content stringlengths 0 24.8k |
|---|
Design Achievement – Situated near a large high school and the surrounding suburbs, the Garden Market Shopping Center draws in a diverse and active crowd throughout the week. To further position the development as a community destination for neighborhood customers in Western Springs, Illinois, Federal Realty Inve... |
Setup so team can track new CD and BN time related to incorporating value-engineering revisions into a new set of bid documents for the project.
|
Hourly services to create and issue conformed construction documents
|
Peer review of the MEP design documents for the TD Ameritrade build-out at 600 West Chicago.
|
Design Achievement
The building owner wanted to assess the option of upgrading its mechanical systems and replace an outmoded hot water heater unit with a new, more efficient model. DLR Group's engineering team was hired to analyze current need and estimate costs of replacement.
Scope Summary
DLR Group's engineeri... |
DLR Group understands that to prolong the viability of jail division lll annex and division lV, it is the County's intention to perform a roof replacement on both buildings. We further understand that the County, through their arrangement with your Gompany, is in administration of the County's JOC Program. We further... |
Hourly services to create and issue conformed construction documents
|
The State of Illinois mandates that every public school building be inspected annually to assure compliance with the minimum standards necessary to ensure the health and safety of students. Every ten years all buildings must be resurveyed by an architect licensed by the State of Illinois. All work necessary to bring ... |
Hourly services to create and issue conformed construction documents
|
Review and inspection of mobile classrooms. Necessary in order to review existing conditions and complete the forms required by the ROE.
|
We understand that Hotel Chicago wishes to install roof anchors at the roof of the 15 story tower to provide anchor points for window washing tie offs. DLR will work with a window washing anchor manufacturer (i.e. Probel or equal) to confirm layout for location, spacing and quantity of roof anchors for the window was... |
DLR Group understands that to prolong the viability of jail division lll annex and division lV, it is the County's intention to perform a roof replacement on both buildings. We further understand that the County, through their arrangement with your Gompany, is in administration of the County's JOC Program. We further... |
We understand that Hotel Chicago wishes to install roof anchors at the roof of the 15 story tower to provide anchor points for window washing tie offs. DLR will work with a window washing anchor manufacturer (i.e. Probel or equal) to confirm layout for location, spacing and quantity of roof anchors for the window was... |
DLR Group understands that to prolong the viability of jail division lll annex and division lV, it is the County's intention to perform a roof replacement on both buildings. We further understand that the County, through their arrangement with your Gompany, is in administration of the County's JOC Program. We further... |
Review and inspection of mobile classrooms. Necessary in order to review existing conditions and complete the forms required by the ROE.
|
1). Provide architectural demolition drawings to obtain a permit via City of Chicago's Self-Certification program. Include all notes, tables and plans as necessary.2). Provide building permit application documents as needed. Coordinate with the permit expeditor John Lyle & Associates. |
LEED fundamental and enhanced commissioning services associated with the pursuit of LEED Gold Commercial Interiors certification at HSBC’s office. Functional performance testing of all energy using HVAC, plumbing and lighting equipment were conducted. Equipment functional performance testing demonstrated that the ins... |
We understand that Hotel Chicago wishes to install roof anchors at the roof of the 15 story tower to provide anchor points for window washing tie offs. DLR will work with a window washing anchor manufacturer (i.e. Probel or equal) to confirm layout for location, spacing and quantity of roof anchors for the window was... |
Provide architecutre, engineering, and cost estimating services to conduct Health / Life Safety surveys for the Matea Valley High School part of Indian Prairie Community Unit School District (CUSD) 204 and consisting of approximately 462,000 square feet.
|
Chicago Energy Bechmarking Compliance assistance of 8 facilities located in Chicago, IL. DLR Group shall facilitate the benchmarking process and provide all services to ensure the facility is in compliance with the Chicago Benchmarking ordiance.
