Spaces:
Paused
π HVAD MANGLER VI NU? - KOMPLET OVERSIGT
Dato: 2025-11-24
Status: Opdateret efter alle nylige implementeringer
β HVAD ER FΓRDIGT
Phase 1: Unified Cognitive Architecture β 100% COMPLETE
- β UnifiedMemorySystem (4 memory types)
- β AutonomousTaskEngine (BabyAGI loop)
- β HybridSearchEngine (keyword + semantic + graph)
- β EmotionAwareDecisionEngine (PAL integration)
- β Holographic pattern correlation
- β Whole-part system modeling
Phase 2: GraphRAG + Role-Based Agents β ~85% COMPLETE
- β UnifiedGraphRAG (multi-hop reasoning, LLM synthesis)
- β StateGraphRouter (checkpoints, time-travel)
- β PatternEvolutionEngine (mutation, A/B testing)
- β AgentTeam (5 role-based agents)
- β PAL Agent (5 specialized modes)
- β MCP tool exposure (all components)
- β ChromaDB Vidensarkiv (persistent vector DB)
- β TaskRecorder (observation, learning, approval)
- β HansPedder Deep Integration
- β Document Generation Service (PowerPoint, Word, Excel)
- β UI & Frontend (Win11 Visual Shell + WidgeTDC Content)
- β Railway deployment fix (Dockerfile workspace dependencies)
β KRITISKE MANGELER (Priority 1)
1. Neo4j Graph Database β NOT STARTED
Status: Using implicit graph via patterns + CMA memory_relations
Impact: No explicit graph storage, limited graph queries
Priority: π΄ CRITICAL
Effort: 2-3 dage
Hvad mangler:
- Neo4j instance setup (Docker/local)
- Migrate implicit patterns to explicit edges
- Cypher query integration
- Graph persistence layer
- Replace CMA memory_relations with Neo4j
- Integration tests for Neo4j operations
Næste skridt:
# 1. Start Neo4j container
docker-compose up neo4j
# 2. Test connection
npm run test:neo4j
# 3. Migrate CMA memory_relations
npm run migrate:graph
2. Integration Tests β NOT STARTED
Status: Ingen integration tests
Priority: π΄ CRITICAL
Effort: 1 uge
Hvad mangler:
- End-to-end GraphRAG tests
- AgentTeam coordination tests
- StateGraphRouter workflow tests
- Cross-component integration tests
- TaskRecorder observation tests
- ChromaDB vidensarkiv tests
- Neo4j graph operation tests
Test framework:
- Vitest (allerede installeret)
- Playwright (for E2E)
3. Smoke Tests β NOT STARTED
Status: Ingen smoke tests
Priority: π΄ CRITICAL
Effort: 2-3 dage
Hvad mangler:
- Component startup tests
- API endpoint smoke tests
- MCP tool smoke tests
- Health check validation
- TaskRecorder initialization
- ChromaDB initialization
- Neo4j connection test
β οΈ HΓJ PRIORITET (Priority 2)
4. UnifiedGraphRAG Neo4j Upgrade β οΈ PARTIAL
Status: Bruger implicit graph
Priority: π‘ HIGH
Effort: 3-5 dage
Hvad mangler:
- Replace implicit graph med Neo4j
- Explicit edge storage
- Better graph queries
- Query expansion
- Multi-modal similarity
- Advanced graph traversal optimizations
5. AgentTeam Communication Protocol β οΈ PARTIAL
Status: Basic coordination implementeret
Priority: π‘ HIGH
Effort: 1 uge
Hvad mangler:
- Advanced agent communication protocol
- Agent-to-agent negotiation
- Dynamic agent spawning
- Agent specialization learning
- Cross-agent knowledge sharing
6. StateGraphRouter Enhancements β οΈ PARTIAL
Status: Basic functionality implementeret
Priority: π‘ HIGH
Effort: 1 uge
Hvad mangler:
- LLM-based node selection
- Dynamic graph construction
- Conditional branching logic
- Human-in-the-loop integration
- Graph visualization
7. UnifiedMemorySystem Enhancements β οΈ PARTIAL
Status: Placeholders i ProductionRuleEngine & Whole-Part analyse
Priority: π’ MEDIUM
Effort: 1 uge
Hvad mangler:
- Implementer
ProductionRuleEngine(udtræk regler fra mønstre) - Implementer
detectEmergentBehaviors(system-wide correlation) - Implementer
EvolutionRepositoryintegration (fix manglende metoder) - Forbedre
HolographicPatterndetektion (mere end bare keywords)
π MEDIUM PRIORITET (Priority 3)
8. Phase 3: Meta-Cognition β NOT STARTED
Status: Ikke implementeret
Priority: π’ MEDIUM
Effort: 3-6 uger
Komponenter:
- SelfReflectionEngine
- MetaLearningEngine
- RLHFAlignmentSystem
9. Performance Testing β NOT STARTED
Status: Ingen performance benchmarks
Priority: π’ MEDIUM
Effort: 3-5 dage
Hvad mangler:
- Latency benchmarks
- Throughput testing
- Memory usage profiling
- Graph traversal performance
- Vector search performance (ChromaDB)
- TaskRecorder observation overhead
10. Documentation β οΈ PARTIAL
Status: Basis dokumentation eksisterer
Priority: π’ MEDIUM
Effort: 1 uge
Hvad mangler:
- API documentation (OpenAPI/Swagger)
- MCP tool documentation (comprehensive)
- Usage examples (code samples)
- Integration guides (step-by-step)
- Troubleshooting guides
- TaskRecorder usage guide
- ChromaDB vidensarkiv guide
- Neo4j integration guide
π BUGS & ISSUES
