Spaces:
Sleeping
Sleeping
| Focus on Track 1. Trying to build two full projects in four days will leave you with nothing polished. Here’s your kill-plan for Track 1: | |
| 1. **Today (June 6):** | |
| * Finalize your symptom→ICD mapping module and JSON output. | |
| * Stand up a minimal Gradio/MCP endpoint locally. | |
| 2. **June 7:** | |
| * Wire up the front-end UI (Gradio space). | |
| * Hook it into Sonova (or your local HuggingFace‐hosted model) and verify the API calls work. | |
| 3. **June 8:** | |
| * Write README + usage docs. | |
| * Deploy your Space to HF. | |
| 4. **June 9:** | |
| * End-to-end testing with 5–10 real symptom examples. | |
| * Polish prompts, confidence scores, and UI copy. | |
| 5. **June 10 (morning):** | |
| * Final sanity check, package, and submit before end of day. | |
| Only if you finish these steps by end of Day 2 should you consider a tiny Track 2 add-on (e.g. a single custom slider). Otherwise nail Track 1. | |