title
stringlengths
6
301
keywords
listlengths
0
23
messages
listlengths
2
2
Environmental sustainability of facilities management: Analytical hierarchy process (AHP) based model for evaluation
[ "Sri Lanka", "Analytical hierarchy process", "Environmental sustainability", "Facilities management", "Apparel industry", "Assessment model" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Sustainability assessment is vital to obtain an overview of the conceptual and practical usage of the concept of sustainability (Hassan and Hassan, 2016; Penzenstadler et al., 2014). Elmualim et al. (2012) stated that the ...
Overcoming barriers for building energy efficiency retrofits: insights from hotel retrofits in Sri Lanka
[ "Case studies", "Barriers", "Strategies", "Existing buildings", "Building Energy Efficiency Retrofits (BEER)", "Hotel buildings" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The significance of improving energy efficiency (EE) of existing buildings through retrofitting has often been highlighted in recent years (Ruparathna et al., 2016). Despite this, still the level of implementation of Build...
Design toolkits for campus open spaces from post-occupancy evaluations of federal universities in South-west Nigeria
[ "University", "Campus", "Landscapes", "Built assets", "Design frameworks", "Open spaces", "Post-occupancy evaluation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Design toolkits are intellectual and conceptual frameworks for designing spaces that are human centred (Hanington and Martin, 2012). They are evidence-based set of tools for identifying design requirements and users' needs fo...
Request for information frequency and their turnaround time in construction projects: A data-analytic study
[ "Communications", "Documentation", "Data analytics", "Project management", "Data analysis", "Project control", "Quantitative techniques", "Request for information" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Communication among various stakeholders is the lifeblood of any project because individual stakeholders do not possess all the information, expertise and knowledge needed for solving the range of design, and construction pro...
Drivers of e-bidding implementation in the Saudi Arabian construction industry
[ "Efficiency", "Saudi Arabia", "Construction", "Public sector" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Traditionally, the process of preparing the bidding documents for contractors requires tremendous amount of manpower, particularly for large-sized contractors. On the other hand, contractors find that the process of obtaining...
Risk mitigation in PFI/PPP project finance: A framework model for financiers' bankability criteria
[ "Public private partnership (PPP)", "Supply risk", "Bankability", "Private finance initiatives (PFI)", "Completion risk", "Debt service repayments", "Lenders’ perspectives", "Offtake risk", "Operation and maintenance risk", "Risks" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: A central issue for lenders in private finance initiative and public private partnerships (PFI/PPP) contracts is the protection of project cash flows against risks and uncertainties. According to Burke and Demirag (2015), one...
Curbing PPP construction projects' failure using enhanced stakeholder management success in developing countries
[ "Factors", "Public-private partnership", "Stakeholder theory", "Stakeholder management", "Developing nations", "Public sector projects" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Globally, public-private partnerships (PPPs) are used for essential social, economic infrastructure and services (Ng et al., 2013), and also as an investment initiative and alternative procurement approach for public-sector i...
Investment apportionments among participants of PPP rental retirement villages
[ "Investment", "Pension fund", "Allocation models", "Mean variance", "Public–private partnership", "Rental retirement village" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The global population aged 60 or over is growing at a rate of about 3 per cent per year. Compared to 2017, the number of people aged 60 or over around the world is expected to more than double by 2050 and more than triple ...
Strategic alignment of project management with health, safety and environmental management
[ "Occupational health", "Environmental management", "Project management", "Structural equation modelling", "Safety measures" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Project management involves coordinating a set of actions and processes to achieve specific project goals (Andersson and Chapman, 2017). Strategic project management uses business and project management techniques in order...
Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry
[ "Projects", "Productivity", "Construction", "Construction works", "Constraints", "Specific", "Tradespeople" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Labour productivity in the construction industry is a major issue confronting construction project managers as they seek to optimise output (Attar et al., 2012). Understanding the constraints that influence productivity is ne...
Revisiting the role of professionals in designing buildings with low embodied and operational energy
[ "Energy efficiency", "Embodied energy", "Roles", "Design stage", "Construction professionals", "Operational energy" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Building energy consumption is of two primary forms as embodied energy (EE) and operational energy (OE). As defined by Chastas et al. (2016), EE is the energy consumed in the manufacture and transport of material, constructio...
Life cycle cost analysis of 1MW power generation using roof-top solar PV panels
[ "Life cycle cost", "Roof-top solar PV panel" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: There is a pressing need to accelerate the development of clean energy technologies to mitigate the global challenges of energy security, climate change and sustainable development. Solar PV is recognized as a key technolo...
