hash
stringlengths
32
32
doc_id
stringlengths
7
13
section
stringlengths
3
121
content
stringlengths
0
2.2M
b020d11ac2390e683574d6f0493057fa
102 694-1
3.4.2 Format of the applicability table
The applicability of every test in table 4.2 a) is formally expressed by the use of Boolean expression defined in the following clause. The columns in table 4.2 a) have the following meaning: Column Meaning Test case: The "Test case" column gives a reference to the test case number(s) detailed in the present document a...
b020d11ac2390e683574d6f0493057fa
102 694-1
3.4.3 Status and Notations
The "Rel-x Terminal" columns show the status of the entries as follows: The following notations, defined in ISO/IEC 9646-7 [7], are used for the status column: M mandatory - the capability is required to be supported. O optional - the capability may be supported or not. N/A not applicable - in the given context, it is ...
b020d11ac2390e683574d6f0493057fa
102 694-1
4 Test environment
b020d11ac2390e683574d6f0493057fa
102 694-1
4.1 Table of optional features
The supplier of the implementation shall state the support of possible options in Table 4.1 a). See clause 3.4 for the format of Table 4.1 a). Items indicated as O_XYZ (for example, O_SREJ) refer to features supported by the device; items indicated as B_XYZ (for example, B_STREAM_IFRAMES) refer to behaviour of the devi...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.2 Applicability table
Table 4.2 a) specifies the applicability of each test case to the device under test. See clause 3.4 for the format of Table 4.2 a). For better readability Table 4.2 a) is split. Table 4.2 a)/1 shows the applicability for Rel-7 to Rel-13. Table 4.2 a)/2 shows the applicability for Rel-14 and onwards. Table 4.2 a)/1: App...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3.9 Void
5.3.2.3.9a SWP Initial activation in full power mode - no ACT_READY frame (repeat last frame) Rel-10 N/A N/A N/A C001 C001 C001 C001 5.3.2.3.10 SWP initial activation failed in full power mode - corrupted ACT_READY frame (multiple) Rel-7 C001 C001 C001 C001 C001 C001 C001 5.3.2.3.11 SWP initial activation failed in ful...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.3 Information provided by the device supplier
Some test cases require that the test equipment triggers the terminal to perform further communication over SHDLC or CLT after performing an SWP activation. Some other test cases require the modification of the power supply during the test execution. The device supplier shall provide enough information to allow this to...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4 Test equipment
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.0 General requirements
The test equipment shall provide a UICC simulator which is connected to the DUT during test procedure execution, unless otherwise specified. With respect to the Terminal and CLF, the UICC simulator shall act as a valid UICC according to ETSI TS 102 613 [1], ETSI TS 102 221 [2], and ETSI TS 102 600 [3] (if this interfac...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.1 Measurement/setting uncertainties
The following accuracy applies for measurement and setting of electrical parameter for the test equipment. Table 4.3 a): Measurement accuracy Parameter Tolerance Remark VCC ±50 mV VOH, VOL ±15 mV T ±25 ns tr, tf ±5 ns, if tr/f ≤ 100 ns ±10 ns, if tr/f > 100 ns (see note) TS1_HIGH_V ±20 µs P3 ±100 ns P4 ±1 µs T2, T3 ±10...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2 Default conditions for DUT operation
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.0 General
Unless otherwise specified, the test equipment shall apply the default conditions described in the following clauses during test procedure execution.
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.1 Temperature
Void.
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.2 ETSI TS 102 221 interface contacts (CLK, RST, I/O) and contact VCC
Tables 4.4 and 4.5 give the electrical conditions that shall be applied by the UICC simulator to all contacts during a test if not stated otherwise. Table 4.4: Nominal test conditions on 3 V UICC-Terminal interface Contacts Low level High level Max. capacitive load C1 (VCC) --- I = 7.5 mA C2 (RST) I = -200 µA I = +20 µ...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.3 ETSI TS 102 600 interface contacts (IC_DP, IC_DM)
Void.
