Simulation techniques for cost management and performance in construction projects in Malaysia
[ "Performance", "BIM", "Contingency planning", "Monte Carlo simulation", "4D simulation", "Cost estimates" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Cost is one of the most important elements throughout the project life cycle, which can determine the success or failure of a project. High accuracy of cost estimation and control is important to prevent cost overrun at the e...
Interdependency of the critical success factors and ex-post performance indicators of PPP projects
[ "Critical success factors", "Regression analysis", "PPP", "Project management", "Asset management", "Ex-post performance" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The PPP projects have greatly evolved in the recent years, because of their potential to offer better value for money (VFM). There are several resources which advocate that the use of PPP projects improves the performance of ...
Co-productive interrelations between business model and zero carbon building: A conceptual model
[ "Organization", "Innovation", "Value", "Projects", "Business model", "Zero carbon building" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: To deliver long-term sustainability, companies are required to create economic value while increasing corporate environmental and social performance. Leading economies have to not only master the cost-driven competition, b...
An analytic network process (ANP) model to examine LEED-certified buildings' operational performance
[ "LEED", "ANP", "Building life cycle", "Building operational performance", "Green rating", "Sustainable buildings" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Sustainable buildings have gained tremendous recognition in the construction industry over the past decade, and various environmental rating systems have been proposed worldwide since 1990s.\nResearch methodology: The methodo...
A framework for adopting green leasing in developing countries: the case of Sri Lanka
[ "Sri Lanka", "Barriers", "Enablers", "Green building", "Green leasing", "Adoptability" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The concept of green is not new as there has been a noticeable trend toward green buildings in the last few decades (Samer, 2013). According to a publication of the US Environmental Protection Agency (2014), green building...
An eco asset ontology towards effective eco asset management
[ "Asset management", "Eco asset", "Eco asset knowledge management", "Eco asset management", "Eco asset ontology", "Natural asset" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Aging infrastructure, high level of service requirements, economic downturn, declining rate of re-investment on infrastructure and high renewal and replacement costs require the civil infrastructure to be managed effectively ...
Application of "R" principles to enhance the efficiency of water usage in construction sites
[ "Behaviour", "Sustainability", "Attitudes", "Construction", "Efficiency", "Water" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Water conservation is increasingly being identified as an important facet of sustainable development with rapidly decreasing freshwater availability that already threatens the survival of 1.1 billion people around the globe (...
Production of green concrete using recycled waste aggregate and byproducts
[ "Sustainability", "Building materials", "Compressive strength", "Cement replacement", "Green concrete", "Recycled aggregate" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The construction sector is not only a massive consumer of non-renewable resources, but also a massive producer of wastes (Bakhoum and Brown, 2011). Concrete is the leading construction material with an annual global productio...
Payment mechanisms for contractors for better environmental hazard controlling in road construction projects
[ "Sri Lanka", "Road construction", "Environmental hazards", "Fund allocation", "Hazard controlling", "Payment mechanisms" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The construction industry plays an essential role in providing physical infrastructure, which is required for fulfilling the growing needs of the society. Simultaneously, it contributes to the negative effects such as vari...
Focusing megaproject strategies on sustainable best value of stakeholders
[ "Sustainability", "Relationship management", "Stakeholder value", "Stakeholder management", "Built infrastructure", "Megaprojects" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nBackground and introduction: Megaprojects, initial expectations and best value\nApplying stakeholder theory to megaprojects: Stakeholder theory in megaprojects - origins and scope\nDisruptions due to inadequate stakeholder engagement - an ...
Exploring construction client values and qualities: Are these two distinct concepts in construction studies?
[ "Construction", "Epistemology", "Client values", "Client qualities", "Client value", "Contractor services" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The provision of satisfactory services by contractors with respect to time, cost, and quality has been widely accepted as desirable if clients' expectations are to be met (Maloney, 2002; Soetanto and Proverbs, 2002; Jafari...
Developing a clients' charter and construction project KPIs to direct and drive industry improvements
[ "India", "KPIs", "Ci3", "Clients’ charter", "Construction clients", "Construction Industry Institute", "Industry improvement initiative" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Background and introduction: 1.1 International initiatives for industry improvements\n2. Initiative for construction industry improvements in India: 2.1 Launch and trajectory of \"Ci3 India\" (construction industry improvement initiativ...
Maintaining focus on clients' requirements using the DQI tool: Towards a requirements-oriented project process
[ "Client requirements", "Construction projects", "Project lifecycle", "Requirements management", "Design quality indicator (DQI)", "Requirements-oriented project process" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: This paper addresses the broad question of how focus on client requirements is maintained over the lifecycle of a construction project, such that the end result truly reflects their wishes. In this context, the \"client\" ref...