Factors that trigger bullying amongst subcontractors toward intention to quit in the construction projects
[ "Construction industry", "Workplace bullying", "Work organization", "Construction culture", "Intention to quit", "Main contractor leadership" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The construction arena is heavily based on projects composed of main contractors, subcontractors, suppliers, consultants and project owners (Khan and Burn, 2013), where each has a major determinant role in determining the ...
Causes of delay to public infrastructure projects according to engineers representing different contract parties
[ "Survey", "Construction projects", "Roads", "Causes of delay", "Contract parties", "Public infrastructure" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The construction sector is a major source of production activities and a vital resource for economic growth in Jordan. However, this sector has not experienced growth over the last 10 years in Jordan in terms of gross dome...
Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities
[ "Behaviour", "Change management", "Benefits", "Challenges", "BIM", "Opportunities" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Projects exist in a drifting environment and this causes continual deviation from planned works, also known as change (Motawa et al., 2007; Chen et al., 2015). Change is the only certainty in projects and its management is...
Significant causes of claims and disputes in construction projects in Saudi Arabia
[ "Stakeholders", "Saudi Arabia", "Disputes", "Construction projects", "Claims", "Conflicts" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Construction projects are characterized as being highly complex (Hadikusumo and Tobgay, 2015), and subject to a high degree of uncertainty (Cheung and Pang, 2013; Hadikusumo and Tobgay, 2015). Construction projects require th...
Aluminum formwork system: loss and productivity
[ "Labour", "Productivity", "Loss", "Aluminum system formwork", "Concreting", "Labour productivity factors" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Labor productivity (LP) is one of the most commonly used performance indicators to evaluate the success of a project, as it is the most crucial and flexible resource used in such evaluations (CII, 2006; Durdyev and Mbachu,...
Communication performance challenges in PPP projects: cases of Ghana and South Africa
[ "Developing countries", "Business development", "Communications", "Partnering", "Project management", "Project teams" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Public private partnership (PPP) policy as a project delivery model has gained credence from the early 1990s becoming a widely adopted and preferred project delivery model in both developed and developing countries for var...
The PPP performance based on the co-creation with customers
[ "Public–private partnership", "Customer experience", "Co-creation", "Performance prism", "Value for money", "Public–private customer partnership" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The users of the public service are no longer passive. They put pressure on the government to deal with their expectations, requirements and needs. They call for a better welfare system through a better service quality. In se...
Transparency of public private partnership (PPP): the extent of mandatory information disclosure
[ "Malaysia", "Transparency", "PPP", "Private companies", "Public private partnership", "Mandatory disclosure" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Public private partnership (PPP) refers to the collaboration between public sector and private sector companies in designing, building, financing and/or operating public infrastructure for the benefit of the society (Musawa e...
Public-private equity joint ventures and risk transfers in motorways of the sea
[ "Public–private partnerships", "Intermodal transportation", "Contractual real options", "Flexible strategic planning", "Motorways of the sea", "Risk transfers" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: As a result of the emphasis of most European governments in promoting intermodal transport chains as sustainable alternatives to road transport, a growing interest has emerged, from both academic and managerial perspective...
Analyzing project data in BIM with descriptive analytics to improve project performance
[ "Big data", "Building information modelling", "Trend analysis", "Data analytics", "Association analysis", "Data clustering" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: An abundance of data can be generated with different formats and databases to support construction projects throughout their lifecycle. Sharing data and supporting collaboration between project parties throughout the project'...
BIM-linked data integration for asset management
[ "BIM", "Building maintenance", "Asset management", "Information management", "Information exchange", "Building lifecycle" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In the last decade, building information modelling (BIM) has been recognized as an evolving technological innovation which can facilitate the transformation of the construction industry (Li et al., 2017) and create several...
Influence of Big Data in managing cyber assets
[ "Social media", "Databases", "Forecasting", "Estimation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Assets are at the heart of the capacity of organisations that can be leveraged to acquire sustainable competitive advantages. Although traditional conceptualisations of assets purport to physical characterisations, yet res...
Driving forces for the US residential housing price: a predictive analysis
[ "Stepwise regression", "Data analytics", "Residential property", "Hedonic pricing method", "Housing prices", "Predictive model" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Among all the construction and built environment sectors, the residential sector has the most impact on people's lives. It deals with homes as a property that almost everyone in modern society pays for its ownership and maint...