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.4 ETSI TS 102 613 interface contact (SWIO)
When activated, the UICC simulator shall maintain the characteristics on this contact in following range: • S2 signal levels applied: - State H between 650 µA and 950 µA. - State L between 0 µA and 15 µA. Following each resume by the UICC simulator, the test equipment shall use the following S2 bit pattern: "R | 1 | W ...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.5 Status of UICC interfaces
The UICC simulator shall not attach on the ETSI TS 102 600 [3] interface. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 28 Release 15
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.6 Characteristics of LLC's
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.6.1 ACT LLC
ACT_SYNC frames sent by the UICC simulator during initial interface activation shall contain an ACT_INFORMATION field, as specified in ETSI TS 102 613 [1]. This field shall indicate that extended bit durations are not supported unless otherwise specified within the test case. ACT_READY frames sent by the UICC simulator...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.6.2 SHDLC LLC
For SHDLC link establishment, the UICC simulator shall send RSET(). I-frames sent by the UICC simulator shall contain at least 1 byte and shall contain valid messages according to the context of the upper layer, i.e. the contents of the I-frames shall not provoke error conditions in the upper layer of the DUT. If the u...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.2.6.3 CLT LLC
For test cases involving CLT communication for Type A, a value of SAK of '28' shall be used during upper layer (for example HCI) initialization. The following convention applies: For ISO/IEC 14443-3 [5] communication, the number of RF bytes in the test cases include the CRC, but not the framing and parity bits (i.e. wh...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.3 Minimum/maximum conditions for DUT operation
Void.
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.4 Execution requirements
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.4.0 Overview
Table 4.2 a), Applicability of tests, specifies Trigger Requirement (TRn) for several test cases, to trigger the DUT to perform a particular operation in order to test a certain feature, since the core specification (ETSI TS 102 613 [1]) does not provide a standardized mechanism to trigger that operation.
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.4.1 Definition of TR1
The choice of the implementation for this trigger requirement is left up to the test tool provider. However, as a guideline, it is expected that the implementation only relies on the 2 interfaces available (SWP/HCI and RF) such that the test tool can have a full control of the mechanism and does not require any user ac...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.4.4.2 Definition of TR2
If the terminal supports HCI-based Card Emulation for technology A or B, a Proximity Coupling Device (PCD, ISO/IEC 14443-4 [6] compliant) shall be used to perform the trigger requirement TR2 for test execution with one of the supported RF technologies. The test procedure shall be performed from ISO/IEC 14443-3 [5] ACTI...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.5 Test execution
b020d11ac2390e683574d6f0493057fa
102 694-1
4.5.1 Parameter variations
Unless otherwise specified, all tests shall be carried out once for each voltage class and power mode available in the terminal in addition to the parameter variations specified individually for each test case.
b020d11ac2390e683574d6f0493057fa
102 694-1
4.5.2 Execution requirements
Table 4.2 a), Applicability of tests, specifies "execution requirements" for several test cases. An example of test requirements is: • The test case requires the DUT to perform a particular operation in order to test that feature, but the core specification (ETSI TS 102 613 [1]) does not provide a standardized mechanis...
b020d11ac2390e683574d6f0493057fa
102 694-1
4.6 Pass criterion
A test shall only be considered as successful if the test procedure was carried out successfully under all parameter variations with the DUT respecting all conformance requirements referenced in the test procedure. NOTE: Within the test procedures, the RQs are referenced in the step where they are observable. In some c...
