MEP Peer Review for Jump Trading Permit Set.
|
DLR Group to provide LEED Consulting Services/Commissioning services for the following project.
Info from XS Tennis website: http://xstennis.org/xs-tennis-village/
"Currently located on 47th Street and South Lake Park Avenue in Chicago’s Hyde Park neighborhood, XS in need of a new home. The lease is expiring, the p... |
DLR Group shall assign a Professional Mechanical Engineer and a City of Chicago Registered Energy Professional to provide a peer review of the design documents and provide our professional opinion on the proposed design.
|
DLR Group shall prepare Functional Performance Test procedures and work with the mechanical electrical and controls contractors to oversee functional testing of the HVAC equipment being provided.
Testing of the new HVAC equipment shall include all modes and sequence of operation, including under full-load,
part-loa... |
Design Achievement - The Rock Island County Courthouse was originally built in 1896 when the population was 50,000 and people arrived on horseback. The building is materially unchanged since then. An addition to the justice center was completed in 2001, but the four courtrooms did not meet today’s County design stand... |
Building B is currently served by multiple HVAC types of HVAC systems. The result is lower energy efficiency and in certain locations poor indoor air quality. This project would remove these systems and provide a single variable air volume rooftop air handling unit to serve the building. The project will need to revi... |
DLR Group shall prepare Functional Performance Test procedures and work with the mechanical electrical and controls contractors to oversee functional testing of the HVAC equipment being provided.
Testing of the new HVAC equipment shall include all modes and sequence of operation, including under full-load,
part-loa... |
DLR Group shall assign a Professional Mechanical Engineer and a City of Chicago Registered Energy Professional to provide a peer review of the design documents and provide our professional opinion on the proposed design.
|
Analyze the heat loss and finned tube requirements for 5 S. Wabash and verify the necessary finned tube lengths for each window location in the tenant spaces.
|
Design Achievement – DLR Group was engaged by the Batavia School District to generate and analyze information, share ideas, develop options, and offer guidance in decision-making around their educational facilities. Through the process, the design team challenged district stakeholders to think differently about the f... |
Fundamental and enhanced commissioning for services for 62,000 SF office space located at 6000 West Chicago Ave.. Commissioning included testing the following systems: generator, UPS, ATS, roof top HVAC units,
CHRA supplemental cooling units, VESDA system, Pre Action system. Cx included develop prefunctional chec... |
Our role in this process is to generate and analyze information, share ideas, develop options, and offer guidance in decision making. We believe that it is our responsibility to challenge District stakeholders to think differently about
the facilities and how they can help become assets towards continued exce... |
Analyze the heat loss and finned tube requirements for 5 S. Wabash and verify the necessary finned tube lengths for each window location in the tenant spaces.
|
Design Achievement - The Rock Island County Courthouse was originally built in 1896 when the population was 50,000 and people arrived on horseback. The building is materially unchanged since then. An additional justice center was added in 2001, but the four courtrooms did not meet today's County design standards. Bon... |
You require architectural and engineering documents describing alterations to the second floor office suite in Building A,
reflected in the attached architectural floor plan, demolition plan, existing conditions reflected ceiling plan and proposed
reflected ceiling plan (minor modifications to these sketches are ex... |
You require architectural and engineering documents describing alterations to the second floor office suite in Building A,
reflected in the attached architectural floor plan, demolition plan, existing conditions reflected ceiling plan and proposed
reflected ceiling plan (minor modifications to these sketches are ex... |
Our role in this process is to generate and analyze information, share ideas, develop options, and offer guidance in decision making. We believe that it is our responsibility to challenge District stakeholders to think differently about
the facilities and how they can help become assets towards continued exce... |
You require architectural and engineering documents describing alterations to the second floor office suite in Building A,
reflected in the attached architectural floor plan, demolition plan, existing conditions reflected ceiling plan and proposed
reflected ceiling plan (minor modifications to these sketches are ex... |
Design Achievement: Harper College was established by referendum in 1965 and opened September 1967. It is named for Dr. William Rainey Harper, a pioneer in the junior college movement in the United States and the first president of the University of Chicago. Harper College is now one of the nation’s premier commu... |
It is our understanding that Hines would like to procced through a portion of the schematic design phase to establish a deliverable sufficient for preliminary pricing to confirm budget. Design for T3 Oakbrook shall be based T3 Midtown Atlanta “the prototype”. As part of this effort, DLR Group will provide... |
With the adoption of the Educational Master Facility Plan (EMFP) by the Board of Education, the next step is to enter into the implementation phase to establish details of step one toward the District's final vision. The implementation phase, and recommended actions, sets out the potential projects, programs, policie... |
The project updated the refrigerant leak detection system for the chiller room to bring the systems up to code and connect the detection system to the campus automation system to alert the utilities department to the status of the chiller plant. The project included replacing the chiller plant controls to replace age... |
Proposed Scope of Work
• DLR Group shall administer the incentive process for all ComEd incentives/rebates.