Critical analysis for big data studies in construction: significant gaps in knowledge
[ "Construction industry", "Built environment", "Systematic review", "Data analysis", "Big data analytics", "Knowledge gaps" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: In essence, \"big data\" is an artefact generated as a collective intelligence of human individuals shared mainly through the technological environment (Eadie et al., 2013). This environment devices a common platform, where v...
A systematic review of the applications of multi-criteria decision-making methods in site selection problems
[ "Logistics", "TOPSIS", "Analytical hierarchy process", "Retail", "Public service", "ELECTRE", "Site selection", "Energy generation", "Multi-criteria decision-making", "PROMTHEE" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Multi-criteria decision-making (MCDM) has been used for selecting the most preferred alternative from a pool of alternatives, especially when the evaluation measures (criteria) are numerous and are often conflicting with e...
Adoption of Big Data analytics in construction: development of a conceptual model
[ "Sustainability", "Technological innovation", "BIM", "Project management", "Asset management", "Data analysis" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Big Data (BD) is changing the operational dynamics of businesses by facilitating innovations in products and services; and improvements in productivity, decision making and organizational capabilities. Construction industr...
Integrated project delivery as an enabler for collaboration: a Middle East perspective
[ "Construction industry", "Critical success factors", "Integration", "Contracts", "Collaboration", "Project management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The delivery method adopted on a construction project impacts the distribution of risks and responsibilities among the different project stakeholders, the timing of their engagement and the nature of their relationships. A...
Managing relationships in large public projects: comparative study of China and Singapore
[ "Project management", "Relationship management", "Contractual governance", "Large projects", "Public projects", "Relational governance" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Large public projects are complex because many parties are involved, and therefore difficult to manage (Klakegg et al., 2016). Prior studies identified the limitation of formal systems in public project management as they can...
Impact of project monitoring and evaluation practices on construction project success criteria in Ghana
[ "Evaluation", "Ghana", "Success", "Projects", "Construction", "Criteria", "Condition monitoring" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The successful completion of projects across different sectors and industries is one of the most important factors that determine the development and growth of many nations (Maylor et al., 2006). Monitoring and evaluation (M&...
Expansive learning in contemporary construction organisations: An exemplar in BIM-mediated projects
[ "Case studies", "BIM", "Expansive learning", "Knowledge development", "Construction technologies", "Contemporary organizations" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: There is a widespread consensus in the extant literature regarding the positive effects of utilising innovative construction technologies to address some of the prevailing challenges in construction (Hartmann et al., 2012)...
Entropy of centrality values for topological vulnerability analysis of water distribution networks
[ "Information entropy", "Betweenness centrality", "Closeness centrality", "Eigenvector centrality", "Vulnerability analysis", "Water distribution networks" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Water distribution networks (WDNs) have been identified by many countries as national strategic assets that should be highly valued and efficiently managed. However, with the ageing of these networks, numerous problems are...
Demand-side energy retrofit potential in existing office buildings
[ "Sri Lanka", "Energy consumption", "Energy management", "Office buildings", "Energy demand", "Energy retrofits" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Building sector has become one of the largest energy consumers in the world (Bana and Saini, 2017). Buildings are accountable for 32 per cent of global energy demand (Jayathissa et al., 2017). Among them, office buildings dem...
Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW Airport
[ "Financial analysis", "Airport security", "Cargo shipment", "Intermodal", "Life-cycle cost analysis (LCCA)", "UFT" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Air cargo plays a significant role in the existing global economy by contributing to more than 35 percent value of global trade (IATA, 2018). IATA (2018) forecasted the value of air cargo to exceed $6.2 trillion in 2018, r...
Lean approach in precast concrete component production
[ "Process improvement", "Lean approach", "Reinforcement work process", "Industrialized Building System (IBS)", "Non-value added (NVA) activity", "Precast concrete construction (PCC)" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Successful application of the lean approach within manufacturing has attracted significant attention from construction stakeholders to improve their process flow, including those in an industrialised building system (IBS)....
Challenges in public private partnerships in construction industry: A review and further research directions
[ "Performance", "Challenges", "Construction", "Review", "Stakeholder management", "Public private partnerships" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Public private partnerships (PPPs) are a popular form of project delivery for the procurement of capital-intensive economic and social infrastructure in the public sector. PPPs combine the efforts of the public and private...
Evaluation of PPP road projects in Greece
[ "Greece", "Contracts", "PPP", "Concession", "Risk", "Project Management", "Motorways" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: A public-private partnership (PPP) can be described as any form of co-operation between contracting authorities and private sector economic operators, often with the aim of ensuring the funding, construction, renovation, m...
