multilingual-absa / .opencode /command /gsd-resume-work.md
Aryan Mishra
feat: initial commit - Multilingual ABSA project setup with 6 phases, 36 requirements
a6b96c2
|
Raw
History Blame Contribute Delete
714 Bytes

A newer version of the Gradio SDK is available: 6.26.0

Upgrade
metadata
description: Resume work from previous session with full context restoration
tools:
  read: true
  bash: true
  write: true
  question: true
  skill: true
Restore complete project context and resume work seamlessly from previous session.

Routes to the resume-project workflow which handles:

  • STATE.md loading (or reconstruction if missing)
  • Checkpoint detection (.continue-here files)
  • Incomplete work detection (PLAN without SUMMARY)
  • Status presentation
  • Context-aware next action routing
@/Users/theogengineer/Projects/Multilingual-Absa/.opencode/gsd-core/workflows/resume-project.md Execute end-to-end.