Download analysis/ppm-coverage-map.md from EnergyVenom/patch-testing-coworker: direct link, hf CLI and curl.
- Browser
- Download file 46.5 kB
-
https://huggingface.co/spaces/EnergyVenom/patch-testing-coworker/resolve/main/analysis/ppm-coverage-map.md
- Command line
-
hf download hf://spaces/EnergyVenom/patch-testing-coworker/analysis/ppm-coverage-map.md
-
curl -L -o ppm-coverage-map.md https://huggingface.co/spaces/EnergyVenom/patch-testing-coworker/resolve/main/analysis/ppm-coverage-map.md
Oracle Fusion Project-to-Profit (PPM) coverage map for patch regression testing (Project Financials)
| Owner | Fusion Analyst |
| Written | 9 Oct 2026, IST |
| Inputs | BRIEF.md, architecture.pdf (pdftotext), the P2P / O2C / R2R / A2R / Expenses coverage maps (format, scale, boundaries), public Oracle docs (links checked 9 Oct 2026) |
| Pack order | Accepted order of the remaining modules: A2R → Expenses → Project-to-Profit → Supply Chain Execution → HCM → Plan-to-Produce → Supply Chain Planning → Procurement Contracts/Sourcing depth → CX → Grants (separate pack, added 9 Oct 2026) |
| Scope | Project Financial Management: project definition, costing, contracts, billing, revenue, budgets/forecasts and project control, capitalization to A2R. Project Execution Management (work plans/scheduling, resource management, task progress) joined this pack on 9 Oct 2026 (§6.12). Grants Management is a separate future pack |
| Client questions | analysis/open-client-questions.md §PPM |
| Next reader | Fusion Test Designer |
| Pod access | None. No Oracle Fusion pod, credentials, or client data were used. |
⚠ Verification status: read this first
Nothing in this document has been checked against a live Oracle Fusion pod. Every row, score, role, setup and patch-impact statement is UNVERIFIED until the Scout and pod probers run read-only against a real test pod. Target release, cohort, licensed modules and Redwood vs classic UI are unknown.
What each tag means:
Tag Meaning UNVERIFIED · DOC-LINKThe Oracle doc URL loaded on 9 Oct 2026 and its page title matched the book named. The statement itself was not checked on a pod. UNVERIFIED · DOC-TOPICA topic with this name appears in the 26D table of contents of the cited Oracle book. Behaviour was not checked on a pod. UNVERIFIED · ANALYSTComes from general Oracle Fusion Project Financials knowledge. Not checked against doc text or a pod. UNVERIFIED · ASSUMEDA placeholder value such as a usage score or "if used". It must be replaced with Scout/pod-prober data. POD-REQUIREDOnly a pod (or the client) can answer this. It is left blank on purpose rather than guessed. event-drivenA rare, calendar- or event-bound process. It runs in the patch cycle before each event, whatever its tier. tolerant-suiteAn AI-dependent row. It runs in the separate tolerant suite, is reported separately and is not counted toward go/no-go (decision 9 Oct 2026). No fact in this file comes from a pod: no project types, templates, rate schedules, burden structures, contract types, invoice methods, budgets, roles, volumes or patch level.
Decisions in force (Chief of Staff, 9 Oct 2026)
- Shared scale: P1 ≥ 75, P2 40–74, P3 20–39, P4 < 20.
- Standing rule: amount triage. Any failure involving client amounts is triaged on the local model with real amounts, in every module. In PPM that covers costs, burden, bill and revenue amounts, budgets, and capitalized amounts. This is not raised as a question again.
- Standing rule: boundaries (Chief of Staff, 9 Oct 2026). The source module owns everything up to the hand-off; the receiving module owns import onward; R2R owns GL. Boundaries that fit this pattern are settled without a decision. Only boundaries that break the pattern are flagged ⚑ and raised. The PPM boundaries below were accepted as proposed (9 Oct 2026); no PPM ⚑ flags remain.
- Standing rule: sub-products (Chief of Staff, 9 Oct 2026). A new sub-product folds into an existing pack if it shares the same flows; otherwise it becomes a separate pack. Applied: Project Execution Management joins the PPM pack (rows
EXE-01..05, §6.12); Grants Management becomes a separate future pack (added to the module order). - Contract Terms Library (Chief of Staff, 9 Oct 2026): owned by the procurement-depth pack everywhere (
PRD:CTL-01..05). This map references it and tests only the terms that appear on its own documents (project contracts,CTR-01). - Labor test data (Chief of Staff, 9 Oct 2026): until the HCM pack exists, labor test data comes from seeded payroll cost import files (synthetic employees, †"Import Payroll Costs"). Applies to
CST-03,CST-07andEXE-04. tolerant-suiterule: AI-dependent rows run in a separate tolerant suite, reported separately and not counted toward go/no-go. PPM rows:CST-11(Digital Assistant for time entry) andEXE-05(Digital Assistant for project management).event-drivenrule: rare events run in the patch cycle before each event, whatever their tier. PPM rows:RAT-01(annual rate / burden multiplier update) andBUD-05(annual budget/forecast cycle).- Budgetary control: owned by P2P
REQ-05everywhere.BUD-03here is reference only and isn't tested in PPM. - Excel add-in rule: budget/forecast Excel editing (†"Can I update planning element values for a budget or forecast line in Excel?") is tested through the underlying imports (†"Import Project Budgets", "Import Project Forecasts"). The manual Windows check is a recorded gap.