• DLR Group shall prepare Pre-Functional Checklists and Functional Performance Test
procedures and work with the mechanical, electrical, and controls contractors to oversee
functional testing of all chiller... |
After touring facilities across the country, the Public Building Commission of Chicago realized their first responder training facility, currently housed in an old high school, was inadequate. The client wanted to create a state-of-the-art campus that would strengthen their capability to train new and current first r... |
An energy audit plan following the requirements of ASHRAE Level 2, Energy Survey and Analysis, to evaluate energy efficiency opportunities and to satisfy the deliverable requirements for HUD Multifamily Energy Policies
|
An energy audit plan following the requirements of ASHRAE Level 2, Energy Survey and Analysis, to evaluate energy efficiency opportunities and to satisfy the deliverable requirements for HUD Multifamily Energy Policies
|
look at narrative in #22-21122-00
|
Proposed Scope of Work
• DLR Group shall administer the incentive process for all ComEd incentives/rebates.
• DLR Group shall prepare Pre-Functional Checklists and Functional Performance Test
procedures and work with the mechanical, electrical, and controls contractors to oversee
functional testing of all chiller... |
Design Achievement – As a part of the GSA’s overall goals to reduce workplace footprint, conserve energy, and improve employee health & wellness, DLR Group was engaged to stitch together multiple ad-hoc Post Occupancy Evaluation (POE) inputs into a unified process that will inform future workplace engag... |
Proposed Scope of Work
• DLR Group shall administer the incentive process for all ComEd incentives/rebates.
• DLR Group shall prepare Pre-Functional Checklists and Functional Performance Test
procedures and work with the mechanical, electrical, and controls contractors to oversee
functional testing of all chiller... |
***NOT TO SPEC***
Evaluation of air handling equipment and plumbing infrastructure within multiple vacant tenant suites for need of replacement and viability for use for future tenants build-out.
Size: 57,440 RSF | Cost: $1,105
|
Facade and patio improvements to an existing commercial/retail center in Western Springs, IL.
|
Proposed Scope of Work
• DLR Group shall administer the incentive process for all ComEd incentives/rebates.
• DLR Group shall prepare Pre-Functional Checklists and Functional Performance Test
procedures and work with the mechanical, electrical, and controls contractors to oversee
functional testing of all chiller... |
It is our understanding that Hines would like to procced through a portion of the schematic design phase to establish a deliverable sufficient for preliminary pricing to confirm budget. Design for T3 Oakbrook shall be based T3 Midtown Atlanta “the prototype”. As part of this effort, DLR Group will provide... |
Indoor Air Quality Monitoring - one time setup fee, Monitors Setup, Kaiterra Sensedge Mini Air Quality monitor hardware fee at $1,500 ea + Freight at cost at 1.15, Yr 2 Annual sonrai IAQ Subscription $4,500 fee, but zero $ amount shown on the invoice (see 22-21112-00 for example) this will actually end up on a -02 #... |
Indoor Air Quality Monitoring - one time setup fee, Monitors Setup, Kaiterra Sensedge Mini Air Quality monitor hardware fee at $1,500 ea + Freight at cost at 1.15, Yr 2 Annual sonrai IAQ Subscription $4,500 fee, but zero $ amount shown on the invoice (see 22-21112-00 for example) this will actually end up on a -02 #... |
The project updated the refrigerant leak detection and purge system for the chiller room to bring the systems up to code, and connect the detection system to the campus automation system to alert the utilities department to the status of the chiller plant. The project included replacing the purge fan and connected th... |
Sterling Bay, a developer with a passion for technology and design Chicago properties, created what they term as an “office to envy” at 333 North Green in the middle of the energy and excitement of Fulton Market. Sterling bay had a portfolio-wide improvement initiative in response to the global pandemic that included... |
Indoor Air Quality Monitoring - one time setup fee, Monitors Setup, Kaiterra Sensedge Mini Air Quality monitor hardware fee at $1,500 ea + Freight at cost at 1.15, Yr 2 Annual sonrai IAQ Subscription $4,500 fee, but zero $ amount shown on the invoice (see 22-21112-00 for example) this will actually end up on a -02 #... |
ID Services to upgrade hotel guest room floor to enhance visitor experience in each room, corridor and lounge.
