hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.4.3 MS Receives GA-PSR TC Activation Request while GA-PSR TC active | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.4.3.1 Conformance requirements | If the MS receives a GA-PSR TC activation message from the GANC while the GA-PSR TC is active, it shall send the GA-PSR-ACTIVATE-UTC-ACK message to the GANC. The message shall include MS UDP port allocated to the existing GA-PSR TC. In parallel, if the GANC provided new IP Address and UDP port number, the MS shall upda... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.4.3.2 Test purpose | To verify that if the MS receives a GA-PSR TC activation message from the GANC while the GA-PSR TC is active, the MS sends the GA-PSR-ACTIVATE-UTC-ACK message to the GANC. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.4.3.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
MS is made to initiate GA-PSR-ACTIVE state establishment and SS re... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.5 MS Initiated Deactivation of GA-PSR Transport Channel, Normal Case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.5.1 GA-PSR TC Deactivation Initiation by the MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.5.1.1 Conformance requirements | When the TU4001 timer expires and if there are no outstanding uplink GPRS user data messages to be transferred, the MS GA-PSR shall send GA-PSR-DEACTIVATE-UTC-REQ message to the GANC to request the deactivation of the transport channel. In parallel, the MS shall start TU4002 timer to wait for the confirmation.
Upon rec... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.5.1.2 Test purpose | To verify that, when the TU4001 timer expires and if there are no outstanding uplink GPRS user data messages to be transferred, the MS GA-PSR sends GA-PSR-DEACTIVATE-UTC-REQ message to the GANC to request the deactivation of the transport channel and in parallel, the MS starts TU4002 timer to wait for the confirmation.... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.5.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
MS is made to initiate GA-PSR-ACTIVE state and SS responds with GA... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6 MS Initiated Deactivation of GA-PSR Transport Channel, Abnormal Cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.1 Uplink User Data Transfer is initiated while GA-PSR TC Deactivation is in Progress | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.1.1 Conformance requirements | If the MS LLC initiates the uplink user data transfer after the MS GA-PSR has sent the deactivation request to the GANC, the MS GA-PSR shall complete the deactivation procedure first and than initiate a new GA-PSR TC activation procedure to enable data transfer.
References
3GPP TS 44.318, subclause 8.4.4.3 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.1.2 Test purpose | To verify that if the MS LLC initiates the uplink user data transfer after the MS GA-PSR has sent the deactivation request to the GANC, the MS GA-PSR completes the deactivation procedure first and than initiate a new GA-PSR TC activation procedure to enable data transfer. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
MS is made to initiate GA-PSR-ACTIVE state establishment by trigge... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.2 Downlink User Data Transfer is received while the GA-PSR TC Deactivation is in Progress | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.2.1 Conformance requirements | If the MS receives any downlink user data packets while waiting for the GA-PSR-DEACTIVATE-UTC-ACK message response, it shall abort the deactivation procedure (i.e. stop timer TU4002) and restart TU4001 timer.
References
3GPP TS 44.318, subclause 8.4.4.4 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.2.2 Test purpose | To verify that if the MS receives any downlink user data packets while waiting for the GA-PSR-DEACTIVATE-UTC-ACK response, it aborts the deactivation procedure (i.e. stop timer TU4002) and restarts TU4001 timer. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.2.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
The MS is made to initiate GA-PSR-ACTIVE state establishment by tr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.3 Unexpected GA-PSR-DEACTIVATE-UTC-ACK response | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.3.1 Conformance requirements | If the MS receives an unexpected GA-PSR-DEACTIVATE-UTC-ACK message response while the GA-PSR is in GA-PSR-ACTIVE state, the MS GA-PSR shall stop TU4001 timer, and release the GA-PSR TC. In parallel, the MS GA-PSR shall transition to GA-PSR-STANDBY state.
If the MS receives an unexpected GA-PSR-DEACTIVATE-UTC-ACK messag... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.3.2 Test purpose | To verify that if the MS receives an unexpected GA-PSR-DEACTIVATE-UTC-ACK response while the GA-PSR is in GA-PSR-ACTIVE state, the MS GA-PSR stops TU4001 timer, releases the GA-PSR TC and, the MS GA-PSR transitions to GA-PSR-STANDBY state. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.3.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell.
Test Procedure
MS is made to initiate GA-PSR-ACTIVE state establishment and SS r... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.4 Unexpected GA-PSR-ACTIVATE-UTC-REQ | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.4.1 Conformance requirements | If the MS receives any downlink user data packets while waiting for the GA-PSR-DEACTIVATE-UTC-ACK message response, it shall abort the deactivation procedure (i.e. stop timer TU4002) and restart TU4001 timer.
