hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.3.1.1 Conformance requirement
3GPP TS 44.318 subclause 8a.7.2.1: The GANC initiates the packet transport channel (PTC) modification procedure when it determines that one or more active PTCs require modification; e.g., based on information received from the SGSN in the RAB Assignment Request message or based on local GANC logic. The following PTC pa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.3.1.2 Test purpose
To verify that MS is able to change active PTC parameters if requested.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.3.1.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (PS domain) in service of GAN cell, with active PTC Foreseen Final State of the MS MS in GA-RRC-IDLE state (PS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (PS domain) in service of GAN cel...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.4 PS channel modify procedure / negative cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.4.1 PS channel modify requests illegal change to parameter
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.4.1.1 Conformance requirement
3GPP TS 44.318 subclause 8a.7.2.1: The GANC initiates the packet transport channel (PTC) modification procedure when it determines that one or more active PTCs require modification; e.g., based on information received from the SGSN in the RAB Assignment Request message or based on local GANC logic. The following PTC pa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.4.1.2 Test purpose
To verify that the MS does not change the PTC parameters if requested to make an illegal change to a parameter (i.e., to change the MS TEID value).
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.10.4.1.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (PS domain) in service of GAN cell, with active PTC Foreseen Final State of the MS MS in GA-RRC-IDLE state (PS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (PS domain) in service of GAN cel...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11 Deactivate channel procedure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1 CS deactivate channel procedure / successful cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.1 CS deactivate channel request from GANC
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.1.1 Conformance requirement
3GPP TS 44.318 subclause 8a.8.3: The GANC normally initiates this procedure when it receives the RAB Assignment message from the CN indicating RAB release; however, the GANC may also initiate this procedure under certain failure conditions. One or more circuit or packet transport channels may be deactivated using a sin...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.1.2 Test purpose
To verify that MS is able to deactivate a CTC if requested.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.1.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (CS domain) in service of GAN cell, one CTC active Foreseen Final State of the MS MS in GA-RRC-IDLE state (CS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (CS domain) in service of GAN cell...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.2 CS deactivate channel request from MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.2.1 Conformance requirement
3GPP TS 44.318 subclause 8a.8.1: If the MS needs to deactivate one or more transport channels for a particular domain, it shall send the GA-RRC DEACTIVATE CHANNEL REQUEST message to the GANC and start timer TU5002 for the domain. The MS shall include the IE "CN Domain Identity" and the IE "GA-RRC Cause". The GA-RRC Cau...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.2.2 Test purpose
To verify that MS is able to request deactivation of a CTC.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.2.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (CS domain) in service of GAN cell, one CTC active Foreseen Final State of the MS MS in GA-RRC-IDLE state (CS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (CS domain) in service of GAN cell...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.2 CS deactivate channel procedure / negative cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.2.1 TU5002 timer expires
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.2.1.1 Conformance requirement
3GPP TS 44.318 subclause 8a.8.1: If the MS needs to deactivate one or more transport channels for a particular domain, it shall send the GA-RRC DEACTIVATE CHANNEL REQUEST message to the GANC and start timer TU5002 for the domain. The MS shall include the IE "CN Domain Identity" and the IE "GA-RRC Cause". The GA-RRC Cau...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.2.1.2 Test purpose
To verify that the MS releases the CTC when the TU5002 timer (CS domain) expires.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.2.1.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (CS domain) in service of GAN cell, one CTC active Foreseen Final State of the MS MS in GA-RRC-IDLE state (CS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (CS domain) in service of GAN cell...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.3 PS deactivate channel procedure / successful cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.3.1 PS deactivate channel request from GANC
