multilingual-absa / .opencode /command /gsd-audit-uat.md
Aryan Mishra
feat: initial commit - Multilingual ABSA project setup with 6 phases, 36 requirements
a6b96c2
|
Raw
History Blame Contribute Delete
641 Bytes

A newer version of the Gradio SDK is available: 6.26.0

Upgrade
metadata
description: Cross-phase audit of all outstanding UAT and verification items
tools:
  read: true
  glob: true
  grep: true
  bash: true
Scan all phases for pending, skipped, blocked, and human_needed UAT items. Cross-reference against codebase to detect stale documentation. Produce prioritized human test plan. @/Users/theogengineer/Projects/Multilingual-Absa/.opencode/gsd-core/workflows/audit-uat.md Core planning files are loaded in-workflow via CLI.

Scope: Glob: .planning/phases//-UAT.md Glob: .planning/phases//-VERIFICATION.md