ResearchIT / docs /phases

Commit History

Phase 6.5 Day 1: Real Qdrant cosine scores (A1) + verification timestamp (A2)
3f58d41

siddhm11 commited on

Phase 6.1+6.2+6.3: Wire all 37 features into caller + health endpoint
5856b85

siddhm11 commited on

Phase 6: LightGBM reranker integration (37-feature schema, 141-tree model)
63b37fd

siddhm11 commited on

Phase 5: Cold-Start Onboarding + UI Redesign
7106701

siddhm11 commited on

Phase 4 complete + Phase 4.5 instrumentation foundation
61d5f0d

siddhm11 commited on

Phase 3 complete: Hybrid Semantic Search pipeline
d5a6f3e

siddhm11 commited on