Spaces:
Paused
WidgeTDC Agent Task System
π Overview
This directory contains detailed implementation plans for all major system improvements, broken down into agent-executable tasks with comprehensive test cases.
π― Implementation Phases
β Completed
None yet - ready to start!
π In Progress
None
π Planned
| Phase | Priority | Est. Time | Status | Dependencies |
|---|---|---|---|---|
| Phase 1: Authentication | π΄ Critical | 25h | Ready | None |
| Phase 2: PostgreSQL Migration | π΄ Critical | 27h | Ready | None |
| Phase 3: Vector Embeddings & LLM | π‘ High | 32h | Ready | Phase 2 |
| Phase 4: Microservices | π‘ High | 40h | Blocked | Phase 2 |
| Phase 5: MCP Marketplace | π’ Medium | 45h | Blocked | Phase 4 |
| Phase 6: Observability | π‘ High | 20h | Ready | None |
| Phase 7: Analytics Dashboard | π’ Medium | 28h | Blocked | Phase 6 |
| Phase 8: Mobile App | π’ Medium | 50h | Blocked | Phase 1 |
| Phase 9: CI/CD Automation | π‘ High | 15h | Ready | None |
| Phase 10: Data Privacy & Compliance | π΄ Critical | 30h | Blocked | Phase 1, 2 |
Total Estimated Time: 312 hours (~8 weeks with 2 developers)
π Phase Details
Phase 1: Authentication & Authorization System
File: PHASE_1_AUTHENTICATION.md Status: β Ready to Start Priority: π΄ Critical
Quick Summary:
- Implement JWT-based authentication
- Role-based access control (RBAC)
- Login/logout flows
- Frontend auth context
- Security audit
Key Deliverables:
- Auth service with bcrypt password hashing
- JWT middleware for all API endpoints
- User/role database schema
- Login form component
- Token refresh mechanism
Agents Required:
- Backend Architect
- Backend Engineer (2)
- Frontend Engineer
- Security Expert
- QA Engineer
Phase 2: PostgreSQL Migration
File: PHASE_2_POSTGRESQL_MIGRATION.md Status: β Ready to Start Priority: π΄ Critical
Quick Summary:
- Migrate from SQLite to PostgreSQL
- Implement Prisma ORM
- Data migration scripts
- Performance optimization
- Concurrent access testing
Key Deliverables:
- Prisma schema for all tables
- Docker Compose PostgreSQL setup
- Migration script (SQLite β PostgreSQL)
- Updated repository layer
- Performance benchmarks
Agents Required:
- Data Engineer
- Backend Engineer (2)
- DevOps Engineer
- QA Engineer
Phase 3: Vector Embeddings & LLM Integration
File: PHASE_3_VECTOR_LLM.md (to be created) Status: π Planned Priority: π‘ High
Quick Summary:
- Add semantic search with vector embeddings
- Integrate Sentence Transformers
- LLM integration for prompt refinement
- Hybrid search (keyword + semantic)
- Caching for LLM calls
Dependencies: Phase 2 (PostgreSQL with pgvector extension)
Phase 4: Microservices & Container Orchestration
File: PHASE_4_MICROSERVICES.md (to be created) Status: π Planned Priority: π‘ High
Quick Summary:
- Split monolith into microservices
- Dockerize all services
- Kubernetes/Docker Compose orchestration
- API Gateway implementation
- Service mesh (optional)
Dependencies: Phase 2 (database)
Phase 5: MCP Marketplace & Open Standard
File: PHASE_5_MCP_MARKETPLACE.md (to be created) Status: π Planned Priority: π’ Medium
Quick Summary:
- Formalize MCP specification
- Create TypeScript SDK
- Build marketplace backend/frontend
- Widget sandboxing
- Version management
Dependencies: Phase 4 (microservices)
Phase 6: Observability & Metrics
File: PHASE_6_OBSERVABILITY.md (to be created) Status: β Ready to Start Priority: π‘ High
Quick Summary:
- Implement structured logging (Winston/Pino)
- Prometheus metrics
- OpenTelemetry tracing
- Grafana dashboards
- Alert system
Dependencies: None (can run in parallel)
Phase 7: AI-Driven Analytics Dashboard
File: PHASE_7_ANALYTICS.md (to be created) Status: π Planned Priority: π’ Medium
Quick Summary:
- KPI aggregation API
