Commit History

Today

  1. LIBERO: release the H16 model reported in the paper (16-step chunks, replan 16)

    Verified signature
    da65309

Yesterday

  1. Link the arXiv paper (2610.26564)

    Verified signature
    f495110

2 days ago

  1. Update project links and citation

    ce4ff2e
  2. Use current module names in model configs and checkpoint metadata; link the paper

    Verified signature
    c7eca00
  3. Update model card

    Verified signature
    b3e4c42
  4. Upload PrismWAM checkpoints

    Verified signature
    3a0762d
  5. initial commit

    Verified signature
    5516701