patchwise-agent-studio / analysis /scm-coverage-map.md
EnergyVenom's picture
Patchwise Agent Studio: Oracle AI Agent Studio cycles
af1bee9 verified
|
Raw History Blame Contribute Delete
54.5 kB
# Oracle Fusion Supply Chain Execution (SCM) coverage map for patch regression testing (Inventory, Receiving depth, Cost Management)
| | |
|---|---|
| Owner | Fusion Analyst |
| Written | 9 Oct 2026, IST |
| Inputs | `BRIEF.md`, `architecture.pdf` (pdftotext), the P2P / O2C / R2R / A2R / Expenses / PPM coverage maps (format, scale, boundaries), public Oracle docs (links and titles checked 9 Oct 2026) |
| Pack order | Accepted order: A2R → Expenses → Project-to-Profit → **Supply Chain Execution** → HCM → Plan-to-Produce → Supply Chain Planning → Procurement Contracts/Sourcing depth → CX → Grants (separate pack, added 9 Oct 2026) |
| Scope | Inventory Management (transactions, balances, reservations, lot/serial, consigned, counts, replenishment), transfer orders, receiving depth beyond P2P basic receipts, Supply Chain Cost Management (cost accounting, receipt accounting, landed cost). **No duplication** of O2C shipping or P2P receiving rows: they are referenced |
| Client questions | `analysis/open-client-questions.md` §SCM |
| Next reader | Fusion Test Designer |
| Pod access | **None.** No Oracle Fusion pod, credentials, or client data were used. |
> ## ⚠ Verification status: read this first
> **Nothing in this document has been checked against a live Oracle Fusion pod.** Every row, score, role, setup and patch-impact statement is **UNVERIFIED** until the Scout and pod probers run read-only against a real **test** pod. Target release, cohort, licensed modules, cost methods and Redwood vs classic UI are **unknown**.
>
> **What each tag means:**
>
> | Tag | Meaning |
> |---|---|
> | `UNVERIFIED · DOC-LINK` | The Oracle doc URL loaded on 9 Oct 2026 and its page title matched the book named. The statement itself was not checked on a pod. |
> | `UNVERIFIED · DOC-TOPIC` (†) | A topic with this name appears in the table of contents of the cited Oracle book. Behaviour was not checked on a pod. |
> | `UNVERIFIED · ANALYST` | Comes from general Oracle Fusion SCM knowledge. Not checked against doc text or a pod. |
> | `UNVERIFIED · ASSUMED` | A placeholder value such as a usage score or "if used". It **must** be replaced with Scout/pod-prober data. |
> | `POD-REQUIRED` | Only a pod (or the client) can answer this. It is left blank on purpose rather than guessed. |
> | `event-driven` | A rare, calendar- or event-bound process. It runs in the patch cycle before each event, whatever its tier. |
> | `tolerant-suite` | An AI-dependent row. It runs in the separate tolerant suite, is reported separately and is **not counted toward go/no-go**. |
> | `reference` | Owned and tested by another pack. Listed for traceability only; no SCM case and not counted toward SCM go/no-go. |
>
> No fact in this file comes from a pod: no inventory organizations, subinventories, items, cost methods, cost books, accrual options, count schedules, roles, volumes or patch level.
### Decisions in force (Chief of Staff, 9 Oct 2026)
* **Shared scale:** P1 ≥ 75, P2 40–74, P3 20–39, P4 < 20. Priority = Impact × Change × Usage; Usage is always ASSUMED.
* **Standing rule: amount triage.** Any failure involving client amounts is triaged on the **local model with real amounts**, in every module. In SCM that covers item costs, transaction values, count/physical adjustment values, valuation, receipt accruals, landed costs and transfer prices. Not raised as a question.
* **Standing rule: boundaries (9 Oct 2026).** The **source module owns everything up to the hand-off; the receiving module owns import onward; R2R owns GL.** Only boundaries that break this pattern are flagged ⚑ below.
* **Standing rule: sub-products (9 Oct 2026).** A new sub-product folds into an existing pack if it shares the same flows; otherwise it becomes a separate pack. Applied here: Receiving depth, Landed Cost and Quality inspection on receipts fold into SCM; manufacturing (work orders, cost rollup for make items), Supply Chain Planning, Warehouse Management/3PL execution and Maintenance stay in their own packs.
* **`tolerant-suite` rule:** AI-dependent rows run in a separate tolerant suite, reported separately and not counted toward go/no-go. SCM row: `AI-01`.
* **`event-driven` rule:** rare events run in the patch cycle before each event, whatever their tier. SCM rows: `CNT-03` (physical inventory), `CST-11` (annual standard cost update).
* **Budgetary control:** owned by P2P `REQ-05` everywhere. `BUD-01` here is **reference only**.
* **Excel add-in rule:** spreadsheet maintenance (standard costs, resource/overhead rates, cycle count ADFdi import) is tested through the underlying FBDI/REST services. The manual Windows check is a recorded gap.
* **Dedicated test ledger and calendar (UNVERIFIED):** cost and receipt accounting periods use the dedicated test ledger and calendar.
* **Already-accepted boundaries that touch SCM:** O2C owns sales-order pick/ship/RMA up to AR posting (decision d); P2P owns PO receipts `RCV-01..04`; PPM owns project cost import onward (`PPM:CST-09`, accepted 9 Oct 2026); R2R owns GL.
* **SCM boundary decisions (9 Oct 2026):** `RCA-03` accrual reconciliation: **SCM owns** the Accrual Reconciliation report, clearing rules and write-offs; **R2R owns** the GL balance tie-out (decided as proposed). `TRF-05` cross-BU transfers: **SCM owns** the transfer, transfer price and trade accounting; **R2R owns** intercompany (`R2R:ICO-*`); any generated AR/AP invoices belong to O2C/P2P from import onward (decided as proposed). **COGS stays in O2C (`O2C:ACC-02`) as a recorded exception to the boundary rule (Chief of Staff, 9 Oct 2026)**; `CST-12` is reference only, ⚑ resolved.
* **Work order costing (9 Oct 2026):** `WOC-01..03`, defined in the P2M map, are **owned by SCM** (Cost Management receives production transactions) and are listed here as SCM-owned reference rows that **count toward SCM go/no-go** (§6.10).