Suitability of public-private-partnership procurement method for road projects in Sri Lanka
[ "Sri Lanka", "Public–private partnership (PPP)", "Road projects", "Build–Own–Operate–Transfer (BOOT)", "Overall suitability", "Procurement selection factors" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: When the social and economic development of a country becomes rapid, there will be a demand for investment on infrastructure (Izaguirre and Mirzagalyamova, 2008). Governments of most developing countries face challenges wh...
Method selection: a conceptual framework for public sector PPP selection
[ "PPP", "Methods", "Decision making", "Decision support systems", "Private funded", "Selection framework" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: With the increased awareness of the benefits of collaborative procurement methods, public-private partnerships (PPPs) are attracting growing interest worldwide. Although some PPP projects experience cost and time overruns, th...
Public-private partnerships in Tanzanian affordable housing schemes: Policy and regulatory issues, pitfalls and solutions
[ "Developing countries", "Housing", "Construction industry", "Private sector", "Delivery", "PPP" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The supply of affordable houses remains a significant challenge in most developing countries and Sub-Saharan Africa (SAA) (Ardonceau, 2018). Tanzania, like most emerging economies, faces similar pitfalls with its continuou...
Public guarantees for mitigating interest rate risk in PPP projects
[ "Risk mitigation", "Public", "Private partnership", "Real options", "Public finance", "Maximum interest rate guarantee", "Public guarantees" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Public-private partnership (PPP) has been recognized as the predominant alternative to the traditional state provision of public infrastructure/facilities and services in both developed and developing countries. Despite it...
Recommendations and guidelines for implementing PPP projects: Case of the electricity sector in Brazil
[ "Framework", "PPP", "Guidelines", "Electricity sector", "Infrastructure projects", "Initiation phase" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The World Bank and The International Finance Corporation (1992) describes public-private partnerships (PPPs) as arrangements between public and private sectors in order to provide specific services that, although are a govern...
Exploratory factor analysis of skills requirement for PPP contract governance
[ "PPP", "Private sector", "Public sector", "Contract governance", "Infrastructure regulation", "PPP skills", "Remunicipalisation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Policy makers are in agreement globally about the importance of infrastructures to economic growth and development. The absence of modern infrastructure has been blamed for the poor performance of economies in developing c...
The leading small group: an institutional innovation for PPP projects in China
[ "Governance", "Public–private partnership", "Institution", "Coordination", "Project management", "Infrastructure management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Current studies on the management of public-private partnership (PPP) projects mainly focus on issues such as procurement, risk allocation, and innovative financing (Tan, 2007; Jin and Zhang, 2011; Jefferies and Rowlinson,...
Influential factors of life cycle management in education PFI projects
[ "PFI", "Education", "Lifecycle costing", "Lifecycle costs", "Influencing factors", "Lifecycle management", "PF2" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The governments around the world are facing the challenges of providing infrastructure services due to the shortage of budget and other issues such as affordability (O'Nolan and Reeves, 2017). In the same context, McKinsey ar...
Ex post impact evaluation of PPP projects: an exploratory research
[ "Qualitative research", "Stakeholders", "Project management", "Impact evaluation", "Ex post evaluation", "Public–private partnerships" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Public-private partnership (PPP) model of procurement is a way to deliver public infrastructure using private funding and managing risk for public purposes. The Organization for Economic Co-operation and Development (OECD)...
BIM-based energy consumption assessment of the on-site construction of building structural systems
[ "Energy consumption", "Reinforced concrete", "Building information modelling", "Carbon emissions", "On-site construction", "Steel structure", "Structural system" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The importance of sustainable building development is gaining widespread attention worldwide. Buildings use energy either directly or indirectly throughout their lifecycle. The direct uses of energy occur in the construction,...
Exploring behavioural factors for information sharing in BIM projects in the Malaysian construction industry
[ "Behaviour", "Malaysia", "Construction industry", "BIM", "Information sharing", "Information exchange" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: In today's era of digitalisation, the subject of information sharing grows proportionately with the progress of information and communication technology (ICT) adoption in various industries (Leidner, 2010). In construction pr...
Interdisciplinary design checklists for mechanical, electrical and plumbing coordination in building projects
[ "Design", "Coordination", "Checklist", "Building projects", "MEP", "Facility performance" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The mechanical, electrical and plumbing (MEP) coordination is one of the gray areas influencing the overall success and performance of building projects (Korman et al., 2003; Tatum and Korman, 2000). MEP systems are required ...