Collaborative facilities management model: Sri Lankan perspective
[ "Core business", "Information", "Facilities management", "Ownership", "Collaborative facilities management model", "Facility services", "Geographical location", "Utilities/infrastructure" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Globalisation has inspired professionals to instigate a complete rethinking and restructuring of all business processes. In this context, facilities management (FM) professionals, who have recently become a significant pro...
Integrating lean and visual management in facilities management using design science and action research
[ "Lean", "Change management", "Action research", "Visual management", "Design science research", "Facilities asset management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The global recession of 2008 generated economic constraints that prompted world governments to establish leaner, more efficient, value-added initiatives. This trickled down to governments, universities, and organizations arou...
Relationally integrated value networks (RIVANS) for total facilities management (TFM)
[ "Construction industry", "Project management", "Social network", "Life-cycle value", "Relationally integrated value networks (RIVANS)", "Total facilities management (TFM)" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Collaboration and relational approaches such as in joint ventures, partnering, alliancing, integrated project delivery, and other collaborative contracting modes are increasingly practiced worldwide (Manley, 2002; Rowlinson a...
Vision and advocacy of optoelectronic technology developments in the AECO sector
[ "Building information modelling (BIM)", "Digital built environment", "Laser scanning", "Machine vision", "Optoelectronic devices", "Point cloud" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Optoelectronics has its etymological roots grounded in physics and encompasses the study, design and manufacture of electronic devices for emitting, modulating, transmitting and sensing light (Sergiyenko and Rodriguez-Quinone...
Development of a web-based system for managing suppliers' performance and knowledge sharing in construction project
[ "Knowledge management", "Information technology", "Information systems", "Knowledge sharing", "Performance management", "Supplier management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The development of construction projects involves several stages during which a number of parties with different expertise interact and cooperate to accomplish the various project tasks. The client who owns a project normally...
Challenges to the implementation of building management systems in Saudi Arabia
[ "Building", "Implementation", "Operation and maintenance", "Briefing and design", "Building management systems", "Installation and acceptance" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The building industry has been lagging behind the services and manufacturing industries in terms of quality and productivity for more than 40 years. Some of the root causes for this setback include the continual fragmentation...
Critical success factors for local government project stakeholder management
[ "Critical success factors", "Ghana", "Participation", "Stakeholder management", "Project", "Local government" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Stakeholder management is one of the critical aspects of project management as it is a key contributing factor to the success or failure of a project. Cooper (2014) asserts that successful stakeholder management helps to c...
Process mapping for road works planning and coordination
[ "Case studies", "Management", "Construction management", "Efficiency", "Public sector", "Business analysis", "Transport", "Process analysis" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Public highway works (utility works and highway maintenance) management increasingly requires enhancement to minimise its negative impacts on society including, congestion, depleted structural life, compromised air quality...
Improving the cost estimates of complex projects in the project-based industries
[ "Estimation", "Cost overrun", "Risk", "Dimensions", "Complex projects", "Project-based industries" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Project cost overrun is a significant and fairly common issue in many project-based industries (Bertelsen and Koskela, 2003; Flyvbjerg, 2005; Olaniran et al., 2015; Ramasubbu and Balan, 2012). A variety of reasons for cost...
Sustainability and cost assessment of coastal vacation homes for energy retrofits
[ "Energy", "Cost", "Retrofitting", "EQUEST", "Outer Banks", "Vacation homes" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Over the recent years, there has been a constant pursuit to develop new building materials, usage of highly efficient air conditioning and heating units, in addition to designing and constructing new buildings such that th...
Developing labour productivity norms for aluminium system formwork in Sri Lanka
[ "Productivity", "Aluminium system formwork (ASF)", "Labour productivity (LP)", "Labour productivity factors (LPFs)", "Labour productivity norms (LPNs)", "Low-cost housing projects (LHPs)" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Brett (1988) defines productivity as, \"an index that measures output relative to the input, used to produce them\" (p. 51). Productivity fosters satisfied clients, attracts investment and contributes to economic growth an...
Review of project planning methods for deconstruction projects of buildings
[ "Planning", "Deconstruction", "Building deconstruction planning", "Deconstruction planning", "Deconstruction planning methods", "Deconstruction scheduling", "Planning methods" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The lifecycle of buildings broadly covers the stages of construction, utilisation and deconstruction/demolition. Deconstruction or demolition occurs at the end of a building's lifecycle. In this paper, the term \"building\...
