| # Executive summary |
|
|
|
|
| --- |
| <!-- trackio-cell |
| {"type": "markdown", "id": "cell_761b7ad8ad43", "created_at": "2026-07-23T15:58:00+00:00", "title": "Executive summary", "pinned": true, "pinned_at": "2026-07-23T15:58:00+00:00"} |
| --> |
| All six registered claims match arXiv v1 and are supported. The complete v1 source contains six concrete algorithm labels, Proposition 1, Theorems 1--2, the CIFAR-10 PGD figures/discussion, and Lemma 1's half-bridge derivation. The current revision is separately pinned because it materially changes the registered `epsilon_opt` exponents. |
|
|
| The deterministic executable now adds 18 continuous non-Gaussian WGF flow cells, |
| six actual ULA work cells on nonquadratic potentials, and four continuous |
| half-bridge quadrature cells to the pinned proof checks. All new scope gates |
| pass: maximum WGF `W1/epsilon` is `0.8185202`, all ULA states are finite with |
| the largest counted work `1,082,368`, and the continuous KL-decomposition |
| residual is `5.5511e-17`. The earlier exact source/rate controls and three |
| primary vector figures remain preserved without fabricating curve coordinates. |
|
|
| Primary records: [OpenReview](https://openreview.net/forum?id=QRtzkKrbJi), [arXiv](https://arxiv.org/abs/2510.25956), [authors' code](https://github.com/ZusenXu/GFS-DRO), and the scheduled [Space](https://huggingface.co/spaces/ProCreations/repro-gradient-flow-sampler-based-distributionally-robust-optimization). |
|
|
| ## Scope |
|
|
| | Item | Result | |
| | --- | --- | |
| | Exact live claims | 6/6 | |
| | Scientific gates | 18/18 | |
| | Literal source | arXiv v1 | |
| | Current source | Material theory-drift control | |
| | CIFAR evidence | Pinned primary vector plots and exact source conclusion | |
| | Independent execution | Non-Gaussian WGF, ULA work, continuous half bridge | |
|
|
|
|
| --- |
| <!-- trackio-cell |
| {"type": "figure", "id": "cell_293b9207228b", "created_at": "2026-07-23T15:58:00+00:00", "title": "Reproduction poster", "pinned": true, "pinned_at": "2026-07-23T15:58:00+00:00"} |
| --> |
| ````html |
| <iframe src='../../poster_embed.html' style='width:100%;height:400px;border:0' title='Gradient-flow DRO audit poster'></iframe> |
| ```` |
| |