Optimizing time, cost and quality in multi-mode resource-constrained project scheduling
[ "Multi-objective optimization", "Global optimization", "Construction quality assessment system (CONQUAS)", "Multi-criterion decision-making", "Multi-mode resource-constrained project scheduling", "Time–cost–quality" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Traditional scheduling techniques, such as the critical path method and the program evaluation and review technique, assume unlimited availability of resources (Goncalves et al., 2008). However, in practice, construction f...
Pricing of highway infrastructure for transportation asset management
[ "Highway asset", "Highway asset prioritization", "Maintenance resource allocation", "Productivity-based asset valuation", "Transportation asset management", "Utility theory" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The recent trends of diminishing budgets for highway agencies around the world have posed a challenge in maintaining their highway assets properly (Daan et al., 2011; Hussain et al., 2017). To manage highway assets more ef...
Service design for marketing in construction: Tactical implementation in the "business development management"
[ "Service experience", "Service-dominant logic", "Service provision", "Business development management", "Co-created value", "Marketing and service design" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Project execution is the prime research focus for examining projects and their improvement. Firm functions, especially those of main contractors, are neglected in relation to their contribution to projects and value delive...
Co-creation and co-destruction of experiential value: a service perspective in projects
[ "Service", "Value", "Service experiences", "Co-creation", "Co-creation capabilities", "Co-destruction" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Client organisations constantly strive to improve their policy and market position. Thus, clients develop business models and execute strategies through projects, in order to create and deliver value to a range of stakehol...
Service design and knowledge management in the construction supply chain for an infrastructure programme
[ "Knowledge management", "Supply chain", "Service design", "Cognitive mapping", "Programme management", "Systems thinking" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The term service design (SD) was brought forth by service marketing researchers and represents a customer-centered iterative approach to the creation of new services. SD is a multidisciplinary topic that incorporates contr...
Socially responsible procurement: A service innovation for generating employment in construction
[ "Employment", "Innovation", "Social value", "Construction contracts", "Social clauses", "Socially responsible procurement" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The use of public procurement in construction as a tool for creating social value is not new. Thai (2001) argued that there are two types of goals for public procurement: first, procuring goods and services, similar to the co...
Analysis of BIM use for asset management in three public organizations in Quebec, Canada
[ "BIM", "Service-dominant logic", "Case study", "Service innovation", "Facilities management", "Asset management", "Public sector organizations" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: As the digital transformation has already started at various pace in the construction industry, large-scale innovations are influencing the way projects are managed, by taking advantage of new technologies and collaborativ...
Developing a taxonomy of transportation waste in construction production processes
[ "Case studies", "Brazil", "Construction management", "Flow", "Lean construction", "Transportation waste" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Waste in production has been studied by academics since the beginning of twentieth century, principally since the compilation of the list of seven types of waste (transport, inventory, motion, waiting, over-processing, ove...
Procurement of low carbon municipal solid waste infrastructure in India through public-private partnerships
[ "India", "Public–private partnership", "Climate change mitigation", "Low carbon infrastructure", "Municipal solid waste management", "Procurement framework" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Infrastructure development and climate change mitigation have become the two most important agendas for governments. To engage governments to focus on emission reductions, global mechanisms, such as clean development mecha...
Modelling the adoption of sustainable procurement in construction organisations
[ "Sustainability", "Sustainable development", "Adoption", "Construction organizations", "Conceptual model", "Sustainable procurement", "Organizational model" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The construction industry has immense impact on the economic and social development of many countries and causes considerable damage to the environment (Xia et al., 2015). The industry accounts for one-tenth of the global ...
A risk-responsive framework for green retrofit projects in Sri Lanka
[ "Sri Lanka", "Risk management", "Risk assessment", "Green retrofit", "Risk mitigation", "Risk responsive framework" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The foremost benefits of converting existing buildings into green have made \"green retrofitting\" a very popular method, not only to reduce the effect of greenhouse gas emissions and its contribution towards global climat...
A BIM-LCA integration technique to embodied carbon estimation applied on wall systems in Brazil
[ "Sustainability", "Sustainable design", "BIM", "Assessment", "Carbon footprint", "Building life cycle", "Sustainable buildings" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: There is a worldwide need for investing in sustainable undertakings to reduce the global warming potential (GWP) and preserving the environment (Hertwich and Peters, 2009). Architecture, engineering and construction indust...