Integrated solutions for total asset management through "RIVANS"
[ "Integration", "BIM", "Collaboration", "Networks", "Facilities management", "Relationally integrated value networks (RIVANS)", "Total asset management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Integration and value optimisation have been studied through design and in construction and supply chains (e.g. Kumaraswamy et al., 2002; Dubois and Gadde, 2000; Bresnen, 2009). However, arguably minimal effort has been di...
Physical asset management practices in the Saudi public sector
[ "Saudi Arabia", "Asset management", "Physical asset management", "Infrastructure management", "Physical assets", "Saudi public sector" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nBackground: Saudi Arabia is the largest country in the Gulf region and one of the largest in the Middle East. It stretches over 1,500 km from north to south and 1,000 km from east to west (Filor, 1988). The total area is 1,962,582 square k...
Success criteria of toll road projects from a community societal perspective
[ "Communities", "Public private partnership", "Roads", "Project impact assessment", "Social benefit", "Toll roads" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: A toll road as an infrastructure project greatly influences the quality of life and economic activity, therefore its success is very important. Infrastructure projects, which may be developed under public private partnersh...
The influence of risk on the equity share of build-operate-transfer projects
[ "Regression analysis", "Projects", "Public private partnership", "Private finance", "Risk analysis", "Built operate transfer" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In a build-operate-transfer (BOT) delivery system, a special purpose vehicle (SPV) designs, funds, builds and operates a public infrastructure for a specified concession period at the end of which the facility is transferr...
Identification of risk patterns in Vietnamese road and bridge construction: Contractor's perspective
[ "Risk", "Risk management", "Roads", "Bridges", "Transportation projects", "Vietnam" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In recent years, Vietnam's economy has been growing up speedily and integrating with the global economy. Since 2007, Vietnam has been a member of the World Trade Organization. Vietnam has also joined many bilateral and mul...
Impacts of human resource development on engineering, procurement, and construction project success
[ "Vietnam", "Construction management", "Project management", "Human resources management", "Project teams", "Engineering procurement and construction project success", "Personnel management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The advantage of engineering, procurement and construction (EPC) contracts is to provide a complete facility as soon as possible (Jergeas and Fahmy, 2006). EPCs have become the project delivery systems of choice; however, ...
Overrun causations under advance payment regimes
[ "Costs", "Construction", "Capabilities", "Business strategy", "Cash flow", "Capital projects" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: An efficient payment mechanism is a vital necessity to stimulate performance in construction projects. If a project is funded poorly, it is not likely to succeed greatly. How then are payments supposed to help achieve project...
Maintenance strategy for public-rented residential building: a case study in Jakarta, Indonesia
[ "Strategy", "Maintenance", "Property management", "Jakarta", "Residential building", "Slums" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Housing is one aspect of a social infrastructure that accommodates people to live in a suited place and is one of human's basic needs other that food and clothing. Housing in general refers to a building that protects people ...
Analyzing relationships between project team compositions and green building certification in green building projects
[ "Project management", "Green building", "Project teams", "Link analysis", "Organizational analysis", "Page rank" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The design, construction, and management of a green building project are different from those of a traditional construction project. For example, when stakeholders approach a green building project, more emphasis is given to ...
Indoor environmental quality and occupants' productivity: Suggestions to enhance national green certification criteria
[ "Productivity", "Performance measurement", "Environment", "Green building", "Environmental performance", "Office buildings" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In recent years, the topic of indoor environmental quality (IEQ) seems as a growing concern where it was identified as a major factor influencing occupants' health, well-being and productivity. Specially, much more attenti...
Green business models transformation: evidence from the UK construction sector
[ "UK", "Transformation", "Value chain", "Exploratory study", "Construction sector", "Green business model" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The construction sector plays a vital role for most human activities. The quality of the built environment has an impact on the quality of people's lives (Raynsford, 1999). In the UK, the construction sector remains centra...
Sustainability of Indian PPP procurement process: Development of strategies for enhancement
[ "Sustainable development", "Sustainability", "India", "Public-private partnerships", "Procurement process" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Public-private partnership (PPP) is a procurement approach where the public and private sector (PS) join forces to deliver a public service or facility. In this arrangement normally both the public and PS will contribute t...
Malaysian experience with public-private partnership (PPP): Managing unsolicited proposal
[ "Procurement", "Public policy", "Governance", "Competition", "Economic sustainability", "Public sector organizations" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Sustainable procurement is defined as achieving sustainable development goals through the act of acquiring and purchasing (Walker et al., 2012). Sustainability in procurement can be achieved through an effective use of res...
Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka
[ "Sri Lanka", "Criteria", "As-planned vs as-built analysis", "Delay analysis techniques", "Road construction", "Window analysis" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: For a project to be successful it has to be completed within the allotted time and budget while meeting the expected standards. Unsuccessful projects lead to unfavourable issues such as late completion, cost overruns and s...
Sustainable management of NHS assets backlog maintenance
[ "Healthcare", "Strategy", "Risk", "Asset management", "Critical infrastructure", "Backlog maintenance" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nBackground: The National Health Service (NHS) is one of the largest building landlords in the UK and responsible for assets worth over PS84 billion (Baillie, 2013). The value of its property, plant and equipment (including owned, leased an...
Water use efficiency and conservation during construction: drivers, barriers and practices
[ "Water efficiency", "Water conservation", "Water use", "Behaviour of the workers", "Construction site" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The world is experiencing an unprecedented scarcity of water due to its overuse and ever-increasing demand (Young and Loomis, 2014). This phenomenon combined with the rising pollution of water sources has restricted the av...
Primary BIM dataset for refurbishing flood risk vulnerable housing in the UK
[ "BIM", "Risk management", "Project management", "Refurbishment", "Floods", "Housing management", "Housing information", "Climate risk" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Climate change has been identified as the greatest challenge facing human society and the United Nations Intergovernmental Panel on Climate Change recommended that the potential consequences of climate change should be mit...
Disaster risk reduction infrastructure requirements for South-Western Bangladesh: Perspectives of local communities
[ "Disaster risk reduction", "Infrastructure", "Flooding", "Disaster management", "Infrastructure management", "Floods", "Disaster planning", "Community development", "Cyclones", "Community engagement" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Geographical location and land characteristics make Bangladesh one of the most hazard-prone countries in the world (World Bank, 2011), and hence the country is often considered to be one of the world's natural disaster hot...
Capacity building of institutions for disaster risk reduction: Learning from communities as first responders
[ "Case studies", "Disasters", "Communities", "Community development", "Capacity development", "Citizen participation" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n__NO_TITLE__: Dear sir, this may be your project but this is my life.\nMethodology: The authors have been conducting evaluations and research into how local communities respond to disasters and conflicts for the past ten years. Based on th...
Disaster vulnerability of Emirati energy sector and barriers to enhance resilience
[ "Barriers", "Disasters", "Hazards", "UAE", "Energy sector", "Vulnerabilities" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Increasing frequency and intensity of disasters have resulted in severe disruptions to communities and built environment facilities around the world. There is an evident increase in human and property losses from disaster eve...
Measuring eco-roof mitigation on flash floods via GIS simulation
[ "Disaster risk reduction", "Numerical simulation", "Geographical information systems (GISs)", "Green building", "Infrastructure management", "Floods", "Disaster planning", "Land use", "Green roof", "MOUSE", "Critical infrastructure" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Urban flooding is a severe problem and a growing development challenge for many cities around the world (Jha et al., 2012). It ranges from minor incidents, such as flooding of basements, to major ones, where flooding of ci...
A conceptual framework for understanding resilience of construction SMEs to extreme weather events
[ "Construction industry", "SMEs", "Vulnerability", "Construction management", "Business continuity", "Resilience", "Disaster planning", "Small to medium sized enterprises", "Extreme weather events" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Small and medium sized enterprises (SMEs), which form a significant portion in many economies, are some of the most vulnerable to the impact of extreme weather events (EWEs). In this research, EWEs are considered as \"weat...
Delivering sustainable communities: a case study in China
[ "China", "Case study", "Project development", "Green building", "Best practice", "Sustainable community" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In recent years, China has witnessed rapid economic growth and urbanisation development. However, this has given rise to a number of environmental problems and challenges, such as pollution, energy consumption, ecological ...
A systems approach to assessing organisational viability in project based organisations
[ "Nigeria", "Implementation", "Social benefits", "Infrastructure delivery", "Organizational viability", "Project-based organizations", "Socio-economic benefits", "Systems analysis" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Project-based organisations (PBOs) within the realm of infrastructure delivery consist of multi-disciplinary, inter-organisational project teams with diverse cultures, and values (Hobday, 2000; Thiry and Deguire, 2007). Proje...