|
In 2020, in the midst of COVID-19 Sterling Bay, a developer renowned for bringing inspired new beginnings to storied Chicago properties, sought to create ideal places for trend-setting corporate headquarters and boutique brands to expand on their stature and influence. In response to the global pandemic Sterling bay ... |
Develop a Post-Occupancy Evaluation (POE) process for GSA to use for
future projects. Consultant will recommend POE techniques that are connected to GSA's current pre-occupancy processesand tools. Execution of these services will be accomplished in the
following four phases:
- Project Planning
- Develop POE Proc... |
ID Services to upgrade hotel guest room floor to enhance visitor experience in each room, corridor and lounge.
|
Develop a Post-Occupancy Evaluation (POE) process for GSA to use for
future projects. Consultant will recommend POE techniques that are connected to GSA's current pre-occupancy processesand tools. Execution of these services will be accomplished in the
following four phases:
- Project Planning
- Develop POE Proc... |
Custom Air Handling Unit Replacement. Revised scope and fee TBD.
|
Design Achievement - Tenants at Atwater Apartments, a luxury apartment building in downtown Chicago, saw their electric bills double and triple in the winter months compared to the summer months. This prompted Atwater to improve tenant satisfaction and decrease resident turnover by reducing electricity costs. To acco... |
Custom Air Handling Unit Replacement. Revised scope and fee TBD.
|
You are in search of an architect to provide an update to the character of the entrance vestibule, building lobby, elevator lobby and adjacent circulation space of your building. By your description, these spaces, finished primarily in marble, natural wood trim and gypsum wallboard, no longer present the residents w... |
You are in search of an architect to provide an update to the character of the entrance vestibule, building lobby, elevator lobby and adjacent circulation space of your building. By your description, these spaces, finished primarily in marble, natural wood trim and gypsum wallboard, no longer present the residents w... |
Indoor Air Quality Monitoring - one time setup fee, Monitors Setup, Kaiterra Sensedge Mini Air Quality monitor hardware fee at $1,500 ea + Freight at cost at 1.15, Yr 2 Annual sonrai IAQ Subscription $4,500 fee, but zero $ amount shown on the invoice (see 22-21112-00 for example) this will actually end up on a -02 #... |
Batavia High School:
Remove existing wood sports floor and wall base down to existing concrete subfloor in Main and Middle Gymnasiums.
Installation of new dual-grade maple wood sports floor, vented wall base, new thresholds/transitions and vapor barrier (as required per selected basis-of-design manufacturer... |
DLR Group shall prepare Functional Performance Test procedures and work with the mechanical electrical and
controls contractors to oversee functional testing of the HVAC equipment being provided.
Testing of the new HVAC equipment shall include all modes and sequence of operation, including under full-load,
part-lo... |
Documents to complete Priority "A" items from the recent planning & assessment work and District's 10-year health/life safety survey.
|
With the change in scope to design and engineer a full replacement of the exterior stair, in lieu of repair/coating, we would like to propose that our time for this effort be on a T&M basis, including IMEG’s time to re-survey and document.
|
Summer 2019 H/LS Work
|
With the change in scope to design and engineer a full replacement of the exterior stair, in lieu of repair/coating, we would like to propose that our time for this effort be on a T&M basis, including IMEG’s time to re-survey and document.
|
NOT TO SPEC
Design Achievement:
The Center for Structural Biology at the University of Illinois at Chicago promotes and facilitates research in structural biology to understand the functions, interactions, and roles in cellular processes of biological molecules that contributes to an array of scientific fields. ... |
DLR Group shall prepare Functional Performance Test procedures and work with the mechanical electrical and
controls contractors to oversee functional testing of the HVAC equipment being provided.
Testing of the new HVAC equipment shall include all modes and sequence of operation, including under full-load,
part-lo... |
Self certifcation for work on base number.
|
Self certifcation for work on base number.