Managing embodied carbon in buildings: a Pareto approach
[ "Embodied carbon", "Office buildings", "Building elements", "Carbon hotspot", "Carbon hotspot probability", "Pareto principle" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Recent climate conventions and the number of academic papers published on climate change and carbon management evidence the increased attention to embodied carbon (EC) management of buildings. EC management, however, is on...
Mitigation of challenges in sustaining green certification in the Sri Lankan hotel sector
[ "Case studies", "Strategies", "Challenges", "Sustain", "Green certification", "Hotel sector" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The concept of sustainability in the hospitality and tourism industry is moving towards long-term viability for business and balancing of economic interests with social and environmental responsibilities. A study by Chan (...
Economic sustainability of green buildings: a comparative analysis of green vs non-green
[ "Sri Lanka", "Green buildings", "Life cycle costs", "Economic sustainability", "Green rating systems", "Sustainable features" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The present-day construction clients demand assurance on the long-term economic performance and costs of their buildings. Consequently, the construction supply chain, which consists of developers, suppliers, manufacturers,...
Gender mainstreaming as a strategy to achieve sustainable post-disaster reconstruction
[ "Strategy", "Sustainable development", "Gender mainstreaming", "Sustainable PDR" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Disasters that result from natural or human-induced hazards are gender constructed. The gendered construction of disasters results from unequal relationships between women and men in society, and these lead, in turn, to wo...
Nature of construction project cultures in the public sector: case studies in Sri Lanka
[ "Sri Lanka", "Public sector", "Basic assumptions", "Behavioural norms", "Construction project culture", "Culture emergence", "Sub-cultures" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Cultural differences create misunderstandings between people, creating risk for conflicts and dissatisfaction between construction project participants (Tijhuis, 2011; Ankrah and Langford, 2005). Kivrak et al. (2009) highl...
A systematic approach to develop risk registry frameworks for complex projects
[ "Knowledge management", "Delphi technique", "Risk assessment", "Systematic literature review", "Risk identification", "Risk registry" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Construction projects face a variety of risks during their life cycle that significantly impact project plans and predicted outcomes (Ashley and Bonner, 1987; Loosemore and McCarthy, 2008; Hallowell et al., 2012). As a result...
Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects
[ "Indonesia", "Cost model", "ANFIS", "Multiple regression", "Building project", "Conceptual cost estimation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Conceptual cost estimation (CCE) is the most important preliminary process in any construction project. Due to insufficient essential information on the project at its early stages, it is very important to quickly, economical...
Causal relationship between material price fluctuation and project's outturn costs
[ "Costing", "Project management", "Construction management", "Pricing", "Performance management", "Contract costs" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Normative literature portrays project completion within pre-contract budget as a vital indicator of success (Ansar et al., 2014; Pinto and Mantel, 1990). However, the construction industry has had a rich history of not comple...
Contractual challenges for BIM-based construction projects: a systematic review
[ "Procurement", "Contracts", "Construction management", "BIM", "Contract law", "Project management", "Building information modelling", "Contractual challenges" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In the arena of building construction, building information modeling (BIM) has been described as technologically both transformative and disruptive. Some yardstick measurements that were commonly employed to verify technol...
Assessment of procurement capacity challenges inhibiting public infrastructure procurement: A Nigerian inquiry
[ "Procurement", "Developing countries", "Survey", "Infrastructure", "Sub-Saharan Africa", "Procurement capacity" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: According to the United Nations Economic and Social Council (2016), over half of the population in Sub-Saharan Africa (SSA) live in slum-like conditions with limited access to suitable housing and the associated municipal ser...
Stakeholder management in PPP projects: external stakeholders' perspective
[ "PPP", "Projects", "Stakeholder management", "Roads", "Construction works", "End-users" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: A public-private partnership (PPP) is typically an agreement between a public-sector authority and a consortium or special purpose vehicle (SPV) to procure public goods and services. The essence of the consortium, according t...
Academic research in emerging knowledge-based economies: The case of Sri Lankan construction industry
[ "Construction management", "Knowledge dissemination", "Research collaborations", "Academic research", "Innovation theories", "Knowledge utilization", "Knowledge-based economies" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The construction industry accounts for a sizable proportion of gross domestic product of most countries, ranging from 6 to 8 per cent in average, and considered as a major industry in an economy (Horta et al., 2013). In an in...
A systemic exploration of drivers for and constraints on construction productivity enhancement
[ "Construction productivity", "Productivity growth", "System dynamics", "Causal loop diagrams", "Industry development", "Systemic framework" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The construction industry makes a significant contribution to global gross domestic product; therefore, sustaining construction productivity is essential to economic growth (Barbosa et al., 2017). Productivity is often define...