If the MS receives an unexpected GA-PSR-ACTIVATE-UTC-REQ message while waiting for GA-PSR-DEACTIVATE-UTC-ACK me... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.4.2 Test purpose | To verify that if the MS receives an unexpected GA-PSR-ACTIVATE-UTC-REQ while waiting for GA-PSR-DEACTIVATE-UTC-ACK response, the MS ignores the request and continues waiting for deactivation response. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.6.4.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell.
Test Procedure
MS is made to initiate GA-PSR-ACTIVE state establishment and SS r... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.7 GANC Initiated Deactivation of GA-PSR Transport Channel, Normal Case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.7.1 GA-PSR TC Deactivation Initiation by the GANC | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.5.7.1 Conformance requirements | When the GANC decides to deactivate GA-PSR TC channel, it shall send GA-PSR-DEACTIVATE-UTC-REQ message to the MS to request the deactivation.
If the MS receives an unexpected GA-PSR-DEACTIVATE-UTC-ACK message response while the GA-PSR is in GA-PSR-ACTIVE state, the MS GA-PSR shall stop TU4001 timer, and release the GA-... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.7.1.2 Test purpose | To verify that upon receiving a GA-PSR-DEACTIVATE-UTC-REQ message from the GANC, the MS releases the GA-PSR TC, sends the GA-PSR-DEACTIVATE-UTC-ACK message to the GANC indicating successful deactivation and MS GA-PSR enters the GA-PSR-STANDBY state. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.7.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
The SS initiates active state. The MS responds with GA-PSR-ACTIVAT... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.1.8 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2 GA-PSR GPRS User Data Transport | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.1 GA-PSR GPRS User Data Transport , Normal Cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.1.1 MS Initiates Uplink GPRS User Data Transfer | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.1.1.1 Conformance requirements | The GPRS user data packets are tunnelled using UDP transport as specified for GA-PSR Transport Channel. Each packet is assigned a sequence number in the range of 0 to 65535 sequentially. The sequence number is set to 0 after reaching the maximum – 65535.
Assuming that the GA-PSR TC has been already activated as specifi... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.1.1.2 Test purpose | To verify that MS:
1) Uses corresponding GANC IP address and UDP port number,
2) Transmits at least 65537 packets, and that each packet is assigned a sequence number in the range of 0 to 65535 sequentially.
3) Assigns sequence number to 0 after reaching the maximum – 65535 |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.1.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell.
Test Procedure
The MS activates the GA-PSR TC with the corresponding GANC IP addr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.2 GA-PSR GPRS User Data Transport , Abnormal Cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.2.1 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.2.2 Void | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.2.3 MS Receives a Downlink Message to Initiate Uplink GPRS User Data Transfer while the GA-PSR TC activation Procedure is in progress | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.2.3.1 Conformance requirements | Upon receiving a downlink message while the GA-PSR TC activation procedure is in progress (TU4002 timer is still running), the MS GA-PSR shall process the request as if the transport channel was active. The MS shall not initiate uplink GPRS user data transfer until the GA-PSR TC activation procedure is successfully co... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.2.3.2 Test purpose | To verify that MS GA-PSR shall only use IP address and UDP port number received in the GA-PSR ACTIVATE UTC ACK message to send uplink GPRS user data packets to the SS |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.2.2.3.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated
Foreseen Final State of the MS
MS in GA-PSR-ACTIVE state in service of GAN cell.
