hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.1.4.2.3 Message contents | All messages indicated above shall use the same content as described in the default message content in TS 36.508 [28] clause 4.4 and 4.6 with the following exceptions:
SystemInformationBlockType19: for inter-RAT UTRA TDD - EUTRAN TDD is of higher priority cell re-selection
Derivation Path: TS 36.508 [28] clause 4.4.4.1... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.1.4.3 7.68Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.1.5 Test requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.1.5.1 3.84Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.1.5.2 1.28Mcps Option | Table 8.2.2.6.1.5.2-1: Cell specific test parameters for cell re-selection UTRA TDD to E-UTRA TDD test case (cell 1)
Parameter
Unit
Cell 1 (UTRA)
Timeslot Number
0
DwPTS
T1
T2
T3
T1
T2
T3
UTRA RF Channel Number (Note1)
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
-3
DwPCH_Ec/Ior
dB
0
0
0
OCNS_Ec/Ior
dB
-3
-3
-3
dB
11
11
11
11
11
1... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.1.5.3 7.68Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2 UTRA to E-UTRA TDD cell reselection: E-UTRA is of lower priority | Editor’s note: This Test case is incomplete for frequencies above 3GHz
• The Test system uncertainties applicable above 3GHz are undefined
• The Test Tolerances and Test Requirements applicable above 3GHz are undefined |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.1 Definition and application | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.1.1 3.84 Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.1.2 1.28Mcps Option | The cell reselection delay to low priority is defined as the time from the beginning of time period T2, to the moment when the UE camps on cell2, and start to send preamble on the PRACH for the RRC CONNECTION REQUEST message on cell2.
This test is for case when the UE camps on a 1.28Mcps TDD cell and reselects to a E-U... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.1.3 7.68Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.2.1 3.84 Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.2.2 1.28Mcps Option | The cell re-selection delay to lower priority shall be less than 21 s.
The rate of correct cell reselections observed during repeated tests shall be at least 90%.
NOTE: The cell re-selection delay to lower priority cell can be expressed as: TevaluateE-UTRA + TSI,
Where:
TevaluateE-UTRA 19.2s, See Table 4.2A in section ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.2.3 7.68Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.3 Test purpose | This test verifies the UE meet minimum requirement for the case where the UE camps on a TDD cell and reselects to a E-UTRA TDD cell which is of lower priority. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.4.1 3.84Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.4.2 1.28Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.4.2.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: see table J.2 in Annex J.
This test scenario comprised of 1 UTRA TDD serving cell ,and 1 E-UTRA TDD cell to be re-selected.Test parameters are given in table 8.2.2.6.2.4.2.1-1, 8.2.2.6.2.4.2.1-2 and 8.2.2.6.2.4.2.1-3. The test consisits o... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.4.2.2 Procedure | 1) The SS activates cell1 with T1 defined parameters in tables 8.2.2.6.2.5.2-1 and monitors cell1 for random access requests from the UE.
2) The UE is switched on.
3) The SS and the UE shall perform a location registration procedure on cell1 and apply the cell 2 parameters with T1 defined in table 8.2.2.6.2.5.2-2. T1 s... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.4.2.3 Message contents | All messages indicated above shall use the same content as described in the default message content in TS 36.508 [28] clause 4.4 and 4.6 with the following exceptions:
SystemInformationBlockType19: for inter-RAT UTRA TDD - EUTRAN TDD is of lower priority cell re-selection
Derivation Path: TS 36.508 [28] clause 4.4.4.1,... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.4.3 7.68Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.5 Test requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.5.1 3.84Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.5.2 1.28Mcps Option | Table 8.2.2.6.2.5.2-1: Cell specific test parameters for cell re-selection UTRA TDD to E-UTRA TDD test case (cell 1)
Parameter
Unit
Cell 1 (UTRA)
Timeslot Number
0
DwPTS
T1
T2
T1
T2
UTRA RF Channel Number (Note1)
Channel 1
PCCPCH_Ec/Ior
dB
-3
-3
DwPCH_Ec/Ior
dB
0
0
OCNS_Ec/Ior
dB
-3
-3
dB
11
-3
11
-3
dBm/1.28 MHz
-80
P... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.6.2.5.3 7.68Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7 Scenario 6: Inter-band Cell Re-selection for 1.28 Mcps TDD UE | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7.1 Definition and applicability | The cell re-selection delay is defined as the time from a change of cell parameters to the moment when the UE camps on a new cell, and starts to send SYNCH-UL sequence in the UpPTS for sending the RRC CONNECTION REQUEST to perform a Location Registration on the new cell.