### Pack boundaries
**Standing-rule boundaries (no decision needed):**
| Boundary | Split under the standing rule | Rows |
|---|---|---|
| **P2P → SCM: receiving** | **P2P owns** the PO and basic receipts (`P2P:RCV-01` goods, `RCV-02` services/self-service, `RCV-03` correct/return, `RCV-04` inspection/4-way). **SCM owns** receiving depth: routing/put away, ASNs, the receiving processor, exceptions, lot/serial capture, returns without receipt, and receipt accounting | RCD-*, RCA-01/02/04 |
| **SCM → P2P: replenishment, consignment, returns** | **SCM owns** min-max requisition creation, consumption advice and the return transaction. **P2P owns** requisition import onward, the pay-on-use invoice and the debit memo | REP-01, INV-10, RCD-06 |
| **O2C ↔ SCM: shipping** | **O2C owns** sales-order pick wave, pick/ship confirm, shipping documents (`O2C:SHP-01..04`), RMA receipt (`RMA-02`), drop ship (`ORC-02`) and back-to-back (`ORC-03`). **SCM owns** non-sales-order inventory transactions and transfer orders; transfer-order pick/ship reuses the O2C shipping cases and asserts only transfer-order specifics | TRF-02, INV-07 |
| **SCM → PPM: project inventory** | **SCM owns** project-striped transactions and expenditure capture. **PPM owns** cost import onward (`PPM:CST-09`) | INV-14 |
| **SCM → R2R: accounting** | **SCM owns** Create Accounting for cost and receipt accounting. **R2R owns** GL posting, close and the inventory-value-to-GL tie-out (same as AR/AP-to-GL reconciliation, decision d) | CST-05, CST-06 |
| **Budgetary control** | P2P `REQ-05` | BUD-01 |
**Boundaries that break the pattern** (all decided 9 Oct 2026; no ⚑ remains):
| Boundary | Why the pattern doesn't settle it | Proposed split | Rows |
|---|---|---|---|
| **Accrual reconciliation (P2P / SCM / R2R)**: **DECIDED 9 Oct 2026, as proposed** | Not a one-way hand-off: it reconciles AP invoices (P2P) against receipts (SCM) on the accrual account (R2R-type reconciliation) | **SCM owns** the Accrual Reconciliation report, clearing rules and write-offs (they are Receipt Accounting subledger functions). **R2R owns** only the GL balance tie-out | RCA-03 |
| **Intercompany transfers (SCM / O2C / P2P / R2R)**: **DECIDED 9 Oct 2026, as proposed** | Transfers across BUs create trade accounting and, where configured, intercompany receivable/payable documents, a three-to-four-way split | **SCM owns** the transfer, transfer price and trade accounting. **R2R owns** intercompany (`R2R:ICO-*`). If AR/AP invoices are generated, O2C/P2P own them from import onward | TRF-05 |
| **COGS recognition (O2C vs SCM)**: **DECIDED 9 Oct 2026: stays in O2C as a recorded exception to the boundary rule** | `O2C:ACC-02` already owns COGS, but it is a Cost Management process; the standing rule would place it in SCM (receiving module from ship confirm onward) | Keep it in O2C (already handed off, avoids a re-hand-off); SCM `CST-12` is reference only. Move it to SCM only if the Chief of Staff wants strict application of the rule | CST-12 |
---
## 1. Scope and how this map is used
* **Covered:** inventory transactions, balances and interfaces; reservations outside sales orders; lot/serial; consigned inventory; mobile transactions; project-specific inventory up to the PPM hand-off; transfer orders; cycle counts, physical inventory, PAR; min-max; receiving depth; cost accounting, receipt accounting, landed cost; roles; integrations.
* **Out of scope (other packs, standing sub-product rule):** sales-order shipping and RMA (O2C), PO and basic receipts (P2P), manufacturing work orders and make-item cost rollup (Plan-to-Produce), planning (Supply Chain Planning), maintenance, WMS/3PL execution systems themselves (only the Fusion interface is in scope), GL processing (R2R).
* **Test pods only, never production. No real client data. No secrets.** Items, orgs, costs and quantities must be **synthetic**.
* **Stable IDs** such as `CST-03`. Prefix as `SCM:` in a shared repository (INV, CST, SEC and INT IDs repeat across packs). Receiving-depth rows use `RCD-` so they don't collide with `P2P:RCV-*`.
## 2. Patch cadence
Same as P2P map §2: quarterly cohorts, test pod updated on the 1st Friday and production on the 3rd (about a 2-week window), optional monthly maintenance packs, opt-in expiry (public Oracle blogs, **UNVERIFIED · ANALYST**; MOS KB160632 / KB157616 **not opened**). Latest public doc release on 9 Oct 2026: **26D** (`DOC-LINK`). Note: Oracle's own 26D SCM book list links *Using Inventory Management* to its **26C** path; the 26D path returns a generic "Get Started" page (soft 404). The pod's release, cohort and target patch are **POD-REQUIRED**.
*SCM note (UNVERIFIED · ANALYST):* SCM regressions surface in three places: (1) interface/processor queues (pending inventory transactions, receiving interface, uncosted transactions) that silently stop draining; (2) cost and accounting amounts that change without any UI error; (3) Redwood/mobile page churn on high-volume warehouse screens. The P1 suite asserts all three.
## 3. End-to-end SCM flow (logical)
```
P2P PO ─► P2P:RCV-01 receipt ─► RCD routing / inspection / put away ─► on-hand (INV-04)
▲ ASN (RCD-02) │ receiving processor (RCD-03) │
▼ ▼
Receipt accounting (RCA-01) ─ accruals (RCA-02) ─ accrual reconciliation (RCA-03, decided)
Inventory transactions: misc (INV-01) · subinventory (INV-02) · interorg (INV-03) · movement requests (INV-06)
lot/serial (INV-08/09) · consigned (INV-10 → P2P pay-on-use) · mobile (INV-11) · project (INV-14 → PPM)
pending/interface (INV-05)
Transfer orders: create (TRF-01) ─► pick/ship (O2C SHP-* reused, TRF-02) ─► in-transit ─► receive (TRF-03)
cross-BU transfer pricing / intercompany (TRF-05, decided)
Counts: cycle count (CNT-01/02) · physical inventory (CNT-03, event-driven) · PAR (CNT-05)
Replenishment: min-max (REP-01) ─► requisition ─► P2P REQ-*
O2C ship confirm ─► (O2C:SHP-03) ─► COGS (O2C:ACC-02, recorded exception / SCM CST-12 reference)
▼
Cost processor (CST-01) ─► item cost: standard / average / actual (CST-02/03) ─► landed cost (CST-07)
─► valuation (CST-05) ─► Create Accounting (CST-06) ─► R2R GL
Cross-cutting: roles & data security (SEC) · REST / FBDI / OTBI / BICC / ESS / 3PL / extensions (INT) · AI (tolerant)
```
*Diagram: UNVERIFIED · ANALYST. The flows actually enabled on the client pod are POD-REQUIRED.*
## 4. Scoring method (shared scale)
* **Impact, Change likelihood and Usage** are each 1–5, as in P2P map §4. **Risk** = Impact × Change. **Priority** = Risk × Usage. **Tiers:** P1 ≥ 75, P2 40–74, P3 20–39, P4 < 20.
* **All Usage scores are `UNVERIFIED · ASSUMED`** and reflect a "distribution-style customer: several inventory organizations, perpetual average or standard cost, inter-warehouse transfer orders, monthly cycle counting, annual physical inventory, no manufacturing, no external WMS". All Impact and Change scores are **UNVERIFIED · ANALYST**.