b020d11ac2390e683574d6f0493057fa
102 694-1
5 Test cases
b020d11ac2390e683574d6f0493057fa
102 694-1
5.1 Principle of the Single Wire Protocol
Reference: ETSI TS 102 613 [1], clause 4. There are no conformance requirements for the terminal for the referenced clause.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2 System architecture
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2.1 General overview
Reference: ETSI TS 102 613 [1], clause 5.1. There are no conformance requirements for the terminal for the referenced clause. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 31 Release 15
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2.2 ETSI TS 102 221 support
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2.2.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 5.2. RQ1 A terminal supporting SWP shall remain compliant with ETSI TS 102 221 [2]. NOTE: The validation of RQ1 is out of scope of the present document. Compliancy to RQ1 can be verified by running testcases described in other related test specifications.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2.3 Configurations
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2.3.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 5.3. RQ1 The terminal shall indicate the support of SWP interface in the terminal capability as defined in ETSI TS 102 221 [2]. RQ2 If the SWP interface is activated while a session on ETSI TS 102 600 [3] interface is in progress, actions on the SWP interface shall not disturb the...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2.4 Interaction with other interfaces
b020d11ac2390e683574d6f0493057fa
102 694-1
5.2.4.1 Conformance requirements
Reference: : ETSI TS 102 613 [1], clause 5.4. RQ1 Signaling on a contact assigned to one interface shall not affect the state of other contacts assigned to another interface. This also applies to the activation sequence of the UICC. RQ2 Operation of the SWP interface after activation shall be independent from operation...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3 Physical characteristics
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.1 Temperature range for card operations
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.1.1 Conformance requirements
Reference: : ETSI TS 102 613 [1], clause 6.1. There are no conformance requirements for the terminal for the referenced clause. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 32 Release 15
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2 Contacts
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.1 Provision of contacts
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.1.1 Conformance requirements
Reference: : ETSI TS 102 613 [1], clause 6.2.1. All conformance requirements for the referenced clause are included in clause 5.3.2.2 of the present document.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.2 Contact activation and deactivation
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.2.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 6.2.1. RQ101 The terminal shall reuse the VCC (contact C1) and Gnd (contact C5) provided in the UICC to provide power supply. RQ102 The terminal shall use SWIO (contact C6) for data exchange (i.e. SWP) between UICC and the CLF. Reference: ETSI TS 102 613 [1], clause 6.2.3.1, RQ6 a...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.2.2 Test case 1: activation of SWP additionally to other interfaces
5.3.2.2.2.1 Test execution The test procedure shall only be executed in voltage class B, if available, and voltage class C, full power mode, if available. The test procedure shall be performed with the following parameters: • The UICC indicating the support of the ETSI TS 102 600 [3] interface in the ATR, if sent. • Th...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.2.3 Test case 2: activation of SWP in low power mode
5.3.2.2.3.1 Test execution The test procedure shall only be performed for voltage class C, low power mode. 5.3.2.2.3.2 Initial conditions • None of the UICC contacts is activated. 5.3.2.2.3.3 Test procedure Step Direction Description RQ 1 User T Trigger the terminal to activate contact VCC and SWIO 2 T  UICC Activate...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3 Interface activation
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 6.2.3 (from clause 6.2.3.1 to 6.2.3.4). The following conformance requirements apply to initial interface activation as specified in ETSI TS 102 613 [1], clause 6.2.3.1. The conformance requirements also apply to subsequent interface activation, as specified in RQ13. RQ1 In case t...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3.2 Test case 1: SWP initial activation in full power mode - normal procedure
5.3.2.3.2.1 Test execution The test procedure shall only be executed in voltage class B, if available, and voltage class C, full power mode, if available. The test procedure shall be performed with variation in the parameters TS2_ACT_RES_V and TS2_ACT_FRP, in following values and combinations: • TS2_ACT_RES_V between 1...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3.3 Test case 2: SWP Initial activation - no resume
This test case is FFS. 5.3.2.3.4 Test case 3: SWP initial activation in full power mode - corrupted ACT_SYNC frame (repeat the last frame) 5.3.2.3.4.1 Test execution The test procedure shall only be executed in voltage class B, if available, and voltage class C, full power mode, if available. ETSI ETSI TS 102 694-1 V15...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3.12 Test case 11: SWP initial activation in low power mode
5.3.2.3.12.1 Test execution The test procedure shall be performed only for voltage class C, low power mode. 5.3.2.3.12.2 Initial conditions • None of the UICC contacts is activated. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 42 Release 15 5.3.2.3.12.3 Test procedure Step Direction Description RQ 1 User  T Trigger the te...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3.17 Test case 16: SWP subsequent activation in full power mode
5.3.2.3.17.1 Test execution The test procedure shall only be executed in voltage class B, if available, and voltage class C, full power mode, if available. The test procedure shall be executed once for each of following parameters: • TS2_ACT_RES_D between 10 µs and 50 µs. • TS2_ACT_RES_D between 400 µs and 500 µs. 5.3....
