multilingual-absa / .opencode /command /gsd-audit-milestone.md
Aryan Mishra
feat: initial commit - Multilingual ABSA project setup with 6 phases, 36 requirements
a6b96c2
|
Raw
History Blame Contribute Delete
1.19 kB

A newer version of the Gradio SDK is available: 6.26.0

Upgrade
metadata
description: Audit milestone completion against original intent before archiving
argument-hint: '[version]'
requires:
  - execute-phase
tools:
  read: true
  glob: true
  grep: true
  bash: true
  agent: true
  write: true
Verify milestone achieved its definition of done. Check requirements coverage, cross-phase integration, and end-to-end flows.

This command IS the orchestrator. Reads existing VERIFICATION.md files (phases already verified during execute-phase), aggregates tech debt and deferred gaps, then spawns integration checker for cross-phase wiring.

@/Users/theogengineer/Projects/Multilingual-Absa/.opencode/gsd-core/workflows/audit-milestone.md Version: $ARGUMENTS (optional — defaults to current milestone)

Core planning files are resolved in-workflow (init milestone-op) and loaded only as needed.

Completed Work: Glob: .planning/phases//-SUMMARY.md Glob: .planning/phases//-VERIFICATION.md

Execute end-to-end. Preserve all workflow gates (scope determination, verification reading, integration check, requirements coverage, routing).