production-rag-backend / docs /pre-phase /ground_truth_source_analysis.md
UDHOV's picture
Sync from GitHub via hub-sync
bef3cc6 verified
|
Raw
History Blame Contribute Delete
2.11 kB

Ground Truth Source Analysis

Project 02 | Pre-Phase 1 Activity

Overview

This document tracks which files from @data/raw were utilized to generate the initial 25 Ground Truth QA pairs (Track A).

Total Files in Corpus: 33 Files Analyzed for QA: 10 Status: Initial batch (25/60) complete.

Analysis Summary Table

Filename Domain Pages QA Pairs Generated Key Topics Covered
Access-to-Information-2023-annual-report.pdf Financial 11 3 FY23 metrics, page views, data indicators.
2605.02520v1.pdf Academic 15 3 RAG benchmarking, DeepEval metrics, retrieval strategies.
Python-tutorial-pdf1.pdf Technical ~100 4 Author, Release date, Control flow, Coding style.
AtI-annual-report-2012.pdf Financial 80 2 Transparency theme, data accuracy disclaimers.
AtI-annual-report-2014.pdf Financial 84 1 Rights and permissions contact info.
2604.27415v1.pdf Academic 22 2 ChipLingo framework, EDA-Bench accuracy.
Python-tutorial-pdf2.pdf Technical 139 2 Function definitions, Web pages.
FAO_EMSTOT.pdf Academic 10 2 Greenhouse gas types, IPCC global warming potentials.
WB_CLEAR.pdf Technical 17 2 CLEAR Water Dashboard purpose, generation date.
Access-to-Information-2016-annual-report.pdf Financial 7 2 ATI Policy 6th year anniversary, WBG Finances.
worldbankSECBOS-8b71cac3...pdf Financial 67 2 President Ajay Banga, 2025 Fiscal Year period.

Clarification on Coverage

We did not read all 33 documents for question generation. To meet the "Track A" milestone efficiently, we focused on 10 representative documents that span all three required domains (financial, academic, technical).

The remaining 23 documents were:

  1. Audited (for structure/parsing issues) in docs/audit_pre_phase.md.
  2. Reserved for generating the remaining 35-45 QA pairs during Phase 1 development to ensure the dataset covers the full breadth of the corpus.

Last Updated: May 2026