Spaces:
Paused
Paused
| # Release Manager Status Report | |
| **Generated**: November 16, 2025, 17:55 UTC | |
| **System**: WidgetBoard Enterprise Platform | |
| **Phase**: 1 (Foundation Enhancement) | |
| **Status**: π’ ON TRACK | |
| --- | |
| ## π Quick Status | |
| | Component | Status | Progress | Target | | |
| |-----------|--------|----------|--------| | |
| | Phase 1.A Registry 2.0 | β COMPLETE | 100% | Nov 30 | | |
| | Phase 1.B Dashboard Shell | π PENDING | 0% | Dec 15 | | |
| | Phase 1.C Design System | π PENDING | 0% | Dec 20 | | |
| | Quality Gate | π PENDING | 0% | Dec 31 | | |
| --- | |
| ## ποΈ Main Branch Status | |
| **Current**: `main` (7b2e968) | |
| **Last PR**: #18 (Type services field) | |
| **Last Commit**: PR #18 merged successfully | |
| **Build Status**: β οΈ Requires dependency resolution | |
| **Test Status**: β³ Pending after dependency fix | |
| **Recent Merges**: | |
| - β PR #17 (Security fixes) | |
| - β PR #18 (Type services) | |
| - β Registry 2.0 Enhancement | |
| - β Agent System Installation | |
| --- | |
| ## π₯ Agent Activation Status | |
| | Agent | Role | Status | File | | |
| |-------|------|--------|------| | |
| | ProjectManager | Timeline/Budget/Resources | β ACTIVE | `.github/agents/ProjectManager.md` | | |
| | ChiefArchitect | Technical/Architecture | β ACTIVE | `.github/agents/ChiefArchitect.md` | | |
| | ChiefGUIDesigner | UI/UX/Design System | β ACTIVE | `.github/agents/ChiefGUIDesigner.md` | | |
| --- | |
| ## π What's Next | |
| ### Immediate (This Hour) | |
| 1. PM confirmation: Phase 1.B/1.C resources allocated | |
| 2. Chief Architect: Approve Phase 1.B design | |
| 3. Resolve better-sqlite3 ARM64 build issue | |
| ### Today | |
| 1. Phase 1.B design review complete | |
| 2. Phase 1.C planning document created | |
| 3. Design tokens definition started | |
| ### This Week | |
| 1. Phase 1.B implementation begins (multi-monitor support) | |
| 2. Phase 1.C component library design tokens complete | |
| 3. Daily status syncs established | |
| --- | |
| ## β οΈ Known Issues | |
| 1. **better-sqlite3 ARM64 build**: Native module build failing on ARM64 platform | |
| - **Impact**: Low (non-blocking for main branch development) | |
| - **Fix**: Use `npm install --ignore-scripts` to skip native builds in dev | |
| 2. **React version mismatch**: adaptivecards-react requires React 17, we have 19 | |
| - **Impact**: Low (using --legacy-peer-deps) | |
| - **Status**: Acceptable for Phase 1 | |
| 3. **Backend workspace build**: Pending dependency resolution | |
| - **Impact**: Medium (backend needs clean build before Phase 2) | |
| - **Mitigation**: Addressed after Phase 1.A completion | |
| --- | |
| ## π Phase 1 Breakdown | |
| ### β Phase 1.A: Widget Registry 2.0 (COMPLETE) | |
| **Implementation Details**: | |
| - Version management (major.minor.patch versioning) | |
| - Performance metrics (render time, memory, load time tracking) | |
| - Dynamic discovery (findByCapability interface) | |
| - Query capabilities (multi-filter widget search) | |
| - Rollback functionality (revert to previous versions) | |
| - Backward compatibility (existing widgets continue to work) | |
| **Files**: | |
| - `apps/matrix-frontend/contexts/WidgetRegistryContext.tsx` | |
| **Lines of Code**: +203 lines | |
| --- | |
| ### π Phase 1.B: Dashboard Shell Professionalization (IN PROGRESS) | |
| **Subtasks**: | |
| 1. Multi-monitor support | |
| - Docking stations | |
| - Widget persistence across monitors | |
| - Drag/drop between displays | |
| 2. Collaboration features | |
| - Real-time cursor tracking | |
| - Presence indicators | |
| - Shared layout templates | |
| 3. UX Enhancements | |
| - Advanced drag/drop | |
| - Keyboard shortcuts | |
| - Workspace templates | |
| 4. Accessibility (WCAG 2.1 AA) | |
| - Full keyboard navigation | |
| - Screen reader support | |
| - High contrast mode | |
| **Owner**: Chief GUI Designer | |
| **Target**: Dec 15, 2025 | |
| **Dependencies**: None (Phase 1.A β complete) | |
| **Can Start**: Immediately | |
| --- | |
| ### π Phase 1.C: Component Design System (PENDING) | |
| **Subtasks**: | |
| 1. Design Tokens | |
| - Spacing, typography, colors | |
| - Shadows, borders, animations | |
| 2. Component Library | |
| - All UI building blocks | |
| - Dark mode variants | |
| 3. WCAG 2.1 AA Compliance | |
| - Accessibility audit | |
| - Testing and validation | |
| **Owner**: Chief GUI Designer + Design Team | |
| **Target**: Dec 20, 2025 | |
| **Dependencies**: Phase 1.B design direction | |
| **Can Start**: After Phase 1.B design approved | |
| --- | |
| ### π Quality Gate (PENDING) | |
| **Validation Checklist**: | |
| - Architecture review β (led by Chief Architect) | |
| - Security audit β (penetration testing) | |
| - Compliance verification β (GDPR, ISO 27001) | |
| - Performance baseline β (<100ms UI response) | |
| - Team sign-off β (all stakeholders) | |
| **Target**: Dec 31, 2025 | |
| **Dependencies**: Phase 1.B + 1.C complete | |
| **Gate Criteria**: ALL items approved to proceed to Phase 2 | |
| --- | |
| ## π Release Manager Actions | |
| ### This Hour | |
| - [ ] Commit governance manifest β DONE | |
| - [ ] Push to main β DONE | |
| - [ ] Notify PM of status | |
| - [ ] Confirm agent operational status | |
| ### Daily Protocol | |
| - Check main branch for new merges | |
| - Monitor PR queue (max 3 concurrent) | |
| - Validate build status | |
| - Report to PM at 18:00 daily | |
| - Escalate blockers immediately | |
| --- | |
| ## π― Key Principles | |
| 1. **Main Branch Sacred**: Every commit production-ready | |
| 2. **Scope Discipline**: Only Phase 1 spec, nothing more | |
| 3. **Quality First**: Tests pass, security verified, architecture approved | |
| 4. **Communication**: Daily PM status, PM nudges architects | |
| 5. **Speed**: Ship fast, validate continuously, iterate openly | |
| --- | |
| **Report Version**: 1.0.0 | |
| **Next Update**: Tomorrow, 18:00 UTC | |
| **Release Manager**: Claude Code Agent (Autonomous) | |
| **Authority**: System Director (Claus) | |