- Dedicated test ledger and calendar (UNVERIFIED): project accounting periods and accounting use the dedicated test ledger and calendar.
- Already-accepted boundaries that touch PPM: P2P→A2R mass additions (accepted); A2R stops at Create Accounting (accepted); O2C ends at AR posting (decision d); Expenses → P2P reimbursement and card boundaries (accepted 9 Oct 2026).
Pack boundaries: accepted as proposed by the Chief of Staff, 9 Oct 2026 (⚑ flags removed; all fit the standing boundary rule)
| Boundary | Split | Rows |
|---|---|---|
| P2P → PPM: supplier costs | P2P owns the PO/invoice with project details and its validation and accounting (PO-02, AP-01, AP-09). PPM owns importing the cost into the project, cost processing and project commitments (CST-01, CST-10). Shared recipe: a project-coded PO and invoice |
CST-01, CST-10, CAP-04 |
| Expenses → PPM: expense costs | Expenses owns project charging at entry (EXP-03). PPM owns the imported project expenditure items |
CST-02 |
| HCM → PPM: labor | Time cards and payroll are a later HCM pack. PPM owns labor cost import, costing and distribution. Until HCM exists, labor data = seeded payroll cost import files | CST-03, CST-07, EXE-04 |
| PPM → O2C: project invoices | PPM owns contract invoice generation, approval and transfer. O2C owns the Receivables transaction from AutoInvoice up to AR posting (BIL-01 O2C) |
BIL-03 |
| PPM → A2R: capitalization (CIP) | PPM owns project assets, asset line generation and the transfer. A2R owns the received source lines onward (A2R AST-03, AST-05). This matches the Projects→A2R split in the A2R map (resolved 9 Oct 2026) |
CAP-02 |
| PPM → R2R: accounting | PPM owns Create Accounting for project costs, revenue and billing (SLA). R2R owns GL posting, close and balances | ACC-01, REV-02 |
| SCM → PPM: project-driven supply chain | SCM owns project-striped inventory transactions and expenditure capture (SCM:INV-14). PPM owns cost import onward |
CST-09 |
1. Scope and how this map is used
- Covered: Project Execution Management (work plans and scheduling, resource management, task progress, enterprise resources, Digital Assistant), project definition, costing (supplier, expense, labor, miscellaneous, burden, adjustments, labor distribution, allocations, supply chain, commitments), project accounting and periods, customer contracts, billing (invoice methods, review, transfer to AR, events, rates and limits, formats), revenue, budgets/forecasts/change orders/progress, performance reporting, capitalization, roles, integrations.
- Out of scope: Grants Management (separate future pack), the time-entry UI (HCM pack), and Receivables / Assets / GL processing beyond the boundaries above.
- Test pods only, never production. No real client data. No secrets. Projects, customers, employees and rates must be synthetic.
- Stable IDs such as
BIL-03. Prefix asPPM:in a shared repository (BIL, REV, ACC, SEC and INT IDs repeat across packs).
2. Patch cadence
Same as P2P map §2: quarterly cohorts, test pod updated on the 1st Friday and production on the 3rd (about a 2-week window), optional monthly maintenance packs, opt-in expiry (public Oracle blogs, UNVERIFIED · ANALYST; MOS KB160632 / KB157616 not opened). Latest public doc release on 9 Oct 2026: 26D (DOC-LINK). The pod's release, cohort and target patch are POD-REQUIRED.
PPM note (UNVERIFIED · ANALYST): Project Financials is driven by long chains of scheduled processes (import → process → burden → account → invoice/revenue → transfer). Most patch regressions show up as process errors or changed amounts rather than UI breaks, so amount-level assertions matter more here than in the other packs.
3. End-to-end PPM flow (logical)
P2P PO/invoice ─────┐ Expenses report ─────┐ HCM time/payroll ─────┐ FBDI/REST misc ──┐ SCM ─────┐
▼ ▼ ▼ ▼ ▼
Import costs ─► process (validate, cost, burden) ─► expenditure items ─► adjustments (approve)
│ │
Project (template, tasks, controls) ────┤ ├─► Create accounting ─────► R2R GL
Budgets / forecasts / change orders / progress ── performance KPIs │
(budgetary control: P2P REQ-05) │
▼ ▼
Contract (bill plan + revenue plan, rates, funding, limits) ─► Generate invoices ─► review/approve/release
│ └─► transfer to AR ─────► O2C AutoInvoice
└─► Generate revenue ─► revenue accounting / unbilled-unearned reclass ─────► R2R
Capital project: project assets ─► generate asset lines ─► transfer ─────► A2R source lines (CIP)
Cross-cutting: project roles & data security (SEC) · REST / FBDI / OTBI / BICC / ESS / extensions (INT)
Diagram: UNVERIFIED · ANALYST. The flows actually enabled on the client pod are POD-REQUIRED.
4. Scoring method (shared scale)
- Impact, Change likelihood and Usage are each 1–5, as in P2P map §4. Risk = Impact × Change. Priority = Risk × Usage. Tiers: P1 ≥ 75, P2 40–74, P3 20–39, P4 < 20.
- All Usage scores are
UNVERIFIED · ASSUMEDand reflect a "professional-services style customer: billable T&M and fixed-price contracts, labor and supplier costs, some capital projects, no grants". All Impact and Change scores are UNVERIFIED · ANALYST. event-drivenrows run before their event.tolerant-suiteand reference-only rows are excluded from go/no-go counts.
