hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.2.4 Method of test
Initial Conditions System Simulator: The SS is configured to use default RLP parameters. Mobile Station: The MS is configured to use RLP arbitrary chosen parameters different from the default parameters. 1. The MS is made to establish a MO non transparent data call. In initial conditions MS is in call state U10 ("Call ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.2.5 Test requirements
Specific message content The frame from the MS shall be: 0: One XID frame containing: C=1, P=1. 1: One SABM frame containing: C=1,P=1. NOTE: The MS may send the SABM frame before the XID. 2: One RR frame containing N(R)=NSS+1 mod (62) within T2. 3: One RR frame containing N(R)=NSS+1 mod (62). 4: One RR frame containing...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.3 Collision of XID frames
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.3.1 Definition
The XID negotiation procedure allows RLP parameters to be negotiated between peer RLP entities. If a collision of XID frames occurs, the MS shall ignore all XID frames and restart the parameter negotiation on expiry of timer T1.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.3.2 Conformance requirements
The MS shall be able to ignore an XID frame from the network in the case where it has sent a XID frame asking for a negotiation to the network, and to restart the negotiation procedure after expiry of timer T1. 3GPP TS 04.22, 5.2.2.6. References 3GPP TS 04.22 subclause 5.2.2.6.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.3.3 Test purpose
To test that the correct reaction of the MS to a collision of XID frames.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.3.4 Method of test
Initial Conditions System Simulator: The SS is configured to use default RLP parameters. Mobile Station: The MS is configured to use RLP parameters different from the default parameters and arbitrary chosen. The MS is made to establish a MO non transparent data call. In initial conditions MS is in call state U10 ("Call...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.3.5 Test requirements
Specific message content The frame from the MS shall be: 0: One XID frame containing: C=1, P=1. 1: After T1(def) expiry, one XID frame containing: C=1, P=1. NOTE: The MS may send an SABM frame before the 1st or the 2nd XID frame. 2: One SABM frame containing: C=1,P=1. 3: One RR frame containing N(R)=NSS+1 mod (62) with...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.4 Loss of XID frames
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.4.1 Conformance requirements
The MS shall repeat an XID frame upon expiry of RLP timer T1 if the network has not acknowledged it by a correct XID frame. References 3GPP TS 04.22 subclause 5.2.2.6.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.4.2 Test purpose
To test that the MS repeats the XID frame if the SS does not answer correctly.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.4.3 Test method
Initial Conditions System Simulator: The SS is configured to use default RLP parameters. Mobile Station: The MS is configured to use RLP parameters different from the default parameters (T1 different from T1(def)). The MS is made to establish a MO non transparent data call. In initial conditions MS is in call state U10...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.5 Total loss of XID frames
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.5.1 Definition
The XID negotiation procedure allows RLP parameters to be negotiated between peer RLP entities. An unsuccessful XID exchange shall be repeated on expiry of T1. After N2 times of unsuccessful repetition, the RLP link shall be disconnected.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.5.2 Conformance requirements
The MS shall not repeat an unacknowledged XID frame more than N2 times. After N2 repetition it shall disconnect the RLP link if it had been connected earlier. 3GPP TS 04.22, subclause 5.2.2.6. References 3GPP TS 04.22 subclause 5.2.2.6.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.5.3 Test purpose
To test that the MS repeats the XID frame no more than N2 times, if the SS does not answer correctly.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.5.4 Method of test
Initial Conditions System Simulator: The SS is configured to use default RLP parameters. Mobile Station: The MS is configured to use RLP parameters different from the default parameters. The MS is made to establish a MO non transparent data call. In initial conditions MS is in call state U10 ("Call Active") after havin...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.3.3.5.5 Test requirements
Specific message content The frame from the MS shall be: 0: The MS may send a SABM frame containing: C=1,P=1. This frame may be sent at any instant. This is not verified. 1: One XID frame containing: C=1, P=1. 2,...,N2(def)+1: After T1 (def) expiry, one XID frame containing: C=1, P=1. N2(def)+2: If the MS has previousl...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4 Facsimile tests for the transparent network support
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.1 General
According to ITU-T Recommendation T.30 a facsimile call can be divided into the following phases: - Phase A - call establishment procedure; - Phase B - pre-message procedure (identification and selection of required facilities); - Phase C - message transmission according to ITU-T Recommendation T.4; - Phase D - post-me...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2 Mobile originated call
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1 Call establishment procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.1 Alternate speech / facsimile
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.1.1 Definition
-29.4.2.1.1.2 Conformance requirement An MS supporting transparent facsimile group 3 shall perform the ICM and shall support the frames and circuits at the Um-, R- and 2w-interface according to the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, 3GPP TS 07.01, ITU-T Recommendation T.30...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.1.3 Test purpose