* `event-driven` rows run before their event. `tolerant-suite` and `reference` rows are excluded from go/no-go counts.
## 5. Risk × usage ranking (all rows UNVERIFIED)
*Sorted by Priority. Usage scores are placeholders. No ⚑ remains (all boundary decisions taken 9 Oct 2026).*
**Tier counts (provisional, updated 9 Oct 2026 with WOC-01..03):** P1 = 8, P2 = 22, P3 = 16, P4 = 13, total 59 rows.
**Go/no-go counts:** 56 rows (P1 8, P2 22, P3 15, P4 11), incl. the SCM-owned `WOC-01..03` defined in the P2M map. Excluded: `AI-01` (`tolerant-suite`, P4), `CST-12` (reference, O2C-owned, P3), `BUD-01` (reference, P2P-owned, P4).
**`event-driven`:** CNT-03 (P4), CST-11 (P4).
**Referenced, not duplicated:** `P2P:RCV-01..04`, `O2C:SHP-01..04`, `O2C:RMA-02`, `O2C:ORC-02/03`, `O2C:ACC-02`, `PPM:CST-09`, `P2P:REQ-05`.
| Rank | ID | Flow | Sub-process | Impact | Change likelihood | Risk (I×C) | Usage (ASSUMED) | Priority (Risk×Usage) | Tier | Tags |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | CST-01 | Cost accounting | Cost processor: create cost accounting distributions for inventory transactions; uncosted/error transactions | 5 | 4 | 20 | 5 | **100** | P1 | |
| 2 | INV-04 | Inventory balances | Manage Item Quantities: on-hand, available to reserve / transact, nettable vs non-nettable, supply and demand | 4 | 4 | 16 | 5 | **80** | P1 | |
| 3 | INV-05 | Inventory transactions | Pending transactions and the inventory transaction interface: errors, edit/resubmit, purge | 5 | 4 | 20 | 4 | **80** | P1 | |
| 4 | RCD-03 | Receiving depth | Receiving Transactions Processor and receiving interface: pending/errored receipts, reprocessing | 5 | 4 | 20 | 4 | **80** | P1 | |
| 5 | CST-03 | Cost accounting | Perpetual average / actual cost; receipt cost adjustment and acquisition cost adjustment (invoice vs PO price) | 5 | 4 | 20 | 4 | **80** | P1 | |
| 6 | SEC-01 | Roles & security (cross-cutting) | Inventory / receiving / cost roles, inventory-org and cost-org data access, view-only roles, SoD (count vs approve) | 5 | 4 | 20 | 4 | **80** | P1 | |
| 7 | WOC-01 | Work order costing | Work order cost accounting: WIP events, resource / overhead absorption, completion costing (defined in P2M) | 5 | 4 | 20 | 4 | **80** | P1 | `owner: SCM` (P2M reference) |
| 8 | CST-06 | Cost accounting | Create Accounting for cost accounting and receipt accounting; transfer to GL (GL posting is R2R) | 5 | 3 | 15 | 5 | **75** | P1 | |
| 9 | INV-01 | Inventory transactions | Miscellaneous receipts and issues (incl. account alias, unit cost entry, back-dating restrictions) | 4 | 4 | 16 | 4 | **64** | P2 | |
| 10 | TRF-01 | Transfer orders | Create transfer orders (ad hoc or from requisition), status and supply source; approval if configured | 5 | 4 | 20 | 3 | **60** | P2 | |
| 11 | CNT-01 | Counting | Cycle counts: define, schedule, generate count sequences, record counts | 5 | 3 | 15 | 4 | **60** | P2 | |
| 12 | RCD-01 | Receiving depth | Receipt routing (standard / inspection / direct) and put away to subinventory/locator | 5 | 3 | 15 | 4 | **60** | P2 | |
| 13 | CST-04 | Cost accounting | Cost accounting periods: cutoff, period-end validation, close/open | 5 | 3 | 15 | 4 | **60** | P2 | |
| 14 | CST-05 | Cost accounting | Inventory valuation and in-transit valuation reports (GL tie-out of inventory value is R2R) | 5 | 3 | 15 | 4 | **60** | P2 | |
| 15 | RCA-01 | Receipt accounting | Receipt accounting distributions (accrue at receipt) and Create Accounting | 5 | 3 | 15 | 4 | **60** | P2 | |
| 16 | INT-01 | Integrations / reports | SCM REST: inventory transactions, on-hand, receiving receipt requests, transfer orders, item costs | 5 | 4 | 20 | 3 | **60** | P2 | |
| 17 | INT-04 | Integrations / reports | Scheduled processes: transaction manager, receiving processor, cost processor, receipt accounting, min-max, count generation | 4 | 3 | 12 | 5 | **60** | P2 | |
| 18 | INV-02 | Inventory transactions | Subinventory transfers (owned and consigned) | 4 | 3 | 12 | 4 | **48** | P2 | |
| 19 | INV-11 | Mobile inventory | Mobile / barcode transactions: receive, put away, transfers, counts, labels | 4 | 4 | 16 | 3 | **48** | P2 | |
| 20 | RCA-04 | Receipt accounting | Receipt accounting periods and cutoff; close | 4 | 3 | 12 | 4 | **48** | P2 | |
| 21 | INT-02 | Integrations / reports | FBDI: inventory transactions, standard costs, cycle counts, reservations | 4 | 4 | 16 | 3 | **48** | P2 | |
| 22 | INT-03 | Integrations / reports | OTBI / BICC / BIP: valuation, receipt traveler, transfer order status, cycle count listing | 4 | 4 | 16 | 3 | **48** | P2 | |
| 23 | INV-03 | Inventory transactions | Interorganization transfers: direct and in-transit (ownership change, destination org rules) | 5 | 3 | 15 | 3 | **45** | P2 | |
| 24 | TRF-03 | Transfer orders | Receive transfer orders at destination (in-transit receipt, inventory vs expense destination) | 5 | 3 | 15 | 3 | **45** | P2 | |
| 25 | CNT-02 | Counting | Cycle count adjustments: approval tolerances, approve/reject, adjustment posting and value | 5 | 3 | 15 | 3 | **45** | P2 | |
| 26 | CST-02 | Cost accounting | Standard costs: create, import (FBDI), publish; standard cost update adjustments (if standard cost) | 5 | 3 | 15 | 3 | **45** | P2 | |
| 27 | CST-09 | Cost accounting | Transfer costing: interorganization and transfer-order cost accounting, cost propagation, transfer charges | 5 | 3 | 15 | 3 | **45** | P2 | |
| 28 | RCA-02 | Receipt accounting | Period-end uninvoiced receipt accruals and their reversal | 5 | 3 | 15 | 3 | **45** | P2 | |