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.3.18 Void
5.3.2.3.19 Test case 18: SWP initial activation in full power mode - send ACT frames in wrong order, ACT_READY frame after activation (repeat the last frame) 5.3.2.3.19.1 Test execution The test procedure shall only be executed in voltage class B, if available, and voltage class C, full power mode, if available. 5.3.2....
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.4 Behaviour of a UICC in a terminal not supporting SWP
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.4.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 6.2.4. There are no conformance requirements for the terminal for the referenced clause. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 46 Release 15
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.5 Behaviour of terminal connected to a UICC not supporting SWP
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.5.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 6.2.5. All conformance requirements for the referenced clause are included in clause 5.3.2.3 of the present document.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.5.2 Void
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.6 Inactive contacts
b020d11ac2390e683574d6f0493057fa
102 694-1
5.3.2.6.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 6.2.6. RQ1 The conditions for inactive contacts as defined in ETSI TS 102 221 [2] shall apply to contact C6. NOTE: There is no explicit test case for RQ1 in the present document (fully covered by other test cases).
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4 Electrical characteristics
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1 Operating conditions
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.1 Voltage and current definitions
Reference: ETSI TS 102 613 [1], clause 7.1.0. There are no conformance requirements for the terminal for the referenced clause.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.2 Supply voltage classes
Reference: ETSI TS 102 613 [1], clause 7.1.1. There are no conformance requirements for the terminal for the referenced clause.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.3 VCC (C1) low power mode definition
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.3.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 7.1.2. RQ1 A terminal shall provide a supply voltage VCC in the range 1,62 V to 1,98 V. RQ2 A terminal shall maintain VCC in the specified range despite transient power consumption (spikes on ICC) of maximum 6 nAs. The maximum duration of these spikes shall be 400 ns and their max...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.3.2 Test case 1: current provided in low power mode, no spikes
5.4.1.3.2.1 Test execution The test procedure shall only be executed in voltage class C, low power mode. The test procedure shall apply for the following parameters: • UICC's current consumption is 5 mA (after activation of contact VCC). • UICC's current consumption is 0 mA (after activation of contact VCC). 5.4.1.3.2....
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.3.3 Test case 2: current provided in low power mode, with spikes
5.4.1.3.3.1 Test execution The test procedure shall only be executed in voltage class C, low power mode. The test procedure shall apply for the following parameters: • After activation of contact VCC, the UICC's current consumption shall be varied with following spike profiles: - random spikes:  current amplitude 10 m...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.4 Signal S1
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.4.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 7.1.3. RQ1 In voltage class B, the terminal output voltage on SWIO with S1 in state H (VOH) shall be in the range of 1,40 V to 1,98 V (see note 1). This range shall be maintained for currents between 0 µA and 1 000 µA. RQ2 In voltage class B, the terminal output voltage on SWIO wi...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.4.2 Test case 1: communication with S2 variation in full power mode
5.4.1.4.2.1 Test execution The test procedure shall only be executed in voltage class C and voltage class B if available in full power mode. The test procedure shall be executed once for each of following parameters: • Load current for S1 in state H, S2 signal: State L 0 µA/state H 1 000 µA. • Load current for S1 in st...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.4.3 Test case 2: communication with S2 variation in low power mode
5.4.1.4.3.1 Test execution The test procedure shall only be executed in voltage class C, low power mode. The test procedure shall be executed once for each of following parameters: • Load current for S1 in state H, S2 signal: State L 0 µA/state H 1 000 µA. • Load current for S1 in state L: -20 µA. 5.4.1.4.3.2 Initial c...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.5 Signal S2
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.5.1 Definition
Reference: ETSI TS 102 613 [1], clause 7.1.4.0. There are no conformance requirements for the terminal for the referenced clause.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.4.1.5.2 Operating current for S2