5. Risk × usage ranking (all rows UNVERIFIED)
Sorted by Priority. Usage scores are placeholders. Boundaries accepted 9 Oct 2026, so ⚑ markers are removed; the boundary is named in the sub-process text.
Tier counts (provisional, updated 9 Oct 2026 with Project Execution): P1 = 9, P2 = 17, P3 = 17, P4 = 7, total 50 rows.
Go/no-go counts: 47 rows (P1 9, P2 17, P3 15, P4 6). Excluded: CST-11 (tolerant-suite, P3), EXE-05 (tolerant-suite, P4) and BUD-03 (reference only, owned by P2P, P3).
event-driven: RAT-01 (P4), BUD-05 (P4).
| Rank | ID | Flow | Sub-process | Impact | Change likelihood | Risk (I×C) | Usage (ASSUMED) | Priority (Risk×Usage) | Tier | Tags |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | BIL-01 | Billing | Generate invoices: rate-based (T&M), percent spent/complete, amount-based, milestone/events | 5 | 4 | 20 | 4 | 80 | P1 | |
| 2 | BIL-03 | Billing | Transfer invoices to Receivables (AutoInvoice); transfer-rejected handling (O2C boundary) | 5 | 4 | 20 | 4 | 80 | P1 | |
| 3 | CST-03 | Costing | Labor costs from Time and Labor / payroll cost import (HCM boundary) | 5 | 4 | 20 | 4 | 80 | P1 | |
| 4 | CST-06 | Costing | Cost adjustments: transfer, split, reverse, recalculate, billable/capitalizable change; adjustment approval | 5 | 4 | 20 | 4 | 80 | P1 | |
| 5 | CTR-01 | Contracts | Create customer contract with bill plan and revenue plan; approve; activate | 5 | 4 | 20 | 4 | 80 | P1 | |
| 6 | REV-01 | Revenue | Generate revenue: rate-based, percent spent/complete, milestone; revenue limits | 5 | 4 | 20 | 4 | 80 | P1 | |
| 7 | SEC-01 | Roles & security (cross-cutting) | Project roles, project/BU data security, SoD | 5 | 4 | 20 | 4 | 80 | P1 | |
| 8 | ACC-01 | Accounting | Create accounting for project costs and transfer to GL (R2R boundary) | 5 | 3 | 15 | 5 | 75 | P1 | |
| 9 | CST-01 | Costing | Supplier costs from Payables invoices and PO commitments into projects (P2P boundary) | 5 | 3 | 15 | 5 | 75 | P1 | |
| 10 | BUD-01 | Budgets & control | Project budgets and forecasts: create, edit, baseline (Excel edits tested via import) | 4 | 4 | 16 | 4 | 64 | P2 | |
| 11 | CST-04 | Costing | Import Costs (miscellaneous, usage, third-party) via FBDI/REST; unprocessed transaction errors | 4 | 4 | 16 | 4 | 64 | P2 | |
| 12 | PRJ-01 | Project definition | Create project from template: tasks, team, transaction controls, project status | 4 | 4 | 16 | 4 | 64 | P2 | |
| 13 | ACC-02 | Accounting | Project accounting periods: open/close, period validations | 5 | 3 | 15 | 4 | 60 | P2 | |
| 14 | BIL-02 | Billing | Invoice review: approve, release, holds, credit actions, adjusted invoices | 5 | 3 | 15 | 4 | 60 | P2 | |
| 15 | BIL-05 | Billing | Bill rates, rate schedules, funding and hard/soft invoice limits | 5 | 3 | 15 | 4 | 60 | P2 | |
| 16 | INT-04 | Integrations / reports | Scheduled processes: import/process costs, create accounting, generate invoices/revenue, transfer to AR/Assets, update performance data | 4 | 3 | 12 | 5 | 60 | P2 | |
| 17 | REV-02 | Revenue | Revenue and billing accounting; unbilled receivables / unearned revenue reclassification (R2R boundary) | 5 | 3 | 15 | 4 | 60 | P2 | |
| 18 | CST-02 | Costing | Expense report costs into projects (Expenses boundary) | 4 | 3 | 12 | 4 | 48 | P2 | |
| 19 | CTR-02 | Contracts | Amend contract; versions; revert | 4 | 4 | 16 | 3 | 48 | P2 | |
| 20 | INT-01 | Integrations / reports | REST for projects, costs, budgets, contracts, invoices | 4 | 4 | 16 | 3 | 48 | P2 | |
| 21 | INT-02 | Integrations / reports | FBDI imports: projects, tasks, costs, budgets, forecasts, billing events, rate schedules, assets | 4 | 4 | 16 | 3 | 48 | P2 | |
| 22 | INT-03 | Integrations / reports | OTBI / BICC project extracts; invoice and revenue reports | 4 | 4 | 16 | 3 | 48 | P2 | |
| 23 | EXE-01 | Project execution | Work plans and scheduling: tasks, dependencies, critical path, baselines, date sync with the financial plan | 4 | 4 | 16 | 3 | 48 | P2 | |
| 24 | CAP-01 | Capitalization | Capital projects: create project assets, generate asset lines, assign, allocate | 5 | 3 | 15 | 3 | 45 | P2 | |
| 25 | CAP-02 | Capitalization | Transfer project asset lines to Assets (CIP / source lines) (A2R boundary) | 5 | 3 | 15 | 3 | 45 | P2 | |
| 26 | CST-05 | Costing | Burdening: burden schedules, multipliers, burden cost calculation | 5 | 3 | 15 | 3 | 45 | P2 | |