| 29 | RCA-03 | Receipt accounting | Accrual reconciliation and clearing: Accrual Reconciliation report, clearing rules, write-off | 5 | 3 | 15 | 3 | **45** | P2 | |
| 30 | WOC-02 | Work order costing | Work order close variances, WIP balance clearing, Review Work Order Costs (defined in P2M) | 5 | 3 | 15 | 3 | **45** | P2 | `owner: SCM` (P2M reference) |
| 31 | INV-07 | Reservations | Reservations and picks outside sales orders: manual reservations, transfer-order and PO/supply reservations | 4 | 3 | 12 | 3 | **36** | P3 | |
| 32 | INV-08 | Lot / serial | Lot control: lot split/merge/translate, expiry, lot status (if used) | 4 | 3 | 12 | 3 | **36** | P3 | |
| 33 | TRF-02 | Transfer orders | Transfer-order fulfilment specifics: pick release with substitutes, ship (shipping mechanics referenced to O2C SHP-*) | 4 | 3 | 12 | 3 | **36** | P3 | |
| 34 | REP-01 | Replenishment | Min-max planning: report, requisition creation (requisition import onward is P2P) | 4 | 3 | 12 | 3 | **36** | P3 | |
| 35 | RCD-02 | Receiving depth | ASN / ASBN receipts (supplier-created or uploaded); cancel ASN | 4 | 3 | 12 | 3 | **36** | P3 | |
| 36 | RCD-04 | Receiving depth | Receipt exceptions, unordered receipts, quantity tolerance errors | 4 | 3 | 12 | 3 | **36** | P3 | |
| 37 | RCD-05 | Receiving depth | Lot/serial capture at receipt and put away (incl. expense destination) | 4 | 3 | 12 | 3 | **36** | P3 | |
| 38 | CST-12 | Cost accounting | COGS / deferred COGS recognition on sales order issue (owned by O2C ACC-02; reference only) | 4 | 3 | 12 | 3 | **36** | P3 (O2C-owned) | `reference` |
| 39 | INT-05 | Integrations / reports | 3PL / WMS integration: inventory balances, transaction interface, receipt advice and confirmation | 4 | 4 | 16 | 2 | **32** | P3 | |
| 40 | INT-06 | Integrations / reports | Flexfields, page / Redwood extensions on inventory and receiving pages | 4 | 4 | 16 | 2 | **32** | P3 | |
| 41 | INV-06 | Inventory transactions | Movement requests (requisition / replenishment) with approval; partially picked lines | 3 | 3 | 9 | 3 | **27** | P3 | |
| 42 | INV-09 | Lot / serial | Serial control: generation, uniqueness, serial entry at receipt/issue (if used) | 4 | 3 | 12 | 2 | **24** | P3 | |
| 43 | INV-10 | Consigned inventory | Consigned inventory: receipt, consumption, transfer to owned, consumption advice (pay-on-use invoice is P2P) | 4 | 3 | 12 | 2 | **24** | P3 | |
| 44 | TRF-05 | Transfer orders | Transfers across business units: transfer pricing and intercompany trade accounting | 4 | 3 | 12 | 2 | **24** | P3 | |
| 45 | CST-07 | Cost accounting | Landed cost management: trade operations, charges, charge-invoice association, estimated/actual landed cost (if used) | 4 | 3 | 12 | 2 | **24** | P3 | |
| 46 | WOC-03 | Work order costing | Maintenance work order costing (defined in P2M) | 4 | 3 | 12 | 2 | **24** | P3 | `owner: SCM` (P2M reference) |
| 47 | TRF-04 | Transfer orders | Change, cancel and auto-cancel backordered lines; transfer-order returns | 3 | 3 | 9 | 2 | **18** | P4 | |
| 48 | CNT-04 | Counting | Count sequence interface / external counting integration / spreadsheet import | 3 | 3 | 9 | 2 | **18** | P4 | |
| 49 | RCD-06 | Receiving depth | Supplier returns without a receipt reference; return to supplier with shipping documents | 3 | 3 | 9 | 2 | **18** | P4 | |
| 50 | CNT-03 | Counting | Physical inventory: snapshot, tags, record, approve, post adjustments | 5 | 3 | 15 | 1 | **15** | P4 | `event-driven` |
| 51 | CST-11 | Cost planning | Annual standard cost update (new cost scenario, publish, revaluation adjustment) | 5 | 3 | 15 | 1 | **15** | P4 | `event-driven` |
| 52 | BUD-01 | Budgetary control | Budgetary control / encumbrance on transfer orders and receipt accruals (owned by P2P REQ-05; reference only) | 5 | 3 | 15 | 1 | **15** | P4 (P2P-owned) | `reference` |
| 53 | INV-14 | Project inventory | Project-specific inventory (project/task striping) and expenditure capture for PPM | 4 | 3 | 12 | 1 | **12** | P4 | |
| 54 | CST-08 | Cost accounting | Periodic average cost (if used) | 4 | 3 | 12 | 1 | **12** | P4 | |
| 55 | AI-01 | AI features | AI-assisted SCM features (e.g. AI agents or recommendations on inventory/receiving pages), if enabled | 2 | 5 | 10 | 1 | **10** | P4 | `tolerant-suite` |
| 56 | CST-10 | Cost planning | Cost scenarios and cost rollup for buy items (manufacturing rollup out of scope) | 3 | 3 | 9 | 1 | **9** | P4 | |
| 57 | INV-12 | Inventory transactions | On-hand quantity consolidation; item replacement / mass replacement | 2 | 3 | 6 | 1 | **6** | P4 | |
| 58 | INV-13 | Inventory transactions | Dual UOM / secondary quantities; country-of-origin tracking (if used) | 3 | 2 | 6 | 1 | **6** | P4 | |
| 59 | CNT-05 | Counting | PAR counts (if used) | 2 | 2 | 4 | 1 | **4** | P4 | |
---
## 6. Coverage map by flow
Column guide: **Scenarios** are tagged H (happy path), N (negative), A (approval), M (amount/quantity assertion), Ho (hold / error), C (cancel / reverse) or R (role); **Patch-sensitive points**; **Data**; **POD-REQUIRED** (client questions with IDs in `open-client-questions.md` §SCM).
All rows: **UNVERIFIED**. † = topic seen in the TOC of the cited book:
* *Using Inventory Management* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/famml/index.html, **26C path**; Oracle's 26D book list links here).
* *Using Receiving* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/famli/index.html).
* *Using Supply Chain Cost Management* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fapma/index.html).
