hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.1.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for CELL UPD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.2.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.4.1.4.2.1, 8.3.4.1.4.2.2, 8.3.4.1.4.2.3, and 8.3.4.1.4.2.4.
Table 8.3.4.1.4.2.1: General test parameters for 1,28 Mcps Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
initial condition
Active ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.2.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclause s 7.3.3 and 7.4.2 to place the UE in CELL_FACH.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for SYNCH-U... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.3 7,68 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.3.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.4.1.4.3.1, 8.3.4.1.4.3.2, 8.3.4.1.4.3.3 and 8.3.4.1.4.3.4.
Table 8.3.4.1.4.3.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.4.3.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH.
d) After 15 s, the parameters are changed as described for T2.
e) The SS waits for CELL UPD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5 Test Requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5.1 3,84 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 2.5 s.
3) In step g), the UE shall respond on cell 1 within 2.5 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be m... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5.2 1,28 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 1.6 s.
3) In step g), the UE shall respond on cell 1 within 1.6 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be m... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.1.5.3 7,68 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 2 within 2.5 s.
3) In step g), the UE shall respond on cell 1 within 2.5 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be m... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2 Scenario 2: TDD/TDD cell re-selection multi carrier case | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1.1 3,84 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 3,84 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send SYNCH-UL sequence in the UpPTS for sending the CELL UPDATE with cause value "cell reselection".
The requirements and this test apply to the 1,28 Mcps TD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.1.3 7,68 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2.1 3,84 Mcps TDD option | The cell re-selection delay shall be less than 3 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.2 and A.5.4.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 2 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.3 and A.5.4.2.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.2.3 7,68 Mcps TDD option | The cell re-selection delay shall be less than 3 s. The rate of correct cell re-selections observed during repeated tests shall be at least 90%.
The normative reference for this requirement is TS 25.123 [2] clauses 5.4.4 and A.5.4.3.2. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.3 Test purpose | This test verifies that the UE meets the requirement for the cell re-selection delay in CELL_FACH for the multi carrier case. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.1 3,84 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.1.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.4.2.1.1, 8.3.4.2.1.2, 8.3.4.2.1.3, and 8.3.4.2.1.4.
Table 8.3.4.2.1.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.1.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH. If the UE has failed to respond with the correct message within the allowed time, a failure... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.2.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.4.2.4.2.1, 8.3.4.2.4.2.2, 8.3.4.2.4.2.3, and 8.3.4.2.4.2.4.
Table 8.3.4.2.4.2.1: General test parameters for 1,28Mcps Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
initial condition
Active cell
Cell1
Neig... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.2.2 Procedure | The SS activates cell 1-2 with T1 defined parameters;
a) The UE switched on.
b) A RRC connection is set up according the generic set-up procedure specified in TS 34.108[3] clause 7.3.3 and 7.4.2 to place UE in CELL_FACH state;
c) After 15s the parameters changed to those defined for T2;
d) If the UE responds on cell 2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.3 7,68 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.3.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.4.2.4.3.1, 8.3.4.2.4.3.2, 8.3.4.2.4.3.3, and 8.3.4.2.4.3.4.
Table 8.3.4.2.4.3.1: General test parameters for Cell Re-selection in CELL_FACH
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cel... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.4.3.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the generic set-up procedure specified in TS 34.108 [3] subclauses 7.3.3 and 7.4.2 to place the UE in CELL_FACH. If the UE has failed to respond with the correct message within the allowed time, a failure... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5 Test Requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5.1 3,84 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 3 s.
3) In step g), the UE shall respond on cell 2 within 3 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5.2 1,28 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 2 s.
3) In step g), the UE shall respond on cell 2 within 2 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.2.5.3 7,68 Mcps TDD option | 1) In step d), after the UE has responded on cell 1, it shall not respond on any other cell (cell selection).
2) In step e), the UE shall respond on cell 1 within 3 s.
3) In step g), the UE shall respond on cell 2 within 3 s.
For the test to pass, the total number of fulfilled test requirements 2) and 3) shall be more ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3 Scenario 3: TDD/GSM cell re-selection | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1.1 3,84 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from when the cell quality levels change to the moment when this change makes the UE reselect a better ranked cell, and starts to send CHANNEL REQUEST message to perform a Location update to the new cell.