The requirements and this test apply to all type... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7.2 Minimum requirement | The cell re-selection delay shall be less than 8 s. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7.3 Test purpose | This test is to verify the requirement for the cell re-selection delay in the cross frequency band case. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
Cell condition:
There are six cells. Two frequency points are in frequency band a and frequency band b respectively. (The cells are two service cells and four background cells. The service cells use different f... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7.4.2 Procedure | 1) The SS activates cells 1–6 with T1 defined parameters and monitors cells 1 and 2 for RRC CONNECTION REQUEST messages from the UE.
2) The UE is switched on.
3) The SS waits until the UE camps on Cell 1 and sends the RRC CONNECTION REQUEST message.
4) After 15 seconds, the SS shall switch the power settings from T1 to... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.2.2.7.5 Test Requirements | The cell re-selection delay shall be less than 8s.
The rate of correct cell reselections observed during repeated tests shall be at least 90% with a confidence level of 95%.
In step 3, after the UE has responded on cell 1, it shall not respond on any other cell.
In step 5, the UE shall respond on cell 2 within eight se... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3 UTRAN Connected Mode Mobility | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1 TDD/TDD Handover for 3,84 Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1 Handover to intra-frequency cell | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1.1 Definition and applicability | Handover interruption time is defined as the time between the end of the last TTI containing a transport block on the old DPCH and the time the UE starts transmission of the new uplink DPCH.
The requirements and this test apply to the UTRA TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1.2 Minimum requirement | The interruption time shall be less than 40 ms in the single carrier case when the cell is known by the UE and the SFN of the target cell does not need to be decoded. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The interruption time is dependent ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1.3 Test purpose | The purpose of this test is to verify the requirement for the intra-frequency handover delay in CELL_DCH state in the single carrier case. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in table 8.3.1.1.1 and 8.3.1.1.2. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1G shall be used, and that P-CCPCH RSCP... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1.4.2 Procedure | 1) The RF parameters are set up according to T1.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4.
[Editor's note: subclause 7.3.4 in TS 34.108 (Message sequence chart for Handover Test procedure) is not yet specified]
4) SS shall transmit a MEASUR... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.1.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of [FFS]% of the cases.
Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2 Handover to inter-frequency cell | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.1 Definition and applicability | The handover interruption time is defined as the time between the end of the last TTI containing a transport block on the old DPCH and the time the UE starts transmission of the new uplink DPCH.
The requirements and this test apply to the UTRA TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.2 Minimum requirement | The interruption time shall be less than 40 ms in the dual carrier case when the cell is known by the UE and the SFN of the target cell needs to be decoded. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The interruption time is dependent on whether... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.3 Test purpose | The purpose of this test is to verify the requirement for the inter-frequency handover delay in CELL_DCH state in the dual carrier case. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in table 8.3.1.2.1 and 8.3.1.2.2. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 2C shall be used. The PCCPCH RSCP and S... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.4.2 Procedure | 1) The RF parameters are set up according to T1.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4.
[Editor's note: subclause 7.3.4 in TS 34.108 (Message sequence chart for Handover Test procedure) is not yet specified]
4) SS shall transmit a MEASUR... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.1.2.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of [FFS]% of the cases.
Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2 TDD/FDD Handover for 3,84 Mcps Option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.1 Definition and applicability | The handover interruption time is defined as the time between the end of the last TTI containing a transport block on the old DPCH and the time the UE starts transmission of the new uplink DPCCH.
The requirements and this test apply to the UTRA TDD / FDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.2 Minimum requirement | The interruption time shall be less than 100 ms in the single carrier case when the cell is known by the UE and the SFN of the target cell does not need to be decoded. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The interruption time is dependent... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.3 Test purpose | The purpose of this test is to verify the requirement for the TDD/FDD handover delay in CELL_DCH state. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
The test parameters are given in table 8.3.2.1, 8.3.2.2 and 8.3.2.3 below. In the measurement control information it is indicated to the UE that event-triggered reporting with Event 1G and 2B shall be used. The... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.4.2 Procedure | 1) The RF parameters are set up according to T1.
2) The UE is switched on.
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4.
[Editor's note: subclause 7.3.4 in TS 34.108 (Message sequence chart for Handover Test procedure) is not yet specified]
4) SS shall transmit a MEASUR... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.2.5 Test requirements | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of [FFS]%of the cases.
Note: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 a... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3 TDD/GSM Handover | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1.1 3,84 Mcps option | The UTRAN to GSM cell handover interruption time is defined as the time from the end of the last TTI containing an RRC message implying hard handover to the transmission on the channel of the new RAT.