To verify the transition from speech to fax in case of an MS supporting TS 61 and that the circuit and tone handling of the MT and FA is correct.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.1.4 Method of test
Initial conditions A TS 61 s/f call is set up. The speech phase is active. Test procedure The transition from speech to fax is initiated by manual intervention at both ends of the connection. The data call direction DCD is mobile originated. Upon connection to line the FA turns on CT108.2 (see note 2) as a basic requir...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.1.5 Test requirements
1. The condition of CT108.2 and CT105 is verified (see note 2); CT106, 107, 109 have to be in OFF (see note 2) condition. The MODIFY message has to be sent 3 seconds after circuit CT108.2 has gone to ON condition (see note 2). 2. To be verified that the MT begins the synchronization phase by sending the pattern 1/OFF a...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.2 Automatic facsimile
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.2.1 Definition
-29.4.2.1.2.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the call setup procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, 3GPP TS 07.01, ITU-T R...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.2.3 Test purpose
To verify that the circuit and tone handling of the MT and FA is correct.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.2.4 Method of test
Initial conditions The MS, configured for the TS 62 fax call, is updated. Then the call establishment phase A begins. Test procedure The FA sets CT108.2 to ON (see note 2) condition and passes the dialling information to the MT. A SETUP message is then sent by the MT towards the SS. When the TCH is available (indicated...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.1.2.5 Test requirements
1. The condition of CT108.2 (see note 2) is verified and the SETUP message should contain the BC-IE for TS 62. 2. To be verified that at the MT CT106, 107, 109 are in OFF (see note 2) condition, that the MT begins the synchronization phase by sending the pattern 1/OFF and that CT107 (see note 2) is turned on by the MT ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.2 Pre-message procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.2.1 Definition
-29.4.2.2.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the pre-message procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T....
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.2.3 Test purpose
To verify the correct handling of the T.30 DIS/DCS/TCF frames.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.2.4 Method of test
Initial conditions The activity progress of the fax call is brought to the beginning of Phase B. Test procedure After phase A the FA is in BCS-TRA state and sends SYNC frames. The SS being in BCS-REC state sends the T.30 DIS embedded in STATUS frames indicating its capabilities. The received DIS is checked, if necessar...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.2.5 Test requirements
1. To be verified that SYNC frames are transmitted across the radio interface in BCS-TRA and in the IDLE state and that CT105 is set to OFF (see note 2). The correct generation of the T.30 BCS shall be verified (down-conversion to the BCS speed according to 3GPP TS 03.45). 2. The condition of CT109 shall be verified (s...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.3 Message procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.3.1 Definition
-29.4.2.3.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the message procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T.30, ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.3.3 Test purpose
To verify the facsimile data transmission phase.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.3.4 Method of test
Initial conditions The activity progress of the fax call is brought to the beginning of Phase C. The ECM shall not be used. Test procedure The FA is in IDLE state. The connected fax starts transmitting the fax message. Upon reception of the training sequence the FA enters the MSG-REC state and sends STATUS frames, whic...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.3.5 Test requirements
1. To be verified that the FA enters the MSG-REC state and inserts the correct ident octet in the STATUS frames interleaved with SYNC frames. 2. To be verified that the FA sends the fax message after the SS has sent the STATUS frames containing the MSG-TRA identifier. 3. At the end of the document transmission the cond...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.4 Post-message procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.4.1 Definition
-29.4.2.4.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the post-message procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.4.3 Test purpose
To verify phase D of the facsimile transmission.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.4.4 Method of test
Initial conditions The activity progress of the fax call is brought to the beginning of Phase D. The ECM shall not be used. Test procedure The fax sends the preamble followed by the EOP frame. The FA then enters the BCS-REC state after having transmitted at least 5 SYNC frames since the last transition to the idle stat...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.4.5 Test requirements
1. To be verified that the FA enters the BCS-REC state and inserts the correct ident octet in the STATUS frames. The up-conversion to the message speed has to be checked.. The condition of CT109 has to be verified (see note 2). The contents of the SYNC frames shall be checked. 2. To be verified that the FA enters the B...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.5 Call release procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.5.1 Definition
