π Priority 3: GO SIGNAL - Option C Execution Launch
Date: Nov 17, 2025 (Friday Evening) Status: β OFFICIALLY APPROVED & AUTHORIZED Launch: Monday Nov 18, 2025 @ 09:00 AM Authority: System Director - Final Approval Given
π’ Official Authorization
OPTION C IS A GO.
All 4 teams are authorized to begin Week 1 "Start Now" prep work starting Monday Nov 18, 2025 at 09:00 AM.
This is an official execution authorization from the System Director.
π― Mission
Complete 8.5 people-days of parallel prep work (Nov 18-22) to enable Phase 1.C acceleration execution (Dec 8-13).
Result: Phase 1 complete 7 days early instead of Dec 16-20.
π₯ Teams Ready to Execute
β Team 1: Design System Foundation (2 people-days)
Lead: Chief GUI Designer Support: Frontend Architect 3 (50%) First Task: Review existing components, document hierarchy Deliverable: Design System Standards document (Friday Nov 22)
β Team 2: Storybook Infrastructure (1.5 people-days)
Lead: Frontend Architect 3 (50% after Team 1) Support: Technical Writer (50%) First Task: Install Storybook 7.x, configure Chromatic Deliverable: Storybook environment ready (Friday Nov 22)
β Team 3: E2E Test Planning (3 people-days)
Lead: QA Engineer 1 Support: QA Engineer 2 First Task: Plan test coverage strategy, design critical user journeys Deliverable: 100+ test scenarios (Friday Nov 22)
β Team 4: Performance Infrastructure (2 people-days)
Lead: Frontend Performance Specialist Support: DevOps Engineer 2 (50%) First Task: Set up Core Web Vitals monitoring Deliverable: Performance infrastructure operational (Friday Nov 22)
π Monday Morning Checklist (Nov 18 @ 09:00 AM)
Before Standup
- All team members present
- Required tools/access provisioned
- Slack channels ready
- Communication tested
09:00 AM - Team Assignments Distributed
- Each team member has their task sheet
- All questions answered
- Ready to begin work
09:15 AM - First Daily Standup
Location: TBD (Zoom or in-person) Attendees: All 4 team leads + System Director Duration: 15 minutes
Agenda:
- System Director: Official launch authorization
- Each team (2 min): Confirm readiness and first task
- Coordination: Daily standup times established
- Launch: Begin execution
π Week 1 Schedule (Nov 18-22)
Every Day
- 09:15 AM: Daily standup (15 min)
- Team status
- Blockers
- Coordination
- 17:00 PM: End-of-day check (10 min)
- Day summary
- Tomorrow prep
Monday Nov 18 (Kickoff)
- 09:00: Team assignments
- 09:15: First standup
- All day: All teams execute their first day tasks
- 17:00: End-of-day sync
Tuesday-Thursday (Nov 19-21)
- 09:15: Daily standup
- All day: Teams execute
- 17:00: End-of-day sync
- Progress toward Friday deliverables
Friday Nov 22 (Checkpoint)
- 09:15: Final standup
- All day: Final completion and review
- 14:00: Deliverable review with System Director
- 17:00: CELEBRATION - All 4 teams complete! π
π― Friday Nov 22 Definition of Done
All 4 teams must deliver:
Team 1: Design System β
- Component hierarchy documented (all 20+ components)
- Naming conventions established
- Color system (semantic + accessibility)
- Typography scale documented
- Spacing system (8px base)
- Accessibility standards (WCAG 2.1 AA)
- File:
design-system/DESIGN_SYSTEM_STANDARDS.md
Team 2: Storybook β
- Storybook 7.x installed and running
- Chromatic integration working
- CSF templates ready
- Story writing guides complete
- CI/CD pipeline verified
- File:
storybook/STORYBOOK_SETUP.md
Team 3: E2E Testing β
- 100+ test scenarios documented
- Cross-browser matrix defined
- Test data generators created
- Accessibility scenarios included
- Playwright templates ready
- File:
testing/E2E_TEST_PLAN.md
Team 4: Performance β
- Core Web Vitals monitoring operational
- CI/CD performance gates working
- Performance dashboards accessible
- Optimization workflow documented
- File:
performance/PERFORMANCE_INFRASTRUCTURE.md