Improving relationships in project teams in Malaysia
[ "Performance", "Time", "Relationship management", "Costing", "Quality", "Project management", "Project teams", "Relational contracting", "Project outcomes", "Clients", "Consultants", "Main contractors" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: A party in a contract has a range of norms to adopt - from relying heavily on contractual arrangements to implementing relational norms (Macneil, 1983). This indicates that both transactional and relational forces exist in a ...
Building management system for sustainable built environment in Sri Lanka
[ "Buildings", "Sustainability", "Energy", "Facilities", "Environment", "Economic sustainability", "Building management system" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Designing a sustainable building that meets all sustainability requirements is often a challenge to the building professionals (WBDG Sustainable Committee, 2011). A building management system (BMS) is one of the innovative...
Change management framework to enable sustainable outsourcing of facilities management services
[ "Outsourcing", "Sri Lanka", "Change management", "Maintenance", "Facilities management", "Building operations" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Outsourcing of facilities management (FM) services is become popular as many organisations decided to focus on their core business activities (Kadefors, 2008). Rapid changes in the business environment lead the organisatio...
Fault tree analysis method for deterioration of timber bridges using an Australian case study
[ "Evaluation", "Deterioration", "Fault tree analysis", "Preventive maintenance", "Road structures", "Timber bridges" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Australia has about 40,000 timber bridges and most of which are more than 50 years old thus require immediate attention to maintain them as serviceable assets (Ranjith, 2010; Ranjith et al., 2013; Wallace, 2015). The majority...
Task-based defect management: anatomical classification
[ "Quality management", "Construction industry", "Defects", "Building projects", "Quality deviation", "Sub-tasks requirements" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Defects, departures from established requirements, so severe that rectification is mandatory, have become an (unfortunate but) accepted part of the building process (Burati and Farrington, 1987; Georgiou, 2010; Mills et al...
Identifying stakeholders' involvement that enhances project scope definition completeness in Saudi Arabian public building projects
[ "Analytical hierarchy process", "Participation", "Decision making", "Stakeholder management", "Prioritising", "Project scope definition" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Project scope definition is the development and stating of the project purpose, cost, schedule, technology, environmental concerns, resource requirements and construction methods or procedures (Wang, 2002). It is required ...
Estimation of life-cycle costs of buildings: regression vs artificial neural network
[ "A connection weight (CW)", "Artificial-neural-networks", "Building projects", "Cost-significant-items (CSIs)", "Life-cycle estimation", "Multiple regression" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The principle of life-cycle costing (LCC) is not new; the Japanese used LCC concepts widely post Second World War to rejuvenate their economy through specification choices that would last longer and thus save costs in the lon...
Critical success factors of adapting heritage buildings: an exploratory study
[ "Heritage", "Buildings", "Adaptability", "Critical success factors", "Refurbishment", "Historic buildings" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The loss of heritage buildings should be avoided as they provide a tangible example of a period of life that is now gone. However, it is not feasible for all heritage buildings to be conserved as museum pieces. Adaptive re-us...
A critical success model for PPP public housing delivery in Ghana
[ "Developing countries", "Ghana", "Housing", "PPP", "Public private partnership", "Critical success factors", "Project success", "Public housing projects", "Public housing" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Emerging studies on the provision of major government (public) infrastructural projects continue to identify and give credence to public private partnerships (PPPs) as suitable alternative project delivery approach for gov...
Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria
[ "Nigeria", "Stakeholders", "Developing countries", "Implementation", "Critical success factors", "PPP projects" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In an increasingly competitive global environment, governments around the world are focusing on new ways to finance projects, build infrastructure, and deliver services (Canadian Council for Public Private Partnerships, 20...
Capacity building in construction health and safety research, education, and practice in Pakistan
[ "Developing countries", "Construction industry", "Risk management", "Construction systems", "Health and safety", "Safety measures" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The construction industry environment is highly conducive to human and monetary losses (Garrett and Teizer, 2009). The accident rate in construction is among the highest in comparison to other industries all over the world (W...
Exploratory analysis of the pathway towards operationalizing resilience in transportation infrastructure management
[ "Sustainability", "Natural disasters", "Disaster management", "Systems management", "Asset management", "Infrastructure management", "Disaster planning", "Transportation infrastructure resilience", "Transportation agencies" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The increased frequency and severity of natural disasters due to climate change call for improving resilience in infrastructure systems. In particular, the resilience of transportation infrastructure systems is of critical im...
Analysis of US commercial buildings' energy efficiency programs
[ "USA", "Energy efficiency", "Commercial buildings", "Electricity consumption", "Energy programs", "Foreign oil" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Many publicly funded programs target the commercial buildings sector which uses one-third (1,319 billion kilowatt-hours (kWh) as at 2011 (US Energy Information Administration, 2011a, b)) of all electricity produced in the USA...