| 27 | BIL-06 | Billing | Invoice formats / layouts (BIP) | 3 | 4 | 12 | 3 | 36 | P3 | |
| 28 | BUD-04 | Budgets & control | Financial project progress: percent complete, ETC, plan update | 4 | 3 | 12 | 3 | 36 | P3 | |
| 29 | PRF-01 | Performance reporting | Update project performance data, KPIs, performance analysis | 3 | 4 | 12 | 3 | 36 | P3 | |
| 30 | PRJ-03 | Project definition | Project status changes, action controls, closing projects | 4 | 3 | 12 | 3 | 36 | P3 | |
| 31 | EXE-02 | Project execution | Resource management: project resource requests, matching/nomination, approval, assignment, resource pools | 4 | 3 | 12 | 3 | 36 | P3 | |
| 32 | EXE-03 | Project execution | Task management and progress entry; deliverables; requirements/backlog | 3 | 4 | 12 | 3 | 36 | P3 | |
| 33 | INT-05 | Integrations / reports | Flexfields, Application/Page Composer and Redwood extensions | 4 | 4 | 16 | 2 | 32 | P3 | |
| 34 | BUD-03 | Budgets & control | Project budgetary control (owned by P2P REQ-05; reference only) | 5 | 3 | 15 | 2 | 30 | P3 (P2P-owned) | |
| 35 | CST-10 | Costing | Commitments (requisitions/POs) visibility in project control | 3 | 3 | 9 | 3 | 27 | P3 | |
| 36 | BIL-04 | Billing | Billing events import and billing transactions | 4 | 3 | 12 | 2 | 24 | P3 | |
| 37 | BUD-02 | Budgets & control | Change orders for budget adjustments; budget approval | 3 | 4 | 12 | 2 | 24 | P3 | |
| 38 | CAP-04 | Capitalization | Automatically create project assets for supplier invoices | 4 | 3 | 12 | 2 | 24 | P3 | |
| 39 | CST-07 | Costing | Labor distribution (labor schedules) | 4 | 3 | 12 | 2 | 24 | P3 | |
| 40 | CST-08 | Costing | Project cost allocations | 4 | 3 | 12 | 2 | 24 | P3 | |
| 41 | REV-03 | Revenue | Revenue adjustments (incl. closed periods) | 4 | 3 | 12 | 2 | 24 | P3 | |
| 42 | EXE-04 | Project execution | Project enterprise resources import and resource cost/bill rates (HCM data seeded) | 4 | 3 | 12 | 2 | 24 | P3 | |
| 43 | CST-11 | Costing | Digital Assistant for time entry (AI channel) | 2 | 5 | 10 | 2 | 20 | P3 | tolerant-suite |
| 44 | PRJ-02 | Project definition | Project / task import and Microsoft Project integration | 3 | 3 | 9 | 2 | 18 | P4 | |
| 45 | RAT-01 | Rates | Annual cost/bill rate and burden multiplier update (effective-dated) and rate true-up | 5 | 3 | 15 | 1 | 15 | P4 | event-driven |
| 46 | BUD-05 | Budgets & control | Annual budget / forecast cycle: new fiscal-year versions and imports | 4 | 3 | 12 | 1 | 12 | P4 | event-driven |
| 47 | CAP-03 | Capitalization | Capitalized interest | 4 | 3 | 12 | 1 | 12 | P4 | |
| 48 | CST-09 | Costing | Project-driven supply chain / inventory and transfer order costs (SCM boundary) | 4 | 3 | 12 | 1 | 12 | P4 | |
| 49 | CTR-03 | Contracts | Intercompany / interproject billing contracts and transfer pricing | 4 | 3 | 12 | 1 | 12 | P4 | |
| 50 | EXE-05 | Project execution | Project management via Oracle Digital Assistant (AI channel), if enabled | 2 | 5 | 10 | 1 | 10 | P4 | tolerant-suite |
6. Coverage map by flow
Column guide: Scenarios are tagged H (happy path), N (negative), A (approval), M (amount assertion), Ho (hold / error), C (cancel / reverse) or R (role); Patch-sensitive points; Data; POD-REQUIRED (client questions with IDs in open-client-questions.md §PPM).
All rows: UNVERIFIED. † = topic seen in the 26D TOC of the cited book:
- Using Project Costing (https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjc/index.html). Chapters †: Project Costs; Project Cost Transactions; Overhead Costs to Projects; Project-Driven Supply Chain; Project Cost Adjustments; Project Rate Schedules; Accounting for Project Transactions; Project Cost Allocations; Capital Asset Costs; Labor Distribution; Oracle Digital Assistant for Time Entry.
- Using Project Revenue and Billing (https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjb/index.html). Chapters †: Create Customer Contract; Amend Customer Contract; Project Contract Billing; Project Contract Revenue; Project Rate Schedules; Record Accounting for Project Billing.
- Defining and Managing Financial Projects (https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjf/index.html). Chapters †: Project Definition; Project Plan Tasks and Task Assignments; Project Budgets and Forecasts; Budgetary Control; Financial Project Progress; Microsoft Project integration.