TypeScript Build Errors
Status: Nogle fejl tilbage
Priority: π΄ CRITICAL
Effort: 1-2 timer
Kendte fejl:
-
timestampproperty iMcpContext(flere steder) -
emotionalStateproperty iDecision(AgentTeam.ts) -
semanticQueryproperty iMemorySearchQuery -
getSourceHealthmethod iCognitiveMemory -
UsagePatterniterator issues
Railway Deployment
Status: β
FIXED (workspace dependencies)
Priority: β
RESOLVED
Fix:
- β Dockerfile kopierer nu workspace package.json filer fΓΈr npm ci
- β Zustand dependency resolveres korrekt
π OVERALL PROGRESS
Phase 1: β 100% Complete
Phase 2: β οΈ ~85% Complete
- β ChromaDB implementeret
- β TaskRecorder implementeret
- β HansPedder deep integration
- β Neo4j mangler stadig
Phase 3: β 0% Complete
Infrastructure: β οΈ ~60% Complete
- β Basic components
- β ChromaDB (vector DB)
- β TaskRecorder
- β Neo4j (graph DB)
- β οΈ Partial integrations
Testing: β 0% Complete
- β Integration tests
- β Performance tests
- β Smoke tests
π― KRITISK VEI (Critical Path)
1. Neo4j Setup (2-3 dage) π΄ CRITICAL
β
2. TypeScript Build Fixes (1-2 timer) π΄ CRITICAL
β
3. Integration Tests (1 uge) π΄ CRITICAL
β
4. Smoke Tests (2-3 dage) π΄ CRITICAL
β
5. Documentation (1 uge) π‘ HIGH
β
6. Enhancements (ongoing) π‘ HIGH
β
7. Phase 3 (3-6 uger) π’ MEDIUM
π ANBEFALEDE NΓSTE SKRIDT
Uge 1: Infrastructure Completion
Setup Neo4j (2-3 dage) π΄
- Docker container
- Schema design
- Migration fra CMA memory_relations
- Cypher query integration
Fix TypeScript Errors (1-2 timer) π΄
- Fix
timestampproperty issues - Fix
emotionalStateproperty - Fix
semanticQueryproperty - Fix
getSourceHealthmethod
- Fix
Integration Tests (3-4 dage) π΄
- TaskRecorder tests
- ChromaDB tests
- GraphRAG tests
- AgentTeam tests
Uge 2: Testing & Documentation
Smoke Tests (2-3 dage) π΄
- Component startup
- Health checks
- Basic functionality
Documentation (2-3 dage) π‘
- TaskRecorder guide
- ChromaDB guide
- API documentation
Uge 3+: Enhancements
- Neo4j integration i UnifiedGraphRAG
- AgentTeam communication protocol
- StateGraphRouter enhancements
- Phase 3 components
π‘ QUICK WINS (Kan gΓΈres nu)
- Fix TypeScript Errors - 1-2 timer
- Neo4j setup - Docker container (1-2 timer)
- Smoke tests - Quick validation (2-3 timer)
- TaskRecorder tests - Basic integration tests (1 dag)
- ChromaDB tests - Vector search tests (1 dag)
β RECENT COMPLETIONS
β TaskRecorder (2025-11-24)
- Observes all tasks automatically
- Learns patterns from repeated tasks
- Suggests automation (requires approval)
- Complete security model
β ChromaDB Vidensarkiv (2025-11-24)
- Persistent vector database
- HuggingFace embeddings
- Continuous learning
- Widget integration
β HansPedder Deep Integration (2025-11-24)
- Phase 1 components integrated
- ProjectMemory protocol
- Context-aware orchestration
β Document Generation Service (2025-11-26)
- PowerPoint: MCP-based generation (Titles, Content, Images)
- Word: Structured template generation (Reports, Proposals, Manuals)
- Excel: Financial & Statistical sheet generation
- Architecture: Event-driven job queue system
β UI & Frontend (2025-11-24)
- Windows 11 Copilot UI: Visual shell, glassmorphism & layout clone (hosting WidgeTDC engine)
- ChatWidget: Integrated chat interface for WidgeTDC agents
- HansPedder Widgets: Visualization of system logs & insights
- ScraperWidget: Interface for real-time data collection
β Railway Deployment Fix (2025-11-24)
- Dockerfile workspace dependencies
- Zustand import resolution
β Bug Fixes (2025-11-24)
- QueryIntent/string type mismatches
- Empty messages array validation
- Decision interface emotionalState
π TODO LIST (Prioriteret)
π΄ CRITICAL (Do First)
- Neo4j Graph Database setup
- Fix TypeScript build errors
- Integration tests
- Smoke tests
π‘ HIGH (Do Next)
- UnifiedGraphRAG Neo4j upgrade
- AgentTeam communication protocol
- StateGraphRouter enhancements
- Documentation
π’ MEDIUM (Do Later)
- Phase 3 components
- Performance testing
- Advanced enhancements
π΅ ARCHITECTURE ENHANCEMENTS (From Analysis)
- Type-Safe Widget Registry: Migrate
widgetRegistry.jsto TypeScript class with generics. - Standardized Widget Lifecycle: Implement
BaseWidgetpattern withonInit,onMount,onDestroy. - Audit Logging: Implement
audit_logsschema and service for compliance. - Data Aggregation Service: Create service to merge data from OpenSearch, Postgres, and MinIO.
- MCP Router Pattern: Formalize
MCPRouterclass and message types in backend.
Status: β
Phase 1 Complete, β οΈ Phase 2 ~85%, β Phase 3 Not Started
Critical Path: Neo4j β TypeScript Fixes β Testing β Documentation β Enhancements β Phase 3
Næste umiddelbare handling: Setup Neo4j Graph Database + Fix TypeScript Errors