-29.4.2.5.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the call release procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.5.3 Test purpose
To verify phase E of the facsimile transmission.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.5.4 Method of test
Initial conditions The activity progress of the fax call is brought to the beginning of Phase E. Test procedure The fax sends the preamble followed by the DCN frame. The FA then enters the BCS-REC state and sends the DCN frame embedded in STATUS frames to the SS. The FA enters the IDLE state again. CT108.2 will go OFF ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.5.5 Test requirements
To be verified that CT108.2 is turned off (see note 2) and that CT109 is set to OFF (see note 2) 200ms after the DCN frame has been sent. The contents of the STATUS frames including the ident octet has to be checked (up-conversion to the message speed according to 3GPP TS 03.45). The MT shall send the DISC message.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.6 CTC processing - 4th PPR for the same block
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.6.1 Definition
-29.4.2.6.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the CTC processing procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.6.3 Test purpose
To verify phase D of the facsimile transmission in case of a 4th PPR for the same block.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.6.4 Method of test
Initial conditions The activity progress of the fax call is brought to the beginning of Phase C. The ECM shall be used. The fax transmission shall start a speed of 9,6 kBit/s. Test procedure The fax sends the preamble followed by the PPS-NULL(0,0) frame. The FA then enters the BCS-REC state and sends the PPS* frame emb...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
5 Repeat steps 1 to 4 four times
6 MS-->SS Fax: Send preamble, CTC FA: CT109 ON (see note 2) BCS-REC Monitor CTC Send preamble*, CTC* -----> Receive preamble*, CTC* CT109 OFF (see note 2) IDLE 7 SS-->MS <----- Send preamble*, CTR* FA: CT105 ON (see note 2) BCS-TRA Transmit preamble, CTR CT105 OFF (see note 2) IDLE Fax: Receive preamble, CTR 8 MS-->S...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.6.5 Test requirement
It shall be verified that the FA transmits 1 SYNC frame every 3 DATA frames.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.7 Transition from Facsimile to Speech - Procedure interrupt generated by receiving station
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.7.1 Definition
-29.4.2.7.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the ICM procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T.30.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.7.3 Test purpose
To verify the transition from fax to speech in case of an MS supporting TS 61.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.7.4 Method of test
Initial conditions The activity progress of the fax call is brought to phase C (message phase). The ECM shall not be used. Test procedure During the message phase a procedure interrupt is generated by the SS, which is executed as soon as phase D is entered. The SS then sends the PIP frame causing an alert at the mobile...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.7.5 Test requirements
1. To be verified that CT106/109 are in OFF (see note 2) condition. 2. To be verified that CT108.2 goes to OFF (see note 2) upon completion of the PRI handshaking, that this transition to OFF triggers the MODIFY message to be sent and that the reception of the MODIFY COMPLETE message causes CT107 to be set to OFF (see ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.8 Transition from Facsimile to Speech - Procedure interrupt generated by transmitting station
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.8.1 Definition
-29.4.2.8.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the ICM procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T.30.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.8.3 Test purpose
To verify the transition from fax to speech in case of an MS supporting TS 61.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.8.4 Method of test
Initial conditions The activity progress of the fax call is brought to phase C (message phase). The ECM shall not be used. Test procedure During the message phase a procedure interrupt is generated at the MS side, which is executed as soon as phase D is entered. The fax then sends the PRI-EOP frame causing an alert at ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
1 Message Procedure (as described above)
Operator intervention requested 2 MS-->SS Fax: Send preamble, PRI-EOP FA: CT109 ON (see note 2) BCS-REC Send preamble*, PRI-EOP* CT109 OFF (see note 2) -----> Receive preamble*, PRI-EOP* IDLE 3 SS-->MS <----- Send preamble*, PIP* FA: CT105 ON (see note 2) BCS-TRA Transmit preamble, PIP CT105 OFF (see note 2) IDLE Fa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.8.5 Test requirements
1. To be verified that CT106/109 are in OFF (see note 2) condition. 2. To be verified that CT108.2 goes to OFF (see note 2) upon completion of the PRI handshaking, that this transition to OFF triggers the MODIFY message to be sent and that the reception of the MODIFY COMPLETE message causes CT107 to be set to OFF (see ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.9 Quality check
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.9.1 Definition
-29.4.2.9.2 Conformance requirement The configuration supporting transparent facsimile group 3 shall decode the T.4 coding and shall generate a document. Reference 3GPP TS 03.45, ITU-T Recommendation T.21, ITU-T Recommendation T.4.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.9.3 Test purpose
To verify the quality of the received document.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.9.4 Method of test
Initial conditions The document has been received at the called side. Test procedure The quality of the received document at the SS side shall be checked.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.2.9.5 Test requirement