6.1 Project definition (PRJ)
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| PRJ-01 | H: create project from template with tasks, team members and transaction controls. N: charge to a task that disallows the expenditure type → rejected. H: status change to Active | Project pages are Redwood candidates (locator churn); template copy logic | Project template, project type, organization, synthetic team | Project types, templates, transaction controls |
| PRJ-02 | H: import projects/tasks (†"Import Projects", "Import Project Tasks"). H: Microsoft Project integration (if used) | Import templates | Synthetic import file | MS Project usage |
| PRJ-03 | H: close project; N: charge after close blocked; action controls by status | Status/action control rules | Active project | Project statuses, action controls |
6.2 Costing (CST): Using Project Costing
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| CST-01 | H: a project-coded PO commitment appears in project commitments. H: a validated project-coded AP invoice imports as a supplier-cost expenditure item (†"How Project Costs are Imported", "How Project Costs are Processed"). M: raw and burdened amounts. Ho: invalid project/task on the invoice → import exception. Boundary: P2P owns the invoice itself | Cross-pack hand-off; import/validation logic (†"How Project Costs are Validated") | P2P project-coded PO + invoice recipe | Which sources feed projects |
| CST-02 | H: a project-charged expense report imports as expenditure items. M: amounts and expenditure types | Cross-pack hand-off | Expenses recipe with project charging | Expense-to-project usage |
| CST-03 | H: labor costs from Time and Labor (†"How Time and Labor Works with Project Costing") or payroll import (†"Import Payroll Costs") costed at the expected cost rate. Ho: HCM assignment validation errors (†"HCM Assignment Status Validations When Importing Person-Related Costs") | Labor costing and HCM integration; cost rate determination | Synthetic employees, time cards or payroll file, labor cost rates | Labor source (OTL, payroll, third-party), cost rate schedules |
| CST-04 | H: Import Costs (†"Import Costs Process") for miscellaneous/usage/third-party transactions via FBDI/REST. Ho: unprocessed transactions with errors corrected and reprocessed | FBDI template changes; ESS chain | Synthetic cost file | Third-party cost sources |
| CST-05 | M: burden costs calculated per schedule and multipliers (†"How Burden Costs Are Calculated"); additive vs precedence structures (†"Examples for Additive and Precedence Burden Structures"). H: correct burden (†"How can I correct burden costs?") | Burden calculation engine | Burden schedule with known multipliers | Burden structures, schedules |
| CST-06 | C: transfer, split, reverse (†"How can I reverse processed project costs?") and recalculate. H: change billable/capitalizable (†"Considerations When Selecting Billable or Capitalizable Status for Transactions"). A: adjustment approval (†"Configure Approval Notifications for Project Cost Adjustments"). H: mass adjustment (†"How can I perform a mass adjustment?"). M: amounts after each adjustment | Adjustment processing (†"How Project Cost Adjustments are Processed"); approval workflow | Processed expenditure items | Adjustment approval enabled? |
| CST-07 | H: labor schedules distribute payroll costs (†"Managing Labor Schedules"). M: distributed amounts | Labor schedule recipe | Is labor distribution used? | |
| CST-08 | H: allocation rule runs (†"How Project Cost Allocations are Processed"). M: allocated amounts = pool × basis | Allocation engine | Source pool and basis | Allocation rules |
| CST-09 | H: supply chain / transfer order costs captured (†"Capture Transfer Order Costs in Projects") | Cross-pack with the SCM pack | Is project-driven supply chain used? | |
| CST-10 | H: commitments visible in budget-vs-actual. H: canceled POs drop out of commitments (†"How can I remove canceled purchase orders that continue to appear as committed costs?") | Commitment extraction | Open PO on project | |
CST-11 tolerant-suite |
H: time entry via Oracle Digital Assistant (chapter †) produces the expected time entry | AI/conversational channel. Probabilistic, so tolerant suite, not counted toward go/no-go | Synthetic employee | Is the Digital Assistant enabled? |
6.3 Project accounting (ACC): Using Project Costing, ch. "Accounting for Project Transactions" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| ACC-01 | H: create accounting for project costs (†"Considerations when Creating Accounting for Transactions") → expected debit/credit accounts → transfer to GL. H: burden accounting (†"How Accounting Burden Costs are Processed"). Boundary: R2R owns GL posting | SLA rules for Projects | Processed costs | Project costing SLA rules / account derivation |
| ACC-02 | H: open/close project accounting periods (†"Options to Maintain Accounting Periods and Project Accounting Periods"). Ho: close validations (†"How Accounting Periods and Project Accounting Period Closing are Validated"). M: accounting/project accounting dates (†"How Accounting and Project Accounting Dates are Determined") | Period logic | Dedicated test calendar (UNVERIFIED) | Project calendar vs GL calendar |
6.4 Contracts (CTR): Using Project Revenue and Billing, ch. "Create Customer Contract", "Amend Customer Contract" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| CTR-01 | H: create contract from template (†"Contract Templates for Project Billing", "Example of Creating a Contract for Billing") with lines, bill plan and revenue plan (†"How Bill Plan and Revenue Plan Components Work Together"), linked to project/task funding. A: approval and activation (†"Contract Actions and Status Changes"). N: invoice before funding/activation blocked | Contract authoring UI (enterprise contracts engine shared with other contract types) | Synthetic customer (O2C recipe), contract type | Contract types, templates, approval |