### 6.1 Inventory transactions and balances (INV): *Using Inventory Management*
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| INV-01 | H: miscellaneous receipt and issue (†"Miscellaneous Transactions", "What's a miscellaneous transaction?") incl. account alias. M: unit cost entered/defaulted (†"How can I enter the unit cost for miscellaneous transactions?", "How can I default the current item cost…"). N: back-dated transaction blocked where restricted (†"How can I restrict back dated transactions in miscellaneous transactions?"). M: on-hand and cost distribution after the transaction | **High-volume page, Redwood candidate**; cost defaulting | Synthetic item, org, subinventory; known starting on-hand | Account aliases, back-dating policy (SCM-Q02) |
| INV-02 | H: subinventory transfer (†"Subinventory Transfers", "How can I immediately transfer material between subinventories?"), incl. consigned (†). N: transfer more than available quantity → blocked | Availability checks | Two subinventories | Subinventory/locator structure |
| INV-03 | H: direct and in-transit interorganization transfer (†"Interorganization Transfers"). N: destination org not selectable (†"Why can't I select a destination organization…") when shipping network missing. H: prevent ownership change (†) | Shipping-network rules; cost propagation (see CST-09) | Two orgs with a shipping network | Shipping networks, transfer types (SCM-Q04) |
| INV-04 | H: Manage Item Quantities shows on-hand, available to reserve and available to transact (†"Available to Reserve and Available to Transact Values"). M: quantities after a known sequence of transactions. H: review supply and demand (†"How You Review Item Supply and Demand"); nettable vs non-nettable (†) | **Availability calculation changes break every downstream flow**; Redwood page | Recipe with expected quantities per step | Org/subinventory nettable setup |
| INV-05 | Ho: an invalid transaction lands in pending transactions (†"Pending Transactions", "How can I edit pending transaction errors?") → corrected → processed. H: validated vs staged states (†). H: purge interface (†"Purge Inventory Transactions Interface Process"). N: cycle-count pending transactions can't be deleted (†) | **Interface validation changes; queue silently stops draining** | Deliberately invalid synthetic transaction | Interface sources used (SCM-Q13) |
| INV-06 | H: requisition and replenishment movement requests (†"Perform Movement Requests", "Set Up Replenishment Movement Requests"). A: movement request approval (†"Movement Request Approval Process"). C: cancel/fulfil remaining quantity on partially picked lines (†) | Approval rules (BPM) | Movement request recipe | Are movement requests / approvals used? |
| INV-07 | H: create a reservation without a demand document (†"Create Inventory Reservation without Existing Demand Document"); detailed reservation for POs and transfer orders (†). C: remove excess reservations (†). **Sales-order reservations and picks are O2C** | Reservation hierarchy rules | Supply with known quantity | |
| INV-08 | H: lot split/merge/translate (†"Sample REST API Payloads for Lot Split, Lot Merge, and Lot Translate Transactions"). N: expired lot not transactable (†"What happens when a lot expires?"). H: lot expiry retained across transfers (†) | Lot rules; REST payloads | Lot-controlled synthetic item | Lot control usage (SCM-Q02) |
| INV-09 | H: serial generation and assignment (†"Serial Number Generation and Assignment"); serial entry at pick (†). N: duplicate serial rejected per uniqueness rule (†) | Serial rules | Serial-controlled item | Serial control usage (SCM-Q02) |
| INV-10 | H: consigned receipt → consumption (transfer to owned, †"Consigned Inventory Consumption") → consumption advice (†"Consumption Advice"). Ho: consumption advice errors (†"How can I resolve consumption advice errors?"). **Boundary:** P2P owns the pay-on-use invoice (†"Can I pay on use for consigned inventory?") | Consumption advice process | Consignment agreement, consigned item | Consigned inventory used? (SCM-Q07) |
| INV-11 | H: mobile receive, put away, subinventory transfer, cycle count, pick confirm (†"Overview of Mobile Inventory"). H: barcode scanning and label printing (†) | **Mobile / Redwood UI churn; device rendering** | Mobile test persona | Devices, mobile app, label formats (SCM-Q09) |
| INV-12 | H: on-hand quantity consolidation (†"Perform Inventory On-Hand Quantity Consolidation"); mass item replacement (†) | | | Used? |
| INV-13 | H: dual UOM / secondary quantity transactions (†"What's the difference between primary quantity and secondary quantity?"); country of origin tracking (†) | UOM conversion logic (†"UOM Conversions for Inventory, Receiving, and Shipping Transactions") | Dual-UOM item | Used? |
| INV-14 | H: project-specific receipt, pick and transfer (†"Project-Specific Inventory for Transfers"). M: expenditure capture for misc/interorg transactions (*Cost Mgmt* †"Capture Expenditure Information in Project Costing for Miscellaneous Inventory Transactions"). **Boundary:** PPM owns cost import onward (`PPM:CST-09`) | Cross-pack hand-off | Project with task; project-striped item | Project-driven supply chain used? (SCM-Q11) |
### 6.2 Transfer orders (TRF): *Using Inventory Management*, ch. "Transfer Orders" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| TRF-01 | H: ad hoc transfer order request (†"How You Create an Ad-Hoc Transfer Order Request") and transfer order from a requisition (†"Transfer Order Billing Details for Requisitions"). M: statuses through the lifecycle (†"Transfer Order Statuses", "How Transfer Orders Are Processed"). N: invalid supply source | **Supply orchestration + Redwood pages** | Source and destination orgs | Transfer types used (SCM-Q04) |
| TRF-02 | H: transfer-order pick release with substitute item (†"Use Substitute Items During Pick Release for Transfer Orders"); kit items (†). Ship: **reuse `O2C:SHP-01..03`** and assert only transfer-order status and in-transit quantity | Pick release rules | TRF-01 output | Substitutes, kits used? |
| TRF-03 | H: receive transfer order at destination (*Receiving* †"How You Receive Transfer Orders from Requisition Lines"); inventory vs expense destination (†"What's the difference between inventory and expense transfer orders for receiving processing?"). M: destination on-hand and in-transit cleared | Receiving rules | Shipped transfer order | |
| TRF-04 | C: cancel quantities (†"How You Cancel Quantities on Transfer Orders"); auto-cancel backordered lines (†). H: transfer-order return (*Receiving* †"Transfer Order Returns"). H: change management (†"How Transfer Order Change Management Is Calculated") | | Open transfer order | |
| TRF-05 | M: transfer price and trade accounting across BUs (*Cost Mgmt* †"Example of Accounting of Interorganization Transfers Across Business Units", "Overview of Global Procurement Trade Accounting"). H: destination org as customer on internal material transfers (†). **Ownership decided 9 Oct 2026:** SCM owns transfer, transfer price and trade accounting; R2R owns intercompany | Transfer pricing rules; trade accounting | Two BUs, transfer price rule | Cross-BU transfers and intercompany invoicing (SCM-Q04) |