|
***NOT TO SPEC***
The study examines an ophthalmology & visual program spread between three different buildings and how to house all its functions in a new building. With a history of adjusting or dealing with the any space available, this department has a new take on how to practice. Adjacencies, synergies, collabo... |
***NOT TO SPEC***
Facility assessment for historical preservation of Niles Historical Society Museum. Deliverables included identifying current deficiencies of the building, ongoing maintenance, and identifying future uses for better utilizing the space. The final conceptual plans included a report of the site condi... |
Design Achievement: Tucked into the ground floor of a new 52-story Class-A office tower in downtown Chicago are two complementary, yet contrasting food and beverage experiences. Both operated by Spearhead Hospitality, Canal Street Eatery & Market serves building tenants and visitors from day to night, offering everyt... |
Design Achievement: The proposed Rivere development is a public/private partnership between the city of Chicago and Friedman Properties. The site, at the southwest corner of Illinois and Dearborn Streets in Chicago’s River North neighborhood, will be home to a 30-story office tower with a multi-story lobby, retail sp... |
Design Achievement: Tucked into the ground floor of a new 52-story Class-A office tower in downtown Chicago are two complementary, yet contrasting food and beverage experiences. Both operated by Spearhead Hospitality, Canal Street Eatery & Market serves building tenants and visitors from day to night, offering everyt... |
Interior Design for The Rivere and Leasing Center at 450 N Dearborn
|
Summer 2019 H/LS Work
|
Design Achievement
Tucked into the ground floor of a new 52-story Class-A office tower in downtown Chicago are two complementary, yet contrasting food and beverage experiences. Canal Street Eatery & Market serves the building’s tenants from day to night, offering everything from a morning coffee, grab-and-go lunche... |
Interior Design for The Rivere and Leasing Center at 450 N Dearborn
|
Interior Design for The Rivere and Leasing Center at 450 N Dearborn
|
Summer 2019 H/LS Work - Number reserved for the hourly time related to inputting their H/LS items into the online portal for the State to approve
|
# s/be -02. Yr 2 forward Annual sonrai IAQ Subscription $4,500 fee, and in Yr 3, 4 etc, but zero $ amount shown on the invoice (see 22-21112-00 for example). The Yr 3, 4 etc will be added in that year it is billed if the client requests the renewal of the subscription, but for current set up it's shown on the invoice... |
# s/be -02. Yr 2 forward Annual sonrai IAQ Subscription $4,500 fee, and in Yr 3, 4 etc, but zero $ amount shown on the invoice (see 22-21112-00 for example). The Yr 3, 4 etc will be added in that year it is billed if the client requests the renewal of the subscription, but for current set up it's shown on the invoice... |
Design Achievement – School District U-46 wanted to develop an Educational Facility Master Plan (EFMP) to address current and future facility needs. As the second-largest PK-12 school district in Illinois, an integrated plan would impact not only families in the district, but potentially throughout the state as well.... |
Interior Design for The Rivere and Leasing Center at 450 N Dearborn
|
Interior Design for The Rivere and Leasing Center at 450 N Dearborn
|
Cx at Elementary School
|
Test Fit effort for office.
|
Cx at Elementary School
|
Summer 2019 H/LS Work - Number reserved for the hourly time related to inputting their H/LS items into the online portal for the State to approve
|
Test Fit effort for office.
|
Project setup to track time on compiling CAD sheets for coordination wtih sub.
|
Artfully Modern Chicago
Design Achievement: Chicago has long been an epicenter for art and culture attracting the greatest creative minds and serving as a living laboratory for the future. From this diverse melting pot of ideas, modernism in Chicago becomes a unifying element--fusing all forms of art: design, archit... |
Project setup to track time on compiling CAD sheets for coordination wtih sub.
|
The intent is to expand the restrooms into an adjacent coat room, maximizing the number of men's and women's fixtures within the overall space.
For the purposes of this proposal, we assume that the total construction cost (not including soft costs) to be $425,000 of the $550,000 grant.
|
DLR Group understands that the scope includes delivery of a new Engine Company 115 of approximately 18,000 to 22,000 square feet, 1 story. Significant revisions to accommodate a 2-story design option are excluded. The station shall include a large apparatus bay (3 to 4 bays wide), facilities for 20 fire fighters an... |
The intent is to expand the restrooms into an adjacent coat room, maximizing the number of men's and women's fixtures within the overall space.
For the purposes of this proposal, we assume that the total construction cost (not including soft costs) to be $425,000 of the $550,000 grant.
|
Cx at Elementary School
|
The intent is to expand the restrooms into an adjacent coat room, maximizing the number of men's and women's fixtures within the overall space.
For the purposes of this proposal, we assume that the total construction cost (not including soft costs) to be $425,000 of the $550,000 grant.
|
Update existing retail leasing plans and BOMA calculations for existing retail spaces at Marina City on Level 1, 2, 3 and 4 at 333 North Dearborn in Chicago, IL. Updated calculations exclude condo and House of Blues areas.
|
Cx at Elementary School
|
Update existing retail leasing plans and BOMA calculations for existing retail spaces at Marina City on Level 1, 2, 3 and 4 at 333 North Dearborn in Chicago, IL. Updated calculations exclude condo and House of Blues areas.
|
Elementary School Cx
|
Design Achievement - The Reed Southbank, an impressive 42-story multi-family high-rise, graces the southern bank of the Chicago River in downtown Chicago. Meticulously crafted by Perkins + Will Architects and developed, owned, and operated by Lendlease, The Reed Southbank seamlessly integrates into a planned devel... |
c
|
Elementary School Cx
|
c
|
MEP/FP engineering and energy modeling services for a residential development project at 4601 N Broadway.
|
MEP/FP engineering and energy modeling services for a residential development project at 4601 N Broadway.
|