| CTR-02 | H: amend contract → new version (†"Considerations for Contract Amendments and Adjusted Invoices"). C: revert to the previous version (†"How can I revert a contract to a previous active version?"). H: change bill/revenue plan on an active contract (†) | Versioning logic | Active contract | |
| CTR-03 | H: intercompany billing contract with transfer price rules (†"Example of an Intercompany Billing Contract", "Examples of Transfer Price Rates") | Two BUs | Is intercompany/interproject billing used? |
6.5 Billing (BIL): Using Project Revenue and Billing, ch. "Project Contract Billing" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| BIL-01 | M: generate invoices (†"How Invoices Are Generated") for rate-based T&M (†"How Invoice and Revenue Rates Are Determined"), percent spent (†"How Percent Spent Invoice Amounts Are Calculated"), percent complete (†"How Percent Complete Invoice Amounts Are Calculated"), and milestone/event billing (†"Milestone Billing and Revenue Recognition"). Ho: billing controls (†"Examples of Using Billing Controls") | Invoice generation engine. Amount changes are silent | Contract per invoice method + billable costs/events | Invoice methods in use |
| BIL-02 | A: approve and release invoices (†"How can I release an invoice automatically?"). Ho: transactions on hold (†"Invoice Transactions on Hold"). C: credit actions (†"Invoice Credit Actions"). M: adjusted invoices (†"Examples of Removed and Adjusted Invoice Transactions") | Invoice review UI | Draft invoices | Invoice approval process |
| BIL-03 | H: transfer released invoices to Receivables → AR transaction created (†"How can I view the receivables invoice from the Manage Project Invoices page?"). Ho: transfer-rejected invoice corrected (†"How can I correct the bill-to and ship-to details in transfer rejected invoices?"). H: automatic credits to AR (†). Boundary: O2C owns AR to posting | Cross-pack interface (AutoInvoice) | Released invoice | Transaction source for projects in AR |
| BIL-04 | H: import billing events (†"Import Project Billing Events"). H: billing transactions (†"How do I create a billing transaction?") | Event import template | Synthetic events | Event usage |
| BIL-05 | M: bill rates from rate schedules (†"Bill Rate Changes for Contract Lines"). Ho: hard/soft limits stop invoicing/revenue at the funded amount (†"How can I change the soft limit or hard limit amount for invoicing or revenue recognition?") | Rate determination, limits | Rate schedule recipe; funding just below costs | Bill rate schedules, funding practice |
| BIL-06 | H: invoice output with expected key fields (Generate Invoice Report †) | BIP layouts | Released invoice | Custom invoice formats |
6.6 Revenue (REV): Using Project Revenue and Billing, ch. "Project Contract Revenue", "Record Accounting for Project Billing" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| REV-01 | M: generate revenue (†"How Revenue is Calculated") for rate-based, percent spent (†"How Percent Spent Revenue Amounts are Calculated"), percent complete (†"How Percent Complete Revenue Amounts are Calculated") and milestone methods. Ho: revenue limits. H: recognize before funding where allowed (†"How can I recognize revenue before my contract is funded?") | Revenue engine. Amount changes are silent | Contract per revenue method | Revenue methods in use |
| REV-02 | H: revenue and invoice accounting (†"Example of Revenue Accounting Entries"). M: unbilled receivables / unearned revenue reclassification (†"How can I reclassify unbilled receivables and deferred revenue account balances?"). Boundary: R2R owns GL posting | SLA rules | Contract with revenue ≠ invoiced | Accounting rules |
| REV-03 | C: adjust revenue (†"Adjust Revenue Transactions"), incl. closed period (†"Can I adjust revenue in a closed accounting period?") | Recognized revenue |
6.7 Budgets, forecasts and project control (BUD): Defining and Managing Financial Projects
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| BUD-01 | H: create, edit (†"Edit Budgets and Forecasts") and baseline a budget (†"How Financial Project Plan Baseline is Set"). H: forecast. M: budget vs actual + commitments. Excel edits tested via import (†"Import Project Budgets", "Import Project Forecasts") | Financial plan pages (Redwood); spread logic (†"Calculate Project and Financial Plan Period Amounts Using Daily Spread Basis") | Financial plan type, synthetic budget | Financial plan types, approval |
| BUD-02 | H/A: change order drives a budget adjustment (†"Change Order Automation for Project Budget Adjustments"); budget approval | Workflow | Change order recipe | Is it used? |
| BUD-03 (P2P-owned) | Reference only. Project budgetary control (†"How can I enable budgetary control for my project?", "Create Control Budgets from Project Budgets") is owned by P2P REQ-05 |
(P2P-Q02) | ||
| BUD-04 | H: progress (percent complete, ETC) updated and the plan refreshed (†"How Resources are Mapped When Update Financial Project Plan and Progress is Submitted"). M: EAC values | Progress calculations | Project with actuals | Progress method |
BUD-05 event-driven |
H: new fiscal-year budget/forecast versions created and imported. M: copied amounts (†"How Budgets and Forecasts are Copied") | Copy/import logic | Prior-year version | Budget cycle dates |
6.8 Rates (RAT)
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
RAT-01 event-driven |
M: new cost/bill rates and burden multipliers apply from their effective date and old ones before it (†"Import Project Rate Schedules Process", "Considerations when Editing Burden Schedule Multipliers"). H: rate true-up / burden recompile | Effective-dating and recalculation | Rate set with old and new effective dates | Annual rate change dates |
6.9 Performance reporting (PRF): Using Project Performance Reporting (https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjs/index.html)
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| PRF-01 | H: Update Project Performance Data and KPIs (ch. †) complete. M: KPI values for recipe projects | Summarization / KPI logic | Projects with costs and budgets | KPI definitions |