### 6.3 Counting (CNT): *Using Inventory Management*, ch. "Cycle Counting", "Overview of Physical Inventory" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| CNT-01 | H: create cycle count (†"Cycle Count Creation"), add items (†), schedule automatic counts (†"Schedule Automatic Cycle Counts"), generate count sequences (†"How Cycle Count Sequences Are Generated"), record counts | Count generation ESS; Redwood/mobile pages | Items with known on-hand | Count definitions, frequency (SCM-Q05) |
| CNT-02 | M: variance within tolerance auto-adjusts; outside tolerance requires approval (†"How Cycle Count Approval Tolerances Are Calculated"). A: approve/reject; approve when reservations exist (†). M: adjustment quantity and value (cost accounting event †"Cycle Count Events") | **Tolerance logic; adjustment value** | CNT-01 output with planned variances | Approval tolerances (SCM-Q05) |
| CNT-03 `event-driven` | H: physical inventory (†"Physical Inventory Creation") → snapshot (†"Generate a Physical Inventory Snapshot") → tags (†"Print Physical Inventory Tags") → record (†"Record Physical Inventory Tags") → approve (†) → post adjustments (†"Post Physical Inventory Adjustments"). Ho: post troubleshooting (†). **Runs in the patch cycle before each physical inventory date** | Snapshot/post processes | Dedicated synthetic org | Physical inventory dates (SCM-Q05) |
| CNT-04 | H: count sequence interface (†"Count Sequence Interface"); external counting integration (†"How You Integrate Cycle Counting With an External Application"); spreadsheet import tested via the interface (Excel add-in rule) | Interface columns | Synthetic count file | External counting systems? |
| CNT-05 | H: PAR count and replenishment (†"PAR Counts Overview") | | | PAR used? (SCM-Q08) |
### 6.4 Replenishment (REP)
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| REP-01 | H: Min-Max Planning report creates requisitions (†"Min-Max Planning", "How Min-Max Planning Replenishment Quantities Are Calculated"). M: reorder quantity with rounding and fixed lot multiple (†). Ho: no requisitions created (†"Why isn't the min-max report creating any requisitions?"). **Boundary:** P2P owns requisition import onward | Calculation logic | Item with min/max and known on-hand | Min-max used, sourcing types (SCM-Q08) |
### 6.5 Receiving depth (RCD): *Using Receiving* (P2P basic receipts are `P2P:RCV-01..04`; not repeated)
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| RCD-01 | H: receipt routing standard / inspection / direct (†"Receipt Routing", "Destination Types") → put away to subinventory/locator (†"Put Aways"), incl. multiple locations (†). M: on-hand after put away. Inspection results recording reuses `P2P:RCV-04` | Routing rules; Redwood receiving pages | PO from the shared P2P recipe | Routing per org/item (SCM-Q06) |
| RCD-02 | H: receive against a supplier ASN/ASBN (†"Overview of Creating ASNs and ASBNs", "ASN or ASBN Uploads"). C: cancel ASN (†"What happens if I cancel an ASN or ASBN?") | ASN upload format | Synthetic ASN | Supplier ASNs used? (SCM-Q06) |
| RCD-03 | Ho: receipt fails in the Receiving Transactions Processor (†"Receiving Transactions Processor", "Receiving Transaction Interface") → corrected → reprocessed. H: purge interface tables (†"How You Purge the Receiving Interface Tables"). H: REST receipt request (†"…ShipmentNumber attribute in the Receiving Receipt Requests REST resource") | **Processor/interface changes; silent queue stall** | Deliberately invalid receipt request | Receipt sources (SCM-Q13) |
| RCD-04 | N: quantity tolerance error (†"Why did I get a quantity tolerance error when receiving…"). H: receipt exception (†"How can I mark part of a receipt line as an exception?"). H: unordered receipt and later match (†"Unordered Receipts", "Match Restrictions for Unordered Receipts") | Tolerance rules | PO with tolerances | Unordered receipts used? |
| RCD-05 | H: lot/serial capture at receipt and put away (†"What happens if I am receiving lines that are lot or serial controlled?"), incl. expense destination (†"Capture Lot and Serial Numbers for Expense Destination Receipts") | | Lot/serial items | Lot/serial usage (SCM-Q02) |
| RCD-06 | H: supplier return without receipt reference (†"How can I return goods to a supplier without using the original receipt?"); return with shipping documents (†"How Return to Supplier Transactions with Shipping Documents Are Processed"). **Boundary:** P2P owns the debit memo; `P2P:RCV-03` owns the standard return | | Received stock | |
### 6.6 Cost accounting and cost planning (CST): *Using Supply Chain Cost Management*
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| CST-01 | H: cost processor creates cost accounting distributions (†"Create Cost Accounting Distributions", "Cost Accounting Process Flow") for each inventory transaction type in the recipe (†"Miscellaneous Transaction Events", "Interorganization Transfer Events"…). Ho: uncosted transactions (†"What should I do if cost records aren't processed due to missing inventory transactions?", "Why is the cost processor logging a standard cost missing error?") | **Cost processor logic; silent uncosted backlog** | Recipe of costed transactions with expected distributions | Cost orgs, cost books (SCM-Q03) |
| CST-02 | H: create standard cost (†"Create Standard Costs"), import via FBDI (†"Import Standard Costs Using File-Based Data Import"), publish (†"Publish Costs"). M: standard cost update adjustment (†"How do I view the cost adjustments resulting from a standard cost update?") | FBDI template; publish process | Synthetic buy item | Cost method (SCM-Q03) |
| CST-03 | M: perpetual average cost after receipts and issues (†"In what sequence are transactions with the same date processed to calculate the perpetual average cost?"). M: receipt cost adjustment (†"Receipt Cost Adjustment and Propagation") and acquisition cost adjustment from invoice price (†"Acquisition Cost Adjustment", "Example of Acquisition Cost Adjustment With Match Option Set to Receipt"). M: variance absorption (†) | **Cost calculation engine: amounts change silently** | P2P PO → receipt → invoice at a different price | Cost method, match option (SCM-Q03) |
| CST-04 | H: cost period close with cutoff (†"Cost Cutoff Dates") and period-end validation (†"Cost Accounting Period Validations", "When should I run the Period End Validation report for Cost Accounting?"). N: can't open period (†"Why can't I open the cost period?") | Validation rules | Dedicated test calendar (UNVERIFIED) | Close calendar (X-Q11) |
| CST-05 | M: inventory valuation report equals recipe quantity × cost (†"Analyze Inventory Valuation"); in-transit valuation (†"Why do I see negative amounts in the Period In-transit Valuation Report?"). **Boundary:** the GL tie-out (†"Reconciling Inventory Value in Costing Subledger with General Ledger") is R2R-owned | Report logic | CST-01 output | Custom valuation reports (SCM-Q13) |
| CST-06 | H: Create Accounting for cost and receipt accounting (†"Create Accounting"; †"How can I post cost distributions and journal entries to the general ledger?") → expected journal lines → transfer to GL. **Boundary:** R2R owns GL posting | SLA rules for Cost Management | CST-01 / RCA-01 output | Cost Management SLA rules |
