Generic City of Calgary SWMR workflow

Kincora Phase 2 is a regression fixture only. Production functions do not contain Kincora object IDs, values, geometry, or report conclusions.

MCP sequence

  1. upload_model — immutable EPA SWMM INP upload and inventory.
  2. set_report_details — project, consultant, professional, site, objective, methodology and administrative information.
  3. set_report_configuration — project-specific criteria, major routes, special flow limits, facility classifications, drawing inventory, applicable reports and checklist overrides.
  4. run_simulation — legacy-default normalization where required, isolated execution, execution-integrity gate, database creation and RPT reconciliation.
  5. get_table_catalog / query_results — complete tokenized input and result review rather than top-N-only evidence.
  6. preliminary_design_review, get_reconciliation, calgary_screening — deterministic QA/QC and preliminary City screening.
  7. get_timeseries and controlled run_scenario calls where authorized.
  8. generate_report — editable SWMR DOCX plus immutable audit ZIP, model listings, model schematic, depth-velocity figure and readiness registers.

Execution and readiness gates

  • An invalid hydraulic run produces an Input/Configuration Review and no hydraulic screening conclusions.
  • Missing drawings, approved criteria, boundary conditions, current-source verification, or professional fields remain explicit readiness gaps.
  • Generated figures do not replace drawing-to-model reconciliation.
  • The output is never represented as approved, authenticated, or submission ready solely because the automated workflow completed.

Project-neutral design

  • Object selection is derived from each uploaded INP or explicit project configuration.
  • Unit labels and effective solver defaults follow the model unit system.
  • Coordinates and vertices drive schematic geometry; incomplete coordinate sets receive a deterministic topology fallback.
  • Criteria and facility classifications are session-scoped and archived with the report package.
  • Kincora-specific numerical pins remain only in regression tests.