Service quality and user satisfaction of outsourced facilities management (FM) services in Nigeria's public hospitals
[ "Hospitals", "Quality management", "Service quality", "Services", "Factor analysis", "Facilities management services" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Over the years, facilities management (FM) has grown from what was traditionally perceived to be mere managing of buildings or maintenance unit of an organisation to the holistic reality of being integrated into the core a...
An ontology-supported asset information integrator system in infrastructure management
[ "Asset management", "Information system", "Asset information integrator system", "Asset inventory and condition assessment reporting", "Infrastructure asset management", "Infrastructure management", "Tangible capital asset", "Tangible capital asset ontology", "Tangible capital asset reporting", "T...
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Infrastructure agencies own, operate, and manage various infrastructure systems. To efficiently manage these systems, various private, para-governmental (e.g. Crown corporations), and public agencies (e.g. municipal, regional...
Revisiting the construction project failure factors in Vietnam
[ "Performance", "Vietnam", "Construction industry", "Critical factors", "Risk management", "Project management", "Project failure" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: While factors causing failure of construction projects has been studied in other countries, the revisiting of studies undertaken in the context of Vietnam deserves particular attention. It cannot be denied that the Vietnam...
An empirical analysis of construction organisations' competitive strategies and performance
[ "Performance", "Construction", "Business strategy", "Performance measures", "Organizational development", "Competitive strategy" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The South African construction industry has been a key driving force behind the nation's economic growth ever since it was targeted for reformation at the beginning of the post-apartheid era of the 1990s. The construction ind...
Post conflict housing reconstruction: Exploring the challenges of addressing housing needs in Sri Lanka
[ "Sustainable development", "Role conflict", "Housing", "Project management", "Public policy", "Terrorism", "Resource management", "Stakeholder management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Post conflict reconstruction contributes to overcome the legacies of conflict through reactivating the development process that has been disrupted by conflict (The World Bank, 1998) and among such interventions, physical r...
Comparative analysis of back-to-back subcontracts in the construction and telecommunications industries
[ "Construction", "Telecommunication", "Projects", "Back-to-back", "Model contracts", "Subcontracts" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The intent of a \"back-to-back\" contractual arrangement is to align, or transfer, contractual terms and conditions from a main contract to a subcontract (Noreen et al., 2009). Akintoye and MacLeod (1997) identified that m...
Case-based reasoning and BIM systems for asset management
[ "BIM", "Building maintenance", "Asset management", "Building knowledge modelling", "Case-based reasoning", "Knowledge systems" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: During the whole lifecycle of a building and for asset management purposes, different stakeholders handle different working stages. The information exchanged among the teams of each stage is generally limited in the format of...
Digital model data distribution in civil engineering contracts
[ "Asset management", "Civil-engineering", "Data-distribution", "Digital-modelling", "Maintaining-information", "Managing-information" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Available methods of communicating engineering design documentation have grown from the use of hard-copy blueprints, evolving beyond computer-aided-designs, towards integrated digital-models. Despite increasingly commonplace ...
BIM in facilities management applications: a case study of a large university complex
[ "Information technology", "BIM", "Information management", "Facilities management", "Asset management", "Facilities management (premises)", "Information exchange" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Facilities management (FM) is an umbrella term under which a wide range of property and user-related functions are brought together for the benefit of the organisation and its employees as a whole (Spedding and Holmes, 199...
A systems information model for managing electrical, control, and instrumentation assets
[ "BIM", "Systems management", "Asset management", "System design", "Systems engineering", "Utility life" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Asset management (AM) involves the balancing of costs, opportunities and risks against the desired performance of assets, to achieve an owner's objectives. It also enables asset owners to examine the need for and performance ...
Towards green building performance evaluation using asset information modelling
[ "Building information modelling (BIM)", "Asset information management (AIM)", "As-built BIM", "Building performance attribute data (BPAD)", "Facilities management (FM)" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The aim of this paper is to address the disconnect between design aspiration and operational performance of facilities through proposed developments in the use of Building Information Modelling (BIM). Although improved unders...
BIM-FM and consequential loss: how consequential can design models be?
[ "Intellectual property", "Asset management", "Building information modelling (BIM)", "Virtual property", "Consequential loss", "Disclaimer" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Building information modelling (BIM) supports integration. This means project development data could be contributed from across multiple disciplines to form a single model which could be put to use for the entire project life...