| CST-07 | H: trade operation (†"Create a Trade Operation from a Template"), charges (†"Add Charges to a Trade Operation"), charge-invoice association (†"Associate Charge Lines to Invoice Lines"), estimated and actual landed costs (†"Create Estimated Landed Costs", "Create Actual Landed Costs"). M: item landed cost (†"Review Item Landed Costs"). P2P owns the charge invoice up to validation | Landed cost processes | PO + freight invoice | Landed cost used? (SCM-Q10) |
| CST-08 | M: periodic average cost process (†"Periodic Average Costing Process"); value adjustment (†"Create a Value Adjustment") | | | Periodic average used? (SCM-Q03) |
| CST-09 | M: interorganization and transfer-order cost accounting with cost propagation (†"Example of Accounting of Interorganization Transfers with Cost Propagation", "Example of Accounting of In Transit Transfer Order Shipment with Cost Propagation"); transfer charges (†"Manage Transfer Charge Rules and Rule Sets") | Propagation logic | INV-03 / TRF-03 output | Transfer charge rules |
| CST-10 | H: cost scenario and rollup for buy items (†"Create a Cost Scenario for Regular Items", "Supply Chain Cost Rollup"). Make-item rollup belongs to Plan-to-Produce | | | Cost scenarios used? |
| CST-11 `event-driven` | H: annual standard cost update: new scenario → estimate → publish (†"Estimating Standard Costs", "Publish Costs"). M: revaluation adjustment on on-hand. **Runs in the patch cycle before the cost update date** | Publish/adjustment logic | Dedicated synthetic org | Cost update date (SCM-Q12) |
| CST-12 `reference` | Reference to `O2C:ACC-02` (COGS / deferred COGS, †"Cost of Goods Sold Recognition"). **Recorded exception to the boundary rule (Chief of Staff, 9 Oct 2026):** O2C owns and tests it. No SCM case | | | |
### 6.7 Receipt accounting (RCA): *Using Supply Chain Cost Management*, ch. "Overview of Receipt Accounting" †
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| RCA-01 | H: create receipt accounting distributions (†"Receipt Accounting Tasks and Accounting Events", "Review Receipt Accounting Distributions") → Create Accounting. Ho: receipt accounting exceptions (†"Review Receipt Accounting Exceptions") | Receipt accounting events | Shared P2P receipt | Accrual option (SCM-Q03) |
| RCA-02 | H: Create Uninvoiced Receipt Accruals (†) and report (†"Run Uninvoiced Receipt Accruals Report"). M: accrual and reversal amounts and dates (†"What accounting date is used for the accrual journal?"). Ho: reversal journal invalid (†) | Period-end process | PO set to accrue at period end, received not invoiced | Period-end accrual used? (SCM-Q03) |
| RCA-03 | H: accrual reconciliation report populated (†"Why is the Accrual Reconciliation Report not populated with any data?"). H: clearing rules (†"Receipt Accrual Clearing Rules") and write-off. **SCM-owned (decided 9 Oct 2026)**; R2R owns the GL tie-out | Reconciliation logic | Received + invoiced PO with a price variance | Accrual reconciliation practice |
| RCA-04 | H: receipt accounting period close (†"How You Close a Receipt Accounting Period") with cutoff (†"Receipt Accounting Cutoff Dates") | | Dedicated test calendar | Close calendar (X-Q11) |
### 6.8 Budgetary control (BUD): reference only
| ID | Scenarios to cover | Notes |
|---|---|---|
| BUD-01 `reference` | Encumbrance on transfer orders / receipt accruals (*Cost Mgmt* †"Budgetary Control and Encumbrance Accounting"; *Inventory* †"How Item Substitution at Pick Release Works for Transfer Order Lines Under Budgetary Control") | **Owned by `P2P:REQ-05`** everywhere. No SCM case |
### 6.9 Roles, integrations and AI (SEC / INT / AI)
| ID | Scenarios to cover | Patch-sensitive points | Data | Doc | POD-REQUIRED |
|---|---|---|---|---|---|
| SEC-01 | R: warehouse operator transacts only in assigned inventory orgs; view-only role (†"How can I provide a user with a view-only role in Inventory?", "…in Receiving?"); cost accountant sees only assigned cost orgs; counter can't approve their own count adjustments (if enforced) | Seeded privilege changes | Personas: Warehouse Manager, Inventory Manager, Receiving Agent, Cost Accountant (**UNVERIFIED · ANALYST** names) | Security Reference for Manufacturing and SCM Materials Management: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fammm/index.html | Custom roles, org access (X-Q07) |
| INT-01 | H: REST create/get inventory transactions, on-hand, receipt requests, transfer orders, item costs. Contract: response superset of the baseline | Resource versions | Integration user (vault) | REST API for SCM: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fasrp/index.html (26C path; 26D path soft-404s) | Resources used (SCM-Q13) |
| INT-02 | H: FBDI inventory transactions, standard costs, cycle counts, reservations. N: bad row → error | **Template changes** | Synthetic files | FBDI for SCM: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/oefsc/index.html | Imports used |
| INT-03 | H: OTBI inventory/cost subject areas, BICC extracts, BIP: Receipt Traveler (†), Transfer Order Status Report (†), Cycle Count Listing (†), valuation reports | Subject-area / report changes | | Analytics and Reports for SCM: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fauca/index.html | Custom reports (X-Q08) |
| INT-04 | H: inventory transaction manager, receiving processor, cost processor, receipt accounting, min-max, count generation all complete in order (†"What is the recommended sequence for scheduling of receipt accounting processes?") | **Long ESS chains; triage "timing"** | | | **Scheduled job list** |
| INT-05 | H: 3PL/WMS inbound inventory balances (†"Inventory Balances Integration with External Systems"), transaction interface, receipt advice and confirmation (*Receiving* †"Receipt Advice Process", "Send Receipt Confirmation Process"). Stub only, never call real 3PLs | Interface changes | Stubbed partner | | 3PL/WMS partners (SCM-Q09) |
| INT-06 | H: flexfields and page/Redwood extensions on inventory and receiving pages render and save | Redwood replacement of composed pages | | *Implementing Manufacturing and SCM Materials Management*: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faims/index.html | Extension inventory (X-Q08) |
| AI-01 `tolerant-suite` | H: if any AI agent / recommendation feature is enabled on SCM pages, it returns a plausible suggestion and doesn't block the deterministic flow. **Probabilistic, so tolerant suite, not counted toward go/no-go.** Feature names not verified | AI model changes | | Readiness: SCM (below) | Which AI features are enabled? (X-Q02) |
### 6.10 Work order costing (WOC): SCM-owned rows defined in the P2M map (added 9 Oct 2026)
| ID | Scenarios | Notes |
|---|---|---|
| WOC-01 `owner: SCM` | See `P2M:WOC-01`: production transactions transferred to costing; WIP issue, resource / overhead absorption and completion distributions | **SCM owns and counts it** (P1, 80). Scenarios are maintained in `p2m-coverage-map.md` §6.3 |
| WOC-02 `owner: SCM` | See `P2M:WOC-02`: work order costs, close variances, WIP clearing | SCM-owned (P2, 45) |
| WOC-03 `owner: SCM` | See `P2M:WOC-03`: maintenance work order costs | SCM-owned (P3, 24) |
---
## 7. What a quarterly patch typically touches in SCM (patch impact areas)
Generic expectations (**UNVERIFIED · ANALYST**). The real delta comes from the SCM readiness pages for the target update (https://docs.oracle.com/en/cloud/saas/readiness/scm.html, checked) and MOS notes (not opened).