This test is for the case where the UE camps on a 1,28 Mcps TDD ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.1.3 7,68 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2.1 3,84 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 5530ms + TBCCH,
NOTE: The cell re-selection delay can be expressed as:
where
: The maximum time allowed to read BCCH data from GSM cell, 1.9s.
: The additional delay caused by the random access procedure, 10ms.
Specified in TS 25.123, here it is 5000ms
: 480ms
This gives ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.2.3 7,68 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.3 Test purpose | This test verifies that the UE meets the minimum requirement for the inter-RAT cell re-selection delay in CELL_FACH state. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.1 3,84 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.2.1 Initial conditions | This scenario implies the presence of one 1.28 Mcps TDD serving cell, and one GSM cell to be re-selected. Test parameters are given in Tables 8.3.4.3.4.1, 8.3.4.3.4.2, 8.3.4.3.4.3, 8.3.4.3.4.4, 8.3.4.3.4.5.
The ranking of the cells shall be made according to the cell reselection criteria specified in TS25.304. Cell 1 a... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.4.3 7,68 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.5 Test Requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.5.1 3,84 Mcps TDD option | Void |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.5.2 1,28 Mcps TDD option | In step d), the UE shall respond on cell 2 within 7.5 s.
For the test to pass, the total number of fulfilled test requirement shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.4.3.5.3 7,68 Mcps TDD option | Void
8.3.4A Cell Re-selection in Enhanced CELL_FACH
8.3.4A.1 Scenario 1: Cell Re-selection to Intra-Frequency TDD cell
8.3.4A.1.1 Definition and applicability
8.3.4A.1.1.1 3,84 Mcps TDD option
Void
8.3.4A.1.1.2 1,28 Mcps TDD option
The cell re-selection delay is defined as the time from a change of cell levels to the m... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5 Cell Re-selection in CELL_PCH | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1 Scenario 1: TDD/TDD cell re-selection single carrier case | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.1.1 3,84 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 3,84 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send SYNCH-UL sequence in the UpPTS for sending the CELL UPDATE with cause value "cell reselection".
The requirements and this test apply to the 1,28 Mcps TD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.1.3 7,68 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.2.1 3,84 Mcps TDD option | The cell re-selection delay shall be less than 8 s.
NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to TS 25.123 [2] table 4.1 in clause 4.2.2.7.
TSI Maximum repetit... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 8 s.
NOTE:
The cell re-selection delay can be expressed as: TevaluateNTDD + TSI, where:
TevaluateNTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to TS 25.123 [2] table 4.1a in clause 4.2.2.
TSI Time required ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.2.3 7,68 Mcps TDD option | The cell re-selection delay shall be less than 8 s.
NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to TS 25.123 [2] table 4.1B in clause 4.2.2.7.3.
TSI Maximum repe... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.3 Test purpose | This test verifies that the UE meets the minimum requirement for the cell re-selection delay in CELL_PCH for the single carrier case |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.1 3,84 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.1.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.5.1.1.1, and 8.3.5.1.1.2.
Table 8.3.5.1.1.1: General test parameters for Cell Re-selection single carrier multi-cell case
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
C... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.1.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.4.2.7.1 to place the UE in the CELL_PCH state on Cell 1 and then the SS waits for this process to complete.
d) After 15 s from the completion of s... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.2.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.5.1.4.2.1 and 8.3.5.1.4.2.2.
Table 8.3.5.1.4.2.1: General test parameters for 1,28 Mcps Cell Re-selection single carrier multi-cell case
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Ne... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.2.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.4.2.7.1 to place the UE in the CELL_PCH state on Cell 1 and then the SS waits for this process to complete.
d) After 15 s from the completion of s... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.3 7,68 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.3.1 Initial conditions | This scenario contains 6 cells operating on the same carrier frequency. The test parameters are given in Tables 8.3.5.1.4.3.1, and 8.3.5.1.4.3.2.