The contents of the transmitted and the received document shall be the same.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3 Mobile terminated call
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1 Call Establishment Procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1 Alternate Speech/Facsimile
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.1 DCD Mobile Terminated
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.1.1 Definition
-29.4.3.1.1.1.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the ICM procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T.30.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.1.3 Test purpose
To verify the transition from speech to fax in case of an MS supporting TS 61 and that the circuit and tone handling of the MT and FA is correct in case of an MT DCD.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.1.4 Method of test
Initial conditions A TS 61 s/f call is set up. The speech phase is active. Test procedure The transition from speech to fax is initiated by manual intervention at both ends of the connection, i.e. the data call direction DCD is mobile terminated. Upon connection to line the FA turns on CT108.2 (see note 2) as a basic r...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.1.5 Test requirements
1. The condition of CT108.2 and CT105 is verified (see note 2); CT106, 107, 109 have to be in OFF (see note 2) condition. The MODIFY message has to be sent 3 seconds ± 10% after circuit CT108.2 has gone to ON (see note 2) condition. 2. The RCSD-IE shall not be included in the MODIFY message. 3. To be verified that the ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.2 DCD mobile originated
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.2.1 Definition
-29.4.3.1.1.2.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the ICM procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T.30.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.2.3 Test purpose
To verify the transition from speech to fax in case of an MS supporting TS 61 and that the circuit and tone handling of the MT and FA is correct in case of an MO DCD.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.2.4 Method of test
Initial conditions A TS 61 s/f call is set up. The speech phase is active. Test procedure The transition from speech to fax is initiated by manual intervention at both ends of the connection, i.e. the data call direction DCD is mobile originated. Upon connection to line the FA turns on CT108.2 (see note 2) as a basic r...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.1.2.5 Test requirements
1. The condition of CT108.2 and CT105 is verified (see note 2); CT106, 107, 109 have to be in OFF (see note 2) condition. 2. The MODIFY message containing the RCSD-IE has to be sent 3 seconds ± 10% after circuit CT108.2 has gone to ON (see note 2) condition. 3. To be verified that the MT begins the synchronization phas...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.2 Automatic facsimile
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.2.1 Definition
-29.4.3.1.2.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the call setup procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, 3GPP TS 07.01, ITU-T R...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.2.3 Test purpose
To verify that the circuit and tone handling of the MT and FA is correct.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.2.4 Method of test
Initial conditions The MS, configured for the fax call, is updated. Then the call establishment phase begins. Test procedure The SS will send the SETUP message causing CT125 (see note 2) going to ON condition at the MT. The FA then sends ring current (see note 2) to the fax machine, which will connect to line. The FA s...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.1.2.5 Test requirements
1. The condition of CT125 (see note 2) shall be verified. 2. CT108.2 to be verified (see note 2) and the CONNECT message has to be sent by the MT. 3. To be verified that at the MT CT106, 107, 109 are in OFF (see note 2) condition, that the MT begins the synchronization phase by sending the pattern 1/OFF, that CT107 is ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.2 Pre-message procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.2.1 Definition
-29.4.3.2.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the pre-message procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T....
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.2.3 Test purpose
To verify the correct handling of the T.30 DIS/DCS/TCF frames.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.2.4 Method of test
Initial conditions The activity progress of the fax call is brought to the beginning of Phase B. The fax transmission shall start using a speed of 9,6 kBit/s. Test procedure After phase A the FA being in BCS-REC state, sends the DIS* frame in order to indicate the capabilities of the connected fax and the FA and return...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.2.5 Test requirements
1. To be verified that the DIS is filtered and that the correct up-conversion to the message speed is applied. CT109 should go to OFF (see note 2). 2. The DCS shall indicate a message speed of 7 200 bit/s and the down-conversion to the BCS speed shall be verified. 3. The FA, after the reception of the DCS, sends SYNC f...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.3 Message procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.3.1 Definition
-29.4.3.3.2 Conformance requirement The MS supporting transparent facsimile group 3 shall perform the message procedure and shall support the frames and the circuits at the Um-,R- and 2w-interface according the specifications referred to in the subclause "Reference". Reference 3GPP TS 03.45, ITU-T Recommendation T.30, ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
29.4.3.3.3 Test purpose
To verify the facsimile data transmission phase.