6.10 Capitalization (CAP): Using Project Costing, ch. "Capital Asset Costs" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| CAP-01 | H: create project asset (†"How can I create a project asset?"), generate asset lines, assign (†"How to decide where to assign project assets?"), allocate (†"Asset Cost Allocation Methods"). Ho: unassigned asset lines resolved (†"How can I resolve project asset lines that are identified as assets without assignments?") | Asset line rules (†"Asset Line Processing Rules for Automatically Created Project Assets") | Capital project with capitalizable costs | Capital project types, capitalization options |
| CAP-02 | H: transfer asset lines to Assets (†"Asset Cost Allocation Methods in the Project Costs to Fixed Assets Process") → A2R source lines. Ho: adjustment lines not transferred (†"Why did my adjustment asset lines not get transferred into Oracle Assets?"). Boundary: A2R owns from source lines onward | Cross-pack interface | CAP-01 output | |
| CAP-03 | M: capitalized interest (†"Considerations for Managing Capitalized Interest") | Is it used? | ||
| CAP-04 | H: automatically create project assets for supplier invoices (†"Automatically Create Project Assets for Supplier Invoices") | Cross-pack with P2P | Project-coded capital invoice | Is it used? |
6.11 Roles and integrations (SEC / INT)
| ID | Scenarios to cover | Patch-sensitive points | Data | Doc | POD-REQUIRED |
|---|---|---|---|---|---|
| SEC-01 | R: project manager sees and edits only their projects; project accountant can adjust costs but can't approve their own adjustments; billing specialist sees only contracts in their BU; SoD for contract approval vs invoice release (if enforced) | Seeded privilege changes; project role-based security | Personas: Project Manager, Project Accountant, Project Billing Specialist, Project Administrator, Grants/Contract admin (UNVERIFIED · ANALYST names) | Security Reference for Project Management: https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjm/index.html | Custom roles, project security |
| INT-01 | H: REST read/create projects, costs, budgets, contracts, invoices. Contract: response superset of the baseline | Resource versions | Integration user (vault) | REST API for Project Management: https://docs.oracle.com/en/cloud/saas/project-management/26d/fapap/index.html | Which resources are used |
| INT-02 | H: FBDI imports (projects, tasks, costs, budgets, forecasts, billing events, rate schedules, unassigned asset lines †"Import Unassigned Asset Lines"). N: bad row | Template changes | Synthetic files | Using Project Costing / Defining and Managing Financial Projects | Imports used |
| INT-03 | H: OTBI project analyses, BICC extracts, Generate Invoice / Revenue Reports (†) | Subject-area / report changes | Analytics & Reports for PPM: https://docs.oracle.com/en/cloud/saas/project-management/26d/fapca/index.html | Custom reports / extracts | |
| INT-04 | H: import/process costs, create accounting, generate invoices/revenue, transfer to AR, transfer to Assets, update performance data: all complete | Long ESS chains. Timing failures likely (triage "timing") | Scheduled job list | ||
| INT-05 | H: flexfields and Application/Page Composer extensions (Implementing PFM, ch. "Application Composer", "Page Composer" †) render and save | Redwood replacement of composed pages | Implementing Project Financial Management and Grants Management: https://docs.oracle.com/en/cloud/saas/project-management/26d/oapfm/index.html | Extension inventory |
6.12 Project Execution Management (EXE): Using Project Execution Management (https://docs.oracle.com/en/cloud/saas/project-management/26d/oapem/index.html), joined 9 Oct 2026
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| EXE-01 | H: build a work plan with tasks, predecessors and milestones (†"Project Scheduling", "Project Milestones"); critical path (†"What's critical path?"); baseline (†"Project Plan Baselines"). M: dates sync between the work plan and financial plan (†"Automatically Sync Dates Between Financial Project Plans and Work Plans", "Which Dates Get Automatically Synchronized…"). H: fixed-duration vs fixed-effort behaviour (†) | Gantt/project plan pages are Redwood candidates (locator churn); scheduling engine | Synthetic project with a work plan template (†"Work Plan Templates") | Is scheduling used? (PPM-Q15) |
| EXE-02 | H: project resource request → match (†"Example of Matching Resource to Resource Request") → resource manager approves assignment → status (†"Project Resource Request Statuses"). N: request dates outside the resource calendar (†). H: import resource requests (†"Import Project Resource Requests Process") | Matching/capacity scores (†"How Resource Available Capacity Score Is Calculated"); notifications | Resource pool with seeded resources | Resource management used? (PPM-Q15) |
| EXE-03 | H: team member enters task progress (†"Progress Entry for Tasks"); deliverables (†"Project Deliverables"); requirements/backlog (†"Project Requirements"). M: project progress calculation (†"How Project Progress is Calculated") | Progress calculation; task pages | EXE-01 output | Progress practice (PPM-Q15) |
| EXE-04 | H: import project enterprise resources (†"Import Project Enterprise Resources"); adjust cost and bill rates (†"Adjust Cost and Bill Rates for a Project Enterprise Resource"). N: missing resource rates (†"What happens if resource rates are missing?"). HCM data seeded (labor decision, 9 Oct 2026) | HCM dependency | Seeded synthetic employees | |
EXE-05 tolerant-suite |
H: project management via Oracle Digital Assistant (†"Project Management Using Oracle Digital Assistant") returns the expected task/progress update. Probabilistic, so tolerant suite, not counted toward go/no-go | AI/conversational channel | Synthetic team member | Is the Digital Assistant enabled? (PPM-Q15) |
7. What a quarterly patch typically touches in PPM (patch impact areas)
Generic expectations (UNVERIFIED · ANALYST). The real delta comes from the readiness pages for the target update (Project Management readiness lives under the ERP readiness site, https://docs.oracle.com/en/cloud/saas/readiness/erp.html, checked) and MOS notes (not opened).