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.3.1 Conformance requirement
3GPP TS 44.318 subclause 8a.8.3: The GANC normally initiates this procedure when it receives the RAB Assignment message from the CN indicating RAB release; however, the GANC may also initiate this procedure under certain failure conditions. One or more circuit or packet transport channels may be deactivated using a sin...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.3.2 Test purpose
To verify that MS is able to deactivate a PTC if requested.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.1.3.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (PS domain) in service of GAN cell, one PTC active Foreseen Final State of the MS MS in GA-RRC-IDLE state (PS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (PS domain) in service of GAN cell...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.3.2 PS deactivate channel request from MS
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.3.2.1 Conformance requirement
3GPP TS 44.318 subclause 8a.8.1: If the MS needs to deactivate one or more transport channels for a particular domain, it shall send the GA-RRC DEACTIVATE CHANNEL REQUEST message to the GANC and start timer TU5002 for the domain. The MS shall include the IE "CN Domain Identity" and the IE "GA-RRC Cause". The GA-RRC Cau...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.3.2.2 Test purpose
To verify that MS is able to request deactivation of a PTC.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.3.2.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (PS domain) in service of GAN cell, one PTC active Foreseen Final State of the MS MS in GA-RRC-IDLE state (PS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (PS domain) in service of GAN cell...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.4 PS deactivate channel procedure / negative cases
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.4.1 TU5002 timer expires
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.4.1.1 Conformance requirement
3GPP TS 44.318 subclause 8a.8.1: If the MS needs to deactivate one or more transport channels for a particular domain, it shall send the GA-RRC DEACTIVATE CHANNEL REQUEST message to the GANC and start timer TU5002 for the domain. The MS shall include the IE "CN Domain Identity" and the IE "GA-RRC Cause". The GA-RRC Cau...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.4.1.2 Test purpose
To verify that the MS releases the PTC when the TU5002 timer (PS domain) expires.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
84.11.4.1.3 Method of test
Initial Conditions System Simulator: - 1 GAN cell, default parameters Mobile Station: - MS in GA-RRC-CONNECTED state (PS domain) in service of GAN cell, one PTC active Foreseen Final State of the MS MS in GA-RRC-IDLE state (PS domain) Test Procedure The MS is in GA-RRC-CONNECTED state (PS domain) in service of GAN cell...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90 Text Telephony (TTY) Services
This subclause contains test cases for Text Telephony (TTY) services.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1 Transmission of CTM Bearer Code
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1 Mobile Originated TTY Call
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1.1 Conformance requirement
1) When establishing a mobile originated call with TTY mode enabled in the MS, bit 6 of Octet 3a in the Bearer Capability Information Element shall be '1'. 2) When establishing a mobile originated call with TTY mode disabled in the TTY-compatible MS, bit 6 of Octet 3a in the Bearer Capability Information Element shall ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1.2 Test purpose
1) To verify that a TTY compatible MS, with TTY mode enabled, correctly sets bit 6 of Octet 3a in the Bearer Capability Information Element to 1 when made to originate a call. 2) To verify that a TTY compatible MS, with TTY mode disabled, correctly sets bit 6 of Octet 3a in the Bearer Capability Information Element to ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1.3 Method of test
90.1.1.3.1 void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1.3.2 Initial conditions
System Simulator: - 1 cell, default parameters. Mobile Station: - The MS is in MM-state “idle, updated” with valid TMSI and CKSN.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1.3.3 Final foreseen state of the MS
U0, null.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1.3.4 Test Procedure
a) The MS is set to TTY mode using the normal MMI. A mobile originated call is established following the generic call set-up procedure for mobile originating speech calls. b) After receipt of the SETUP message from the MS, the SS shall disconnect the call. c) TTY mode is disabled in the MS using the normal MMI. A mobil...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.1.4 Test requirement
