2026-11-05
168
https://epoch.ai/data/ai-data-centers
2026-11-05
null
null
null
4,886,778,000
https://epoch.ai/data/ai-data-centers
2026-11-05
null
null
null
null
null
null
null
null
null
null
null
null
2026-11-05
google-lancaster
Google Lancaster
https://joltrents.com/data-centers/projects/google-lancaster/
OH
Ohio
Lancaster
Fairfield County
39.727031
-82.683111
address
https://epoch.ai/data/ai-data-centers
Operating
2024-01-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-03-12
null
null
null
164
https://epoch.ai/data/ai-data-centers
2026-03-12
null
null
null
5,189,834,000
https://epoch.ai/data/ai-data-centers
2026-03-12
null
null
null
null
null
null
null
null
null
null
null
null
2026-03-12
google-kansas-city-east
Google Kansas City East
https://joltrents.com/data-centers/projects/google-kansas-city-east/
MO
Missouri
Kansas City
null
39.125155
-94.550313
city
https://www.datacenterdynamics.com/en/news/google-files-project-plan-for-data-center-in-kansas-city-missouri/
Operating
2026-08-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-08-01
null
null
null
126
https://epoch.ai/data/ai-data-centers
2026-08-01
null
null
null
3,977,610,000
https://epoch.ai/data/ai-data-centers
2026-08-01
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-01
coreweave-lancaster-greenfield
CoreWeave Lancaster Greenfield site
https://joltrents.com/data-centers/projects/coreweave-lancaster-greenfield/
PA
Pennsylvania
Lancaster
Lancaster County
40.04869
-76.25609
address
https://epoch.ai/data/ai-data-centers
Under construction
2025-07-15
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-07-13
null
null
null
124
https://epoch.ai/data/ai-data-centers
2026-07-13
null
null
null
3,485,144,000
https://epoch.ai/data/ai-data-centers
2026-07-13
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-13
google-midlothian
Google Midlothian
https://joltrents.com/data-centers/projects/google-midlothian/
TX
Texas
Midlothian
Ellis County
32.438927
-97.050799
city
https://epoch.ai/data/ai-data-centers
Operating
2026-04-19
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-07-01
null
null
null
123
https://epoch.ai/data/ai-data-centers
2026-07-01
null
null
null
3,901,846,000
https://epoch.ai/data/ai-data-centers
2026-07-01
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-01
meta-gallatin
Meta Gallatin
https://joltrents.com/data-centers/projects/meta-gallatin/
TN
Tennessee
Gallatin
null
36.388303
-86.44759
city
https://epoch.ai/data/ai-data-centers
Operating
2026-08-24
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-08-24
Meta
https://epoch.ai/data/ai-data-centers
2026-08-24
114
https://epoch.ai/data/ai-data-centers
2026-08-24
null
null
null
3,295,734,000
https://epoch.ai/data/ai-data-centers
2026-08-24
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-24
microsoft-sat40
Microsoft SAT40
https://joltrents.com/data-centers/projects/microsoft-sat40/
TX
Texas
San Antonio
null
29.4246
-98.49514
city
https://epoch.ai/data/ai-data-centers
Operating
2024-05-24
Epoch AI
https://epoch.ai/data/ai-data-centers
Microsoft
https://epoch.ai/data/ai-data-centers
2026-02-04
null
null
null
106
https://epoch.ai/data/ai-data-centers
2026-02-04
null
null
null
2,841,150,000
https://epoch.ai/data/ai-data-centers
2026-02-04
null
null
null
null
null
null
null
null
null
null
null
null
2026-02-04
meta-sarpy
Meta Sarpy
https://joltrents.com/data-centers/projects/meta-sarpy/
NE
Nebraska
Springfield
Sarpy County
41.103572
-96.147913
address
https://epoch.ai/data/ai-data-centers
Operating
2026-08-02
Epoch AI
https://epoch.ai/data/ai-data-centers
Meta
https://epoch.ai/data/ai-data-centers
2026-08-02
Meta
https://epoch.ai/data/ai-data-centers
2026-08-02
105
https://epoch.ai/data/ai-data-centers
2026-08-02
null
null
null
3,030,560,000
https://epoch.ai/data/ai-data-centers
2026-08-02
null
null
null
null
null
null
null
null
null
null
null
null
2026-08-02
google-arcola
Google Arcola
https://joltrents.com/data-centers/projects/google-arcola/
VA
Virginia
Sterling
null
39.003685
-77.40831
city
https://epoch.ai/data/ai-data-centers
Operating
2026-06-16
Epoch AI
https://epoch.ai/data/ai-data-centers
Google
https://epoch.ai/data/ai-data-centers
2026-06-16
null
null
null
93
https://epoch.ai/data/ai-data-centers
2026-06-16
null
null
null
2,916,914,000
https://epoch.ai/data/ai-data-centers
2026-06-16
null
null
null
null
null
null
null
null
null
null
null
null
2026-06-16
coreweave-marble-nc
CoreWeave Marble NC
https://joltrents.com/data-centers/projects/coreweave-marble-nc/
NC
North Carolina
Marble
Cherokee County
35.184987
-83.914091
address
https://epoch.ai/data/ai-data-centers
Operating
2026-03-13
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-05-06
null
null
null
91
https://epoch.ai/data/ai-data-centers
2026-05-06
null
null
null
2,462,330,000
https://epoch.ai/data/ai-data-centers
2026-05-06
null
null
null
null
null
null
null
null
null
null
null
null
2026-05-06
microsoft-nebius-new-jersey
Microsoft-Nebius New Jersey
https://joltrents.com/data-centers/projects/microsoft-nebius-new-jersey/
NJ
New Jersey
Vineland
Cumberland County
39.428193
-75.018457
address
https://epoch.ai/data/ai-data-centers
Operating
2026-04-15
Epoch AI
https://epoch.ai/data/ai-data-centers
Nebius
https://epoch.ai/data/ai-data-centers
2026-07-12
null
null
null
70
https://epoch.ai/data/ai-data-centers
2026-07-12
null
null
null
1,894,100,000
https://epoch.ai/data/ai-data-centers
2026-07-12
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-12
microsoft-sat14
Microsoft SAT14
https://joltrents.com/data-centers/projects/microsoft-sat14/
TX
Texas
San Antonio
Bexar County
29.473182
-98.681509
address
https://epoch.ai/data/ai-data-centers
Operating
2024-07-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Microsoft
https://epoch.ai/data/ai-data-centers
2026-03-31
null
null
null
66
https://epoch.ai/data/ai-data-centers
2026-03-31
null
null
null
1,780,454,000
https://epoch.ai/data/ai-data-centers
2026-03-31
null
null
null
null
null
null
null
null
null
null
null
null
2026-03-31
core42-lake-mariner
Core42 Lake Mariner
https://joltrents.com/data-centers/projects/core42-lake-mariner/
NY
New York
Barker
Niagara County
43.34894
-78.603357
address
https://epoch.ai/data/ai-data-centers
Operating
2025-10-01
Epoch AI
https://epoch.ai/data/ai-data-centers
Core42
https://epoch.ai/data/ai-data-centers
2026-07-23
null
null
null
58
https://epoch.ai/data/ai-data-centers
2026-07-23
null
null
null
2,197,156,000
https://epoch.ai/data/ai-data-centers
2026-07-23
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-23
coreweave-dalton-1-and-2
CoreWeave Dalton 1 & 2
https://joltrents.com/data-centers/projects/coreweave-dalton-1-and-2/
GA
Georgia
Dalton
Whitfield County
34.713507
-84.952185
address
https://epoch.ai/data/ai-data-centers
Operating
2026-02-20
Epoch AI
https://epoch.ai/data/ai-data-centers
CoreWeave
https://epoch.ai/data/ai-data-centers
2026-02-20
null
null
null
40
https://epoch.ai/data/ai-data-centers
2026-02-20
null
null
null
1,060,696,000
https://epoch.ai/data/ai-data-centers
2026-02-20
null
null
null
null
null
null
null
null
null
null
null
null
2026-02-20
xai-qts-atlanta
xAI QTS Atlanta
https://joltrents.com/data-centers/projects/xai-qts-atlanta/
GA
Georgia
Atlanta
Fulton County
33.775662
-84.422576
address
https://epoch.ai/data/ai-data-centers
Operating
2025-02-20
Epoch AI
https://epoch.ai/data/ai-data-centers
SpaceXAI
https://epoch.ai/data/ai-data-centers
2026-07-10
SpaceXAI
https://epoch.ai/data/ai-data-centers
2026-07-10
24
https://epoch.ai/data/ai-data-centers
2026-07-10
null
null
null
656,484,074
https://epoch.ai/data/ai-data-centers
2026-07-10
null
null
null
null
null
null
null
null
null
null
null
null
2026-07-10