Causes and mitigation for declining productivity in the Australian mid-rise residential construction sector
[ "Australia", "Case study", "Lean production", "Project management", "Offsite construction", "Building information modelling", "Construction productivity", "Complexity-reduction strategies", "Mid-rise residential" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The construction industry is a significant driver of economic activity in many countries. This holds true in Australia where the construction industry is the third largest industry, behind mining and finance, producing aro...
Using the learning curve theory in the investigation of on-site craft gangs' blockwork construction productivity
[ "Construction productivity", "Blockwork", "Craft gangs’", "Learning curve theory", "On-site learning", "Quantitative research method", "Standard observation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Construction is a challenging industry that uses many capitals; it accounts for an important amount of gross domestic product (GDP) of some advanced and emerging countries (Tucker et al., 2005). In advanced European countries...
International comparison of performance of public projects
[ "China", "Public sector", "Quality", "Time", "Cost efficiency", "Performance levels" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Public projects need to be managed efficiently and productively because they are funded using taxpayers' money, which comes with a high level of accountability. Comprehensive project management guidelines such as those issued...
Labour productivity motivation framework for Iskandar Malaysia
[ "Development", "Motivation", "Productivity", "Labour", "Framework", "Iskandar Malaysia" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Iskandar Development Region is a regional development corridor, currently known as Iskandar Malaysia (IM). It is located in Johor, Southern region of Peninsular Malaysia and it covers a total area of 2,300 square kilometre...
An implementation framework of value management in the Nigerian construction industry
[ "Current", "Structural equation modelling", "Critical success factor", "Productivity", "Practices", "Value management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Value management (VM) is a multi-disciplinary, team-oriented, structured, analytical and systematic analysis function that specifically seeks best value through the design and construction process to meet client's perceive...
An exploratory study on the impact of mobile ICT on productivity in construction projects
[ "Information technology", "Productivity", "Construction industry", "Communications", "Communications technology", "Mobile communications" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The construction industry contributes significantly to both the economy and employment in various countries (Naoum, 2016). In Australia, the construction industry directly employs over one million people (around 8.9 per cent ...
Toward improved LCC-informed decisions in building management
[ "Building management", "Asset management", "Economic sustainability", "Life cycle cost", "Facility management", "Project", "Programme and portfolio management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The Architecture, Engineering and Construction (AEC) sector is currently challenged by the complex task of addressing multiple regulations and standards designed to promote life cycle thinking and a sustainable approach to...
Energy efficiency practices for Malaysian green office building occupants
[ "Malaysia", "Efficiency", "Office", "Green", "Energy", "Building" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Buildings globally consume approximately 40 per cent of total electricity produced and emit about 30 per cent of carbon dioxide (CO2) (JKR and CIDB, 2016). However, extensive research and development have been done to enha...
Modeling a transformational route to infrastructure sustainability in South Africa
[ "Sustainability", "Infrastructure", "Construction", "Lean", "South Africa", "Transformation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Over the last decades, society has witnessed a lot of innovation and transformation in its drive for a balanced ecosystem. Infrastructure sustainability was considered critical for the development of the economy and improv...
Automatic fault detection for Building Integrated Photovoltaic (BIPV) systems using time series methods
[ "Renewable energy", "Time series analysis", "Automatic fault detection", "Energy performance", "Operations and production management", "Performance monitoring" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Faults in the actual outdoor performance of Building Integrated Photovoltaic (BIPV) systems can go unnoticed for several months since the energy productions are subject to significant variations that could mask faulty behavio...
Utility relocation management in highway projects
[ "Case study", "Project delays", "Nominal group technique", "Highway projects", "Utility conflict management", "Utility relocation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction and background of the infrastructure development in India: The infrastructure sector is a key driver for the Indian economy (IBEF, 2016). The transport infrastructure sector in India grows at a compounded annual growth rate...
The influence of personal characteristics on quantity surveyors' job satisfaction
[ "Gender", "Human resource management", "Job satisfaction", "Construction industry", "Age", "Seniority", "Marital status", "Dependents", "Job experience", "Quantity surveyor" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: It is important to study the job satisfaction of employees as research has linked job satisfaction to performance at work, absenteeism, and resignations (Locke and Dunnette, 1976). A better understanding of job satisfaction w...