π¨ Blocker Protocol
If a blocker occurs during the week:
Immediate Report (same day standup)
- State the blocker clearly
- Identify impact (team only, affects others, critical)
- Propose solution or escalation
Resolution Path:
- Team can fix: Resolve immediately
- Other team dependency: Coordinate at standup
- External blocker: Escalate to System Director
- Critical blocker: Emergency escalation (notify System Director immediately)
No Blocker Cancels Friday Deliverable
- Work around it or escalate
- Deliverables MUST complete by Friday EOD
- System Director is final authority on any blocker
π Success Metrics for Week 1
Individual Team Success (each team must achieve):
- All assigned tasks completed
- All deliverables reviewed and approved
- Team ready for Phase 1.C execution
Collective Success (all teams):
- 100% of 8.5 people-days work completed
- 0 deliverables missed
- All teams satisfied with progress
- Phase 1.C Dec 8 launch confirmed ready
Phase 1.C Readiness (collective):
- Phase 1.C can begin Dec 8 with ZERO ramp-up time
- All infrastructure ready
- All teams empowered to execute
π¬ Phase 1.C Execution Timeline (After Nov 22)
After Week 1 "Start Now" work completes:
Dec 8 (Day 1): Phase 1.C begins
- Block 1: Component Design System + 100+ Storybook stories
- Block 2: E2E Tests + Performance optimization
- Parallel execution begins
Dec 9-10: All blocks running parallel
- No ramp-up needed
- Full productivity immediately
- Teams operate at peak efficiency
Dec 11: Blocks 2-3 finalization Dec 12: Block 4 prep + validation Dec 13: Quality Gate + Phase 1 Completion β
Result: Phase 1 complete 7 days early
π Escalation & Support
System Director: Final authority, blocker escalation, approval Team Leads: Daily coordination, team management Specialists: Execution, task completion
Emergency Contact: System Director (any critical blocker)
π What Success Looks Like
Friday Nov 22 @ 17:00
- β All 4 deliverables complete
- β All teams satisfied with progress
- β Phase 1.C execution confirmed ready
- β CELEBRATION: All teams accomplished their mission
Dec 8 @ 09:00
- β Phase 1.C execution begins smoothly
- β Zero onboarding overhead
- β All infrastructure ready
- β Teams operating at peak efficiency
Dec 13
- β Phase 1 complete
- β 7 days early
- β Quality maintained (95%+ coverage, 0 vulns)
- β Ready for Phase 2 (Jan 1)
π Documentation Ready
All team members should have access to:
PRIORITY_3_STARTNOW_KICKOFF.md
- Week 1 overview
- Daily coordination
- Blocker resolution
PRIORITY_3_TEAM_ASSIGNMENTS.md
- Individual daily tasks
- Detailed schedules
- Deliverables per team
PRIORITY_3_EXECUTION_SUMMARY.md
- Complete reference
- All metrics and criteria
- Launch checklist
PRIORITY_3_GO_SIGNAL.md (this document)
- Official authorization
- Team readiness
- Success criteria
β OFFICIAL GO AUTHORIZATION
This is the official GO signal for Priority 3 Option C execution.
All teams are authorized and ready to begin Monday Nov 18, 2025 @ 09:00 AM.
System Director has approved this plan.
All documentation is complete.
All teams are ready.
THIS IS A GO. π
π― Final Checklist Before Launch
- All 4 team leads have read this document
- All team members have task assignments
- Communication channels (Slack) set up
- First standup location confirmed (Zoom or in-person)
- First standup time confirmed (09:15 AM Nov 18)
- System Director availability confirmed
- Required tools/access provisioned
- Documentation accessible to all teams
- Monday morning ready to go
OFFICIAL STATUS: β GO
LAUNCH DATE: Monday, Nov 18, 2025
LAUNCH TIME: 09:00 AM (Teams ready) β 09:15 AM (First Standup)
AUTHORIZATION: System Director - Final Approval Given
π Ready to execute. Let's accelerate Phase 1 completion.
Generated: Nov 17, 2025 By: Claude Code - Priority 3 Execution Authority: System Director Approval Status: OFFICIALLY APPROVED & AUTHORIZED