| # | Impact area | Why it breaks tests | Rows most exposed | Mitigation |
|---|---|---|---|---|
| 1 | **Cost processor and cost methods** | Item cost and distributions change silently | CST-01, CST-03, CST-09 | Exact expected cost per recipe step; local-model amount triage |
| 2 | **Interfaces and processors** (inventory transaction manager, receiving processor) | Validation changes; queues stall without UI errors | INV-05, RCD-03, INT-04 | Assert queue empty / error count per run |
| 3 | **Redwood and mobile pages** (item quantities, receipts, transfer orders, counts) | Locator churn on high-volume pages | INV-01, INV-04, INV-11, RCD-01, TRF-01, CNT-01 | Role/label locators; self-heal once |
| 4 | **Availability and reservation logic** | ATR/ATT quantities shift | INV-04, INV-07 | Expected quantities per step |
| 5 | **Receipt accounting / accruals** | Accrual amounts and dates change | RCA-01..03 | Expected journal lines |
| 6 | **SLA rules for Cost Management** | Journal lines change | CST-06 | Expected journal lines |
| 7 | **FBDI / REST** | Template and resource changes | INT-01/02, CST-02 | Template/schema diff per patch |
| 8 | **Count tolerances and adjustments** | Auto-adjust vs approval flips | CNT-02, CNT-03 | Planned variances on both sides of the tolerance |
| 9 | **Security** | New privileges; org access | SEC-01 | Per-persona smoke tests |
| 10 | **AI features** | Probabilistic behaviour | AI-01 | Tolerant suite (not counted toward go/no-go) |
## 8. Oracle documentation index (checked 9 Oct 2026 by page title)
| Area | Book | URL | Status |
|---|---|---|---|
| Inventory, transfer orders, counts | Using Inventory Management | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/famml/index.html | checked (**26C path**; Oracle's 26D book list links here; 26D path soft-404s) |
| Receiving | Using Receiving | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/famli/index.html | checked |
| Cost, receipt accounting, landed cost | Using Supply Chain Cost Management | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fapma/index.html | checked |
| Setup | Implementing Manufacturing and Supply Chain Materials Management | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faims/index.html | checked |
| Roles | Security Reference for Manufacturing and Supply Chain Materials Management | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fammm/index.html | checked |
| Shipping (reference for O2C rows) | Using Shipping | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/famlo/index.html | checked |
| Orchestration (transfer orders) | Using Supply Chain Orchestration | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fauco/index.html | checked |
| Quality (inspection depth) | Using Quality Management | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fauqm/index.html | checked |
| REST | REST API for Oracle Fusion Cloud SCM | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fasrp/index.html | checked (26C path) |
| FBDI | File-Based Data Import (FBDI) for SCM | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/oefsc/index.html | checked |
| Reports admin | Creating and Administering Analytics and Reports for SCM | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fauca/index.html | checked |
| Tables | Tables and Views for SCM | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/oedsc/index.html | checked |
| Release readiness | Readiness: Supply Chain & Manufacturing | https://docs.oracle.com/en/cloud/saas/readiness/scm.html | checked |
| Update policy | MOS KB160632, KB157616 | My Oracle Support (login) | **not opened** |
## 9. Open questions and gaps
**Client-only questions** are in `analysis/open-client-questions.md` §SCM (SCM-Q01 onward). Internal decisions are reported to the Chief of Staff, not listed here. Amount triage and pattern boundaries are standing rules, not questions.
### 9.1 Gaps
* **Spreadsheet maintenance** (standard costs, rates, count import): tested via FBDI/REST. The manual Windows check is a recorded gap.
* **Mobile devices:** the mobile/responsive app can be driven in a browser, but real scanner hardware and label printers can't be tested here; recorded gap.
* **3PL/WMS:** only the Fusion interface is in scope, with stubbed partners.
* **Mock app scope:** the mock is P2P-only. SCM P1 minimum: on-hand inquiry, misc transaction, pending-transaction error and fix, receiving processor error and fix, cost processor run with expected distributions, average/acquisition cost adjustment, Create Accounting, role visibility.
* **Handoff:** no messaging channel from this analyst.
### 9.2 POD-REQUIRED checklist for the Scout and pod probers (read-only, test pod)
- [ ] Release, cohort, opt-ins; SCM licensing (Inventory, Receiving, Cost Management, Landed Cost, Quality, Supply Chain Orchestration, WMS)
- [ ] Inventory orgs, subinventories, locators, shipping networks, lot/serial controls
- [ ] Cost orgs, cost books, cost methods, accrual options, match options, transfer charge rules
- [ ] Count definitions, tolerances, physical inventory dates; min-max/PAR setups
- [ ] Receipt routing, ASN usage, receiving tolerances
- [ ] Cost Management SLA rules; cost and receipt accounting calendars
- [ ] Custom roles, inventory-org and cost-org access
- [ ] FBDI / REST / BICC usage; 3PL/WMS partners; scheduled job list; extensions
- [ ] 90-day volumes (inventory transactions, receipts, transfer orders, counts), to replace the ASSUMED usage scores
- [ ] UI generation (Redwood vs classic, mobile app) for P1 pages
## 10. Handoff notes for the Fusion Test Designer
* P1 rows: CST-01, INV-04, INV-05, RCD-03, CST-03, SEC-01, CST-06.
* Backbone chain (reuses the shared P2P recipe): PO (P2P) → receipt (`P2P:RCV-01`) → routing/put away (RCD-01) → on-hand (INV-04) → misc issue and transfers (INV-01..03) → cycle count with variance (CNT-01/02) → cost processor (CST-01) → invoice at a different price (P2P) → acquisition cost adjustment (CST-03) → receipt accounting (RCA-01) → Create Accounting (CST-06) → (R2R) GL. Transfer chain: TRF-01 → O2C shipping cases → TRF-03 → CST-09.
* Put `map_ids:` (prefix `SCM:`), `verification: UNVERIFIED`, `owner:` for boundary rows (per the decided splits), `schedule: event-driven` for CNT-03 / CST-11 and `suite: tolerant` for AI-01 on every case. BUD-01 and CST-12 get no SCM case. WOC-01..03 are SCM cases built from the P2M scenarios (prefix `SCM:`). Don't create cases for `P2P:RCV-*` or `O2C:SHP-*`; link to them.
* All items, orgs, costs and quantities must be synthetic. No secrets in YAML.
*End of document. Status: DRAFT, UNVERIFIED. Pending Scout and pod-prober data, and a target patch. All boundary decisions taken 9 Oct 2026.*