phi-drift / docs /DEVELOPMENT_PHASES.md
crexs's picture
sync: update docs/DEVELOPMENT_PHASES.md
8a70078 verified
|
Raw
History Blame Contribute Delete
1.56 kB

PHI // DRIFT β€” Development Phases

Saved 2026-05-28


Phase 1 β€” Finish Unification (Phases 3–5)

Do this first. Until DRIFT and hive_mind are fully consolidated into infj_bot, any tests you write against fragmented modules will need to be rewritten. Stabilize the structure before building on top of it.

Phase 2 β€” Test Coverage

Once the unified architecture is stable, systematically cover the cognitive modules that currently have zero tests. Starting here before unification means rework.

Phase 3 β€” GPU Acceleration

With a clean, tested codebase, add the GPU inference path for local models. This is a contained technical addition that doesn't need to block the others.

Phase 4 β€” Observer / Dashboard Polish

Can run in parallel with Phase 3. The cognitive state is the interesting thing to observe β€” better to do this once the unified architecture is settled so the dashboard reflects the real structure.

Phase 5 β€” Outward-Facing Positioning

A product narrative, landing page, or research-facing one-pager. Do this last so it reflects the finished system β€” but it can be drafted in parallel once you know what's in scope.


Order rationale

Step Why it comes here
Unification first Fragmented modules mean test rework later
Tests second You can't trust what you can't measure
GPU third Contained addition, clean codebase makes it easy
Dashboard fourth Reflects real unified architecture
Positioning last Describes the finished thing