Test Procedure
The MS receives a downlink message GA-PSR UNITDATA while Transport ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.3 Packet paging for packet service | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.3.1 PS Paging Request Processed by the MS, Normal Case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.3.1.1 PS Paging Request Processed by the MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.3.1.1.1 Conformance requirements | Upon receiving a GA-PSR-PS-PAGE message from the GANC, the MS GA-PSR shall forward the indication to the GMM layer using the GMMRR SAP as per standard GPRS. Subsequently, the MS shall send an uplink LLC PDU as a page response per standard GPRS. The MS may either send GA-PSR-DATA or GA-PSR-UNITDATA message as described ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.3.1.1.2 Test purpose | To verify that the MS responds with GA-PSR-DATA message upon receiving a GA-PSR-PS-PAGE message from the GANC. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.3.1.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Forseen Final State of the MS
MS in Idle state
Test Procedure
The SS sends the GA-PSR-PS-PAGE, paging the MS. The MS responds with GA-PSR-DATA. The SS checks the... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.4 GPRS Suspend Procedure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.4.1 GPRS Suspension Initiation by the MS, normal Case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.4.1.1 GPRS Suspension Initiation by the MS | 83.4.1.1.1 Conformance requirements
While transitioning to dedicated mode and if unable to support simultaneous CS and PS services, the MS shall request the suspension of the downlink GPRS data transfer by sending a GA-CSR GPRS SUSPENSION REQUEST message to the GANC
Upon receiving a GA-CSR GPRS SUSPENSION REQUEST messa... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.4.1.1.2 Test purpose | To verify that the MS requests the suspension of the downlink GPRS data transfer by sending a GA-CSR GPRS SUSPENSION REQUEST message to the GANC, while the MS is transitioning to dedicated mode and if the MS unable to support simultaneous CS and PS services. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.4.1.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
The SS initiates GA-PSR TC, sending the GA-PSR-ACTIVATE-UTC-REQ. T... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.5 Downlink Flow Control | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.5.1 Initiation of the Downlink Flow Control and Processing of the TU4003 Timer Expiry by the MS, Normal Case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.5.1.1 Initiation of the Downlink Flow Control and Processing of the TU4003 Timer Expiry by the MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.5.1.1.1 Conformance requirements | Upon detecting the downlink flow control condition, the MS shall initiate a downlink flow control procedure by sending a GA-PSR-DFC-REQ message to the GANC via the existing GA-PSR TC. The message includes new estimated data rate that can be supported. At the same time the MS shall start timer TU4003 to continue monitor... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.5.1.1.2 Test purpose | To verify that:
1) If the flow control condition exists the MS calculates a new data rate that can be supported and forwards the corresponding GA-PSR-DFC-REQ to the GANC via the existing GA-PSR TC.
2) If the timer expires, the MS checks the downlink flow control condition, and if it continues to exist, the MS restarts ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.5.1.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Forseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
SS initiates the activation procedure and starts to transmit data. ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6 Uplink Flow Control | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.1 Processing of the Uplink Flow Control Request by the MS, Normal Case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.1.1 Processing of the Uplink Flow Control Request by the MS | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.1.1.1 Conformance requirements | Upon detecting the uplink flow control condition, the GANC initiates an uplink flow control procedure by sending a GA-PSR-UFC-REQUEST message to the MS via the existing GA-PSR TC. The request is PFC based if the packet flow management procedures are supported.
Upon receiving the GA-PSR-UFC-REQUEST message from the GANC... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.1.1.2 Test purpose | To verify that the MS adjusts the uplink data rate accordingly with GA-PSR-UFC-REQUEST message received from the GANC. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.1.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Forseen Final State of the MS
MS in Idle state
Test Procedure
The MS activates GA-PSR TC and starts to send lowest data rate to the SS. SS requests UL Flow Contro... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.2 Processing of the Uplink Flow Control Request by the MS, Abnormal Cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.2.1 GA-PSR TC in not Active | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.2.1.1 Conformance requirements | If the MS receives a GA-PSR-UFC-REQUEST message while the GA-PSR TC deactivation is in progress, the MS shall ignore the flow control request.
References
3GPP TS 44.318, subclauses 8.12.4.1. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.2.1.2 Test purpose | To verify whether the MS ignores a flow control request received while the GA-PSR TC deactivation is in progress. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 83.6.2.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS GA-PSR is in the GA-PSR-STANDBY state. PDP context 1 is activated.
Foreseen Final State of the MS
MS in GA-PSR-STANDBY state in service of GAN cell
Test Procedure
The MS is in GA-PSR STANDBY state. MS is made to activate GA-PSR T... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84 GAN Iu Mode Procedures | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.1 Macros for GAN Iu mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2 GA-RRC connection establishment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1 GA-RRC connection establishment / successful case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.1 GA-RRC connection establishment, Upper Layer Message Transmission and GA-RRC connection release by GANC (CS domain) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.1.1 Conformance requirement | The GAN Iu mode GA-RRC CS and PS connections are logical connections between the MS and the GANC. As described in 3GPP TS 43.318, the GA-RRC sub-layer in the MS contains two entities, the CS domain GA-RRC sublayer entity and the PS domain GA-RRC sublayer entity. These entities operate independently and in parallel; e.g... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.1.2 Test purpose | To verify all of the following for the CS domain.
To verify that MS is able to initiate GA-RRC connection establishment between the MS and GANC and to verify that MS is able to communicate with the CN by encapsulating NAS messages in the GA-RRC INITIAL DIRECT TRANSFER message (first NAS message after GA-RRC connection ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS in GA-RRC-IDLE state for CS domain in service of GAN cell
Foreseen Final State of the MS
MS in GA-RRC-IDLE state for CS domain.