Contextualizing learning approaches which shape BIM for maintenance
[ "BIM", "Learning", "Maintenance" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: BIM is a relatively new occurrence in maintenance. The UK government has been instrumental in the take up of BIM in projects and maintenance (Cabinet Office, 2012) but the impact of this external influence is not fully und...
BIM in the operations stage: bottlenecks and implications for owners
[ "The Netherlands", "Operations", "Information management", "Building information modelling (BIM)", "Asset management", "Client organization" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: As in many other countries, every year almost 10 per cent of the turnover of Dutch construction firms is wasted by unnecessary mistakes and poor collaboration (USP, 2012). Integrating and managing information more actively an...
Contractor use of productivity and sustainability indicators for building refurbishment
[ "Sustainability", "Sweden", "Productivity", "Performance management", "Performance measures", "Indicators", "Building refurbishment" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Refurbishment and new construction differ in several ways, and the uncertainties pertaining to the existing building as well as tenants' involvement are two among these many differences. However, earlier studies of productivi...
Organizational leadership role in the delivery of sustainable construction projects in UK
[ "UK", "Sustainability", "Leadership", "Construction organizations", "Leadership role" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The UK construction industry is in an era of difficult times in terms of its socio-economic, cultural, political and business environments. There is an urgent need to promote a positive culture in the construction industry...
The role of team leadership in achieving LEED certification in a green building project
[ "Green building", "Construction project", "LEED certification", "Team leadership" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: This paper presents a research project which was aimed to explore the role of team leadership in achieving LEED certification in a green building project. The research findings are based on the perspectives of key particip...
Leadership style of sustainability professionals in the UK construction industry
[ "UK", "Leadership style", "Sustainability", "Leadership", "Construction organizations" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Leadership is vital in the construction industry and a key success factor in the drive towards sustainability (Ofori and Toor, 2008). Construction organizations need leadership that provide the collective vision, strategy ...
Actors and barriers to the adoption of LCC and LCA techniques in the built environment
[ "Content analysis", "Sustainability", "Organizational culture", "LCA", "LCC", "Life cycle management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Life Cycle Costing (LCC) and Life Cycle Assessment (LCA) are among the most discussed tools in the last decades. Indeed, they are both innovative approaches with a strong theoretical background but a rather complicated tak...
Rethinking conservation: managing cultural heritage as an inhabited cultural landscape
[ "Heritage", "Sustainability", "Values", "Conservation", "Cultural landscape", "Cultural significance", "Heritage management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: William Morris and John Ruskin, the nineteenth century forerunners of the conservation movement in western Europe, advocated stewardship of the physical fabric of cultural heritage buildings for educational and spiritual r...
A survey of current status of and perceived changes required for BIM adoption in the UK
[ "Procurement", "BIM", "Finance", "Management", "Collaboration", "Fees" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Building information modeling (BIM) is defined by the US National Institute of Building Sciences (2007) as a \"digital representation of physical and functional characteristics of a facility creating a shared knowledge res...
Managing public-private partnerships: dealing with business-culture influences
[ "Contracts", "Management", "Business-culture", "Construction-industry", "Public-private-partnership" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: In the construction industry nowadays, there are several ongoing developments, as regards the (re)financing possibilities of construction projects. Some examples of such projects in The Netherlands are a tender for the ren...
Review of performance measurement: implications for public-private partnerships
[ "PPP", "Project management", "Performance measurement", "Performance Prism", "Infrastructure development", "Effective performance measures" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Limitations on public funds for infrastructure have encouraged governments to involve private entities in the provision of public services, such as health, education, water supply, and transport (Yong, 2010). This kind of par...
Analysis of characteristics affecting completion time for Malaysian construction projects
[ "Procurement", "Time", "Costs", "Costing", "Cost/benefit analysis", "Cost reduction", "Private sector", "Tendering", "Time drivers" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: The construction industry plays a vital role in Malaysia's economic growth (Rahman et al., 2013). It offers employment and improvements to people's quality of life by providing essential socio-economic infrastructure, such as...
Construction project leadership across the team development process
[ "Leadership", "Construction", "Project management", "Team development process" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Leaders are needed in all fields and at all levels to give direction, create teamwork and inspire people to give their best (Adair, 2002). In a construction project, the project manager has a distinctive role as a leader, ...
Employee architect's perception of human resource practices and their job satisfaction
[ "Human resource management", "Perception", "Employees" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Scholars such as Allen et al. (2003, p. 100), Gelade and Ivery (2003, p. 384) and Wright and Kim (2004, pp. 19-20) have posited that the beliefs or perceptions of employees about how their employing organization care about th...
