Spaces:
Sleeping
PRD β Product Requirements Document
Purpose
Read this file at phase start to understand requirements. Contains full product vision, all phases and acceptance criteria. Do not implement anything not listed here without user confirmation.
Product Overview
Product Name: [name] Description: [one paragraph max] Primary User: [who is this for] Core Problem: [what problem does this solve]
Success Metrics
[metric one β measurable] [metric two β measurable] [metric three β measurable]
Technical Constraints
[constraint one] [constraint two] [constraint three]
Phase Overview
Phase 1 β [name] β [one liner] Phase 2 β [name] β [one liner] Phase 3 β [name] β [one liner] Phase 4 β [name] β [one liner] Phase 5 β [name] β [one liner] Phase 6 β [name] β [one liner] Phase 7 β [name] β [one liner] Phase 8 β [name] β [one liner]
Phase 1 β [Phase Name]
Goal
[One paragraph β what this phase achieves]
Features
[feature name] β [one liner description] [feature name] β [one liner description] [feature name] β [one liner description]
Acceptance Criteria
[specific testable criterion] [specific testable criterion] [specific testable criterion]
Out of Scope for This Phase
[what is explicitly NOT included] [what is explicitly NOT included]
Phase 2 β [Phase Name]
Goal
[One paragraph]
Features
[feature name] β [one liner] [feature name] β [one liner]
Acceptance Criteria
[criterion] [criterion]
Out of Scope for This Phase
[excluded item]
Phase 3 β [Phase Name]
Goal
[One paragraph]
Features
[feature name] β [one liner]
Acceptance Criteria
[criterion]
Out of Scope for This Phase
[excluded item]
Phase 4 β [Phase Name]
Goal
[One paragraph]
Features
[feature name] β [one liner]
Acceptance Criteria
[criterion]
Out of Scope for This Phase
[excluded item]
Phase 5 β [Phase Name]
Goal
[One paragraph]
Features
[feature name] β [one liner]
Acceptance Criteria
[criterion]
Out of Scope for This Phase
[excluded item]
Phase 6 β [Phase Name]
Goal
[One paragraph]
Features
[feature name] β [one liner]
Acceptance Criteria
[criterion]
Out of Scope for This Phase
[excluded item]
Phase 7 β [Phase Name]
Goal
[One paragraph]
Features
[feature name] β [one liner]
Acceptance Criteria
[criterion]
Out of Scope for This Phase
[excluded item]
Phase 8 β [Phase Name]
Goal
[One paragraph]
Features
[feature name] β [one liner]
Acceptance Criteria
[criterion]
Out of Scope for This Phase
[excluded item]
Phase Gate Rules
- Do not start a phase without user confirmation
- Do not proceed to next phase if current tests are failing
- Do not implement features outside current phase scope
- Mark acceptance criteria as complete before closing phase
- All criteria must be checked before phase is marked COMPLETE
Rules for This File
- Fill in placeholders before starting Phase 1
- Do not modify acceptance criteria mid phase
- Do not add features to a phase that is in progress
- New features go into the next available phase or a new phase