JOLT U.S. Data Center Construction Projects

Where are data centers being built in the U.S.? This dataset is the data behind the JOLT data center construction map: 77 U.S. data center projects in 29 states with 43,403 MW of planned power. Sixteen are under construction, one is in site work and sixty are operating.

Texas leads with 14 projects and 8,934 MW. The largest project under construction is OpenAI Stargate New Mexico at 2,450 MW. The largest on the map is Microsoft Fairwater Wisconsin, operating at 2,715 MW.

What is in it

One row per project campus, with its stage, planned power, developer, location and a dated source link for every fact.

Columns

  • slug
  • name
  • url
  • state
  • state_name
  • city
  • county
  • latitude
  • longitude
  • location_precision
  • location_source_url
  • stage
  • stage_date
  • stage_source_name
  • stage_source_url
  • developer
  • developer_source_url
  • developer_source_date
  • tenant
  • tenant_source_url
  • tenant_source_date
  • planned_mw
  • planned_mw_source_url
  • planned_mw_source_date
  • announced_investment_usd
  • announced_investment_usd_source_url
  • announced_investment_usd_source_date
  • epoch_capital_cost_estimate_usd
  • epoch_capital_cost_estimate_usd_source_url
  • epoch_capital_cost_estimate_usd_source_date
  • acres
  • acres_source_url
  • acres_source_date
  • buildings
  • buildings_source_url
  • buildings_source_date
  • general_contractor
  • general_contractor_source_url
  • general_contractor_source_date
  • utility_or_energy_company
  • utility_or_energy_company_source_url
  • utility_or_energy_company_source_date
  • last_changed

Each fact column has matching _source_url and _source_date columns. location_precision says whether coordinates are at address or county level.

Source and method

Counts are as of Nov. 19, 2026. The newest dated record is Nov. 5, 2026. Records start from Epoch AI's open data on AI data centers (https://epoch.ai/data/ai-data-centers), used under CC BY 4.0, U.S. sites only, and add company releases, state economic development releases, county planning and permit records and utility filings. The map covers projects with a public, dated source. It does not count every data center building in the country.

Cite as

JOLT. "U.S. Data Center Construction Projects." Nov. 19, 2026. https://joltrents.com/data-centers/map/

License

CC BY 4.0. Credit JOLT (https://joltrents.com/data-centers/map/) and Epoch AI.

Links

Downloads last month
-