The requirements and this test apply to the combined TDD (3,84 Mcps option) and GSM UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1.2 1,28 Mcps option | The UTRAN to GSM cell handover delay is defined as the time from the end of the last TTI containing an RRC message implying hard handover to the transmission on the channel of the new RAT.
The requirements and this test apply to the combined TDD (1,28 Mcps option) and GSM UE |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.1.3 7,68 Mcps option | The UTRAN to GSM cell handover delay is defined as the time from the end of the last TTI containing an RRC message implying hard handover to the transmission on the channel of the new RAT.
The requirements and this test apply to the combined TDD (7,68 Mcps option) and GSM UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2.1 3,84 Mcps option | The interruption time shall be less than 40 ms in the case where the UE has synchronised to the GSM cell before the HANDOVER FROM UTRAN COMMAND is received. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of [FFS]%.
The normative reference for this requirement ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2.2 1,28 Mcps option | The handover delay shall be less than 90 ms in the case where the UE has synchronised to the GSM cell before the HANDOVER FROM UTRAN COMMAND is received. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of 95%.
The normative reference for this requirement is TS ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.2.3 7,68 Mcps option | The handover delay shall be less than 90 ms in the case where the UE has synchronised to the GSM cell before the HANDOVER FROM UTRAN COMMAND is received. The rate of correct handovers observed during repeated tests shall be at least 90% with a confidence level of 95%.
The normative reference for this requirement is TS ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.3 Test purpose | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.3.1 3,84 Mcps option | To verify that the UE meets the minimum requirement. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.3.2 1,28 Mcps option | To verify that the UE meets the minimum requirement. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.1 3,84 Mcps option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.1.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4 for TDD conditions, and clause A1.2 of TS 51.010-1 [23] for the corresponding GSM conditions.
The test parameters are given in Table 8.3.3.1, 8.3.3.2 and 8.3.3.3 below. In the measurement control information i... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.1.2 Procedure | 1) The RF parameters for cell 1 are set up according to T1.
2) The UE is switched on
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4
4) The RF parameters for cell 2 are set up according to T1 and the SS configures a traffic channel
5) SS shall transmit a MEASUREMENT CONTRO... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.2 1,28 Mcps option | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4 for TDD conditions, and clause A1.2 of TS 51.010-1 [24] for the corresponding GSM conditions.
The test parameters are given in Table 8.3.4.1, 8.3.4.2 and 8.3.4.3 below. In the measurement control information i... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.2.2 Procedure | 1) The RF parameters for cell 1 are set up according to T1.
2) The UE is switched on
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4
4) The RF parameters for cell 2 are set up according to T1 and the SS configures a traffic channel
5) SS shall transmit a MEASUREMENT CONTRO... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.3 7,68 Mcps option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.3.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4 for TDD conditions, and clause A1.2 of TS 51.010-1 [23] for the corresponding GSM conditions.
The test parameters are given in Table 8.3.3.4.1B, 8.3.3.4.2B and 8.3.3.4.3B below. In the measurement control info... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.4.3.2 Procedure | 1) The RF parameters for cell 1 are set up according to T1.
2) The UE is switched on
3) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.3.4
4) The RF parameters for cell 2 are set up according to T1 and the SS configures a traffic channel
5) SS shall transmit a MEASUREMENT CONTRO... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5 Test requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5.1 3,84 Mcps option | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5.2 1,28 Mcps option | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.3.5.3 7,68 Mcps option | For the test to pass, the total number of successful tests shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 and... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4 Cell Re-selection in CELL_FACH | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1 Scenario 1: TDD/TDD cell re-selection single carrier case | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1.1 3,84 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 3,84 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send SYNCH-UL sequence in the UpPTS for sending the CELL UPDATE with cause value "cell reselection".
The requirements and this test apply to the 1,28 Mcps T... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.1.3 7,68 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2.1 3,84 Mcps TDD option | The cell re-selection delay shall be less than 2.5 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.2 and A.5.4.1. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 1.6s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.3 and A.5.4.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.2.3 7,68 Mcps TDD option | The cell re-selection delay shall be less than 2.5 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.4 and A.5.4.3. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.3 Test purpose | This test verifies that the UE meets the minimum requirement for the cell re-selection delay in CELL_FACH for the single carrier case |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.1 3,84 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.1.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.4.1.1.1, 8.3.4.1.1.2, 8.3.4.1.1.3, and 8.3.4.1.1.4.
Table 8.3.4.1.1.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.