1) In step a), the MS shall send a SETUP message where bit 6 of Octet 3a of the Bearer Capability Information Element is set to 1. 2) In step c), the MS shall send a SETUP message where bit 6 of Octet 3a of the Bearer Capability Information Element is set to 0.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2 Mobile Terminated TTY Call
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2.1 Conformance requirement
1) When establishing a mobile terminated call with TTY mode enabled in the MS, bit 6 of Octet 3a in the Bearer Capability Information Element shall be '1'. 2) When establishing a mobile terminated call with TTY mode disabled in the TTY-compatible MS, bit 6 of Octet 3a in the Bearer Capability Information Element shall ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2.2 Test purpose
3) verify that a TTY compatible MS, with TTY mode enabled, correctly sets bit 6 of Octet 3a in the Bearer Capability Information Element to 1 when receiving a mobile terminated call. 4) To verify that a TTY compatible MS, with TTY mode disabled, correctly sets bit 6 of Octet 3a in the Bearer Capability Information Elem...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2.3 Method of test
90.1.2.3.1 void
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2.3.2 Initial conditions
System Simulator: - 1 cell, default parameters. Mobile Station: - The MS is in MM-state “idle, updated” with valid TMSI and CKSN.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2.3.3 Final foreseen state of the MS
U0, null.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2.3.4 Test Procedure
a) The MS is set to TTY mode using the normal MMI. A mobile terminated call is established following the generic call set-up procedure for mobile terminating speech calls. b) After receipt of the CALL CONFIRMED message from the MS, the SS shall disconnect the call. c) TTY mode is disabled in the MS using the normal MMI...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
90.1.2.4 Test requirement
1) In step a), the MS shall send a CALL CONFIRMED message where bit 6 of Octet 3a of the Bearer Capability Information Element is set to 1. 2) In step c), the MS shall send a CALL CONFIRMED message where bit 6 of Octet 3a of the Bearer Capability Information Element is set to 0.
686035b507b3b9278dc8a7741151e4bb
43.868
1 Scope
The present document contains the results from the study of improvements for Machine-type Communications in GERAN. The following items are in the scope of the study: - GERAN enhancements for Smart metering - Enhancements which enable or improve efficient use of RAN resources and/or which lower complexity when a large n...
686035b507b3b9278dc8a7741151e4bb
43.868
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present document. - References are either specific (identified by date of publication, edition number, version number, etc.) or non‑specific. - For a specific reference, subsequent revisions do not apply. - Fo...
686035b507b3b9278dc8a7741151e4bb
43.868
3 Definitions, symbols and abbreviations
686035b507b3b9278dc8a7741151e4bb
43.868
3.1 Definitions
For the purposes of the present document, the terms and definitions given in TR 21.905 [1] and the following apply. A term defined in the present document takes precedence over the definition of the same term, if any, in TR 21.905 [1]. MTC Device: A MTC Device is a UE equipped for Machine Type Communication, which comm...
686035b507b3b9278dc8a7741151e4bb
43.868
3.2 Symbols
Void.
686035b507b3b9278dc8a7741151e4bb
43.868
3.3 Abbreviations
For the purposes of the present document, the abbreviations given in TR 21.905 [1] and the following apply. An abbreviation defined in the present document takes precedence over the definition of the same abbreviation, if any, in TR 21.905 [1].) CCCH Common Control Channel GERANIMTC GERAN Improvements for Machine Type ...
686035b507b3b9278dc8a7741151e4bb
43.868
4 Areas for study to effectively support MTC in GERAN
686035b507b3b9278dc8a7741151e4bb
43.868
4.1 General
Sub-clause 4 contains the outcome of the study of GERAN enhancements driven by the prioritized general MTC functions as defined in [3] that are considered applicable to GERAN specifications.
686035b507b3b9278dc8a7741151e4bb
43.868
4.2 Overload control
686035b507b3b9278dc8a7741151e4bb
43.868
4.2.1 General
Overload Control refers to use cases Radio Network Congestion, Signalling Network and Core Network Congestion as described in [2] Annex A.
686035b507b3b9278dc8a7741151e4bb
43.868
4.2.2 Description and Analysis
686035b507b3b9278dc8a7741151e4bb
43.868
4.2.2.1 CCCH Overload Control
686035b507b3b9278dc8a7741151e4bb
43.868
4.2.2.1.1 Description and Analysis
The large amount of access attempts that can be generated from mobile stations used for MTC is believed to increase the load and cause congestion on the common control channel (CCCH) and therefore may negatively impact legacy services. The legacy pre-release 10 RR connection establishment procedure is not sufficient fo...