A conceptual model for evaluating infrastructure-based temporary multi-organisations
[ "Emerging economies", "VSM", "Implementation", "Infrastructure delivery", "Temporary multi-organizations" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: In apparent recognition of the power of public procurement to boost the economic growth of local economies (Arrowsmith, 1995), successive governments have seemingly begun to make conscionable attempts to organise the implemen...
Government-led critical success factors in PPP infrastructure development
[ "Critical success factors", "Infrastructure", "PPP", "Indonesia", "Weighted gap analysis" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Many governments around the world are frustrated by their limited resources, which make it difficult for them to keep pace with the demand to both maintain their existing infrastructure and push for new development (Aziz, ...
Grand challenges for the Indian construction industry
[ "Project management", "Developing countries", "India", "Delphi method", "Construction industry", "Grand Challenges Approach" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction and background of the Indian construction sector: The Indian construction industry is one of the key pillars of the Indian economy. The sector possesses the ability to grow further due to economic development, industrializa...
Improving investment sustainability for PPP power projects in emerging economies: Value for money framework
[ "Project management", "Environmental management", "Energy management", "Power", "Planning", "PPP", "Procurement", "Projects", "Private finance" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Energy demand is growing across the world, but in the Asian emerging economies it is growing at a much faster rate. However, financing and funding remain significant issues for infrastructure projects in many emerging econ...
Cost reallocation in social housing projects considering the desired values of end-users
[ "Brazil", "Social housing", "Target costing", "Cost management", "Architectural design process", "Cost reallocation", "Desired value", "User requirements", "Value delivery", "Value management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: Housing is an essential factor for social development and with this in mind governments will invest in social housing (SH). In developing economies and emerging ones with restricted resources, SH costs must take into consi...
Determinants of trade credit supply among the Ghanaian construction sector
[ "Suppliers", "Cash flow", "Construction firms", "Trade credit", "Ghana", "Developed and developing countries" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Trade credit (TC) is an imperative source of finance for many contractors (Ferrando and Mulier, 2011; DfBIS, 2013a). TC is a financial intermediation device, whereby suppliers with access to credit markets act as financial pr...
Identification and assessment risks in maintenance operations
[ "Sri Lanka", "Risk analysis", "Risk assessment", "Maintenance", "Safety risks", "Occupational risks" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The proper maintenance of properties and facilities in the workplace is essential for the efficient functioning of any organisation (Booty, 2006). A recent study by Lind (2009) asserts that maintenance, in the case of a co...
System development toward effective maintenance management practices
[ "Maintenance management", "Efficiency", "Conventional method", "Maintenance management system", "Malaysian Polytechnic", "Building facility management" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The expansion of current conventional method (paper-based form and unsystematic database) is to assist the maintenance management processes using ICT-based system. The processes start from identification, defect diagnosis,...
Could refurbishment of "traditional" buildings reduce carbon emissions?
[ "Refurbishment", "Energy efficiency", "Comfort", "PoE", "Post occupancy evaluation", "Traditional buildings" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The need for steep reductions in carbon emission is widely recognised (Intergovernmental Panel on Climate Change, 2013) and the UK has enacted legislation for an 80 per cent reduction in CO2 emission by 2050 over the 1990 ...
Constraints in implementing Public Private Partnership (PPP) in Malaysia
[ "Malaysia", "Government", "Private sector", "Constraints", "Hindrance factors", "Negative factors", "Public Private Partnership (PPP)" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Public Private Partnership (PPP), as a procurement method for delivering public sector projects has been used worldwide including Malaysia. In the broadest sense, PPP covers any arrangement between the public sector and the p...
Health and safety coordinators in building projects
[ "Qualifications", "Legislation", "Planning", "Health and safety", "Design co-ordination/co-operation", "Occupational health/safety" ]
[ { "content": "Summarize the following paper into structured abstract.\n\n1. Introduction: The risk of getting seriously injured at work in the building and civil engineering industry in Sweden is more than twice the average in the Swedish labour market. The risk of work-related diseases approved by the insuranc...
Machinery transportation management: case study of "plant-trailer" H&S incidents
[ "Risk", "Inspection", "Maintenance", "Machinery", "H&S", "Trailers" ]
[ { "content": "Summarize the following paper into structured abstract.\n\nIntroduction: Construction relies extensively on mechanical machinery (also known as \"plant\") to maximise output and productivity (Holt and Edwards, 2013). Typical plant items include concrete mixers, excavators, dump trucks and lifting ...