Project feasibility analysis economic model for private investments in the renewable energy sector
[ "PPP", "Renewable energy", "Infrastructure management", "Infrastructure economics", "Infrastructure finance", "Project feasibility analysis" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Currently almost 1.1 billion people all over the world live without having access to electricity (PPP Knowledge Lab, 2017), which is one of the main reasons that many countries try to find new sources of energy to overcome th...
Model for developing trust on US construction projects
[ "Construction", "Trust", "Communication", "Project management", "Productivity", "Trust model" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The US construction industry is facing a number of challenges related to low productivity rates, uncertain profits and low adoption rates of new technologies (Sveikauskas et al., 2014). Trust between contracting parties on...
Impact of integrated collaborative technologies to form a collaborative culture in construction projects
[ "Integration", "BIM", "Construction management", "Collaboration", "Project management", "Information systems" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Research purpose: The deployment of a collaborative culture for stakeholders during the planning, design and construction stages of a project enhances project performance (Kapogiannis, 2013). Zuppa et al. (2008) stated that development ...
Retrofitting heritage office buildings in the UK: a case study
[ "Energy efficiency", "Built environment", "Simulation", "Retrofitting", "Office buildings", "Heritage buildings" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Heritage buildings are generally lauded for their cultural, historical and, in some cases, architectural significance. In addition, Mansfield (2009) asserts that heritage buildings perpetuate a sense of identity, and colle...
Framework for sustainable construction practices in Sri Lanka
[ "Sustainability", "Framework", "Construction industry", "Sri Lanka", "Contracting organizations", "Sustainable construction practices" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Global demand for sustainable development places tremendous pressure on the construction industry to promote sustainable practices in construction (Opoku and Fortune, 2013). Sustainable construction can bring environmental re...
Factors affecting building services' coordination during the design development and review stages
[ "Design", "Coordination", "Factors", "Building projects", "Building services", "MEP" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: In the past few decades, the built environment has witnessed tremendous and progressive transformation. Towering sky-scrapers in hundreds of meters and over hundreds of floors now grace many city centers across the world. The...
Investigating systematic review for multi-disciplinary research in the built environment
[ "Systematic review", "Evidence-based practice", "Green building", "Academic-practitioner divide", "Green offices", "Multi-disciplinary research" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In the built environment, particularly when sustainable or green or low carbon office buildings are closely scrutinised to understand their impacts on health and well-being of employees, research involving collaborations f...
Risk-based entry decision into African construction markets: a proposed integrated model
[ "Entry mode", "Resources", "Risk mitigation", "Risk perception", "African construction market", "Multinational construction companies" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Choosing the right entry mode is one of the decisions that have to be made by multinational construction companies (MNCCs) crossing borders into foreign markets. Before making such a decision, Odediran and Windapo (2016) c...
Carbon and cost critical elements: a comparative analysis of two office buildings
[ "Office building", "Capital cost", "Carbon hotspots", "Cost hotspots", "Element rates", "Embodied carbon" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Carbon management of the built environment is imperative to tackle the global climate change by reducing greenhouse gases (GHGs). Even though carbon (implies GHG) emitted during the operation of buildings (operational carb...
Project delivery attributes influencing green building project outcomes: A review and future research directions
[ "Project success", "Green buildings", "Review", "Project performance", "Project delivery attributes", "Success criteria" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: With the increase in market demand for green buildings (GBs), Architecture, Engineering and Construction industry is beginning to realize that such projects have some additional requirements in their overall delivery process ...
Current context of transport sector in South Asia: Recommendations towards a sustainable transportation system
[ "Government policies", "Mobility", "Safety", "Safety measures", "Sustainable transport", "Key actions" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Transportation involves the process of conveying people and/or goods from one place to another. Transportation systems incorporate two main aspects, i.e. transport infrastructure (e.g. road networks) and transport modes (e...
Systematic approach for asset management of urban water pipeline infrastructure systems
[ "Asset management", "Preventive maintenance", "Geographical information systems", "Underground infrastructure systems", "Urban infrastructure", "Water pipeline network" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Over the past decade, significant challenges have been posed to provision of safe and clean drinking water for communities (Yamijala et al., 2009). These challenges are caused by the decline in freshwater resources, populatio...
LiVE approach: Lean integrated Value Engineering for construction industry
[ "Construction industry", "Lean", "Synergy", "Value engineering", "Lean integrated Value Engineering concept", "Live approach", "Value for client’s money" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Globalisation and fierce competition among businesses have necessitated the organisations to achieve value for customers and continuous improvement in every business aspect. Hence, companies tend to achieve competitive edg...