section,item,description,unit,qty,rate
Substructure,A1,Excavation for foundation (machine dig),m3,350,340
Substructure,A2,Blinding concrete grade 20,m3,40,1600
Substructure,A3,Concrete grade 35 in foundations,m3,120,1750
Substructure,A4,Reinforcement bar supply and fix (T16),kg,15000,11.5
Substructure,A5,Formwork to foundation faces,m2,800,460
Superstructure,B1,Masonry wall in cement sand mortar,m2,650,660
Superstructure,B2,Reinforced concrete column grade 35,m3,85,1850
Superstructure,B3,Formwork to columns,m2,900,470
Superstructure,B4,Reinforcement bar supply and fix (T20),kg,22000,12
Superstructure,B5,Precast concrete slab panel,m2,1400,1450
Finishes,C1,Cement sand plastering to wall,m2,1300,175
Finishes,C2,Emulsion painting to wall,m2,2400,52
Finishes,C3,Ceramic wall tiling,m2,900,2850
Finishes,C4,Waterproofing membrane to roof,m2,700,265
Finishes,C5,Ceiling false ceiling with metal frame,m2,1100,380
External Works,D1,Demolition of existing structures,m3,90,480
External Works,D2,Excavation and disposal of spoil,m3,420,355
External Works,D3,uPVC drainage pipe 110mm,m,320,285
External Works,D4,Road base and asphalt surfacing,m2,1500,620
External Works,D5,Scaffolding to external walls,m2,1200,115
Services,E1,Electrical installation point,no.,180,950
Services,E2,Plumbing installation point,no.,120,1050
Services,E3,Fire alarm detection point,no.,95,1250
Services,E4,LV switchboard supply and install,no.,2,185000
Joinery,F1,Hollow core door with frame and ironmongery,no.,45,2750
Joinery,F2,Aluminium window with glazing,m2,220,3100
Joinery,F3,Scaffolding to external walls,m2,1200,118