| # Processed + UI Finalized Merge Report | |
| Generated UTC: 2026-07-23T17:22:53Z | |
| ## Decision | |
| The final package uses the user-attached `processed(1)` archive as the base because it contains the fuller Phase 4 backend/audit implementation and its associated migration/test coverage. The UI-specific responsive fixes from `ui-finalized` were then applied on top. | |
| ## Applied UI corrections | |
| - Changed mobile quick-navigation hiding from `.quicknav a span{display:none}` to `.quicknav a>span:not(.medallion){display:none}` so icon medallions remain visible on narrow screens. | |
| - Added `aria-label` values to every quick-navigation tab so icon-only mobile navigation remains accessible. | |
| - Kept the top toolbar controls visible below `980px` by overriding the previous `.toolbar-cluster{display:none}` behavior. | |
| - Allowed the top bar to wrap and scroll horizontally where needed on mobile/tablet widths. | |
| - Added `test_mobile_navigation_keeps_icons_and_touch_controls_visible` to lock the regression. | |
| ## Preserved backend/audit work from processed base | |
| - Phase 4 execution command contracts and error taxonomy. | |
| - Durable execution audit/session files. | |
| - SQLite and PostgreSQL execution-audit migrations. | |
| - Phase 4 state-machine, validation-order, locking/durability, client-routing, and adjacent-gap audit tests. | |
| - Execution client-path and adjacent-path audit scripts. | |
| ## Verification | |
| - Full local pytest suite: `364 passed, 1 warning`. | |
| - UI/frontend contract subset: `25 passed`. | |
| - Execution client-path audit: `0 findings`. | |
| - Phase 4 adjacent-path audit: `0 findings`. | |
| - Repository metadata verifier: `PASS`. | |
| - Secret scan: `0 findings`. | |
| - Migration checks: `PASS` for SQLite and PostgreSQL migration inventories. | |
| - Runbook consistency: `CONSISTENT`. | |
| ## Remaining status | |
| This is still a Paper-only working package. Testnet, Live, autonomous execution, credential rotation, upstream approval, independent audit, and final sign-off remain external/operator-controlled gates. | |