The following information will be required to be provided to DLR Group ... |
1). Provide architectural demolition drawings to obtain a permit via City of Chicago's Self-Certification program. Include all notes, tables and plans as necessary.2). Provide building permit application documents as needed. Coordinate with the permit expeditor John Lyle & Associates. |
Chicago Energy Bechmarking Compliance assistance of 8 facilities located in Chicago, IL. DLR Group shall facilitate the benchmarking process and provide all services to ensure the facility is in compliance with the Chicago Benchmarking ordiance.
The following information will be required to be provided to DLR Group ... |
See below for proposed scope of work and NTE:
· Review of existing MEP Drawings for areas being served by existing AHU HV-1.
· DLR Group will perform one site visit to collect data on the existing AHU, building construction & installation.
· DLR Group will provide a high level load estimate based on Trane TRACE 70... |
We understand that Hotel Chicago wishes to install roof anchors at the roof of the 15 story tower to provide anchor points for window washing tie offs. DLR will work with a window washing anchor manufacturer (i.e. Probel or equal) to confirm layout for location, spacing and quantity of roof anchors for the window was... |
See below for proposed scope of work and NTE:
· Review of existing MEP Drawings for areas being served by existing AHU HV-1.
· DLR Group will perform one site visit to collect data on the existing AHU, building construction & installation.
· DLR Group will provide a high level load estimate based on Trane TRACE 70... |
1). Provide architectural demolition drawings to obtain a permit via City of Chicago's Self-Certification program. Include all notes, tables and plans as necessary.2). Provide building permit application documents as needed. Coordinate with the permit expeditor John Lyle & Associates. |
1). Provide architectural demolition drawings to obtain a permit via City of Chicago's Self-Certification program. Include all notes, tables and plans as necessary.2). Provide building permit application documents as needed. Coordinate with the permit expeditor John Lyle & Associates. |
We understand that Hotel Chicago wishes to install roof anchors at the roof of the 15 story tower to provide anchor points for window washing tie offs. DLR will work with a window washing anchor manufacturer (i.e. Probel or equal) to confirm layout for location, spacing and quantity of roof anchors for the window was... |
1). Provide architectural drawings for the demolition of interior non-load bearing walls and all associated MEP items to obtain a permit via City of Chicago's Self-Certification program. Include all notes, tables and plans as necessary.
2). Permit coordination and acquisition to be handled by DLR Group.
3). Landlor... |
The Illinois Veterans’ Home in Quincy provides long term skilled nursing care to approximately 380 elderly persons and employs over 500 direct care and support staff. The Home has continued to experience Legionnaires’ Disease outbreaks despite remedial efforts that have taken place since 2015. To date there have been... |
Chicago Energy Bechmarking Compliance assistance of 8 facilities located in Chicago, IL. DLR Group shall facilitate the benchmarking process and provide all services to ensure the facility is in compliance with the Chicago Benchmarking ordiance.
The following information will be required to be provided to DLR Group ... |
We understand that Hotel Chicago wishes to install roof anchors at the roof of the 15 story tower to provide anchor points for window washing tie offs. DLR will work with a window washing anchor manufacturer (i.e. Probel or equal) to confirm layout for location, spacing and quantity of roof anchors for the window was... |
NOT TO SPEC
Design Achievement: Located in the center of this large community college campus, Space 2000 in the College of DuPage’s Student Resource Center Building provides a flexible venue for a variety of important campus functions. Board meetings, student engagement events and other special gatherings are acco... |
See Exhibit A of the Signed contract on the Links tab.
|
1). Provide architectural drawings for the demolition of interior non-load bearing walls and all associated MEP items to obtain a permit via City of Chicago's Self-Certification program. Include all notes, tables and plans as necessary.
2). Permit coordination and acquisition to be handled by DLR Group.
3). Landlor... |
Chicago Energy Bechmarking Compliance assistance of 8 facilities located in Chicago, IL. DLR Group shall facilitate the benchmarking process and provide all services to ensure the facility is in compliance with the Chicago Benchmarking ordiance.