Test Procedure
The MS is made to initiate a GA-RRC connection establishment for CS domain. The MS mov... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.2 GA-RRC connection establishment, Upper Layer Message Transmission and GA-RRC connection release by GANC (PS domain) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.2.1 Conformance requirement | The GAN Iu mode GA-RRC CS and PS connections are logical connections between the MS and the GANC. As described in 3GPP TS 43.318, the GA-RRC sub-layer in the MS contains two entities, the CS domain GA-RRC sublayer entity and the PS domain GA-RRC sublayer entity. These entities operate independently and in parallel; e.g... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.2.2 Test purpose | To verify all of the following for the PS domain.
To verify that MS is able to initiate GA-RRC connection establishment between the MS and GANC and to verify that MS is able to communicate with the CN by encapsulating NAS messages in the GA-RRC INITIAL DIRECT TRANSFER message (first NAS message after GA-RRC connection ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.1.2.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS in GA-RRC-IDLE state for PS domain in service of GAN cell
Foreseen Final State of the MS
MS in GA-RRC-IDLE state for PS domain.
Test Procedure
The MS is made to initiate a GA-RRC connection establishment for PS domain. The MS mov... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2 GA-RRC connection establishment / negative cases | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.1 GA-RRC REQUEST rejected (CS domain) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.1.1 Conformance requirement | 3GPP TS 44.318 subclause 8a.1.2.2:
If the GANC rejects the GA-RRC connection establishment request, it shall send the GA-RRC REQUEST REJECT message to the MS including the IE "CN Domain Identity".
3GPP TS 44.318 subclause 8a.1.3.2:
When the MS receives the GA-RRC REQUEST REJECT message, it shall:
- if timer TU5908 is a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.1.2 Test purpose | To verify that MS will remain in GA-RRC-IDLE state (CS domain) when MS receives the GA-RRC REQUEST REJECT message (CS domain). |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.1.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS in GA-RRC-IDLE state for CS domain in service of GAN cell
Foreseen Final State of the MS
MS in GA-RRC- IDLE state for CS domain.
Test Procedure
The MS is made to initiate a GA-RRC connection establishment for CS domain. SS sends ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.2 MS receives GA-RRC REQUEST ACCEPT message after TU5908 expiry (CS domain) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.2.1 Conformance requirement | If the GANC accepts the GA-RRC connection establishment request, it shall send the GA-RRC REQUEST ACCEPT message to the MS including the IE "CN Domain Identity".
When the MS receives the GA-RRC REQUEST ACCEPT message, it shall:
- if timer TU5908 is active for the domain indicated by the IE "CN Domain Identity":
- stop ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.2.2 Test purpose | To verify that MS will remain in GA-RRC IDLE state (CS domain) if TU5908 expires before MS receives the GA-RRC REQUEST ACCEPT message (CS domain). |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.2.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS in GA-RRC-IDLE state for CS domain in service of GAN cell
Foreseen Final State of the MS
MS in GA-RRC- IDLE state for CS domain.
Test Procedure
The MS is made to initiate a GA-RRC connection establishment for CS domain. MS receiv... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.3 GA-RRC REQUEST rejected (PS domain) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.3.1 Conformance requirement | 3GPP TS 44.318 subclause 8a.1.2.2:
If the GANC rejects the GA-RRC connection establishment request, it shall send the GA-RRC REQUEST REJECT message to the MS including the IE "CN Domain Identity".
3GPP TS 44.318 subclause 8a.1.3.2:
When the MS receives the GA-RRC REQUEST REJECT message, it shall:
- if timer TU5908 is a... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.3.2 Test purpose | To verify that MS will remain in GA-RRC-IDLE state (PS domain) when MS receives the GA-RRC REQUEST REJECT message (PS domain). |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.3.3 Method of test | Initial Conditions
System Simulator:
- 1 GAN cell, default parameters
Mobile Station:
- MS in GA-RRC-IDLE state for PS domain in service of GAN cell
Foreseen Final State of the MS
MS in GA-RRC- IDLE state for PS domain.
Test Procedure
The MS is made to initiate a GA-RRC connection establishment for PS domain. SS sends ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.4 MS receives GA-RRC REQUEST ACCEPT message after TU5908 expiry (PS domain) | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 84.2.2.4.1 Conformance requirement | If the GANC accepts the GA-RRC connection establishment request, it shall send the GA-RRC REQUEST ACCEPT message to the MS including the IE "CN Domain Identity".
When the MS receives the GA-RRC REQUEST ACCEPT message, it shall:
- if timer TU5908 is active for the domain indicated by the IE "CN Domain Identity":
- stop ... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.