686035b507b3b9278dc8a7741151e4bb
43.868
4.2.2.1.2 Result
By using the implicit reject procedure, the network can effectively protect the CCCH from being overloaded by mobile stations configured with low access priority. The objective of CCCH overload control in MTC study has been met with the implicit reject procedure with respect to preventing overload of CCCH hence minimis...
686035b507b3b9278dc8a7741151e4bb
43.868
5 Void
686035b507b3b9278dc8a7741151e4bb
43.868
6 Common assumptions
686035b507b3b9278dc8a7741151e4bb
43.868
6.1 Traffic model
686035b507b3b9278dc8a7741151e4bb
43.868
6.1.1 General
The traffic model is assumed to be mobile originated, meaning that the MTC server will not poll/request reports from the MTC devices. Hence, the MTC devices will require access to the network rather autonomously and thus the network need not page the MTC devices. 6.1.2 CCCH Signalling In order to capture different net...
686035b507b3b9278dc8a7741151e4bb
43.868
6.1.2.1 Time limited deterministic event distribution
Following considerations are made: Assuming that all events take place between t=0 and t=T , the intensity is described by the distribution p(t) and the total number of devices in the cell is X, then the number of arrivals in the i:th TDMA frame is given by: Equation 1: Number of arrivals in a given TDMA-frame Any dist...
686035b507b3b9278dc8a7741151e4bb
43.868
6.1.2.1.1 Beta distribution
The benefit of this model is: • This deterministic traffic model simplifies simulation (by virtue of being deterministic). It may be considered to approximate the traffic load generated by multiple devices accessing the network quasi-simultaneously (the selection of a time window of 1 second is arbitrary). , where is ...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2 Methodology
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.1 Simulator methodology
A single cell evaluation of possible congestion of the CCCH and PDCH is used. Either a single cell simulator (sometimes also referred to as a protocol level simulator) or system level type simulator can be used where the basic difference is in that the system level simulator models dynamic interference from neighbourin...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.1.1 Network trace
In order to get a simplified distribution of the interfering signal that network level simulations are run to collect the signal distributions of the interferer. Further on, the derived interference distribution is presented in tabulated format to allow for easier comparison and verification of contributions from diffe...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.1.2 Network load
The resource allocation from the background traffic in neighbouring cells is assumed to be fully allocated (constant transmission), transmitted at full power (no power control) using 8PSK modulation (for assumptions on power back-off see Table 3).
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.1.3 Cell under investigation
For the cell under investigation all traffic is assumed to be MTC devices while the background noise is assumed to be best effort PS traffic modelled as described in clause 6.1. This should be seen as a worst case scenario in terms of network access attempts. 6.2.1.4 Service coverage Full service coverage of stationa...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2 Simulation assumptions
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.1 General
This clause defines the parameters required for the simulations which may be required to conduct the study. The parameters are referenced where appropriate. Table 3: Network level simulator parameters Parameter Value Unit Comment Sectors per site 3 Sector antenna pattern 65º deg H-plane, max TX gain 15 dBi 18 dBi anten...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.2 Path loss
It is assumed that the gain (path loss + shadow fading + antenna gain) from a given MS to its serving BTS is the same in UL and DL.
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.3 Channel propagation
It is assumed that the external interferers experience a TU3-channel while the MTC devices are assumed to be stationary and subject to TU0-channel propagation.
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.4 External interference
It is assumed that the external interference levels are uncorrelated between the DL and UL, i.e. that uncorrelated samples are used from the respective distributions.
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.5 Application protocol
It is assumed that the MTC application is using UDP as a transport protocol with acknowledgments on the application layer from the MTC server to the MTC client will be transmitted, i.e. there will both be PUANs and data blocks (containing application Acks) transmitted in the DL for the PDCH evaluation. Details are left...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.5.1 IP version
The IP version to use for the evaluation is left FFS.