The following information will be required to be provided to DLR Group ... |
See Exhibit A of the Signed contract on the Links tab.
|
Design Narrative: As Benedictine University (BenU) seeks to define the next chapter in their esteemed history, they requested DLR Group, a long-time architectural design partner, to work with them on creating and executing an inclusive master planning process that elicited input from representatives of their four cam... |
The Illinois Veterans’ Home in Quincy provides long term skilled nursing care to approximately 380 elderly persons and employs over 500 direct care and support staff. The Home has continued to experience Legionnaires’ Disease outbreaks despite remedial efforts that have taken place since 2015. To date there have been... |
Harper College serves more than 35,000 students annually in Chicago’s northwest suburbs. Harper offers associate degree and certification programs, advanced career programs, workforce training, professional development, continuing education classes, accelerated degree options for adults and developmental education pr... |
T&M for Issued for Construction Documents
|
MEP due diligence services to walk-through & visually inspect MEP systems at the building, providing a narrative description on the condition of the existing systems and estimated remaining useful life of systems. |
T&M for Issued for Construction Documents
|
T&M for Issued for Construction Documents
|
Future Ready D36, the Winnetka Public School District 36’s first Educational Master Facility Plan (EMFP) in 20 years, is a holistic process that will measure, validate, quantify and qualify opportunities to align the district’s school facilities, enrollment, and vision for progressive teaching and learning. The resul... |
T&M for Issued for Construction Documents
|
Arch/Eng Services for undetermined duration while phasing and implementation strategizing for EFMP.
|
DLR Group will confirm existing ventilation systems and analyze the indoor air quality for the occupied areas of Building B, including but not limited to offices, conference rooms, lounges, and workrooms.
|
T&M for Issued for Construction Documents
|
Arch/Eng Services for undetermined duration while phasing and implementation strategizing for EFMP.
|
MEP due diligence services to walk-through & visually inspect MEP systems at the building, providing a narrative description on the condition of the existing systems and estimated remaining useful life of systems. |
Arch/Eng Services for undetermined duration while phasing and implementation strategizing for EFMP.
|
Design Achievement – Co-living is a modern housing option that helps bring community, diversity and affordable housing solutions to neighborhoods across the country. DLR Group’s design pays tribute to the surrounding contextual scale and is a modern approach to residential design rhythm in the façade. Each occupant ... |
Design Achievement – Indian Prairie CUSD 204 wanted to replace the visitor bleachers at Waubonsie Valley High School stadium, and enlarge capacity to 1000 seats. The district also wanted a press box to serve both the football stadium and adjacent soccer field. DLR Group was engaged to design and develop construction ... |
Tollway Dekalb
Job# 4017-1073
P.O.#GR2867
|
Design Achievement – In response to sustained and continuing enrollment increases, the Champaign Unit 4 Consolidated Unit School District needed to expand their infrastructure support for transportation services and better accommodate associated staff. DLR Group’s design solution not only provides a centralized, eff... |
Existing office suite will be divided to create a 4,000 SF office suite which will be renovated for Urban Labs at 111 W. Washington. The renovation will include the creation of four (4) enclosed offices, a conference room, a huddle meeting room, a phone room, a mother's room, a reception area, a 42 station open... |
Design Achievement – Mount Carmel High School, an all-boy Catholic school founded in 1900, is committed to providing a college prep program from young men of different academic abilities. In a Campaign for a new Century of Excellence, the school sought to provide 21st century learning environments, with varied instru... |
Architect/Engineering Svcs for SD-PC of 3 buildings (the Ph II conceptual planning # was 22-13130-00):1924 Main School Building1953 Student Center1969 McDermott/Doyle Science Link |
Tollway Dekalb
Job# 4017-1073
P.O.#GR2867
|
Developer Sterling Bay embarked on a major renovation and deep energy retrofit to re-envision 311 West Monroe. It was the first project in Chicago to leverage utility incentives to analyze, integrate and formalize energy performance goals early in the design process, and to also verify achievement post-occupancy usin... |
Existing office suite will be divided to create a 4,000 SF office suite which will be renovated for Urban Labs at 111 W. Washington. The renovation will include the creation of four (4) enclosed offices, a conference room, a huddle meeting room, a phone room, a mother's room, a reception area, a 42 station open offi... |
Graphic assistance for the exhibits upcoming zoning meeting for a new signage tower at the Crossroads Shopping Center, at 113-295 Skokie Valley Road, Highland Park, IL.