5.4.1.5.2.1 Conformance requirements Reference: ETSI TS 102 613 [1], clause 7.1.4.1. RQ1 In voltage class B and with S1 in the range between 1,13 V and 2,28 V, the terminal shall consider state H when the UICC draws a current between 600 µA and 1 000 µA RQ2 In voltage class B and with S1 in the range between 1,13 V and...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5 Physical transmission layer
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1 S1 Bit coding and sampling time
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 8.1; additional clause 3.1 for RQ12. RQ1 When sending a bit on S1 with the logical value 0 and the bit duration T, the terminal shall apply a leading rising edge to state H, maintain S1 in state high for a time TH0 with the minimum of 0,20 x T and the maximum of 0,30 x T, then app...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.2 Test case 1: S1 waveforms, default bit duration
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.2.1 Test execution
The test procedure shall be executed for the following parameters: • S2 signal, IH = 1 000 µA, S2 signal, IL = 0 µA. In case the terminal provides means to be configured for certain bit rate ranges on S1 (and this information is provided by the DUT manufacturer), the test procedure shall be performed with variation to ...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.2.2 Initial conditions
• None of the UICC contacts is activated.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.2.3 Test procedure
Step Direction Description RQ 1 User  T Trigger the terminal to activate VCC (contact C1) and SWIO (contact C6), and SWP interface activation in the requested power mode 2 T  UICC Activate VCC (contact C1) 3 T  UICC Activate SWIO (contact C6) (see note) RQ10 4 UICC T Resume SWP 5 T  UICC Send transition sequence R...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.3 Test case 2: S1 waveforms, extended bit durations
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.3.1 Test execution
The test procedure shall be executed once for each of the following parameters: • S2 signal, IH = 1 000 µA, S2 signal, IL = 0 µA. In case the terminal provides means to be configured for certain bit rate ranges on S1 (and this information is provided by the DUT manufacturer), the test procedure shall be performed with ...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.3.2 Initial conditions
• None of the UICC contacts is activated. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 54 Release 15
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.1.3.3 Test procedure
Step Direction Description RQ 1 User  T Trigger the terminal to activate VCC (contact C1) and SWIO (contact C6), and SWP interface activation in the requested power mode 2 T  UICC Activate VCC (contact C1) 3 T  UICC Activate SWIO (contact C6) (see note) RQ10 4 UICC T Resume SWP 5 T  UICC Send transition sequence R...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.2 S2 switching management
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.2.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 8.2. There are no conformance requirements for the terminal for the referenced clause.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3 SWP interface states management
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3.1 Conformance requirements
Reference: ETSI TS 102 613 [1], clause 8.3.1. RQ1 For a transition from SWP SUSPENDED state to SWP DEACTIVATED state, the terminal shall maintain S1 in state L for at least P4 = 100 µs. RQ2 For a transition from SWP ACTIVATED state to SWP SUSPENDED state, the terminal shall issue at least P1 = 7 idle bits on S1. If the...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3.2 Test case 1: SWP states and transitions, communication
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3.2.1 Test execution
There are no test case-specific parameters for this test case. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 56 Release 15
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3.2.2 Initial conditions
• None of the UICC contacts is activated.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3.2.3 Test procedure
Step Direction Description RQ 1 User  T Trigger the terminal to activate VCC (contact C1) and SWIO (contact C6), and SWP interface activation in the requested power mode. 2 T  UICC Activate VCC (contact C1). 3 T  UICC Activate SWIO (contact C6) (see note). 4 UICC T Resume SWP. 5 T  UICC Send transition sequence. R...
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3.3.1 Test execution
The test procedure shall only be executed in voltage class B and voltage class C, full power mode. The test procedure shall be executed once for each of following parameters: • There are no test case-specific parameters for this test case.
b020d11ac2390e683574d6f0493057fa
102 694-1
5.5.3.3.2 Initial Conditions
• SHDLC link is established. • SHDLC link is idle, i.e. no further communication is expected. ETSI ETSI TS 102 694-1 V15.1.0 (2023-08) 57 Release 15