Table 8.3.5.1.4.3.1: General test parameters for Cell Re-selection single carrier multi-cell case
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour c... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.4.3.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.4.2.7.1 to place the UE in the CELL_PCH state on Cell 1 and then the SS waits for this process to complete.
d) After 15 s from the completion of s... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.5 Test Requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.5.1 3,84 Mcps TDD option | For the test to pass, the total number of successful attempts shall be more than 90% with a confidence level of [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.5.2 1,28 Mcps TDD option | For the test to pass, the total number of successful attempts shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.1.5.3 7,68 Mcps TDD option | For the test to pass, the total number of successful attempts shall be more than 90% with a confidence level of 95% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F.2 ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2 Scenario 2: TDD/TDD cell re-selection multi carrier case | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.1 Definition and applicability | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.1.1 3,84 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 3,84 Mcps option TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.1.2 1,28 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send SYNCH-UL sequence in the UpPTS for sending the CELL UPDATE with cause value "cell reselection".
The requirements and this test apply to the 1,28 Mcps TD... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.1.3 7,68 Mcps TDD option | The cell re-selection delay is defined as the time from a change of cell levels to the moment when this change causes the UE to camp on a new cell , and starts to send the CELL UPDATE message with cause value "cell reselection" in the new cell.
The requirements and this test apply to the 7,68 Mcps TDD UE. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.2 Minimum requirement | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.2.1 3,84 Mcps TDD option | The cell re-selection delay shall be less than 8 s.
NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to TS 25.123 [2] table 4.1 in clause 4.2.2.7.
TSI Maximum repetit... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.2.2 1,28 Mcps TDD option | The cell re-selection delay shall be less than 8 s.
NOTE:
The cell re-selection delay can be expressed as: TevaluateNTDD + TSI, where:
TevaluateNTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to TS 25.123 [2] table 4.1a in clause 4.2.2.
TSI Time required ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.2.3 7,68 Mcps TDD option | The cell re-selection delay shall be less than 8 s.
NOTE:
The cell re-selection delay can be expressed as: TevaluateTDD + TSI, where:
TevaluateTDD A DRX cycle length of 1280ms is assumed for this test case, this leads to a Tevaluate TDD of 6.4s according to TS 25.123 [2] table 4.1B in clause 4.2.2.7.3.
TSI Maximum repe... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.3 Test purpose | This test verifies that the UE meets the requirement for the cell re-selection delay in CELL_PCH for the multi carrier case. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.1 3,84 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.1.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.5.2.1.1 and 8.3.5.2.1.2.
Table 8.3.5.2.1.1: General test parameters for Cell Re-selection in Multi carrier case
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4, Cell5... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.1.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.4.2.7.1 to place the UE in the CELL_PCH state on Cell 1 and then the SS waits for this process to complete.
d) After 15 s from the completion of s... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.2 1,28 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.2.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.5.2.4.2.1 and 8.3.5.2.4.2.2.
Table 8.3.5.2.4.2.1: General test parameters for 1,28Mcps Cell Re-selection in Multi carrier case
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cel... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.2.2 Procedure | a) The SS activates cell 1-6 with T1 defined parameters.
b) The UE is switched on.
c) A call is set up according to the test procedure specified in TS 34.108 [3] subclause 7.4.2.7.1 to place the UE in the CELL_PCH state on Cell 1 and then the SS waits for this process to complete.
d) After 15 s from the completion of s... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.3 7,68 Mcps TDD option | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.4.3.1 Initial conditions | This scenario contains 6 cells and 2 carrier frequencies. The test parameters are given in Tables 8.3.5.2.4.3.1 and 8.3.5.2.4.3.2.
Table 8.3.5.2.4.3.1: General test parameters for Cell Re-selection in Multi carrier case
Parameter
Unit
Value
Comment
Initial condition
Active cell
Cell1
Neighbour cells
Cell2, Cell3,Cell4,... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.5 Test Requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 8.3.5.2.5.1 3,84 Mcps TDD option | For the test to pass, the total number of successful attempts shall be more than 90% with a confidence level of [FFS]% of the cases.
NOTE: If the above Test Requirement differs from the Minimum Requirement then the Test Tolerance applied for this test is non-zero. The Test Tolerance for this test is defined in clause F... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.