|
To provide CPS with a tool for measuring the inter-related impacts of the recommended energy projects, identified by the design team, DLR Group will create a dynamic energy model and establish energy performance metrics (annual energy consumption, annual energy cost, energy use by end use) for the existing building, ... |
To provide CPS with a tool for measuring the inter-related impacts of the recommended energy projects, identified by the design team, DLR Group will create a dynamic energy model and establish energy performance metrics (annual energy consumption, annual energy cost, energy use by end use) for the existing building, ... |
Description of Project
1.1.1 Project consists of (7) seven floors above grade, (1) one floor below grade on an
approximate 6,120 SF site at 123 W Chicago Avenue, Chicago, Illinois 60654.
1.1.2 Basement level will include amenity spaces such as a fitness center, bike storage room,
theater movie viewing, communal s... |
Graphic assistance for the exhibits upcoming zoning meeting for a new signage tower at the Crossroads Shopping Center, at 113-295 Skokie Valley Road, Highland Park, IL.
|
To provide CPS with a tool for measuring the inter-related impacts of the recommended energy projects, identified by the design team, DLR Group will create a dynamic energy model and establish energy performance metrics (annual energy consumption, annual energy cost, energy use by end use) for the existing building, ... |
Structural design, construction documentation and construction administration for
new signage tower at Crossroads Shopping Center.
|
Description of Project
1.1.1 Project consists of (7) seven floors above grade, (1) one floor below grade on an
approximate 6,120 SF site at 123 W Chicago Avenue, Chicago, Illinois 60654.
1.1.2 Basement level will include amenity spaces such as a fitness center, bike storage room,
theater movie viewing, communal s... |
To provide CPS with a tool for measuring the inter-related impacts of the recommended energy projects, identified by the design team, DLR Group will create a dynamic energy model and establish energy performance metrics (annual energy consumption, annual energy cost, energy use by end use) for the existing building, ... |
Commissioning to be compete on base project 22-18133-00.
|
Structural design, construction documentation and construction administration for
new signage tower at Crossroads Shopping Center.
|
Architect/Engineering Svcs for SD-PC of 3 buildings (the Ph II conceptual planning # was 22-13130-00):1924 Main School Building1953 Student Center1969 McDermott/Doyle Science Link |
To provide CPS with a tool for measuring the inter-related impacts of the recommended energy projects, identified by the design team, DLR Group will create a dynamic energy model and establish energy performance metrics (annual energy consumption, annual energy cost, energy use by end use) for the existing building, ... |
Design Achievement – Mount Carmel High School, an all-boy Catholic school founded in 1900, is committed to providing a college prep program from young men of different academic abilities. In a Campaign for a new Century of Excellence, the school sought to provide 21st century learning environments, with varied instru... |
To provide CPS with a tool for measuring the inter-related impacts of the recommended energy projects, identified by the design team, DLR Group will create a dynamic energy model and establish energy performance metrics (annual energy consumption, annual energy cost, energy use by end use) for the existing building, ... |
Design Achievement: Due to the continuing interest in the intersections between science, technology, and entrepreneurship at Benedictine University, there was a need for space within the Birck Hall of Science that would support these interdisciplinary studies and research. DLR Group’s design creates a Center for Inno... |
1st Floor Classroom Renovation:
• Estimated construction cost: $2,000,000
• A/E documentation, permit assistance and construction administration-related activities shall be
provided for $27,248 per previously negotiated phased services.
|
Structural design, construction documentation and construction administration for
new signage tower at Crossroads Shopping Center.
|
An existing 2nd floor 3,211 SF office suite will be renovated for Skoubis & Mantas, LLC at 1300 W.