| # | Impact area | Why it breaks tests | Rows most exposed | Mitigation |
|---|---|---|---|---|
| 1 | Invoice and revenue engines | Amounts change silently | BIL-01, BIL-05, REV-01 | Exact-amount recipes per method; local-model amount triage |
| 2 | Cost import / processing / burden | Validation and calculation changes | CST-01..06 | Expected raw/burdened amounts per recipe |
| 3 | Redwood rollout (projects, work plans, financial plans, contracts, invoices) | Locator churn | PRJ-01, EXE-01, BUD-01, CTR-01, BIL-02 | Role/label locators; self-heal once |
| 4 | Cross-pack interfaces (AP, Expenses, labor, AR, Assets) | A change upstream or downstream breaks the hand-off | CST-01..03, BIL-03, CAP-02 | Shared recipes; assert each side once |
| 5 | SLA rules for Projects | Journal lines change | ACC-01, REV-02 | Expected journal lines |
| 6 | FBDI / REST | Template and resource changes | INT-01/02, CST-04, BIL-04 | Template/schema diff per patch |
| 7 | ESS chains | Job parameters and runtimes | INT-04 | Bounded polling; triage "timing" |
| 8 | Security | New privileges; project security model | SEC-01 | Per-persona smoke tests |
| 9 | AI channels | Probabilistic behaviour | CST-11, EXE-05 | Tolerant suite (not counted toward go/no-go) |
8. Oracle documentation index (checked 9 Oct 2026)
| Area | Book | URL | Status |
|---|---|---|---|
| Costing, capitalization | Using Project Costing | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjc/index.html | checked |
| Contracts, billing, revenue | Using Project Revenue and Billing | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjb/index.html | checked |
| Projects, budgets, budgetary control, progress | Defining and Managing Financial Projects | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjf/index.html | checked |
| Setup | Implementing Project Financial Management and Grants Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapfm/index.html | checked |
| Performance reporting | Using Project Performance Reporting | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjs/index.html | checked |
| Roles | Security Reference for Project Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapjm/index.html | checked |
| REST | REST API for Oracle Fusion Cloud Project Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/fapap/index.html | checked |
| Reports admin | Creating and Administering Analytics and Reports for Project Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/fapca/index.html | checked |
| Project execution | Using Project Execution Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapem/index.html | checked |
| Project execution setup | Implementing Project Execution Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/oapex/index.html | checked |
| Grants (future pack) | Using Grants Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/faugr/index.html | checked (not mapped here) |
| Tables | Tables and Views for Project Management | https://docs.oracle.com/en/cloud/saas/project-management/26d/oedpp/index.html | checked |
| Release readiness | Readiness: ERP | https://docs.oracle.com/en/cloud/saas/readiness/erp.html | checked |
| Update policy | MOS KB160632, KB157616 | My Oracle Support (login) | not opened |
9. Open questions and gaps
Client-only questions are in analysis/open-client-questions.md §PPM (PPM-Q01 onward). Internal decisions are reported to the Chief of Staff, not listed here. Amount triage is a standing rule and is not a question.
9.1 Gaps
- Excel budget editing: tested via imports. The manual Windows check is a recorded gap.
- Time entry UI and payroll belong to the later HCM pack. Decided 9 Oct 2026: labor recipes use seeded payroll cost import files until HCM exists.
- Project Execution Management joined this pack (9 Oct 2026); its usage detail is PPM-Q15. Grants is a separate future pack.
- Mock app scope: the mock is P2P-only. PPM P1 minimum: project from template, cost import with burden, cost adjustment, contract with T&M invoice and revenue, transfer to AR, create accounting, role visibility.
- Handoff: no messaging channel from this analyst.
9.2 POD-REQUIRED checklist for the Scout and pod probers (read-only, test pod)
- Release, cohort, opt-ins; PPM licensing (Project Costing, Billing, Revenue, Control, Execution); work plan templates, resource pools, resource request types
- Project types, templates, organizations, transaction controls
- Cost sources, cost rate schedules, burden structures and schedules, labor distribution, allocations
- Contract types/templates, invoice and revenue methods, bill rate schedules, funding, limits, invoice formats
- Financial plan types, budget approval, progress methods, KPI definitions
- Capital project types, capitalization options, capitalized interest
- Project SLA rules; project accounting calendar
- Custom roles, project security
- FBDI / REST / BICC usage; scheduled job list; extensions
- 90-day volumes (expenditure items, invoices, revenue events), to replace the ASSUMED usage scores
- UI generation (Redwood vs classic) for P1 pages
10. Handoff notes for the Fusion Test Designer
- P1 rows: BIL-01, BIL-03, CST-03, CST-06, CTR-01, REV-01, SEC-01, ACC-01, CST-01.
- Backbone chain: project from template → contract (T&M) → costs (supplier from P2P, labor, misc) → burden → adjustment → invoice → approve → transfer to AR (O2C) → revenue → accounting → (R2R) GL. Capital chain: capital project → costs → asset lines → transfer to Assets (A2R).
- Put
map_ids:(prefixPPM:),verification: UNVERIFIED,owner:for boundary rows (per the accepted split),schedule: event-drivenfor RAT-01 / BUD-05 andsuite: tolerantfor CST-11 and EXE-05 on every case. BUD-03 gets no PPM case. - All projects, customers, employees, rates and amounts must be synthetic. No secrets in YAML.
End of document. Status: DRAFT, UNVERIFIED. Pending Scout and pod-prober data, and a target patch. Boundaries accepted 9 Oct 2026.