- Admin dashboard with charts
- ML-based anomaly detection
- Recommendations engine
- Admin-only access control
Dependencies: Phase 6 (metrics infrastructure)
Phase 8: Mobile App Development
File: PHASE_8_MOBILE_APP.md (to be created) Status: π Planned Priority: π’ Medium
Quick Summary:
- React Native mobile app
- Push notifications
- Offline caching
- Responsive UI
- iOS/Android deployment
Dependencies: Phase 1 (authentication)
Phase 9: CI/CD Automation
File: PHASE_9_CICD.md (to be created) Status: β Ready to Start Priority: π‘ High
Quick Summary:
- GitHub Actions workflows
- Automated testing
- Docker image builds
- Staging/production deployment
- Secrets management
Dependencies: None (can run in parallel)
Phase 10: Data Privacy & Compliance
File: PHASE_10_COMPLIANCE.md (to be created) Status: π Planned Priority: π΄ Critical
Quick Summary:
- GDPR compliance implementation
- NIS2 directive compliance
- Audit logging system
- Data retention policies
- Incident response procedures
Dependencies: Phase 1 (auth), Phase 2 (database)
π Getting Started
For Agents
- Check Prerequisites: Review phase dependencies
- Read Phase Document: Understand all tasks and deliverables
- Verify Environment: Ensure all tools/services available
- Execute Tasks Sequentially: Follow task order in phase document
- Run Tests: Execute all test cases after each task
- Document Progress: Update phase status
Recommended Start Order
Week 1-2: π΄ Critical Foundation
- Phase 9: CI/CD (parallel) β Enables testing infrastructure
- Phase 6: Observability (parallel) β Enables monitoring
- Phase 1: Authentication β Enables secure access
Week 3-4: π΄ Database & Core
- Phase 2: PostgreSQL Migration β Scalability foundation
- Phase 10: Compliance (start) β Build on auth + database
Week 5-6: π‘ Advanced Features
- Phase 3: Vector Embeddings & LLM β Semantic search
- Phase 4: Microservices β Architecture refactor
Week 7-8: π’ Extensions
- Phase 5: MCP Marketplace β Ecosystem
- Phase 7: Analytics Dashboard β Business intelligence
- Phase 8: Mobile App β User reach
π Progress Tracking
Phase Status Definitions
- β Ready: All prerequisites met, can start immediately
- π In Progress: Work actively happening
- β Complete: All tasks done, tests passing
- βΈοΈ Blocked: Waiting on dependencies
- π Planned: Design complete, not yet ready
Test Coverage Requirements
- Unit tests: β₯ 80%
- Integration tests: β₯ 70%
- E2E tests: Critical paths covered
- Performance tests: Baseline established
Documentation Requirements
- API documentation updated
- Architecture diagrams current
- Developer guides complete
- Deployment procedures documented
π€ Agent Coordination
Communication Channels
- Task Assignment: Via git branch naming (e.g.,
agent/backend-engineer/phase1-task3) - Progress Updates: Commit messages with phase/task references
- Blockers: GitHub issues tagged with phase
- Handoffs: PR reviews between agents
Review Process
- Agent completes task
- Runs all test suites
- Creates PR with test results
- Another agent reviews
- Merge after approval
- Update phase status
π Support & Questions
For Implementation Questions:
- Refer to phase-specific documents
- Check existing codebase patterns
- Review architecture decisions in docs/planning/
For Technical Blockers:
- Create GitHub issue with
[BLOCKER]tag - Reference phase and task number
- Include error logs and attempted solutions
π Continuous Updates
This task system is living documentation. As phases complete:
- Update status in this README
- Add lessons learned to phase docs
- Create new phases as requirements emerge
- Refine estimates based on actuals
Last Updated: 2025-11-19 Current Phase: Phase 1 (Authentication) - Ready to Start Active Agents: None yet