Higgins Rd in Park Ridge. The renovation will include the creation of five (5) enclosed offices, three
(3) conference rooms, an open office area, a break room, storage areas, and a reception lobby.
|
Additional hours/efforts for structural design, construction documentation and construction administration for new signage tower at Crossroads Shopping Center.
|
Commissioning to be compete on base project 22-18133-00.
|
An existing 2nd floor 3,211 SF office suite will be renovated for Skoubis & Mantas, LLC at 1300 W.
Higgins Rd in Park Ridge. The renovation will include the creation of five (5) enclosed offices, three
(3) conference rooms, an open office area, a break room, storage areas, and a reception lobby.
|
Additional hours/efforts for structural design, construction documentation and construction administration for new signage tower at Crossroads Shopping Center.
|
They’ve asked us for assistance in evaluating a parcel they are interested in purchasing that is directly adjacent to one of their middle schools.
|
Peer review of the MEP design documents for the TD Ameritrade Relocation build-out at 600 West Chicago.
|
To comply with Illinois regulations, the District sought an architectural consultant to conduct its ten-year Health Life and Safety survey of all school facilities. In addition to annual inspections for compliance with state standards, the ten-year survey is a comprehensive analysis to identify violations of the Heal... |
Design Achievement - Designed to encourage professional collaboration, expand ”touchdown” opportunities for nomadic staff ,and foster healthy teacher perspectives, this adaptive reuse of a former medical office suite as a Center of Innovation is tied to two of Yorkville District 115’s strategic plan goals: "Community... |
1st Floor Classroom Renovation:
• Estimated construction cost: $2,000,000
• A/E documentation, permit assistance and construction administration-related activities shall be
provided for $27,248 per previously negotiated phased services.
|
They’ve asked us for assistance in evaluating a parcel they are interested in purchasing that is directly adjacent to one of their middle schools.
|
1st Floor Classroom Renovation:
• Estimated construction cost: $2,000,000
• A/E documentation, permit assistance and construction administration-related activities shall be
provided for $27,248 per previously negotiated phased services.
|
LEED Fundamental and Enhanced Commissioning services for the AZEK tenant buildout, a LEED CI v4 project of approximately 17,000 square feet of office space located in an existing building at 1330 W. Fulton in Chicago, IL.
|
In 2018, Yorkville CUSD 115 engaged DLR Group to research options for flooring replacement for their large gym at Yorkville High School Academy. The study included evaluation of different flooring materials including wood, rubber and synthetic sheet goods, poured flooring, and portable gym flooring, Considerations... |
Peer review of the MEP design documents for the TD Ameritrade Relocation build-out at 600 West Chicago.
|
DLR performed two site visits to document the existing facility’s electrical infrastructure. Upon completion of the survey, DLR used the information collected during the survey to develop an SKM model to determine the available fault current and the arc flash incident energy at the electrical distribution equipment. ... |
Scope Summary: Chicago’s XS Tennis Village and Education Foundation exists as a sanctuary for underserved youth that gives them a foundation to break the cycle of poverty. Its mission is to provide a “positive academic/athletic pathway to college through a community-based sports and academic enrichment program,” and ... |
Building B is currently served by multiple HVAC types of HVAC systems. The result is lower energy efficiency and in certain locations poor indoor air quality. This project would remove these systems and provide a single variable air volume rooftop air handling unit to serve the building. The project will need to revi... |
MEP Peer Review for Jump Trading Permit Set.
|
LEED Fundamental and Enhanced Commissioning services for the AZEK tenant buildout, a LEED CI v4 project of approximately 17,000 square feet of office space located in an existing building at 1330 W. Fulton in Chicago, IL.
|
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.