Spaces:
Paused
Paused
WidgeTDC - TODO & Roadmap
Last Updated: 2025-12-08 Current Phase: Phase 2 (Infrastructure & Testing) Status: [DONE] Phase 1 Complete | [WIP] Phase 2 In Progress
[DONE] Phase 1: COMPLETE (100%)
Infrastructure
- Docker Compose setup (PostgreSQL, Redis, Neo4j)
- PM2 process management configuration
- Winston production logging
- Resource limits and auto-restart policies
Database Layer
- Prisma ORM integration
- PostgreSQL migration from SQLite
- pgvector extension setup
- Complete schema (20+ tables)
- Migration scripts
Vector Store
- PgVectorStoreAdapter implementation
- ChromaDB -> PgVector migration
- Backward compatibility wrapper
- Namespace isolation
Semantic Search
- Multi-provider embedding service
- OpenAI embeddings support
- HuggingFace embeddings support
- Transformers.js local embeddings
- Auto-embedding generation on insert
- Text-based semantic search
- Vector-based search
Event System
- Redis Event Bus implementation
- Production/development mode switching
- Persistent event storage
- Distributed architecture support
Learning Loops
- Autonomous Task Engine
- Memory optimization tasks
- Nightly consolidation scheduling
- Pattern extraction (placeholder)
Documentation
- Architecture documentation with diagrams
- Quick start guide
- Semantic search guide
- Enterprise setup guide
- Environment configuration guide
- Updated README
Frontend Build System (2025-11-26)
- Fixed CSS build errors in App.css
- Rebuilt all @keyframes animations with proper syntax
- Converted all @apply directives to standard CSS
- Migrated to Tailwind CSS v4 compatibility
- Verified successful build (npm run build)
Scripts & Automation (2025-11-26)
- Created update_agent.ps1 (PSScriptAnalyzer compliant)
- Created update_agent_github.ps1 (PSScriptAnalyzer compliant)
- Created update_agent_readme.ps1 (PSScriptAnalyzer compliant)
- Fixed PowerShell approved verb issues
- Removed unused variables from scripts
- Updated ARCHITECTURE.md with latest changes
[WIP] Phase 2: Infrastructure & Testing (CURRENT - 40%)
Priority: [HIGH] CRITICAL
Timeline: 2-3 weeks
Goal: Production-ready infrastructure with comprehensive testing
2.1 Graph Database ([HIGH] HIGH - Week 1)
- Setup Neo4j instance (Docker)
- Design graph schema for entities and relations
- Migrate CMA memory_relations to Neo4j
- Implement Cypher query layer
- Graph persistence integration
- Replace implicit graph with explicit Neo4j storage
2.2 Testing Infrastructure ([HIGH] HIGH - Week 1-2)
Smoke Tests ([HIGH] CRITICAL)
- Component startup validation
- API endpoint smoke tests
- MCP tool smoke tests
- Health check validation
- TaskRecorder initialization tests
- Database connectivity tests
Integration Tests ([HIGH] HIGH)
- End-to-end GraphRAG tests
- AgentTeam coordination tests
- StateGraphRouter workflow tests
- Cross-component integration tests
- TaskRecorder observation tests
- Neo4j graph integration tests
- Vector search integration tests
Unit Tests ([MEDIUM] MEDIUM)
- Embedding service tests
- Vector store adapter tests
- Event bus tests
- Memory system tests
- MCP router tests
2.3 Performance & Monitoring ([MEDIUM] MEDIUM - Week 2-3)
Performance Testing
- Load testing (concurrent users)
- Stress testing (max throughput)
- Embedding generation benchmarks
- Vector search optimization
- Graph traversal performance
- Memory usage profiling
- Latency benchmarks
Health Checks
- Database health endpoint
- Redis health endpoint
- Neo4j health endpoint
- Vector store health check
- Overall system health dashboard
[DATE] Phase 3: Security & Governance (NEXT - 0%)
Priority: [HIGH] CRITICAL
Timeline: 3-4 weeks
Goal: Enterprise-grade security and compliance
3.1 Authentication & Authorization
- JWT token generation and validation
- OAuth 2.0 integration (Google, Microsoft)
- User registration and login
- Role-Based Access Control (RBAC)
- API key management
- Session management
3.2 Row Level Security
- Implement RLS policies in PostgreSQL
- User-scoped vector search
- Organization-level data isolation
- Cross-organization sharing rules
- Tenant isolation validation
3.3 Human-in-the-Loop
- Approval workflow system