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.6 Link model
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.6.1 CCCH
A simplistic link-to-system interface is assumed. It is assumed that only a total co-channel interference level needs to be assumed for each burst. Adjacent channel suppression is assumed to be 18 dB. To capture the correct combined channel propagation behavior of the total interfering signal, impacts on fast fading is...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.6.1.1 RACH (CCCH/U)
For possible reception of an access burst, CRACH/(IRACH + ITOT) needs to be greater than 9 – 3 = 6 dB. RACH reference interference ratio is specified at 9 dB (Channel propagation TU3, 3GPP TS 45.005) and an additional gain of 3 dB is assumed for a dual antenna MRC type BTS architecture. On top of this an error rate of ...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.6.1.2 AGCH (CCCH/D)
For possible reception of an access grant, CAGCH/ITOT needs to be greater than 9 dB. AGCH reference interference ratio is specified at 9 dB (Channel propagation TU3, 3GPP TS 45.005). On top of this an error rate of 22% is added (AGCH reference interference performance, TU3, TS 45.005). NOTE: The figures above are bein...
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.6.2 PDCH
Vendor specific L2S mapping methodology is to be used that can be verified against a set of pre-defined interferer scenarios. Common assumptions for the UL receiver include: • Dual antenna base station • MRC receiver algorithm. Common assumptions for the DL receiver include: • Single antenna mobile station
686035b507b3b9278dc8a7741151e4bb
43.868
6.2.2.7 Number of CCCHs
The CCCH performance is evaluated using a single CCCH.
686035b507b3b9278dc8a7741151e4bb
43.868
6.3 Output
686035b507b3b9278dc8a7741151e4bb
43.868
6.3.1 General
All results should be presented as per indicated below. It should be noted that this list is not exhaustive and that outputs not currently listed cannot be precluded that could affect the conclusions of this work. Upon evaluation of different proposals, the KPIs of services with a higher priority should be seen to take...
686035b507b3b9278dc8a7741151e4bb
43.868
6.3.2 Overall MTC simulation and evaluation output
MTC success rate = Number of successfully received reports (i.e. all application level payload associated with this report) sent from the device to the network divided by the total number of arrivals. MTC delay = The time it takes for a MTC device to successfully transfer its application level payload, as from when it ...
686035b507b3b9278dc8a7741151e4bb
43.868
6.3.3 CCCH signalling output
Access success rate = Number of successful Immediate Assignment procedures, see sub-clause 3.3.1.1 in [4] divided by total number of Immediate Assignment procedures, inclusive of both RACH and AGCH. Access attempts needed = Number of access attempts per successfully completed Immediate Assignment procedures, inclusive ...
686035b507b3b9278dc8a7741151e4bb
43.868
6.3.4 PDCH traffic output
TBF Blocking Rate = Blocking rate due to insufficient resources (e.g. USF and TFI identifiers), which makes it impossible for the network to assign uplink PDCHs to the MTC devices. The output should be differentiated between different causes. MTC payload transfer delay = The time it takes for a MTC device to successful...
686035b507b3b9278dc8a7741151e4bb
43.868
7 Summary and conclusions
The impacts on GERAN specifications identified in sub-clause 4 should be used as a basis for additional normative specification work. Annex A: Change history Change history Date TSG # TSG Doc. CR Rev Subject/Comment Old New 2012-11 56 GP-121309 Approved at TSG GERAN#56 2.0.0 12.0.0 2014-02 61 GP-140199 0001 1 Correctio...
2d016e763d82d2bbce817fafc33663a6
24.826
1 Scope
The present document contains the result of the study on the impacts on signalling between the UE and core network when energy saving measures are applied to network entities. The study aims, within the defined CT1 work areas, at: - analysing UE idle mode procedures and signalling between the UE and core network result...