- Task risk classification (safe, medium, high)
- Approval queue UI component
- Notification system for pending approvals
- Kill switch for autonomous operations
- Audit trail for approvals
3.4 Audit & Compliance
- Comprehensive audit logging
- User action tracking
- Data access logging
- Export audit logs
- Compliance reports (GDPR, SOC2)
- Data retention policies
Phase 4: Agent System Enhancements (PLANNED - 0%)
Priority: [MEDIUM] MEDIUM
Timeline: 4-6 weeks
Goal: Advanced agent capabilities and coordination
4.1 UnifiedGraphRAG Enhancements
- Query expansion
- Multi-modal similarity
- Advanced graph traversal optimizations
- Hybrid search (semantic + keyword)
- Query caching layer
- Result re-ranking
4.2 AgentTeam Communication
- Advanced agent communication protocol
- Agent-to-agent negotiation
- Dynamic agent spawning
- Agent specialization learning
- Cross-agent knowledge sharing
- Collaborative task execution
4.3 StateGraphRouter Enhancements
- LLM-based node selection
- Dynamic graph construction
- Conditional branching logic
- Graph visualization
- Workflow templates
- State persistence
[META] Phase 5: Meta-Cognition (COMPLETE - 100%)
Priority: [LOW] LOW
Timeline: 6-8 weeks
Goal: Self-improving AI system
5.1 Self-Reflection Engine
- Self-assessment of agent performance
- Error pattern analysis
- Strategy effectiveness evaluation
- Continuous improvement loop
- Performance metrics tracking
5.2 Meta-Learning Engine
- Learning-to-learn algorithms
- Transfer learning across domains
- Meta-optimization strategies
- Cross-task knowledge sharing
- Adaptive learning rates
5.3 RLHF Alignment System
- Human feedback collection
- Reward model training
- Alignment optimization
- Safety constraints
5.4 Plugin System
- Plugin architecture
- Plugin hooks (onLoad, onQuery, onResult)
- Plugin API system
- Dependency management
- Example plugins
5.5 Browser Extension
- Chrome extension manifest
- Content script for page capture
- Floating action buttons
- Sidebar interface
- AI-powered text selection
- Semantic search integration
[BUG] Known Issues & Limitations
High Priority ([HIGH] Fix in Phase 2)
-
getByIdnot implemented in PgVectorStoreAdapter - Per-namespace statistics limited
- Missing health check endpoints
- No smoke tests
Medium Priority ([MEDIUM] Fix in Phase 3)
- No cursor-based pagination yet
- Limited batch embedding optimization
- First Transformers.js run downloads model (~50MB)
Low Priority ([LOW] Fix Later)
- Console warnings in development mode
- Missing some JSDoc comments
- Test coverage incomplete
Success Metrics
Phase 2 Completion Criteria
- Neo4j operational and integrated
- All smoke tests passing
- 50%+ integration test coverage
- Health checks implemented
- Performance benchmarks established
Phase 3 Completion Criteria
- All authentication flows working
- RLS policies enforced
- Approval workflow operational
- Audit logging complete
- Security documentation updated
Overall Quality Targets
- 80%+ unit test coverage
- 70%+ integration test coverage
- <1% error rate in production
- <100ms p95 for semantic search
- 99.9% uptime
[GOAL] IMMEDIATE NEXT ACTIONS (This Week)
[DONE] Completed This Session (2025-11-26)
- Setup Neo4j Docker container
- Design graph schema
- Create migration scripts
- Implement smoke test framework
- Add component startup tests
- Add health check tests
- Create integration test suite
- Add GraphRAG integration tests
- Implement advanced agent features
- Add meta-cognition systems
- Implement multi-modal support
- Add observability system
- Create external integrations
Next Priority: Phase 3 Security
- Implement JWT authentication
- Add OAuth 2.0 integration
- Setup RLS policies
- Create approval workflow UI
- Implement audit logging
Priority Legend:
- [HIGH] HIGH - Critical/Blocking
- [MEDIUM] MEDIUM - Important but not urgent
- [LOW] LOW - Nice to have
Status Legend:
- [DONE] Complete
- [WIP] In Progress
- [DATE] Planned
- [IDEA] Idea/Proposed
Current Focus: Phase 2 In Progress | Phase 4-6 Advanced Features Complete
Next Milestone: Phase 3 - Security & Governance
Target: Production-ready system by end of Phase 3
Last Updated: 2025-12-08